HomeMy WebLinkAbout23 Utility Relocations Presidents Plaza E-W Parking Lot Improvements 758-14STAFF REPORT
CITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
MEETING DATE: August 26, 2021
PREPARED BY: Randy Bowman, Deputy Director of Public Works
REQUEST: Authorize the additional expenditure of up to $572,240 for utility
relocations related to President's Plaza East and West Parking Lot
Improvements (Project No. 758-14).
Recommendation
By minute motion, that the City Council,
1) Authorize the additional expenditure of up to $572,240 for utility relocations
related to the project;
2) Appropriate $571,977 from the Restricted Capital Project Fund 451 to
Account No. 4514692-4400100; and
3) Authorize the City Manager or his designee to take any action and execute any
documents, necessary to facilitate utility relocation agreements related to the
project.
Upon approval of the above actions, funds will be available in Restricted Capital Project Fund
Account No. 4514692-4400100.
Strategic Plan
The improvements to the El Paseo Corridor fulfill priorities identified in the City's Strategic
Plan, including the following:
Economic Development Priority No. 1: Expand job and business creation opportunities.
Action Step: Revitalize Highway 111. Look at creating a possibility of creating
a "City Center" atmosphere.
To encourage growth and revitalization of the Highway 111 corridor, the City assists in
providing large blocks of attractive and efficient public parking within the corridor.
Background Analysis
To date, the City Council has authorized the following actions for the President's Plaza East
and West Improvements project, resulting in a total of $10,089,791 for the project design,
construction management, utility relocations, and construction:
August 26, 2021 - Staff Report
Authorization of Additional Utility Relocation Expenditure
Page 2 of 4
• Mav 10. 2018 — Awarded Contract No. C37040 for professional engineering,
landscape architecture and utility design services to Dudek of La Quinta, California, in
the amount of $606,120.
• July 11, 2019 — Selected Alternative 5 for the design of President's Plaza East and
West Parking Lot Improvements; and approved Contract No. C37041, Amendment
No. 1 to Contract No. C37040 with Dudek, in an amount of $50,000.
• October 15, 2020 — Awarded Contract No. C37040B for construction management
services to Southstar Engineering of Riverside, California in the amount of $853,960.
• January 14, 2021 — Authorized staff to advertise and call for bids for the construction
contract; and authorized the Contract Documents to include an early completion
incentive.
• February 25. 2021 — Ratified and confirmed the Interim City Manager's execution and
authorization to enter into necessary agreements for utility relocation; and authorized
the expenditure of up to $400,000 for utility relocations.
• March 11, 2021 — Awarded Contract No. C37040A to H & H General Contractors, Inc.
of Highland, California for President's Plaza East and West Improvements (Project
No. 758-14) in the total amount of $7,123,393.00; and approved Amendment No. 2 to
Contract C37040 with Dudek of La Quinta, California, for additional design and
construction engineering support services in an amount not to exceed $55,975.
• Mav 13, 2021 — Authorized City Manager to enter into necessary agreements for
utility relocation; authorized the expenditure of up to $250,000 for utility
relocations; and approved Amendment No. 3 to Contract C37040 with Dudek of
La Quinta, California, for additional design services in an amount not to exceed
$37,950.
On June 30, 2021, Coachella Valley Water District (CVWD) submitted an invoice to the
City in the estimated amount of $572, 240 for water utility relocations required to connect
the existing CVWD infrastructure within the public ROW to the new domestic water
infrastructure within the project site. More specifically, CVWD is required to relocate 51
meters, install 29 new 1" services, install 19 new 1.5" services, 3 - 2" water services and
2 new fire hydrants with related appurtenances.
This work is distinguished from both the utility relocations contemplated in the February
25 and May 13 City Council authorizations, which captured the costs to relocate Charter
Communications, Frontier Communications, and Southern California Edison utilities, and
the utility construction contained within the project limits.
The prior Director of Public Works for the City was responsible for managing the water
utility connections with CVWD, including the identification and negotiation of those costs
to the City. Due to the abrupt transition in the position, this was not completed. The current
project management staff has coordinated with CVWD. The City is required to
compensate CVWD for their system modifications to receive the new improvements on
the East and West Parking lots. CVWD requires payment of the invoice in full to schedule
August 26, 2021 - Staff Report
Authorization of Additional Utility Relocation Expenditure
Page 3 of 4
and install the required domestic water improvements within the public right-of-way.
Fiscal Analysis
Staff requests authorization to expend up to an additional $572,240 for utility relocation
costs. The CVWD invoice includes $227,240 in fixed costs and $345,000 in estimated
costs. If the actual cost to install the improvements is less than the invoice cost, CVWD
will refund the remainder to the City. Actual costs in excess of the deposit invoice will be
billed to the City, and a funding source may need to be determined at that time if monies
are no longer available in the Restricted Capital Project Fund.
