Loading...
HomeMy WebLinkAboutC38740 Local Area Network (LAN) Cabling UpgradesCONTRACT NO. C38740 STAFF REPORT CITY OF PALM DESERT INFORMATION SYSTEMS DEPARTMENT MEETING DATE: June 13, 2019 PREPARED BY: Clayton von Helf, Information Systems Manager REQUEST: Approve contract for Local Area Network Cabling Upgrades with Vector USA in the amount of $112,928.47 and authorize the City Manager to negotiate, finalize and execute agreement. Recommendation By Minute Motion, that the City Council: Approve contract to VectorUSA in the amount of $112,928.47 for Local Area Network (LAN) Cabling Upgrades and authorize the City Manager to execute same. Funds are available in the Equipment Replacement Fund. Strateqic Plan Although the City's internal I.T. infrastructure is not addressed in the strategic plan, its upgrade underlays, and is essential to, all projects and services performed by the City. Information Technoloqv Master Plan Local Area Network (LAN) Upgrade is listed as Initiative 4 in the Information Technology Master Plan adopted by the City Council on February 23, 2017. It was rated as a high priority by the I.T. Steering Committee. Executive Summary Staff requests approval of a contract with VectorUSA totaling $112,928.47 for Local Area Network (LAN) cabling upgrades and replacements. Completion of this project will support: improved computing speeds; faster, more stable Wi-Fi connections; additional connection points for A/V, computers and telephones; and more stable telephone connectivity. Backqround Analvsis The City uses a Local Area Network (LAN) for both computer and telephone communications, which consists of cabling, switches and hubs throughout City Hall and the Corporation Yard. This network is the framework for all of our services and interactions with the public and internally with staff. The current LAN requires replacing because it consists of older, slower fiber optic cable, and does not provide adequate CONTRACT NO. C38740 June 13, 2019 - Staff Report VectorUSA Fiber and Cabling Page 2 of 2 "drops" or locations to service the requirements of an increasingly technological and "connected" modern organization. Upgrading the LAN is a multi -step process; this first step is replacing old fiber optic cable with the latest standard, increasing the number of cables between our network sections, and adding new network connection points in offices, conference rooms and lobbies. This project contract lays the foundation for future Wi-Fi upgrades and a new network room, connected by fiber optic cable, at the city's corporation yard. The new network room will be part of our disaster recovery plan. Fiscal Analvsis This bulk of the work and materials included in this contract, ($107,157.25), falls within CMAS government pricing contracts and therefore fulfills the competitive bidding requirement of the Palm Desert purchasing ordinance (PDMC 3.30.160.E). The remainder of the contract ($5,771.22) is for ancillary parts and equipment necessary for installation such as clamps, couplings, bushings, network patch cables, equipment rental etc., that are not available under government pricing contracts. These ancillary items represent 5% of the total contract and for efficiency and in the best interest of the City staff recommends that they be approved as part of the total contract with VectorUSA as quoted, in accordance with PDMC section 3.30.160.F. Approval of staff's request will result in an expense of $112,928.47 from the equipment replacement fund. Funds are budgeted and available for this fiscal year, account number 5304190-4404000. LEGAL REVIEW DEPT. REVIEW FINANCIAL REVIEW CITY MANAGER ATTACHMENTS: 7� lance Exhibit "A" — Fiber and Cabling upgrade proposal Lauri Aylaian City Manager *CTOR Vector Resources, Inc. VRN-093160-003 dba VectorUSA May 6, 2019 CONNEGTIM6 8647 Ninth Street us& PEOPU TO Rancho Cucamonga, CA INFORMATION 91730 AND M WORLD City of Palm Desert 73510 Fred Waring Dr Palm Desert, CA 92260 Project Fiber and Cabling Upgrade Proposal 1, Version 2 Prepared For City of Palm Desert Prepared By Vector Resources, Inc. dba VectorUSA Scott Shiffer Page 1 VRN-093160-003 May 6, 2019 TABLE OF CONTENTS 1.0 General Info 2.0 Project Overview 3.0 Project Parameters Detailed Pricing Terms and Conditions of Contract (SignatureRequired) Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 931 1022 Page 2 VRN-093160-003 May 6, 2019 1.0 General Info 1.1 Company Information VectorUSA designs, implements and maintains unified voice, video and data networks. Founded in 1988, VectorUSA is today one of the nation's premiere network integration companies. VectorUSA is based in Torrance, CA with offices in San Diego, Rancho Cucamonga, Phoenix, Harrisburg, PA, and Washington, D.C. Widely recognized for our engineering capabilities and management excellence, VectorUSA's team consists of the 4 original partners and over 400 employees, including engineers, technical personnel, business development and customer service agents. VectorUSA's certifications and partnerships make us a full -service solution provider. We maintain C7, C10 electrical contractor licenses and a General Contractor "B" license. Our business partners include TE Connectivity, Ascom Wireless, Avaya, Cisco, HP Networking, Hirsch, OnSSI, PCSC, Sony, and other world class IT and integration solution vendors. 2.0 Project Overview 2.1 Project Overview VectorUSA is pleased to present the following proposal to City of Palm Desert ("client") for the Fiber Backbone and CAT6A cable additions project located at City of Palm Desert. This proposal includes: -Specifications for the installation of new structured communication cabling This proposal was based on the information gathered from meetings and conversations, the site walk, and our past experience with similar projects. The proposal includes the furnishing of all materials, labor, transportation, tools, permits, fees, utilities and incidentals necessary for the complete installation of all work specified in this document. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 931 1022 Page 3 VRN-093160-003 May 6, 2019 2.2 Scope of Work VectorUSA will be upgrading existing 62.5/125 multimode armored fiber optic backbone cabling to new Corning OM4 multimode fiber optic cabling system. Overview: Civic Center 12-strand OM4 from Main Computer Room to North Wing IDF 12-strand OM4 from Main Computer Room to Council Chamber IDF 12-strand OM4 from Main Computer Room to PBX Room IDF 12-strand OM4 from Main Computer Room to Public Works IDF Corp Yard 12-strand OM4 from BLDG "F" Main IDF to BLDG "G" existing IDF 12-strand OM4 from BLDG "F" Main IDF to BLDG "G" new IDF A new IDF will be established in the Corp Yard Disaster Recovery Room. 1 new CPI MegaFrame cabinet will be installed along with new Corning FTU and CAT6A patch panel. New Category 6A cabling will be provide, installed and tested based on information provide in the client scope of work documentation. For additional data drop locations 2 new Berk-Tek CAT6A plenum rated data cables (BLUE) will be provided for 64 new locations. For new Access Point locations 2 new Berk-Tek CAT6A plenum rated data cables (White) will be provided for 34 new locations. New CAT6A patch cords will be provided as follows: Data - 435 Berk-Tek CAT6A, 10ft, Blue patch cords - for workstation connection Data - 435 Berk-Tek CAT6A, 1ft, Blue patch cords - for IDF Switch connection AP - 68 Berk-Tek CAT6A, 10ft, White patch cords - for Access Point connection AP - 68 Berk-Tek CAT6A, 1ft, White patch cords - for IDF Switch connection In addition new 1" EMT conduit and Nema3R boxes will be installed to intercept existing conduit on the breezeway in front of the Civic Center entrance for nonfunctional surveillance cameras. This existing pathway will be utilized to install new CAT6A cabling for 2 new outdoor rated access points to be installed at a future date, 1 new 2" conduit pathway will be installed at the Corp Yard to provide fiber optic backbone cabling to the new Disaster Recovery IDF. Note: This proposal assumes all pathways in wall are existing for new data drops. if new surface raceways or fishing of walls is required a written change order will be provided to the client prior to commencement of work for approval. This proposals assumes all conduit pathway is free and clear of obstructions. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 931 1022 Page 4 VRN-093160-003 May 6, 2019 2.3 Installation VectorUSA will establish a project team comprised of individuals with knowledge and experience relevant to this project. An experienced project manager or project coordinator will head the project team to ensure that the project is on schedule and within budget. In addition to the core project team, VectorUSA has over 400 employees with a full range of specialties who will assist on the project as needed. Among these employee resources are VectorUSA's quality control officials, who will visit the project site over the course of the project to ensure that the highest -quality installation practices are being used. VectorUSA recommends that the client create its own project team prior to the project's start. This team will work together with Vector's team to determine the implementation schedule, establish policies and procedures, decide best methods to train and distribute information to client's staff members, resolve technical issues, device management and maintenance, and system maintenance. 2.4 Codes All work performed on this project will be installed in accordance with IEEE 802.11 installation guidelines, the current edition of the NEC, NESC, BICSI Telecommunications Distribution Methods Manual (TDMM), BICSI Cabling Installation Manual, and the latest issue of the ANSI/TIA/EIA Standards, along with all state/local codes and ordinances. 3.0 Project Parameters 3.1 Change Order Any work that is added to or deleted from the original scope of this proposal that alters the original costs or completion date must be agreed upon by both parties in the form of a written change order. 3.2 Delays The client must provide five (5) working days advance notice of any factor that will delay this project or VectorUSA will issue a work stoppage change order. Additionally, idle time incurred due to the absence of required escorts, clearance, permits, inability to enter the work place, delays by other trades or other factors beyond VectorUSA's control will be addressed with a written change order. 3.3 Work Days/Overtime Project work will be performed during VectorUSA's standard business hours of 7am-5pm, PST, Monday through Friday (except holidays). Work outside of standard business hours is available, but requires a written change order. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 931 1022 Page 5 VRN-093160-003 May 6, 2019 3.4 Access VectorUSA has access to all areas required to perform the proposed scope of work in a timely manner. 3.5 Schedule VectorUSA plans to implement this project in a continuous fashion or as outlined in the RFP. If any additional mobilization is required as a result of a change in the project schedule that is not caused by VectorUSA, it will be addressed with a written change order. 3.6 Asbestos/Hazardous VectorUSA assumes that its installation teams will be working in areas that do not contain asbestos or any other hazardous material that would require additional time or alternative installation procedures. It is the responsibility of the client to provide written notification to VectorUSA of any asbestos contained material (ACMs) in or around the area of the project prior to the start of a project. In the event that ACMs are present prior to job commencement or if ACMs are encountered during the project, additional cost, damages and/or delays attributed to necessary procedures for working in this environment will be the client's responsibility. 3.7 Adequate Room The client must provide adequate room for the installation of the proposed termination hardwired at the station and in the communications closets. 3.8 Storage Area The client will provide a secured storage area inside the building for VectorUSA's materials and tools. 3.9 Office Furniture VectorUSA is not responsible for disassembling or moving desks or other office furniture in order to gain proper access to perform work. 3.10 Ceiling Tile VectorUSA exercises care in the removal, storage and reinstallation of existing (used) ceiling tiles; however, Vector accepts no liability for any incidental damages that may result from the handling of ceiling tiles. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 9311022 Page 6 VRN-093160-003 May 6, 2019 3.11 Existing Cable VectorUSA has not confirmed that the existing cable infrastructure is usable (e.g., labeled, correct pin configurations, etc.). The client is responsible for providing technician(s) (e.g., cable vendor) to troubleshoot any wiring issues that may arise during installation. VectorUSA will troubleshoot or resolve in-house wire issues if so requested by the client in the form of a written change order. 3.12 Existing Conduit The client is responsible for ensuring that existing conduits/pathways that may be used for this project are installed and utilized in accordance with NEC requirements, have adequate space available for addition of new cables, will not exceed 60% fill ratio after new cables have been added, and are free of obstructions, blockages, and/or defects. If existing conduits/pathways to be used for this project need to be brought into compliance with current code and standards, VectorUSA can assist the client with this work if the client requests such assistance in the form of a written change order. 