Loading...
HomeMy WebLinkAboutC37960B Council Chamber Audio Visual (AV) RemodelSTAFF REPORT CITY OF PALM DESERT INFORMATION SYSTEMS DEPARTMENT MEETING DATE: June 13, 2019 PREPARED BY: Clayton von Helf, Information Systems Manager REQUEST: Award Contract No. C37960B for professional installation services for the Council Chamber Audio Visual Remodel to Presentation Products, Inc., DBA Spinitar, and authorize City Manager to execute the contract. Recommendation By Minute Motion, 1. Award Contract No. C37960B for professional installation services for the Council Chamber Audio Visual Remodel to Spinitar, in an amount not to exceed $225,125.68, and authorize the City Manager to take measures necessary to effectuate and execute the contract; and 2. Give staff direction on the alternate proposed screen; and 3. Declare the existing Audio Visual assets surplus, and authorize staff to properly dispose of them in a manner consistent with electronics disposal processes. Strateqic Plan Although the City's internal I.T. infrastructure is not addressed in the strategic plan, its upgrade underlays, and is essential to, all projects and services performed by the City. Information Technology Master Plan Council Chamber Audio Visual system is listed as Initiative 9 in the Information Technology Master Plan adopted by the City Council on February 23, 2017. It was rated as a high priority by the I.T. Steering Committee. Executive Summary Staff requests approval of a contract with Presentation Products, Inc., DBA Spinitar in an amount not to exceed $225,125.68 for purchase and installation of a new, upgraded Audio Vision system in the Council Chambers, including a new second monitor on the west wall. This project is necessary due to the age and condition of the current equipment, and the project supports the City's goals related to increased transparency, June 13, 2019 - Staff Report #C37960B - Council Chamber Remodel 2019 Page 2 of 4 accurate and reliable record keeping, and clear presentation of information to the City Council and the public. Backaround Analvsis The Council Chamber is the main public space for the City of Palm Desert, and is utilized for Council Meetings, Planning Commission Meetings, public outreach and regional presentations. This is where the public comes to participate in their local democratic process and where the City creates and streams the records of these proceedings. These important functions deserve attention and investment. The current Audio Visual (AV) system was last substantially refitted in 2011, however the current system consists of a mix of technologies, with some equipment being in place from 1999. Maintenance and upgrades were deferred during the economic downturn and portions of the system are now well past their useful life. Spare parts or service are no longer available for many components. This modernization project will bring all of the technologies up to date, incorporate as much "future proofing" as possible, and allow for better public engagement in our meetings. Staff contracted with an expert consultant, K2, to analyze the space and the needed technological improvements. This study resulted in a preliminary design and development of an RFP for this project. Staff reviewed the structural and technological needs to design a new, integrated system with the consultant. The most noticeable part of the retrofit will be a significant upgrade to the main display screen for public viewing. The current technology is a rear projector that has faded in color and brightness, making details in drawings very difficult for members of the public to see. The aspect ratio (4:3) is also an older standard instead of the current standard (16.9). This aspect ratio discrepancy has caused distortion in electronic presentations, and makes it difficult for presenters (staff and the public) to share information clearly. This project includes replacing the rear projection display with a LED video wall that will be both bright and clear, giving true to life colors, and with an aspect ratio that modern computer applications expect (16:9). Because the video wall is thin, we will be able to mount it directly over the existing wall with very limited construction. The most impactful changes will be behind the scenes, with a complete overhaul and relocation of the control room (including equipment, server, and camera operator) resulting in improved performance and necessary employee safety. The entire network is being upgraded from analog to digital, which will greatly improve our ability to transmit, record, and archive meeting proceedings. June 13, 2019 - Staff Report #C37960B - Council Chamber Remodel 2019 Page 3 of 4 From a user standpoint, the new AV system will function similarly to the existing system, but with more reliable processing and upgrades. Features of the new system include: • Dais touch screens for voting and microphone control that will be simplified and made larger; • New widescreen monitors for the dais, with a lower height profile and better stands; • Current camera and broadcast system upgraded from standard definition to high definition; • New speakers and microphones for improved sound recording and amplification. Staff has included an optional second monitor as part of this project. This screen would be placed on the west wall opposite the current display (currently occupied by the artwork from New Zealand) and would add needed functionality for members of the public. There are three planned uses for this screen: • As a second display, that mirrors the primary display. This would give members of the public sitting at a sharp angle to the primary display an easier view of what is being presented; • A camera feed of the speaker at the podium. Currently, members of the public cannot see the face of anyone speaking at the podium. By sending the camera feed to this monitor, they would be able to see the presenter as they spoke, making verbal presentations easier to understand. The monitor would be out of the sight line of the presenter, so it will not distract during a presentation. • Display the agenda with current location highlighted. By capturing the timestamps made by the City Clerk staff, we can display the current location on the agenda. This would help members of the public orient themselves when they arrive during the meeting. Construction will take place during the City Council summer recess, July 12th to August 21 st. Every effort will be made to have construction complete for the August 22"d Council Meeting. If, however, another meeting location is required, staff has made plans to hold the City Council meeting at an alternate location. City Council, and the Public, will be noticed well in advanced of any location change. An RFP was published on May 19th, 2019. The City received one proposal, Spinitar. June 13, 2019 - Staff Report #C37960B - Council Chamber Remodel 2019 Page 4 of 4 Spinitar is well qualified for this work, having completed many similar projects. The fee proposal was well within the estimated budget. Fiscal Analysis Approval of staff's request would result in a not to exceed one-time expenditure of - $225,125.68 including the alternate screen, or $216,769.60 without it. Funds were budgeted from the Equipment Replacement Fund, as part of the Capital Improvement Plan, (under the IT Master Plan), and are available for this fiscal year, account number 5304190-4404000. LEGAL REVIEW c71G b � Robert W. Hargreaves City Attorney DEPT. REVIEW FIN NCIAYEVIEW ri arney , Director of Jane M )ore Administrative Services Director of Finance ATTACHMENTS: RFP Vendor RFP Response Contract CITY MANAGER Lauri Aylaian City Manager REQUEST FOR PROPOSALS FOR CITY OF PALM DESERT FOR Council Chambers Audio Visual Remodel 2019 CITY OF PALM DESERT 73-510 Fred Waring Drive Palm Desert, CA 92260-2578 Telephone: (760) 346-0611 Facsimile: (760) 341-4564 www.cityofpalmdesert.org CITY OF PALM DESERT NOTICE INVITING PROPOSALS COUNCIL CHAMBERS AUDIO VISUAL REMODEL 2019 RFP NO. IS71219 CONTRACT NO. C37960B PUBLIC NOTICE IS HEREBY GIVEN that proposals will be received by the City of Palm Desert ("City") in the office of the City Clerk, 73-510 Fred Waring Drive, Palm Desert, CA 92260 until 5:00 p.m., June 3, 2019. Proposals received after this date will be returned to the proposers unopened. Faxed or electronically submitted proposals will not be accepted. The City is requesting proposals to provide: An extensive remodel of the audio visual system in the council chambers during the summer recess, July 12, 2019 through August 21, 2019. Time for commencement and completion of the work is important. The successful proposer shall order any long lead-time equipment items immediately following Notice of Award. The award of this contract is subject to available budget adequate to carry out the provisions of the proposed agreement including the identified scope of work. The City reserves the right to reject any or all proposals determined not to be in the best interest of the City. Certain labor categories under this project may be subject to prevailing wages as identified in the State of California Labor Code commencing at sections 1720 et seq. and 1770 et seq. If applicable, employees working in these categories at the site must be paid not less than the basic hourly rates of pay and fringe benefits established by the California Department of Industrial Relations. Copies of the State of California wage schedules are available for review at www.dir.ca.gov/dlsr/. In addition, a copy of the prevailing rate of per diem wages will be made available at the City's Information Systems Department upon request. The successful bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the proposer to whom the contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors. If the total compensation under the contract will exceed $25,000 and pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations ("DIR"). No proposal will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the DIR to perform public work. If awarded a contract, the successful proposer and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the project. The contract awarded pursuant to this proposal may also be subject to compliance monitoring and enforcement by the DIR. Each proposer shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its proposer and for the duration of the contract: a valid class C7 contractor's License. 72500.00001 \31308562.1 Substitution requests shall be made within 35 calendar days after the award of the contract. Pursuant to Public Contract Code Section 3400(b), City may make findings designating that certain additional materials, methods or services by specific brand or trade name be used for the project. Such findings, if any, as well as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Project Specifications. Pursuant to Public Contract Code section 3400(c), if City has made any findings designating certain materials, products, things, or services by specific brand or trade name, such findings and the materials, products, things, or services and their specific brand or trade names will be set forth in the Project Specifications. Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful proposer may substitute certain securities for funds withheld by City to ensure its performance under the contract. Interested proposers may download copies of the Request for Proposals ("RFP") by visiting the City's web site, www.cityofpalmdesert.org. To view the RFP, from the main menu under "Quick Links," click on "Projects Up For Bid". Firms that anticipate submitting a proposal are required to send an email to the project manager acknowledging receipt of the RFP so that the City can add the firm to its notification list. Please include the contact person, the name of the firm, address, phone number, and e-mail address. All addenda will be published on the City's website. Palm Desert is committed to inclusion and diversity and welcomes proposals and bids from contractors, consultants, and vendors of all faiths, creeds, ancestries, and ethnicities without regard to disability, gender identity, sexual orientation, or immigration status. The City condemns and will not tolerate prejudice, racism, bigotry, hatred, bullying, or violence towards any group within or outside of our community. For more information regarding the RFP, please contact: City of Palm Desert Information Systems Department Clayton von Helf, Information Systems Manager cvonhelf ZDcitvofpalmdesert.orq RACHELLE D. KLASSEN, CITY CLERK CITY OF PALM DESERT, CALIFORNIA (760) 346-0611 DATE: May 16, 2019 72500.00001 \31308562.1 CITY OF PALM DESERT REQUEST FOR PROPOSALS Council Chambers Audio Visual Remodel 2019 I. BACKGROUND AND INTRODUCTION The City of Palm Desert ("City") is requesting proposals from qualified firms' ("Proposers") for the installation and maintenance of Audio Visual Systems ("Services"). The City is a charter city in the State of California. The City is a thriving community of approximately 50,000 full-time and 32,000 seasonal residents. It is located in the Coachella Valley in eastern Riverside County, part of the low desert region of Southern California. The City features big -city resources in a friendly, small-town setting, offering first class educational opportunities, safe and clean streets, as well as plentiful shopping and community events. Palm Desert is considered the geographical, educational and retail center of the Coachella Valley. Incorporated in 1973, the City operates under a council-manager form of government with a five -member City Council elected at large. Each council member serves a four-year term. The City Council meets on the second and fourth Tuesdays of the month at Palm Desert City Hall, 73-510 Fred Waring Drive. To serve and promote the welfare of its residents, the City intends to procure the Services, as described below. II. REQUEST FOR PROPOSALS A. Scope of Services The Services sought under this Request for Proposals ("RFP") are set forth in more detail in Exhibit "A", attached hereto and incorporated herein by this reference. Notwithstanding the inclusion of such Services in Exhibit "A", the final scope of Services negotiated between City and the successful Proposer shall be set forth in the Audio Video Installation Agreement ("Agreement') executed by and between City and the successful Proposer. A copy of the Agreement is attached hereto as Exhibit "B" and incorporated herein by this reference. The Services shall be completed during the summer recess, July 12th, 2019 to August 21 st, 2019 and in accordance with the Contract Time described in Section 3.3 of the Agreement. If not, the contractor shall be subject to liquidated damages in the amount listed in said Section 3.3. Public Works Prevailinq Waqe and Contractor Reqistration Certain labor categories under this project may be subject to prevailing wages as identified in the State of California Labor Code commencing at sections 1720 et seq. and 1770 et seq. If applicable, employees working in these categories at the site must be paid not less than the basic hourly rates of pay and fringe benefits established by the California Department of Industrial Relations. Copies of the State of California wage schedules are available for review 'Use of the term "firm" shall mean individual proprietorship, partnership, Limited Liability Company, corporation or joint venture. 72500.00001 \31308562.1 at www.dir.ca.gov/dlsr/. In addition, a copy of the prevailing rate of per diem wages will be made available at the City's Information Systems Department upon request. The successful Proposer shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Proposer to whom the Agreement is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Agreement, employment of apprentices, hours of labor and debarment of contractors and subcontractors. If the total compensation under the Agreement will exceed $25,000 and pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations ("DIR"). No proposal will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the DIR to perform public work. If awarded a contract, the Proposer and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the project. B. Bonds City requires at the time of contract award a Payment Bond in the amount of one hundred percent (100%) of the contract amount from the successful Proposer. In addition to the Payment Bond, City requires at the time of contract a one hundred percent (100%) Performance Bond from the successful Proposer. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted by the State of California. Each bond shall be accompanied, upon the request of City, with all documents required by California Code of Civil Procedure Section 995.660 to the extent required by law. C. City Contact for this RFP The principal contact for the City regarding this RFP will be Clayton von Helf, Information Systems Manager, 760-346-0611, ext. 338, cvonhelf@ciytofpalmdesert.org or a designated representative, who will coordinate the assistance to be provided by the City to the Proposer. D. Requests for Clarification All questions, requests for interpretations or clarifications, either administrative or technical must be requested in writing and directed to the City Contact for this RFP, identified above. All written questions, if answered, will be answered in writing, conveyed to all interested firms, and posted on the City's website. Oral statements regarding this RFP by any persons should be considered unverified information unless confirmed in writing. To ensure a response, questions must be received in writing by 2:00 p.m. local time on the date identified in the Proposal Schedule. E. Content and Format of Proposal Proposals shall be concise, well organized and demonstrate qualifications and applicable experience. Proposals shall include two (2) hard copies and one (1) electronic pdf version on a CD or USB Drive enclosed in a sealed envelope. Proposals shall be organized, 72500.00001 \31308562.1 tabbed, and numbered in the order presented below. Proposals must include page numbers for all pages in the proposal. Proposals shall be in the following order and shall include: Executive Summarv: Summarize the content of your proposal in a clear and concise manner. 2. Table of Contents 3. Identification of Proposer: a. Legal name and address of the company. b. Legal form of company (partnership, corporation). c. If company is a wholly owned subsidiary of a "parent company," identify the "parent company." d. Name, title, address and telephone number of the proposed representative to contact concerning the Proposal Submittal. e. California Business License Number 4. Staffinq Resources: a. Firm Staffing and Key Personnel (i) Provide the number of staff to be assigned to perform the Services and the names/discipline/job title of each as well as your firm's capacity to provide additional personnel as needed. (ii) Identify three (3) persons that will be principally responsible for working with the City. Indicate the role and responsibility of each individual. If the Proposer is chosen as a finalist, these principal individuals must attend the interview and in -person presentation. (iii) Describe proposed team organization, including identification and responsibilities of key personnel. Please include one -page resumes. (iv) Provide brief biographies of individuals that will be working directly with the City. b. Subcontractors/Subconsultants (i) The Proposer shall identify functions that are likely to be subcontracted and identify the subcontractor / sub - consultant that is anticipated to perform each function, if known at this time. 72500.00001 \31308562.1 5. Fiscal Stabilitv: a. The Proposer should provide evidence of corporate stability including: (i) A current report from any commercial credit rating service such as Dunn and Bradstreet or Experian; or (i i) A letter from a financial institution stating a current line of credit; and (iii) Latest audited financial statement and/or annual report that has been certified by a CPA. This information will remain confidential and is not subject to public disclosure. 6. Experience and Technical Competence: a. Experience (i) The Proposer shall provide a description of how the Proposer's experience, technical and professional skills will meet the goals and fulfill the general functions identified in this RFP. (ii) Describe the past experience of the staff to be assigned to perform the Services in performing similar services. (iii) The Proposer shall state the number of years the firm has conducted business. Proposer must have at least four (4) years' experience in providing the required scope of Services for public clients. (iv) Provide five (5) references regarding the Proposer's experience and performance performing similar services. Include the following information: (1) Organization/City, contact name, phone number, e-mail address; and (2) project size and description, if applicable, and description of services. (v) Describe the Proposer's local experience and knowledge of City. b. Project Specific Experience (i) The Proposer shall provide examples of five completed projects of a similar nature, to include: (a) Sample shot drawings — schematic and layout. (b) Sample photographs from past projects including front and rear rack assemblies. (c) Description of the project. 72500.00001 \31308562.1 (d) Duration of the project / description of the project timeline. (e) Contact name, position, entity name, telephone number, fax number and e-mail address for each project. (ii) If any of the following has occurred, please describe in detail: (a) Failure to enter into a contract or professional services agreement once selected. (b) Withdrawal of a proposal as a result of an error. (c) Termination or failure to complete a contract. (d) Debarment by any municipal, county, state, federal or local agency. (e) Involvement in litigation, arbitration or mediation. Conviction of the firm or its principals for violating a state or federal antitrust law by bid or proposal rigging, collusion, or restrictive competition between bidders or proposers, or conviction of violating any other federal or state law related to bidding or professional services performance. Knowing concealment of any deficiency in the performance of a prior contract. (f) Falsification of information or submission of deceptive or fraudulent statements in connection with a contract. (g) Willful disregard for applicable rules, laws or regulations. Information regarding any of the above may, at the sole discretion of the City, be deemed to indicate an unsatisfactory record of performance. C. Technical Competence (i) AV project team resumes (ii) AV project team industry qualifications and certificates (iii) AV project team organizational chart (iv) Corporate AV industry membership certificates (v) Details of the AV contractor's workshop(s) and tools 72500.00001 \31308562.1 (vi) List of the AV contractor's test equipment 7. Proposed Method to Accomplish the Work: Describe the technical and management approach to providing the Services to the City. Proposer should take into account the scope of the Services, goals of the City, and general functions required. Time is of the essence and the schedule of providing the Services is of the utmost importance. Include a draft schedule of tasks, milestones, and deliverables that will provide for timely provision of the Services. In reviewing the scope of Services and goals described in Exhibit "A", the Proposer may identify additional necessary tasks and is invited to bring these to the City's attention within the discussion of its proposed method to accomplish the work. 8. Fee Proposal: Please provide a detailed fee proposal for the scope of Services. The fee proposal shall include hourly rates for all personnel for "Additional Work" (as such term is defined in the proposed Agreement attached hereto as Exhibit "B"). 9. Insurance: See the Agreement, attached hereto as Exhibit "B", for a description of the insurance requirements. 10. Litigation: Provide litigation history for any claims filed by your firm or against your firm related to the provision of Services in the last five (5) years. 11. Other Information: This section shall contain all other pertinent information regarding the following: a. Demonstration of record of staffing tasks efficiently and completing projects on time and within the allocated budget. b. Description of community involvement. c. Description of any previous involvement with the City. d. A statement that the Proposer has not conflicts of interest in connection with providing the Services. 12. Certification of Proposal: This section shall state: "The undersigned hereby submits its proposal and, by doing so, agrees to furnish services to the City in accordance with the Request for Proposal (RFP), and to be bound by the terms and conditions of the RFP." 13. Other Forms Required a. A Non -Collusion Declaration attached hereto as Exhibit "C" and incorporated herein by this reference. b. A Public Works Contractor DIR Registration Certification attached hereto as Exhibit "D" and incorporated herein by this reference. c. A Workers' Compensation Certification attached hereto as Exhibit "E" and incorporated herein by this reference. 72500.00001 \31308562.1 d. A Designation of Subcontractors attached hereto as Exhibit "F" and incorporated herein by this reference. F. No Deviations from the RFP In submitting a proposal in response to this RFP, Proposer is certifying that it takes no exceptions to this RFP including, but not limited to, the Agreement. If any exceptions are taken, such exceptions must be clearly noted in the proposal and may be reason for rejection of the proposal. As such, Proposer is directed to carefully review the proposed Agreement and, in particular, the insurance and indemnification provisions therein. G. Selection Process 1. The City will evaluate proposals based on the following criteria: a. Completeness of proposal specific to the content outlined in the specifications and proposal requirements. b. Contractor's qualifications (as outlined in the specifications). c. Contractor's relevant project experience and past performance. d. Team member's qualifications and relevant experience. e. Method(s) of accomplishing work and timely delivery based on provided project schedule. f. Comments by references. g. Fee proposal. 2. During the evaluation process, the City reserves the right, where it may serve the City's best interest, to request additional information or clarifications from Proposers, or to allow corrections of errors or omissions. 3. The contract, if awarded, shall be to the most qualified Proposer, which submits the proposal that, in the sole judgment of City, is in the best interest of the City. The City reserves the right to reject all proposals, select by proposal review only or interview as needed. Certain Proposers may be selected to make a brief presentation and oral interview after which a final selection will be made. The successful Proposer will be selected on the basis of information provided in the RFP, in -person presentations, and the results of the City's research and investigation. Upon selection of a Proposer, the City will endeavor to negotiate a mutually agreeable Agreement with the selected Proposer. In the event that the City is unable to reach agreement, the City will proceed, at its sole discretion, to negotiate with the next Proposer selected by the City. The City reserves the right to contract for services in the manner that most benefits the City including awarding more than one contract if desired. 4. After negotiating a proposed Agreement that is fair and reasonable, City staff will make the final recommendation to the City Council concerning the proposed Agreement. The City Council has the final authority to approve or reject the Agreement. H. Protests 72500.00001 \31308562.1 1. Protest Contents: Protests based on the content of the RFP shall be submitted to the City no later than ten (10) calendar days prior to the scheduled proposal submittal deadline. If necessary, the proposal submittal deadline may be extended pending a resolution of the protest. Proposer may protest a contract. A protest must be filed in writing with the City (email is not acceptable) within five (5) business days after contract award. Any protest submitted after 5 p.m. of the fifth business day of the contract award will be rejected by the City as invalid and the Proposer's failure to timely file a protest will waive the Proposer's right to protest the contract award. The Proposer's protest must include supporting documentation, legal authorities in support of the grounds for the protest and the name, address and telephone number of the person representing the Proposer for purposes of the protest. Any matters not set forth in the protest shall be deemed waived. 2. City Review: The City will review and evaluate the basis of the protest provided the protest is filed in strict conformity with the foregoing. The City shall provide the Proposer submitting the protest with a written statement concurring with or denying the protest. Action by the City relative to the protest will be final and not subject to appeal or reconsideration. The procedure and time limits set forth in this section are mandatory and are the Proposer's sole and exclusive remedy in the event of protest. Failure to comply with these procedures will constitute a waiver of any right to further pursue the protest, including filing a Government Code claim or legal proceedings. Proposal Schedule The tentative schedule is as follows: ACTION Release of Request for Proposal Last Day to Submit Questions for Clarification received by the City on or before 2:00 pm Clarifications Issued by City on or before 4:30 pm Deadline for Receipt of Proposals submitted on or before 5:00 pm Notification of Finalist(s) Authorization to Negotiate Contract DATE May 19th, 2019 May 24th, 2019 May 28th, 2019 June 3rd, 2019 June 5th, 2019 June 13th, 2019 The above scheduled dates are tentative and City retains the sole discretion to adjust the above schedule. Nothing set forth herein shall be deemed to bind City to award a contract for the above -described professional Services and City retains the sole discretion to cancel or modify any part of or all of this RFP at any time. J. Submittal Requirements 1. General: It is strongly recommended that the Proposer submit proposals in the format identified in this RFP to allow the City to fully evaluate and compare the proposal. 72500.00001 \31308562.1 All requirements and questions in the RFP should be addressed and all requested data shall be supplied. The City reserves the right to request additional information which, in the City's opinion, is necessary to assure that the Proposer's competence, number of qualified employees, business organization, and financial resources are adequate to perform according to the Agreement. 2. Preparation: Proposals should be prepared in such a way as to provide a straightforward, concise delineation of capabilities to satisfy the requirements of this RFP. Responses should emphasize the Proposer's demonstrated capability to perform the Services. Expensive bindings and promotional materials, etc., are not necessary or desired. However, technical literature that supports the approach to providing the Services and work plan should be forwarded as part of the proposal. Emphasis should be concentrated on completeness, approach to the work and clarity of proposal. 3. Site Examination: Proposers may visit the City and its physical facilities to determine the local conditions which may in any way affect the performance of the work; familiarize themselves with all federal, state and local laws, ordinances, rules, regulations, and codes affecting the performance of the work; make such investigations, as it may deem necessary for performance of the Services at its proposal price within the terms of the Agreement; and correlate its observations, investigations, and determinations with the requirements of the Agreement. 4. Authorization: The proposal shall be signed by an individual, partner, officer or officers authorized to execute legal documents on behalf of the Proposer. 5. Confidentiality of Proposal: Pursuant to Michaelis, Montanan, & Johnson v. Superior Court (2006) 38 Cal.4th 1065, proposals submitted in response to this RFP shall be held confidential by City and shall not be subject to disclosure under the California Public Records Act (Cal. Government Code section 6250 et seq.) until after either City and the successful Proposer have completed negotiations and entered into an Agreement or City has rejected all proposals. All correspondence with the City including responses to this RFP will become the exclusive property of the City and will become public records under the California Public Records Act. Furthermore, the City will have no liability to the Proposer or other party as a result of any public disclosure of any proposal or the Agreement. If a Proposer desires to exclude a portion of its proposal from disclosure under the California Public Records Act, the Proposer must mark it as such and state the specific provision in the California Public Records Act which provides the exemption as well as the factual basis for claiming the exemption. If a request is made for information marked "Confidential", "Trade Secret" or "Proprietary" ("Proprietary Information"), the City will provide Proposers who submitted the information with reasonable notice to seek protection from disclosure by a court of competent jurisdiction. Proposer shall have five (5) working days after receipt of such notice to give City written notice of Proposer's objection to the City's release of Proprietary Information. Proposer shall indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents from and against all liability, loss, cost or expense (including attorney's fees) arising out of a legal action brought to compel the release of Proprietary Information. Proposals which indiscriminately identify all or most of the proposal as exempt from disclosure without justification may be deemed unresponsive and disqualified from further participation in this procurement. 72500.00001 \31308562.1 6. Submittal Instructions The proposal must be received no later than 5:00pm local time, on or before June 3rd, 2019 at the office of: Clayton von Helf Information Systems Manager City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260-2578 The envelope should clearly indicate "Proposal for (Project Name)" and Respondent's name and address shall appear in the upper left hand corner of the envelope. If more than one envelope is required, each envelope shall be legibly numbered below the name of the Respondent, e.g. Envelope 1 of 3, as required. The City will not be responsible for proposals that are delinquent, lost, incorrectly marked, sent to an address other than that given herein, or sent by mail or courier service and not signed for by the City. K. General Conditions 1. Amendments to RFP: The City reserves the right to amend the RFP or issue to all Proposers a Notice of Amendment to answer questions for clarification. 2. Amendments to Proposals: Unless specifically requested by the City, no amendment, addendum or modification will be accepted after a proposal has been submitted to City. If a change to a proposal that has been submitted is desired, the submitted proposal must be withdrawn and the replacement proposal submitted prior to the deadline stated herein for receiving proposals. 3. Non -Responsive Proposals: A proposal may be considered non- responsive if conditional, incomplete, or if it contains alterations of form, additions not called for, or other irregularities that may constitute a material change to the proposal. 4. Costs for Preparinq: The City will not compensate any Proposer for the cost of preparing any proposal, and all materials submitted with a proposal shall become the property of the City. The City will retain all proposals submitted and may use any idea in a proposal regardless of whether that proposal is selected. 5. Cancellation of RFP: City reserves the right to cancel this RFP at any time prior to contract award without obligation in any manner for proposal preparation, interview, fee negotiation or other marketing costs associated with this RFP. 6. Price Validity,: Prices provided by Proposers in response to this RFP are valid for 60 days from the proposal due date. The City intends to award the contract within this time but may request an extension from the Proposers to hold pricing, until negotiations are complete and the contract is awarded. 7. No Commitment to Award: Issuance of this RFP and receipt of proposals does not commit the City to award a contract. City expressly reserves the right to postpone the proposal for its own convenience, to accept or reject any or all proposals received in response 72500.00001 \31308562.1 to this RFP, to negotiate with more than one Proposer concurrently, or to cancel all or part of this RFP. 8. Right to Neqotiate and/or Reiect Proposals: City reserves the right to negotiate any price or provision, task order or service, accept any part or all of any proposals, waive any irregularities, and to reject any and all, or parts of any and all proposals, whenever, in the sole opinion of City, such action shall serve its best interests and those of the tax -paying public. The Proposers are encouraged to submit their best prices in their proposals, and City intends to negotiate only with the Proposer(s) whose proposal most closely meets City's requirements at the lowest estimated cost. The Agreement, if any is awarded, will go to the Proposer whose proposal best meets City's requirements. 