Loading...
HomeMy WebLinkAbout75519 HOVELY LANE EAST (CVWD) (2)IT IS A REDUCED PRINT. SCALE IS REDUCED ACCORDINGLY - ..nl I I CI' uuvICINJIUIVJ JrIHLL I Hnt VKtrtKtNCt OVt}z SCALED. IF SHEET IS LESS THAN 305x4 LU I 2X ROOTBALL / DIAMETER 4" PVC SCH 40 PERF. PIPE WRAPPED IN FILTER SOCK. (1 PER TREE) (6) TREE TIES (SEE SPECS) S ET TOP OF ROOTBALL 1' ABOVE FINISH GRADE 3' LAYER MULCH MATERIAL, P ROVIDE 3 CLEARANCE FROM TRUNK (SEE SPECS) 6" HIGH WATERING BERM FINISH GRADE PROJECT APPLICATION RESIDENTIAL COMMERCIAL HOA CSA LMD/CFD ■ J J = co H F- O- o w O 0 IY OvvyVVVO vVVVVVyyrnavy DRAIN PIPE an 1 SCALE 1,Y = 0 (2) 2" DIAMETER STAKES, USE 3" DIA. STAKES IN HIGH WIND EXPOSURE AREAS (SEE SPECS) P LANTING BACKFILL (SEE SPECS) S LOPE PLANTING HOLE TO CORNER(S) WITH DRAIN PIPE BLACK ROUND DRAIN GRATE CAP, MAX. 1" ABOVE MULCH FINISH SURFACE (SEE SPECS) 1 CU FT. OF 3/4" DIAMETER CRUSHED ROCK FOR 15 GAL. AND 24" BOX (2 CU FT. FOR 36' BOX) N OTE STAKE TREE PERPENDICULAR TO DIRECTION OF PREVAILING WIND. TREE ON LEVEL GRADE 15 GALLON TO 35" BOX I SCALE: 1/4"=1'-0" I P-SERIES • vy o vIVVy vOrVyvvvOnvy ..•I y9y0Ovv9Vvy I 2 X ROOTBALL DIAMETER SET TOP OF ROOTBALL 1" ABOVE FINISH GRADE 3" LAYER MULCH MATERIAL (SEE SPECS) 3" HIGH WATERING BERM I STD. P-001 envoy OVvy FINISH GRADE PLANTING BACKFILL (SEE SPECS) SLOPE PLANTING HOLE TO CORNERS PROJECT APPLICATION ■ RESIDENTIAL SHRUB ON LEVEL GRADE ■ COMMERCIAL ■ HOA ■ CSA ■ LMD/CFD SCALE: 1"=1'-0" I P-SERIES I STD. P-015 11 IIII 2X ROOTBALL DIAMETER 4" PVC SCH 40 PERF. P PE WRAPPED IN FILTER SOCK. (1 PER TREE) TREE TIES (SEE SPECS) SET TOP OF ROOTBALL 1' ABOVE FINISH GRADE 3' LAYER MULCH MATERIAL, PROVIDE 3' CLEARANCE FROM TRUNK (SEE SPECS) 6" HIGH WATERING BERM FINISH GRADE PROJECT APPLICATION RESIDENTIAL COMMERCIAL HOA CSA LMD/CFD 1, 692,1,0 SCALE 1,2 = 1'-0' 0 (3) 2" DIAMETER STAKES SPACED EQUIDISTANT AROUND ROOTBALL, U SE 3' DIA STAKES IN HIGH WIND EXPOSURE AREAS (SEE SPECS) P LANTING BACKFILL (SEE SPECS) S LOPE PLANTING HOLE TO CORNER(S) WITH DRAIN PIPE BLACK ROUND DRAIN GRATE CAP, MAX. 1" ABOVE MULCH FINISH SURFACE (SEE SPECS) 1 CU FT. OF 3/4" DIAMETER CRUSHED ROCK FOR 15 GAL AND 24" BOX (2 CU FT. FOR 36' BOX) N OTE STAKE TREE PERPENDICULAR TO DIRECTION OF PREVAILING WIND. MULTI -STEM TREE ON LEVEL GRADE 15 GALLON TO 36" BOX I SCALE: 1/4"=1'-0' I P-SERIES I STD. P-003 2 X ROOTBALL DIAMETER 3" HIGH WATERING BERM O N DOWN HILL SIDE ORIGINAL GRADE S ET TOP OF ROOTBALL 1' ABOVE FINISH GRADE PROJECT APPLICATION ■ RESIDENTIAL ■ COMMERCIAL ■ HOA ■ CSA ■ LMD/CFD FINISH GRADE PLANTING BACKFILL (SEE SPECS) SLOPE PLANTING HOLE TO CORNERS SHRUB ON SLOPE I SCALE: 1"=1'-0" I P-SERIES I STD. P-016 \ J = CO a o w O 0 •CV DRAIN PIPE SCALE 1/ IIl Ill II11-1 2X ROOTBALL DIAMETER 4" PVC SCH 40 PERF. PIPE WRAPPED IN FILTER SOCK. (1 PER TREE) SET TOP OF ROOTBALL 1 ABOVE FINISH GRADE 3 LAYER DECOMPOSED GRANITE PROVIDE 3' CLEARANCE FROM TRUNK (SEE SPECS) FINISH GRADE 6' HIGH WATERING BERM PROJECT APPLICATION ■ RESIDENTIAL ■ COMMERCIAL ■ HOA ■ CSA ■ LMD/CFD 1'-0' SAND BACKFILL MIX (SEE SPECS) SLOPE PLANTING HOLE TO CORNERS WITH DRAIN PIPE BLACK ROUND DRAIN GRATE CAP MAX. 1" ABOVE D.G. FINISH SURFACE (SEE SPECS) 1 CU FT. OF 3/4' DIAMETER CRUSHED ROCK, (SEE SPECS) PALM UP TO 15' BTH I SCALE: 1 '=1'-0" I P-SERIES ! STD. P-011 s Vas .