3.13 Coring If any coring, x-ray or sonar inspections are necessary, it will be addressed with a written change order. No costs for coring, sonar or x-ray inspection have been included in this proposal. 3.14 Add & Delete Any additional work requested outside of the SOW will be considered as separate work and addressed with a written change order. This proposal is not to be used as an "add & delete" schedule; it only applies to the work specified in the original RFP. 3.15 Taxes Taxes are calculated and billed based on tax rates effective at the date of invoice. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 9311022 Page 7 VRN-093160-003 May 6, 2019 3.16 Extraordinary Service Certain additional charges related to extraordinary levels of support or out-of-pocket costs incurred by VectorUSA, through no fault of its own, shall be reimbursed to VectorUSA by the client under this agreement. Examples of costs reimbursable under this section include, but are not limited to: 1) shipping expenses related to unusual site handling fees (e.g., extra distance, no loading dock, extra stairs, extra demurrage charges); 2) storage or special handling expenses incurred if an installation site is not able to accept delivery as scheduled; 3) expenses incurred by VectorUSA to resolve network compatibility issues caused by a client's election to substitute non-VectorUSA provided equipment or services; and 4) expenses incurred by VectorUSA for additional installation time and/or materials caused by a site not being prepared as called for in this proposal. VectorUSA shall promptly notify the client in writing of such charges. Notification will be provided, when feasible, prior to the incurrence of such charges, unless circumstances preclude such prior written notification (by way of example, but not limited to, unusual site handling charges). Provided the incurrence of such charges is not due to VectorUSA's fault or negligence, VectorUSA shall be entitled to an equitable adjustment in the prices herein, the delivery schedule, or both, to reflect such charges and any related delay. 3.17 Proprietary Information The information contained in this document is proprietary to VectorUSA and intended to be used as evaluative and/or bidding information only. No part of this document may be disclosed, reproduced and/or distributed to anyone except the listed recipients within this package without written permission from VectorUSA. Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 9311022 Page 8 VRN-093160-003 May 6, 2019 DETAILED PRICING CMAS 3-17-70-0876AN Quantity Unit Cost Material Labor Total FREEDM® One Interlocking Armored Cable, Plenum, tight- 3,000 4.27 12,810.00 6,525.00 19,335.00 48 Port Patch Panel 5 477.99 2,389.95 1,740.00 4,129.95 24 Port High Density Unloaded Patch Panel 7 45.00 315.00 203.00 518.00 eXtreme Cat 6A QuickPort Jack, Channel -Rated, Blue 128 8.63 1,104.64 1,484.80 2,589.44 eXtreme Cat 6A QuickPort Jack, Channel -Rated, White 136 8.63 1,173.68 1,577.60 2,751.28 Single -Gang QuickPort Wallplate with ID Windows, 2-Port, 64 1.38 88.32 464.00 552.32 eXtreme Cat 6A Standard Patch Cord, 10 ft, Blue 435 12.84 5,585.40 630.75 6,216.15 eXtreme Cat 6A Standard Patch Cord, 10 ft, White 68 12.84 873,12 98.60 971.72 M-SERIES MEGAFRAME CABINET; 23"W X 1 2,679.19 2,679.19 696.00 3,375.19 -HOOK CEILING CABLE BRACKET; 6"H X 3"D; 300 5.43 1,629.00 1,740.00 3,369.00 Sub -Total 28,648.30 15,159.75 43,808.05 CMAS 3-17-70-0876AP Quantity Unit Cost Material Labor Total 1U Rack Mount Fiber Enclosure 7 180.73 1,265.11 203.00 1,468.11 2U Rack Mount Fiber Enclosure 1 214.90 214.90 29.00 243.90 LC 10G 50/125 Multi Mode Anaerobic Connector Aqua 144 4.02 578.88 2,088.00 2,666.88 12 Port LC Multi Mode 50/125 10G Ceramic Insert Coupler 12 72.02 864.24 261.00 1,125.24 Armored Cable Grounding Kit 12 12.82 153.84 1,044.00 1,197.84 CAT6A Blue Plenum Cable 23,000 0.62 14,260.00 7,337.00 21,597.00 CAT6A White Plenum Cable 13,000 0.62 8,060.00 4,147.00 12,207.00 TELECOMMUNICATIONS OUTLET 2 Port Surface Mount Box White 34 1.51 51.34 739.50 790.84 Cable Runway Wall to Rack Kit 1 94.69 94.69 174.00 268.69 Sub -Total 25,543.00 16,022.50 41,565.50 CMAS 3-08-70-0876Y Quantity Unit Cost Material Labor Total Testing & Labeling - Fiber 72 0.00 0.00 1,044.00 1,044.00 Testing & Labeling - Copper 196 0.00 0.00 2,273.60 2,273.60 Installation Services 1 0.00 0.00 6,525.00 6,525.00 Mobilization & Logistics 3 0.00 0.00 1,044.00 1,044.00 Project Mananagement 1 0.00 0.00 6,250.00 6,250.00 Sub -Total 0.00 17,136.60 17,136.60 Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 9311022 Page 9 NSP LC Duplex, ZipcoFiber Optic Patch Cord, 2 Fibers, LC Duplex LANmark-10G Cat 6A OSP Cat 6A Standard Patch Cord, 01 ft, Blue Cat 6A Standard Patch Cord, 01 ft, White Cat 6A OSP Patch Cord, 10 ft 6U Wall Mount Patch Panel Bracket - 19 in - Steel - Vertical 12x12x8 Nema 4 Weatherproof 1 IN EMT Conduit 1" EMT Compression Coupling 1" EMT Compression Connector 1 IN Plastic Bushing Pipe Pier 1" EMT Unistrut Clamp 6x6x4 NEMA 3R No Knockouts 2" X 24" Conduit Sleeve Kit 2 IN EMT Conduit 2" EMT Compression Connector 2" EMT Steel Compression Coupling CONNECTORS 2" Plastic Bushing 2" EMT Unistrut Clamp 26Ft Working Height Scissor Lift Sub -Total Project Sub -Total Sales Tax Project Total VRN-093160-003 May 6, 2019 Quantity Unit Cost Material Labor Total 20 26.25 525.00 0.00 525.00 1,000 0.55 550.00 0.00 550.00 435 3.19 1,387.65 0.00 1,387.65 68 3.19 216.92 0.00 216.92 4 24.07 96.28 0.00 96.28 2 125.00 250.00 0.00 250.00 3 97.50 292.50 0.00 292.50 100 1.58 158.00 0.00 158.00 10 0.91 9.10 0.00 9.10 6 0.87 5.22 0.00 5.22 6 0.28 1.68 0.00 1.68 20 25.01 500.20 0.00 500.20 20 2.13 42.60 0.00 42.60 2 24.92 49.84 0.00 49.84 3 106.25 318.75 0.00 318.75 140 3.59 502.60 0.00 502.60 6 3.10 18.60 0.00 18.60 20 3.14 62.80 0.00 62.80 4 1.56 6.24 0.00 6.24 28 3.40 95.20 0.00 95.20 1 682.04 682.04 0.00 682.04 5,771.22 0.00 5,771.22 59,962.52 48,318.85 108,281,37 4,647.10 112,928.47 Vector Resources, Inc. dba VectorUSA California State License No. 654046 8647 Ninth Street, Rancho Cucamonga, CA 91730 (909) 9311022 Page 10 VRN-093160-003 May 6, 2019 TERMS AND CONDITIONS OF CONTRACT TERMS AND CONDITIONS All work is to be completed in a workmanlike manner according to standard practices. All material is to be as specified. Any alterations or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the estimate. All agreements contingent upon strikes, accidents or delays beyond our control will be settled in a formal agreement. Owner is responsible to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. PAYMENT REQUIREMENTS This proposal pricing is only valid for 30 days. Upon acceptance a purchase order and 50% deposit is required and due prior to commencement of work. Monthly progress invoices will