WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the
Governor in April 2017, in order to address the significant multi -modal transportation
funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure that the residents of our City are aware of the projects proposed for funding in our
community, and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive
fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA),
created by SB 1, which must include a description and the location of each proposed
project, a proposed schedule for the project's completion, and the estimated useful life of
the improvement; and
WHEREAS, the City, will receive an estimated $893,168 in RMRA funding in Fiscal
Year 2021-22 from SB 1; and
WHEREAS, this is the fifth year in which the City is receiving SB 1 funding which
may enable the City to continue essential road maintenance and rehabilitation projects,
safety improvements, and increasing access and mobility options for the traveling public
that would not have otherwise been possible without SB 1; and
WHEREAS, the SB 1 project list and overall investment in our local streets and
roads infrastructure with a focus on basic maintenance and safety, investing in complete
streets infrastructure, and using cutting -edge technology, materials and practices, will
have significant positive co -benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by
the City Council of the City of Palm Desert, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The fiscal year 2021-22 list of projects planned to be funded with Road
Maintenance and Rehabilitation Account revenues includes:
Cook Street Resurfacing Proiect - Phase 2
• Location: Cook Street from Frank Sinatra Drive to Merle Drive.
RESOLUTION NO. 2021-24
• Description: The asphalt will milled down two inches and capped with
rubberized asphalt concrete.
• Estimated useful life: 25 years
• Anticipated construction date: 2nd Quarter 2022
3. The following previously proposed and adopted projects may also utilize Fiscal
Year 2021-22 Road Maintenance and Rehabilitation Account revenues in their
delivery. With the relisting of these projects in the adopted fiscal year resolution,
the City is reaffirming the public and the State our intent to fund these projects
with Road Maintenance and Rehabilitation Account revenues:
Citywide Pavement Condition Evaluation
• Location: Citywide
• Description: Contract with a consultant to perform a pavement condition
survey, assessment, and inventory services on the entire City street network.
• Estimated useful life: The information in the report will be accurate for a
period of three to five years, but will be updated regularly to maintain accurate
data.
• Anticipated completion date: 1st Quarter 2022
PASSED, APPROVED, AND ADOPTED on this 27th day of May 2021 by the
following vote, to wit:
AYES: HARNIK, JONATHAN, NESTANDE, QUINTANILLA, and KELLY
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
KATH LE KELLY;-MAYOF,(
ATTEST:
l
M. GLO I SANCHE ING CITY CLERK
CITY O ALM DES RT ALIFORNIA