HomeMy WebLinkAboutC37000 CO1, 2, and NOC - Desert Willow Pump Panel Rplcmnt 861-18Contract No. C37000 STAFF REPORT CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT MEETING DATE: May 23, 2019 PREPARED BY: Randy Chavez, Landscape Supervisor REQUEST: Ratify Change Orders No. 1 and No. 2 to Contract No. C37000 with Huntington Beach Electric, and authorize the City Clerk to file a Notice of Completion for the Desert Willow Pump Station Panel Replacement Project (Project No. 861-18) Recommendation By Minute Motion: 1. Ratify Change Order No. 1 to Contract No. C37000 in the amount of $6,300 for the cost of installing new cable connectors. 2. Ratify Change Order No. 2 to Contract No. C37000 in the amount of $3,000 for reconfiguration of cable connections to service meters. 3. Authorize the City Clerk to File a Notice of Completion for the Desert Willow Pump Station Panel Replacement Project No. 861-18. Funds are available in Account No. 4414195-4809200, Desert Willow Golf Capital. Strategic Plan This project conforms to Parks and Recreation Priority 1 Goal of continuing the high quality of life that our residents and visitors expect, and provide recreational and exercise opportunities in all public spaces. as The ongoing maintenance of the Desert Willow golf courses preserves and enhances one of the City's premier recreational facilities. Background Analvsis Desert Willow Golf Resort's irrigation pump station panels were the original equipment installed when Desert Willow was developed over twenty (20) years ago. The controllers did not communicate efficiently with the pumps, which caused washouts and erosion in the golf courses that lead to expensive repair costs and resulted in thousands of gallons of unrecoverable water. With the advancement and improvement to technology used to manage golf course irrigation, a web -based system was selected to disseminate information rapidly when anomalies are detected in the system. The new panels will now monitor water flow and May 23, 2019 - Staff Report Ratify Change Orders No. 1 & 2 and File Notice of Completion for Desert Willow Pump Station Panel Replacement Project No. 861-18 (Contract No. C37000) Page 2 of 2 pressure produced by the irrigation pumps and will notify the water manager when they are not within range. This will ensure that adjustments can be performed quickly to minimize failures to irrigation lines, valves, rotors and keep the golf courses in peak condition at all times. On June 14, 2018, City Council awarded Contract No. C37000 in the amount of $149,964 to Huntington Beach Electric of Huntington Beach, California, authorized the Finance Director to set aside a 10% contingency in the amount of $14,996.40, and authorized the City Manager to execute the contract. On February 28, 2019, the City Manager approved Change Order No. 1 in the amount of $6,300 for the cost of installing new cable connectors instead of reusing the existing connectors, as the existing connecters were no longer sufficient. On April 12, 2019, the City Manager approved Change Order No. 2 in the amount of $3,000 for the modification of configuring the connections to the service meter to maximize the rate benefit of the new tiered rate structure implemented by Southern California Edison. This project is now complete and the work performed is acceptable by staff. Therefore, it is recommended that the City Council authorize the City Clerk to file a Notice of Completion for the Desert Willow Pump Station Panel Replacement Project No. 861-18. Fiscal Analvsis Funds for Change Orders 1 & 2 were included in the contingency that was set aside for this project. Therefore, there is no fiscal impact. LEGAL REVIEW N/A DEPT. REVIEW Robert W. Hargreaves Tom Garcia, P.E. City Attorney Director of Public Works FINANCIAL CITY MANAGER REVIEW �----t Moore Lauri Aylaian Director of Finance City Manager CONTRACTOR: Huntington Beach Electric 17632 Metzler, Suite 213 Huntington Beach, CA 92647 ATTACHMENTS: Change Order No. 1 Change Order No. 2 Notice of Completion CITY OF PALM DESERT CONTRACT CHANGE ORDER Contract Purpose Desert Willow Pump Station Panel Replacement Consultant's Name Huntington Beach Electric, Inc. Address: 17632 Metzler, Suite 213 Huntington Beach, CA 92647 Contract # / P.O. # C37000 Change Order No. I 1 Contingency: I YES X I NO Account No. 4414195-4809200 ProjectNo. 861-18 Vendor No. You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE In Contract Price In Contract Price Installation of new connector cable for irrigation pump panel replacement $6,300.00 TOTALS: - 6,300.00 NET CHANGE IN CONTRACT PRICE: 6,300.00 JUSTIFICATION: Due to necessary panel configuration changes, the length of the cable connectors intended for reuse is no longer sufficient and splicing the cables is not recommended due to the voltage necessary for safe operation. TOTAL BUDIXT FM PROXIECT: + 164,94240 I 1cwn I"avy- Less: Experd & Bmm b. To Date: - 149,946.00 Amail Approved by Canal: + 14,996.40 Less: This A Tend ent Arrant: - 6,300.00 Less: Prior Change Order(s): - - BALANCE OF BUDGET Less: This Change Order: - 6,300.00 REMAINING FOR PRCUE;T: 8,696.40 Balarce Pamairyng of Corfdrgerxy. 