HomeMy WebLinkAboutC38820B San Pablo Ave PH2 Streetscape Imprvmnts- 681-20CONTRACT NO. C38820B
STAFF REPORT
CITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
MEETING DATE: September 10, 2020
PREPARED BY: Randy Bowman, Project Manager
REQUEST: Award Contract No. C38820B to Los Angeles Engineering, Inc. of
Covina, California for the San Pablo Avenue Phase 2 Streetscape
Improvements in the amount of $6,655,233 (Project No. 681-20)
Recommendation
By Minute Motion:
Award Contract No. C38820B in the amount of $6,655,233.00 to Los
Angeles Engineering, Inc. of Covina, California for the San Pablo Avenue
Phase 2 Streetscape Improvements;
2. Authorize the Director of Finance to set aside a 15 percent contingency
in the amount of $998,284.95;
3. Authorize the City Manager or designee to review and approve written
change order requests for amounts up to $100,000 each and a
cumulative maximum amount of $500,000 for the use of contingency for
unanticipated conditions, per Section 3.30.170 of the Palm Desert
Municipal Code;
4. Appropriate $1,067,000 from unobligated Measure A reserve; and
5. Authorize the Mayor to execute the agreement.
Aside from the requested appropriation, funds are available in Account No. 4514342-
4400100, Capital Bond Funds; and Account No. 2134342-4400100, Measure A Fund.
Strateaic Plan
The improvements to the San Pablo Corridor fulfill priorities identified in the City's Strategic
Plan, including the following:
Tourism and Marketing — Priority 1: "Improve access to Palm Desert and its attractions
to enhance the ease of lifestyle."
Transportation — Priority 1: "Create walkable neighborhoods and areas within Palm
Desert that would include residential, retail, services and employment centers, and
parks, recreation and open space to reduce the use of low occupancy vehicles. "
Transportation — Priority 3: "De-emphasize single/low-occupancy vehicles and
optimize modes of travel (bus, carpool, golf -cart, bicycle and pedestrian)."
September 10, 2020 - Staff Report
Award Construction Contract for the San Pablo Phase 2 Project (Project No. 681-20)
Page 2 of 4
• Land Use - Priority 4: "Create a mixed -use city core integrating shopping, dining,
lodging, and housing."
Backaround Analvsis
The first phase of construction of the San Pablo Avenue Corridor Improvements is the
roadway section from Highway 111 to Fred Waring Drive. The project construction
commenced in July, 2019 and construction was substantially completed in July, 2020. The
contractor is presently finishing punchlist work.
The second phase of the San Pablo Avenue Corridor Improvements is the roadway section
from Fred Waring Drive to Magnesia Falls Drive, and it continues design elements included
in the first phase, plus roundabouts at Magnesia Falls Drive and at the entrance to the College
of the Desert. The project is being coordinated with the CV Link along Magnesia Falls Drive.
The City applied for ATP funding on July 27, 2018; on May 21, 2019, the City received official
confirmation that ATP funds in the amount of $3,222,000 have been awarded for
reimbursement of the project construction costs.
To date, the City Council has authorized or taken action on the following for the project:
• Design services contract to Dokken Engineering (Contract No. C38820) for $701,507
on September 12, 2019
• Construction management, surveying and materials inspection services to Southstar
Engineering (Contract No. C38820A) for $1,072,766.76 on March 12, 2020
• Temporary construction access easement agreement with College of the Desert
(Contract No. C38820C) at no cost proposed for March 26, 2020
• Received and filed an informational update on the project on April 9, 2020
The project has proceeded according to the original schedule established in June 2019.
Major milestones include the following:
• Commencement of design September 2019
• Public Open House
October 2019
• Design completed
May 2020
• CTC funding approval
June 2020
• Advertise bids
July 2020
• Open bids
August 2020
• Construction completed
June 2021
The City staff have been proceeding with an aggressive schedule for the project for two
reasons: maintaining the City's obligations for the ATP grant funding, and completing the
project before the City's anticipated July 4, 2021 celebration at Civic Center Park. To
accomplish completion of construction of the project in time for the City's Fourth of July
celebration, it is necessary to completely close San Pablo Avenue between Magnesia Falls
Drive and Fred Waring Drive, so the contractor will have unrestricted access to the entire
September 10, 2020 - Staff Report
Award Construction Contract for the San Pablo Phase 2 Project (Project No. 681-20)
Page 3of4
construction site. While San Pablo Avenue is closed for construction, staff and customers of
the City will continue access city facilities via a temporary traffic signal at the Civic Center
entrance on Fred Waring Drive.
The Project was advertised for bid on July 14, 2020, and on August 20, 2020, nine bids
were received via the City's online PlanetBids bidding portal with the following results:
Contractor
Los Angeles Engineering, Inc.
MVC Enterprises, Inc.
Jacobsson Engineering Construction, Inc
Griffith Company
Hazard Construction Company
C.S. Legacy Construction, Inc.
Granite Construction Company
All American Asphalt
Leonida Builders, Inc.
Location
Covina, CA
Temecula, CA
Palm Desert, CA
Santa Fe Springs, CA
Lakeside, CA
Chino, CA
Indio, CA
Corona, CA
Santa Clarita, CA
Total Base Bid
$6,612,414.60 1
$6,769,359.80
$7,053,574.40
$7,241,34. 1.60 1
$7,267,859.00
$7,509,402.48
$7,528,131.00 1
$7,969,913.64 I
$8,148,525.20
The engineer's estimate for construction is $7,661,729.00, which places the lowest bid at
fourteen (14) percent lower than the engineer's estimate, with which City staff concurs.
The project was bid with three Alternate Bid Items, but the bids are evaluated solely on
the Total Base Bid alone. The three Alternate Bid Items are as follows:
AA-1 Diagonal Parking - Permeable Pavers
AA-2 Adjust To Existing Water Valve, Air Vent, & Blow -Off Covers to Finished Grade
AA-3 Adjust Existing Sewer Manholes to New Grade
Alternate Bid Item AA-1 is a substitute for the stamped asphalt pavement surface in the
base bid for the on -street diagonal parking in the project. Accepting the Alternate Bid
Item and removing from the contract the stamped asphalt bid item adds a net amount of
$42,818.40 to the contract. Staff recommends accepting this bid alternate, as permeable
pavers are environmentally advantageous, and they complement the pavers installed with
the Phase 1 project.