9. Non -Discrimination: The City does not discriminate on the basis of race, color, national origin, religion, age, ancestry, medical condition, disability or gender in consideration for an award of contract. Publication Date of RFP: May 191h, 2019 72500.00001 \31308562.1 l�i:u 3�liir_Vi PROPOSED SCOPE OF SERVICES Defined in the following documents and drawings: • Section 27 41 16 Audio Video Systems and Equipment • AV Systems Proposal Set Drawings 72500.00001 \31308562.1 EXHIBIT "B" CITY OF PALM DESERT AUDIO VISUAL INSTALLATION AGREEMENT 72500.00001 \31308562.1 EXHIBIT "C" NON -COLLUSION DECLARATION To Be Executed by Proposer(s) and Submitted with Proposal The undersigned declares: I am the of , the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ,20 ,at 72500.00001 \31308562.1 City State CONTRACTOR By: Signature Title: EXHIBIT "D" PUBLIC WORKS CONTRACTOR DIR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.z Name of Contractor: DIR Registration Number: DIR Registration Expiration: Small Project Exemption: Yes or No Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges: 1. Contractor shall maintain a current DIR registration for the duration of the project. 2. Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project. 3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non -responsive. Name of Contractor: Signature: Name and Title: Dated: Z If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark "Yes" in response to "Small Project Exemption." 72500.00001 \31308562.1 EXHIBIT "E" WORKERS' COMPENSATION CERTIFICATION Labor Code Section 3700 provides in relevant part: Every employer except the State shall secure the payment of compensation in one or more of the following ways: (a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations a certificate of consent to self -insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self -insure and to pay any compensation that may become due to his employees. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Contractor: By: Name: Its: In accordance with article 5 (commencing at Section 1860), chapter 1, part 7, division 2 of the Labor Code, the above certificate must be signed and filed with CVWD prior to performing any work under the Contract. 72500.00001 \31308562.1 EXHIBIT "F" DESIGNATION OF SUBCONTRACTORS In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, sections 4100 et seq., Contractor shall set forth below: (a) the name and the location of the place of business and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (1/2%) of the Contractor's proposal price. No additional time shall be granted to provide the below requested information. If no subcontractor is specified, for a portion of the work, or if more than one subcontractor is specified for the same portion of Work, then the Contractor shall be deemed to have agreed that it is fully qualified to perform that Work, and that it shall perform that portion itself. CSLB License DIR Portion of Subcontractor Location of Number Registration Work Name Business Number Name of Contractor Signature Name and Title Dated 72500.00001 \31308562.1 eel 00 SSPINITAR 0 ' ., -' June 2, 2019 Rachelle Klassen, City Clerk City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260 Dear Ms. Klassen, Audio, Visual and Communication Solutions Spinitar is very pleased to provide our proposal and response package for the Council Chambers Audio Visual Remodel 2019. With over 33 years of experience managing, providing, installing and supporting similar projects, we are confident that Spinitar can meet or exceed the overall goals of providing the best value for the cost of goods and services for all aspects of this project. Our commitment is to perform the scope of work described by our most qualified and experienced team members, each highly skilled in their particular areas of expertise which is our standard process. Spinitar has successfully finished many projects that are of similar size and type, and we have included references which outline some of those projects as part of this response package. We acknowledge the main purpose and requirements of this project as described in all the documentation provided to us. With that said, we have given very careful consideration in selecting particular staff members and subcontractors that possess the most experience, the best qualifications and certifications so we can deliver a solution that will meet those requirements with standards allowing consistency and ultimate price breaks with consideration for future expandability. Timelines schedules, staffing and millstones are the key to the success of any project. Our highly skilled and certified Project Management and engineering teams' commitment is to detailed communication to final sign off is part of our standard business practices. 0 Corporate Office 16751 Knott Avenue La Mirada, CA 90638 WWW.soinitar.com . Corporate Office • Audio. Visual and Communication i 16751 Knott 4(: SolufionS venue La Mirada, CA S P I N I T A R 99638 0— www.soinitar.com Spinitar's technical installation and support staff is second to none in industry. Our dedicated Service Department is staffed with full time coordinators and certified industry technical specialists servicing our customers' specific needs. On behalf of the entire team at Spinitar, we would appreciate very much the opportunity to win your selection and work on this project for you. Sincerely yours, Krik Bolling, CTS Account Manager Kirk. bollina(&soinitar.com 714-222-3983 C, I Request for Proposal Council Chambers Audio Visual Remodel 2019 June 3, 2019 S P I N I T A R Identifications of Proposer 2 Staffing Resources 3 Fiscal Stability 4 Experience and Technical Competence Proposed Method to Accomplish the Work 6 7 8 9 10 i 11 i 12 `111 A: FRY READY INfrX- Fee Proposal Insurance Litigation Other Information Certification of Proposal Other Forms Required c OCompany Legal Name: Doing Business As: Corporate Office Address: Corporate Phone Number: Web Site Address: Email Address: Responsible Managing Officers: Proposal Contact: Headquarters: Corporate Data Presentation Products, Inc. SPINITAR"" 16751 Knott Avenue La Mirada, CA 90638 Main Line: 714.367.2900 Toil Free: 800.722.6444 Fax Line: 714.367.2910 www.spinitar.com spinitar@spinitar.com J. Jeffrey Irvin, Principal Joseph J. Rogina, Principal Kirk Bolling Kirk. bolling0spi,n't rr 714-222-3983 16751 Knott Avenue La Mirada, CA 90638 Local phone: 714.367.2900 Tall Free: 800.722.6444 Local fax: 714.367.2910 Area Offices: Bay Area: 5066 Commercial Circle, Suite A Concord, CA 94520 Local phone: 510.266.0300 Local fax: 650.266.0306 San Diego: 5939 Darwin Court, Suite 102 Carlsbad, CA 92008 Local phone: 760.918.1614 Local fax: 760.918.9140 Arizona: Business Formed: Incorporated: Number of Employees: Federal ID Number: Business License Number: DIR Number: California State Contractor's License 2024 W. 1t St., Suite #103 Tempe, AZ 85281 May 26, 1986 State of California 155 95-4044229 SRYA14-716179 1000002995 783424, C-7 Classification, Exp. 08/2020 Integrated audiovisual communications, managed and support servicea. 44 0 3 � Cin Dew zmN n rn' o z <n`: T mrnc m rz• O O (n rn rn °c zw rn> CD {7 v n O v 4-, NT*0 L 9 M ZOy ��m m� nQ z m G) m r m C 9 0 SPINITAR Services Simplified, Since 1986 Audio, visual and Communication Solutions The following is a comprehensive narrative statement that illustrates Spinitar's understanding of the requirements of this project, and the project schedule with the designated phased approach. This is our 71h year of using the Project Team approach to our AV System Integration Projects, and it has been proven to be very successful for both our customers and our employees. SPINITAR Team Verticals for Citv of Palm Desert The three people principally responsible for working with the city: - Project Manager: Valerie Sanchez -Cruz - Designer/Commissioning Agent: Shaun DeVault, CTS-I, CTS-D - Project Foreman & Site Supervisor: Tom Grogan, CTS-I Additional staff assigned to perform Services for the City: - Project Install/Resource Teams o Spinitar Technician Installation Team o Structural Installation & Wiring Sub -contractors - In-house Rack Build Team o Alex Ramon, Adrian Mendoza - In -House CAD Drafting Team o Ken Daugherty, CTS - In-house Commissioning Team o Daniel Portugal, CTS SPINITAR Comaanv and Proiect Oversiaht - Leadership Team o Account Management & VP of Systems Sales: Dan Tompkins, CTS o Design and Technology Leader: Dave Novak, CTS o Service and After -Sales Support: Scott Kroeze, CTS - Spinitar Ownership o ]ay Rogina, CTS, Principal In the overall scope of an Integrated Solutions Project, Spinitar understands that collaboration between the AV Contractor, Customer, and other members of the project team is critical. Prompt action, communication and progressive elaboration are key to maintain project flow and eliminate roadblocks. Spinitar's team based approach, Work Breakdown Structure (WBS) and Systems Integration Process allow our project execution methodology to deliver successful integration projects year after year. Spinitar's Project Managers ensure that communication flows from the Spinitar project team to the project stakeholders and also ensure that the proper resources are scheduled for the proper task at the necessary time. Spintar's Project Management Information Systems (PMIS) include, but are not limited to, MS Project for project schedule development and management, email as a primary form of communication, and a proprietary WBS program for resource and inventory management. SPiNITAN 161131 Krtatt Avenue La Mirada CA 90638 Piruile (80.) 72 2-6-14 1, Fax (714) 361-291r?, ti•;wv.sp�;urar.ccm Proiect Communication Spinitar emphasizes communication as one of the most important aspects of a successful project. Weekly updates, either in project meetings or written form, are essential to maintain the project team's visibility on project progress. In addition, direct communication in the established forums with the Customer, AV Consultant and General Contractor are critical to address unknowns, mitigate risks, manage changes in schedule, verify logistics and confirm that deliverables are on target. Open channels of communication are the foundation that allows the project team to manage risk and project scope, including iterative project reviews with internal and external stakeholders during significant milestones at each phase of the project. Procurement Manaaement Spinitar uses a proprietary program for Procurement and Inventory Management which allows internal visibility from design inception to Procurement processing to equipment receipt and Inventory/Warehouse Management. The Procurement Management system also ensures that serialization of equipment is documented for closeout and assists with expeditious equipment replacement in the event of failures. Oualitv Manaaement Spinitar takes pride in producing quality integrated systems, both with field work and in -shop rack building and testing at our Headquarters in La Mirada. The time that the System Designers spend verifying and testing the fully built systems in our controlled testing environments, allow Spinitar to maintain project schedule and deliver quality systems in coordination with the Customer's timeline. By eliminating as many system 'bugs', updating firmware, setting IP address and other efforts that may be required by the project scope, the racks arrive onsite as close to a plug -and -play system as possible. Commissioning the systems in our shop also allows the Customer and AV Consultant to test the systems and make any final adjustments before the systems are shipped to site. The effort spent on Quality Management by the project team ensures that the systems will serve the Customer for many years. Post Implementation Sunoort Spinitar knows that a project, by definition, has a completion date; however, the Customer may still require support after the project is signed off, whether more training is required or an equipment failure a few years after completion. Spinitar places equal importance on successful project execution and post -installation training and support through the Spinitar Service Department, with dedicated Service Technicians to provide professional support after the project Is completed. Spinitar understands the importance of having a well-defined project plan and strategy in partnering with the USC Marshall School of Business and the USC Capital Construction Development teams. We value having good processes, emphasize quality work product and keep our staff certified to ensure that we deliver a quality product on schedule and something we can all be proud of. sip:Nu TX I 16751 Knott Avenge La Mirada, CA 90639 Phune (81= 722-rA,14: Fax ("ild) 367-2910. w ww-spinsta"x0rr; VPG ApMIN v r m n m q z n nn ,I r O z PACNW II SOUTHWEST I ` I I v � I t n � G i O alC 4 i ! I I I INSTAL INST I LI ALu INSTA UPPOR7 SUPPORT SUPPORT 4ks Ls., Sales Support/ Offke Coardlnatlon k INSTALLATION RESOURCES Li- - BACKBUItD - - CAD PROGRAMMING w� New 5ystem Technologies ISUCCESS SERVICES ACCOUNTING 3 I- -- - PURCHASING - ---- -- - - _ - WHAREHOUSE v (,n ao � m D m m c) CORPORATE MM:HNG MARKETING HUMAN EXECTEAM Tom+ RESOURCES ti Ate• 0) m Cr lu N ONJ ko + f"f' ADMEN PROJECT TEAMS PAC NW - SCUTHI m PACIFIC To T DESERT WAVE ' VERTWW FWAFM DYNAMIC PWA F/4GLESS IUDM MNCE Y �( 11 fill Ell E1.1 'g, dill Ell I 1 $ R R F :Z 4-d f W. VIM 5 . . . . . . . ... Ln 3E irL Ln E A LA =3 1r+ m cr M Ln tj 0 CD %D (D r) m to r+ i i 31 fill FINANCE r �t Ln .70 90 Tl 2 Z m m V x 0 rD n n� 6a :. k n R1 IM , Kirk Bolling, CTS Account Manager Work Experience Biography el.. sPiN:fAfi Kirk has been with Spinitar since March of 2018. Prior to joining Spinitar, Kirk worked as a Regional Account Manager for a large corporation with offices in Orange and San Diego Counties. Positions and Responsibilities As an Account Manager for Spinitar, Kirk is responsible for sales design and client consultation for installed and integrated pro AV systems and services to all corporate, educational, government and military customers. He pro -actively generates new sales and accounts, growing Spinitar's existing customer business by providing A/V Systems Integration solutions based on cutting edge technology. He works closely and extensively with the Engineering and Project Management teams to design and provide professional audio visual solutions customized for every customer's needs. Kirk actively builds relationships with industry manufacturer's to maintain and expand his technical knowledge and to bring the best solutions to all his customers. Qualifications and Industry Training Kirk is a motivated self-starter with strong customer relations skills. With almost a decade's worth of sales experience, Kirk has a developed sense for business and is a savvy team player. Kirk remains knowledgeable by consistently attending trainings and seminars with industry leaders. In[OWClc_1 orr m,miCul a s, IT (1T;0gL'J CNI(I supporl sclvl_c: - Valerie Sanchez -Cruz Project Manager Work Experience Biography e. 5PINITAR Valerie began working with Spinitar in 2018. Prior to Spinitar, Valerie worked as an Operations Manager overseeing projects ranging from outreach to event coordination, to policy and program implementation. She also oversaw construction and renovation projects totaling over $3 mil. Including, space planning, architectural design, and procurement of services and vendors. She has a Bachelor of Arts degree from San Francisco State University. Positions and Responsibilities As a Project Manager for Spinitar, Valerie is responsible for managing, coordinating and overseeing several audiovisual systems integration projects. In this capacity, she manages project budgets, plans project timetables and coordinates personnel activities to ensure that required milestones are being met, integration teams are operating efficiently and clients are informed of project progress and completion timeframes. Valerie also works closely with Spinitar's engineering teams and support personnel to verify that equipment and staff resources are properly allocated to each client project. As part of the Project Manager role and process, Valerie regularly visits client job sites to coordinate team direction, initiate system testing, and oversee final commissioning procedures to verify strong system quality, functionality and operability. Qualifications and Industry Training Valerie remains knowledgeable by consistently attending trainings and seminars with industry leaders. lrtegrated and cv swil communisations, managed and support Semites. 14 Shaun DeVault, CTS, CTS-I Systems Designer Work Experience Biography e... SPINITAR Shaun has been with Spinitar since October 2011. Shaun came to Spinitar eager to learn everything he could about the AV industry. It is this attitude that enabled him to gain a strong perspective on all aspects of systems integration. His technical skills evolved to the point where he became one of Spinitar's installation leaders. He moved into the service department to improve his troubleshooting skill and is now a Systems Designer. Position and Responsibilities As a System Designer, Shaun helps ensure timely and profitable delivery of projects through the sales process, system design and support of project managers. System design responsibilities include design, product selection, system engineering, CAD, and system testing/commissioning for both specification and design build projects. This support helps to create a coordinated workflow through design and purchasing that carries over to field installation and system startup. This process creates an organized and successful implementation of projects to meet the customer's needs. Shaun is responsible for ensuring completed designs and functionality for all projects assigned to him and his team. He works with the System Designer team leader through the design process to ensure quality projects, on time and on budget. Qualifications and Industry Training • CTS and CTS-I • AMX ACE Installation Expert • DMC-D-4K • Extron Control Associate and Control Professional • Biamp RU training • OSHA 10 certified Shaun has also received training from numerous manufacturing partners including Listen, Shure, Vaddio, Atlona and Dante. Irfory;SiecI nmiaw,SI1r1I C{,e-RiNF1i.kA47rr5, rrinnCXVd Lim S-ippaii seevi(es Tom Grogan Project Foreman Work Experience Biography • ` SPINITAR Tom has been with Spinitar since May 2018. Prior to joining Spinitar, Tom was an in the AV industry supervising projects from award to completion while coordinating materials, scheduling technicians, tracking job costs and closeout documentation. Positions and Responsibilities As a Project Foreman for Spinitar, Tom reports to the Project Manager and Technical Support Team, and is responsible for the daily activities of coordinating and managing installation tasks with our customers, general contractors, electrical contractors and Spinitar sub -contractors. Tom provides essential communication with the Project Manager in coordination of installation tasks and gathers all the necessary information, tools and spare parts to insure the installation team performs the installation correctly the first time. We participates in site walks, construction meetings, safety meetings, project kickoffs and reviews and prioritizes onsite efforts to ensure the project stays on track and on budget. Qualifications and Industry Training Tom has received training from numerous manufacturing partners including Christie Digital, Extron, Crestron, Kramer and AMX. --------- -- — — - ---- Irte�jrnfe=d aidim-srrnl ccrmmuriirrafinns, maringed mwl suppao servires. - L Compass April 15, 2019 To Whom It May Concern: Re:Spinitar BBVA Compass Bank, herein referred to as "Compass Bank", is pleased to have a banking relationship with Spinitar since early 2013. The company has a secured line of credit available for its use in business operations. As of the date of this letter, the commitment is $5,500,000. Please me at (909) 285-3927 if you have any questions or need additional information. ,R — -- - — PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Financial Statements And Independent Accountants' Review Report December 31, 2018 I PRESENTATION PRODUCTS, INC. DBA SPINITAR to California Corporation) Financial Statements and Independent Accountants' Review Report December 31, 2018 Table of Contenl,1 Independent Accountants' Review Report................................................................... Balance Sheet as of December 31, 2018- ............................................................... Statement of Comprehensive Income for the year endedDecember 31, 2018............................................................................. .......................... 1 .......................... 2 ............................. 3 Statement of Stockholders' Equity for the year endedDecember 31, 2018.................. . .................................................................................... 4 Statement of Cash Flaws for the year ended December31, 2018................................................... ................_...._...................................................... 5 Notes to the Financial Statements........................................................................................................ 6-14 Schedule l -- Seffing, General and Administrative Expenses for the year ended December 31, 2018...............................................................................15 MILAM, Kr\zt C I i T&� WARINTR,L1 CamFiED Puauc Accomm Cumnm Buse % VALUATw ANAttgs MANAr VffVALUE CONS! .".TA M INDEPENDENT ACCOUNTANTS' REVIEW REPORT To The Stockholders and Board of Directors Presentation Products. Inc. DBA Spinitar La Mirada, California 535 N. llmo Bwi m, Surf 600 G NDA9, Cr. fvm 91203 TEL: 818.550.9991 Fit: 818.550-9993 WEAnoVuuE.m 300 Sncmm CENo DvE, Sofa 955 11W. C+ ONA 92619 Tit: 949.861-4445 FAx 949.861-4449 WEAWVuutcoµ We have reviewed the accompanying balance sheet of Presentation Products, Inc. ❑BA Spinitar (A California Corporation) as of December 31, 2018, and the related statements of comprehensive income, stockholders' equity, and cash flows for the year then ended, and the related notes to the financial statements. A review includes primarily applying analytical procedures to management's financial data and making inquiries of company management A review is substantially less in scope than an audit, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly. we do not express such an opinion. Management's Responsibility for the Financial Statements Management is responsible for the preparation and fair presentation of the financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement whether due to fraud or error. Accountants' Responsibility Our responsibility is to conduct the review engagement in accordance with Statements on Standards for Accounting and Review Services issued by the Accounting and Review Services Committee of the AICPA. Those standards require us to perform procedures to obtain limited assurance as a basis for reporting whether we are aware of any material modifications that should be made to the financial statements for them to be in conformity with accounting principles generally accepted in the United Stales of America. We believe that the results of our procedures provide a reasonable basis for our conclusion. Accountants' Conclusion Based on our review, we are not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in accordance with accounting principles generally accepted in the United States of America. Supplementary Information The supplementary information included in Schedule I is presented only for the purpose of additional analysis and is not a required part of the basic financial statements. The information is the representation of management. We have reviewed the information and, based on our review, we are not aware of any material modifications that should be made to the information in order for it to be in accordance with accounting principles generally accepted in the United States of America. We have not audited the information and, accordingly, do not express an opinion on such information. 1 a Milam, Knecht & Warner, LLP Glendale, California February 8, 2019 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Balance Sheet December 31, 2018 Assets Current assets: Cash and cash equivalents $ 1,394.387 Contract receivables, including retention receivables of $171.031, net of allowance for doubtful accounts of $80,242 7,774,109 Costs and estimated earnings in excess of billings on uncompleted contracts 2,778,434 Inventories, stated at lower of cost and net realizable value 1,991.295 Prepaid expenses 315,621 Note receivable from stockholder 54,265 Total current assets 14,308,111 Property and equipment, net of accumulated depreciation of of $1,186,352 707.772 Other assets: Marketable securities 2,217.422 Deposits 42,606 Total other assets 2,260.028 Total assets $ 17,275.911 Liabilities and Stockholders' Eouitv Current liabilities: Accounts payable $ 4,166.927 Billings in excess of cost and estimated earnings on uncompleted contracts 2,155,646 Accrued expenses 2.106.902 Deferred revenue, current portion 1.519,547 Customer deposits 13,683 Notes payable, current portion 95,493 Total current liabilities 10,058.198 Long-term liabilities: Deferred revenue, net of current portion 1,217.363 Notes payable, net of current portion 132.562 Total long-term liabilities 1,349,925 Total liabilities 11,408,123 Stockholders' equity: Capital stock 523,733 Retained earnings 5.321.939 Accumulated other comprehensive income 22,116 Total stockholders' equity 5,867.788 Total liabilities and stockholders' equity $ 17.275.911 See accompanying notes and independent accountants' review report. 2 PRESENTATION PRODUCTS, INC. OBA SPINITAR (A California Corporation) Statement of Comprehensive Income For the year ended December 31, 2018 Percent of Amount Revenue Sales and contract revenues earned $ 44,802,173 100.00% Cost of sales and cost of contract revenues earned 30,433,933 67.93% Gross profit 14,368,240 32.07% Selling, general and administrative expenses (Schedule 1) 11,814,802 26.39% Income from operations 2,553,438 5.68% Other income (expenses): Gain on the sale of property and equipment 23,964 0.05% Other expense (4,048) -0.01 % Interest expense (19,913) -0.04% Total other income 3 0.00% Income before provision for state income taxes 2,553,441 5.68% Provision for state income taxes 800 0.00% Net operating income 2.552,641 5.68% Other comprehensive income: Unrealized gain on marketable securities 6.687 0.01% Total comprehensive income $ 2,559.328 5.67% See accompanying notes and independent accountants' review report. 3 2,22 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Statement of Stockholders' Equity For the year ended December 31, 2018 Stockholders' equity balance, beginning of year Comprehensive income: Net operating income Unrealized gain on marketable securities Total comprehensive income Distributions to stockholders Stockholders' equity balance, end of year Accumulated Other Total Common Stock Retained Comprehensive Stockholders' Shares Amount Earnings Income Equity 15,834 $ 523,733 $ 3,419,298 $ 15,429 S 3,958.460 2,552,641 - 2,552.641 - 6,687 6,687 2,559.328 (650.000) - (650.000) 15,834 $ 523.733 $ 5,321,939 $ 22,116 $ 5.867,788 See accompanying notes and independent accountants' review report. 4 zq PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Statement of Cash Flows For the year ended December 31, 2018 Cash flows from operating activities: Total comprehensive income $ 2.559,328 Adjustments to reconcile total comprehensive income to net cash provided by operating activities: Gain on the sale of property and equipment (23.964) Unrealized gain on marketable securities (6,687) Depreciation 185,211 Change in operating assets and liabilities: Contract receivables (1,482,556) Costs and estimated earnings in excess of billings on uncompleted contracts (734,482) Inventories (91,026) Prepaid expenses (71.115) Deposits (17,213) Accounts payable 2,072,647 Billings in excess of cost and estimated earnings on uncompleted contracts (1,873,317) Accrued expenses 661,681 Customer deposits (43,492) Deferred revenue 294.333 Net cash provided by operating activities 1,429,348 Cash flows used In investing activities: Purchase of property and equipment (424,546) Proceeds from the sale of property and equipment 25,575 Purchase of marketable securities 2050000)Net cash used in investing activities �2:448:9711j Cash flows used in financing activities: Payments on notes payable (99,153) Distributions to stockholders M9,153) 0,000) Net cash used in financing activities Net decrease in cash and cash equivalents (1,768,776) Cash and cash equivalents at beginning of year 3.163,163 Cash and cash equivalents at end of year $ 1,394,387 Supplemental disclosures- Interest paid $ 19.913 Income taxes paid $ 800 Non -cash transactions: In 2018, the Company purchased a vehicle for $78,896. The purchase was fully financed with a term note payable. See accompanying notes and independent accountants' review report. 5 25 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 1. Nature of Operations Presentation Products, Inc. DBA Spinitar (the "Company") was incorporated in May 1986. The Company designs, integrates, installs, and services audiovisual, presentation, and communication systems for commercial businesses, governmental, and educational organizations, primarily in California, Arizona, and Florida. The length of the Company's systems integration contracts is typically between three weeks and twelve months. 2. Summary of Significant Accounting Policies The summary of significant accounting policies of the Company is presented to assist In understanding the Company's financial statements. The financial statements and notes are representations of the Company's management, who is responsible for their integrity and objectivity. The Company maintains its books and records on the accrual basis of accounting. These accounting policies conform to accounting principles generally accepted in the United States of America and have been consistently applied in the preparation of the financial statements. New accounting oronouncements In May 2014, the FASB issued Accounting Standards Update ("ASU") No. 2014-09, "Revenue from Contracts with Customers." The guidance in this ASU supersedes existing accounting literature relating to how and when a company recognizes revenue. Under the new guidance, an entity should recognize revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. In August 2015, the FASB issued ASU 2015-14, "Revenue from Contracts with Customers (Topic 606): Deferral of the Effective Dale", which delayed the effective date of ASU 2014-09 by one year. As a result, for private companies ASU 2014-09 will be effective for annual reporting periods beginning after December 15, 2018, and is to be applied with either a full retrospective or modified retrospective approach. Application prior to the original effective dale for public entities is prohibited. The Company is currently evaluating the impact of adopting this ASU on its financial statements. In February 2016, the FASB issued ASU 2016-02, "Leases," which amends the existing accounting standards for lease accounting, including requiring lessees to recognize most leases on their balance sheets and making targeted changes to lessor accounting. The new standard is effective for fiscal years beginning after December 15, 2019 and requires a modified retrospective transition approach for all leases existing at, or entered into after, the date of initial application. Early adoption is permitted with an option to use certain transition relief. The Company is currently evaluating the impact of adopting this ASU on Its financial statements. In August 2016, the FASB issued ASU 2016-15, "Statement of Cash Flows" (Topic 230): Classification of Certain Cash Receipts and Cash Payments, which intends to reduce diversity in practice in how certain transactions are classified in the statement of cash flows. ASU 2016-15 provides guidance on eight specific cash flow issues. In the absence of specific guidance, an entity should classify each separately identifiable cash source and use on the basis of the nature of the underlying cash flows. For cash flows with aspects of more than one class that cannot be separated, the classification should be based an the activity that is likely to be the predominant source or use of cash flow. ASU 2016-15 is effective for fiscal years beginning after December 15, 2018 and early adoption is permitted. The Company is currently assessing the impact of adopting ASU 2016-15 on its financial statements, but does not expect the adoption of ASU 2016-15 to have a material impact. Use of estimates Management uses estimates and assumptions in preparing financial statements. Those estimates and assumptions affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities, and reported revenues and expenses. Actual results could differ from these estimates. 6 Z (49 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 2. Summary of Significant Accounting Policies (Continued) Revenue recognition Service Agreements The Company recognizes maintenance and service contract revenue ratably over the contractual period, beginning with the effective date of the contract_ Maintenance and service contract revenue received in advance of the effective dale is recorded as deferred revenue. Systems Integration Contracts The accompanying financial statements have been prepared using the percentage -of -completion method of accounting and, therefore, lake into account the cost, estimated earnings, and revenue to date on systems installation contracts not yet completed. This method is used because management considers total cost to be the best available measure of progress on the contracts. Because of inherent uncertainties in estimating costs, it is at least reasonably possible that the estimates used will change within the near term. The amount of revenue recognized at the statement date is the portion of the total contract price that the cost expended to date bears to the anticipated final cost, based on current estimates of costs to complete. It is not related to progress billings to customers. Contract costs include direct labor and all materials unique to or installed in the project and those indirect costs related to contract performance, such as indirect labor, supplies and repairs. Changes in job performance, job conditions, and revisions In estimates of costs and earnings during the course of the work are reflected in the accounting period in which the facts that require the revision become known. Provisions for estimated losses on uncompleted contracts are recognized at the time the losses become known. Revenue earned on contracts in progress in excess of billings (underbillings) is classified as a current asset. Amounts billed in excess of revenue earned (overbillings) are classified as current liabilities. In accordance with Emerging Issues Task Force Statement No. 00-21. "Revenue Arrangements with Multiple Deliverables," when an arrangement contains multiple elements with standalone value, such as product installation and maintenance programs, revenue is allocated based on the fair value of each element as evidenced by vendor specific objective evidence. This evidence consists primarily of pricing of multiple elements as if sold as separate products or services. Cash and cash equivalents For purposes of the statement of cash flows, the Company considers highly liquid investments with an original maturity at the date of purchase of three months or less to be cash equivalents. Marketable securities The Company invests in marketable securities, which mainly consist of mutual funds. Marketable securities are stated at fair market value based on quoted market prices at year-end. For the year ended December 31, 2018, the Company had $2,217,422 in marketable securities. Additionally, when marketable securities are sold, a gain or loss is reflected in eamings based upon the proceeds of the sale in relation to its cost. At year end, unsold marketable securities, which are stated at fair market value, are compared to historical costs. A gain or loss is recognized in the statement of comprehensive income, and is a component of stockholders' equity. PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 2. Summary of Significant Accounting Policies (Continued) Contract receivables The Company extends credit to its customers. Collateral is generally not required. Credit losses are provided for in the financial statements based on management's evaluation of the Company's historical and current industry trends. Although the Company expects to fully collect amounts due, actual collections may differ from estimated amounts. Inventories Inventories consist of finished goods and installation components and are stated at the lower of cost (on a weighted average basis) and net realizable value ("NRV"). The Company reduces the inventory's carrying value to the lower of cost and net realizable value. In determining net realizable value, the Company assumes the inventories will be offered for sale in the normal course of business and not on a liquidation basis. Property and equioment Property and equipment are stated at cost. Major renewals and improvements are charged to the property accounts while replacements, maintenance and repairs, which do not extend the useful lives of the respective assets, are expensed currently. At the time property and equipment is sold or otherwise disposed of, the asset and related accumulated depreciation or amortization accounts are relieved of the applicable amounts and any gain or loss is recorded in earnings. Depreciation and amortization are calculated using the straight-line method over the estimated useful lives of the respective assets as follows: Computers and software Office furniture and equipment Automobiles and trucks Leasehold improvements 3 years 5 years 5 years Estimated useful life or lease term, whichever is shorter Depreciation expense for the year ended December 31, 2018 amounted to $185,211. For federal and slate income tax purposes, depreciation is computed using the modified accelerated cost recovery system. Accountina for the imoairment of Iona -lived assets Long-lived assets are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amounts of the assets in question may not be recoverable. Impairment would be recorded in circumstances where undiscounted cash flows expected to be generated by an asset are less than the carrying value of that asset. As of December 31, 2018, no impairment has been recognized as management expects to fully utilize the Company's long-lived assets. Advertising Advertising expenses are charged to expense as incurred. For the year ended December 31, 2018, total advertising expense was $15.786. Z� PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 2. Summary of Significant Accounting Policies (Continued) Shioaino and handlino costs In accordance with ASC 60545, the Company records the revenue related 10 shipping and handling costs charged to customers in net sales. For the year ended December 31, 2018, the Company recorded total shipping and handling costs in cost of sales of $313,704. Research and development The Company accounts for research and development costs in accordance with the Accounting Standards Codification subtopic 730-10, Research and Development ("ASC 730-10"). Under ASC 730- 10, all research and development costs must be charged to expense as incurred. Accordingly, internal research and development costs are so expensed. Third -party research and development costs are expensed when the contracted work has been performed. The Company incurred research and development expenses of $2,313,097 for the year ended December 31, 2018. Income taxes The Company has elected to be treated as a Small Business Corporation under Section 1372(a) of the Internal Revenue Code. Under this "S Corporation" status, the stockholders separately account for the Company's items of income, deduction, losses and credits. Therefore, these statements do not include any provision for corporate income taxes other than the minimum tax imposed by the state of California. Income tax expense for the year ended December 31, 2018 has been reduced to the minimum California tax of $800, due to expected research and development credits earned as of December 31, 2018. Accounting for Uncertainty in Income Taxes (FASB Accounting Standard Codification (ASC) 740, Income Taxes) requires the Company to recognize the impact of tax positions in the financial statements, as well as potential accrued interest and penalties, if that position is more likely than not of being sustained on audit. During the year ended December 31, 2018, the Company did not recognize any amount in potential interest and penalties associated with uncertain tax positions. The tax years ending in 2015 and after remain open to Federal examination and tax years ending in 2014 and after remain open to examination by the State of California. 