-II!I-II ��I 1)_41`, II II I_ I 1I �� �I_ R� I ► -I i I -I r -1 -1 I-1 I-1-1 CONCRETE SIDEWALK PER HARDSCAPE DRAWINGS DOUBLE LAYER COBBLE AGAINST CURB FINISH GRADE 3" BELOW TOP OF SIDEWALK COBBLE (SEE PLANTING LEGEND) COMPACTED SUBGRADE MAX 4:1 SLOPE PROJECT APPLICATION I RESIDENTIAL COMMERCIAL HOA CSA LMD/CFD COBBLE INSTALLATION DETAIL I SCALE: N.T.S. I P-SERIES I STD. P-017 • P LAN S CALE: 1 /4"=1'0" r SECTION SCALE: 3/4"=1'0" po I Pt s :, HARDSCAPE ROOT BARRIER (SEE SPECS) TRENCH FOR ROOT BARRIER ALONG EDGE OF HARDSCAPE MAY BE SAME AS IRRIGATION TRENCH WHERE APPLICABLE. (BACKFILL SAME AS ADJACENT MATERIAL) PROJECT APPLICATION RESIDENTIAL COMMERCIAL HOA CSA LMD/CFD ■ I' SET TOP OF ROOT BARRIER 1' BELOW FINISH GRADE TREE PLANTING PER PLANS AND DETAILS NOTE: ROOT BARRIER IS REQUIRED WHERE TREE IS 6'-0' OR LESS FROM EDGE OF HARDSCAPE ROOT BARRIER UP TO 15 BTH I SCALE VARIES I P-SERIES FINISH GRADE BOULDER LOCATION AND SIZE PER PLAN I STD. P-013 2/3 THICKNESS OF BOULDER 1/3 THICKNESS OF BOULDER UNDISTURBED SOIL/AMENDED SOIL NOTE: 1. BOULDER SIZE AND TYPE SHALL BE APPROVED PRIOR TO PURCHASE OF MATERIAL 2. ALL BOULDER LOCATIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT PROJECT APPLICATION ■ RESIDENTIAL ■ COMMERCIAL ■ HOA ■ CSA ■ LMD/CFD BOULDER PLACEMENT I SCALE. 1"=1'-0" I P-SERIES I STD. P-021 NOTE: No permanent structures or trees within CVWD and/or USBR easements. CVWD will not be responsible for damage or replacement of any surface improvements, including but not limited to, decorative concrete, landscaping, curb, gutter, sidewalks, planters, gates and related improvements installed within CVWD and/or USBR easements. IIInh-7 Date These plans have been reviewed by the Coachella Valley Water District in accordance with California Government Code, Section 65591 et seq. requiring efficient landscape and irrigation design in cooperation with the local governing agency (City or County) Approval of this drawing by CVWD staff does not constitute approval to encroach into district and USBR right-of-way. Trees, plants, walls and permanent structures of any kind may not be planted or installed in CVWD and USER easements or Right -of -Way without first obtaining an encroachment permit for CVWD. CVWD Plan # L44450 Lei naggem nt Department �evement Servi = I aartment FERGUSON PAPE BALDWIN ARCH ITEM 4499 Ruffin Road S uite 300 S an Diego CA 921 619 231 0751 www.fpbarch.com LANDSCAPE ARCHITECTS 462 Stevens AvenuE Suite 107 San Diego CA 920; 619 294 8484 www.vdla.us a) co co co V 0 U I Initial CVWD APPROVAL _ Date Description No. I 80% CONSTRUCTION DOC PLAN CHECK SUBMITTAL 90% CONSTRUCTION DOC ISSUED FOR BID A 9/1 B 1L FPBA PROJECT NO. 15066 PLANTING DETAILS 0 CC 0 C W U W CC CO U z o_ 1.2 co 0 LLI w U a co N X en C Cl) <n cn F— co Ul ci W U <n LU O 0 W w U. W W Q co 2 0 