Per Contract No. C31910 between the City and Coachella Valley Water District (CVWD),
all paving projects will include an additive alternate bid items to raise the valves and
manholes to the new grade on behalf of CVWD. CVWD has the option of accepting the
price from the City's contractor and reimbursing the City for the work or using their own
forces to perform the work, in which case the City would not award the additive alternate
bid items. CVWD has reviewed the contractor's unit bid price of Alternate Bid Items AA-
1 and AA-2 and has opted to perform the work with their contractor, therefore Bid
Alternates AA-2 and AA-3 will not be awarded.
September 10, 2020 - Staff Report
Award Construction Contract for the San Pablo Phase 2 Project (Project No. 681-20)
Page 4of4
The total contract price is $6,655,233.00, which includes the Total Base Bid and Alternate
Bid Item AA-1.
Fiscal Analvsis
The approved Capital Improvement Project (CIP) budget for FY 2020/21 includes for the San
Pablo Phase 2 Streetscape Improvements Project construction $4,400,000 in Measure A
Funds and $3,983,000 in Capital Bond Funds for a total of $8,383,000. The recommended
award for construction including contingency is $7,653,517.95.
The total cost for San Pablo Phase 2 is anticipated to be as follows:
Design (Dokken Engineering): $ 701,507.00
Construction management (Southstar Engineering): $1.072,766.76
Subtotal: $1,774,273.76
Construction (Los Angeles Engineering): $6,655,233.00
Contingency: $ 998,284.95
Estimated permit fees with CVWD and SCE for meters: $ 22,208.29
Total estimated cost of San Pablo Phase 2: $9,450,000.00
Budget (remaining) in both funds is approximately: $8,383,000.00
Appropriation to the Measure A fund needed: $1,067,000.00
The City will be reimbursed $3,222,000 to Measure A Funds from the ATP grant.
The cost to date for San Pablo Phase 1 is $11,707,595.96, so the current anticipated total
project cost for the entire San Pablo Corridor Improvements is $21,157,595.96 before the
ATP reimbursement, or $17,935,595.96 after ATP reimbursement. Once the project is
complete, staff estimates on -going maintenance and utility costs to be around $50,000 per
year.
LEGAL REVIEW
N/A
Robert W. Hargreaves
City Attorney
DEPT. REVIEW
Ii4ri1
Tom Garcia, P.E.
Director of Public Works
City Manager, Lauri Aylaian: ..
CONTRACTOR: Los Angeles Engineering, Inc.
1945 Chicago Avenue, Unit C
Riverside, CA 92507
FINANCIAL REVIEW
Janet M. Moore
Director of Finance
ATTACHMENT: 1) Contractor's Bid
2) Agreement and Bonds
3) Vicinity Map
ASSISTANT
CITY MANAGER
.Andy Firestine
Andy Firestine
Assistant City Manager
City of Palm Desert
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on August 20,
Bid Results
Bidder Details
Vendor Name
Los Angeles Engineering, Inc.
Address
633 N. Barranca Ave
Covina, CA 91723
United States
Respondee
Aaron O'Brien
Respondee Title
Secretary
Phone
626-454-5222 Ext. 211
Email
aaron@laeng.net
Vendor Type
CADIR
License #
591176
CADIR
1000002848
Bid Detail
Bid Format
Electronic
Submitted
August 20, 2020 1:53:14 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
223950
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
Proposal
MX-M565N_20200820_133918.pdf
Line Items
Type
Item Code UOM Qty
Unit Price
Base Bid Item
1
MOBILIZATION/ DEMOBILIZATION (NOT TO EXCEED 5% OF SUBTOTAL)
1 LS 1
$300,000.00
2
PROJECT INFORMATION SIGN
2 EA 2
$600.00
3
PUBLIC NOTIFICATION PER SECTION 1.7 OF THE SPECIAL CONDITIONS
3 LS 1
$3,000.00
4
DEVELOP AND IMPLEMENT RISK LEVEL 1 WATER POLLUTION PREVENTION PLAN (SWPPP)
4 LS 1
$3,000.00
5
IMPLEMENTATION OF EROSION CONTROL UPON MOBILIZATION
5 LS 1
$10,000.00
Page 1
Printed 08/20/2020
File Type
General Attachment
Line Total Comment
$300,000.00
$1,200.00
$3,000.00
$3,000.00
$10,000.00
PlanetBids, Inc.
City of Palm Desert
Page 2
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on August
20, Printed 08/20/2020
Bid Results
Type
Item Code UOM City
Unit Price
Line Total Comment
6
TEMPORARY WATER POLLUTION CONTROL BMPs
6 LS 1
$12,000.00
$12,000.00
7
TEMPORARY HIGH -VISIBILITY FENCE
7 LF 1050
$4.00
$4,200.00
8
CHANGEABLE MESSAGE BOARDS FOR TRAVEL CONDITIONS AND ADVANCED PROJECT WARNING
8 EA 5
$8,200.00
$41,000.00
9
TRAFFIC CONTROL AND CONSTRUCTION STAGING
9 LS 1
$12,000.00
$12,000.00
10
POTHOLING - LOCATE, PROTECT & RESTORE EXISTING UTILITIES & IMPROVEMENTS
10 LS 1
$7,000.00
$7,000.00
11
SURVEY MONUMENT PRESERVATION
11 LS 1
$3,000.00
$3,000.00
12
RECORD DRAWING ("AS -BUILT') PLANS (STIPULATED AMOUNT)
12 LS 1
$2,500.00
$2,500.00
13
CLASS "A" FIELD OFFICE
13 MO 10
$1,300.00
$13,000.00
14
CLEARING AND GRUBBING WITH CLEAN-UP/MAINTENANCE
14 LS 1
$5,000.00
$5,000.00
15
REMOVE AND DISPOSE OF EXISTING TREE AND ROOT SYSTEM, GRIND
STUMP (TAMARISKS & OTHERS NOTED ON DEMO PLANS)
15 LS 1
$110,000.00
$110,000.00
16
GRIND EXISTING AC PAVEMENT (2" MIN.)
16 SF 14408
$0.70
$10,085.60
17
REMOVE EXISTING AC PAVEMENT
17 SF 182800
$1.00
$182,800.00
18
SAWCUT AND REMOVE EXISTING PCC SIDEWALK (4" THICK TYP.) & DRIVEWAYS (6" THICK TYP.) & CROSS -GUTTER (8" THICK TYP.) &
CONCRETE CHANNEL (4" THICK TYP.)
