HomeMy WebLinkAboutC37620 NOC Playground Equipment at the Joe Mann Park 925-19Contract No. C37620 STAFF REPORT CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT MEETING DATE: May 23, 2019 PREPARED BY: Randy Chavez, Landscape Supervisor REQUEST: Accept Contract No. C37620 with Great Western Recreation, LLC for the installation of inclusive playground equipment at Joe Mann Park as complete and authorize the City Clerk to file the Notice of Completion (Project No. 925-19). Recommendation By Minute Motion: 1. Ratify Change Order No. 1 in the amount of $12,905.10, for statutorily required bonds that were not included in the original scope of work, as well as replacement of wood fibers for ADA accessibility and 2. Ratify Deductive Change Order No. 2 in the credit amount of $2,050; and 3. Accept the installation of inclusive playground equipment at Joe Mann Park, Contract No. C37620 with Great Western Recreation, LLC, of Logan, Utah, as complete; and 4. Authorize the Mayor to execute the Notice of Completion; and 5. Authorize the City Clerk to record the same. Strategic Plan The project furthered the goals of the strategic plan by providing a high quality, inclusive park with recreations facilities for the community. Background Analvsis On September 27, 2018, City Council approved Contract No. C37620, with Great Western Recreation, LLC (Great Western), of Logan, Utah, for the installation of inclusive playground equipment at Joe Mann Park in the amount of $215,179. At that time a contingency amount of $43,036 was also approved. May 23, 2019 - Staff Report Approve Change Order No. 2 to Contract No. C37620 with Great Western Recreation for Joe Mann Park Playground Improvements (Project No. 925-19) Page 2 of 2 On January 9, 2019, City Manager approved Change Order No. 1 in the amount of $12,905.10, for statutorily required bonds that were not included in the original scope of work, as well as replacement of wood fibers for ADA accessibility. This prevented an undue delay to the project, allowing the contractor to be approved, and commence with ordering equipment. On March 27, 2019, Great Western notified the City that due to the existing equipment being donated for repurposing to Father's Heart Ranch and relocated by their forces, Great Western did not have to remove the existing equipment. This resulted in a credit of $2,050. Great Western asked that the Change Order No. 2 be acknowledged by the City so they could close out their contract file, with documented contract totals. On May 10, 2019, the City Manager acknowledged the Deductive Change Order, and it has been sent to the contractor. The overall total contract price was reduced to $226,034. The work has been inspected by staff and found to be complete and incompliance with the contract documents. Fiscal Analvsis There is no fiscal impact associated with this action. LEGAL REVIEW DEPT. REVIEW FINANCIAL REVIEW CITY MANAGER Approved as to Form N/A ,... .....,.�. a Robert W. Hargreaves Tom Garcia, P.E. fan Moore Lauri Aylaian City Attorney Director of Public Works Director of Finance City Manager CONTRACTOR: Great Western Recreation 975 S. State Highway 89 Logan, UT 84321 ATTACHMENTS: Memo to Lauri Aylaian, dated January 9, 2019 Change Order No.1 Memo to Lauri Aylaian, dated May 10, 2019 Change Order No. 2 Notice of Completion Vicinity Map CITY OF PALM DESERT �. PUBLIC WORKS DEPARTMENT,'r, INTEROFFICE MEMORANDUM To: Lauri Aylaian, City Manager From: Tom Garcia, P.E., Director of Public Works Date: January 9, 2019 Subject: Approve Change Order No. 1 for the Joe Mann Park Playground On September 27, 2018, City Council approved a contract in the amount of $215,719, with a 20% contingency, with Great Western Recreation, LLC (Great Western) for the removal of existing playground equipment at Joe Mann Park and the installation of new inclusive equipment. Initially this procurement was being handled by the Housing Authority using a Government Procurement Agency; US Communities. The equipment was secured and Great Western Recreation, LLC, was the listed manufacturer/installer. Subsequently, the project was turned over to Public Works for project implementation, construction, and completion. After