U) W 2 0 k U U = it a z ❑ w a a z 0 CO Ui W LL z W Ui W w Q CO 0- LLI 0 w H 0 Z a z 0 W W CO 00 z J Q x <n a ti rn U IL x U C 0 ct a 0 CO CC w U. 0 I 0 U z Q at 0 CC a w W C CO Z 0 a U LL W N ❑ z a w w EXISTING VEHICULAR GATE TO REMAIN AND BE PROTECTED IN PLACE 3.3 SHB __,16,0' THE EXISTING IRRIGATION CONTROL WIRE SPLICE BOX TO REMAIN ,AND BE PROTECTED IN PLACE EXISTING IRRIGATION 'CONTROL VALVES TO BE. REMOVED. � I N N- Ll I EXISTING PARKING LOT crl i tl EXISTING LANDSCAPE AND/ \ IRRIGATION TO REMAINAND \BE PROTECTED IN PLACE I PROPOSED CRITICAL SUPPORT SERVICES BUILDIN3 .__ • 3/4" //////////////////i!//////////////////// /%T/////i 3/4 Z1 \ EXISTING I NDSCAPE AND IRRIGATION TO REMAIN. EXISTING OPERATIONS BUILDING // XISTING PARKING LOT / IRRIGATION SYSTEM NOTE THE PLANTS WILL BE IRRIGATED USING A POINT SOURCE DRIP SYSTEM, ZONED FOR THE WATER USE AND EXPOSURE OF EACH TYPE OF PLANT THE TREES WILL BE IRRIGATED USING BUBBLERS ON RISERS. THE ENTIRE IRRIGATION SYSTEM WILL BE CONTROLLED WITH AN EXISTING SMART CONTROLLER THAT CALCULATES RUN TIMES BASED ON EVAPO-TRANSPORATION. PARKING LOT IRRIGATION ALL IRRIGATION WITHIN THE PARKING LOT IS EXISTING TO REMAIN NO NEW PARKING WILL BE ADDED FOR THIS BUILDING. CROSS CONNECTION TEST • • THE CONTRACTOR MUST COORDINATE ALL CROSS CONNECTION TESTS TO BE PERFORMED BY CVWD WITH THE CVWD INSPECTOR PRIOR TO CONSTRUCTION. CITY OF PALM DESERT DEPARTMENT OF COMMUNITY DEVELOPMENT APPROVED BY ❑ C.0 RES. NO tV STAFF LETTER ❑ P.C. RES. ❑ARC ACTION �QRM� BY ' 17 �� ate CONSTRUCTION SHALL COMMENCE WITHIN ONE YEAR OF THE APPROVAL 0 5' 10' 20' 30' 40' FERGLISOI PAPE BALDW I N ARCH ITEC 4499 Ruffin Road S uite 300 S an Diego CA 9 619 231 0751 www.fpbarch.con phillip� Signature Renewal Date:1113012019 Dale OF CALF �i LANDSCAPE ARCHITECTS 462 Stevens Av1 S uite 107 S an Diego CA 619 294 8484 www.vdla.us NOTE: No permanent structures or trees within CVWD and/or USBR easements. CVWD will not be responsible for damage or replacement of any surface improvements, including but not limited to, decorative concrete, landscaping, curb, gutter, sidewalks, planters, gates and related improvements installed within CVWD and/or USBR easements. These plans have been reviewed by the Coachella Valley Water District in accordance with California Government Code, Section 65591 et seq. requiring efficient landscape and irrigation design in cooperation with the local governing agency (City or County) Approval of this drawing by CVWD staff does not constitute approval to encroach into district and USBR right-of-way. Trees, plants, walls and permanent structures of any kind may not be planted or installed in CVWD and USBR easements or Right -of -Way without first obtaining an encroachment permit for CVWD. III%1II1 Date CVWD Plan # L44444 Water agementDepartm evelopment Se s e epartment — / vt 0 a. co t) fm � V .O mt N CL W 0 E at CL v+ CVWD APE Initial Description 100% DESIGN DEVELOPMENT 80% CONSTRUCTION 5 PLAN CHECK SUBMITT/ 90% CONSTRUCTION D ISSUED FOR BID I II I FPBA PROJECT NO IRRIGATII PLAN THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF FERGUSON PAPE BALDWIN ARCHITECTS INC. AND SHALL NOT BE USED ON ANY OTHER WORK EXCEPT BY AGREEMENT WITH FERGUSON PAPE BALDWIN ARCHITECTS INC - WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED. IF SHEET IS LESS THAN 30"x42" IT IS A REDUCED PRINT, SCALE IS REDUCED ACCORDINGLY. GENERAL IRRIGATION NOTES 1. THESE PLANS WERE PREPARED USING BASE INFORMATION PREPARED BY SWS ENGINEERING AND FPBA ARCHITECTS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE ACCURACY OF THIS BASE COMPARED TO ACTUAL FIELD CONDITIONS PRIOR TO ORDERING MATERIALS AND/OR BEGINNING WORK AND IMMEDIATELY NOTIFYING THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. IN THE EVENT THAT THE CONTRACTOR FAILS TO VERIFY THE ACCURACY OF THE BASE INFORMATION AND/OR FAILS TO IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT OF DISCREPANCIES PRIOR TO ORDERING MATERIALS AND/OR BEGINNING WORK, THEN THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR ANY AND ALL ADDITIONAL LABOR AND MATERIALS AS DIRECTED BY THE LANDSCAPE ARCHITECT TO RESOLVE SUCH DISCREPANCIES AT NO ADDITIONAL COST TO THE OWNER. 2. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY AND ALL DAMAGES WHICH OCCUR DUE TO THE CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES, AT NO ADDITIONAL COST TO THE OWNER. 3. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR REPLACING ALL EQUIPMENT AND/OR MATERIALS OUTSIDE OF THE LIMIT OF WORK WHICH ARE DAMAGED DURING CONSTRUCTION, WITH MATERIALS IN -KIND, AT NO ADDITIONAL COST TO THE OWNER 4. REFER TO THE IRRIGATION DETAILS, LEGEND AND SPECIFICATIONS FOR PRODUCT INSTALLATION AND EXECUTION PROCEDURES. 5. SYSTEM FLOW VELOCITIES SHALL NOT EXCEED 5 FEET PER SECOND. IN THE EVENT THAT IRRIGATION ZONES ARE ALTERED DURING CONSTRUCTION, THE CONTRACTOR ASSUMES THE RESPONSIBILITY OF SIZING THE LATERAL LINES ACCORDINGLY, AT NO ADDITIONAL COST TO THE OWNER. 6. PRIOR TO REQUESTING A WALK THROUGH FOR SUBSTANTIAL COMPLETION, ALL REQUIREMENTS IN THE CONSTRUCTION NOTES AND SPECIFICATIONS SHALL BE COMPLETED BY THE CONTRACTOR. REFER TO SPECIFICATIONS FOR QUALITY CONTROL MEASURES 7. DURING THE FINAL WALK THROUGH OF CONSTRUCTION IF IT IS FOUND THAT THE EMITTER ASSEMBLY SPACING WAS NOT COMPLETED PER PLAN AND/OR THE MANUFACTURER'S RECOMMENDATIONS THEN THE CONTRACTOR SHALL ADD ADDITIONAL EMITTER ASSEMBLIES, RELOCATE EMITTER ASSEMBLIES OR CHANGE EMITTERS AS DIRECTED BY THE LANDSCAPE ARCHITECT AT NO ADDITIONAL COST TO THE OWNER. 8. COORDINATE IRRIGATION SLEEVING PRIOR TO THE BEGINNING OF HARDSCAPE INSTALLATION. INSTALL ALL PRESSURE SUPPLY LINE, LATERAL LINE AND IRRIGATION HEADS/EMITTERS AFTER SIDEWALK, CURB AND GUTTER INSTALLATION IS COMPLETE. 9. INSTALL ALL IRRIGATION AS PER IRRIGATION SPECIFICATIONS, DETAILS AND AS SPECIFIED ON LEGEND. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FLUSHING NON PRESSURE LATERAL LINES PRIOR TO INSTALLATION OF EMITTERS AND BUBBLERS, AND FOR FLUSHING ONCE AGAIN ONCE THE EMITTERS AND BUBBLERS HAVE BEEN INSTALLED. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REPLACING ALL PLANT MATERIAL LOST DUE TO CLOGGED NON PRESSURE LATERAL LINES OR CLOGGED EMITTERS/BUBBLERS DURING THE CONSTRUCTION PERIOD AND FOR THE DURATION OF THE MAINTENANCE PERIOD. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING (1) ONE DRIP EMITTER PER SHRUB FOR ALL SHRUBS ON PLANTING PLANS. DRIP EMITTER ASSEMBLY SHALL BE BUILT FROM DETAIL R-090 AND R-091. 11. PRIOR TO INSTALLATION OF SLEEVING ACROSS ANY HARDSCAPE, CONTRACTOR SHALL FIRST MARK SLEEVING LOCATION AND HAVE IT APPROVED BY THE LANDSCAPE ARCHITECT, CITY AND CVWD INSPECTOR. IF CONTRACTOR FAILS TO HAVE SLEEVE LOCATION INSPECTED AND APPROVED THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING ALL SLEEVES AT NO ADDITIONAL COST TO OWNER. 12. ALL WIRE SPLICES, CONNECTIONS SHALL BE SEALED WITH 3M SCOTCH LOCK 3570 CONNECTORS. 13. THE LOCATION OF IRRIGATION LINES AND SYMBOLS ARE DIAGRAMMATIC. ALL IRRIGATION SHALL BE PLACED IN PLANTING AREAS EXCEPT WHEN CROSSING PAVEMENT. 14. ALL IRRIGATION PRESSURE SUPPLY LINE, WIRES AND LATERAL LINES BENEATH HARDSCAPE SHALL BE SLEEVED. 15. CONTRACTOR SHALL BE RESPONSIBLE FOR ADDING SPRING/SWING CHECK VALVES TO EMITTER AND BUBBLER LATERAL LINES AT ALL LOCATIONS WHERE THE ELEVATION CHANGE EXCEEDS 5'. NO LOW HEAD DRAINAGE ALLOWED. IRRIGATION WATER USE CALCULATIONS Riverside County Ordinance 859 Landscape Water Use Calculations CVWD Critical Support Services Project 1 Maximum Annual Water Allowance (MAWA) EToX.45XAreasf X 62/748 INPUT the total square footage of landscape area = INPUT the total square footage of special landscape area INPUT the Hist. ETo for the area =1 75 Landscape MAWA = SLA MAWA = Total MAWA = 2 Estimated Annual Water Use (EAWU) (ETo X PF XArea sf. X.62 / 748) / IE 175.7 Hydrozone # 1 - Shrubs Low INPUT Plant Factor =I 0.2 INPUT square footage of hydrozone = 5,900 INPUT hydrozone irrigation efficiency = 0.9 Drip EAWU = 1 81.5 ICCF / yr Hydrozone # 2 - Shrubs Mod INPUT Plant Factor = INPUT square footage of hydrozone =I 222 INPUT hydrozone irrigation efficiency = 0.9 Drip EAWU = I 7.7 ICCF / yr Hydrozone #3 - Tree/Palm Low INPUT square footage of hydrozone =I 80 INPUT hydrozone irrigation efficiency =I 0.8 Bubbler EAWU = I 1.2 CCF / yr 0.5 INPUT Plant Factor =) 0.2 Hydrozone #4 - Tree Mod INPUT Plant Factor = 0.5 INPUT square footage of hydrozone = 80 INPUT hydrozone irrigation efficiency = 0.8 II Bubbler EAWU =1 3.1 ICCF / yr 6,282 IS.F. 0 S.F. 175.7 CCF / yr 0 CCF / yr CCF / yr I I Total EAWU = 93.5 CCF / yr Input Irrigation System Operation Factory 0.85 I Total EAWU = 110.0 CCF / yr MAWA- EAWU =I 65.7 ICCF l yr (this number must be positive) PERCENTAGE OF WATER SAVED RELATIVE TO MAX ALLOWED = 37% CONSTRUCTION NOTES THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL ELECTRIC CONTROL VALVES SHOWN ON THESE PLANS. VALVES SHALL BE INSTALLED IN APPROXIMATE LOCATION SHOWN. DO NOT INSTALL VALVES IN UTILITY EASEMENTS UNLESS PRIOR APPROVAL HAS BEEN OBTAINED FROM OWNER OR OWNER'S REPRESENTATIVE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LANDSCAPE ARCHITECT IN THE EVENT