be generated based on percentage of completion and due Net 30. Balance will be invoiced upon substantial completion and due Net 30. City of Palm Desert 73510 Fred Waring Dr Palm Desert, CA 92260 Job Total $112,928.47 Vector Resources, Inc. dba VectorUSA Authorized Signature Date ACCEPTANCE OF PROPOSAL The prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Authorized Signature Print Name Date Page 11 Das r AL c> ri H i n DPART � ri ,: N r OF Procurement Division 707 Third Street, 2nd Floor, MS #2-202 GENERAL SERVICES West Sacramento, CA 95605-2811 State of California MULTIPLE AWARD SCHEDULE Vector Resources, Inc. CMAS NUMBER: SUPPLEMENT NO.: CMAS TERM DATES: CMAS CATEGORY: APPLICABLE TERMS & CONDITIONS: MAXIMUM ORDER LIMIT: FOR USE BY: BASE GSA SCHEDULE NO.: 3-17-70-0876AN 10/02/2017 through 04/09/2023 Information Technology Goods & Services March 15, 2018 State Agencies: See Purchasing Authority Dollar Threshold provision Local Government Agencies: Unlimited State & Local Government Agencies GS-35F-0499N BASE SCHEDULE HOLDER: Accu-Tech Corporation This CMAS provides for the purchase and warranty of hardware. (See page 2 for the specific brands applicable to this CMAS.) NOTICE: Products and/or services on this CMAS may be available on a Mandatory Statewide Contracts. If this is the case, the use of this CMAS is restricted unless the State agency has an approved exemption as explained in the Statewide Contract User Instructions. Information regarding Statewide Contracts can be obtained at the website: www.documents.das.ca.00v/ad/contracts/contractindexiistina.Ddf, This requirement is not applicable to local government entities. The purpose of this supplement is to renew this CMAS through 04-09-2023. In addition, this supplement replaces in its entirety VECTOR RESOURCES, INC.'s existing California Multiple Award Schedule (CMAS) that expires on 07-31-2018. The most current Ordering Instructions and Special Provisions, CMAS Terms and Conditions dated March 15, 2018 and products and/or services are included herein. Please review these provisions carefully because they may have changed since issuance of your last CMAS. r - Effective Date: 06/27/2018 KTOWERS, Program Analyst, California Multiple Award Schedules Unit Procurement Division Des c' An i a r w u r r� t ,•+ r tr r 707 Third Street, 2nd Floor, MS #2-202 GENERAL SERVICES West Sacramento, CA 95605-2811 State of California MULTIPLE AWARD SCHEDULE Vector Resources, Inc. CMAS NUMBER: SUPPLEMENT NO.: CMAS TERM DATES: CMAS CATEGORY: APPLICABLE TERMS & CONDITIONS: 3-17-70-0876AP 2 12/14/2017 through 7/26/2022 Information Technology Goods & Services March 15, 2018 State Agencies: See Purchasing MAXIMUM ORDER LIMIT: Authority Dollar Threshold provision Local Government Agencies: Unlimited FOR USE BY: State & Local Government Agencies BASE GSA SCHEDULE NO.: GS-35F-573GA BASE SCHEDULE HOLDER: Communications Supply Corporation This CMAS provides for the purchase and warranty of hardware. (See page 2 for the specific brands applicable to this CMAS.) NOTICE: Products and/or services on this CMAS may be available on a Mandatory Statewide Contracts. If this is the case, the use of this CMAS is restricted unless the State agency has an approved exemption as explained in the Statewide Contract User Instructions. Information regarding Statewide Contracts can be obtained at the website: www.documents.das.ca.ciov/pd/contracts/contractindexlistina.Ddf. This requirement is not applicable to local government entities. The purpose of this supplement is to incorporate the following changes: 1) Update the CMAS Terms and Conditions to March 15, 2018 as attached (30 pages). All other terms and conditions and provisions of the CMAS remain unchanged. The provisions of supplement 1 have been incorporated into this supplement. The most current Ordering Instructions and Special Provisions, CMAS Terms and Conditions, and products and/or services are included herein. All purchase orders issued by State agencies under this CMAS shall incorporate these Ordering Instructions and Special Provisions and CMAS Terms and Conditions dated March 15, 2018. Effective Date. 3/15/2019 JANNA WELK, Program Analyst, California Multiple Award Schedules Unit 6s � ,r 04N,., 7: 0A+ 1 rl, N f 0H Procurement Division 707 Third Street, 2nd Floor, MS #2-202 0G-ENERAL SERVICES West Sacramento, CA 95605-2811 State of California MULTIPLE AWARD SCHEDULE Vector Resources, Inc. JCMAS NUMBER: 3-08-70-0876Y SUPPLEMENT NO.: 5 CMAS TERM DATES: 9/16/2013 through 7/31/2023 CMAS CATEGORY: I Information Technology Goods & Services APPLICABLE TERMS & CONDITIONS: MAXIMUM ORDER LIMIT: FOR USE BY: March 15, 2018 State Agencies: See Purchasing Authority Dollar Threshold provision Local Government Agencies: Unlimited State & Local Government Agencies BASE GSA SCHEDULE NO.: GS-35F-0505U BASE SCHEDULE HOLDER: , Vector Resources, Inc. This CMAS provides for the purchase, warranty and installation of hardware, and InformationTechnology (IT) consulting services. (See page 2 for the restrictions applicable to this CMAS.) The purpose of this supplement is to renew this CMAS through 7-31-2023, In addition, this supplement replaces in its entirety Vector Resources, Inc.'s existing California Multiple Award Schedule (CMAS) that expires on 10-31-2018. The most current Ordering Instructions and Special Provisions, CMAS Terms and Conditions dated March 15, 2018, and products and/or services are included herein. Please review these provisions carefully because they may have changed since issuance of your last CMAS. NOTICE: Products and/or services on this CMAS may be available on a Mandatory Statewide Contracts. If this is the case, the use of this CMAS is restricted unless the State agency has an approved exemption as explained in the Statewide Contract User Instructions. Information regarding Statewide Contracts can be obtained at the website: www.documents.das.ca.ciov/od/contracts/contractindexlistino.odf. This requirement is not applicable to local government entities. The installation services provided under this CMAS are only in support of the products covered by this CMAS. Agency non-compliance with the requirements of this CMAS may result in the loss of delegated authority to use the CMAS program. CMAS contractor non-compliance with the requirements of this CMAS may result in termination of the CMAS. ':� - Effective Date: 9/12/2018 WfAN DUGGE ogram Analyst, California Multiple Award Schedules Unit CONTRACT NO. C38740 CITY OF PALM DESERT SHORT FORM CONSTRUCTION CONTRACT Fiber and Cabling Upgrade 1. PARTIES AND DATE. This Contract is made and entered into this 13th day of June 2019, by and between the City of Palm Desert, a municipal corporation organized under the laws of the State of California with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California 92260-2578, County of Riverside, State of California ("City") and Vector Resources, DBA VectorUSA a CORPORATION with its principal place of business at 8647 Ninth Street, Rancho Cucamonga, CA 91730 ("Contractor"). City and Contractor are sometimes individually referred to as "Party" and collectively as "Parties" in this Contract. 