award of the contract, it was brought to the attention of staff that bonds had never been a part of the requested quote. The cost to provide the statutorily required bonds is approximately $3,670. The original design of the playground called for 5,510 square feet of poured in place rubber surface. Staff felt this was costly and asked Great Western to reduce that amount to 2,704 square feet at a cost savings of $38,021.30, and provide an alternative. Which they did, however, in revising the quote Great Western did not provide a line item for the replacement engineered wood fibers for ADA accessibility. After award of Contract No. C37620, the omission was discovered. Therefore, staff is now requesting the approval of Change Order No. 1 to Joe Mann Park Playground Replacement in the amount of $12,905.10. In an effort to move the project along, staff would like you to approve the Change Order No. 1, which staff will take to City Council on February 14, 2019 for ratification. Funds are available in the 20 percent contingency (account number 1104618-4400100). `fom Garcia, P.E. Director of Public Works kIg and S? ::�Lauri Aylaian t--- City Manager GAPubWorks\PROJECTS\925-19 Joe Mann Park Playground Equipment\Correspondence\Inter-Olfice\2019-01-09 MEMO to City Manager -Approve CO tdoc GREAT WESTERN Myles t-4atvey R1 "ir, IUmpec zar, Joe Mann EWF Surfacing City of Palm Desert Attn: Randy Chavez 73510 Fred Waring Dr. Palm Desert, CA 92260 Phone: 760-346-0611 Fax: 760-341-7098 rchavez@cityofpalmdesert.org QUOTE #95062 08/20/2018 Project #: P69849 Ship To Zip: 92211 Quantity Part 4 Description• 167 EWF Turboscape - Engineered Wood Fiber Blown $55.30 $9,235.10 in - 167 CY of EWF Blown in Site Location: 77810 California Dr. SubTotal: $9,235.10 Palm Desert, CA 92211 Total Amount: $9,235.10 Quote is for EWF Blown in Surfacing only please referance quote 95060 for equipment Payment Options Cash or Check Orders - Please make check out to Great Western Recreation Credit Card Orders - Visa or Mastercard. 50% Down - 50% down payment with order and remaining 50% payment before shipment Credit Terms - Credit application required with order. Terms negotiated prior to order placement. Down payment may still be required. ***Note: If you are issuing a P.O. please make it payable to Great Western Recreation** Payment Terms - NET 30 This quotation is subject to policies in the current product catalogs used to develop this quote and the following terms and conditions. Our quotation is based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess of $1,000.00 to be supported by your written purchase order made out to Great Western Installations. Kindly issue one order for the equipment and a separate order for surfacing and/or equipment installation services. Pricing: fo.b. factory, firm for 10 days from date of quotation. Payment terms: payment in full, net 30 days subject to approval by Great Western Installations. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted. Shipment: order shall ship within 30-45 days after Great Western Installations' receipt and acceptance of your purchase order, unless confirmed otherwise, color selections, approved submittals, and receipt of deposit, if required. Receipt of goods: Customer shall receive, unload and inspect goods upon arrival, noting any discrepancies on the Delivery Receipt prior to written acceptance of the shipment. Damaged goods and/or shortages must be reported within 30 days of receipt of shipment in order to receive full credit. Please inspect and inventory all items received and list all damaged and missing goods on the bill of lading provided by the freight driver. Credit will not be given on items reported outside the 30 day time period. Freight Charges: Prepaid and added at time of invoicing. Taxes: State and local taxes, if applicable, will be added at time of invoicing unless a tax exempt certificate is provided at the time of order entry. Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing; borders and drainage provisions. Unless specifically included, this quotation also excludes prevailing wages, drawings and permits. This quotation also excludes impact testing and independent audits unless specifically included. Submittals: our design proposal reflects the spirit and intent of the project plans and specifications. While some variations may exist between our quotation and the project design, the differences do not materially affect the intended use. Great Western Installations designs and specifications are unique and not intended to be identical in all respects to other manufacturers. When requested we shall submit for review and approval by the owner's representative detailed drawings depicting the equipment to be furnished accompanied by specifications describing materials. Once approved, these drawings and specifications shall constitute the final documents for the project and shall take precedence over all other requirements. To Order: Please complete the acceptance portion of this quotation and provide color selections, purchase order copy and other key information requested. Acceptance of this proposal indicates your agreement to the terms and conditions stated herein. Pagel of 2 Joe Mann EWF Surfacing QUOTE #95062 08/20/2018 Installation: shall be by a Certified GameTime Installer. Customer shall be responsible for scheduling coordination and site preparation. Site should be level and permit installation equipment access. Purchaser shall be responsible for unknown conditions such as buried utilities, tree stumps, bedrock or any, concealed materials or conditions that may result in additional labor or material costs. Order Information: Bill To: Ship To: Company: Contact: Billing Contact: Address: Address: City, State, Zip: City, State, Zip: Tel: Tel: Email: Email: SITE: Address: City, State, Zip: Customer Signature: *TO ENSURE WE HAVE ALL THE CORRECT INFORMATION, PLEASE COMPLETELY FILL OUT THE ORDER INFORMATION ABOVE!! Page 2 of 2 ` Remit to: Game Time Invoice PO Box 680121 Page 1 of 1 A pLAyCORE c�Wr Fort Payne, AL 35968 Invoice number PJI-0102627 Customer no 0001_ 4342 150 PlayCore Dr SE, Fort Payne, AL 35967 Invoice date 12/11/2018 Customer PO www.gametime.com Payment terms Net 30 days Reference 1811064.6 (256) 845-5610 * (800) 633-2394 Date shipped 11/29/2018 Sold to: Ship to : City of Palm Desert City of Palm Desert 73-510 Fred Waring Dr 77810 California Dr. PALM DESERT, CA 92260 Joe Mann Park Palm Desert, CA 92211 Original Order No: 8332317 Project Name Joe Mann Change order 1 Sales Group: Great Western Park & Playground -CA Cataloq No Description Qtv Unit price Amount Installation BOND 1.00 3,670.000 3,670.00 Sub total 3,670.00 Total 3,670.00' Sales subtotal amount Sales tax 3,670.00 0.00 INVOICE TOTAL DUE USD $3,670.00 CONCEALED SHORTAGES MUST BE REPORTED TO GAMETIME WITHIN 60 DAYS OF RECEIPT OF MERCHANDISE. CONDITIONS: TITLE TO THIS MERCHANDISE PASSES TO BUYER WHEN SELLER DELIVERS GOODS TO CARRIER Please note that GAMETIME is a material supplier only and therefore not subject to payment retainage. Shipment of goods which appear on this invoice constitutes completion of this contract by GAMETIME. Payment in full is required within the agreed terms stated on this invoice. Warranty claims and back charges may not be deducted from contract payments without prior approval of GAMETIME customer service personnel. Seller hereby certifies, to the best of its knowledge, information and belief, that its selling price does not exceed the maximum price permissible under any prevailing applicable law or regulation. Seller agrees to refund any amounts paid by Buyer which are subsequently determined to be in excess of such maximum price. We hereby certify that these goods were produced in compliance with all applicable requirements of Sections 6, 7 and 12 of the Fair Labor Standards Act, as amended, and of regulations and orders of the United States Department of Labor issued under Section 14 thereof. Tell me about your experience. Call me at 256-997-5308 or email at SpencerC@GameTime.com Spencer Cheak Group President Landscape Services Division LMA: Location: Acct No: Description: ApprovEjd for Payment By: Ordered By Approved By / Date CITY OF PALM DESERT CONTRACT CHANGE ORDER Contract Purpose Joe Mann Park Inclusive Playground Installation Consultant's Name Great Western Recreation, LLC Address: 975 S. Hwy 