18 SF 19750
$1.00
$19,750.00
19
REMOVE EXISTING PCC CURB & GUTTER (6" C.F. TYPICAL)
20 LF 6000
$3.00
$18,000.00
20
REMOVE EXISTING PCC CURB (6" C.F. TYPICAL)
21 LF 1150
$2.00
$2,300.00
21
DEMO CVWD WALL
22 LF 20
$50.00
$1,000.00
PlanetBids, Inc.
City of Palm Desert
Page 3
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on
August 20, Printed 08/20/2020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
22
CONSTRUCT BLOCK WALL
23 SF
160
$110.00
$17,600.00
23
RELOCATE CVWD GATE
24 EA
1
$3,500.00
$3,500.00
24
RELOCATE STONE SIGN
25 EA
2
$1,500.00
$3,000.00
25
RELOCATE COLLEGE OF THE DESERT SIGN
26 EA
1
$500.00
$500.00
26
ADJUST EXISTING STORM DRAIN MANHOLE TO GRADE
27 EA
1
$2,000.00
$2,000.00
27
MODIFY EXIST CATCH BASIN TO PROPOSED CURB AND ADJUST TO GRADE
28 EA
1
$4,000.00
$4,000.00
28
REMOVE EXISTING STORM DRAIN CATCH BASIN
29 EA
1
$2,000.00
$2,000.00
29
REMOVE EXISTING STORM DRAIN PIPE
30 LF
1
$200.00
$200.00
30
CLEAN EXISTING STORM DRAIN PIPE
31 LF
84
$5.00
$420.00
31
15' RCP STORM DRAIN
32 LF
76
$120.00
$9,120.00
32
18" RCP STORM DRAIN
33 LF
418
$94.00
$39,292.00
33
24" RCP STORM DRAIN
34 LF
282
$110.00
$31,020.00
34
18" HDPE STORM DRAIN
35 LF
589
$75.00
$44,175.00
35
TEMPORARY SHORING
36 LS
1
$9,000.00
$9,000.00
36
CONVERT EXIST CATCH BASIN TO MANHOLE
37 EA
1
$3,500.00
$3,500.00
37
CATCH BASIN NO.1 (7- LONG)
38 EA
1
$7,500.00
$7,500.00
PianetBids, Inc.
City of Palm Desert
Page 4
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on
August 20, Printed 08/20/2020
Bid Results
Type
Item Code
UOM
City
Unit Price
Line Total Comment
38
CATCH BASIN NO.1 (14' LONG)
39
EA
2
$10,000.00
$20,000.00
39
CATCH BASIN NOA (1-GRATE)
40
EA
6
$7,500.00
$45,000.00
40
CALTRANS STANDARD G1 INLET
41
EA
6
$5,600.00
$33,600.00
41
JUNCTION STRUCTURE NO.2
42
EA
1
$1,500.00
$1,500.00
42
PIPE INTO EXISTING STRUCTURE
43
EA
3
$2,100.00
$6,300.00
43
MANHOLE NO.1
44
EA
6
$4,000.00
$24,000.00
44
BIORETENTION BMP
45
SF
2805
$13.00
$36,465.00
45
ROCK SLOPE PROTECTION
46
CY
10
$150.00
$1,500.00
46
ROCK SLOPE PROTECTION FABRIC (CLASS 8)
47
SQYD
36
$20.00
$720.00
47
HEADWALL
48
EA
1
$7,000.00
$7,000.00
48
CONCRETE CHANNEL TRANSITION
49
EA
1
$8,000.00
$8,000.00
49
DRY WELL
50
EA
1
$6,000.00
$6,000.00
50
CONCRETE BACKFILL
51
CY
175
$140.00
$24,500.00
51
MODIFY CURB OUTLET
52
EA
1
$300.00
$300.00
52
REPLACE AREA DRAIN CONNECTION
53
EA
1
$300.00
$300.00
53
RUBBERIZED AC PAVEMENT (TOP 2" R-HMA SURFACE COURSE PER PLANS)
54
TON
1890
$124.00
$234,360.00
Planetoids, Inc.
City of Palm Desert
Page 5
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on August 20, Printed 08/20/2020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
54
NON -RUBBERIZED AC PAVEMENT (HMA BASE COURSE & FULL TRENCH
REPAIR PER PLANS)
55 TON
2600
$111.00
$288,600.00
55
CLASS 2 AGGREGATE BASE (F)
56 CY
3350
$43.00
$144,050.00
56
PCC CURB & GUTTER 8" CF
57 LF
244
$27.00
$6,588.00
57
PCC CURB ONLY 6" CF
58 LF
7502
$21.00
$157,542.00
58
PCC CURB & GUTTER 6" CF
59 LF
3970
$26.00
$103,220.00
59
PCC CURB ONLY 4" CF
60 LF
3572
$15.00
$53,580.00
60
PCC CURB & GUTTER 4" CF
61 LF
71
$25.00
$1,775.00
61
6" PCC HEADER (FLUSH CURB)
62 LF
3792
$11.00
$41,712.00
62
CROSS -GUTTERS & SPANDRELS PER C.P.D. STD 106&108
63 SF
1160
$14.00
$16,240.00
63
6" PCC ROLLED CURB & GUTTER
64 LF
142
$36.00
$5,112.00
64
MODIFIED PCC ROLLED CURB
65 LF
392
$42.00
$16,464.00
65
PCC CURB RAMP TYPE A PER SDRSD NO. G-27
66 EA
17
$2,000.00
$34,000.00
66
PCC CURB RAMP TYPE C PER SDRSD NO. G-29
67 EA
2
$2,000.00
$4,000.00
67
PCC TRUCK APRON PAVERS AND SUBSECTION PER PLAN
68 SF
2980
$20.00
$59,600.00
68
SPECIALTY, ARTIST -DESIGNED CROSSWALK MARKINGS PER PLANS "CHROMATIC
OR POLKA DOT" DETAILS
69 SF
620
$65.00
$40,300.00
69
DETECTABLE WARNING SURFACE
70 SF
1970
$3.80
$7,486.00
PlanetBids, Inc.