2. RECITALS. 2.1 Cif. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose. 2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing Installation of new structured communication cabling related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project: C7. 2.3 Project. City desires to engage Contractor to render such services for the Fiber and Cabling Upgrade ("Project") as set forth in this Contract. 2.4 Proiect Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, insurance documents and any other certifications as required by the Contract. 3. TERMS 3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto: • Services/Schedule (Exhibit "A") • Plans and Specifications (Exhibit "B") • Contractor's Certificate Regarding Workers' Compensation (Exhibit "C") 3.1.1 Precedence. To the extent there is a conflict between any portions of this Contract, the order of precedence shall be as follows: change orders, special conditions, technical specifications, plans/construction drawings, general contract terms, scope of work, standard plans, advertisements for bid/proposals, bids/proposals or other documents submitted by Contractor. 72500.00001 \31605522.1 Rev 11-9-18 3.2 Contractor's Basic Obliaation; Scooe of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the "Work"), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit "B" attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit "C" attached hereto and incorporated herein by this reference. 3.2.1 Chanqe in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in advance and in writing by a valid change order executed by the City. 3.2.1.1 Chanqe Orders. Changes to the Contract Time (as defined in Section 3.3) or Total Contract Price shall be in the form of a written Change Order, either signed by both parties or issued unilaterally by the City. No adjustment shall be made to the Contract Time unless the delay impacts the critical path to completion and the delay was not caused in whole or in part by the Contractor. Failure to timely request a Change Order shall constitute a waiver of any right to adjust the Contract Time or the Total Contract Price. All requests for Change Orders shall be accompanied by detailed supporting documentation, including but not limited to payroll records, invoices, schedules, and any other documentation requested by the City for the purpose of determining the additional costs or the impact of any delay. If the change involves Work bid at a unit price, then the Total Contract Price shall be increased at the unit price. If there is no unit price, then the Total Contract Price shall be adjusted to account for costs actually incurred plus an allowed mark-up of fifteen percent (15%), which shall constitute the entire amount of profit, mark-ups, field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such work. Nothing herein shall prevent the Parties from agreeing to a lump sum cost. (A) Chanaes Ordered By City. City may at any time issue a written directive ordering additions, deletions, or changes to the Work. Contractor shall proceed with the work in accordance with the directive. To the extent the directive results in extra work or requires additional Contract Time, Contractor shall request a Change Order within seven (7) days of receiving the Work Directive. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. (B) Chanaes Reauested By Contractor. With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the potential change within seven (7) days or prior to the alteration of conditions, whichever is earlier. Failure to give notice shall constitute a waiver of Contractor's right to a change order. If any costs are not capable of being determined within seven (7) 2 72500.00001\31605522.1 Rev 11-9-18 days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. 3.2.2 Substitutions/"Or Equal". Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words "or equal." Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any "or equal" material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of "or equal" requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed "or equal" substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor. The City has the complete and sole discretion to determine if a material, process or article is an "or equal" material, process or article that may be substituted. Data required to substantiate requests for substitutions of an "or equal" material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted "or equal" material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted "or equal" material, process or article, and substantiates that it is an "or equal" to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted or equal material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution. Contractor shall bear all of the City's costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted "or equal" material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400. 3.3 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a City Business License, and that such licenses and approvals shall be 3 72500.00001\31605522.1 Rev 11-9-18 maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any work necessary to correct errors or omissions which are caused by Contractor's failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work. 3.4 Control and Pavment of Subordinates: Contractual Relationship. City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor's exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers' compensation insurance. 3.5 Citv's Basic Obliqation. City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below -referenced compensation in accordance with compensation provisions set forth in the Contract. 3.6 Compensation and Pavment. 3.6.1 Amount of Compensation. As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Contract Price of One Hundred Twelve Thousand Nine Hundred Twenty Eight Dollars and Forty Seven Cents ($112,928.47) ("Total Contract Price") provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the City. 3.6.2 Pavment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein. On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments. Contractor shall submit its final invoice to City within thirty (30) days from the last date of the Work or termination in accordance with section 3.18.3 and failure by the Contractor to submit a timely invoice shall constitute a waiver of its right to final payment. 