89-91, Logan, UT 84321 Contract # / P.O. # C37620 P 114348 Change Order No. 1 Contingency: kYES I NO Account No. 1104618-4400100 Project No. 925-19 Vendor No. V0014219 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE In Contract Price In Contract Price Bond Premiumn $3,670.00 Engineered Wood Fiber 9,235.10 TOTALS: NET CHANGE IN CONTRACT PRICE: 12,905.10 12,905.10 JUSTIFICATION: Bond were not required in the original quote and removal of more costly poured -in -place rubber surface must be replaced with ADA compliant engineered wood fiber product. Less: Emend. & Enaarrb. To Date. - 215,719.00 Less: This A. , u tit , u (L Amount: - 12,905.10 BALANCE CF BUDG-ET FEK44 MNG FCR PRQIECT (12,905.10) The amount of the Contract will be increased by the Sum of: Twelve Thousand Nine Hundred Five dollars and 10/100 Contract C37620 Contract Change Order No. 1 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days Revised Contract Total $228,624.10 The undersigned Contractor approves the foregoing Change Order No. 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order No. 1 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purc ase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: OM GARCIA, P.E. -1a PUBLIC WORKS DIRECTOR CONTRACTOR Date Accepted 3. CERTIFIED FUNDS AVAILABLE: JANET MOORE FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval 4. APPROVED BY: LAURI AYLAIAN Date Approved CITY MANAGER CITY OF PALM DESERT CONTRACT CHANGE ORDER Contract Purpose Joe Mann Park Inclusive Playground Installation Consultant's Name Great Western Recreation, LLC Address: 975 S. Hwy 89-91, Logan, UT 84321 Contract # / P.O. # C37620 P114348 Change Order No. h 1 Contingency: YES) I NO Account No. 1104618-4400100 Project No. 925-19 Vendor No. V0014219 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE In Contract Price In Contract Price Bond Premiumn $3,670.00 Engineered Wood Fiber 9,235.10 TOTALS: NET CHANGE IN CONTRACT PRICE: 12,905.10 12,905.10 JUSTIFICATION: Bond were not required in the original quote and removal of more costly poured -in -place rubber surface must be replaced with ADA compliant engineered wood fiber product. _ss: Ex•a • & Eryurb. To Dder 215,719.00 MANCE CF BUDGEr FEMAINNG FOR PFCJEC;T (12,905.10) The amount of the Contract will be increased by the Sum of: Twelve Thousand Nine Hundred Five dollars and 10/100 Contract C37620 Contract Change Order No. 1 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days Revised Contract Total $228,624.10 The undersigned Contractor approves the foregoing Change Order No. 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order No. 1 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY:---- /L TOM GARCI'A, P.E. PUBLIC WORKS DIRECTOR CERTIFIED FUNDS AVAILABLE: JANET MOORE FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval 2. ACCEPTED BY: CONTRACTOR 4. APPROVED BY: LAURI AYLAIAN CITY MANAGER ]-&LI-Ir Date Accepted Date Approved CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT INTEROFFICE MEMORANDUM To: Lauri Aylaian, City Manager From: Cora L. Gaugush, Management Specialist II Date: May 10, 2019 Subject: Approve Change Order No. 2 for the Joe Mann Park Playground On September 27, 201 B, City Council approved a contract in the amount of $215,719, with a 20'0/6 contingency, with Great Western Recreation, LLC (Great Western) for the removal of existing playground equipment at Joe Mann Park and the installation of new inclusive equipment. On January 9, 2019, Change Order No.1, in the amount of $3,670 for statutorily required bonds for the above -mentioned project was approved. Due to the fact the City donated the existing equipment to Father's Heart Ranch, the work for demolition for was performed by others, and there is a credit for this line item. On March 27, 2019, Great Western submitted Change Order No. 2 indicating a credit of $2050.00. Great Western is requesting the City acknowledge Change Order No.2., and the total contract amount reduction. Staff recommends the City Manager execute Change Order No. 2. A Notice of Completion Tom Garcia, P.E. Director of Public Works /cIg Review and Concur: 145tuun Aylaian City Manager G 4-,&Wa'kdPROJEGTSV&10 Joe Mardi Park