City of Palm Desert
Page 6
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT
NO. 681-20
(20-21), bidding on
August 20, Printed 08/20/2020
Bid Results
Type
Item Code
UOM
Qty
Unit Price
Line Total Comment
70
KEYSTONE GRAVITY WALL
71
CY
58
$1,500.00
$87,000.00
71
PEDESTRIAN CONCRETE PAVING (BROOM FINISH)
72
SF
39750
$4.80
$190,800.00
72
CONCRETE DRIVEWAY (ALLEY TYPE) PER SDRSD NO. G-14E
73
SF
3960
$10.80
$42,768.00
73
1'-6" PCC HEADER (MOW STRIP)
74
SF
8950
$13.80
$123,510.00
74
UNCLASSIFIED EXCAVATION (F)
75
CY
6500
$82.00
$533,000.00
75
IMPORTED BORROW (F)
76
CY
500
$100.00
$50,000.00
76
DIAGONAL PARKING - STAMPED AC (INCLUDES STRUCTURAL SECTION PER PLANS)
77
SF
11268
$20.00
$225,360.00
77
TRAFFIC STRIPING, PAVEMENT MARKINGS
AND SIGNAGE PER
PLANS
78
LS
1
$110,000.00
$110,000.00
78
CV LINK CONNECTION
79
LS
1
$142,000.00
$142,000.00
79
TRASH RECEPTACLE
80
EA
10
$2,200.00
$22,000.00
80
RECYCLING RECEPTACLE
81
EA
10
$2,200.00
$22,000.00
81
BENCH TYPE A (WITH CONCRETE PAD)
82
EA
2
$1,700.00
$3,400.00
82
BENCH TYPE B (WITH CONCRETE PAD)
83
EA
3
$3,100.00
$9,300.00
83
BENCH TYPE C (WITH CONCRETE PAD)
84
EA
3
$4,600.00
$13,800.00
84
BOLLARD LIGHT TYPE 'C'
85
EA
108
$2,010.00
$217,080.00
85
BIKE RACK BOLLARD
86
EA
3
$700.00
$2,100.00
PlanetBids, Inc.
City of Palm Desert
Page 7
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT
NO. 681-20 (20-21), bidding on
August 20, Printed O8/20/2020
Bid Results
Type
Item Code UOM
City
Unit Price
Line Total Comment
86
BIKE REPAIR STATION
87 EA
2
$1,300.00
$2,600.00
87
BIKE PUMP STATION
88 EA
2
$1,300.00
$2,600.00
88
IN -ROADWAY LIGHTS
89 EA
44
$3,500.00
$154,000.00
89
TYPE 15 STREET LIGHT
90 EA
12
$8,000.00
$96,000.00
90
PEDESTRIAN PUSH BUTTON ASSEMBLY WITH POST
91 EA
11
$2,700.00
$29,700.00
91
TRAFFIC SIGNAL MODIFICATIONS
92 LS
1
$106,000.00
$106,000.00
92
FOUNDATIONS WITH ELECTRICAL FOR FUTURE ART
93 EA
2
$14,000.00
$28,000.00
93
EMPTY CONDUIT & PULL BOXES FOR FUTURE FIBER OPTIC LINE
94 LS
1
$128,000.00
$128,000.00
94
ELECTRICAL TRENCHING/CONDUITS/CONDUCTORS
95 LS
1
$269,000.00
$269,000.00
95
TREE GRATE UPLIGHT
96 EA
76
$1,650.00
$125,400.00
96
PALM TREE UP LIGHT PER DETAIL ON ELECTRICAL PLANS
97 EA
30
$2,140.00
$64,200.00
97
JUNCTION BOX
98 EA
30
$300.00
$9,000.00
98
SERVICE EQUIPMENT ENCLOSURE
99 EA
4
$7,700.00
$30,800.00
99
SERVICE EQUIPMENT ENCLOSURE W/240V OUTLETS
100 EA
4
$7,300.00
$29,200.00
100
RECEPTACLE PEDESTAL
101 EA
76
$600.00
$45,600.00
101
PULL BOXES, ROUND TYPE AND TYPE 3 PER DETAILS ON ELECTRICAL PLANS
102 EA
38
$700.00
$26,600.00
PlanetBids, Inc.
City of Palm Desert
Page 8
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on August 20, Printed 08/20/2020
Bid Results
Type Item Code UOM Qty
Unit Price
Line Total Comment
102 TEMPORARY TRAFFIC SIGNAL (CIVIC CENTER ENTRANCE AT FRED WARING)
103 LS 1
$352,000.00
$352,000.00
103 18" STEPPING STONES
104 EA 20
$90.00
$1,800.00
104 24" STEPPING STONES
105 EA 44
$100.00
$4,400.00
105 ROCK BLANKET
106 SF 16
$120.00
$1,920.00
106 IRRIGATION SYSTEM
107 LS 1
$400,000.00
$400,000.00
107 PLANTS & PLANTING MATERIAL
108 LS 1
$490,000.00
$490,000.00
108 90 DAY PLANT ESTABLISHMENT/MAINTANENCE PERIOD (POST -CONSTRUCTION)
109 LS 1
$26,000.00
$26,000.00
109 LIMIT OF WORK/ EDGE CONDITION REPAIR
110 LS 1
$12,000.00
$12,000.00
Subtotal
$6,596,414.60
Alternate Bid Item
110 DIAGONAL PARKING - PERMEABLE PAVERS
AA-1 SF 11268
$23.80
$268,178.40
111 ADJUST TO EXISTING WATER VALVE, AIR VENT, & BLOW -OFF COVERS TO FINISHED GRADE
AA-2 EA 29
$300.00
$8,700.00
112 ADJUST EXISTING SEWER MANHOLES TO NEW GRADE
AA-3 EA 7
$600.00
$4,200.00
Subtotal
$281,078.40
Base Bid Item
113 PRIVATE WATER LINE PER PLANS
111 LS 1
$16,000.00
$16,000.00
Subtotal
$16,000.00
Total
$6,893,493.00
Subcontractors
Name & Address Description License Num
CADIR
Amount Type
Sierra Pacific Electrical Electrical (Partial) 264048
1000004626
$1,505,613.00
2542 Avalon Street
Jurupa Valley, CA 92509
United States
Claddagh Paving Pavers (Partial) 819859
1000007179
$274,000.00
2246 Huffstatler St
Fallbrook, CA 92028
United States
PlanetBids, Inc.
City of Palm Desert
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS, PROJECT NO. 681-20 (20-21), bidding on August 20
Bid Results
Name & Address Description License Num CADIR
Lopez Construction Inc.
Drainage Structures (Partial)
890389
1000017840
1125 E 5th St
Corona, CA 92879
United States
Hardy & Harper, Inc.
AC Paving (Partial)
215952
1000000076
32 Rancho Circle
Lake Forest, CA 92630
United States
Cal Stripe Inc.