THAT THERE ARE ANY EXTENUATING CIRCUMSTANCES WHICH WOULD CAUSE ELECTRIC CONTROL VALVES NOT TO BE INSTALLED USING THE AFORE MENTIONED CRITERIA AND/OR THE PLANS. FINAL LOCATION OF ALL ELECTRIC CONTROL VALVES SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT AND CVWD INSPECTOR PRIOR TO INSTALLATION. INSTALL ALL PRESSURE SUPPLY LINE AND ANY EQUIPMENT LOCATED ON THE PRESSURE SUPPLY LINE, INCLUDING BUT NOT LIMITED TO ELECTRIC CONTROL VALVES, DRIP IRRIGATION CONTROL VALVES, BALL VALVES, AND BOXES AFTER FINE GRADING AND HARDSCAPE INSTALLATION HAS BEEN COMPLETED. INSTALL THE PRESSURE SUPPLY LINE IN THE APPROXIMATE LANDSCAPE AREA AS SHOWN. WHERE PRESSURE SUPPLY LINE RUNS ADJACENT TO SIDEWALKS IT SHALL BE INSTALLED AT BACK OF SIDEWALK, WHEN POSSIBLE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LANDSCAPE ARCHITECT, CITY AND CVWD INSPECTOR IN THE EVENT THAT THERE ARE ANY EXTENUATING CIRCUMSTANCES WHICH WOULD CAUSE PRESSURE SUPPLY LINE NOT TO BE INSTALLED USING THE AFORE MENTIONED CRITERIA AND/OR THE PLANS. FINAL LOCATION OF ALL PRESSURE SUPPLY LINE IS TO BE APPROVED BY THE LANDSCAPE ARCHITECT AND CVWD INSPECTOR PRIOR TO TRENCHING. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING EXACT SLEEVE AND CONDUIT LOCATIONS AND FOR ROUTING ALL PRESSURE SUPPLY LINE, WIRING AND LATERAL LINE TO THESE LOCATIONS. FOR SLEEVE SIZES AND INSTALLATION DEPTH ACROSS SIDEWALKS AND ROADWAYS, REFER TO THE IRRIGATION SPECIFICATIONS AND DETAILS. ALL PIPE AND WIRES UNDERNEATH HARDSCAPE SHALL BE SLEEVED. THE CONTRACTOR IS RESPONSIBLE FOR SPLICING AND RUNNING NEW TWO WIRE CONTROL WIRE FROM THE EXISTING SPLICE BOX LOCATION ALONG THE EXISTING MAINLINE TO THE NEW SPLICE BOX LOCATION AND ALL NEW VALVES, GROUNDING THE TWO WIRE SYSTEM AND EACH DECODER PER MANUFACTURER'S SPECIFICATIONS, ALL ELECTRICAL AND IRRIGATION TWO WIRE CONNECTIONS, AND ALL DECODERS AND DECODER CONNECTIONS. ALL WORK SHALL BE DONE PER ALL LOCAL GOVERNING CODES AND REGULATIONS. WIRE SIZES FOR EACH NEW COMPONENT SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO ORDERING MATERIALS. ALL TWO WIRE CONTROL WIRE SHALL BE PAIGE CABLE P-7354-D OR APPROVED EQUAL IN 1 2'CONDUIT. GROUNDING FOR TWO WIRE SYSTEM SHALL BE PER RAINBIRD MINIMUM REQUIREMENTS. CONTRACTOR TO CONTACT RAINBIRD FOR GROUNDING REQUIREMENTS AND INSTALLATION PROCEDURES. IRRIGATION HYDRAULICS HYDRAULIC ANALYSIS FOR CVWD Critical Support Services Project AS OF 11-1-17 **EQUIPMENT: PRESSURE SUPPLY LINE: ELECTRIC CONTROL VALVE: LATERAL LINE: FITTINGS: S UBTOTAL: CLASS: SCH 40 SIZE: LOSS: 2" 0.71 N/A 1" SCH 40 N/A N/A N/A ***ELEVATION: at highest point within point of connection: at meter. SUBTOTAL: **PSI REQUIRED @ HEAD: TOTAL SYSTEM LOSSES: N/A 1.62 1100 LENGTH: ****GPM: PSI LOSS: 15.00 1500 @ 16 10.65 N/A N/A @ 16 2.6 260 @ 16 N/A @ 16 N/A N/A FEET: 200 210 *STATIC WATER PRESSURE: 10% OF STATIC WATER PRESSURE: S TATIC WATER PRESSURE AVAILABLE FOR IRRIGATION USE: S TATIC WATER PRESSURE LESS TOTAL SYSTEM LOSSES: *****BOOSTER PUMP REQUIREMENTS: 4.60 5.00 2.00 22.25 • -4.33 30.00 47.92 75.00 7.50 67.50 