PA,proW4 ImpmonwtWcmempoWKeo imw4ontWTo1 PAs10 M6M0 to CMr M&h&o•r-Mvm'+4 Ca 2.ex GREAT WESTERN From: Great Western Recreation 975 S State Hwy 89 Logan, LIT 84321 435.245.5055 Change Order Date: 3-27-19 Change Order:002 Project: Joe Mann Original Quote Amount: $ 215,178.31 Total Previous Change Orders: $ 12,905.10 Total Before This Change Order: $ 228,083.41 Amount of this Change Order: $-2050.00 Revised Amount: $ 226,033A1 To: City of Palm Desert 73510 Fred Waring Dr. Palm Desert, CA 92260 Original Quote #95103 CO #1 Quote 496040 The Original Agreement is hereby modified and amended by the following deviations from the original plans and specifications: Change Order Request #002 It is mutually agreed that for such change the contract price is decrease by two thousand and fifty - dollars and 00/100 ($2,050.00), payable with the payments due under the original agreement. All other provisions of the original quote and agreement shall remain in full force and effect without change because of the above deviations. Except as amended herein, all terms, covenants, and conditions of the Original Agreement shall remain in full force and effect. Reason for Change Order #002 Demo and Remove playground equipment were not provided, the cost for this was $4120.00 but we need to provide and install rebar cages for shade structure and demo and Remove concrete access point for a cost of $2050.00. Taking the original demo and removed of playground cost and subtracting the additional cost will result in decreasing the contract amount of this line item to a total of $2070.00 GameTime C/O Great Western Recreation Printed Name: Shellece Gunnell Title: Chief PoeratineOffiAA�}ce( Aj�/�n a D Signature Date: _ 77-t4 Printed Name: Title: Signature. Date: --JfJ, �� I To be recorded with the Riverside County Recorder within 10 days after completion and acceptance by the City Council. NO RECORDING FEE PER SECTION 6103 OF THE GOVERNMENT CODE. When recorded, return to: Office of the City Clerk City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260 APN 637-062-010 NOTICE OF COMPLETION (Cal. Civ. Code § 3093 — Public Works) NOTICE IS HEREBY GIVEN: 1. That the interest or estate stated in paragraph 3 herein in the real property herein described is SOLELY OWNED by the CITY OF PALM DESERT, A MUNICIPAL CORPORATION, a political subdivision of the State of California, and whose address is 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA, 92260. 2. That the full name and address of the owner of said interest or estate is set forth in the preceding paragraph. 3. That the nature of the title of the stated owner, as set forth in paragraph 1, is FEE. 4. That on the23rd day of May. 2019, work of improvement described as the Installation of inclusive Plavqround Equipment at Joe Mann Park, Project No. 925-19Contract No.C37620, on the real property herein described was completed. 5. That the name of the original contractor, if any, for said work of improvement was: Great Western Recreation, LLC, 975 S. Highway 89-91, Logan, Utah, 84621. 6. That the real property herein referred to is situated in the City of Palm Desert, County of Riverside, State of California, and is described as: 77810 California Avenue, Palm Desert, California 92211. Date: STATE OF CALIFORNIA } } ss COUNTY OF RIVERSIDE } CITY OF PALM DESERT A MUNICIPAL CORPORATION By: Susan Marie Weber, Mayor I hereby certify that I am the City Clerk of the governing board of the CITY OF PALM DESERT, CALIFORNIA, the political subdivision which executed the foregoing Notice and on whose behalf I make this verification: That I have read said Notice, know its contents, and that the same is true. I certify under penalty of perjury that the foregoing is true and correct. Executed at Palm Desert, California, on this day of 20 RACHELLE D. KLASSEN, CITY CLERK Rev. Sept 2016 J - 11111111111111111111111111111111111! 11111111 I1111111 I111 � on WOODHAVEN DR S 11111 Ilil 1! 1111111111 I 11111[fill 1111Kin 1! 11111111 i 111 Il li 1111 I t� HOVL-EY-L-N-C MICHIGAN DR I I I 0 Date: 2018 LOCATION I �C o L6 aj A VENUE OF THE STATES ti ---DUDLEY-=\ DR I t l I l r� j HIDDEN RIVER-RD Joe Mann Park Playground EquipmentLTC) VICINITY MAP