Striping and Signs (Partial)
685387
1000001100
2040 E. Steel Rd
Colton, CA 92324
United States
Shaw & Sons, Inc.
Seeded Glass Concrete
685387
1000001100
829 W. 17th St., Suite 5
(Partial)
Costa Mesa, CA 92627
United States
Page 9
Printed 08/20/2020
Amount Type
$134,000.00
$475,000.00 CADIR
$295,495.00 CADIR
$99,000.00
PlanetBids, Inc.
Contract No. C38820B
CONTRACT FOR CONSTRUCTION
This Contract for Construction ("Contract"), No. C388206, is made and entered into this 10th day
of September, 2020, by and between City of Palm Desert, a Charter City and municipal
corporation, organized under the laws of the State of California, with its principal place of business
at 73-510 Fred Waring Drive, Palm Desert, California 92260, sometimes hereinafter called the
"City" and Los Angeles Engineering, Inc., sometimes hereinafter called "Contractor."
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the Contract Documents as specified in Article 5, below,
for the following Project:
SAN PABLO AVENUE PHASE 2 STREETSCAPE IMPROVEMENTS
PROJECT NO. 681-20
The project consists of the 2,600 foot segment of San Pablo Avenue from Fred Waring Drive to
Magnesia Falls Drive. The project continues with the same elements as the first phase project
south of Fred Waring Drive, and it includes two roundabouts at Magnesia Falls Drive and at the
entrance to the College of the Desert. The project includes landscaping and hardscape
improvements, streetlighting, on -street parking, sidewalks, crosswalks, bike lanes, complete
removal and replacement of existing pavement, a small section of CV Link on Magnesia Falls
Drive, and traffic signal improvements.
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor's failure to
comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City's Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 210 calendar days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of Six Million Six Hundred Fifty Five Two Hundred Thirty
Three Dollars ($6,655,233.00). Payment shall be made as set forth in the General Conditions.
The City will pay to Contractor compensation based upon the prices set forth in the Bid Schedule.
SAN PABLO AVENUE PHASE 2 STREETSCAPE _1 _ CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City's actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the
Contractor will pay the City the sum of $4,900 for each and every calendar day of delay beyond
the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages
and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may
deduct that amount from any money due or that may become due the Contractor under the
Contract. This Section does not exclude recovery of other damages specified in the Contract
Documents. Liquidated damages may be deducted from progress payments due Contractor,
Project retention or may be collected directly from Contractor, or from Contractor's surety. These
provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from
terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The "Contract Documents" include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non -Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction "Greenbook", latest edition, Except
Sections 1-9
Standard Plans of the City of Palm Desert, latest edition
Standard Plans for Public Works Construction, latest edition
Caltrans Standard Specifications, latest edition, Except Division 1
Caltrans Standard Plans, latest edition
California Manual on Traffic Control Devices for Streets and Highways (CAMUTCD), latest
edition
Work Area Traffic Control Handbook, latest edition
Reference Specifications
Approved and fully executed Change Orders
SAN PABLO AVENUE PHASE 2 STREETSCAPE -2- CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
Permits
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
ARTICLE 7. INDEMNIFICATION AND INSURANCE
A. Indemnification
1. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City's choosing), indemnify and hold harmless the City, its officials,
officers, agents, employees, and representatives, and each of them from and
against:
(a) Any and all claims, demands, causes of action, costs, expenses, injuries,
losses or liabilities, in law or in equity, of every kind or nature whatsoever, but
not limited to, injury to or death, including wrongful death, of any person, and
damages to or destruction of property of any person, arising out of, related to,
or in any manner directly or indirectly connected with the Work or this Contract,
including claims made by subcontractors for nonpayment, including without
limitation the payment of all consequential damages and attorney's fees and
other related costs and expenses, however caused, regardless of whether the
allegations are false, fraudulent, or groundless, and regardless of any
negligence of the City or its officers, employees, or authorized volunteers
(including passive negligence), except the sole negligence or willful
misconduct or active negligence of the City or its officials, officers, employees,
or authorized volunteers;
(b) Contractor's defense and indemnity obligation herein includes, but is not
limited to damages, fines, penalties, attorney's fees and costs arising from
claims under the Americans with Disabilities Act (ADA) or other federal or state
disability access or discrimination laws arising from Contractor's Work during
the course of construction of the improvements or after the Work is complete,
as the result of defects or negligence in Contractor's construction of the
improvements;
(c) Any and all actions, proceedings, damages, costs, expenses, fines, penalties
or liabilities, in law or equity, of every kind or nature whatsoever, arising out
SAN PABLO AVENUE PHASE 2 STREETSCAPE _3_ CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
of, resulting from, or on account of the violation of any governmental law or
regulation, compliance with which is the responsibility of Contractor;
(d) Any and all losses, expenses, damages (including damages to the Work
itself), attorney's fees, and other costs, including all costs of defense which
any of them may incur with respect to the failure, neglect, or refusal of
Contractor to faithfully perform the Work and all of Contractor's obligations
under Contract. Such costs, expenses, and damages shall include all costs,
including attorney's fees, incurred by the indemnified parties in any lawsuit to
which they are a party.
2. Contractor shall immediately defend, at Contractor's own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City, its officials, officers, agents, employees and representatives. Contractor shall
pay and satisfy any judgment, award or decree that may be rendered against the
City, its officials, officers, employees, agents, employees and representatives, in
any such suit, action or other legal proceeding. Contractor shall reimburse the City,
its officials, officers, agents, employees and representatives for any and all legal
expenses and costs incurred by each of them in connection therewith or in
enforcing the indemnity herein provided. The only limitations on this provision shall
be those imposed by Civil Code section 2782.
3. The provisions of this Article shall survive the termination of this Contract
howsoever caused, and no payment, partial payment, or acceptance of occupancy
in whole or part of the Work shall waive or release any of the provisions of this
Article.
B. Insurance
1. Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during
the term of this Contract, policies of insurance of the type and amounts described
below and in a form that is satisfactory to City.
2. General Liability Insurance. Contractor shall maintain commercial general
liability insurance with coverage at least as broad as Insurance Services Office
form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000
general aggregate, for bodily injury, personal injury, and property damage, and a
$4,000,000 completed operations aggregate. The policy must include contractual
liability that has not been amended. Any endorsement restricting standard ISO
"insured contract" language will not be accepted.