19.58 SOURCES: I ! * MANL NE WATER PRESSURE OBTAINED BY CVWD ON 11/1 /17. ** EQUPMENT LOSSES OBTAINED THROUGH VARIOUS IRRIGATION SOURCES. *** ELEVATIONS OBTAINED FROM SWS ENGINEERING IRRIGATION RUN TIMES CVWD Critical Support Services Project ESTIMATED IRRIGATION RUN TIMES (FOR REFERENCE ONLY) SYSTEM RUN TIME WATER DAYS PER WEEK: 6 PLANT MATERIALS AT INITIAL INSTALLATION CVWD Zone 3 (75.00) Eto Average per month Eto Average per day STA. SYSTEM TYPE PLANT TYPE A-1 Bubbler Palm A-2 Bubbler Tree A-3 Drip Shrub A-4 Drip Shrub A-5 Bubbler Tree JAN. 2.25 0.073 FEB. 3.75 0.134 MAR. APR. 5.25 7.5 0.169 0.242 MAY 9 0.290 JUN. 10.5 0.350 JUL. 10.5 0.339 AUG. 8.25 0.266 SEP. 7.5 0.250 OCT. 5.25 0.169 NOV. 3 0.100 DEC. 2.25 0.073 RT/DAY RT/DAY RT/DAYJ RT/DAY RT/DAY IRT/DAY RT/DAY RT/DAY RT/DAY RT/DAYJRT/DAY RTIDAY GPM JAN. FEB. MAR APR MAY JUN. JUL. AUG. SEP. OCT. NOV. 6 2.4 4.4 5.6 7.9 9.5 11.5 11.1 8.7 8.2 5.6 3.3 12 2.4 4.4 5.6 7.9 as 11.5 11.1 8.7 8.2 5.6 3.3 3 7.1 13.0 16.5 23.5 28.2 34.0 32.9 25.9 24.3 16.5 9.7 4 I 7.1 13.0 16.5 23 5 28.2 34.0 32.9 25.9 24.3 16.5 9.7 16 I 3.2 5.9 7.4 I 10.6 12.7 15.3 14.8 11.6 10.9 7.4 4.4 TOTAL MINUTES PER DAY TOTAL HOURS PER DAY ESTABLISHED PLANT MATERIAL STA. SYSTEM TYPE PLANT TYPE V33-2 V33-4 V33-5 V33-7 V33-9 Bubbler Bubbler Drip Drip Bubbler Palm Tree Shrub Shrub Tree 22.05 0.37 40.69 51.45 0.68 0.86 RT/DAY RT/DAY RT/DAY GPM I JAN. FEB. MAR. 6 2.0 3.7 12 2.0 3.7 3 5.6 10.4 4 5.6 10.4 16 2.5 5.1 TOTAL MINUTES PER DAYJJ 17.73 TOTAL HOURS PER DAYIII 0.30 4.6 4.6 13.2 13.2 6.5 33 28 I 42.09 0.55 I 0.70 73.50 1.23 88.21 1.47 RT/DAY RT/DAY APR. MAY 6.6 7.9 6.6 7.9 18.8 22.6 18.8 22.6 9.3 11.1 60.13 1.00 72.15 1.20 106.34 1.77 102.91 1.72 80.86 75.95 51.45 30.38 1.35 1.27 0.86 0.51 DEC. 2.4 2.4 7.1 7.1 3.2 22.05 0.37 RT/DAY RT/DAY RT/DAY RT/DAY RT/DAY RT/DAY RT/DAY JUN. JUL. AUG. SEP. OCT. NOV. DEC. 9.6 9.3 7.3 6.8 4.6 2.7 2.0 9.6 9.3 7.3 6.8 4.6 2.7 2.0 27.2 26.3 20.7 19.4 13.2 7.8 5.6 27.2 26.3 20.7 19.4 13.2 7.8 5.6 13.4 13.0 10.2 9.6 6.5 3.8 2.8 86.98 184.18 1.45 I 1.40 66.14 1.10 62.13 142.09 1.04 0.70 24.85 0.41 18.04 0.30 RECYCLED IRRIGATION LEGEND SYMBOL: MANUF: • RAINBIRD S A e RAINBIRD RAINBIRD RAINBIRD APPROVED NIBCO EXISTING EXISTING APPROVED - APPROVED APPROVED APPROVED APPROVED EXISTING APPROVED MODEL NUMBER; DESCRIPTION: 1404 FLOOD BUBBLER SYMBOL REPRESENTS (2) TWO PER TREE • RAD.: P.S.I.: G.P.M.: DETAIL: • N/A 25 1.0 R-051, R-052 XXX-EFB-CP-PRS-D ELECTRIC CONTROL VALVE WITH RAINBIRD FD SERIES DECODER XXX-EFB-CP-PRS-D DRIP VALVE ASSEMBLY LCRBY100D DRIP FILTER WITH RAINBIRD FD SERIES DECODER SEE SPECS FLUSH VALVE ASSEMBLY T-580-A TO REMAIN TO REMAIN BRASS BALL VALVE (2" AND SMALLER) QUICK COUPLING VALVE PROTECT IN PLACE 2 WIRE SPLICE BOX SEE SPECS NEW 2 WIRE SPLICE BOX PURPLE PVC SCH40 SUB -GRADE NON -PRESSURE LATERAL LINE ALL EMITTERS SHALL BE RAINBIRD XERI-BUG SERIES INSTALLED ON RAINBIRD PFR-FRA24 POLYFLEX RISERS. MINIMUM LATERAL PIPE SIZE 3/4" UNLESS OTHERWISE NOTED. INSTALL (1) ONE RAINBIRD #XB-20PC-1032 (2GPH) FOR EACH MODERATE WATER USE PLANT AND (1) ONE