3. Concentrations of Credit Risk Cash Financial instruments that potentially subject the Company to concentrations of credit risk consist primarily of cash and trade receivables. The Company deposits its cash in high quality credit institutions. The Company performs ongoing credit evaluations of its customers and establishes allowances when appropriate. The Company has cash in financial institutions which are insured by the Federal Deposit Insurance Company (FDIC) up to $250.000 at each institution. At various times throughout the year, the Company may have cash balances in financial institutions that exceed the FDIC insurance limit, and at December 31, 2018, the Company had cash in financial institutions that exceeded depositor's insurance. Management reviews the financial condition of these financial institutions on a periodic basis and does not believe this concentration of cash results in a high level of risk for the Company. 9 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 3. Concentrations of Credit Risk (Continued) Major customer The Company grants unsecured credit to Its customers in the ordinary course of business. The concentration of credit risk with respect to these receivables is limited due to the number of customers comprising the Company's customer base. The Company has one customer that accounted for approximately 9% of total sales for the year ended December 31. 2018. As of December 31, 2018, there were no amounts in accounts receivable from this customer and there was a net $342,399 in billings in excess of cost and estimated earnings on uncompleted contracts. A decision by significant customers to decrease the amount purchased could have material adverse effects on the Company's financial position and results of operations. Maior vendors For the year ended December 31, 2018, the Company had two major vendors that represented 22% of purchases for the year ended December 31, 2018. The major vendors represented approximately 12% of accounts payable at year end. 4. Property and equipment Property and equipment are summarized by major classifications as of December 31, 2018, as follows: Computers and software $ 497,527 Office furniture and equipment 420,297 Automobiles and trucks 717,493 Leasehold improvements 258,807 Total property and equipment 1,894,124 Less accumulated depreciation (1,186.352) Property and equipment, net $ 707,772 5. Contracts in Progress Contracts in progress as of December 31, 2018 were as follows: Cumulative costs to dale $ 18,154,491 Cumulative gross profit to date 15,812,004 Cumulutive revenues earned 33,966.495 Less progress Millings to date (33,343,707) Contracts in progress, net S 622,788 10 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 5. Contracts in Progress (Continued) Included in the accompanying balance sheet under the following captions: Costs and estimated earnings in excess of billings on uncompleted contracts $ 2,778,434 Billings in excess of costs and estimated earnings on uncompleted contracts (2,155,646) Net balance $ 622,788 6. Backlog The following schedule summarizes changes in backlog on contracts during the year ended December 31, 2018. Backlog represents the amount of revenue the Company expects to realize from work to be performed on uncompleted contracts in progress at year end and from contractual agreements on which work has not yet begun. Backlog balance at December 31, 2017 $ 10.060,045 New contracts during the year 36.803.313 Less contract revenue earned during the year (33.966,495) Backlog balance at December 31, 2018 $ 12,896,863 7. Related Party Transactions For the year ended December 31. 2018, the Company had a note receivable from a stockholder in the amount of $54,265. The note is due on demand, is unsecured, and bears interest at a rate that approximates the applicable federal rate. 8. Line of Credit The Company maintains a $5,500,000 maximum revolving line of credit with a bank for working capital purposes. Borrowings on the line are not to exceed eligible accounts receivable and inventory balances, as defined in the agreement. The line of credit agreement contains various covenants relating to financial reporting and the maintenance of certain minimum financial ratios. During the year ended December 31, 2018, the Company was in compliance with all covenants. The line of credit is secured by substantially all of the Company's assets, and is also guaranteed by the stockholders. Interest is payable monthly, at Compass' Hank rate (4.75% at December 31, 2018). As of December 31, 2018, the available balance on the line of credit was $5,500,000. This line of credit expires May 13, 2019, and there was no outstanding balance on the line of credit at December 31, 2018. 11 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 9. Accrued Expenses As of December 31, 2018. accrued expenses consisted of the following: Accrued payroll and related expenses $ 1,158,417 Accrued sales tax and other taxes 255,610 Accrued commissions 688,003 Accrued other expenses 4,872 Total $ 2,106, 902 10 Notes Payable As of December 31, 2018, notes payable consisted of the following: Notes payable secured by vehicles, due in monthly installments at an interest rate of 5.9% through February 2019 $ 2,992 Notes payable secured by vehicles, due in monthly installments at an interest rate of 5.62% through December 2019 37,767 Notes payable secured by vehicles, due in monthly installments at an interest rate of 7.5% through May 2021 74,408 Notes payable secured by vehicles, due in monthly installments at an interest rate of 7.5% through November 2021 19,451 Notes payable secured by vehicles, due in monthly installments at an interest rate of 6.81% through November 2022 21,054 Notes payable secured by vehicles, due in monthly installments at an interest rate of 8.25% through November 2023 72,383 Total 228,055 Less current portion (95,493) Notes payable, net of current portion $ 132.562 12 3Z PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 10. Notes Payable (Continued) Principal repayment requirements of the long-term debt based on the existing terms at December 31, 2018 for the next five years are as follows: 2019 $ 95,493 2020 59,054 2021 43,029 2022 21,052 2023 9,427 Total $ 228,055 11. Common Stock The Company's authorized share capital consists of 100,000 shares of common stock. As of December 31, 2018, there were 15,834 shares issued and outstanding. 12. Commitments and Contingencies Ooeratino leases The Company leases each of its four facilities, two under non -cancelable operating lease agreements. The lease agreements consist of the following: Concord, California — This lease terminates on September 30, 2019 and consists of the following base monthly rent schedule, January 1, 2019 — September 30. 2019 3,261 Carlsbad, California — The lease period terminates on September 30, 2021 and consists of the following base monthly rent schedule: January 1, 2019 — September 30, 2019 $ 4,093 October 1, 2019 — September 30, 2020 4,214 October 1, 2020 — September 30, 2021 4,336 La Mirada, California — This lease was renegotiated June 30. 2018, over a three-year lease period which terminates on June 30, 2021 and consists of the following base monthly rent schedule: January 1, 2019 — June 30, 2019 July 1, 2019 — June 30, 2020 July 1, 2020 — June 30, 2021 $ 21,853 22,618 23,409 Tempe, Arizona — This lease terminates on February 28, 2020 and consists of the following base monthly rent schedule: January 1, 2019 — February 28, 2019 March 1, 2019 — February 28, 2020 $ 4,090 4,217 The rent expense for the year ended December 31, 2018 was $437,212. 13 32 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Notes to the Financial Statements December 31, 2018 12. Commitments and Contingencies (Continued) The expected future minimum lease payments of the aforementioned leases are as follows: Year Ending December 31. 2019 $ 396.004 2020 335,530 2021 179,478 2022 2023 Total $ 911,012 Litioation The Company, from time to time, is involved in certain legal matters which arise in the normal course of business. Management believes that any resolution of such matters will not have a material adverse effect on the financial position of the Company. Contingent Liabilitv The Company had an accrued contingent liability amount of $22,286, which represents interest due from a sales tax audit for the period October 1, 2009 through September 30, 2012. The Company is awaiting final processing from the Settlement Unit of the California Department of Tax and Fee Administration. 13. 401(k) Plan The Company maintains a 401(k) plan (the "Plan") covering all eligible employees. Employer contributions to the Plan are at the discretion of the Board of Directors and are limited to a percentage of active participants' compensation. During the year ended December 31, 2018, the Company had a matching program that contributes 10% of the first 6% of gross income. The total 401(k) matching expense for 2018 was $23,612. 14. Insurance Reserve On December 1, 2016, a reserve was created to offset the cost of medical expenses for all employees who have selected the HMO option The benefit specifically applies to offsetting those expenses that would be applied to a person's deductible, up to a threshold for each option of insurance. The balance in this account as of December 31, 2018 was $90,518. 15. Subsequent Events Management evaluated all activity through February 8, 2019 and concluded that no subsequent events have occurred that would require recognition in the financial statements or disclosure in the notes to financial statements. 14 31 PRESENTATION PRODUCTS, INC. DBA SPINITAR (A California Corporation) Schedule I - Selling, General and Administrative Expenses For the year ended December 31, 2018 Selling, general and administrative expenses: Salaries and wages Commissions Insurance Payroll taxes Automobile Rent Professional fees Marketing Computer Telephone Travel and lodging Depreciation Office supplies Office Professional development Employee meals Small tools Employee benefits Utilities Entertainment Bad debt Meetings and conventions Taxes and licenses Employee recruiting Miscellaneous Dues and subscriptions Retirement plan Equipment lease Advertising Postage Temporary employees Selling expenses Charitable contributions Bank fees Total selling, general and administrative expenses See independent accountants' review report. 15 Percent of Amount Revenue 3,458,761 7.72% 3,209,061 7.16% 906,206 2.02% 867,770 1.94% 666,661 1.53% 437,212 0.98% 289,434 0.65% 248,662 0.56W 217,977 0.49% 209,960 0.47% 194.936 0.44% 185.211 0.41% 108,667 0.24% 98.222 0.22% 71,505 0.16% 69,094 0.15% 61,623 0.14% 60,812 0.14% 57,551 0.13% 55,027 0.12% 51,884 0.12% 43,546 0.10% 33,749 0.08% 33,138 0.07% 26,650 0.06% 25,633 0.06% 23,612 0.05% 16.901 0.04% 15,786 0.04% 15,156 0.03% 10,443 0.02% 9,927 0.02% 8,643 0.02% 5.382 0.01 % $ 11,814,802 26.39% M Loyola Marymount University Matthew Frank matthew.frank@lmu.edu 310-258-5436 Completed in 2018 $2.2mil+ Riverside County Office of Education $1.1mi1 Lindsay Currier Icurrier@rcoe.us 951-826-6324 Completed in 2019 References e.-. SP'NIrAR School of Film and Television Designed and installed production, post -production, screening, and a variety of other spaces including classrooms, divisible classrooms and conference rooms with Epson projectors, Draper wall screens, Samsung and Sharp flat panel monitors, and AMX control systems. Integrated AV Systems A 4 story building in downtown Riverside primarily consisting of administrative support and rentable conference spaces. The renovation of the AV systems in spaces include a boardroom, divisible multipurpose rooms, a medium conference center, a multipurpose room and a pre -function lobby. Also installed is a countywide AV Asset Management and AV Asset Monitoring system that will support multiple facilities in the future. County of San Mateo $930k Maple Street Correctional Center Kevin Pankhurst New construction of a correctional facility which houses 576 kpankhurst@smcgov.com beds with further expansion to 832 beds. Wall -mounted 650-599-1022 displays were provided in various locations with digital Completed in 2017 signage in the lobby and break rooms. Conference rooms were outfitted with wall -mounted displays with cable and blu-ray players and connections for users portable devices. Projection systems were ceiling mounted with electrically - operated, roll -down projection screens. Other spaces with audiovisual include staff stations, family reunification rooms, briefing multipurpose rooms and numerous conference rooms. City of Beverly Hills $250k Numerous Projects for Public Works and Transportation Alan Schneider including the public library aschneider(abeverlvhills.orq Designed and installed a tum-key audio-visual system for 310-285-1150 the 2"d floor auditorium at the public library which included Completed in 2017 ceiling speakers, wireless mic systems, rack mounted digital signal processor with AVB port, handheld wired mics with desktop mic stands and mic cables for panel discussions in the front of the room. Cucamonga Valley Water District $ 60k Frank Chu frankc@cvwdwater.com 909-987-2591 Completed in 2017 Frontier Project Video Wall Install a 3x3 video wall on the front wall in the boardroom - The existing analog switcher will send the signal from the Boardroom will have the ability to send either an analog signal from the rack or a clickshare located a the wall allowing for a digital source. Integrated audiovisual communications, managed and support services _ �i 11 III ®Q®Q a C) +9 N � 4 s e 1 a - 1 �� 1• 0 0 o r ■ all 1 a fr F�1 0 n m C m 1� w C_ CnH °o r r o P n g ILD C)r r O z n 0 _ 0 r1 - Ln N N yE��R t ? Ei r a r p M Q P S i - 11 i , ` lip�I � lid � il'.Me o� n1•000i N o ��► i I! I wig ? E i s ✓ l vn , LJ 4 L- - - - - - - - - - - I II I II is II 11 ngnflnflnnnn� 6uu im I I II I I �I I ' i' i . r L• � I 1 II I I I I �I I I I q, } -I r- r-,- -I F- J n nnnollnuRn.1 L —J L —J —J L— Igo W I —i i a ,Ij�"0--' tlj d0■aka€ lite f s w s I I II I r f T i { v LL qS I El Ui ,r ti L ' 1l 6 ril ��, r X, 7 ru� F5J i# )WI wr 1 If N h 1. gym• :i� ."..� � -� - -- k ram- .'_���- 41% Mf� L s cp C o m m C nn n a _a n 0 rn cnW V N CP D n a n n N a fm � m �n m m- CI �7 ..L A O CIlb C pl c, m IS Z a @ A ca `ggY O j m 0 0 4- a ~ Sn c x w �a� Q o. w m 3cn CD m v a °, (D m n p a ro a n 3 CLCL 1= 3 C7 cn a e In 1 rf v s C ro _ �' o 1�• Q) ro n cD rn -1 n p O cm ti o ^� -c cn °n a , o ro 3 0 -� CDa a ro m o �='• ro ro o 00 ogn ~< o D a ro rn M a x M � cD 3 p P CL A o n w' o @ '+ s CD G 3 CL O co to M & O M �p [7 C d fAcn ro au3!v m ro CD . to cn _ ro 3 ro Cm)CL ro CL ro O O //��•�• V� CL ro ,-� m 0 a.�� ro Im Cr .0 O rt O s n ro n r,• r\ O /� ,i O 1+ s C _ X 3 a a ro n s m cn ro n o -„ cf fi �• ro v u n m a m n x z O r O m< G) v m n D r- r T -5 W n co �i n O� c~n Cti CL O w r, 0 CERTIFICATE OF ACHIEVEMENT This document certifies that Shaun Devault HAS COMPLETED ACE INSTALLATION EXPERT 2013 on November 23, 2013 11:00: 00 PM 1 ttL C12 K G rh s UX G � o O�K o eo e� w m m� C AZ m Q �p m O d .► Cl aa.Q mica C m (D0 CD 3 0 N A CY M N Cc m 1.4 IL�it Cl"it s �,} I (� l 1 �r 15;11wt'I ro 0 O a ao l< cn ro N r-k 1 3 cn rt N d O 3 w CL ro n --I Cn I CL ro a m a 0 rt cn m o Q- O :� CL as ro =. h � m ro _s _v r) ro CS 01 r! O rL 0 o Q C) n ro 0 � 3 CL CL - CD N n =r o ro � ((D Qti u h 1 cn ro ro C) rat 41' CL rt o o, ���..,.. 44 f� ro (D ro a pp O 3 � ro Cr n Q- ro ro c. CD :r CL ro t7 m CL ro N ro 13 CD m ro ro CL o a ro rt CD X n 0 ro 3 0 ro CL d r'-F lu (n o v a ro n 0 nl D y 3 m �+ I 3 CD 0 ro CA rn p? r l ro ro 0CD N G CL to m n o O N •C7 � 3 ro n ro rt ro N m � 0 = CD CO w -0 _ cs �• �* o m 3 3 ? ro 0• to — CA -a rt � vl' =r n i' ro N o C oft CL n m O 3 N O m d D r� Q Q r--t- wrr� � 0 D 5E -, m AL U n c v 0 C c b r z v Z 4 m c) m v nm x V rn m z n m a 0 0 0 z k # O 00 w N 0 -31 to n c 3 Q Q_ C Z7 zy O Q_ iQ Q_ rr+ K x n rn n rn CL U O tn O 3 (D rt r+ O 0 Cl =� Lo C Q l< rn rn r+ O KN 9 k ", A n A 5 `o o m (f)A rn m m C�4 c� � tC <• v rD o C� X 'C ic Oi m r* 3 o a- tv � s Z o w � � N 0 O F-� ? W w rt P- d . TC : V CD V CD M..r . CD CD No 0 �r OmEd. V) m" r• V ) 0 CD rt rt SD rt n 0 c� r CD W CL Test Equipment and Software • S P I N I T A n Standard Test Equipment Used Listed below is a sampling of the test equipment that Spinitar integrates as part of AV/IT applications: 1. EZ Digital OS 5100 Oscilloscope 2. Extron VTG-350 Video & Audio Test Generator 3. Extron VTG 300, Installation area (several) 4. Extron RGB 202 VTG - Test pattern generator 5. Extech Digital Sound Level Meter Model, 407750 6. Earthworks Omni Measurement Microphone Model, M30 7. Interfacing Tech Model, AIS 10 8. Whirlwind Qbox Mic/Line Tester 9. Minirator MR1 Analog Audio Generator 10.Fluke 189 Multi -Meter 11.Extech Multi -Meter Model, Mini Tec 26 (several) 12.NTI Acoustilyzer AL1 Compact Acoustical Analyzer 13.NTI MiniSPL Calibrated Microphone 14.TOA ZM-104 Impedance Meter 15.Various tone generators 16.Various Digital Volt Meters 17.Sencore - OTC1000 - ColorPro Optical Tri-Stimulus Colorimeter 18.Sencore - VP403C - VideoPro Multimedia Video Generator 19.Sencore - SP495 - SoundPro Audio Consultant 20.Sencore - SP295C - SoundPro Audio Analyzer Contractor Version Spinitar will provide additional / specialized testing equipment if necessary to fulfill those testing requirements not addressed with the basic testing gear listed. Standard Software Used 1. Microsoft Office Professional Suite 2013 2. Microsoft Project 2013 3. Auto CAD 2014 4. Visio 2013 5. Appropriate Manufacturer Software (AMX, Crestron, etc.) Spinitar will provide all serial numbers and equipment calibration information prior to acceptance testing. Integrated audiovisual communications, managed and support services, a 101 PROJECT MANAGEMENT PLAN FOR CITY OF PALM DESERT COUNCIL CHAMBERS AN REMODEL 2019 PALM DESERT ?o S P I N I T A R SCr-iCCS S7,!'.PU.Cd 5 n: r. 1985 TABLE OF CONTENTS INTRODUCTION............................................................................................................................2 PROJECT MANAGEMENT APPROACH.............................................................................................2 PROJECTSCOPE...........................................................................................................................2 MILESTONELIST..........................................................................................................................5 CHANGE MANAGEMENT PLAN......................................................................................................6 COMMUNICATIONS MANAGEMENT PLAN......................................................................................7 PROCUREMENT MANAGEMENT PLAN............................................................................................8 PROJECT SCOPE MANAGEMENT PLAN...........................................................................................8 SCHEDULE MANAGEMENT PLAN...................................................................................................9 QUALITY MANAGEMENT PLAN.....................................................................................................9 S P I N I T A R Serv;cos S:r;;p:i`icd S'ncc 1986 INTRODUCTION Spinitar is honored to provide a project proposal for the Audio -Visual solution design outlined in the City of Palm Desert Council Chambers AN Remodel. The updated Council Chambers Remodel to include Audio and Video systems with Direct View LED, presentation and broadcast video and audio. In addition the AN Control Room and Lobby will include display/video and audio technologies. Spinitar will provide and install a fully functional, integrated system and into ongoing end user support PROJECT MANAGEMENT APPROACH The Spinitar Project Manager has the overall authority and responsibility for managing and executing this project according to this Project Plan and its Subsidiary Management Plans. The project team will consist of a dedicated project foreman, a dedicated system designer, and a group of shared resources to accommodate all of the AV scope to include CAD, control and audio system installation, and installation technicians. The project manager will work with all stakeholders to perform project planning, execution, and closeout. All project and subsidiary management plans will be reviewed and approved by the City of Palm Desert assigned project sponsor. All funding and budgetary scope change decisions will also be made by the City of Palm Desert assigned project sponsor. The Spinitar project manager is responsible for communicating with project stakeholders on the progress and performance of each project resource and tracking the project milestones and deliverables. PROJECT SCOPE The scope of work for this project includes components and requirements as stated in the Audio - Visual written specification sections as well as the associated drawings and governing documents as related to the project descriptions, specified products, installation and project management methods, and testing requirements. Spinitar will provide and install a complete and fully operational system for the City of Palm Desert. Existing Systems and Demolition: It is the intent that the entire system be demolished and replaced with new up-to-date systems. Several items from the existing audio video system shall be reused since they are still in excellent working order. These items are defined herein as well as in the associated project (PC S P I N I T A Ser ices Simp4 ied 5 nce 1986 drawing. This shall include the Council Chambers primary ceiling loudspeakers, the desktop loudspeaker stations (wooden enclosures and loudspeakers only), the press audio plate, the lectern and associated LED signal lights, and the wireless FM hearing assistance system In addition, some existing equipment shall be identified by the Owner as "tagged" and shall be removed during demolition and returned to the owner to be reused/repurposed in other City of Palm Desert systems. All other audio system components are end -of -fife and shall be removed by the AV contractor and disposed of as part of the scope of this project. The AV contractor shall include the demolition of all existing systems as well as the disposal and/or recycling of all materials including a -waste as part their proposal. It is the intent that all cabling, metals, and electronics/e-waste are disposed of appropriately and responsibly. The City of Palm Desert shall provide new flooring and paint as needed for the AV Control Room. Audio Systems: The new audio system shall function similarly to the existing system. The system shall consist of microphones and compact loudspeakers at every dais position as well as at the lectern. The system shall operate as a full mix -minus system allowing an unlimited number of open microphones without feedback or the need to mute the local Ioudspeakers at each dial position. Each dais station shall include a new push -to -talk button. This button shall be a momentary button with an LED that shall communicate with the AV control system to turn on each microphone. This button shall be disconnected from the microphone and used for signaling and control only allowing for both "instant on" as well as "request to speak" (RTS) functions to be programmed into the system In "instant on" mode any time the button is pushed the microphone shall be turned on and the button LED will illuminate green. In RTS mode any time the button is pushed it puts the microphone into a speaker queue and flashes the button LED. When the member is recognized to speak (by the clerk or meeting chair) the microphone shall turn on and the button LED will then illuminate solid green. Mode selection and queue management shall be performed by the Clerk and/or Mayor depending on final DSP programming. The new audio system shall be supplied with a new QSC network -based digital audio processor (DSP), external network I/O, network audio amplifier, and low wattage multi -channel audio amplifiers. The DSP shall serve as both the digital signal processor for audio as well as the control system processor. The DSP shall also be equipped with and internal media drive for audio recording. All meetings shall be recorded onto the media drive and then uploaded to a shared City of Palm Desert network folder. The new audio system shall also replace the lobby loudspeakers with new loudspeakers and grilles. The existing back cans and conduit infrastructure shall be reused. Video Systems: Both the presentation and broadcast video systems shall also undergo a comprehensive remodel and replacement. This shall include a full update to the digital video cameras, new broadcast controls/switcher, new digital endpoints (inputs and outputs), a full digital video 5cn;ces 5=i�pi Ged 5'FIC c 085 distribution/switching system, new I6:9 monitors on the dais, a new direct view LED video wall, and an add -alternate for a secondary 86" LED TV. The intent is to create a new video system that is up-to-date and that can display widescreen HD digital video formats. The existing video system for the Council Chambers is an old 4:3 aspect ratio system, and although the system has somewhat high resolution (1400xI O50), it is not capable of showing native 16:9 content without letterboxing or reducing the screen resolution. This includes the existing 17" desktop displays and the current large 124"x93" acrylic rear projection screen (and video projector). To allow for high definition 16:9 images to be displayed on the dais, the current desktop monitors shall be replaced with new 15" HD (1920x1080p) desktop monitors. The new monitors shall have a lower profile and provide better visibility for the council members and seated audience members. The existing video projector and screen shall be replaced with a high definition direct view LED video wall. The wall shall be I.8mm pixel pitch and a native resolution of l920xl O8Op (or higher). The new video wall would have HD resolution (2280xl368). The video wall shall be new LED technology with an anticipated 60,000 hours half brightness lifespan. The system shall also have excellent brightness and visibility throughout the room As stated previously, it is the intent that the existing rear projection screen and rear projection mirror system shall be removed, and the wall be modified/re-framed to permit the installation of a new 14'-2" x 8'-6" LED video screen. The existing wood trim shall be saved and subsequently be remade as new trim for the LED video wall (removal by AV contractor and reworking by TBD millwork fabricator). The new trim would frame would approximately'/4" deeper than the new video wall and approximately 1 %" wide. A new video distribution shall use an AV over IP based video distribution topology. The system shall employ IP encoders/decoders as endpoints and shall utilize a standalone AV gigabit Ethernet network. The approach shall allow for a highly flexible and scalable system using gigabit network switches and CAT6 cabling. This system shall also allow for management of the audio from the video sources across the AV network. The broadcast video systems shall also be upgraded to HD -SDI (108Op59.94). The broadcast video systems shall also utilize IP distribution. The new cameras as well as a new digital video switcher shall utilize NewTek's Network Device Interface (NDI) technology. The new digital switcher shall have a variety of integrated features and capabilities such as built-in pan/tilt/zoom control, multi - viewer output, audio mixing, and digital video effects such as video titling and clip store). The primary output of the system shall be sent to the City of Palm Desert's Granicus streaming system to broadcast to the web. The broadcast system output shall also be sent to a local solid- state media recorder for archival and backup purposes. The new broadcast systems shall be installed in the AV Control Room (currently the Rear Projection Room). A new TBC console/workstation shall be supplied by the AV Contractor. The workstation shall include 12RU of rack space, a center desk, and a side table. The workstation shall also be supplied with monitor arms for two (2) new 32" LED screens, mounting arms for two (2) new compact Genelec audio monitors, and internal 120VAC power distribution. S P I N I T A Sec.Ces 5'anpllied - 5'riCo 1486 Control Systems: The new AV system shall receive a complete overhaul of the control functionality as well. The system shall use QSC control, user control interfaces (UCIs), and scripting capabilities. The control systems shall include new 5.5" touch screens for voting and countdown timer display, new more tactile and visible microphone controls, a new 22" touch screen for the Clerk's control station, control and voting results computers (supplied by Owner), and a complete update to the control system programming. MILESTONE LIST The below chart tentatively lists the major milestones for the Audio -Visual Integration Project. This chart is comprised only of major project milestones such as completion of a project phase or dependency tasks. There may be smaller milestones which are not included on this chart but are included in the project schedule. If there are any scheduling delays which may impact a milestone or delivery date, the Spinitar project manager must be notified immediately so proactive measures can be taken to mitigate slips in dates. Any approved changes to these milestones or dates will be communicated to the City of Palm Desert project team by the Spinitar project manager. Milestone Description Date Spinitar to Receive All budget and contracts are approved and process to 6/13/2019 Project PO onboard Spinitar as the selected AV integration partner Project Kick Off Meeting Spinitar to initiate a site meeting with all applicable 6/24/19 City of Palm Desert project stakeholders to review scope and critical timelines, as well as dependencies and risks AV Project Submittals Spinitar to submit all required submittal documents 6/25/19 for the City of Palm Desert project team review and comment Procurement Upon approved submittal package, Spinitar to release 6/26/19 equipment order and being in house rack build and testing Onsite Installation Spinitar to begin site work as pertaining to 7/12/19 construction milestone dates. All associated execution phase quality assurance, scope validation, project updates, and change management to occur through this timeframe S P I N I T A R 5erv[n;;SimpGSed Sinc c 1986 In House Commissioning Spinitar to perform in house system testing in parallel 7/12/19 with ongoing site installation work. All required procedures in conjunction with industry best practices to be utilized in this process Final Site Spinitar to perform any and all onsite programming 8/12/19 Programming/Testing and system testing to satisfy the project scope requirements and prepare for final verification System Verification Spinitar to coordinate and work closely with project 8/19/19 consultant and the City of Palm Desert end user team for final punch list items and complete system verification and acceptance Closeout Documentation Spinitar to provide complete and final documentation 8/21/19 and Project Sign Off and system programming software to the City of Palm Desert project team and obtain sign off CHANGE MANAGEMENT PLAN The following steps comprise Spinitar's approach to this project as it relates to managing potential changes on the project: Step #1: Identify the need for a change (This can be identified from any project stakeholder) Sten #2: Conduct an evaluation of the change (Spinitar Project Manager and the City of Palm Desert Project Team) The Spinitar project manager will conduct an evaluation of the impact of the change to cost, risk, schedule, and scope Step #3: Submit change request to the City of Palm Desert Project Team The Spinitar project manager will submit the change request and analysis to the City of Palm Desert Project Team for review Stea #4: City of Palm Desert Project Team decision The City of Palm Desert Project Team will discuss the proposed change and decide whether or not it will be approved based on all submitted information Steu #5: Implement change (Spinitar Project Manager) If a change is approved by the City of Palm Desert Project Team, the Spinitar project manager will update and re -baseline all appropriate project documentation as necessary as well as ensure any changes are communicated to the associated stakeholders Irlmo Srr ,ccs5.riph"cd Sncc 1986 COMMUNICATIONS MANAGEMENT PLAN This Communications Management Plan sets the communications framework for this project. It will serve as a guide for communications throughout the life of the project and will be updated as communication requirements change. This plan identifies and defines the roles of the Spinitar team members as they pertain to communications. It also includes a communications matrix which maps the communication requirements of this project, and communication conduct for meetings and other forms of communication. A project team directory will also be included upon project award and once all appropriate team members are identified. This will allow Spinitar to provide the City of Palm Desert Project Team all necessary project team contact information and associated escalation points as needed. The Spinitar Project Manager will take the lead role in ensuring effective communications on this project. The communications requirements are documented in the Communications Matrix below. The Communications Matrix will be used as the guide for what information to communicate, who is to do the communicating, when to communicate it, and to whom to communicate. Communication Description Frequency Format Participants/ Deliverable Owner Type Distribution Spinitar Project Team, the City of Palm Desert Weekly Status Email Project Team, Spinitar Report summary of Weekly Email and any Status Report Project project status additional Manager construction team Stakeholders Meeting to Updated Weekly Project review action items, status, Weekly In Person/ Project Team Action Items Spinitar