8,696.401 The amount of the Contract will be increased by the Sum of: Six Thousand Three Hundred and 00/100 Dollars Contract C37000 Contract Change Order No. 1 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days Revised Contract Total $156.246.00 The undersigned Contractor approves the foregoing Change Order No.1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order No. 1. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: 2. ACCEPTED BY: TOM GARCIA, P.E. CONTRACTOR PUBLIC WORKS DIRECTOR 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: JANET MOORE FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval LAURI AYLAIAN CITY MANAGER Date Accepted 2/28/19 Date Approved CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT INTEROFFICE MEMORANDUM To: Lauri Aylaian, City Manager From: Randy Chavez, Landscape Supervisor Date: February 28, 2019 Subject: Change Order No.1 to Contract No. C37000 with Huntington Beach Electric for the Desert Willow Pump Panel Replacement ('Project No. 861-18) On June 14, 2018, City Council approved the award of Contract C37000 to Huntington Beach Electric of Huntington Beach, California, in the amount of $149,964 plus a 10% contingency in the amount of $14,996.40. Work was originally scheduled to take place in the summer of 2018. However, due to material delays the project was moved to the fall of 2018 following the over seeding process and turf establishment period. The panels are currently In the process of being replaced. But, due to necessary panel configuration changes, the length of the cable connectors intended for reuse is no longer sufficient and spacing the cables is not recommended due to the voltage necessary for safe operation. The contractor has requested an additional lump sum amount of $6,300 for the cost of Installing the new cable connectors and staff has independently verified both the necessity and the cost associated with the work. Funds are available in contingency. The reclaimed water pumps are unavailable for golf course irrigation until the connectors are replaced. Because the connectors cannot be ordered until the Change Order is approved, staff requests City Manager approval of Change Order No. 1 to Contract No. C37000 with Huntington Beach Electric in the amount of $6,300 per Ordinance No. 1335 Section 1, Chapter 3.30 Purchasing System and Public Works Contracts, 3.30.170 Change Orders, Item B, Number 1 so as not to delay the work in progress. Staff will bring the item forward for ratification by City Council at an upcoming meeting. Reviewed and Concur: '`Lauri Aylaian, City Manager /sd Attachment HUNTINGTON BEACH ELECTRIC INC RFI I CHANGE ORDER TO: CITY OF PALM DESERT 73510 FRED WARING DRIVE ATrrr: RANDY CHAVEZ PRoircT ADDRESS: DESERT WILLOW GOLF COURSE. BEAUTIFUL PALM DESERT. CA REQUEST FOR INFORMATION 92 n9 02/26/ 2019 a. Existing Cables are not long enough to reach new Pump Control Panel load terminals. Existing cables are also deteriorated, and insulation .wrapper is mildly cracking. I. Recommended Solution: Replace approximately 600 LF Total of #1 AWG XHHW Cable to existing motors through existing conduits and re -terminate with 3M 5302 (QTY=B) Motor Lead Kits. Install new 4" LB for incoming power connection and new Terminal lugs for all connections (QTY=40) b. Additional Cost = $6,300 — lump sum L Material $1,900 ii. Labor $3,0S0 Ill. Other: $1,350: Incidental Material (16) new #12 AWG motor heater cables installed inside existing conduits to Motor heaters, new Cable Testing, Bond Premium increase, overhead, subsistence, Contingency, supervision, Engineering, Project Management and Profit. Sincerely, r� Z:). 6, HUNTINGTON BEACH ELECTRIC CONTRACTOR CITY OF PALM DESERT CONTRACT CHANGE ORDER Contract Purpose Desert Willow Golf Resort Pump Panel Replacement Consultant's Name Huntington Beach Electric Address: 17632 Metzler, Suite 213 Huntington Beach, CA 92647 Contract # / P.O. # C37000 Change Order No. I 2 Contingency: I YES X I NO Account No. 14414195-4809200 Project No. 1 861-18 Vendor No. You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE In Contract Price In Contract Price Support existing conduit and enclosures and terminate panel cables to $3,000.00 meter. Reconfigure connection to a variable frequency drive meter. TOTALS: - 3,000.00 NET CHANGE IN CONTRACT PRICE: 3,000.00 JUSTIFICATION: Desert Willow Golf Resort course superintendent asked that the new pump be connected to their energy efficient service to maximize savings rate benefit under the new tiered Southern California Edison rate structure. 03_O...) 64., ,1 BALANCEOF Dr RBVPJMNG FOR PROJECT 5,696.40 CONTINGENCY- ATaxt '••• ed by Cb-m 996.4 Less: Prior Charge Order(s): 6,300.001 Less: This Change Order: 3,000.00 :...- Flernainingr • •- 69641 The amount of the Contract will be increased by the Sum of: Three Thousand Dollars and no/00 Contract C37000 Contract Change Order No. 2 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days Revised Contract Total $159,246.00 The undersigned Contractor approves the foregoing Change Order No. 2 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order No. 2. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: TOM GARCIA, P.E. CONTRACTOR Date Accepted PUBLIC WORKS DIRECTOR 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: 4/12/19 JANET MOORE LAURI AYLAIAN Date Approved FINANCE DIRECTOR CITY MANAGER NOTE: No payments will be made prior to City Manager and Council approval CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT INTEROFFICE MEMORANDUM To: Lauri Aylaian, City Manager From: Randy Chavez, Landscape Supervisor Date: April 12, 2019 Subject: Change Order No. 2 to Contract No. C37500 with Desert Willow Golf Resort Pump Panel Replacement ;(Project No. 861-18) On June 14, 2018, City Council approved the award of Contract C37000 to Huntington Beach Electric of Huntington Beach, California, in the amount of $149,964 plus a 10% contingency in the amount of $14,996.40. On February 28, 2019, the City Manager approved Change Order No. 1 in the amount of $6,300.00, to compensate the contractor for changes in the length of necessary cable to configure the connections for the pump panels. The cable originally thought to be sufficient, however, were not able to be reused due to the voltage necessary for safe operation. During the installation, Desert Willow Golf Resort requested the panels be connected to a variable frequency drive at an adjacent available meter. The configuration was modified to maximize the rate benefit of the new tiered rate structure implemented by Southern California Edison. Contingency funds are available for this modification. Therefore, staff is requesting City Manager approve Change Order No. 2 in the amount of $3,000.00, to Contract No. C37000 with Huntington Beach Electric Inc. (Attached) In an effort to avoid construction delays, and ensure water is available as irrigation needs increase with the rise in temperature, staff is requesting you approve Change Order. No. 2, in the amount of $3,000 per Ordinance No. 1335 Section 1, Chapter 3.30 Purchasing System and Public Works Contracts, 3.30.170 Change Orders, Item B, Number 1, so as not to delay the work in progress. Staff will bring forward ratification by City Council at an upcoming meeting. Reviewed and Concur: Randy Chavez, L dscape Supervisor `Lauri Aylaian, City Manager /clg Attachments as noted HUNTINGTON BEACH ELECTRIC INC RF1 / CHANGE ORDER#2 To: CITY OF PALM DESERT 03/20/2019 73510 FRED WARING DRIVE ATTN: RANDY CHAVEZ PROJECT ADDRESS: DESERT WILLOW GOLF COURSE, BEAUTIFUL PALM DESERT, CA REQUEST FOR INFORMATION a. Site superintendent has requested to install a secondary feed to the VFD in each cabinet from a separate meter. The existing feeders that fed the existing vfds terminate in electrical boxes nearby and can be extended. The existing vendor bussing in control panel must be reconfigured. i. Work Required: Support existing conduit and enclosures, terminate cables on new VFD, and rewire VFD connection in each panel. Remove Electrical bussing and replace with approximately 70 LF of #1 AWG. b. Additional Cost = $3,000 — lump sum i. Material: $400 ii. Labor: 2 days $2,600 Sincerely, ru�" P. 94A+z7 HUNTINGTON BEACH ELECTRIC CONTRACTOR Signature Date ENGINEER Of RECORD — DESERT WILLOW — PALM DESERT To be recorded with the Riverside County Recorder within 10 days after completion and acceptance by the City Council. NO RECORDING FEE PER SECTION 6103 OF THE GOVERNMENT CODE. When recorded, return to: Office of the City Clerk City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260 NOTICE OF COMPLETION (Cal. Civ. Code § 3093 — Public Works) NOTICE IS HEREBY GIVEN: 1. That the interest or estate stated in paragraph 3 herein in the real property herein described is SOLELY OWNED by the CITY OF PALM DESERT, A MUNICIPAL CORPORATION, a political subdivision of the State of California, and whose address is 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA, 92260. 2. That the full name and address of the owner of said interest or estate is set forth in the preceding paragraph. 3. That the nature of the title of the stated owner, as set forth in paragraph 1, is FEE. 4. That on the 231 day of May. 2019, work of improvement described as the Desert Willow Pump Station Panel Replacement, Project No. 861-18 Contract No.C37000, on the real property herein described was completed. 5. That the name of the original contractor, if any, for said work of improvement was: Huntington Beach Electric, Inc. 6. That the real property herein referred to is situated in the City of Palm Desert, County of Riverside, State of California, and is described as Desert Willow Golf Course. 38-995 Desert Willow Drive. Palm Desert, California 92260. Date STATE OF CALIFORNIA } } ss COUNTY OF RIVERSIDE } CITY OF PALM DESERT A MUNICIPAL CORPORATION By: Susan Marie Weber, Mayor I hereby certify that I am the City Clerk of the governing board of the CITY OF PALM DESERT, CALIFORNIA, the political subdivision which executed the foregoing Notice and on whose behalf I make this verification: That I have read said Notice, know its contents, and that the same is true. I certify under penalty of perjury that the foregoing is true and correct. Executed at Palm Desert, California, on this day of 20 RACHELLE D. KLASSEN, CITY CLERK Rev. Sept 2016