4 72500.00001\31605522.1 Rev 11-9-18 3.6.3 Prompt Pavment. City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others. 3.6.4 Contract Retentions. From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107. 3.6.5 Other Retentions. In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of: (1) any sums expended by the City in performing any of Contractor's obligations under the Contract which Contractor has failed to perform or has performed inadequately; (2) defective Work not remedied; (3) stop notices as allowed by state law; (5) unsatisfactory prosecution of the Work by Contractor; (6) unauthorized deviations from the Contract; (7) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (8) erroneous or false estimates by Contractor of the value of the Work performed; (9) any sums representing expenses,' losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (10) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City's right to such sums. 3.6.6 Pavment to Subcontractors. Contractor shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 7108.5 of the California Business and Professions Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to Contractor pursuant to this Contract. 3.6.7 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items. 3.6.8 Labor and Material Releases. Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City. 3.7 Labor 5 72500.00001\31605522.1 Rev 11-9-18 3.7.1 Prevailing Waqes. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the Work is being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $25,000 or more for a public works project or $15,000 or more for a maintenance project, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates. 3.7.2 Anorenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law. 3.7.3 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day's work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker. 3.7.4 Pavroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The L 72500.00001\31605522.1 Rev 11-9-18 responsibility for compliance with this section is on Contractor. In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the DIR on a weekly basis and in the format prescribed by the DIR, which may include electronic submission. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. 3.7.5 Contractor and Subcontractor Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit "E" prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. 3.7.6 Labor Compliance: Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor's sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor's performance of Work, including any delay, shall be Contractor's sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor. 3.8 Performance of Work: Jobsite Obliqations. 3.8.1.1 Reservation of Riqht to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor's failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City's attorney's fees) associated with, any settlement reached between the City and the relevant enforcement entity. 3.8.1.2 Traininq. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.9.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.9.1 as they may relate to the Work provided under this Contract. Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph. 7 72500.00001\31605522.1 Rev 11-9-18 3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site. 3.8.3 Laws and Requlations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 3.8.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City's business license fee, if any. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project. 3.8.5 Trenchina Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City's review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. 0 72500.00001\31605522.1 Rev 11-9-18 3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute. 3.8.7 Underaround Utilitv Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities. 3.8.8 Air Qualitv. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel -powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract. 3.8.9 State Recvclina Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling. 3.8.10 Inspection Of Site. Contractor has visited sites where Work is to be performed and has become acquainted with all conditions affecting the Work. Contractor warrants that it has made such examinations as it deems necessary to determine the condition of the Work sites, its accessibility to materials, workmen and equipment, and to determine the Contractor's ability to protect existing surface and subsurface improvements. No claim for allowances —time or money —will be allowed as to such matters. 3.9 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a re -inspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract 72500.00001\31605522.1 Rev 11-9-18 Price remaining to be paid, less any amount which City may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code. 3.10 Claims: Government Code Claim Compliance. 3.10.1 Intent. Effective January 1, 1991, section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non -binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this section is to implement sections 20104 et seq. and section 9204 of the California Public Contract Code. This section shall be construed to be consistent with said statutes. 3.10.2 The following requirements apply to all contracts entered into after January 1, 1991, and all claims to which this section applies: 3.10.2.1 Prerequisites. If any dispute shall arise between the City and Contractor regarding performance of the work, or any alleged change in the work, Contractor shall timely perform the disputed work and shall give written notice of a claim for additional compensation for the work to the City within three (3) days after commencement of the disputed work. Contractor's failure to give written notice within the three (3)-day period constitutes an agreement by Contractor that it will receive no extra compensation for the disputed work and shall constitute a waiver of the right to these procedures. 3.10.2.2 Claim Submittal. For purposes of this section, "Claim" means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor's request for a change has been denied in whole or in part. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: "THIS IS A CLAIM." Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon. 3.10.2.3 Su000rtinq Documentation: The Contractor shall submit all claims in the following format: (1) Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made (2) List of documents relating to claim: 10 72500.00001\31605522.1 Rev 11-9-18 (A) Specifications A Drawings (C) Clarifications (Requests for Information) (D) Schedules (E) Other (3) Chronology of events and correspondence (4) Analysis of claim merit (5) Analysis of claim cost (6) Time impact analysis in CPM format 3.10.2.4 Citv's Response. Upon receipt of a claim pursuant to this Section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement. (1) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion. (2) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. (3) The City's written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater. 11 72500.00001131605522.1 Rev 11-9-16 3.10.2.5 Meet and Confer. If the Contractor disputes the City's written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City's response or within 15 days of the City's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute. 3.10.2.