Project Team Meeting and project Conf Call nd Mti aeeng Manager deoenden ies Minutes Present daily Project Team Spinitar Project Site Daily reports on Daily Email and Daily Report Project Reports work Construction Foreman oerformed Stakeholders SP I N I T A R Scrn:ces 54mpi,"ccd 5 ncc 1986 PROCUREMENT MANAGEMENT PLAN The Spinitar Project Manager will release all equipment orders once product data submittals have been reviewed by the project AV consultant and architect (to verify finish and trim aesthetics). Once gear is received to the Spinitar warehouse, it will be processed into our internal material tracking system and stickered accordingly to reflect the equipment's final location on the project. In addition, all equipment associated with rack build will be assigned to the Spinitar rack build team who will construct the rack equipment per the approved rack elevations in the AV system drawings. All remaining equipment will be stored in the secured Spinitar warehouse until the appropriate time to deliver items to project site. The Spinitar project manager will coordinate with the City of Palm Desert Project Team on job site storage such that the AV equipment can be stored in a secure environment that Spinitar field team has access to for efficient field installation. All equipment will be installed and protected while adjacent construction activities occur and/or schedule allows Any significant equipment lead times that may impact the project schedule will be communicated early to the City of Palm Desert Project Team by the Spinitar project manager along with a plan of action to address the lead time constraints PROJECT SCOPE MANAGEMENT PLAN Scope management for the Audio -Visual Integration Project will be the sole responsibility of the Spinitar Project Manager. The scope for this project is defined in the project specifications as well as the AV system drawings. The Spinitar Project Manager will perform scope verification throughout project execution and provide documented updates via the communication management plan. Proposed scope changes may be initiated by the Project Stakeholders or any member of the project team. All change requests will be submitted to the Spinitar Project Manager who will then evaluate the requested scope change and proceed with the process outlined in the Change Management Plan. Upon approval of the scope change request, the Spinitar Project Manager will re -baseline the appropriate milestone dates and project plans accordingly. SPIN I TAR SCrviCCS S:mph jed SIOCC 1 M6 SCHEDULE MANAGEMENT PLAN Project schedules for the Audio -Visual Integration Project will be created in cooperation with the construction schedule and associated activities. Activity duration estimating will be used to calculate the number of work periods required to complete work deliverables. Resource estimating will be used to assign resources to tasks in order to complete schedule development. Once a preliminary schedule has been developed, it will be reviewed by the City of Palm Desert project team and any resources tentatively assigned to project tasks. Once this is achieved the approved schedule will be base lined. project sponsor will review and approve the schedule and it will then be base lined. The Spinitar Project Manager will assign technical resources for all associated project implementation tasks and drive the schedule to ensure milestone dates are met. Any schedule impacts due to site conditions and/or other delays will be communicated to the City of Palm Desert Project Team and address in a swift manner in an effort to maintain the critical path. QUALITY MANAGEMENT PLAN All members of the Spinitar project team will play a role in quality management. It is imperative that the team ensures that work is completed at an adequate level of quality from individual work packages to the final project deliverable. The Spinitar Project Manager is responsible for quality management throughout the duration of the project, ensuring all tasks, processes, and documentation are compliant with the scope of work. The Spinitar Project Manager will work with the Spinitar's Quality Lead Coach to verify acceptable quality industry standards and best practices. The Spinitar Project Manager is also responsible for communicating and tracking all quality standards to the project team and stakeholders. The Spinitar Quality Lead Coach will be responsible for working with the Spinitar Project Manager to ensure all field technicians are following the correct mounting and installation methods as required by local code and industry standards. All preliminary and final testing reports will be included in the weekly status reports issued to the Project Team, as stated in the Communications Management Plan -17 C) C> -772 SCOPE OF WORK Summary. Extensive remodel of the audio visual system in the council chambers during the summer recess July 12, 2019 through August 21, 2019. *Complete Scope of Work defined below in "Project Management Plan/Proposed Method to Accomplish Work" Section List of System Types: • Council Chambers • Council Chambers Lobby • Electrical/IT Room • AV Control Room Systems to include but not limited to: • Audio mixers, equalizers, amplifiers, program sources, digital recording devices, microphones and other signal processing equipment; • Loudspeakers and loudspeaker mounting, aiming, rigging, and support hardware; • Video switching, video over IP transmifters/receivers, video display equipment, video conferencing systems, cameras, and other video playback devices. • Audio Video and Control Network equipment; • Control equipment; • Equipment racks, cabinetry, and furniture; • System accessories; • Cable, connectors, adapters, plates, panels, transformers, and other interface devices. This contract also includes: • Verification of dimensions and conditions at the job site. • Preparation of submittal information. • Installation in accordance with the contract documents, manufacturer's recommendations, and all applicable code and legal requirements. ■ Initial tests and adjustments, written report, demonstration for approval, final adjustments, and documentation. • Instruction of operating personnel; provision of manuals • Maintenance services; Warranty. Exclusions: The following work is not included in our Scope of Work: • All conduit, high voltage, wiring panels, breakers, relays, boxes, receptacles, etc. • Concrete saw cutting and/or core drilling. • Fire wall, ceiling, roof and floor penetration. • Necessary gypsum board replacement and/or repair. • Necessary ceiling the orT-bar modifications, replacements and/or repair. • All millwork (moldings, trim, cut outs, etc.). • Patching and Painting. • Permits (unless specifically provided for and identified within the contract). • Programming of System • Site Commissioning of system Sales Infoxalio)n • Service-t-Suoaort e-1. S P I N I T A R Integration Project Management Processes Spinitarwill follow a foundational project management process which may include the following actions/deliverables (based on the size/complexity/duration of the integration project): • Site Survey - performed prior to Scope of Work and attached • Project Welcome Notice - emailed upon receipt of Purchase Order • Project Kick -Off meeting with Customer Representatives) - either by phone or in -person • Project Status reviews - informal or formal - either by phone or in -person (based on the size/complexity/duration of the project) • Project Change Control - comprised of Feld Directed Change Order and/or Contract Change Order submittals (see Appendix) • Project Punch List / Substantial Completion (see Appendix) - at Customer walk-through - prior to Service transition (if purchased) Knowledge Transfer (Training) This is geared specifically towards the end -user / operator. The purpose of this knowledge transfer is to provide operators with the necessary knowledge to confidently and comfortably operate all aspects of the integrated system. Areas covered include the following: • Equipment and system overview • Equipment operation and function • Equipment start up, stop, and shut Down • Equipment automatic and manual operation • Discussion and documentation relating to control system operation • Discussion and documentation relating to system processor and its control applications • Powering up, powering down AV system via control system • Manual operation of display systems, audio system and all other related components • Use/operation of patch panels, when and where to be used • Who to call when help is required Appendi Site Survey Form Feld Directed Change Order form Contract Change Order form Punch List form Substantial Completion form ACCEPTANCE OF SCOPE OF WORK: Name (Please Print): Authorized Signature: Date: TECHNICAL SERVICES APPROACH Spinitar provides a turnkey audiovisual system included but not limited to the following services: • Design Engineering: • Preparation of system functional interconnection diagrams, circuit details, equipment rack elevations and testing/commissioning of the system for optimal performance. Project Management: • Attends construction and client meetings throughout the duration of the project • Provides status reports • Develop project schedule and oversight of the Spinitar team • Oversee the training needs and documentation of the customer • Supervise end -user training on systems operation • Facilitate completion of final punch list items and close out package • Shop Installation: Labor performed in-house. • Racking of equipment, mounting equipment within rack and wiring interconnects • Testing components within rack for proper operation and custom wall plates and/or custom electronic devices, etc. Field Installation: Labor performed on the job site. • Pulling, labeling and terminating cable with -in the room(s) • Mounting and terminating all wall plates • Installing structural systems for audiovisual equipment • Mounting equipment in millwork, walls, floors and/or ceilings • System level testing and de -bugging • Site cleanup and disposal, etc. Programming: Labor performed off -site to develop software programmed to specific approved design for human interface control of the audio-visual system. • Base program from function list • Base touch panel layout from drawings • Client -approved layout and functionality • Loading program and test functions (in -shop) • Modifying program to reflect field conditions. i i 4 S P I N I T A R Spinitar, founded in 1986, is a lead,ng systems design and integration firm dedicated to providing its clients with custom audio, visual and communication solutions and services. Spinitar integrates custom audiovisual technology solutions across a wide array of market segments, including corporate, educafon and government. Spinitar's Service Department We understand that investing in an audiovisual system for your organization is an important decision. Even more critical is properly and regularly maintaining your system to avoid a potential mishap that could cause personnel downtime and lost revenue opportunities. Spinitor is pleased to have the largest dedicated in-house support team in the western U.S. Our support service professionals are manufacturer trained and industry certified to service your audiovisual and communication technology solution oy�SUaL ApA: Spinitar has a wide variety of service offerings, such as Maintenance and Support Agreements, AV Staffing, Remote Monitoring and erne -and -Materials ` Services. Allow us to provide a "quick response from talented folks who care about your" �� .`...... �` ItcEL4E'� Workmanship All workmanship is covered for a period of one year. Workmanship is defined by the work product Spinitar stands behind in design and installation services. Within the first 30 days from beneficial use date, any visit to site has unconditional support and no charges wi I apply. After the 30 days expires, should a technician come to site and the issue is not covered by workmanship, there is a Time & Materials charge for the service tali. Standard service calls are scheduled for a minimum of 2 hours. tabor rates are $125.00/hour and travel is additional depending on distance. Travel is calculated door to door. Any return trips wiii incur the same charges SUMMARY OF TECHNOLOGY INVESTMENT The following is a summary of costs for each area of the project. The AV Equipment cost reflects all of the major components necessary to meet the project's functional goals. The Technical Services cost includes the Applications Engineering, Project Engineering, CAD, Project Management, Shop Installation and Field Installation Labor required for the project. Materials cost include the cable, connectors, plate, panels and miscellaneous incidental components required to integrated the AV equipment into the final system. Council Chambers AV Equipment $167,753.60 Technical Services & Materials $ 45,360.00 Freight $ 2,688.00 System Support $ 995.00 System Price $216,769.60 Add -Alternate #1 AV Equipment $ 7,751.08 Technical Services & Materials 605.00 System Price $ 8,356.08 Project Totals • Council Chambers $216,769.60 • Add-Altemate # 1 $ 8.356.08 Grand Total System Price $225,125.68 TAXES AND SHIPPING Applicable taxes and shipping charges will be added to invoices issued for the project. Invoices will be submitted in accordance with RFP terms. The project will be invoiced based on a Contract Price of S225.125.68. Spinitar is committed to improving how our clients present, receive and exchange important information in their communication environments. We have the experience and expertise to provide the City of Palm Desert with multimedia systems that will serve as models for innovative presentation and broadcasting environments. The Spinitar team looks forward to working with you on this project. Sincerely, SPINITAR Kirk Bolling Account Manager Client Approval Name/Title (please print) Date: a ■ SPINIT'AR Section: Audio Equipment City of Palm Desert: Council Chambers AV Remodel 2019 Audio Equipment 5/31/2019 Presentation Audio Equipment Description Manufacturer Model Part Number Finish/Color Qty 8" Coaxial Loudspeaker with 70.7V-16W Atlas Sound C803AT167 C803AT167 7 Transformer Decorative 8" Steel Baffle White Atlas Sound 61-8W 61-8W 7 2000W Amplifier using FAST channel combining QSC CXD4.2Q CXD4 20. 1 technology 4 Mic/Line Input channels, 500 watts/ch at 1/2 RU 4 Channel ENERGY STAR amp!ifier / QSC 5PA4.60 SPA4.60 4 Multichannel operation 60 watts Into 8? & 4?, Bridged pair Unified Core with 24 local audio 1/0 channels, QSC CORE 110F CORE 110F 1 128x128 network 1/0 channels, dual LAN ports, POTS an Q-SYS Core 110 Scripting Engine Software Q5C SL.CI5E-110-P SL-QSE.110.P 1 License, Perpetual Q-5Y5 Core 210 UCI Deployment Software QSC SL-QUO-110-P SL-QUD-110-P 1 License, Perpetual Media Drive Kit for Core 110f ONLY- Provides a Q5C MD-110 MD 110 1 minimum of 200 hours of audio storage (WAV, MP3 or F Q-SYS 1/0 peripheral providing 8 individual, Q5C 1/0-8 FLEX 1/0.8 FLEX J software-switchable Q-SYS Flex Channels [Mic/Line IP wi Cardioid-18" Gooseneck Condenser Shure MX418/C MX418/C 13 Microphone, Attached Preamp with XLR, Shock Mount, Flange Mount, Sn Black Locking Metal Windscreen for Microflex• Shure A412MW5 A412MWS 13 Gooseneck Microphones 4-Channel Access Point Transceiver Shure MXWAPT4 MXWAPT4 1 Boundary Transceiver, Cardioid Shure MXW5/C MXW6/C 1 Handheld Transmitter with SM58• Microphone Shure MXW2/SM58 MXW2/SM58 1 (Includes one S8902 Battery) Desktop Base Transceiver Shure MXW8 MXW8 1 15" Shock -Mounted Gooseneck, Cardioid, Less Shure MX415LP/C h.MX415LP/C 1 Preamplifier 4-CH NETWORKED CHARGING STATION Shure MXWNC54 N1XWNCS4 1 1x4 Audio Distribution Amp (1 Direct+3150 Jensen DIN -AMP DIN -AMP 2 Outs) 1x4 Audio Distribution Amp (1 Direct+3 ISO Jensen DIN -PS DIN -PS 1 Outs) - Power Supply 1x4 Audio Distribution Amp (1 Direct+3 ISO Jensen DIN-MRP DIN-MRP 1 Outs) -DIN Rack Rail Mount Kit OFE Presentation Audio Equipment Description Manufacturer Model Part Number Finish/Color Qty SPEAKER,AD.C821,,,BLIND MOUNT QSC AD-C821 AD-C821 2 3" 15W Desktop Loudspeaker Tang -Band W3.1335SB W3-13355B 13 Performance RF system (226 MHz) Listen Technologies LS-03-216-01 LS-03-216.01 1 Portable Display RF Rece-ver (216 MHz) Listen Technologies LR-400-216 LR-400.216 2 Ear Speaker Listen Technologies LA-164 LA-164 4 M Neck Loop Section: Audio Equipment Listen Technologies LA•166 LA-1-SE Broadcast Audio Equipment Description Manufacturer Model Part Number Finish/Color Qty 4" Powered Desktop Monitor Speaker Genelec 5020D SC -'OD , Section: Video Equipment City of Palm Desert: Council Chambers AV Remodel 2019 Video Equipment 5/31/2019 Presentation Video Equipment Description Manufacturer Model Part Number Finish/Color City 1.8mm PIXEL PITCH DIRECT VIEW LED PANEL Absen N1.8+ (3x1) B4718-1-0 4S 134) 1.8mm PIXEL PITCH DIRECT VIEW LED PANEL Absen N1.8+134} 84718.0.01 4 (34) -Spare Module 1.8mm PIXEL PITCH DIRECT VIEW LED PANEL Absen N1.8+ i34} B4700-0-05 3C 13x1) - Back Channel 1.8mm PIXEL PITCH DIRECT VIEW LED PANEL Absen N1.8+j3xlj 08600 0.00 1 (3xl) - Manufacturer Spares Direct View LED Panel Video Wal. Processor Absen Nova VX65 F8000.0-17 1 Manufacturer's Onsite Support/Commis on:ng Absen E9000.0.01 1 Technician 1.2 Days 1502L 1SIN M-SERIES LED TOUCHMONITOR Elo Touch Solutions E045538 E045538 11 INTELLITOUCH PRO 1920X1080 BASIC STAND FOR 101N AND 1SIN ANDROID I Elo Touch Solutions E044162 E044162 11 SERIES 22" Desktop Touch Monitor Futl HD Elo Touch Solutions E2202L E2202L ] (1920x1080p) SVSI Stand-alone Minimal Compression V deo AMX FGN1222A-SA FGN1222A-SA 6 over IP Decoder with two RJ45 network ports (one POE), IR SVSI Stand-alone Minimal Compression V'deo AMX FGN1122A•SA FGN1122A-SA 6 over I Encoder with two RJ45 network ports {one POE), IR SVSI Decor Style Wallplate Minimal AMX FGN1115-WP-BL FGN111S-WP-BL 1 Compression Video over I Encoder with Ethernet port, KVM-over-IP 1RU rack shelf for rack mounting two side -by- AMX FGN9102 FGN9102 4 side SVSI N-Series Encoders, Decoders, and AudioTransc Mounting wings for N-Series SVSI Encoders, AMX FGN9101 FGN9101 6 Decoders and Audio Transceiver, designed for mounting to Four output HDMI distribution amplifier Extron 60-1481-01 60-1481-01 2 Six output HDMI distribution amplifier Extron 60-1482.01 60-1482-01 1 Low -profile mount kit for 1/8, 1/4, and 1/2 rack Extron 70-212-01 70-212-01 3 width products HDMI Patch Cables Extron HDMI Ultra 26-663-(#N) TBD Clickshare with two dongels Barco CSE-200 CSE-200 1 Clickshare buttons holder Barco CLICKSHARE TRAY CLICKSHARE TRAY 1 SRU Custom Rack Panel Custom Custom ; CMOS 1080p Desktop Visualizer Wolfvision VZ.BLIGHT4 VZ-8LIGHT4 ; Dust Cover Wolfvision H102961 9102961 ; O Section: Video Equipment OFE Presentation Video Equipment Description Manufacturer SMALL FORM FACTOR COMPUTER - INTEL i7,� Dell 16MB RAM, 256SSD, WINDOW 10 PRO Wireless Keyboard and Mouse Logitech Broadcast Video Equipment Description Manufacturer 30x Zoom, 1/2 8 In Single MOS Sensor, HDMI Panasonic Output, NDI - White THIN PROFILE WALL MOUNT SONY/PANA CAMS Vaddio Live Production Center/PTZ Contraller Panasonic Wireless Keyboard and Mouse Logitech 32" HD Display Monitor NEC Micro Converter HDMI to SD; wPSU Blackmagic Design Micro Converter 501 to HDMI wPSU Teranex Mini - SDI Distribution 12G HyperDeck Studio Mini SAN DISK EXTREME PRO• SD UHS Ii CARD Teranex Mini Rack She f OFE Broadcast Video Equipment Description Streaming Server SMALL FORM FACTOR COMPUTER - INTEL i7, 16M8 RAM, 256SSD, WINDOW 10 PRO Wireless Keyboard and Mouse Blackmagic Design Blackmagic Design B ackmagic Design Sandisk Blackmagic Design Model Part Number Finish/Color Qty Optiplex 70S0 Micro Optip'ex 7060 Micro 2 MK540Advanced MK540 Advanced 1 Model Part Number Finish/Color Qty AW-HN40HW AW-HN40HW White 4 535-2000-243 535.2000-243 4 AV-HLC100P AV-HLC100P 1 MK540 Advanced MK540 Advanced 1 £327 E327 2 BMD, BMD. 1 CONVCMIC/HS/WPS CONVCMIC/HS/WPS U U BMO- BMD- 1 CONVCMIC/SH/WPS CONVCMIC/SH/WPS U U BMD- BMD 1 CONVNTRM/EA/DA CONVNTRM/EA/DA BMD-HYPERDISTM 8MO-HYPERD/STM 1 SDSDXPK-128G- SOSDXPK-128G- 2 ANCIN ANCIN BMD- BMD- 2 CONVNTRM/YA/RSH CONVNTRM/YA/RSH Manufacturer Model Part Number Finish/Color Qty Granicus 1 Dell Optiplex 7060 Micro Optiplex 706o Micro 1 Logitech MK540 Advanced MK540 Advanced 1 Section: Control Networking Equipment City of Palm Desert: Council Chambers AV Remodel 2019 Control & Networking Equipment 5/31/2019 Control & Networking Equipment Description 52-port gigabit stackable smartpro switch with 410gbe sfp+ ports Redundant power supply for d-link managed switches, 589w 10gigabit sfp+adapter (dsm6410 and dsm640) AC1750 Dual Band Wireless Router 2x24-PORT CAT6 PATCH PANEL 2ft CAT6 UTP 28AWG black Q-SYS 5.5" PoE Touch Screen Controller For In - Wall Mounting Includes 1 LAN Port and Aux Power input 8.0" Touch Panel with Table Top mounting accessory included. 2-BUTTON LOW VOLTAGE LIGHTING CONTROLLER 2-PORT RELAY INTERFACE FOR OFE LIGHTING CONTROL 2-PORT RELAY INTERFACE FOR OFE LIGHTING CONTROL - 30CM DIN RAIL 8x8 GPIO TO IP INTERFACE 8x8 GPIO TO IF INTERFACE -DIN RAIL MOUNT 2500MA 24VDC TSD Power Supp,y Manufacturer Model Part Number Finish/Color Qty D-Link Systems OGS-1510-52X DGS-1510-52X 1 D-Link Systems DPS-700 OPS-700 1 D-Link Systems DEM431XT•DD DEM-431XT-DD 1 TRENDNET TEW-812DRU TEW-812DRU 1 BITTREE DSGIGE224D DSGIGE2240 1 Cables to Go 1100 1100 48 QSC TSC-55W G2-8K TSC.55W-G2-B.4 5 QSC TSC-80TW.G2-BK TSC-80TW-G2-BK 1 Legrand LVSW-lD2.W LVSW-102-W 2 WiNFORD RLY202-12V-D.N RLY202-12V-DIN 1 WINFORD DINR135-030 DINR135-030 1 DATAPROBE IP10-8 IPIO-8 1 DATAPROBE IPIO MOUNTING KIT IPIO MOUNTING KIT 1 Atlas Sound TSD PS24V2SOOMA TSD-PS24V2500MA 1 0 1 Section: Other Equipment City of Palm Desert: Council Chambers AV Remodel 2019 Other Equipment 5/31/2019 Other Equipment Description BROADCAST WORKSTATION/DESK W/YORKSHIRE CHERRY LAMINATE TOP & BROADCAST WORKSTATION/DESK - POWER DISTRIBUTION BROADCAST WORKSTATION/DESK-12RU NESTED SIDECART (LEFT) W/YORKSHIRE CHERRY LAMINATE TOP & PURETECH BROADCAST WORKSTATION/DESK- PRODUCERS TABLE (RIGHT) W/YORKSHIRE CHERRY LAMINATE TOP & PURETECH BROADCAST WORKSTATION/DESK - MONITOR ARMS BROADCAST WORKSTATION/DESK -AUDIO MONITOR ARM BROADCAST WORK5TATION/DESK - FREIGHT Manufacturer Model Part Number finis C61or QtO TBC ST2-WS-LT-URE ST2-WS-LT-URE Yourkshire Cherry 1 Laminate TBC PS-1615-ET PS-1615-ET Yourkshire Cherry 1 Laminate TBC SCS-NL-URE SC1.NL-URE Yourkshire Cherry 1 Laminate TB(: SC.PTR-URE SC-PTR-URE You rkshire Cherry 1 Laminate >BC FP-7500 FP-7500 2 TBC SM-C-DM SM-C-DM 2 TBC FREIGHT FREIGHT 1 ,�S Section: Hardware, Racks Material City of Palm Desert: Council Chambers AV Remodel 2019 Hardware, Racks & Material 5/31/2019 Free Standing Racks Description Manufacturer Model Part Number Finish Color Qty7 455P/27D STAND ALONE BGR Middle Atlantic BGR-45SA 27 BGR-45SA-27 1 BGR 276CFM FAN TOP Middle Atlantic BGR-2 6FT BGR-276FT 1 9SP SOLID TOP PANEL STEEL Middle Atlantic BGR ETP9 BGR STP9 2 BGR CASTER KIT W/HDWARE Middle Atlantic CBS-BGR CBS BGR 1 4S5P BGR REAR DOOR Middle Atlantic BGR-RD4S BGR-RD45 1 MAGNETIC WORK UC,HT MiddieAtlantic WL-60 WL-60 1 Rack Power Description Manufacturer Model Part Number Finish/Color Qty POT,2X20A,20OUT,5MLJBOX Middle Atlantic PDT-2X30205 FiDT-2X10205 I 9OUT,SSA,RCKMNT POWER CEN Middle Atlantic PD-91SR PD-91SR 1 SLIM PWR STRP,BOUT,ISA,W/ Middle Atlantic PD-8155C PD-8155C 2 UPS STD1000VA Middle Atlantic UPS-5100011 UPS-5100OR 1 UPSSTD2200VA Middle Atlantic UPS.3?200R UPS-5220OR 1 UPS NETWK INTERFACE CARD Middle Atlantic UPS IPCARD UPS-IPCARD 2 Task Lighting Description Manufacturer Model Part Number Finish/Color Qty DESKTOP LED TASK LIGHTw/18" GOOSENECK LiTTUTE LW-18 LED LW 18 LED 3 cityof ealrn Desert: Sectl°n.- Add- Alter /3 ernate # l �� COvnn/ Ch net #1 5 V 2p19 •g6„h,E4viptnent�iAVRemOdel Video E9tr/pment st 2flr9 p41palsyncC861Q g6cril3t. cd/M �`M°"it°r Stir,'ED I,cp 1 A"tiG 3$4px?l60 tCCPubric sysI S�"d and -al pUAt UNIVER (4K/UHa1. 350 N:FMO P ay��urer over /P ���O�B a MinJmdl $A t °ns M. l {�1°q`Iei pu o nting � ^ with twO ��°^1 ee�o k y d,.Q ChiefDec rsa or /y, tr q HaMI tmouno R t ° d Audi° Tr nsce¢ ysdE°,'Oders�r MX NMX UE RU9 HAM/ Patch Cables es/g"ed for AMX GIV1322A yardware. Racks EOR°N Miscella Des Material ETG) "e°us Materlar�,Pti°n sCab/e, C°""ect,;r Manufacturer M1SC NMX ACC N9101 kDA,t/ Ut7.i74 Model Lot Bart Nvm�ber C861j� PNRUB ftNI�3 sA -c"20I zS-aS3'(A/a) IinishIC°l°r rAD Part Mum�er Fjnish/C o/ryr q� E-7 • • 5 P I N I T A R $crviCosSrnpi5ed Snco!986 NON-TAXABLE LABOR Std.Hours x1.5 x2 a. General Administration: $60.00 $90.00 $120.00 b. System Design: $120.00 $180.00 $240.00 C. System Setup. $120.00 $180.00 $240.00 d. CADD Drawing: $75.00 $112.50 $150.00 e. System Programming: $120.00 $180.00 $240.00 f. Project Management $110.00 $165.00 $220.00 g. Feld Installation (UL): $100.00 $150.00 $200.00 h. Feld Installation (Spinitar): $90.00 $135.00 $180.00 i. Testing & Commissioning: $120.00 $180.00 $240.00 j. IT Software Install/ $135.00 $202.50 $270.00 Config/Testing k. Travel & Parking: $50.00 $50.00 $50.00 I. Electronic Documentation: $80.00 $120.00 $160.00 TAXABLE LABOR: Std. Hours x1.5 x2 a. Shop Installation: $90.00 $135.00 $180.00 b. Customer Training: $120.00 $180.00 $240.00 C. Documentation: $80.00 $120.00 $160.00 Corporate Office San Diego Office Hayward Office 16751 Knott Avenue 5939 Darwin Court, Ste 113 3659 Depot Road La Mirada, CA 90630 Carlsbad, CA 92008 Hayward, CA 94545 (714) 367-2900 • (800) 722-6444 . Fax (714) 367-2910 www.spinitar.com ?I ACORO0 I DATE IMMIDDIYYYY) � �. CERTIFICATE OF LIABILITY INSURANCE 05/2812019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(iss) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer dahts to the certificate holder In lieu of such o �Qrsement(s). PRODUCER _K"e Matthew Rogina Mindful Insurance Solutions Inc PHONE Fes` (909) 641 - 9181 ' FAx -Noi Il�LI'„f(pY. 7750 College Town Drive, Suite 101 Annllpss. mrogina@tublainc.com INSURERISI AFFORDING COVERAGE "Ca Sacramento CA 95826 INSURERA: Travelers Property Casualty Company of America 004461 INSURED INSURER B : Presentation Products, Inc. DBA Spinitar INSURER C : 16751 Knott Ave. INSURER D : INSURER E : La Mirada CA 90638 INSym F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP I TR TYPE OF INSURANCE 143D 3yun POLICY NDMBER IYIMIDDIYYYYf iMM16DIYYYYI LIMITS X COMMERCIAL GENERAL LIABILITY EACH0C IJ I{CE S 1,000,000 DAMA8CLAIMS-MADE FROCCUR PREMIS n (Fm gg f0 s 300,000 MED EXP (Anv one oersonl $ 25,000 A _ 630 5E992165 5121 /2019 5/21/2020 PERSONAL R ADV INJURY S 1,000,000 GEITL AGGREGATE LIMIT APPLIES PER: I GENERAL AGGREGATE $ 2,000.000 X POLICY ED JECaT LOC PRODUCTS-COMPIOPAGG S 2.000.000 nTHER: Employee Benefits $ 1,000,000 AUTOMOBILE LIABILITY B COMBINED SINGLE LIMIT _ IFeaCCI&ot1 $ 1,000,000 X ANY AUTO BODILY INJURY (Per person) $ A — OWNED ASCHEDULED HAON312311 512112019 512112020 I BODILY INJURY (Per accident) $ AUTOS ONLY UTOS X HIRED NON -OWNED PROPERTY DAMAGE S _ AUTOS ONLY AUTOS ONLY IPeraccidenn S UMBRELLA LIAR OCCUR EACH OCCURRENCE S 10,000.000 A EXCESS LlA9 H CLAIMS -MADE CUP 4J780663 5/21/2019 5/2112020 AGGREGATE s 10,000,000 DED I I RETENTInN& S WORKERS COMPENSATION X I STARTU I _ I ER AND EMPLOYERS' LIABILITY OFEFMBEXCUED?EC� E.L.EACH ACCIDENT S 1,Oa0,0a0 A FICMNERECLDNIA UB9M253118 5/21/2019 5/21/2020 (Mandatory In NH) E.L. DISEASE -EA EMPLOYEE S 1,000.000 IF describe under d 6RIPTION OF OPERATIONS below E.L. DISEASE -POLICY LIMIT S 1,000.000 A Errors & Omissions 106741928 5121/2019 512112020 Limits of Liability 2M14M DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101. Additional Rornarks Schedule, may be attached it more apace Is required) Evidence of coverage CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Presentation Products Inc., dba Spinitar ACCORDANCE WITH THE POLICY PROVISIONS. 1675 Knott Ave AUTHORIZED REPRESENTATIVE La Mirada CA 90638 4461W I ^ ®1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD Back I I Save z, � I C7 eel SP NiiAtt Litigation: Audio: Visual and Communioation Solutions Corporate Office 16751 Knott Avenue La Ml rada, CA 90638 WWW.soinitar.com Spinitar has not been involved in any litigation claims filed by our firm or against our firm related to the provision of Services in the last 5 years. qZ I�? rw�-- Other X11f a . tion►. a Auciio Qtio n 6,751 ate Office Ave,'UE?Knott Le 306�gr` da. CA TMost 117te '-sai�;� r h �kF�esgrand� struggle w Qm structur, l/y, due to%-ays °n i thta/ent de to ovtRte, th,s has pin;tar's a cost mand m a dedic been a un/ °mer °ping co wilct�Q ' W,e aced nonis too ndJo,- nstr state t get have one t°am of see' �Pin,tr indvst Inte9rata coon ate en pulled team proles$io ar has se;f dir pa we ar enough ho away to that will pals to v/lt an ected tea Parts em a the is w rare t work ° be de exec d will M So ployees rgest R his is in n other dicated ute agai continue ether throe EGIp our; Gusto to Yovr nst th b execvtln9 oraliforn ah Al the At AV �" �nte9r try, and an roles P"We aid In 2018� time and abeing sa;a S are not While /a hessib/e b cannot City of spin;tar budge yearitar has acre of an ha+�e mar e eve.,South Ca f a guests can Viand spons er year, proven track in Ranc • The evornia, at t treatnme ors raised record h Golf eve to he 4� nt a mor Partners, Course °k A/ace . anneal and resew a than $g� for thC. °$e wh sts n�ers, F a h year . e heart i f ar 'Golf F rater r oc lOr the �° Previous i vier front cancerd fri sf tan brin9srange oCo.rn ope ha ; in d., diabete th ego gether Vat Tustin nvolye Spin dar does n ement with the City sand °than °iSe awa Indust rY rag the Sew;cehS �,e any co ty of pa/m Oese Serious dicee$ss d escr�bed � flirts °f rt. or the Interest city of Pamn connect. Desert with m P", Corporate Office Audio, Visual and Communication 16751 Knott Solutions Avenue La Mirada, CA 90638 www.soinitar.com Certification of Proposal: "The undersigned hereby submits its proposal and, by doing so, agrees to furnish services to the City in accordance with the Request for Proposal (RFP), and to be bound by the terms and conditions of the RFP." CI (p C q EXHIBIT "C" NON -COLLUSION DECLARATION To Be Executed by Proposer(s) and Submitted with Proposal The undersigned declares: Presentation Products, Inc. I am the Principal of dba Spinitar , the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on May 31 72500.00001 \31308562.1 , 20 19 , at La Mirada City CONTRACTOR B• 6ignaturee Title: Principal CA State M EXHIBIT "D" PUBLIC WORKS CONTRACTOR DIR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.z Name of Contractor: Presentation Products, Inc. dba Spinitar DIR Registration Number: 1000002995 DIR Registration Expiration: 6 / 3 0 / 2 019 Small Project Exemption: Yes or x No Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges: 1. Contractor shall maintain a current DIR registration for the duration of the project. 2. Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project. 3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non -responsive. Name of Contractor: Presentation Signature: �r�l ph� Products, Inc. dba Spinitar Name and Tit . J . Rogina, Principal Dated: May 31, 2019 2 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark "Yes" in response to "Small Project Exemption." 72500.00001131308562.1 liq EXHIBIT "E" WORKERS' COMPENSATION CERTIFICATION Labor Code Section 3700 provides in relevant part: Every employer except the State shall secure the payment of compensation in one or more of the following ways: (a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations a certificate of consent to self -insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self -insure and to pay any compensation that may become due to his employees. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Contractor: res a roducts, Inc. dba Spinitar Name: JnsPnh J_ Rn-in;; Its: Principal In accordance with article 5 (commencing at Section 1860), chapter 1, part 7, division 2 of the Labor Code, the above certificate must be signed and fled with CVWD prior to performing any work under the Contract. 72500.00001131308562.1 hoc EXHIBIT "F" DESIGNATION OF SUBCONTRACTORS In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, sections 4100 et seq., Contractor shall set forth below: (a) the name and the location of the place of business and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (112%) of the Contractor's proposal price. No additional time shall be granted to provide the below requested information. If no subcontractor is specified, for a portion of the work, or if more than one subcontractor is specified for the same portion of Work, then the Contractor shall be deemed to have agreed that it is fully qualified to perform that Work, and that it shall perform that portion itself. Portion of Subcontractor Work Name CSLB License DIR Location of Number Registration Business Number Name of Contractor Presentation Products, Inc. dba Spinitar Signature r� Name and Title Joseph J . Rogina, Principal Dated May 31, 2019 72500.00001 \31308562.1 Lod CITY OF PALM DESERT AUDIO VIDEO INSTALLATION CONTRACT Council Chambers Audio Visual Remodel 2019 — Contract No. C37960B 1. PARTIES AND DATE. This Contract is made and entered into this [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***] by and between the City of Palm Desert, a municipal corporation organized under the laws of the State of California with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California 92260-2578, County of Riverside, State of California ("City") and [***INSERT NAME***], a [***INSERT TYPE OF ENTITY - CORPORATION, PARTNERSHIP, SOLE PROPRIETORSHIP OR OTHER LEGAL ENTITY***] with its principal place of business at [***INSERT ADDRESS***] ("Contractor"). City and Contractor are sometimes individually referred to as "Party" and collectively as "Parties" in this Contract. 2. RECITALS. 2.1City. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose. 2.2Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project: C7. 2.3Proiect. City desires to engage Contractor to render such services for the Council Chambers Audio Visual Remodel 2019 — Project # IS71219 ("Project') as set forth in this Contract. 2AProiect Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, PERFORMANCE BOND, PAYMENT BOND, INSURANCE DOCUMENTS AND OTHER CERTIFICATIONS as required by the Contract. 3. TERMS 3.11ncorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto: • Services/Schedule (Exhibit "A") • Plans (Exhibit "B") • Special Conditions (Exhibit "C") • Payment and Performance Bonds (Exhibit "D") • Project Specifications — Section 27 41 16 Audio Video Systems and Equipment (Exhibit "E") • Addenda • Change Orders executed by the City • Request for Proposal Contract No. C37960B Contractor's Proposal 3.1.1 Precedence. To the extent there is a conflict between any portions of this Contract, the order of precedence shall be as follows: change orders, special conditions, project specifications, plans/construction drawings, general contract terms, scope of work, standard plans, advertisements for bid/proposals, bids/proposals or other documents submitted by Contractor. 3.2 Contractor's Basic Obligation: Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the "Work"), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit "B" attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit "C" attached hereto and incorporated herein by this reference. 3.2.1 Chanqe in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in advance and in writing by a valid change order executed by the City. 3.2.1.1 Chanqe Orders. Changes to the Contract Time (as defined in Section 3.3) or Total Contract Price shall be in the form of a written Change Order, either signed by both parties or issued unilaterally by the City. No adjustment shall be made to the Contract Time unless the delay impacts the critical path to completion and the delay was not caused in whole or in part by the Contractor. Failure to timely request a Change Order shall constitute a waiver of any right to adjust the Contract Time or the Total Contract Price. All requests for Change Orders shall be accompanied by detailed supporting documentation, including but not limited to payroll records, invoices, schedules, and any other documentation requested by the City for the purpose of determining the additional costs or the impact of any delay. If the change involves Work bid at a unit price, then the Total Contract Price shall be increased at the unit price. If there is no unit price, then the Total Contract Price shall be adjusted to account for costs actually incurred plus an allowed mark-up of fifteen percent (15%), which shall constitute the entire amount of profit, mark-ups, field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such work. Nothing herein shall prevent the Parties from agreeing to a lump sum cost. (A) Chanqes Ordered By City. City may at any time issue a written directive ordering additions, deletions, or changes to the Work. Contractor shall proceed with the work in accordance with the directive. To the extent the directive results in extra work or requires additional Contract Time, Contractor shall request a Change Order within seven (7) days of receiving the Work Directive. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. 2 72500.00001 \32045856.1 Contract No. C37960B (B) Changes Requested By Contractor. With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the potential change within seven (7) days or prior to the alteration of conditions, whichever is earlier. Failure to give notice shall constitute a waiver of Contractor's right to a change order. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. 3.2.2 Substitutions/"Or Equal". Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words "or equal." Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any "or equal" material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of "or equal" requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed "or equal" substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor. The City has the complete and sole discretion to determine if a material, process or article is an "or equal" material, process or article that may be substituted. Data required to substantiate requests for substitutions of an "or equal" material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted "or equal" material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted "or equal" material, process or article, and substantiates that it is an "or equal" to the material, process or article. The substantiating data must also include information regarding the durability and Iifecycle cost of the requested substituted "or equal" material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution. Contractor shall bear all of the City's costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted "or equal" material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400. 3.3 Period of Performance and Liquidated Damaqes. Contractor shall perform and complete all Work under this Contract within 90 days, beginning the effective date of the Notice 3 72500.00001132045856.1 Contract No. C37960B to Proceed ("Contract Time"). Contractor shall perform its Work in strict accordance with any completion schedule, construction schedule or project milestones developed by the City. Such schedules or milestones may be included as part of Exhibits "A" or "B" attached hereto, or may be provided separately in writing to Contractor. Contractor agrees that if such Work is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of FIVE HUNDRED DOLLARS 1$5001 per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract. 3.4 Standard of Performance: Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any work necessary to correct errors or omissions which are caused by Contractor's failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work. 3.5 Control and Payment of Subordinates: Contractual Relationship. City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor's exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers' compensation insurance. 3.6 City's Basic Obliqation. City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below -referenced compensation in accordance with compensation provisions set forth in the Contract. 3.7 Compensation and Payment. 3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Contract Price of 4 7 2500. 0000 1 Q2045856.1 Contract No. C37960B Dollars ($ .00) ("Total Contract Price") provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the City. 3.7.2 Pavment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein. On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments. Contractor shall submit its final invoice to City within thirty (30) days from the last date of the Work or termination in accordance with section 3.18.3 and failure by the Contractor to submit a timely invoice shall constitute a waiver of its right to final payment. 3.7.3 Prompt Pavment. City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others. 3.7.4 Contract Retentions. From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107. 3.7.5 Other Retentions. In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor's obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City's right to such sums. 5 72500.00001 \32045856.1 Contract No. C37960B 3.7.6 Substitutions for Contract Retentions. In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term "satisfactory completion of the contract" shall mean the time the City has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the City. 3.7.7 Pavment to Subcontractors. Contractor shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 7108.5 of the California Business and Professions Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to Contractor pursuant to this Contract. 3.7.8 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items. 3.7.9 Labor and Material Releases. Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City. 3.8 Labor 3.8.1 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the Work is being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $25,000 or more for a public works project or $15,000 or more for a maintenance project, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its 6 72500.00001 \32045856.1 Contract No. C37960B officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates. 3.8.2 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law. 3.8.3 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day's work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker. 3.8.4 Pavroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor. In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the DIR on a weekly basis and in the format prescribed by the DIR, which may include electronic submission. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. 3.8.5 Contractor and Subcontractor Reqistration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of 7 72500.00001 \32045856.1 Contract No. C37960B Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit "E" prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. 3.8.6 Labor Compliance: Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor's sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor's performance of Work, including any delay, shall be Contractor's sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor. 3.9 Performance of Work; Jobsite Obliqations. 3.9.1 Water Quality Management and Compliance. 3.9.1.1 Water Qualitv Manaqement and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter -Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter -Cologne Water Quality Control Act, to any ground or surface water in the State. 3.9.1.2 Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board ("Permit"). It shall be Contractor's sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a "living document" that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor's sole responsibility to update the SWPPP as necessary to address conditions at the project site. 8 72500.00001 \32045856.1 Contract No. C37960B 3.9.1.3 Other Water Qualitv Rules Requlations and Policies. Contractor shall comply with the lawful requirements of any applicable municipality, drainage City, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs. 3.9.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, hereby acknowledges that it has investigated the risk arising from such waters and assumes any and all risks and liabilities arising therefrom. 3.9.1.5 Liabilitv for Non -Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its directors, officials, officers, employees, volunteers and agents for any alleged violations. In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor's failure to comply with the Permit. 3.9.1.6 Reservation of Riqht to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor's failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City's attorney's fees) associated with, any settlement reached between the City and the relevant enforcement entity. 3.9.1.7 Traininq. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.9.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.9.1 as they may relate to the Work provided under this Contract. Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph. 3.9.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least 9 7 2500.0000 1 N32045856.1 Contract No. C37960B two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site. 3.9.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 3.9.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City's business license fee, if any. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project. 3.9.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City's review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. 3.9.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute. 10 72500.00001 \32045856.1 Contract No. C37960B 3.9.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities. 3.9.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel -powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARE, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract. 3.9.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling. 3.9.10 Inspection Of Site. Contractor has visited sites where Work is to be performed and has become acquainted with all conditions affecting the Work. Contractor warrants that it has made such examinations as it deems necessary to determine the condition of the Work sites, its accessibility to materials, workmen and equipment, and to determine the Contractor's ability to protect existing surface and subsurface improvements. No claim for allowances —time or money —will be allowed as to such matters. 3.9.11 Field Measurements. Contractor shall make field measurements, verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the City immediately and prior to performing any work or altering the condition. 3.10 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a re -inspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code. 3.11 Claims: Government Code Claim Compliance. 11 72500.00001 \32045856.1 Contract No. C37960B 3.11.1 Intent. Effective January 1, 1991, section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non -binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this section is to implement sections 20104 et seq. and section 9204 of the California Public Contract Code. This section shall be construed to be consistent with said statutes. 3.11.2 The following requirements apply to all contracts entered into after January 1, 1991, and all claims to which this section applies: 3.11.2.1 Prereauisites. If any dispute shall arise between the City and Contractor regarding performance of the work, or any alleged change in the work, Contractor shall timely perform the disputed work and shall give written notice of a claim for additional compensation for the work to the City within three (3) days after commencement of the disputed work. Contractor's failure to give written notice within the three (3)-day period constitutes an agreement by Contractor that it will receive no extra compensation for the disputed work and shall constitute a waiver of the right to these procedures. 3.11.2.2 Claim Submittal. For purposes of this section, "Claim" means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor's request for a change has been denied in whole or in part. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: "THIS IS A CLAIM." Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon. 3.11.2.3 Supporting Documentation: The Contractor shall submit all claims in the following format: (1) Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made (2) List of documents relating to claim: (A) Specifications (B) Drawings (C) Clarifications (Requests for Information) 12 72500.00001 \32045856.1 Contract No. C37960B (D) Schedules (E) Other (3) Chronology of events and correspondence (4) Analysis of claim merit (5) Analysis of claim cost (6) Time impact analysis in CPM format 3.11.2.4 Citv's Response. Upon receipt of a claim pursuant to this Section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement. (1) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion. (2) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. (3) The City's written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater. 3.11.2.5 Meet and Confer. If the Contractor disputes the City's written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City's response or within 15 days of the City's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute. 13 72500.00001 \32045856.1 Contract No. C37960B 3.11.2.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time. (1) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (2) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (3) Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (4) The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed. (5) If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation. 3.11.2.7 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this section: 14 72500.00001 \32045856.1 Contract No. C37960B (1) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non- binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court. (2) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. (A) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney's fees on appeal of the other party. 3.11.2.8 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted. 3.11.2.9 Citv's Responses. The City's failure to respond to a claim from the Contractor within the time periods described in this Section or to otherwise meet the time requirements of this Section shall result in the claim being deemed rejected in its entirety. City's failure to respond shall not waive City's rights to any subsequent procedures for the resolution of disputed claims. 3.12 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to 15 72500.00001 \32045856.1 Contract No. C37960B herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this Contract pursuant to Section 3.18.3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice. 3.13 Indemnification. 3.13.1 Scope of Indemnitv. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and authorized volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, (collectively, "Claims") in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor's services, the Project or this Contract, including without limitation the payment of all damages, expert witness fees and attorneys' fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor's indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City's agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons. 3.13.2 Additional Indemnitv Obliqations. Contractor shall defend, with counsel of City's choosing and at Contractor's own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and authorized volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City's attorney's fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and authorized volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall survive expiration or termination of this Contract, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and authorized volunteers. 3.14 Insurance. 3.14.1 Minimum Reauirements. Without limiting Contractor's indemnification of the City of Palm Desert, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form that is satisfactory to the City. 3.14.1.1 General Liabilitv Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services 16 72 500. 0000 1 \32045856.1 Contract No. C37960B Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract" language will not be accepted. 3.14.1.2 Automobile Liabilitv Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. 3.14.1.3 Umbrella or Excess Liabilitv Insurance. Contractor may opt to utilize umbrella or excess liability insurance in meeting insurance requirements. In such circumstances, Contractor may obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability and employer's liability. Such policy or policies shall include the following terms and conditions: (A) A drop down feature requiring the policy to respond if the event that any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason; Pay on behalf of wording as opposed to reimbursement; (B) Pay on behalf of wording as opposed to reimbursement; (C) Concurrency of effective dates with primary policies; (D) Policies shall "follow form" to the underlying primary policies; and (E) Insureds under primary policies shall also be insureds under the umbrella or excess policies. 3.14.1.4 Workers' Compensation Insurance. Contractor may maintain Workers' Compensation Insurance (Statutory Limits) and Employer's Liability Insurance (with limits of at least $1,000,000) for Contractor's employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City of Palm Desert, its officers, agents, employees and volunteers. 3.14.2 Other Provisions or Requirements 3.14.2.1 Proof of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation. Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current 17 72500.00001 \32045856.1 Contract No. C379606 certification of insurance shall be kept on file with City at all times during the term of this contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time. 3.14.2.2 Duration of Coveraqe. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The City of Palm Desert and its officers, officials, employees, and agents shall continue as additional insureds under such policies. 3.14.2.3 Primary/Non-Contributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City's own insurance or self- insurance shall be called upon to protect it as a named insured. 3.14.2.4 Products/Completed Operations Coveraqe. Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed "by or on behalf' of the insured. Policy shall contain no language that would invalidate or remove the insurer's duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage. 3.14.2.5 Citv's Rights of Enforcement. In the event any policy of insurance required under this Contract does not comply with these requirements, or is canceled and not replaced, City has the right, but not the duty, to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor, or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract. 3.14.2.6 Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3.14.2.7 Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City of Palm Desert, its elected or appointed officers, agents, officials, employees and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City of Palm Desert, its elected or appointed officers, agents, 18 72500.00001 \32045856.1 Contract No. C37960B officials, employees and volunteers and shall require similar written express waivers and insurance clauses from each of its subcontractors. 3.14.2.8 Enforcement of Contract Provisions (non -estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder. 3.14.2.9 Requirements Not Limitinq. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 3.14.2.10 Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. 3.14.2.11 Additional Insured Status. General liability, automobile liability, and if applicable, pollution liability policies shall provide or be endorsed to provide that the City of Palm Desert and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. Coverage shall be at least as broad as coverage provided by ISO's Owners, Lessees, or Contractors Additional Insured Endorsement for the ongoing (i.e. ISO Form CG 20 10 07 04) and completed operations (i.e. ISO Form CG 20 37 07 04) of Contractor. 3.14.2.12 Prohibition of Undisclosed Coveraqe Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 3.14.2.13 Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability exclusions. 3.14.2.14 Pass Through Clause. Contractor agrees to ensure that its sub -consultants, sub -contractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. 19 72500.00001 \32045856.1 Contract No. C37960B 3.14.2.15 Citv's Riqht to Revise Requirements. The City or its Risk Manager reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor's compensation. If the City reduces the insurance requirements, the change shall go into effect immediately and require no advanced written notice. 3.14.2.16 Self -Insured Retentions. Any self -insured retentions must be declared to and approved by City. City reserves the right to require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City. 3.14.2.17 Timelv Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. 3.14.2.18 Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work. 3.15 Bond Requirements. 3.15.1 Pavment Bond. If required by law or otherwise specifically requested by City in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City. 3.15.2 Performance Bond. If specifically requested by City in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City. 3.15.3 Bond Provisions. Should, in Citv's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause. 3.15.4 Suretv Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If 20 72500.00001 \32045856.1 Contract No. C379606 a California -admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City. 3.16 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non -conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor's obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand. 3.17 Emplovee/Labor Certifications. 3.17.1 Contractor's Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit "D" and incorporated herein by reference, shall be executed simultaneously with this Contract. 3.17.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. 21 72500.00001 \32045856.1 Contract No. C37960B 3.17.3 Verification of Employment Eliqibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub -subcontractors to comply with the same. 3.18 General Provisions. 3.18.1 City's Representative. The City hereby designates the Clayton von Helf, Information Systems Manager or his or her designee, to act as its representative for the performance of this Contract ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City's Representative or his or her designee. 3.18.2 Contractor's Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City ("'Contractor's Representative"). Following approval by the City, Contractor's Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor's Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Contractor's Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor's Representative, Contractor shall provide the information specified above and obtain the City's written approval. 3.18.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset City's resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 3.18.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City's Representative, whose decision shall be binding upon Contractor. 22 72500.00001 \32045856.1 Contract No. C379606 3.18.5 Anti -Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties. 3.18.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows: CONTRACTOR: CITY: [***INSERT CONTRACTOR NAME AND ADDRESS***] ATTN: [***INSERT CONTRACTOR REP. NAME AND TITLE***] CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CA 92260-2578 ATTN: Clayton von Helf Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. 3.18.7 Time of Essence. Time is of the essence in the performance of this Contract. 3.18.8 Assianment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee. 3.18.9 No Third Partv Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties. 3.18.10 Laws: Venue. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of Riverside, State of California. 23 72500.00001 \32045856.1 Contract No. C37960B 3.18.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original. 3.18.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract. 3.18.13 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability. 3.18A4 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City's Filing Officer as required under state law in the performance of the Work. 3.18.15 Certification of License. 3.18.15.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor's license of the classification indicated below under Contractor's signature. 3.18.15.2 Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826. 3.18.16 Authoritv to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party. 3.18.17 Entire Contract; Modification. agreement of the Parties with respect to the subject matte negotiations, understandings or agreements. This Contract signed by both Parties. 24 72500.00001 \3204585& 1 r This Contract contains the entire hereof, and supersedes all prior may only be modified by a writing Contract No. C37960B 3.18.18 Non -Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing. 3.18.19 Citv's Riaht to Emr)lov Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects. [Signatures on Next Page] 25 72500.00001 \32045856.1 Contract No. C37960B SIGNATURE PAGE FOR CONSTRUCTION CONTRACT BETWEEN THE CITY OF PALM DESERT AND [***INSERT CONTRACTOR NAME***] IN WITNESS WHEREOF, the Parties have entered into this Contract as of the [`"*INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***]. CITY OF PALM DESERT [***INSERT NAME OF CONTRACTOR] [IF CORPORATION, TWO SIGNATURES, PRESIDENT OR VICE PRESIDENT AND By: SECRETARY OR TREASURER REQUIRED] [INSERT NAME] [INSERT TITLE] By: ATTEST: By: City Clerk Its: Printed Name: Contractor's License Number and Classification APPROVED AS TO FORM: DIR Registration Number By: Best Best & Krieger LLP City Attorney 26 72500.00001 \32045856.1 EXHIBIT "A" SERVICES/SCHEDULE r--INSERT SCOPE OF SERVICES/SCHEDULE-'] EXHIBIT "B" PLANS [***INSERT ALL PLANS'-] EXHIBIT "C" SPECIAL CONDITIONS ARTICLE 1. BONDS Concurrently with this Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit "D" to the Contract. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price. [***INSERT ADDITIONAL SPECIAL CONDITIONS USING ABOVE FORMAT***] EXHIBIT "D" PAYMENT AND PERFORMANCE BONDS Contract No. C37960B PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: THAT WHEREAS, the City of Palm Desert (hereinafter referred to as "City") has awarded to , (hereinafter referred to as the "Contractor") an agreement for (hereinafter referred to as the "Project"). WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated , (hereinafter referred to as "Contract Documents"), the terms and conditions of which are expressly incorporated herein by reference; and WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents. NOW, THEREFORE, we, the undersigned Contractor and as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of DOLLARS, ($ ), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City's rights or the Contractor or Surety's obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15. Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City's option: (1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or Exhibit D-31 72500.00001 \32045856.1 Contract No. C37960B (2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. (3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor. Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City's objection to Contractor's further participation in the completion of the Project. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code. Exhibit D-32 72500.00001 \32045856.1 Contract No. C37960B IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20_). (Corporate Seal) (Corporate Seal) Contractor/ Principal A -- Title Surety Attorney -in -Fact Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. (Attach Attorney -in -Fact Certificate) Title The rate of premium on this bond is per thousand. The total amount of premium charges, $ (The above must be filled in by corporate attorney.) THIS IS A REQUIRED FORM Any claims under this bond may be addressed to: (Name and Address of Surety) (Name and Address of Agent or Representative for service of process in California, if different from above) (Telephone number of Surety and Agent or Representative for service of process in California) NOTE: A copy of the Power -of -Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto. Exhibit D-33 72500.00001 \32045856.1 Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On personally appeared 20_, before me, Contract No. C37960B Notary Public, , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature of Notary Public WITNESS my hand and official seal. OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER ❑ Individual ❑ Corporate Officer Title(s) ❑ Partner(s) ❑ Limited ❑ General ❑ Attorney -In -Fact ❑ Trustee(s) ❑ Guardian/Conservator ❑ Other: Signer is representing: Name Of Person(s) Or Entity(ies) DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above NOTE: This acknowledgment is to be completed for Contractor/Principal. Exhibit D-34 72500.00001 \32045856.1 Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On personally appeared 20_, before me, Contract No. C37960B , Notary Public, , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature of Notary Public WITNESS my hand and official seal. OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER ❑ Individual ❑ Corporate Officer Title(s) ❑ Partner(s) ❑ Limited ❑ General ❑ Attorney -In -Fact ❑ Trustee(s) ❑ Guardian/Conservator ❑ Other: Signer is representing: Name Of Person(s) Or Entity(ies) DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above NOTE: This acknowledgment is to be completed for the Attorney -in -Fact. The Power -of - Attorney to local representatives of the bonding company must also be attached. Exhibit D-35 72500.00001\32045856.1 Contract No. C37960B PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS That WHEREAS, the City of Palm Desert (hereinafter designated as the "City"), by action taken or a resolution passed , 20 has awarded to hereinafter designated as the "Principal," a contract for the work described as follows: (the "Project"); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated ("Contract Documents"), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth. NOW THEREFORE, we, the Principal and as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys' fees, court costs, expert witness fees and investigation expenses. This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond. It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment Exhibit D-36 72500.00001 \32045856.1 Contract No. C37960B pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code. IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20_ (Corporate Seal) Contractor/ Principal (Corporate Seal) By Title Surety By Attorney -in -Fact Title Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power -of -Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto. NOTE: A copy of the Power -of -Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto. Exhibit D-37 72500.00001 \32045856.1 Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On personally appeared 20_, before me, Contract No. C37960B Notary Public, , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature of Notary Public WITNESS my hand and official seal. OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER ❑ Individual ❑ Corporate Officer Title(s) ❑ Partner(s) ❑ Limited ❑ General ❑ Attorney -In -Fact ❑ Trustee(s) ❑ Guardian/Conservator ❑ Other: Signer is representing: Name Of Person(s) Or Entity(ies) DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above NOTE: This acknowledgment is to be completed for Contractor/Principal. Exhibit D-38 72500.00001\32045856.1 Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On personally appeared 20_, before me, Contract No. C37960B Notary Public, , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature of Notary Public WITNESS my hand and official seal. OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER ❑ Individual ❑ Corporate Officer Title(s) ❑ Partner(s) ❑ Limited ❑ General ❑ Attorney -In -Fact ❑ Trustee(s) ❑ Guardian/Conservator ❑ Other: Signer is representing: Name Of Person(s) Or Entity(ies) DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above NOTE: This acknowledgment is to be completed for the Attorney -in -Fact. The Power -of - Attorney to local representatives of the bonding company must also be attached. Exhibit D-39 72500 00001\32045856.1 EXHIBIT "E" PROJECT SPECIFICATIONS SECTION 27 41 16 AUDIO VIDEO SYSTEMS AND EQUIPMENT Exhibit E Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA SECTION 27 41 16 AUDIO VIDEO SYSTEMS AND EQUIPMENT PART 1-GENERAL 1.01 SUMMARY A. Contract Documents 1. The General and Special Conditions are hereby made a part of this Section. Where requirements of this Section are at odds with requirements stated in any Special or Supplementary Conditions, the more stringent requirements shall apply. 2. The Contract Documents are complementary and are intended to include or imply all items required for the proper execution and completion of the work. Any item or work required by the Specification or other portion of the Contract Documents, but not shown on the drawings, or shown on the drawings but not described in the Specification, shall be provided and installed by the Contractor as if shown or mentioned in both. 3. The Consultant may furnish additional instruction or clarification necessary for the proper execution of the work. Instructions or clarifications shall be consistent with the Contract Documents or agreed upon modifications thereof, and inferable therefrom. In giving instruction or clarification, only the Contracting Officer shall have the authority to make minor changes in the work that will not entail an increase in the Contract price or time. 4. Copies of drawings and specifications regardless of how furnished are the property of the Owner, and are not to be used on any other work or project. No contract documents may be released for publication or to any other party without the written consent of the Owner and Consultant. B. Scope of Work 1. Work under this Contract includes the following spaces/systems: a. Council Chambers b. Council Chambers Lobby c. Electrical/IT Room d. AV Control Room 2. Refer to "Appendix A: AV Systems Functional Description" for a complete and detailed description of the AN Systems and associated functional requirements. 3. Work under this Contract includes all labor, materials, tools and equipment, transportation services, supervision, coordination, etc., necessary to complete the installation of high -quality AN System, in excellent working order, as described in these specifications and the associated drawings and in accordance with good engineering practice, and to maintain the systems throughout the Warranty period. 4. The systems defined herein shall be called "AN Systems" and shall include, but are not limited to, the following major items: AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 1 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA a. Audio mixers, equalizers, amplifiers, program sources, digital recording devices, microphones and other signal processing equipment; b. Loudspeakers and loudspeaker mounting, aiming, rigging, and support hardware; c. Video switching, video over IP transmitters/receivers, video display equipment, video conferencing systems, cameras, and other video playback devices. d. Audio Video and Control Network equipment; e. Control equipment; f. Equipment racks, cabinetry, and furniture; g. System accessories; h. Cable, connectors, adapters, plates, panels, transformers, and other interface devices. 5. The Contract also includes: a. Verification of dimensions and conditions at the job site. b. Preparation of submittal information. c. Installation in accordance with the contract documents, manufacturer's recommendations, and all applicable code and legal requirements. d. Initial tests and adjustments, written report, demonstration for approval, final adjustments, and documentation. e. Instruction of operating personnel; provision of manuals. f. Maintenance services; Warranty. 6. Notwithstanding any detailed information in the Contract Documents, it is the responsibility of the AN System Contractor to supply systems in full working order, and of the Owner and AN System Contractor to meet all code requirements for the installation of conduit and cable, respectively. 7. Notify the Consultant of any discrepancies in part numbers, sizes, or quantities before proposal period closes. Failing to provide such notification, supply items, sizes, and quantities according to the intent of the design as described in the Specifications and Drawings, without claim for additional payment. 8. Supply accessories and minor equipment items needed for a complete and properly functioning system, or where required to meet the specified performance, even if not specifically mentioned herein or on the drawings, without claim for additional payment. 9. Distribute AC power within all equipment racks and furniture supplied herein. As required, provide all AC power cable, conduit, wireways, junction boxes, power distribution units, and/or receptacles located in equipment racks or furniture provided by the AN System Contractor. This shall also include any power cabling from AN equipment racks or furniture to adjacent receptacles or junction box(es) unless otherwise noted. C. Products Supplied But Not Installed Under This Section 1. Certain equipment may be supplied but not installed or may be determined as "installed by others" or "installed by owner." This may include but not be limited to portable equipment and/or cables. D. Products Installed But Not Supplied Under This Section Certain equipment may be identified after the proposal is awarded as Owner AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-2 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA Furnished Equipment (OFE). Owner Furnished Equipment is presently part of the Owner's system, or will be provided by the Owner, and will be delivered to Contractor's off -site construction facility, delivered to the Contractor's on -site secured storage area, or otherwise provided on site, as appropriate, for incorporation into the system. 2. Inspect the OFE and notify the Owner promptly in writing of damage or defect and the extent of repair and/or adjustment required to bring the OFE to original specification. Service OFE only as directed by the Owner, under the arrangements of a separate contract or agreement. 3. Incorporate OFE equipment into the system as if provided new, exempting any warranty coverage. The Contractor shall not be responsible for the warranty of OFE equipment unless specifically covered under a separate contract or agreement. 