RAINBIRD #XB-10PC-1032 (1GPH) INSTALLED FOR EACH LOW WATER USE PLANT. ALL EMITTERS TO BE INSTALLED WITH WITH PC-DIFF-PPL PURPLE CAP. CUT RISER TO PROPER HEIGHT PER DETAIL ONCE DECOMPOSED GRANITE HAS BEEN INSTALLED. PVC SCH40 PVC SCH40 TO REMAIN PVC SCH40 HYDROZONE DESIGNATION NUMBER STATION NUMBER GALLONS PER MINUTE PLAN MATERIALS INDICATOR CONTROL VALVE SIZE 1 1/2" IRRIGATION CONDUIT SWEEP CONDUIT INTO EVERY OTHER VALVE BOX PER DECODER LOCATIONS. IRRIGATION SLEEVE (SEE SPECS.) (PURPLE PIPE) NON -POTABLE LATERAL LINE (1-1/2" AND SMALLER) MINIMUM 3/4" (PURPLE PIPE) NON -POTABLE PRESSURE SUPPLY LINE PROTECT IN PLACE (PURPLE PIPE) NON -POTABLE PRESSURE SUPPLY LINE 2" AND SMALLER (PURPLE PIPE) PRECIPITATION RATE (INCHES / HOUR) IRRIGATION CONSTRUCTION NOTE WARNING RECYCLED WATER DO NOT DRINK R-041 R-042 R-042 R-092 R-040 G-022 R-090, R-091 G-040, G-041 G-040, G-040, G-041 G-041 G-040, G-041 PLANT MATERIALS INDICATOR LEGEND: INDICATOR DESCRIPTION SHB THE PLM SHRUBS - POINT TO POINT DRIP IRRIGATED TREES - BUBBLER IRRIGATED PALMS BUBBLER IRRIGATED HYDROZONE DESIGNATION CHART: HYDROZONE NUMBER 1 2 3 NOTE WATER IRRIGATION REQUIREMENT METHOD LOW/MOD LOW MEDIUM POINT -TO POINT DRIP BUBBLER BUBBLER PLANT MATERIAL SHRUB TREE/PALM TREE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING PURPLE CHRISTY'S BRAND TAG READING "WARNING RECYCLED WATER DO NOT DRINK -'AVISO AGUA IMPURA NO TOMAR" ON MANUAL ISOLATION VALVES, FLUSH VALVES, AND ELECTRIC CONTROL VALVES. THIS SHALL BE IN ADDITION TO CHRISTY'S TAGS CALLING OUT VALVE STATION NUMBERS. ALL RECYCLED WATER IRRIGATION VALVE BOXES SHALL BE PURPLE IN COLOR NOTE: No permanent structures or trees within CVWD and/or USBR easements. CVWD will not be responsible for damage or replacement of any surface improvements, including but not limited to decorative concrete, landscaping, curb, gutter, sidewalks, planters, gates and related improvements installed within CVWD and/or USBR easements. 1111-1 Date These plans have been reviewed by the Coachella Valley Water District in accordance with California Government Code, Section 65591 et seq. requiring efficient landscape and irrigation design in cooperation with the local governing agency (City or County) Approval of this drawing by CVWD staff does not constitute approval to encroach into district and USBR right-of-way. Trees, plants, walls and permanent structures of any kind may not be planted or installed in CVWD and USBR easements or Right -of -Way without first obtaining an encroachment permit for CVWD. CV WD Plan # L44445 Water Man ement Department (Dev6lopment Se estiepartment FERGUSE PAPE BALDWI N ARCHITE( 4499 Ruffin Rom S uite 300 San Diego CA 619 231 0751 www.fpbarch cor \ADS CA pF phi l l ip� Signature Dale:111302019 Date Op CAL‘ LANDSCAPE ARCHITECTS 462 Stevens Ave S uite 107 S an Diego CA 619 294 8484 www.vdla.us L o. 0. co Cu V •mt a) fr C N r C) E a co CVWD APPROVA Initial Description 80% CONSTRUCTION DOC PLAN CHECK SUBMITTAL 90% CONSTRUCTION DOC ISSUED FOR BID E =PBA PROJECT NO. 15066 IRRIGATION LEGEND AND NOTES L