In 2018, the total Project cost was estimated to be $8.6M. Since that time, we have had
several project re-evaluations, re -designs and unexpected utility fees which have resulted
in additional costs. The table below explains the original budget, and the various City
Council actions and authorizations to date. With City Council approval of the
recommended actions, the request for an additional $572,240 for utility relocations will be
authorized with an additional appropriation of $571,977 from the Restricted Capital
Project Fund 451 to Account No. 4514692-4400100. This action does not affect the
General Fund.
ITEM AUTHORIZED BUDGET COST
Original Budget FY18/19 $8,000,000
Additional Appropriation FY20/21 $740,000
Appropriation Authorized by Council 3/11/21 3/11/2021 $1,200,000
Professional Consulting Service Agreement 5/10/2018 $606,120
C37040
Amendment No. 1 to Agreement C37040 7/11/2019 $50,000
Construction Management Services 10/15/2020 $853,960
Agreement C37040B
Authorize Utility Relocation Expenses 2/25/2021 $400,000
Construction Contract C37040A 3/11/2021 $7,123,393
Construction Contingency 3/11/2021 $712,339
Amendment No. 2 to Agreement C37040 3/11/2021 $55,975
Additional Utility Relocation Expenses and 5/13/2021 $150,000 $250,000
Appropriation by Council 5/13/21
Amendment No. 3 to Agreement C37040 5/13/2021 $37,950
Requesting Authorization of Additional Utility $572,240
Relocation Expenses
TOTAL PROJECT COST $10,090,000 $10,661,977
EXCESS/(SHORTFALL) $(571,977)
August 26, 2021 - Staff Report
Authorization of Additional Utility Relocation Expenditure
Page 4 of 4
LEGAL REVIEW
Approved as to Form DEPT. REVIEW
N/A
Andy lirestine
Robert W. Hargreaves Andy Firestine
City Attorney Assistant City Manager
FINANCIAL ASSISTANT
REVIEW CITY MANAGER
Jose/ Lui' Andy _Firestine
Espwwa.
For Janet M. Moore
Director of Finance
City Manager: L. Todd Hileman: L. TOO(G{ 1-F%l ewi a v�
ATTACHMENT: 1) CVWD Invoice
2) Vicinity Map
Andy Firestine
Assistant City Manager
CITY COUNCILA,C11ON
APPROVE/11 DENTET
RECEIVED OTHER
MEET 4G Doi
AYES:inn )K.
NOES:.`
ABSENT:
ABSTAIN:
VERIFIED BY:
Original on File with City
ee, huinktin<«, #Kelly
rk's Office
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
INVOICE Date: Jun 30, 2021
Subject: PRESIDENT'S PLAZA EAST & WEST, LARKSPUR LN, SAN LUIS REY AVE., PORTOLA AVE, PALM
DESERT
CITY OF PALM DESERT
73510 FRED WARING DR.
PALM DESERT, CA 92260
Project:
Project Date:
Amount Due:
GEO:
Planner:
TO INSURE PROPER CREDIT, PLEASE RETURN THIS PORTION WITH
REMITTANCE AND INCLUDE THE PROJECT ON YOUR CHECK
21-12302
06/24/2021
$572,240.00
05-06-204
SANDRA VILLALOBOS
Units CD
29.00
51.00
2.00
3.00
1.00
19.00
9.00
1.00
3.00
4.00
WH
RM
A6
WL
SP
WD
CI
EN
D7
GH
Fee Type Description
1" WATER SERVICE- COM - 35
RELOCATE METER ONLY
6" FIRE HYDRANT - 35/EST
2" WATER SERVICE- COM - 35
3/4" MTR & 1" SRVC- COM - 35
1 1/2" WATER SERVICE- COM - 35
8" STUB -OUT CONNECTION-35/EST
1" RP BACKFLOW DEVICE - 35
ABANDON WATER MAIN-35/ESTIMATE
8" DBL CK DET CK CMPLT -35/EST
Charge Total Amount
Amount
$3,850.00
$300.00
$15,000.00
$5,150.00
$4,240.00
$4,200.00
$20,000.00
$800.00
$5,000.00
$30,000.00
$111,650.00
$15,300.00
$30,000.00
$15,450.00
$4,240.00
$79,800.00
$180,000.00
$800.00
$15,000.00
$120,000.00
$572,240.00
Subject: PRESIDENT'S PLAZA EAST & WEST, LARKSPUR LN, SAN LUIS REY AVE., PORTOLA AVE, PALM DESERT
COACHELLA VALLEY WATER DISTRICT
P.O. BOX 1058, COACHELLA, CALIFORNIA 92236 (760) 398-2651
[This page has intentionally been left blank.]