4. The Contractor shall be responsible for the physical safety and care of any OFE equipment while in their possession. Any damage or destruction of OFE equipment while in the Contractor's custody shall be the responsibility of the contractor to remedy without additional claim. E. Governing Clause For the sake of brevity these specifications omit phrases such as "Contractor shall furnish and install," "unless otherwise noted or specified," etc.; nevertheless, the requirements of the specifications are mandatory, and these phrases shall be inferred. The mention of materials and operations implies the Contractor shall furnish and install such materials and perform such operations to the overall standards set by the Contract Documents. Exceptions are noted herein or shown on the drawings. 2. In the event that a Consultant is not a participant in this project after award of contract, all references to "Consultant" in this document shall be replaced with "Owner." F. Questions Submit questions about the Drawings and Specification to the Consultant in writing. G. Related Requirements 1. None 1.02 REFERENCES A. Abbreviations and Acronyms 1. None B. Definitions AN System: A set of specified individual components (audio, video, control, and networking equipment as well as associated hardware and wiring) designed and configured to operate and one comprehensive system for the conveyance of audio/video content to an audience. AN Systems may include, but are not limited to, the following major items: AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-3 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA a. Audio mixers, equalizers, amplifiers, program sources, digital recording devices, microphones and other signal processing equipment; b. Loudspeakers and loudspeaker mounting, aiming, rigging, and support hardware; c. Video switching, video over IP transmitters/receivers, video display equipment, video conferencing systems, cameras, and other video playback devices. d. Network equipment; e. Control equipment; f. Equipment racks, cabinetry, and furniture; g. System accessories; h. Cable, connectors, adapters, plates, panels, transformers, and other interface devices. 2. Owner: The designated responsible party with authority to make final decisions on contract and technical issues as well as provide final acceptance of the AN Systems. May also include designated representatives and/or subordinates as part of a larger "Owner Team" such as End -users, Facility Managers, AN Technology Managers, Building Committees, Purchasing Agents and/or Contract Representatives. a. City of Palm Desert, CA 3. Architect: The "Architect' referred to in this specification is the entity who has been hired to design and specify the physical environment the AV systems is to be installed within (e.g., the building, facility, room, and/or space). The architect is generally responsible for hiring and managing the various entities that constitute the design team (architects, engineers, consultants, etc.). a. N/A 4. Consultant: The "Consultant' referred to in this specification is the entity who has been hired to design and specify the AV System as well as work with other design team members and well as contractors/trades to ensure proper collaboration a. K2, LLC 5. Contractor: The "Contractor" referred to in this specification is the AN Systems Contractor selected by the Owner, through competitive proposal or negotiation, to provide the AN systems described by this specification, and to whom a contract has been awarded to do so. 6. Masculine Pronoun: In all cases where a masculine pronoun is used within these specifications, the pronoun is used in the interest of simplicity of syntax, and the reference shall be interpreted as genderless. C. Reference Standards The workmanship and installation of the audio video systems and equipment shall adhere to industry best practices, AVIXA standards, and all national and local codes. 2. The following documents, or the versions closest in time prior to the release of this specification, shall form a part of this specification to the extent specified herein. Where the requirements of these documents conflict with the instructions AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-4 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA herein, the requirements of this specification shall govern a. National Fire Protection Association (N.F.P.A.) National Electrical Code (NEC). b. Electronics Industry Association/Telecommunications Industry Association (EIA)/TIA) Standards. c. International Telecommunications Union (ITU) Standards. d. Society of Motion Picture and Television Engineers (SMPTE) Standards. e. Audio Engineering Society (AES) Standards. f. American National Standards Institute (ANSI) g. Building Seismic Safety Council (B.S.S.C.) D. Other Reference Standards 1. Shields and Grounds: Safety, Power Mains, Studio, Cable and Equipment, (special excerpt) The June 1995 issue of the Journal of the Audio Engineering Society. 2. Grounding and Shielding Techniques in Instrumentation, by Ralph Morrison, published by John Wiley and Sons, Inc.; 3rd edition (March, 1986) ISBN: 0471838055 3. Sound Reinforcement Handbook, by Gary Davis and Ralph Jones, published by Hal Leonard Publishing Corporation; 2nd edition (March 1, 1990) ISBN: 0881889008 4. DOJ 28 CFR Part 36, Appendix A to Part 36 - Standards for Accessible Design: Americans with Disabilities Act Accessibility Guidelines (ADAAG). 5. A Clean Audio Installation Guide, Allen H Burdick, Benchmark Media Systems, Inc., (800) 262-4675, (available on the World Wide Web at http://www.benchmarkmedia.com/); 6. Audio System Design and Installation, Phillip Giddings, Butterworth -Heinemann; Reissue edition (July, 1990) ISBN: 0672226723 7. Sound System Engineering (2nd Edition), Don & Carolyn Davis, Focal Press; 2 edition (May 19, 1997) ISBN: 0240803051 1.03 ADMINISTRATIVE REQUIREMENTS A. Coordination Coordinate work with Owner personnel involved in this project, Consultant, representatives and employees/subcontractors employed of/by Owner, including electricians and the scheduled work of other trades. 2. Cooperate with all trades present on the project, so that lost time, work stoppages, interference, and work inefficiencies do not occur. 3. Assure labor "harmony" among personnel and subcontractors, and with other trades associated with construction, delivery, installation, and testing of the facility. 4. Failures in coordination shall not be a reason for additional payment to correct omissions or errors. 5. Coordinate the electrical and conduit requirements of this contract, and verify that AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-5 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA all power, conduit, non -specialty boxes required for this contract is in the General/Electrical Contractor's scope of work. If there is a discrepancy between this contract and the Electrician's scope of work, notify the Owner and the Consultant, and request clarification or modification of the Contracts to achieve coordination. a. Any discrepancy does not relieve the AN System Contractor from responsibility for a complete working system, and coordination with the electricians and representatives of the Owner in the course of his or her installation is required to achieve a correct conduit system. b. It is the Contractor's responsibility to verify that all conduits, junction boxes, raceways, and back boxes will be of the proper size and type to meet the project requirements. B. Pre -installation Meetings 1. Meet with the Owner on the site and reach a written understanding regarding project conditions outside the AN Systems Contractor's scope of work which will impact the timely completion of this contract. 2. Items that must be coordinated include a schedule of access to equipment room and other areas where access will be required; security of the equipment room; secure storage for equipment and tools on site; cleanliness of the equipment room including both trash and dust; HVAC for the equipment room; technical power in the equipment room and other required locations; conduit and junction box completion; any wire pulling needed for this contract but not provided by the AN Systems Contractor; any and all job site conditions that may impact the timely completion of this contract or its conclusion in excellent condition; and any and all other work that must be provided by others that is required for the timely completion of this contract or its conclusion in excellent condition. 3. Develop an agreed timeline for all the above items, showing the last acceptable completion date for each item, and signed by the Owner and the representative of the AN Systems Contractor. 4. The Electrical Contractor for this project (if required) will be the in-house electricians or other subcontractor designated by the Owner or the Owner's Representative. The Contractor shall meet with the Owner's designated electrician and present them with a copy of the signed and approved timeline. Discuss the electrical issues on the timeline and make sure the time requirements are understood by the General Contractor, Electrical Contractor, and Owner. 5. Meet with any other contractor whose work will impact the performance of this contract, and coordinate as outlined above. C. Sequencing 1. As required, sequence work with the Owner and all trades present on the project. 2. Notify the Owner and/or Owner's Representative immediately of any issues of sequencing so that lost time, work stoppages, interference, and work inefficiencies do not occur. D. Scheduling 1. Coordinate and schedule all on -site activities with the Owner. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-6 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA 2. AN System Contractor shall work and complete all on -site tasks in accordance with the access to the site provided by the Owner. 1.04 SUBMITTALS A. General 1. Submit AN System product information, shop drawings, and samples to the Consultant for review. Begin submittals not later than ten (10) days after the date of Contract execution; failure to comply with this requirement shall be cause for cancellation of the contract, on the basis the selected Contractor does not have the ability or intention to comply with the specifications or schedule. Submit product data binders and submittal drawing information in not more than three submittals. If any submittal drawings are rejected, correct and resubmit within five (5) working days. 2. Obtain approval prior to ordering material or fabrication. Ordering, receipt, or assembly of any equipment before approval is done entirely at the risk of the Contractor, and any rework required is not a valid cause for delay to the project or additional cost to the Owner. B. Product Data Product data submittals to be submitted for review according to general project requirements. The Contractor shall utilize the project information management system (PIM). If hard copies are required, see specific submittal requirements below. The Contractor shall verify the project requirements before providing product data submittals for review. 2. Provide product data submittal as a single submittal for review. a. Provide product data submittal for Consultant review organized with logical and consistent formatting such as font choice, font size, margins, page headers and footers showing project, spec section, date, page numbering, etc. b. Provide title sheet with Project Name, Owner, Specification Section, Date of Submittal, AV Contractor contact information, and any other pertinent project information. c. Provide a table of contents (TOC) outlining major sections as noted below. Include operable bookmarks and page numbers for major sections. d. Provide clear section labels and page breaks for each major section such that it is clear when one section ends and another starts. e. Organize product data submittal into the following six (6) major sections. f. Section I 1. Provide a complete bill of materials (BOM) in spreadsheet format of all major and minor products, hardware, and materials to be provided. Logically group according to specification format —as provided in appendix/appendices. Include any additional or ancillary items not shown in specification required for a complete and working system. 2. See "Appendix Z: FORMATTING REQUIREMENTS FOR SUBMITTALS" for layout and formatting requirements. g. Section II 1. Provide the manufacturer's product data sheet or specification sheet for all equipment and materials contained in this specification. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-7 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 2. Organize and present the manufacturers' product data sheets as provided in Section One BOM order. Full line catalogs, short form catalogs, user manuals, web prints, product pictures with little or no technical data, and unreadable photocopies are not acceptable. 3. Remove extraneous and/or blank pages with no useful information. 4. Remove any repeated information in non-English languages. 5. If no specification sheet is available, excerpts from larger manufacturer information documents are acceptable. Adhere to the guidelines outlined above. Keep information provided relevant to pertinent technical data only and as brief as possible. Section III 1. Provide in spreadsheet format proposed project install cables and associated connectors. Provide the make, model, and the specific use conditions applicable to each cable type and associated connector. Provide ONLY the cables and connectors to be used for the project. "Typical" or "Standard" cable types and connectors shall be rejected and required for resubmission. 2. See "Appendix Z: FORMATTING REQUIREMENTS FOR SUBMITTALS" for layout and formatting requirements. 3. Provide the manufacturer's product literature for all cables and connectors. 4. Organize and present the manufacturers' product data sheets as provided in Section Three project cable types and connectors spreadsheet order. Full line catalogs, short form catalogs, user manuals, web prints, product pictures with little or no technical data, and unreadable photocopies are not acceptable. 5. Remove extraneous and/or blank pages with no useful information. 6. Remove any repeated information in non-English languages. 7. If no specification sheet is available, excerpts from larger manufacturer information documents are acceptable. Adhere to the guidelines outlined above. Keep information provided relevant to pertinent technical data only and as brief as possible. 8. Specifically note any proposed substitutions. NOTE: Submittal of proposed substitution does not guarantee acceptance by Consultant. All substitutions are subject to approval. Ordering, receipt, or installation of any cabling prior to approval is done entirely at the risk of the Contractor. Any rework, removable, and or re -installation required is not a valid cause for delay to the project or additional cost to the Owner. Section IV 1. Provide the manufacturer's product literature for any products which are proposed substitutes to the equipment contained in this specification. Full line catalogs, short form catalogs, user manuals, product pictures with little or no technical data, and unreadable photocopies are not acceptable. NOTE: Submittal of proposed substitution does not guarantee acceptance by Consultant. All substitutions are subject to approval and ordering, receipt, or installation of any equipment prior to approval is done entirely at the risk of the Contractor. Any rework, removable, and or re -installation required is not a valid cause for delay to the project or additional cost to the Owner. 2. Remove extraneous and/or blank pages with no useful information. 3. Remove any repeated information in non-English languages. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-8 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 4. If no specification sheet is available, excerpts from larger manufacturer documents are acceptable. Adhere to guidelines outlined above and keep information provided relevant to pertinent technical data only and as brief as possible. Section V 1. Provide a list showing coordination of selected frequencies for all wireless microphone systems. When multiple frequency block is available from a manufacturer, note the manufacturer's recommended block selection based on RF frequency coordination with TV channels and/or other local interference. Section VI 1. Provide a schedule of finishes indicating proposed materials and color selections for all custom or exposed items subject to Owner's selection and approval not explicitly noted in the BOM. 3. Electronic Submittal Requirements a. Submit one (1) portable document format (.PDF) file organized as outlined above. b. Provide operable bookmarks for major sections outlined above. 4. Hard Copy Submittal Requirements (only if required) a. Submit three (3) copies organized as outlined above. b. Utilize three-ring binders not exceeding 3" spine size, with clear vinyl pockets on cover and spine. c. Provide title sheets for cover and spine identifying the project and the system, room, or area covered by the submittal. d. Print title sheets in ink (pen plotter, inkjet or laser printer) on heavy paper sized to fill the entire pocket. e. Provide tabbed dividers for major sections outlined above. C. Shop Drawings Shop drawings to be submitted for review according to general project requirements: project information management system (PIM) or hardcopy. AV Contractor to verify project requirements before providing shop drawings submittals for review. 2. Minimum drawing sheet size: 24" x 36" (Arch D). 3. Execute drawings at an appropriate scale, but not smaller than 1/8" = 1'-0", utilizing architectural scale factors exclusively. 4. Title, number, and note the scale on each drawing. 5. Submit one (1) electronic reproducible set (portable document format .PDF) and three (3) paper sets of drawings (only paper sets IF REQUIRED). 6. Submittal drawings shall contain sufficient information to describe the work to be performed, or the item to be manufactured, and to thoroughly and completely guide installers, technicians, and manufacturers in the assembly of the system element. 7. Drawings shall include but not necessarily be limited to the following: a. Cover Sheet AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-9 Project #IS71219 05/ 15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA 1. Provide a cover sheet that includes general project information, drawing release, date, project engineer (and/or draftsperson), sheet index, and AV Contractor contact information. b. Legend and General Notes 1. Provide a legend and general notes clearly showing symbols and other abbreviations used. Include details clearly showing and dimensioning cable preparation details for each cable and connector utilized in the system. 2. Provide a complete labeling approach, including the proposed lettering/numbering scheme and data format that cable log will be supplied in. Include representative equipment labeling sizes, styles, and numbering. a) Follow AVIXA F501.01:2015 Cable Labeling for Audiovisual Systems standard. 3. Provide a schedule (table) clearly showing the installed cable types and connectors to be used for the project. Provide information related to the make, model, plenum/non-plenum, and field conditions under each cable is to be specifically used. a) Show ONLY the cables and connectors to be actually supplied and utilized on the project. Tables that are the "Typical" or "Standard" cable and connector types by the AV Contractor shall be rejected and shall be required for resubmission. c. Floor Plans and Reflected Ceiling Plans 1. Provide architecturally scaled floor plans and reflected ceiling plans that show the location of all AV equipment, racks, consoles, millwork, etc. Include device names and pertinent installation details. d. Sections and Elevations 1. Provide architecturally scaled sections and elevations that show the location of all AV equipment, racks, consoles, millwork, etc. Include device names and pertinent installation details. 2. Include detailed drawings of loudspeaker installation, showing the location, orientation, and support and aiming system for each case. Verify load ratings of all hanging components including attachment hardware. 3. Include detailed drawings of video equipment installation (e.g., projection screens, video projector mounting, LCD television mounting, etc.), showing the location, orientation, and support system for each case. Verify load ratings of all hanging/installation components including attachment hardware. e. Wiring diagrams 1. Provide complete, detailed wiring diagrams for all systems, based on the contract drawings, but with the addition of: a) Cable types, identification, and color codes b) Cable numbers (as detailed above). c) Details of connections, both at equipment and between equipment racks and furniture and wiring in the building d) Application of connector models and types e) Comply with AES, ANSI, IEC, and ISO recommendations and standards. f) Schematic drawings of any custom circuitry or equipment modifications, including connector pinouts and component part lists. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-10 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA f. Patch Panels and Custom Plates and Panels 1. Provide shop drawings of actual machine shop drawings since plates and panels are to be fabricated exactly as shown on the submittal drawings. If discrepancies are discovered by the Contractor due to errors or modification of a manufactured product, these must be called to the attention of the Consultant and propose their resolution on the Submittal Drawings. 2. Engraving details and requirements for patch panel and rack labels. 3. Finishes/Colors g. Rack Elevations 1. Provide vertical elevation drawings for all equipment racks regardless of size showing all major equipment, shelves, drawers, vents, and other rack mount hardware. 2. Provide dimensions, wire routing, cabling, and support details, AC power outlet and ground buss locations, location of transformers, relays, accessories, etc. h. Consoles, Enclosures, Tables, and Supports 1. Provide detailed construction drawings of cabinetwork and metalwork, including materials, finishes, adhesives, and fasteners. 8. References may be made in specification paragraphs to a requirement for submittal drawings for that particular item. Such references do not define the only items requiring submittal drawings. 9. Do not consider the Consultant's review of submittals to be exhaustive or complete in every detail. Approval of shop drawings and submittals indicates only the acceptance of the manufacturer, model, materials, general design or method of construction, and quality. 10. Requirements, arrangements, quantities, and installation must comply with the contract documents unless specifically approved to the contrary. Submittal approval does not relieve the Contractor of responsibility for errors in dimensions, details, sizes, fit, etc., or for coordinating items with actual building conditions and dimensions. 11. Submittals which, in the Consultant's opinion, are incomplete, deviate significantly from the requirements of the Contract Documents, or contain numerous errors, will be rejected and returned without review for rework and resubmittal. D. Samples Provide product samples as required herein or as requested by Consultant, Architect, or Owner. 2. Submit electronic copies of any custom programming including source code. Include printed copies of all control screens, wiring pages, etc. E. Delegated Design Submittals Include delegated design submittals for any systems or sub -systems that are not specifically designed by the AN contractor but are required for review and approval. For example, this might include: a. Manufacturer designs for induction loop hearing assist systems b. Loudspeaker System or Room EASE (or other acoustic) models AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-11 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA c. Structural engineering designs for loudspeaker hanging hardware F. Test and Evaluation Reports Shop Testing a. AN equipment racks shall be populated, wired, and tested to the fullest extent possible in the Contractor's shop prior to shipping to the job site. b. When applicable, measure, and record the DC resistance between the racks ground bus bar and the chassis of all rack -mounted components. Also measure and record the DC resistance between the rack ground bus bar and the signal common for all components. 2. Field Testing a. Before delivery of equipment to the job site, submit any test reports for all measurements specified under Shop Testing above. b. Before delivery to the job site, submit photographs depicting the quality of wiring and grounding within equipment racks. c. Immediately after installation, submit photographs showing cable entries and terminations within equipment racks, enclosures and pedestals at the job site. d. All loudspeakers and loudspeaker assemblies shall be tested by the Contractor in the Contractor's shop before delivery to the site. e. Make all equipment including loudspeakers available for testing by the Consultant on the site before installation G. Questions Submit questions about the Drawings and Specification to the Consultant in writing. 1.05 CLOSEOUT SUBMITTALS A, Maintenance Contracts Provide in writing any maintenance contracts included in the project. B. Operation and Maintenance Data Prepare Operation and Maintenance manuals as outlined below. Directly submit one (1) PDF copy of each manual to the Consultant for review at least ten days prior to acceptance testing. After review, make corrections and additions required by the Consultant. After approval, deliver two (2) approved printed copies of the System Reference Manual to the Owner unless otherwise directed by the General Project Requirements or the Owner or the Owner's Representative. a. Assume the intended reader of the manual to be technically inexperienced and unfamiliar with the facility. b. Utilize three-ring binders not exceeding 3" spine size, with full-size clear vinyl pockets on front cover and spine. c. Provide title sheets for both cover and spine identifying the project and the system, room, or area covered by that manual; title sheets shall be printed in ink on heavy paper and fill the entire cover or spine pocket. d. Divide the manual into two or more binders 1. Part I shall consist of the Systems Reference Manual AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 12 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 2. Part II shall consist of the Maintenance Manual(s) 3. Part III shall consist of the Warranty Reference 4. The first section of each binder shall be a Table of Contents 5. Provide tabular dividers on heavy paper with permanent laser printed legends for the sections identified below. 6. Correct and update the System Reference and Maintenance Manuals, if necessary, according to the Consultant's instructions after acceptance testing. 7. Provide DVD or CD-ROM (unless otherwise requested by the Owner) copies of any training sessions for later review by the operators and maintenance staff 2. System Reference Manual (Part 1) a. System Description 1. Provide a typed description of each system including key features and operational concepts (e.g., remote control features, switching or routing functions, patch points, mixing and linking capabilities). b. System Operation and Instructions 1. Provide a "quick set-up" instructions (per space or system) oriented at inexperienced users under time pressure. 2. Provide a "typical procedures" instructions (per space or system) for the operation of the equipment. 3. Provide a "complete procedures" for the operation of the equipment as a system, organized by subsystem or activity. c. Equipment Settings 1. Provide a list of the settings of all semi -fixed controls, as finalized after Acceptance Testing. When these settings are in a software format, include software files with settings saved on them. Indicate the name of the product that the file is associated with and all file names on a label physically attached to all software provided. d. As -Built Drawings 1. Include corrected (as -built) wiring diagrams of each major subsystem, including plans showing locations and circuit numbers for all system outlets and receptacles, mounting and other pertinent details of the system installation, based on the contract drawings, at a reduced scale easy to handle but fully legible. Normal maximum drawing size: 24" x 36". Provide one additional full-size bound set separately, as well as one electronic set in portable document format (.PDF) format for Owner and Consultant. 2. Provide an additional set of reduced -size drawings placed in a pocket folder attached to the equipment rack for convenient future reference. e. Manufacturers' Operation Manuals 1. Provide manufacturer's instruction manuals for all items of equipment, incorporating manufacturer's warranty statements. Provide printed original manuals, not photocopies, unless more copies of a manual are required than the number of units in the total system. For custom circuits or modifications, provide a thorough description of the purpose, function, specifications, and operation. f. Other Data 1. Provide any other pertinent data generated during the project or required for future service. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 13 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 3. Maintenance Manual (Part II) a. Contractor's Warranty 1. Include a clear statement of the terms and period of the Contractor's warranty; Contractor's service department phone and facsimile number(s) and hours; maintenance schedule; description of products recommended or provided for maintenance purposes; and instructions for the proper use of maintenance products. b. Equipment List 1. Provide a comprehensive list of all equipment by subsystem, tabulating the manufacturer, model, serial number, physical location, and wiring diagram drawing number and code. c. Manufacturers' service manuals 1. Provide manufacturers' service manuals for all major equipment items. For custom circuits or modifications, provide a thorough description of the purpose, function, specifications, and operation. d. Performance Test Reports 1. Include a copy system startup test report generated meeting the requirements outlined in Section 3 of this Specification, and test results generated during Commissioning of the system. e. Maintenance Schedule 1. Provide a recommended preventative maintenance schedule with reference to the applicable pages in the manufacturer's maintenance manuals. Where inadequate information is provided by the manufacturer, provide the information necessary for proper maintenance. 4. Warranty Documentation (Part III) a. Contractor's Warranty 1. Include a clear statement of the terms and period of the Contractor's warranty; Contractor's service department phone and facsimile number(s) and hours; maintenance schedule; description of products recommended or provided for maintenance purposes; and instructions for the proper use of maintenance products. b. Manufacturers' Warranty 1. Provide a list of the various manufacturer's warranties for all the major equipment. C. Record Documentation 1. Keep a complete set of documents - contract and approved submittal - on the job, note any changes made during installation. 2. Provide a corrected set of as -built shop drawings in PDF format showing the work as installed, with input and output levels noted, for review and inclusion in the Closeout Submittals. D. Software 1. Provide a properly licensed working copy of the latest version of any and all contractor -provided software required to operate or configure the systems specified herein shall be a part of.the system supplied. This includes, but is not limited to, all software, firmware and hardware required for configuration, adjustment, diagnosis and repair. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 14 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 2. Software shall be fully documented, and that documentation shall be included. 3. The Owner shall retain ownership of all software. This includes both out of the box software and custom scripting and control software as well as the associated source code. 4. Software shall be included in its "installable" state on industry standard CD-ROM, USB flash drive, or another appropriate format. Back-up of the working software may be provided as an additional inclusion. Disk images are unacceptable. E. Logins and Passwords Provide any logins and password required for the operation, maintenance, or modification of the AV Systems. This includes, but is not limited to, both hardware as well as software. a. Audio DSP b. Control Systems c. Network Switches and Wireless Access Points d. Configuration and Maintenance Computers e. Touch Panel PIN numbers. f. Any other password protected equipment. 1.06 MAINTENANCE MATERIAL SUBMITTALS A. Spare Parts The specification may list extra quantities over and above those needed for the installation. Such extra quantities are intended as Owner's on -site spares and are to be turned over to the owner during the training session. Spares may include fuses, lamps, power supplies, hard drives (pre -loaded with all software), rack screws, connectors, phoenix connectors, etc. B. Keys 1. Submit in triplicate all keys required for access to, and operation of, the systems. C. Tools The specification may list tools that are to be provided and turned over to the owner during the training session. Tools may include crimpers (both ratchets and dies), adjustment tools, extraction tools, etc. a. Provide manufacturer's storage case if applicable. 1.07 QUALITY ASSURANCE A. Qualifications 1. The AN system described in the Specification is a complex system requiring the services of a trained and experienced specialty contractor with the resources to carry out the project in a timely and professional manner. 2. AN Contractor shall be a member of the AVIXA AV Provider of Excellence Program (APEx) or equivalent AV industry quality program. 3. AN Integrator's project team members shall be recognized by the AVIXA certification process, and the team shall possess certifications by percentage of AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 15 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA team members. a. Engineers required CTS-D 30% or a minimum of one (1), CTS 70% b. Supervisors required CTS-1 30% or a minimum of one (1), CTS 70% c. Technicians and other installers CTS-1 10% or a minimum of one (1), CTS 40%, AVIXA Recognized AV Technologist 50%. d. No technical staff may be without at least the AVIXA Recognized AV technologist certificate or equivalent independent qualification 4. Unless specifically pre -qualified for the project (see Part 3.1), the AN Contractor shall demonstrate previous experience in the engineering and installation of AN systems for similar projects and provide the following information with their proposal. a. AV project team resumes. b. AV project team industry qualifications and certificates. c. AV project team organizational chart d. Corporate AV industry membership certificates. e. Five (5) project references with telephone and e-mail contact information for past completed projects of a similar nature. This shall include both examples of previous work through photographs and example submittals. f. Sample shop drawings —schematic and layout g. Sample photographs from past projects including front and rear rack assemblies. h. Details of the AN Contractor's workshop(s). i. List of the AN Contractor's workshop tools and test equipment. B. Continuity of Supervision The Contractor shall maintain the same individual in charge of work for the full duration of the project unless illness, loss of personnel, or other circumstances beyond the control of the Contractor intervene. C. Certifications 1. As required, all certifications shall be current, and the organization or individual(s) shall be in good standing with the certifying entity. D. Regulatory Requirements. 1. Obtain all permits necessary for the execution of any work pertaining to the installation or operation of any system equipment by the Owner. Comply with applicable federal, state, and local labor and union regulations. 2. Execute all work in accordance with the National Electrical Code, the National Electrical Safety Code, the Life Safety Code, and all applicable federal, state, and local codes, laws, ordinances, regulations, and requirements including, but not limited to, those of OSHA, EEOC, ATBCB, ADA, ANSI, UL, and the FCC. If a conflict exists between the contract documents and any code or regulation and is reported to the Consultant sufficiently before proposal opening, the Consultant will prepare the clarification required. Where a conflict is reported after the contract is awarded, propose a resolution of the conflict and, upon approval of the change, install the work E. Construction Observation The failure of the Consultant or another representative of The Architect or Owner AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 16 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA to condemn any defective work or material shall not release the Contractor from the obligation to at once tear out, remove, and replace the same at any time prior to final acceptance upon discovery of said defective work or material. F. Safety Site Safety and Personal Protection Equipment a. Contractor shall adhere to all site safety requirements as directed by the Owner, Owner's Representative, Building or Site Supervisor including, but not limited to general project safety training and/or site -specific training for possible contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. b. Contractor shall adhere to all PPE (personal protective equipment) requirements. c. These requirements shall include, but not be limited to, any personnel assigned to the project that may perform work onsite including project engineers, project managers, installers, programmers, and/or other technicians. d. Contractor shall keep all safety certifications in full force until all work is completed and accepted by the Owner. 