3. Automobile Liability Insurance. Contractor shall maintain automobile insurance
at least as broad as Insurance Services Office form CA 00 01 covering bodily injury
and property damage for all activities of the Contractor arising out of or in
connection with Work to be performed under this Contract, including coverage for
any owned, hired, non -owned or rented vehicles, in an amount not less than
$1,000,000 combined single limit for each accident.
SAN PABLO AVENUE PHASE 2 STREETSCAPE _4_ CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
4. Umbrella or Excess Liability Insurance. Contractor may opt to utilize umbrella
or excess liability insurance in meeting insurance requirements. In such
circumstances, Contractor may obtain and maintain an umbrella or excess liability
insurance policy with limits that will provide bodily injury, personal injury and
property damage liability coverage at least as broad as the primary coverages set
forth above, including commercial general liability, automotive liability and
employer's liability. Such policy or policies shall include the following terms and
conditions:
5. A drop down feature requiring the policy to respond in the event that any primary
insurance that would otherwise have applied proves to be uncollectible in whole or
in part for any reason;
(a) Pay on behalf of wording as opposed to reimbursement; and
(b) Concurrency of effective dates with primary policies; and
(c) Policies shall "follow form" to the underlying primary policies; and
(d) Insureds under primary policies shall also be insureds under the umbrella or
excess policies.
6. Workers' Compensation Insurance. Contractor may maintain Workers'
Compensation Insurance (Statutory Limits) and Employer's Liability Insurance
(with limits of at least $1,000,000) for Contractor's employees in accordance with
the laws of the State of California, Section 3700 of the Labor Code. In addition,
Contractor shall require each subcontractor to similarly maintain Workers'
Compensation Insurance and Employer's Liability Insurance in accordance with
the laws of the State of California, Section 3700 for all of the subcontractor's
employees. Contractor shall submit to City, along with the certificate of insurance,
a Waiver of Subrogation endorsement in favor of the City, its officers, agents,
employees and volunteers.
7. Pollution Liability Insurance. Environmental Impairment Liability
Insurance shall be written on a Contractor's Pollution Liability form or other form
acceptable to the City providing coverage for liability arising out of sudden,
accidental and gradual pollution and remediation. The policy limit shall be no less
than $1,000,000 dollars per claim and in the aggregate. All activities contemplated
in this Contract shall be specifically scheduled on the policy as "covered
operations." The policy shall provide coverage for the hauling of waste from the
Project site to the final disposal location, including non -owned disposal sites.
8. Builder's Risk Insurance. Reserved.
9. The named insureds shall be Contractor and City, including its officers, officials,
employees, and agents. All subcontractors (excluding those solely responsible for
design Work) of any tier and suppliers shall be included as additional insureds as
their interests may appear. Contractor shall not be required to maintain property
insurance for any portion of the Project following transfer of control thereof to City.
The policy shall contain a provision that all proceeds from the builder's risk policy
SAN PABLO AVENUE PHASE 2 STREETSCAPE -5- CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
shall be made payable to the City of Palm Desert. The City will act as a fiduciary
for all other interests in the Project.
10. Policy shall be provided for replacement value on an "all risk" basis for the
completed value of the project. There shall be no coinsurance penalty or
provisional limit provision in any such policy. Policy must include: (1) coverage for
any ensuing loss from faulty workmanship, Nonconforming Work, omission or
deficiency in design or specifications; (2) coverage against machinery accidents
and operational testing; (3) coverage for removal of debris, and insuring the
buildings, structures, machinery, equipment, materials, facilities, fixtures and all
other properties constituting a part of the Project; (4) Ordinance or law coverage
for contingent rebuilding, demolition, and increased costs of construction; (5)
transit coverage (unless insured by the supplier or receiving contractor), with sub -
limits sufficient to insure the full replacement value of any key equipment item; (6)
Ocean marine cargo coverage insuring any Project materials or supplies, if
applicable; (7) coverage with sub -limits sufficient to insure the full replacement
value of any property or equipment stored either on or off the Site or any staging
area. Such insurance shall be on a form acceptable to City to ensure adequacy of
terms and sublimits and shall be submitted to the City prior to commencement of
construction.
C. Other Provisions or Requirements
1. Proof of Insurance. Contractor shall provide certificates of insurance to City as
evidence of the insurance coverage required herein, along with a waiver of
subrogation endorsement for workers' compensation. Insurance certificates and
endorsements must be approved by City's Risk Manager prior to commencement
of performance. Current certification of insurance shall be kept on file with City at
all times during the term of this contract. City reserves the right to require complete,
certified copies of all required insurance policies, at any time.
2. Duration of Coveraae. Contractor shall procure and maintain for the duration of the
contract insurance against claims for injuries to persons or damages to property,
which may arise from or in connection with the performance of the Work hereunder
by Contractor, its agents, representatives, employees or subcontractors.
Contractor must maintain general liability and umbrella or excess liability insurance
for as long as there is a statutory exposure to completed operations claims. The
City and its officers, officials, employees, and agents shall continue as additional
insureds under such policies.
3. Primarv/Non-Contributina. Coverage provided by Contractor shall be primary and
any insurance or self-insurance procured or maintained by City shall not be
required to contribute with it. The limits of insurance required herein may be
satisfied by a combination of primary and umbrella or excess insurance. Any
umbrella or excess insurance shall contain or be endorsed to contain a provision
that such coverage shall also apply on a primary and non-contributory basis for the
benefit of City before the City's own insurance or self-insurance shall be called
upon to protect it as a named insured.
4. Products/Completed Operations Coverage. Products/completed operations
coverage shall extend a minimum of three (3) years after project completion.
SAN PABLO AVENUE PHASE 2 STREETSCAPE -6- CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
Coverage shall be included on behalf of the insured for covered claims arising out
of the actions of independent contractors. If the insured is using subcontractors,
the Policy must include work performed "by or on behalf' of the insured. Policy
shall contain no language that would invalidate or remove the insurer's duty to
defend or indemnify for claims or suits expressly excluded from coverage. Policy
shall specifically provide for a duty to defend on the part of the insurer. The City,
its officials, officers, agents, and employees, shall be included as additional
insureds under the Products and Completed Operations coverage.
5. Citv's Riahts of Enforcement. In the event any policy of insurance required under
this Contract does not comply with these requirements, or is canceled and not
replaced, City has the right, but not the duty, to obtain the insurance it deems
necessary and any premium paid by City will be promptly reimbursed by
Contractor, or City will withhold amounts sufficient to pay premium from Contractor
payments. In the alternative, City may cancel this Contract.
6. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance or is on the List of Approved Surplus Line Insurers in the
State of California, with an assigned policyholders' Rating of A- (or higher) and
Financial Size Category Class VI (or larger) in accordance with the latest edition
of Best's Key Rating Guide, unless otherwise approved by the City's Risk
Manager.
7. Waiver of Subroaation. All insurance coverage maintained or procured pursuant
to this agreement shall be endorsed to waive subrogation against the City, its
elected or appointed officers, agents, officials, employees and volunteers, or shall
specifically allow Contractor or others providing insurance evidence in compliance
with these specifications to waive their right of recovery prior to a loss. Contractor
hereby waives its own right of recovery against the City, its elected or appointed
officers, agents, officials, employees and volunteers and shall require similar
written express waivers and insurance clauses from each of its subcontractors.
8. Enforcement of Contract Provisions (non estoppel). Contractor acknowledges and
agrees that any actual or alleged failure on the part of the City to inform Contractor
of non-compliance with any requirement imposes no additional obligations on the
City nor does it waive any rights hereunder.
9. Reauirements Not Limitina. Requirements of specific coverage features or limits
contained in this Section are not intended as a limitation on coverage, limits or
other requirements, or a waiver of any coverage normally provided by any
insurance. Specific reference to a given coverage feature is for purposes of
clarification only as it pertains to a given issue and is not intended by any party or
insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any
type. If the Contractor maintains higher limits than the minimums shown above,
the City requires and shall be entitled to coverage for the higher limits maintained
by the Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to the City.
10. Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker
and insurers to provide to City with a thirty (30) day notice of cancellation (except
SAN PABLO AVENUE PHASE 2 STREETSCAPE -7- CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
for nonpayment for which a ten (10) day notice is required) or nonrenewal of
coverage for each required coverage.
11. Additional Insured Status. General liability, automobile liability, and if applicable,
pollution liability policies shall provide or be endorsed to provide that the City and
its officers, officials, employees, agents, and volunteers shall be additional
insureds under such policies. This provision shall also apply to any
excess/umbrella liability policies. Coverage shall be at least as broad as coverage
provided by ISO's Owners, Lessees, or Contractors Additional Insured
Endorsement for the ongoing (i.e. ISO Form CG 20 10 07 04) and completed
operations (i.e. ISO Form CG 20 37 07 04) of Contractor.
12. Prohibition of Undisclosed Coveraae Limitations. None of the coverages required
herein will be in compliance with these requirements if they include any limiting
endorsement of any kind that has not been first submitted to City and approved of
in writing.
13. Separation of Insureds. A severability of interests provision must apply for all
additional insureds ensuring that Contractor's insurance shall apply separately to
each insured against whom claim is made or suit is brought, except with respect
to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability
exclusions.
14. Pass Through Clause. Contractor agrees to ensure that its sub -consultants, sub-
contractors, and any other party involved with the Project who is brought onto or
involved in the project by Contractor, provide the same minimum insurance
coverage and endorsements required of Contractor. Contractor agrees to monitor
and review all such coverage and assumes all responsibility for ensuring that such
coverage is provided in conformity with the requirements of this section. Contractor
agrees that upon request, all agreements with consultants, subcontractors, and
others engaged in the Project will be submitted to City for review.
15. Citv's Riaht to Revise Reauirements. The City or its Risk Manager reserves the
right at any time during the term of the contract to change the amounts and types
of insurance required by giving the Contractor ninety (90) days advance written
notice of such change. If such change results in substantial additional cost to the
Contractor, the City and Contractor may renegotiate Contractor's compensation.
If the City reduces the insurance requirements, the change shall go into effect
immediately and require no advanced written notice.
16. Self -Insured Retentions. Any self -insured retentions must be declared to and
approved by City. City reserves the right to require that self -insured retentions be
eliminated, lowered, or replaced by a deductible. Self-insurance will not be
considered to comply with these specifications unless approved by City.
17. Timely Notice of Claims. Contractor shall give City prompt and timely notice of
claims made or suits instituted that arise out of or result from Contractor's
performance under this Contract, and that involve or may involve coverage under
any of the required liability policies.
SAN PABLO AVENUE PHASE 2 STREETSCAPE -8- CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
18. Additional Insurance. Contractor shall also procure and maintain, at its own cost
and expense, any additional kinds of insurance, which in its own judgment may be
necessary for its proper protection and prosecution of the Work.
19. Safety. Contractor shall execute and maintain its work so as to avoid injury or
damage to any person or property. In carrying out its Services, the Contractor
shall at all times be in compliance with all applicable local, state and federal laws,
rules and regulations, and shall exercise all necessary precautions for the safety
of employees appropriate to the nature of the work and the conditions under which
the work is to be performed. Safety precautions, where applicable, shall include,
but shall not be limited to: (A) adequate life protection and lifesaving equipment
and procedures; (B) instructions in accident prevention for all employees and
subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges,
gang planks, confined space procedures, trenching and shoring, equipment and
other safety devices, equipment and wearing apparel as are necessary or lawfully
required to prevent accidents or injuries; and (C) adequate facilities for the proper
inspection and maintenance of all safety measures.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City's Office or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys'
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
SAN PABLO AVENUE PHASE 2 STREETSCAPE _9_ CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
IN WITNESS WHEREOF, this Contract has been duly executed by the above -named parties, on
the day and year above written.
CITY OF PALM DESERT LOS ANGELES ENGINEERING, INC.
By:
[Insert Name]
[INSERT TITLE]
ATTEST:
By:
[INSERT NAME], City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
(CONTRACTOR'S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
[If Corporation, TWO SIGNATURES,
President OR Vice President AND Secretary
OR Treasurer REQUIRED]
By:
Its:
Printed
Name:
[DELETE THE FOLLOWING SIGNATURE
LINE IF NOT REQUIRED]
By:
Its:
Printed
Name:
591176
Contractor's License Number and
Classification
A, B, C 10, C27, C61 /D 12, HAZ
DIR Registration Number
END OF CONTRACT
SAN PABLO AVENUE PHASE 2 STREETSCAPE _1 0_ CONTRACT FOR CONSTRUCTION
IMPROVEMENTS
Contract No. C38820B
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On . 20_, before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s)
Partner(s) Limited
General
Attorney -In -Fact
i Trustee(s)
I Guardian/Conservator
i Other. -
Signer is representing:
Name Of Person(s) Or Entity(ies)
SAN PABLO AVENUE PHASE 2 STREETSCAPE
IMPROVEMENTS
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
_1 1_ CONTRACT FOR CONSTRUCTION
Contract No. C38820B
BONDFORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of Palm Desert, a Charter City and municipal corporation, organized
under the laws of the State of California, with its principal place of business at 73-510 Fred Waring
Drive, Palm Desert, California 92260, (hereinafter referred to as the "City") has awarded to Los
Angeles Engineering, Inc., (hereinafter referred to as the "Contractor') an agreement for
Contract No. C3882013, (hereinafter referred to as the "Project").