7.00'
6.67'
0
u)
N
0
0
co
0000,
D0000
0000
D0000
0000S
V
16.00'
9.00'
13.67'
4.00'
DETAIL 1
SCALE: 1"=10'
7.36'
_ 8.36'
DETAIL 2
SCALE: 1"=10'
6.67' _
7.00'
00000
0000
0000C
0000
0000C
M
0
13.67'
DETAIL 3
SCALE: 1"=10'
r
0
v
N
N
CO
(O
N
0
N
CONSTRUCTION NOTES
LU
INSTALL ACCESSIBLE PARKING, PER DETAIL ON SHEET C-10
PAINT PARKING STALL, PER DETAIL ON SHT. C-10
INSTALL STOP BAR & LEGEND
INSTALL THERMOPLASTIC WHITE STRAIGHT ARROW TYPE I, PER
CALTRANS STD PLANS NO. A24A
INSTALL THERMOPLASTIC WHITE (RIGHT OR LEFT) TURN ARROW
TYPE IV, PER CALTRANS STD PLANS A24A
.5,011ERT
DIAL
BEFORE
YOU DIG
TWO WORKING
DAYS BEFORE
YOU DIG
TOLL FREE r 800-227-2600
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
G
L
A
R
K
S
Po
U I
R
L I
N
'
,_. I C161.I2�� /L223 N
" L224
Q
C 160•
-
BENCHMARK: P.D. #119 (USC&GS N-517 1955)
ELEVATION: 224.51 FT. DATUM: NGVD29
LOCATION: 2" BRASS DISC LOCATED AT THE N.E. CORNER
OF SAN PABLO AND HYW 111 (NCVD 29)
BASIS OF BEARINGS: THE CENTERLINE OF EL PASEO.
BEING N89' 44' 35"E, PER MB 21/50-54
C1S9
C173 n
s—7 r 7 r�ue—��
L_
`51v^v/N
1-1
I II
L121
fi
18'
108.00'
9'
YP
L108
•
4'
TYPP
t
L4
25C
M
-J
M
J
C24 C23
L236
L93
C71-- C68
J J
25
4'
T'fP
ca5 Cgr
CO- 0
I L
n
II
IL
1251
nM
L8
C67
_1u C-
Ls - I
HORIZONTAL CONTROL PLAN - WEST
SCALE: 1" = 40'
\C9
126
I I I
AI
$W L177
3 0126
227: �':9�'
�� �tr•�•"s L228
178
•C 12,7
// 1
62.35'
124
0
C127 N
51.96'
T
s
L17�
C1 21
L229 L230
TYP
—
53
73
-I
90.00'
I I
-I-
II r r
L131
L2314_232
HORIZONTAL CONTROL PLAN - EAST
SCALE: 1" = 40'
ANY MODIFICATION TO THIS PLAN
MUST BE APPROVED BY THE CITY
PRIOR TO CONSTRUCTION.
ENGINEER
MARK BY DATE
REVISIONS
CITY
APPR. DATE
ENGINEER'S
SEAL 201,0F E S SI'uiiiiii,,,i
m
*
qOn nn mn0�\\\\\\\
414
_CO
=c�
uj
No.69056
EXP. 06-30-20
DUDEK
Engineering, Planning,
Environmental Sciences and
Management Services
78075 Main St., Ste. 203-G La Quinta, CA. 92253
Tel (760) 341-6660 Fax (760) 346-6118
PREPARED UNDER THE DIRECT SUPERVISION OF:
CITY PERMIT #
CITY ISSUE DATE:
CITY OF PALM DESERT
DEPARTMENT OF PUBLIC WORKS
APPROVED BY:
BO CHEN, P.E. CITY ENGINEER
R.C.E. 64819 EXP. 6-30-2019
DATE
DATE:
CHARLES H. GREELY R.C.E. 69056 EXP. 6/30/20 REVIEWED AND RECOMMENDED BY: DATE
r-11''�� F
8'
95% DESIGN SUBMITTAL
NOT -FOR -CONSTRUCTION
PLAN CHECKED BY:
CIVIL
TRAFFIC
LANDSCAPE
C42 C45
C43
59 65 L64
L66 L253'`
C41
C48
C49
L245
L67
C51 L70 C50
L
II LTr
L134
—T--
•�
rT 44
35. 50' I
ll
C103 roll
2J
4'
L 138-
C97
C104
M
N
J
/C169
C96
P.
1 33.33' _
1; I
J 33.24'
EF
GRAPHIC SCALE
0 4080'
SCALE: 1" = 40'
CITY OF PALM DESERT
PRESIDENT'S PLAZA EAST & WEST
PARKING LOT IMPROVEMENTS
STRIPING AND
HORIZONTAL CONTROL PLAN
SHEET c-11
OF
SHEETS 14.
CITY FILE NUMBER