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time. (1) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (2) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (3) Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (4) The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed. (5) If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any 12 72500.00001\31605522.1 Rev 11-9-18 period of time utilized by the meet and confer conference or mediation. 3.10.2.7 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this section: (1) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non- binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court. (2) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. (A) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney's fees on appeal of the other party. 3.10.2.8 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted. 3.10.2.9 Citv's Responses. The City's failure to respond to a claim from the Contractor within the time periods described in this Section or to otherwise meet the time 13 72500.00001\31605522.1 Rev 11-9-18 requirements of this Section shall result in the claim being deemed rejected in its entirety. City's failure to respond shall not waive City's rights to any subsequent procedures for the resolution of disputed claims. 3.11 Loss and Damaqe. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this Contract pursuant to Section 3.18.3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice. 3.12 Indemnification. 3.12.1 Scope of Indemnitv. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and authorized volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, (collectively, "Claims") in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor's services, the Project or this Contract, including without limitation the payment of all damages, expert witness fees and attorneys' fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor's indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City's agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons. 3.12.2 Additional Indemnitv Obligations. Contractor shall defend, with counsel of City's choosing and at Contractor's own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and authorized volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City's attorney's fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and authorized volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall survive expiration or termination of this Contract, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and authorized volunteers. 3.13 Insurance. 14 72500.00001\31605522.1 Rev 11-9-18 3.13.1 Minimum Reauirements. Without limiting Contractor's indemnification of the City of Palm Desert, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form that is satisfactory to the City. 3.13.1.1 General Liabilitv Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract" language will not be accepted. 3.13.1.2 Automobile Liabilitv Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. 3.13.1.3 Umbrella or Excess Liabilitv Insurance. Contractor may opt to utilize umbrella or excess liability insurance in meeting insurance requirements. In such circumstances, Contractor may obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability and employer's liability. Such policy or policies shall include the following terms and conditions: (A) A drop down feature requiring the policy to respond if the event that any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason; Pay on behalf of wording as opposed to reimbursement; (B) Pay on behalf of wording as opposed to reimbursement; (C) Concurrency of effective dates with primary policies; (D) Policies shall "follow form" to the underlying primary policies; and (E) Insureds under primary policies shall also be insureds under the umbrella or excess policies. 3.13.1.4 Workers' Compensation Insurance. Contractor may maintain Workers' Compensation Insurance (Statutory Limits) and Employer's Liability Insurance (with limits of at least $1,000,000) for Contractor's employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City of Palm Desert, its officers, agents, employees and volunteers. 15 72500.00001\31605522.1 Rev 11-9-18 3.13.2 Other Provisions or Requirements 3.13.2.1 Proof of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation. Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time. 3.13.2.2 Duration of Coveraae. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The City of Palm Desert and its officers, officials, employees, and agents shall continue as additional insureds under such policies. 3.13.2.3 Primarv/Non-Contributinq. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City's own insurance or self- insurance shall be called upon to protect it as a named insured. 3.13.2.4 Products/Completed Operations Coverage. Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed "by or on behalf' of the insured. Policy shall contain no language that would invalidate or remove the insurer's duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage. 3.13.2.5 Citv's Riahts of Enforcement. In the event any policy of insurance required under this Contract does not comply with these requirements, or is canceled and not replaced, City has the right, but not the duty, to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor, or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract. 3.13.2.6 Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 16 72500.00001\31605522.1 Rev 11-9-18 3.13.2.7 Waiver of Subroaation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City of Palm Desert, its elected or appointed officers, agents, officials, employees and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City of Palm Desert, its elected or appointed officers, agents, officials, employees and volunteers and shall require similar written express waivers and insurance clauses from each of its subcontractors. 3.13.2.8 Enforcement of Contract Provisions (non -estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder. 3.13.2.9 Requirements Not Limitinq. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 3.13.2.10 Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. 