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated July 10, 2020, (hereinafter referred to as "Contract
Documents"), the terms and conditions of which are expressly incorporated herein by reference;
and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, the undersigned Contractor and
as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of Six Million Six Hundred Fifty Five Two Hundred Thirty
Three Dollars ($6,655,233.00), said sum being not less than one hundred percent (100%) of the
total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our
heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney's
fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City's rights or the Contractor or Surety's obligations under
SAN PABLO AVENUE PHASE 2 STREETSCAPE -12- BOND FORMS
IMPROVEMENTS
Contract No. C38820B
the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section
337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City's option:
Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
"balance of the contract price" as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term "balance of the
contract price" as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City's objection to Contractor's further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
SAN PABLO AVENUE PHASE 2 STREETSCAPE _13_ BOND FORMS
IMPROVEMENTS
Contract No. C38820B
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of
,20
(Corporate Seal)
(Corporate Seal)
Contractor/ Principal
By
Title
Surety
By
Attorney -in -Fact
(Attach Attorney -in -Fact Certificate) Title
The rate of premium on this bond is per thousand. The total amount of premium
charges is $
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety
and Agent or Representative for
service of process in California)
SAN PABLO AVENUE PHASE 2 STREETSCAPE -14- BOND FORMS
IMPROVEMENTS
Contract No. C38820B
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On . 20_, before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s)
Partner(s) Limited
General
I Attorney -In -Fact
I Trustee(s)
i Guardian/Conservator
i Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
SAN PABLO AVENUE PHASE 2 STREETSCAPE _1 rj_
IMPROVEMENTS
BOND FORMS
Contract No. C38820B
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On . 20_, before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s)
Partner(s) Limited
General
Attorney-[ n-Fact
Trustee(s)
i Guardian/Conservator
i Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney -in -Fact. The Power -of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
SAN PABLO AVENUE PHASE 2 STREETSCAPE _1 6_ BOND FORMS
IMPROVEMENTS
Contract No. C38820B
Pavment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Palm Desert, a Charter City and municipal corporation organized and
operating under the laws of the State of California (hereinafter designated as the "City"), by action
taken or a resolution passed September 10t1, 2020, has awarded to Los Angeles Engineering,
Inc. hereinafter designated as the "Principal," a contract for the work described as follows:
Contract No. C38820B (the "Project"); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated July 10, 2020, (hereinafter referred to as "Contract
Documents"), the terms and conditions of which are expressly incorporated herein by reference;
and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing
that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions,
provender, equipment, or other supplies used in, upon, for or about the performance of the work
contracted to be done, or for any work or labor done thereon of any kind, or for amounts due
under the Unemployment Insurance Code or for any amounts required to be deducted, withheld,
and paid over to the Employment Development Department from the wages of employees of said
Principal and its Subcontractors with respect to such work or labor the Surety on this bond will
pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and as Surety, are held
and firmly bound unto the City in the penal sum of Six Million Six Hundred Fifty Five Two
Hundred Thirty Three Dollars ($6,655,233.00) lawful money of the United States of America,
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors,
heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named
in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in,
upon, for or about the performance of the work contracted to be done, or for any work or labor
thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to
work or labor performed under the contract, or for any amounts required to be deducted, withheld,
and paid over to the Employment Development Department or Franchise Tax Board from the
wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation
Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the
same, in an amount not exceeding the sum herein above specified, and also, in case suit is
brought upon this bond, all litigation expenses incurred by the City in such suit, including
reasonable attorneys' fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as
to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released
from the obligation of this bond by any change, extension of time for performance, addition,
alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining
or relating to any scheme or work of improvement herein above described, or pertaining or relating
to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of
SAN PABLO AVENUE PHASE 2 STREETSCAPE 17 BOND FORMS
IMPROVEMENTS
Contract No. C38820B
any terms of payment or extension of the time for any payment pertaining or relating to any
scheme or work of improvement herein above described, nor by any rescission or attempted
rescission or attempted rescission of the contract, agreement or bond, nor by any conditions
precedent or subsequent in the bond attempting to limit the right of recovery of claimants
otherwise entitled to recover under any such contract or agreement or under the bond, nor by any
fraud practiced by any person other than the claimant seeking to recover on the bond and that
this bond be construed most strongly against the Surety and in favor of all persons for whose
benefit such bond is given, and under no circumstances shall Surety be released from liability to
those for whose benefit such bond has been given, by reason of any breach of contract between
the owner or the City and original contractor or on the part of any obligee named in such bond,
but the sole conditions of recovery shall be that claimant is a person described in Civil Code
Section 9100, and has not been paid the full amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of Contract, including but not limited to, the provisions
of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of
,20
(Corporate Seal)
(Corporate Seal)
Contractor/ Principal
By
Title
Surety
By
Attorney -in -Fact
(Attach Attorney -in -Fact Certificate) Title
SAN PABLO AVENUE PHASE 2 STREETSCAPE 18 BOND FORMS
IMPROVEMENTS
Contract No. C38820B
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On . 20_, before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s)
Partner(s) Limited
General
Attorney -In -Fact
Trustee(s)
i Guardian/Conservator
I Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
SAN PABLO AVENUE PHASE 2 STREETSCAPE 19
IMPROVEMENTS
BOND FORMS
Contract No. C38820B
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On , 20_, before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s)
Partner(s) Limited
General
Attorney -In -Fact
i Trustee(s)
i Guardian/Conservator
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney -in -Fact. The Power -of -Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
SAN PABLO AVENUE PHASE 2 STREETSCAPE 20 BOND FORMS
IMPROVEMENTS
\
\§
.(
)[
2 :
����
�
:
�, \.
�.
.
� -
.
� �� �
}\
Q �
y �
. /
�:
. �
^
��
�
�
\\
�
T
G
�
111
O
09+1Z V1S 1331 M0139 33S 3NI1--:_ti✓1