2. Seismic Safety a. Observe mechanical and electrical support means of all installed equipment as required for the seismic hazard zone for this installation. Refer to Federal Emergency Management Agency (FEMA) Document 303: Recommended Provisions for Seismic Regulations for New Buildings and Other Structures. Also refer to any applicable local building codes. b. All equipment racks are to be anchored with suitable anchors to meet safety standards. c. Appropriate safety attachments as required for overhead mounting of devices. d. Shock and/or vibration isolation of equipment or fixtures as required. 3. Fiber Optic Cable Safety a. The following warnings shall be posted on the job site: WARNING: PERMANENT EYE DAMAGE CAN RESULT FROM LOOKING DIRECTLY INTO A LIGHT BEAM GENERATED BY AN LED OR LASER SOURCE OR INTO THE END OF A CABLE FIBER CONNECTED TO ONE OR THESE SOURCES. CAUTION: LIGHT GENERATED BY THESE SOURCES MAY NOT BE VISIBLE, YET REMAIN HAZARDOUS TO THE EYE. LOOK FOR WARNING LABELS ON SOURCE DEVICES. b. Observe all warning signs on equipment and all written safety precautions in the instruction manual or equipment technical manual. c. Always handle cable carefully to avoid personal injury. Care should be taken with individual fibers to prevent injury to the eyes or penetration of the fibers into the skin. 4. Asbestos Prohibition a. No Asbestos containing materials shall be used under this section. The contractor shall ensure that all materials incorporated in the project are Asbestos free unless specifically authorized in writing by the Owner. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16- 17 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA 1.08 DELIVERY, STORAGE, AND HANDLING A. Delivery and Acceptance Requirements Coordinate with Owner's Representative for any equipment and materials to be delivered on site. 2. All equipment shall be assembled in the Contractor's shop into equipment racks, furniture, or other assemblies, and fully wired and tested before delivery to the site. 3. Do not ship, or cause to be shipped to the site, any material without first ensuring secure dust -free storage facilities are available, and HVAC system is operating. B. Storage and Handling Requirements Coordinate with Owner's Representative for any equipment and materials to be stored on site. 2. Store and protect products and material in accordance with common sense and the manufacturer's recommendations, regardless of location. 3. As needed, provide for a secure storage location for any products and materials stored on site. C. Waste Management 1. Coordinate with the Owner, Owner's Representative, and/or Building Superintendent for the disposal of packaging as well as other debris and waste materials caused by the installation from the site to an approved common trash point or receptacle. 2. Participate in any project construction and demolition waste management plans (LEED). 3. In lieu of any specific project construction and demolition waste management plans, the Contractor is encouraged to develop and maintain an AV waste management plan that diverts equipment packaging and construction waste away from landfills and towards recycling facilities (plastic, cardboard, paper, wood, steel, etc.). The intent shall be to reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials. 4. Keep work area neat and orderly and free from accumulation of waste materials. 1.09 FIELD CONDITIONS A. Ambient Conditions 1. All locations where any portion of the equipment specified in this Section is installed must be temperature and humidity controlled, clean, and dust free. 2. Conditions suitable for office work and equipment shall be acceptable. 3. Do not power up equipment unless you have a source of clean technical power, and the HVAC system is operating correctly. 4. Verify all conditions on the job site applicable to this work. Notify Owner and Consultant in writing of conflicts, discrepancies, or omissions promptly upon AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-18 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA discovery. 5. Specific items will dissipate heat and must be provided with additional airflow and cooling. Make sure adequate HVAC is supplied to equipment spaces to remove the heat generated on a year-round basis. 6. The drawings diagrammatically show conduit, wiring, and arrangements of equipment fitting the space available without interference. If conditions exist at the job site which make it impossible or disadvantageous to install the work as shown, recommend solutions and/or submit drawings for approval showing how the work may be installed. B. Existing Conditions The system is designed to operate correctly given the current/designed physical and acoustic environment of the project site. 1.10 INSURANCE A. Insurance requirements shall be provided in a supplemental document as part of the RFP package. 1.11 WARRANTY AND BOND A. Contractor's Warranty 1. Labor and materials provided under this contract shall be warranted for one (1) year following the date of final acceptance to be free of defects and deficiencies, and to conform to the drawings and specifications as to kind, quality, function, and characteristics. Certain individual pieces of equipment may be covered for a longer period as provided in a specific manufacturer's warranty. Rectify defects occurring in labor or materials within the warranty period by replacement or repair without charge. Projection lamps are excluded from this Warranty unless damage or failure is the result of defective material or workmanship covered by Warranty, or work performed under warranty. 2. Provide two (2) maintenance/site visits within the first one (1) year contractor maintenance period. Maintenance visits to occur approximately 6 months and 12 months after the date of final acceptance. Contractor shall assess the systems and rectify defects occurring in labor or materials within the warranty period by replacement or repair as well as perform any routine maintenance/cleaning without charge. 3. Within the warranty period, respond to service calls within twenty-four hours, and correct the problem within forty-eight hours if at all possible. B. Manufacturers' Warranty 1. Register warranty in the Owner's name for any product with a manufacturer's warranty stipulated in the Contract Documents. C. Extended Correction Period Three months after final acceptance, the Owner reserves the right to direct additional minor changes to the control system software. Such changes shall be made without additional cost to the Owner. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 19 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA D. Bond Requirements 1. See RFP and/or contract documents for project bond requirements. PART 2-PRODUCTS 2.01 OWNER FURNISHED PRODUCTS A. New Products 1. Dell 7060 Micro Computers & Logitech Keyboard/Mouse Combo 2. Granicus Streaming Device B. Existing Products to be Removed and Reused 1. Listen Hearing Assist System a. Listen LT-800 FM Transmitter w/Rack Kit b. Listen LA-122 Antenna c. Listen LR-400 Receivers w/Accessories 2. QSC AD-C821 Loudspeakers 3. Custom Desktop Member Station Millwork w/Integrated Loudspeakers 4. Custom Desktop Council Stations Millwork w/Integrated Loudspeakers C. Existing Products to be Removed and Returned to Owner 1. Middle Atlantic Equipment Racks (Qty 2) a. Equipment Racks, Side Panels, Caster Base, Tops, etc. b. Shelves, Blank Panels, Vent Panels, Cable Management, and Power Strips 2. Marantz PMD580 Compact Flash Recorder (Qty 1) 3. Pioneer BDP-V6000 Blu-ray w/Rack Kit (Qty 1) 4. HP ProCurve Network Switch (Qty 1) 5. Pipeline Video Capture Device w/Power Supply (Qty 1) 6. Shure SLX Wireless Microphone Systems (Qty 2) a. Receivers, '/2 Wave Antennas, Rack Kit, Transmitters, Power Supplies, etc 7. Ensemble Designs BrightEye 75 HD/SD Analog to Digital Video Converter and Analog Audio Embedder w/Power Supply (Qty 1) 8. Lectrosonics PA8 Audio Amplifiers (Qty 2) 2.02 EQUIPMENT A. Description 1. See "APPENDIX A: AN SYSTEMS FUNCTIONAL DESCRIPTION" B. Equipment 1. See "APPENDIX B: AN SYSTEMS EQUIPMENT LIST" AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 20 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA 2. See "APPENDIX C: ADD -ALTERNATE #1 - 86" TV EQUIPMENT LIST" C. Substitute Equipment Materials and products specified herein establish the overall performance level as well as provide the physical appearance, component part quality, construction quality, and background of proven reliability desired by the Owner and therefore define the "minimum standards of quality" required for this project. Substitutions will generally not be considered unless the materials or products have been discontinued. 2. If equipment or material other than that specified is proposed, furnish the Consultant a written request including a detailed specification sheet and any samples or information required for evaluation. Samples of specified equipment may be required as well as the proposed substitute to facilitate comparison. 3. If required as a condition of accepting the proposed substitute, the Contractor shall Warranty the quality of the substitute item. Contractor shall recognize function, performance, appearance, size, utility of service, and accessory requirements are based upon the model or product cited in the specifications, and that if a substitute product varies in any respect and is approved, any additional cost incurred by such approval shall be borne by the Contractor; 4. Approval of a substitute, if and when given, does not relieve the Contractor, material/product supplier, or manufacturer of any responsibility whatsoever; but rather, they jointly assume the responsibility the material/product installed will meet the functions, intent, and performance required by the contract drawings and specifications; 5. Delay in the delivery of any substitute product or material shall not be cause for change to the construction schedule or completion date. 6. The drawings and specifications are based on specific equipment, processes, and arrangements. At no additional cost to the Owner, furnish accessories, parts, and equipment, and perform all work necessary, for the proper functioning and fit of any approved substitute item to the purpose, arrangement, and intent originally indicated. 2.03 ACCESSORIES A. Equipment lists may exclude minor components in the interest of conciseness and clarity. Where these components are integral to a functionally and aesthetically complete system, the Contractor shall without additional compensation provide them as outlined herein. This shall include manufacture's rack mount kits, power supplies, rack blank/vent panels, power distribution, cable management, etc. PART 3 -EXECUTION 3.01 INSTALLERS A. General All installation work shall be performed by experienced AV Contractors skilled and practiced in the proper techniques required for the activity involved. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-21 Project #IS71219 05/15/2019 B. Installer List Council Chambers AV Remodel 2019 City of Palm Desert, CA The following is a list of Contractors pre -approved to provide and install the systems listed herein: a. Spinitar 16751 Knott Avenue La Mirada, CA 90638 Tel. (602) 501-5134 Contact: Christopher Jenkins b. Western Audio Visual 1592 N. Batavia Street, Suite 2 Orange, CA 92867 Tel. (949) 584-7028 Contact: Hailey Schellin c. Ford Audiovisual 920 E Madison St, Suite 140 Phoenix, AZ 85034 Tel. 602-723-9800 Contact: Jeffery Sussman C. Substitution Limitations Other Installers shall be considered acceptable provided they can demonstrate the qualifications outlined above. Refer to Part 1, Article 1.7 Quality Assurance", Paragraph "A. Qualifications." 2. Submittal of qualifications shall not mean acceptance or approval to propose on the systems defined herein. 3.02 EXAMINATION A. Verification of Conditions Verify all conditions on the job site applicable to this work. Notify Owner and Consultant in writing of conflicts, discrepancies, or omissions promptly upon discovery. 2. All locations where any portion of the equipment specified in this Section is installed must be temperature and humidity controlled, clean, and dust free. 3. If conditions exist at the job site which make it impossible or disadvantageous to install the work as shown, recommend solutions and/or submit drawings for approval showing how the work may be installed. B. Pre -installation Testing Install equipment into racks and furniture consoles and fully wire and test before delivery to the job site. If it is impractical to ship certain items installed in a console or rack, assemble, wire, and test in shop; then remove, ship separately, and reinstall at site. 2. Permanently mount all equipment; no equipment shall be installed loose or AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 22 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA secured or suspended only by signal or power cables. 3. Panels or equipment mounted on rear rack rails shall not block clear access to the rear of any front mounted components or their wiring. 4. Mount racks on rubber isolation mat (Mason Industries Super W Pad or equal) when installing on steel or concrete floors, unless the rack is to be equipped with wheels (casters). 3.03 PREPARATION A. Protection of In -Place Conditions 1. The contractor shall make reasonable accommodation to protect the surrounding areas and surfaces during the installation of the A/V Systems. 2. If the integrity of the surrounding areas and/or surfaces is in jeopardy, the AN contractor shall notify the Owner or the Owner's Representative, Building or Site Supervisor immediately and coordinate an appropriate action plan to protect the surrounding areas from damage. B. Demolition/Removal 1. Coordinate with the Owner or the Owner's Representative any requirements for the demolition/removable of existing A/V systems or equipment. 2. Coordinate the storage of any identified equipment to be removed and reused for the project. 3.04 INSTALLATION A. General 1. Execute all work in accordance with the NEC, NESC, and with all local and state codes, ordinances, and regulations. 2. Coordinate work with all other trades to avoid causing delays in construction schedule. Expedite the delivery of equipment and materials and provide additional labor if required to meet the construction schedule. 3. Mount all equipment to be installed over public areas in a manner adequate to support the equipment loads with a minimum 10:1 safety factor or as specified by the Owner, using methods approved by the Owner. Awarded contractor to comply with all safety requirements. Requirements to be supplied to AV Contractor upon award. 4. Colors and finishes of all exposed and custom fabricated items and labels to blend in with the surroundings as approved by the Owner in the submittal process. 5. Install equipment in accordance with manufacturers' recommendations. Ensure that levels and impedances are properly matched between components. Verify that projector distances and lenses are appropriate for the corresponding screen sizes. B. Mechanical All equipment and enclosures shall be aligned, matched, true, plumb and square. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 23 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA All equipment, except portable equipment, shall be permanently attached and held firmly in place. Supports shall be designed to support loads with a safety factor of at least three, without sag or deflection. 2. Permanently mount all equipment; no equipment shall be installed loose or secured or suspended only by signal or power cables. 3. Panels or equipment mounted on rear rack rails shall not block clear access to the rear of any front mounted components or their wiring. 4. Mount racks on rubber isolation mat (Mason Industries Super W Pad or equal) when installing on steel or concrete floors, unless the rack is to be equipped with wheels (casters). 5. Provide ventilation adequate to keep the temperature within the rack(s) below 85 degrees F. Provide an approved low noise ventilation fan in each rack only if the temperature in the rack rises above 85 degrees when powered continuously for five hours. 6. Cover edges of cable pass -through holes in chassis, racks, boxes, etc., with rubber grommets or Brady GRNY nylon grommetting. C. Wiring 1. Coordinate the final connection of power and ground wiring to junction box(es). Power and ground wiring shall be hardwired directly to power contactors and ground busses to ensure uninterrupted operation. 2. Execute wiring in strict adherence to the highest standards of acknowledged industry and professional practice. 3. Take whatever precautions are necessary to prevent and guard against electromagnetic and electrostatic hum. For permanently installed line level audio circuits, ground cable shields at the output of the source device and float at the input of the destination device. If RF interference is encountered, place an RC network between the floated shield and the input ground. 4. All wire, after being cut and stripped, shall have the wire strands twisted back to their original lay and terminated by approved soldered or mechanical means. No bare wire ends are acceptable. Cables with wire shields, braid or wound, must use all the wire conductors for shield termination, and not just a drain wire or some of the shield strands. Connections not following this requirement will be rejected. Foil shielded cables only provided with a drain wire must use the drain wire for shield termination. Fold shields or drain wires not connected back over the cable jacket and cover with heat shrinkable tubing; do not cut off unused shields or drain wires. Dress the shield or drain wires with Teflon tubing, and install heat shrinkable tubing over the junction of the fanout and outer jacket. 5. Exercise care in wiring; damage to cables or equipment will not be accepted. Isolate cables of different signal types or levels, and separate, organize, and route cabling to prevent crosstalk or feedback oscillation in any amplifier section. In all cases, separate wiring for microphone signals, audio line level signals, loudspeakers, video, control, RF, and power into groups. 6. Rack Wiring. Contractor shall follow AVIXA F502.01:2018 "Rack Building for Audiovisual Systems" standard. Adhere to all cable management and signal separation recommendations/best practices. Run wiring vertically inside AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-24 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA adequately sized plastic raceways, or employ an equivalent bundling and support system, to maintain a clear and organized appearance. Support all horizontal wiring using horizontal support bars as needed. Route AC cords directly to the side of the rack, under or over the equipment chassis, and then back to the power outlets, tying the excess cord only at the side of the rack. Organize cabling so that signal and AC cords are in the least possible proximity. 7. All wiring and connections shall be completely visible and labeled in the rack. B. No splices shall exist in any length of cable run unless specifically shown on the contract drawings at a designated junction enclosure. All cables shall originate and terminate at active or passive devices. Where several devices are in close proximity, utilize approved housing -to -housing connectors and adapters; all such adapters shall be rotational. 9. Do not wire any cables with a polarity reversal between connectors, end for end, unless required by the manufacturer for operation. Connect all loudspeakers electrically in phase and of consistent polarity, using the same wire color code for loudspeaker wiring throughout the project. Note that different manufacturers employ differing color coding conventions for driver terminals. Wire all drivers - cone, compression, ribbon, or any other type - so that a positive voltage at the power amplifier "+" terminal causes a positive acoustic pressure out of the driver/enclosure system. 10. For cables terminating at an interface or connection plate mounted on or in an enclosure, dress cables so as to allow removal of the plate from the enclosure and sufficient cable length for service or re -termination. In these circumstances, the plate shall set on the floor or freely swing clear. 11. Install cables without sharp bends or distortion. Where limited clearance prevents the manufacturer's recommended minimum bend radius from being observed, such as in junction boxes, provide a right angle or similar connector. 12. All expansion loops must be neat, and roughly the same size to provide for ease of servicing in the future. 13. In pulling cable, do not bend to less than the manufacturer's recommended radius. Employ temporary guides, sheaves, rollers, or other tools to prevent excessive tension or abrasion to the cable(s). Pull cable with tensions, tools, and lubricants recommended by the manufacturer. 14. Prepare television system semi -rigid cable in accordance with manufacturer's recommendations, with approved coring, cleaning, preparation and assembly tools. Do not score center conductor; utilize tubing cutters to trim the outer conductor. Completely de -burr all conductors. Utilize approved center conductor cleaning tool; degrease the connector and cable prior to termination. Torque connectors to the manufacturer's recommended values. 15. All coaxial or triaxial video or RF connections to plates or panels in boxes, pedestals, racks or any similar location with limited clearance that would prevent that the associated cable manufacturer's minimum bend radius from being strictly observed shall be provided with the appropriate right angle or similar adapter as appropriate. 16. All cable installed under this specification which is to be terminated by others for "future" or Owner Furnished Equipment (OFE) in racks, shall be provided with AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-25 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA ten (10) feet of slack when dressing to the location of future or OFE equipment. All cable installed under this specification which is to be terminated by others shall be provided with twenty (20) feet of slack when ending in a rack enclosure. All cable provided under this specifications, to be terminated by others, shall be provided with fifty (50) feet of slack when terminating in an equipment room without a clear point of demarcation, or in a group of racks where the destination is not known. 17. Fiber Optic Cables a. Consult Sumitomo document #SP-F01-001, Issue 4 for installation guidelines. b. All fiber splicing shall utilize the fusion splice method. The maximum allowable loss per fusion splice shall be 0.2 dB average. c. The bend radius shall be no less than manufacturer's specifications. d. The total degrees of turn shall be no more than the manufacturer's specifications. e. The pull force shall be no more than the manufacturer's specifications. f. When each cable reel arrives from the manufacturer, it shall have a Factory Lot test report attached to it. Factory Lot test reports, for example, Belden Wire & Cable Company Fiber Tracking System, shall be copied to the owner and their representatives upon acceptance of the cable on the site. g. The use of the cable shall be tracked from the reel to each pull. Paperwork, in chart form, shall include the Reel Number, Code ID, and each conduit designator and description that includes cable from the specific reel. h. Splices, terminations, and any patching shall take place after the location has been declared "Dust Free" or "Clean." Special care shall be taken to ensure the integrity of the fiber and connection(s) when these conditions cannot be met. Fiber found to be broken in the length of the run after the pull shall be deemed to be damaged during the installation process and replaced at the expense of the installer. 18. Network Wiring: a. Unless specifically called out for a connection, all data cabling is to be Unshielded Twisted Pair (UTP). The minimum acceptable performance rating for UTP and all associated connectors is Category 6 (CAT 6). All completed Links including all components making up a complete interconnection link between two Ethernet components shall be tested after installation and certified to meet or exceed CAT 6 Gigabit Ethernet performance requirements. 1. Full test results for every complete Link, Permanent Link, and Patchcord must be made available in printed form as part of the Record Documentation before Acceptance Testing. b. No UTP cable may exceed 90 meters in length. All permanently installed UTP must be 4-pair solid wire and terminated according to the connector manufacturer's instructions in outlets certified as meeting CAT 6 or better specifications. c. In no circumstances may solid wire UTP be terminated in RJ-45 plugs not certified by the manufacturer specifically for solid wire. d. All UTP patch cords must be factory made and certified by their manufacturer as meeting at least CAT 6 performance. These patch cords must be made with 4 pair stranded wire. Unless otherwise noted, all patch AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-26 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA cords must be provided with strain relief boots. e. All UTP wiring shall follow the EIA/TIA 568E color code. f. Under no circumstances may more than 1/2" of the pairs in a UTP be untwisted as terminated in a connector, nor may more than 1/2" of a pair be exposed past the end of the jacket of the UTP. g. Interconnections between Ethernet switches may require that the patch cord at one end be a crossover cable. If the switches in question require a crossover cable for proper operation, supply the appropriately wired cable at one end. All crossover cables must be prominently marked indicating they are not normal straight -through cables. h. All UTP cabling must be installed following industry standard minimum spacing requirements for specific electromagnetic interference sources as outlined in the NEC/NFPA 70 Article 800-52. i. Ordinary plastic cable ties are not permitted on all UTP cabling. Plastic cable ties or anything else that can pinch the jacket of the UTP must be avoided. Use Velcro strap type ties as required. j. UTP cables must never be combed out so neatly that they run parallel to each other. Such a practice can cause "alien crosstalk' between the cables that run next to each other. Instead let the UTP cables run with a loose and random lay. k. UTP cables must never be bundled snugly together. I. UTP cables installed in Conduit or other wire ways must never exceed 40% fill. m. UTP cables must never have more than 25 lbs. (or the manufacturer's maximum recommended pull force if lower) of force applied while pulling into conduit or at any other time during installation. n. UTP cables must never be bent sharper than a 1" radius (2" diameter) bend even if straightened out afterward. D. Connections Microphone, Audio line, video, time code, MIDI, RF, and digital signal or control wiring shall be continuous and unbroken from connector plate/chassis to chassis/patch panel, unless a terminal, connector, or other splice is explicitly shown on the contract drawings. 2. Make all joints and connections with rosin core solder or with mechanical connectors approved by the Consultant. 3. Make all solder connections with rosin core solder; employ temperature controlled soldering irons of wattage appropriate to the specific work involved. Soldering guns or unregulated irons are unacceptable. 4. Where spade lugs are used, crimp properly with ratchet type tool. Spade lugs shall be gold or nickel plated to match the receiving binding post or terminal. 5. Conventional non-ratcheting crimping tools are not acceptable. 6. Where terminal blocks are used, utilize Phoenix Contact MBK 2.5/E or MBK 5/E mounted on NS 35/7.5 DIN mounting rails or approved equal. All terminal blocks shall be fully exposed, labeled, and mounted on 1/2" birch veneer plywood board primed and painted two coats latex enamel or rack panels. 7. Make all connections with connectors specified herein. Employ XLR and BNC connectors wherever possible in preference to screw terminals, terminal strips, or AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-27 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA phono connectors. All connectors employed shall be designed specifically for the cable in use. 8. Make connections to loudspeaker transformers with properly sized closed end connectors crimped with factory approved ratchet type tools, or terminal blocks. 9. All coaxial connectors shall be installed using the appropriate hexagonal die crimp tool or compression crimp tool that is correct for the combination of cable and connector. Non-ratcheting type crimping tools are not acceptable; the presence of such tools on the job site shall be interpreted as evidence of mechanical connections made incorrectly, and provide sufficient grounds for rejection of all mechanical connections in the system. 10. "Electrical" adhesive backed tape is not acceptable for any purpose whatsoever. Adhesive cable tie anchors are only acceptable when employed for routing, not support; in any case, do not fasten anchors to any equipment chassis. 11, Do not employ connector adapters. Wire nut, "Scotchlock," or "Beanie" connectors are not acceptable for any purpose. E. Labeling Provide engraved plastic Lamicoid (or similar) identification labels at the front of all equipment mounted in racks. Install labels in a neat, plumb, square, and permanent manner. Mount labels on the equipment rack, not on the equipment, or on blank rack panels if so directed. Where the rack vertical frame has a slightly recessed mid -section, match label width to the recessed section width. Similarly, provide engraved labels at the rear only of equipment mounted in furniture consoles or frames. Equipment labels should have two items of information; the first identifying the equipment type, i.e., "POWER AMPLIFIER"; and the second showing the wiring diagram code, i.e., "AMP1-01". 2. Unless otherwise noted, engraving on plates, panels, and labels shall be 1/8" high, and the typeface, sans serif. Use white letter fill on dark panels or push- buttons, and black fill on stainless steel or brushed natural aluminum plates or light-colored push -buttons. Fill safety or operational warning labels orange. 3. Embossed labels are not acceptable for any purpose. 4. Label all cables except patch cords at both ends with self -laminating labels. Handwritten labels are not acceptable. Contractor shall follow AVIXA F501.01:2015 Cable Labeling for Audiovisual Systems standard. Locate labels within 2" of the connectors, consistent with regard to orientation, dress, and distance from the connector. For connections to in -room panels or floor boxes, label on cable should match panel engraving. For connections to portable equipment, label on cable should match device engraving. 5. Label each terminal strip with a unique identification code in addition to the numerical labels for each terminal (Phoenix Contact BN series). Show terminal strip codes on the system wiring diagrams. 3.05 RE -INSTALLATION The process of acceptance testing may necessitate the moving or adjustment of certain components; perform without claim for additional payment. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 28 Project #IS71219 05/15/2019 3.06 FIELD QUALITY CONTROL A. Field Tests and Inspections Council Chambers AV Remodel 2019 City of Palm Desert, CA Verify the following before beginning actual tests and adjustments on the system a. All electronic devices are properly grounded. b. All powered devices have AC power from the proper circuit. All dedicated AC power circuits are properly wired, phased, and grounded. c. Insulation and shrink tubing are present where required. d. Dust, debris, solder splatter, etc. is removed. e. All cable is dressed, routed, and labeled; all connections are properly made and consistent with regard to polarity. 2. Grounding System Tests. a. Measure the DC resistance between the technical ground in any equipment rack or console and the main building ground. Resistance should be 0.15 ohms or less. b. Verify that the Owner where applicable has connected the technical ground to building ground at only one location with 4 AWG or larger wire. c. Measure the DC resistance between the signal ground at any connector plate and the conduit system. d. Identify and correct any problems if within the A/V System scope of work; notify the Owner if a problem is in a related area of work. 3. The system shall be completely free of hum, parasitic oscillation, ground loops, RF interference, and any audible noise and distortion problems. B. Non -Conforming Work All identified non -conforming work shall be documented and remedied at no additional cost to the owner. 2. Any non -conforming work shall be subject to additional verification prior to acceptance. 3.07 SYSTEM START-UP A. Audio System Tests Perform the following tests and adjustments, supplying all test equipment required. Set for slow meter damping and A or Linear weighting as required. Document all tests and complete measurement results including wire number, date, test equipment used, operator, and test results. If any problems are detected in testing, correct the problem, and retest. Make corrections necessary to bring the system(s) into compliance with the specifications. a. Test all cables as installed for shorts between conductors or to building ground and opens. b. Measure the loop resistance of all loudspeaker cables. c. Measure and record the impedance of each loudspeaker line circuit terminating at the equipment rack, with loudspeakers connected, over the entire frequency range from 20 Hz to 20 kHz. d. Adjust the gain of each active device to provide an optimum signal-to-noise ratio and 18 to 20 dB headroom. Record input and output levels at each step AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 29 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA in the signal chain. e. Measure and record overall system hum and noise level of each mic or line amplifier with controls set so that -50 dBu microphone input or +4 dBu line level input would drive the system to full amplifier output. Terminate inputs with appropriately sized shielded resistors (150 ohms typical) for this test. f. Measure and record system electrical frequency response for each input channel through power amplifier output with all filters and equalization bypassed in the DSP. Deviation shall not exceed f .75dB within the range 20 Hz to 20 kHz. g. Check system to assure freedom from oscillation or stray RF pickup. Check all inputs without signal and with 500 Hz sine wave driving system to full average output. Detect unwanted signals on an oscilloscope at rack termination and over single loudspeakers connected at the farthest distance from the rack for each loudspeaker line. h. Apply a sinusoidal sweep signal to each loudspeaker system, sweeping from 50 to 5000 Hz at a level 10 dB below full amplifier output, and listen for rattles or objectionable noise. Correct any rattles or noise that is discovered. i. Check the polarity of all loudspeakers with an electronic polarity checker, and by applying music program or pink noise signal to the system while walking through the transition areas of coverage from one loudspeaker to the next. The transition should be smooth with no apparent shift in source from one loudspeaker to the next. j. Wireless Systems 1. Ensure that all wireless systems operate on different frequencies from each other and from any other transmitters in the area. 2. Coordinate frequency selection for compatibility with local RF environment. B. Video System Tests 1. Verify performance of all video connecting cables, as specified herein. Continuity tests are not acceptable. Document all tests and complete measurement results including wire number, date, test equipment used, operator, and test results. If any problems are detected in testing, correct the problem, and retest. Replace any defective cable without claim prior to continuing tests. 2. Perform video signal parameter tests on individual items of equipment, and the work as a whole in accordance with EIA, SMPTE and AES Recommended Practices and other recognized standards as listed under REFERENCES. a. Projection Systems Performance 1. Verify optical performance of projection devices to ANSI Standards using standard test signals connected directly to the device under adjustment. 2. Set devices level and true prior to adjustment, and mark positions for future reference. 3. Complete device's optical adjustments for focus, centering, geometry and registration prior to applying any electronic corrections. 4. Do not under any circumstances apply corrections at signal sources to compensate for errors in device alignment or adjustment, or timing errors in source material. 