3.13.2.11 Additional Insured Status. General liability, automobile liability, and if applicable, pollution liability policies shall provide or be endorsed to provide that the City of Palm Desert and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. Coverage shall be at least as broad as coverage provided by ISO's Owners, Lessees, or Contractors Additional Insured Endorsement for the ongoing (i.e. ISO Form CG 20 10 07 04) and completed operations (i.e. ISO Form CG 20 37 07 04) of Contractor. 3.13.2.12 Prohibition of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 3.13.2.13 Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability exclusions. 3.13.2.14 Pass Throuah Clause. Contractor agrees to ensure that its sub -consultants, sub -contractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such 17 72500.00001\31605522.1 Rev 11-9-18 coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. 3.13.2.15 Citv's Riaht to Revise Requirements. The City or its Risk Manager reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor's compensation. If the City reduces the insurance requirements, the change shall go into effect immediately and require no advanced written notice. 3.13.2.16 Self -Insured Retentions. Any self -insured retentions must be declared to and approved by City. City reserves the right to require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City. 3.13.2.17 Timelv Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. 3.13.2.18 Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work. 3.13.2.19 3.14 Bond Requirements. 3.14.1 Pavment Bond. If required by law or otherwise specifically requested by City in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City. 3.14.2 Performance Bond. If specifically requested by City in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City. 3.14.3 Bond Provisions. Should, in City's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be 18 72500.00001\31605522.1 Rev 11-9-18 deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause. 3.14.4 Suretv Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California -admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City. 3.15 Warrantv. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non -conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor's obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand. 3.16 Emolovee/Labor Certifications. 3.16.1 Contractor's Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification 19 72500.00001\31605522.1 Rev 11-9-18 form for this purpose, which is attached to this Contract as Exhibit "D" and incorporated herein by reference, shall be executed simultaneously with this Contract. 3.16.2 Eaual Opportunitv Emplovment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. 3.16.3 Verification of Emplovment Eliaibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub -subcontractors to comply with the same. 3.17 General Provisions. 3.17.1 City's Representative. The City hereby designates The Information Systems Manager, or his or her designee, to act as its representative for the performance of this Contract ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City's Representative or his or her designee. 3.17.2 Contractor's Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City ("'Contractor's Representative"). Following approval by the City, Contractor's Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor's Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Contractor's Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor's Representative, Contractor shall provide the information specified above and obtain the City's written approval. 3.17.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset City's resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, 20 72500.00001\31605522.1 Rev 11-9-18 diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City's Representative, whose decision shall be binding upon Contractor. 3.17.5 Anti -Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. in entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties. 3.17.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows: CONTRACTOR: [***INSERT CONTRACTOR NAME AND ADDRESS***] ATTN: [***INSERT CONTRACTOR REP. NAME AND TITLE***] CITY: CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CA 92260-2578 ATTN: CLAYTON VON HELF, INFORMATION SYSTEMS MANAGER Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. 3.17.7 Time of Essence. Time is of the essence in the performance of this Contract. 3.17.8 Assianment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee. 21 72500.00001\31605522.1 Rev 11-9-18 3.17.9 No Third Partv Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties. 3.17.10 Laws; Venue. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of Riverside, State of California. 3.17.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original. 3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract. 3.17.13 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability. 3.17.14 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City's Filing Officer as required under state law in the performance of the Work. 3.17.15 Certification of License. 3.17.15.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor's license of the classification indicated below under Contractor's signature. 3.17.15.2 Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826. 22 72500.00001\31605522.1 Rev 11-9-18 3.17.16 Authoritv to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party. 3.17.17 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties. 3.17.18 Non -Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing. 3.17.19 Citv's Right to Emolov Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects. _[Signatures on Next Page] 23 72500.00001\31605522.1 Rev 11-9-18 SIGNATURE PAGE FOR CONSTRUCTION CONTRACT BETWEEN THE CITY OF PALM DESERT AND Vector Resources, Inc. dba VectorUSA IN WITNESS WHEREOF, the Parties have entered into this Contract as of the 13th day of June, 2019. CITY OF PALM DESERT [***INSERT NAME OF CONTRACTOR] [IF CORPORATION, TWO SIGNATURES, PRESIDENT OR VICE PRESIDENT AND By: SECRETARY OR TREASURER REQUIRED] [INSERT NAME] [INSERT TITLE] By: Its: ATTEST: Printed Name: By: City Clerk Contractor's License Number and Classification DIR Registration Number APPROVED AS TO FORM: Best Best & Krieger LLP City Attorney 24 72500.00001\31605522.1 Rev 11-9-18 EXHIBIT "A" SERVICES / SCHEDULE SEE PROPOSAL VRN-093160-003 Exhibit A-1 72500.00001\31605522.1 Rev 11-9-18 EXHIBIT "B" PLANS AND SPECIFICATIONS SEE PROPOSAL VRN-093160-003 Exhibit B-1 72500.00001\31605522.1 Rev 11-9-18 EXHIBIT "C" CERTIFICATION LABOR CODE - SECTION 1861 I, the undersigned Contractor, am aware of the provisions of Section 3700, et seg., of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract. Vector Resources, Inc. dba VectorUSA By: Signature Name (Print) Title (Print Exhibit C 72500.00001\31605522.1 Rev 11-9-18