5. Set brightness and contrast using reference test signals connected directly to the device. Adjust grayscale and grayscale tracking using AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 30 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA ramp or stair step test signals. Set overall brightness and contrast with pluge and white flag signal. 6. Reconnect the projection devices to the system as a whole and verify performance of completed installations. Check that registration has not been affected by timing errors occurring elsewhere on all sources. Verify that source signal levels are consistent and match the reference levels set by the standard test signals. Correct any deficiencies noted. 7. Record lamp operating hours at the conclusion of adjustments. b. Video System Tests 1. Test and document all links for compliance with SMPTE standards. 2. Verify performance of all video cables to SMPTE digital video standards using a test signal (Color Bars) connected directly to the device under adjustment. a) Use professional level 0.800 volt peak -to -peak digital video test source with digital test signals. Recommended Tektronix SPG700 with OPT SDI (provides 3G/HD/SD-SDI signal outputs). b) Use professional waveform monitor with physical layer test abilities. Recommended Tektronix WFM2300 with Option 3G (provides 3G HD -SDI signal inputs). 3. Perform Eye -pattern Testing a) Verify cable length and cable loss. Compare measured cable loss to distance and manufacturer's stated performance of the entire video link (cable and connector). b) Verify signal amplitude, risetime, and overshoot. c) Eye -pattern shall be open (or equalized open) and symmetrical. d) Observe any overshoot and undershoots on the eye display indicating improper termination 4. SMPTE Digital Video Performance Standards a) Analog NTSC Video: Test all links to SMPTE 259M standard. b) SD -SDI (SMTPE 259M): 30 dB loss at 1/2 the data clock frequency (135 MHz) c) HD-SDI/3G HD -SDI (SMPTE 292M/SMPTE 424M): 20 dB loss at 1/2 the data clock frequency (743 MHz/1.485 GHz). c. CATV System Tests 1. Check all paths and outlets for appropriate compliance with the Performance Standards. Measure levels at all feeder termination points. Compare actual values to design calculations and investigate any difference of more than 2 dB, rectify or justify these discrepancies to the satisfaction of the Owner. Document all tests and complete measurement results including wire number, date, test equipment used, operator, and test results. If any problems are detected in testing, correct the problem, and retest. 2. Television Distribution System amplitude standards: a) Minimum visual sync -tip level: +3 dBmV b) Maximum visual sync -tip level: +10 dBmV 3. CATV Cable Testing: Each Trunk Cable line shall be inspected for proper termination: a) Using a standard TV receiver connected to each outlet, observe picture quality. No visible components of cross modulation (windshield wiper effect), ghosting, noise, or beat interference shall AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 31 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA appear on the screen of the receiver tuned to any normal signal. b) Carrier -to -noise test shall employ an approved field strength meter. Measurements shall be made at the termination of each Trunk Cable and system extremity. With the normal levels in the system, the field strength meter shall be tuned to the picture carrier of each channel in turn, and the meter reading noted. Tune the field strength meter to an unused portion of the spectrum within the passband, read the level of remaining noise in the absence of the signal and algebraically add the meter bandwidth correction factor. Record the difference between the two readings. Provide calculations or the manufacturer's data concerning the bandwidth correction factor. c) System flatness, both forward and reverse, test shall employ an approved high-level sweep transmitter receiver pair. Sweep measurements shall be taken at the termination of every branch line termination in the system. Where possible, record sweep results by photographic or computer data logging means. C. Fiber Optic Tests An OTDR shall be used to check each strand for: a. Loss per Unit Length: in dB. b. Splice and Connector Evaluation. c. Possible Fault Location. 2. Test results from the OTDR shall be bound and copied to the owner and their representatives. A strand -per -data file index shall be included. 3. Diligence shall be employed to produce efficient testing: i.e., connectors shall be checked with a microscope to determine whether a bad test run is a bad connector, bad termination, dirt, or a connector needing polishing. 4. Connectors shall remain capped or otherwise protected, when not in use. D. Network Tests Check all paths and outlets for appropriate compliance with the Performance Standards. Document all tests and complete measurement results including wire number, date, test equipment used, operator, and test results. If any problems are detected in testing, correct the problem, and retest. 2. Certify all data cables to Category 6 (Draft 9a) or better using a tester capable of 350 MHz measurements such as Fluke DSP-4300, Agilent WireScope 350 or equivalent. E. Report 1. Upon completion of the initial tests and adjustments, submit a written report of tests to the Consultant along with all documents, diagrams, and record drawings required herein. The Report shall include the date of each test, pertinent conditions such as control settings, etc., test circuit, and test equipment employed. In addition, submit written notification that the installation has been completed in accordance with the requirements of the Contract Documents, and is ready for acceptance testing. AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 32 Project #IS71219 05/15/2019 3.08 COMMISSIONING Council Chambers AV Remodel 2019 City of Palm Desert, CA A. Provide the following test equipment on site and available to the Consultant during commissioning. Assure scaffolding or other temporary access equipment is in place if needed for inspection. 1. Tools, including screwdrivers, pliers, cutters, wire strippers, nut drivers, ratchet crimpers, heat gun, controlled temperature soldering unit, ladders, flashlights, measuring tapes, electric drills, long and short precision levels, etc. 2. Sound Pressure Level Meter. The meter shall meet ANSI S1.4 1971 Type 1 standards, with an octave band filter set and A, C, and Linear weighting filters. Provide stand for Type 1 microphone, and cables and interfaces to allow it to be used with the sound level meter, time windowed acoustical measurement system, or STI measurement device. 3. Portable Audio Spectrum Analyzer. Handheld unit with graphical display and internal filter sets for standard third -octave band response measurements. 4. Sine Wave Generator. Output: +4 dBu, 5 Hz to 50,000 Hz with less than 0.03 % THD into any load. 5. Pink Noise Source. Equal energy per octave bandwidth over the band 20 - 20,000 Hz, t1 dB (long-term average) at 0 dBu output. Stability: t2 dB per day. 6. Multimeter. Measurement range, DC to 100,000 Hz, true RMS reading, 100 mV to 300 V, 10 ma to 10A, direct dB reading, frequency counter. Acceptable: Fluke 8060A or equal. 7. Headphones. 8. Programmable Video and Audio Test Generator with SDI/HD-SDI Output. a. SDI/HD-SDI, RGBHV, component video, S-video, and composite video output. b. Video test patterns including multiple crosshatch patterns, color bars, PLUGE, crop patterns, geometry, grayscale, and alternating pixel patterns, as well as flat field, window, checkerboard, hum bar, and Patented CTF Contrast Transfer Function patterns with adjustable levels. c. Selectable output rates, including high -resolution computer -video, HDTV, and NTSC/PAL video. d. Audio test signals including sine waves, square waves, pink noise, white noise, polarity, frequency sweeps, and sine wave bursts with selectable frequencies and output levels. e. Acceptable: Extron VTG 400D or equal. 9. Programmable Video and Audio Test Generator with DVI-D/HDMI Output a. DVI, RGBHV, component video, S-video, and composite video output. b. Displays native resolution of the DVI device when new EDID data is received. c. Video test patterns including multiple crosshatch patterns, color bars, PLUGE, crop patterns, geometry, grayscale, and alternating pixel patterns, as well as flat field, window, checkerboard, hum bar, and Patented CTF Contrast Transfer Function patterns with adjustable levels. d. Selectable output rates, including high -resolution computer -video, HDTV, AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 33 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA and NTSC/PAL video. e. Audio test signals including sine waves, square waves, pink noise, white noise, polarity, frequency sweeps, and sine wave bursts with selectable frequencies and output levels. f. Acceptable: Extron VTG 400DVI or equal. 10. Portable Video and Audio Generator and HDMI Analyzer. a. HDMI Tx/Rx enabled testing of HDMI sink/source devices up to 300MHz. b. Test analog RGB video for PCs. c. HDMI 2.0 4:2:0 Testing. Generator patterns with 4:2:0 pixel encoding with 4K formats at 60Hz. d. HDCP Verification. Show HDCP test on the sink. Show each of the key steps in authentication. e. EDID Verification. Read sink EDID in human text, run partial EDID compliance test. f. Aux Channel Monitoring. View hot plug events, EDID exchange, HDCP transactions and CEC message exchange with sink. g. Status bar showing HDMI Out status. h. Cable & Link Test (loopback). i. 7" color touch screen. j. Acceptable: Quantum Data 780E with Aux Channel Emulation and Network Analyzer optional feature package. 11. Adapter and test lead kit to allow any of the above to be connected to any circuit or connector in the system. 12. Wire number machine as used to produce all the wire numbers for the project. B. Have on site during acceptance testing all parts and components that may be required to make system repairs and minor modifications to bring the system in the Consultant's opinion into compliance with the Specification. At a minimum these parts shall include: All types of connectors used in the system. Plus, straight and right angle XLR 3, 4, and 5 pin connectors of both sexes, straight and right angle'/4" phone 3 conductor connectors of both sexes, RCA connectors of both sexes, "F" connectors, and BNC connectors, even if not used in the system. 2. All types of wire used in the system. 3. All types of hardware used in the system, plus an assorted hardware kit. 4. All types of fuses used by equipment in the system. C. Commissioning will include the operation of each major system and any other components deemed necessary. The contractor will assist in this testing and provide the test equipment specified herein. Contractor shall provide at least one technician available for the entire commissioning period, at any time of the day, to assist in tests, adjustments, and final modifications. Furnish all labor, tools, and material required to make any necessary repairs, corrections, or adjustments. D. In the event the need for further adjustment or work becomes evident during acceptance testing, the Contractor will continue his work with a full labor complement until the system is acceptable, at no addition to the contract price. If approval is delayed because of defective equipment, or failure of equipment or installation to meet the AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 34 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA requirements of these specifications, the Contractor will pay for additional time and expenses of the Consultant at the Consultant's standard rate in effect at that time, during an extension of the acceptance testing period. 3.09 CLEANING A. Remove all unnecessary tools and equipment, unused materials, packing materials, and debris from each area where Work has been completed unless designated for storage. B. Clean all areas around system equipment and be sure that the inside of each equipment rack is free of wire stripping and other debris. 3.10 CLOSEOUT ACTIVITIES A. Demonstration 1. Upon completion of the Work, the Owner may elect to verify test data as part of the acceptance procedure. Provide personnel and equipment, at the convenience of the Owner, to reasonably demonstrate system performance and to assist with such tests without additional cost to the Owner. B. Training Provide eight (8) hours instruction in two (2) four hour blocks to Owner designated personnel on the use and operation of the system. This training must be provided in accordance with a schedule acceptable to the Owner. The instructor should be fully knowledgeable and qualified in system operation. The System Reference Manuals should be complete, approved, and on -site at the time of this instruction. C. First Use The AN Contractor shall provide a person familiar with the system to be present at the first formal use of the system. 3.11 PROTECTION A. The contractor shall make reasonable accommodation to protect the AN equipment and completed work after installation, but prior to acceptance by the Owner. B. When the integrity of the installation is in jeopardy, the AN contractor shall notify the Owner or the Owner's Representative, Building or Site Supervisor immediately. C. Protection methods shall include, but not be limited to, the wrapping or "bagging" (in plastic) and/or the temporary removal of major equipment, wiring, and portable equipment. 3.12 ATTACHMENTS A. None END OF SECTION AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 35 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA APPENDIX A: AUDIO VIDEO SYSTEMS FUNCTIONAL DESCRIPTION Overview: The Council Chambers is the main public space in the City of Palm Desert City Hall building complex. The room currently is used by City of Palm Desert Council and staff for public council meetings, as well as non -council board meetings and occasional staff meetings/presentations. The room has a raised dais for five council members and is flanked by two lower dais sections for staff with five and two seats respectfully. The existing system was installed in 2011 and consists of a mix of new as well as slightly older technologies that were already in place from pre-2011 repairs/remodels. Existing Systems and Demolition: It is the intent that the entire system be demolished and replaced with new up-to-date systems. Several items from the existing audio video system shall be reused since they are still in excellent working order. These items are defined herein as well as in the associated project drawing. This shall include the Council Chambers primary ceiling loudspeakers, the desktop loudspeaker stations (wooden enclosures and loudspeakers only), the press audio plate, the lectern and associated LED signal lights, and the wireless FM hearing assistance system. In addition, some existing equipment shall be identified by the Owner as "tagged" and shall be removed during demolition and returned to the owner to be reused/repurposed in other City of Palm Desert systems. All other audio system components are end -of -life and shall be removed by the AV contractor and disposed of as part of the scope of this project. The AV contractor shall include the demolition of all existing systems as well as the disposal and/or recycling of all materials including a -waste as part their proposal. It is the intent that all cabling, metals, and electronics/e-waste are disposed of appropriately and responsibly. The City of Palm Desert shall provide new flooring and paint as needed for the AV Control Room. Audio Systems: The new audio system shall function similarly to the existing system. The system shall consist of microphones and compact loudspeakers at every dais position as well as at the lectern. The system shall operate as a full mix -minus system allowing an unlimited number of open microphones without feedback or the need to mute the local loudspeakers at each dial position. Each dais station shall include a new push -to -talk button. This button shall be a momentary button with an LED that shall communicate with the AV control system to turn on each microphone. This button shall be disconnected from the microphone and used for signaling and control only allowing for both "instant on" as well as "request to speak" (RTS) functions to be programmed into the system. In "instant on" mode any time the button is pushed the microphone shall be turned on and the button LED will illuminate green. In RTS mode any time AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-36 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA the button is pushed it puts the microphone into a speaker queue and flashes the button LED. When the member is recognized to speak (by the clerk or meeting chair) the microphone shall turn on and the button LED will then illuminate solid green. Mode selection and queue management shall be performed by the Clerk and/or Mayor depending on final DSP programming. The new audio system shall be supplied with a new QSC network -based digital audio processor (DSP), external network 1/0, network audio amplifier, and low wattage multi -channel audio amplifiers. The DSP shall serve as both the digital signal processor for audio as well as the control system processor. The DSP shall also be equipped with and internal media drive for audio recording. All meetings shall be recorded onto the media drive and then uploaded to a shared City of Palm Desert network folder. The new audio system shall also replace the lobby loudspeakers with new loudspeakers and grilles. The existing back cans and conduit infrastructure shall be reused. Video Systems: Both the presentation and broadcast video systems shall also undergo a comprehensive remodel and replacement. This shall include a full update to the digital video cameras, new broadcast controls/switcher, new digital endpoints (inputs and outputs), a full digital video distribution/switching system, new 16:9 monitors on the dais, a new direct view LED video wall, and an add -alternate for a secondary 86" LED TV. The intent is to create a new video system that is up-to-date and that can display widescreen HD digital video formats. The existing video system for the Council Chambers is an old 4:3 aspect ratio system, and although the system has somewhat high resolution (1400x1050), it is not capable of showing native 16:9 content without letterboxing or reducing the screen resolution. This includes the existing 17" desktop displays and the current large 124"x93" acrylic rear projection screen (and video projector). To allow for high definition 16:9 images to be displayed on the dais, the current desktop monitors shall be replaced with new 15" HD (1920x1080p) desktop monitors. The new monitors shall have a lower profile and provide better visibility for the council members and seated audience members. The existing video projector and screen shall be replaced with a high definition direct view LED video wall. The wall shall be 1.8mm pixel pitch and a native resolution of 1920x1080p (or higher). The new video wall would have HD resolution (2280x1368). The video wall shall be new LED technology with an anticipated 60,000 hours half brightness lifespan. The system shall also have excellent brightness and visibility throughout the room. As stated previously, it is the intent that the existing rear projection screen and rear projection mirror system shall be removed, and the wall be modified/re-framed to permit the installation of a new 14'-2" x 8'-6" LED video screen. The existing wood trim shall be saved and subsequently be remade as new trim for the LED video wall (removal by AV contractor and reworking by TBD millwork fabricator). The new trim would frame would approximately'/4" deeper than the new video wall and approximately 1'/2" wide. A new video distribution shall use an AV over IP based video distribution topology. The system shall employ IP encoders/decoders as endpoints and shall utilize a standalone AV gigabit Ethernet network. The approach shall allow for a highly flexible and scalable system using AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 37 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA gigabit network switches and CAT6 cabling. This system shall also allow for management of the audio from the video sources across the AV network. The broadcast video systems shall also be upgraded to HD -SDI (1080p59.94). The broadcast video systems shall also utilize IP distribution. The new cameras as well as a new digital video switcher shall utilize NewTek's Network Device Interface (NDI) technology. The new digital switcher shall have a variety of integrated features and capabilities such as built-in pan/tilt/zoom control, multi -viewer output, audio mixing, and digital video effects such as video titling and clip store). The primary output of the system shall be sent to the City of Palm Desert's Granicus streaming system to broadcast to the web. The broadcast system output shall also be sent to a local solid-state media recorder for archival and backup purposes. The new broadcast systems shall be installed in the AV Control Room (currently the Rear Projection Room). A new TBC console/workstation shall be supplied by the AV Contractor. The workstation shall include 12RU of rack space, a center desk, and a side table. The workstation shall also be supplied with monitor arms for two (2) new 32" LED screens, mounting arms for two (2) new compact Genelec audio monitors, and internal 120VAC power distribution. Control Systems: The new AV system shall receive a complete overhaul of the control functionality as well. The system shall use QSC control, user control interfaces (UCIs), and scripting capabilities. The control systems shall include new 5.5" touch screens for voting and countdown timer display, new more tactile and visible microphone controls, a new 22" touch screen for the Clerk's control station, control and voting results computers (supplied by Owner), and a complete update to the control system programming. NOTE: The hardware and equipment for the AV and control systems shall be supplied and installed by the AV Contractor. However, the DSP and Control System programming, including site commissioning, is to be performed by others under a separate agreement with the City of Palm Desert. The AV Contractor shall exclude the proarammina of the QSC DSP and Control Systems from their proposal. END OF APPENDIX A AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 38 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA APPENDIX B: AUDIO VIDEO SYSTEMS EQUIPMENT LIST ---...------------ PRESENTATION AUDIO EQUIPMENT i 8" CEILING MOUNT ATLAS C803AT167 C803AT167 LOUDSPEAKER w/16W TRANSFORMER 8" CEILING MOUNT ATLAS 61-8W LOUDSPEAKER w/16W TRANSFORMER - GRILLE 4-CHANNEL 625W AUDIO QSC CXD4.2Q AMPLIFIER I 4-CHANNEL 60W AUDIO QSC SPA 4-60 AMPLIFIER 8x8x8 DIGITAL AUDIO SIGNAL QSC I CORE 110f PROCESSOR 8x8x8 DIGITAL AUDIO SIGNAL QSC SL-QSE-110-F PROCESSOR - SCRIPTING LICENSE I 8x8x8 DIGITAL AUDIO SIGNAL I QSC SL-QUD-110-F PROCESSOR - USER CONTROL INTRFACE LICENSE 8x8x8 DIGITAL AUDIO SIGNAL QSC j MD-110 PROCESSOR -INTERNAL MEDIA DRIVE 8-CHANNEL FLEXIBLE 1/0 QSC 1/0-8-FLEX i i 61-8W i III - ... ..... ...... _--- - - ---- - -- I CXD4.2Q AMPl-01 1 I I ' SPA 4-60 AMP2-XX 14 CORE 110f DSP-01 I 1 SL-QSE-110-P I j 1 i I SL-QUD-110-P I i I 1 I � I � MD-110 1 I 1/0-8-FLEX FLEX-I/O-XX 2 18" GOOSENECK MICROPHONE SHURE I MX418/C MX418/C MIC-XX 13 18" GOOSENECK MICROPHONE SHURE A412MWS A412MWS 13 - METAL WINDSCREEN i AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 39 Project #IS71219 Council Chambers AV Remodel 2019 05/15/2019 City of Palm Desert, CA i 4-CHANNEL DIGITAL WIRELESS SHURE MXWAPT4 MXWAPT4 WLESS- 1 MICROPHONE SYSTEM j WAP-01 I 4-CHANNEL DIGITAL WIRELESS SHURE MXW6/C MXW6/C 1 MICROPHONE SYSTEM - BOUNDARY TRANSMITTER w/CARDIOID MIC I 4-CHANNEL DIGITAL WIRELESS SHURE MXW2/SM58 j MXW2/SM58 1 MICROPHONE SYSTEM - HAND I HELD TRANSMITTER w/SM58 4-CHANNEL DIGITAL WIRELESS SHURE MXW8 MXW8 i 1 MICROPHONE SYSTEM - GOOSENECK BASE I TRANSMITTER 4-CHANNEL DIGITAL WIRELESS SHURE MX415LP/C MX415LP/C 1 MICROPHONE SYSTEM - 15" GOOSENECK MICROPHONE _- .... ...-- 4-CHANNEL DIGITAL WIRELESS SHURE MXWNCS4 ` MXWNCS4 1 j MICROPHONE SYSTEM - NETWORK CHARGING STATION t I 1x4 AUDIO DISTRIBUTION I JENSEN DIN -AMP DIN -AMP ADA-01 2 AMPLIFIER (1 DIRECT+3 ISO OUTS) I 1x4 AUDIO DISTRIBUTION JENSEN DIN -PS DIN -PS fADA-PS-01 1 AMPLIFIER (1 DIRECT+3 ISO OUTS) - POWER SUPPLY 1x4 AUDIO DISTRIBUTION JENSEN DIN-MRP DIN-MRP ! 1 AMPLIFIER (1 DIRECT+3 ISO OUTS) - DIN RAIL RACK MOUNT KIT i i OFE PRESENTATION AUDIO EQUIPMENT 8" 200W CEILING QSC AD- C821 AD-C821 OFE-SPK-XX (2 jLOUDSPEAKER 3" 15W DESKTOP STATION I TANG -BAND W3-1335SB I W3-1335SB MS-XX/CS- 13 LOUDSPEAKER I XX j AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-40 Project #IS71219 05115/2019 AsssTmsLISTENING SYSTEM usTsw Aoom0mAL HEARING ASSIST LISTEN nsoewsns ____________________________ /Aoom0wAL HEARING ASSIST LISTEN EAR SPEAKER TsLsco/L Loop uaTsm BROADCAST AUDIO sou/PMsmT 4^POWERED DESKTOP osmEL MONITOR LOUDSPEAKER Council Chambers AVRemodel 2D19 City of Palm Desert, CA ) oFe-HAS � | �TX-01 ' | ! �....... Ln-400-216 iLR-400-216 z -'------''-------- -------------- ----' - LA-164 L*164 4 i | | | -_- \u*66 * / \ ' ! ---- ---- '------------- ( oozoo uOzoo mOw-SPx-Xx z / | � Video Equipment . -----'---------'--------------_---------- PRESENTATION VIDEO -----'-------- -- ---| souIPMsw7 ---------------'---'------------ 1.xmmPIXEL PITCH DIRECT Aossw ---------------------'---'------- w1u+(3x) w1.8~(30) --- Lso-Mxno«x14n --i i VIEW LED PANEL (3,) � | ! ' --- ---------'---' 1.mnmPIXEL PITCH DIRECT Aossw m1SPARES -- - 1 '� ! w1.8+spAnss iVIEW LED PANEL (sx1) SPARE | ! |m000ue � � |1ummPIXEL PITCH DIRECT -' - Aossw - ---' w1u+oAox - ---- w1u+aAox | 1 | 'VIEW LED PANEL (3x1) BACK CHANNEL (As onAwmsL (As ' \c*»mmEL NEEDED) wssoEo) / ------- --'------ ---- ---- 1.8mmpmsLPITcHo|RscT --- Aoasw w1.8+apAnss - '------------------- w1.8+spAess �1 VIEW LED PANEL (3x) ' MANUFACTURER SPARES -- __-----_-----___' DIRECT VIEW LED PANEL _--------_- xassw __-_----'_- wovAsT*nvxss movAoTARvxVs ----____' � Leo'pnoc' 1 VIDEO WALL PROCESSOR »« | / | / \ MANUFACTURER'S --- --- AUDIO VIDEO SYSTEMS AND EQUIPMENT 274118-41 Project #l871219 Council Chambers AVRemodel 2019 mrLED VIDEO SCREEN NEC | |o861Q / C861O usoe6-01 '1 � | / |mrLsomoEoSCREEN-WALL omsp PwRuo PwRua � |1 |�ouwTo��cxsT ` / ' | r--------'---' --''— --'------'--------------------------' -- ---'-------------------- 1orLOW PROFILE DESKTOP sLoToucH -------- 1502L ' ------ '-- /so*osoo -- !Lso15-Xx —| 11 | MONITOR FULL HD ' (1920x 000p)) } | 1o^1ovvPRonLsDES xTop !sLoToo�� | |so�*1oz \="°° s woz I I � MONITOR FULL no ' ' | (1920x nuop) - TABLE TOP STAND � � | �zrDESKTOP . | oOR ELOTOUCH 2202L IE351600 TOUCH- 1 FULL Ho<1yznmoxop Mom-01 ------------ s|wo�sc*�wws�sTn���|ws �mx �^"=^~..^^"° � �sw�ucc���� pw�^�^ '-! * | AV DECODER ________________ _________ |o|ws�s���wws�uTns^�/wo ��x wMx'swC'm1oz^ row1122^-SA |AV -TX 1'xx o i /AvswcooEn | } ' SINGLE CHANNEL STREAMING AMx wMxswo'w1115' row1115vvPeeL |Av-Tx2'01 / AV ENCODER oscon*vvALL vvpeL | PLATE(BLACK) | | SINGLE CHANNEL STREAMING AMx wmx~^CC'w9102 F8w9102 14 AvsmcoosnmscooEn DUAL RACK KIT \ � � -- SINGLE CHANNEL STREAMING -----'------------- Awm mwx-ACC'w9101 ---- rom9101 ''�-------'4' .o AvswCoosn/DE000sn' wouwT|wGvv|wss / | / i | LOW PROFILE MOUNTING WINGS AUO|[}VIDEO SYSTEMS AND EQUIPMENT 2741 18-42 Project #IS71219 05/15/2019 HDMI TO HDMI PATCH CABLE 1 EXTRON (AS REQUIRED TO CONNECT I DEVICES AND IN LENGTHS AS NEEDED) WIRELESS PRESENTATION SYSTEM WIRELESS PRESENTATION DEVICE - DONGLE STORAGE CUP Council Chambers AV Remodel 2019 City of Palm Desert, CA HDMI ULTRA/(#) 126-663-(##) A/R BARCO I CSE-200 CSE-200 CLICKSHAR 1 E-01 BARCO CLICKSHARE TRAY CLICKSHARE TRAY 1 I i � j I RU CUSTOM AV INPUT RACK PANEL AV CUSTOM AV CUSTOM RP-01 1 (1 PANEL CRAFTERS I - - - - ----------- - --- ---- 1------ ............ - -�- -------- HIGH RESOLUTION DOCUMENT WOLFVISION VZ-8 LIGHT 4 VZ-8 LIGHT 4 DOC-CAM-01 1 CAMERA HIGH RESOLUTION DOCUMENT WOLFVISION #102961 #102961 1 CAMERA - DUST COVER ' I i I OFE PRESENTATION ` EQUIPMENT i I SMALL FORM FACTOR DELL OPTIPLEX 7060 OPTIPLEX 7060 CTL- ! 2 COMPUTER - INTEL i7, 16MB MICRO MICRO CPU/VOTE- RAM, 256SSD, WINDOW 10 PRO !CPU WIRELESS KEYBOARD AND LOGITECH MK540 ADVANCED MK540 ADVANCED 1 MOUSE BROADCAST VIDEO EQUIPMENT ' I I I HD PAN/TILT/ZOOM CAMERA PANASONIC AW-HN40HW AW-HN40HW PTZ-CAM-XX 4 w/NDI w/30x ZOOM (WHITE) I HD PAN/TILT/ZOOM CAMERA VADDIO 535-2000-243 535-2000-243 4 w/NDI w/30x ZOOM (WHITE) - WALL MOUNT i I AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 43 Project #IS71219 Council Chambers AVRemodel 2019 05/15/2019 City of Palm Desert, CA |BROADCAST am|TCHEnwxwm PAwASOm|C Av'HuC100 �v'HLc1oo v|o'ovv01 1 'uPTzCONTROL BROADCAST am/rcHs*vwwo/ H mn5*0AovAwCEo MxowoAovAwCsD 1 uPTzCONTROL � KEYoowRmM0usECoMon ' i \ ___ az''HID DISPLAY MONITOR NEC |s327 sour LEooz'Xx z � .(1920x1080P) | | ! � � ----f-�'-- | ''--- -- ' -------'-------------- ------�� �o�|To�o�o|COwv�RTs� -'-' I s�\C�m�GC ------- |��.~.� /c�°nsxm|w| �-- -- |T�n�w�xm|w| ----'---- �o�|'sD|�1 \ / 1 oEsmw Hmm|ToSDI 1zo HowxToSDI 1zo | SDI ToHom|CONVERTER ouu:mmAo|C- TsRAwEx_w|w|So| _ TenAwsx_M|w|so| ao|'HoM|'01 '1 osS|Gw TOHoM|1zG T0HDM|1zG ' HD -SDI DISTRIBUTION oLACxMAo|c TsnAwsxso| TsnAwsxoo| oo|'DA-o/ 1 AMPup|sn<1m0 oeS|sw /o|oT�|ouTmw1zo ' o|ST�|auT|ow1zs | � | \ asoMEDIA RECORDER aILACxMAG|c HvPsnosCx HvPsnosCx v|o-RsC-01 11 oss|sw STUDIO MINI STUDIO MINI BROADCAST EQUIPMENT 1nu tBLACKMAGIC -- TERANEX MINI - TsnAwsxM|m| ---� --r-- i / TRIPLE RACK MOUNT KIT DESIGN RACK SHELF RACK SHELF .z | � --'---�--------- ---------- .-.......... ------'----�-------f-' ' |opsBROADCAST EQUIPMENT | | / � ' 'oRAwICussTnsAm|ws sRAm|ous nTnEAwx|ws nTnsAM|wo ors' '1 ssnvsn | senvsn ssnvsn ' STREAM-01 | ) - SMALL FORM FACTOR - DELL - _ |oPnPLEx7ouo _ _ ----- npTo,Lsx7000 u' || 1 COMPUTER |mTELn.1*Mo /m|onO m|oRo 01 RAM, unoSao.WINDOW 1oPRO --------------------- vv|neLEssxsYaO^RoAwo ------- uoonsC* Mx540AovAwCEo --7----'----�-- MK540AovwwCso ) I MOUSE | AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16-44 Project #IS71219 05/15/2019 Council Chambers AVRemodel 2O1S City of Palm Desert, CA Control & Networking Equipment ----------| 5z+x/x/ETHERNET svv.p:H o�|wx -- ooS-1510a2xmP |oos1510-52xwP /u '- 1 GIGABIT wxPos+uw2spP+1oo / UPLINK PORTS _ nsoowoAwTPovvsnouppc/ o-LINK -- opS-700 LAN -SW -PS- 1 ( «1 ( � 1wswuLnwOoEOPTICAL |o'uws |oEM-431xT )� FIBER TRANSCEIVER SFP+ ponsAT - ' ---------------' -- '-----------------�--------------�---- / � ! ! WIRELESS ACCESS POINT TREwowsT Tsvvo12onu Tsvv812ono AV*AP-01 ! ' 1 ! w/oHCpWIRELESS SERVER -'-----'--'--------... ..... --'---- -'---------`- ---------`—`- ------------'''''---------- 2x24'PonroAT6 PATCH PANEL smnss ouomsau*o 000/os224o wxoe8|GmxT0wsTn|P 110 puwcHonvvw.owSmELoEo. znu cAToowAoLsSSPATCH Cono C*aLEszso o01100 24"SLIM UNSHIELDED BLACK -- ----- � 1 on^vxALL MOUNT TOUCH Osc | 'Too-55w-o2 Tsc-55w+s2 Tscoxx o PANEL / --���-_----_-_--_----- orosaxToPTouCHPAwsL -_--_ Osc -_----_-_'--_� Tsoo«x 1 | z'ouTTowLOW VOLTAGE vxATTsToPpsn Lvsvv102-W |Lvsvv102-W Ls'Fsvv«x |z LIGHTING CONTROLLER ��__---- --------'-_ _ � -_----_'_- i - ------- -- ---- --- � ----'----- - - z'ponTnsu\YINTERFACE vv|wpOno nLYuoo'1m�o|w Rcruoz'1s�o|w uGr'Rs�o1 1 FOR orELIGHTING CONTROL AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 1G-45 Project #IS71219 O5/15/2O1S City of Palm Desert, CA Council Chambers AVRemodel 2O19 z-"oRTRELAY INTERFACE vwwFono o|wn135-030 1 / FOR opsLIGHTING CONTROL ! wn�| .00cw o| L � | mmsPmTO|PINTERFACE o*TApnOaE ||P|o-8 | |� / | � ---------- ----- '--- \ 8x8GP"''"'P INTERFACE ' DIN RAIL MOUNT ---'' z.oA/u4vooPOWER SUPPLY ATLAS 1 / | / / | | | � Other Equipment / BROADCAST IToc aTz-Ws'Lruns OuoTs#woAuo' 7WORKSTATI 11 / vvOnxsTAT0m/oEsx i ooyyo'10 nw | / | � vwvnuRsmnscHsnnv LAMINATE TOP AND � PURETsCHOsDGe i � | __--_--____-------- ' .... onoAocAsT Too Pa'1615-ET QUOTE #uzAuo' / vvonxaTAT|owxzsoK povvsn 0899519 o|3TmaonOw � \ / onoAoCAsT Tso ac1'wL-uns QUOTE #xzAuo' RACx'oz i vvOnxsTAT|ow/oEsn 12nu 08e95-19 | | NESTED SIDE CAR (LspT) ' ) � w1Yonxa*|nsCHsReY LAMINATE TOP AND PuRETsommEoss ---- --'— '---- --------- \---'Vr�---wxu�'------7--'---- BROADCAST TaC /ouuo' |1 | vvonxsTATowxDssK 089e5-19 | | PRODUCER'S TABLE (R|oHT) | i |*xvoRmamnsnHsnnv � | [LAMINATE TOP AND runsTeowmsons ' | anoAocAsT Tec pP'rsoo uoTswxaAuo' z vvonnaTAT|ow/oeoK | 08e95-19 | MONITOR ARMS ---- - ---'---' -1 onoAoC*sT 'TBC ow'C'ow OuoTswxzAoo' z vvOnxaTAT|Ow/ossK Auo|o 08995'19 | / MONITOR ARM l � AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 1G-48 Project #|S71219 05/15/2019 Council Chambers AVRemodel 2019 City of Palm Desert, CA BROADCAST TBC | !1 /vvOnKaTAT0mxDssx- � �FREIGHT | ! | ! \ � � Harduvare, Racks, and Materials FREE STANDING RACK | / 4onoEQUIPMENT RACK zr MID ATLANTIC oGn-45sA-27 aGR-45sA-27 !RAox*1 1 ` DEPTH 4nnuEQUIPMENT RACK FAN MID ATLANTIC |osR-276FT osn-276pT 11 ! TOP i ----------- -------'---7------------------- *nRUEQUIPMENT RACK MID ATLANTIC � ooR-STP(#) --- oGn-S�) np ---- / | � |z RACK SOLID TOP (SIZE A8 { � |mEEuEw | 4nxuEQUIPMENT RACK MID ATLANTIC coa-Ban Cos -Bon � CASTER BASE . ' *n*uEQUIPMENT RACK w|o MID ATLANTIC osw-Rn45 ssw-Rx*5 � RAIL ! 45Ru EQUIPMENT RACK MID ATLANTIC mu-60 vvL-60 | ' 1 WORK LIGHT | � RACK POWER / | EQUIPMENT RACK VERTICAL MID ATLANTIC ipor-2x1020s PoT-2x1020S PuTn|p01 12 | POWER STRIP (FIELD oompx» \ FOR zxuoACIRCUITS) ) j . �-_-_-�_---_ -------- ` -- |WORKSTATION POWER STRIP / PD-915R Poo15n wonxsTATo nwsn WORKSTATION �|o�Tu�wT|c Pou1nsc -------'--- p��1ssc -'' -�--{ o | `"S'"=°'IO" � | RACK MOUNT UPS MID ATLANTIC uPS-S1000n upa-S1000R uPa-02 1ooOvA/60oW(15A) | --'----------------- RACK MOUNT UPS - ! MID ATLANTIC ------------- S's S auuoon ------T---�� uPs01 AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 18-47 Project #IS71219 05/ 15/2019 RACK MOUNT UPS - IP MODULE Council Chambers AV Remodel 2019 City of Palm Desert, CA TASK LIGHTING DESKTOP LED TASK LIGHT LITTLITE LW-18-LED LW-18-LED : 3 w/18" GOOSENECK I I I I I RACK ACCESSORIES (AS i ' I REQUIRED) I EQUIPMENT RACK BLANK MID ATLANTIC EB SERIES EB SERIES BLANK I A/R PANELS EQUIPMENT RACK VENT MID ATLANTIC VTB SERIES I VTB SERIES j VENT I A/R ! PANELS EQUIPMENT RACK SHELVES I MID ATLANTIC U SERIES U SERIES SHELF A/R (STANDARD) EQUIPMENT RACK SHELVES MID ATLANTIC UV SERIES I UV SERIES ' VENTED A/R 1 (VENTED) SHELF EQUIPMENT RACK UTILITY MID ATLANTIC LID SERIES UD SERIES ; DRAWER A/R DRAWERS EQUIPMENT RACK MID ATLANTIC PCHM SERIES PCHM-2-3 CABLE A/R HORIZONTAL CABLE MANAGER MANAGER w/COVER --_..... I I I j -- - -- - — -- - MISCELLANEOUS MATERIALS I ------ - MISC MATERIALS ------ - --t LOT - -- -- I LOT I.. -- .�. ... ............... ' 1 1 (CABLE, CONNECTORS, ETC) I I I END OF APPENDIX B AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 48 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA APPENDIX C: ADD -ALTERNATE #1 - 86" TV EQUIPMENT LIST 86" LED VIDEO SCREEN I NEC 86" LED VIDEO SCREEN - WALLI CHIEF MOUNT BRACKET C861Q C861Q i PNRUB PNRUB ..... _.... --- ...... ......... .. - - --- - - --- SINGLE CHANNEL STREAMING AMX NMX-DEC-N1222A FGN1222A-SA AV-RX-XX 1 AV DECODER I ; SINGLE CHANNEL STREAMING AMX NMX-ACC-N9101 FGN9101 1 AV ENCODER/DECODER- MOUNTING WINGS HDMI TO HDMI PATCH CABLE EXTRON HDMI ULTRA/(#) 26-663-(##) (AS REQUIRED TO CONNECT DEVICES AND IN LENGTHS AS NEEDED) I Hardware, Racks, and Materials I MISCELLANEOUS MATERIALS MISC MATERIALS LOT LOT (CABLE, CONNECTORS, ETC) END OF APPENDIX C 01 AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 49 Project #IS71219 05/ 15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA APPENDIX Z: FORMATTING REQUIREMENTS FOR SUBMITTALS Bill of Materials Formatting Example SECTION M ~. SECTION NAME Client: Project Name Section. System, or Room Name: Bill of Materials MMiDD,YYYV Section or S Nit )�y <Eprprner• Oaacnpiun> cwren <laodel> <Pen Numbers <liniW • <Eypr,wnl O Wp[.- <Marefaeruren <Model' <Psrl Number> <FmiW • <Equyrnere DaScnp—o <MwwNctw— <Wd.1, <Pan Numbers <F,mh- « <EquWn,.n1 D—Vion. <Man/acWrer> 'Models 'Pen Numbers <Fmisn> • Section or Subelrstem N. <Equq-4 Dee-paron> <Menter.Yuren > < e Nurr:ber> �InIW • <EquprneM D.scnpllo- 'Man isciurer> <Nlod.l> <Peq Number> 'finish+ a <EquymeM Deurrylron� <MwxAactumr> <MKWI 'Pen Numbu> <FinIW w <Equpnery Descnpron> <Mmwln �Wrer. 'Model. 'Par, Number' <F".sh. 'Add Addlbonai Section. or Sub"ems as Needed or Pro Id. Indiv$dual BON per Space> MWOOIYYYV BILL OF MATERIALS PAGE 1 OF ti AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 50 Project #IS71219 05/15/2019 Council Chambers AV Remodel 2019 City of Palm Desert, CA Proiect Cable Tvves and Connectors Formatting Example Client' Project Name Se tw System or Room Name ProterA Installation Cable Types and Ca ectors uuvwnvr / J P2h Al e weo . u.. \..a AAi.iy M no sN..+.� Auie cm. r....a a s...�-w •,...y .ar l..w wao ..r 4w.� .s.wH w�,.oe•v�. H.we Poe��nw.:m _r tn.ra ss �H1FtY :n„..wye.zw r.ev Tw., Ili a r'a�•.A, er+ .rr JAM�I.-F •_.y,�.t 4:.A,..,c.•a..u•,rw•..r. r.c +aro u.e.r eN� .z.ne. ..:.4.r�r. },,. s. �3•i L.WprNr Cw. A.r ..,wo..b. •.:er •]...a •'ail Y2lfe « •sv l,Ycw.+r r.n. wl........... r,o..5:a H-a w� v-v+ a.,., n,.. --ir Aa—Te—O..a. \'fiy-�w m..—y-r`r`�Y11\"diRl*M+.fW. t!?,'9 sX{4�aJti->:: tKi='. ••�-xaa;.'�"�j"� �•:<1 d��wfe� •,M>MIYYY� �l vN16ilalM'Yts i d a.,w. tyw MW C�.n.en r6.r1 Crvw.a. � \rwn MoupAOY x lW lwil auM �' Mwn\ N.;TY tl /ip a31� fwn+. }an .l4 fr....�.��<;qy Cv+.e. ONw YtYi McrW....aN L4. �..N AWb tMrvt NCIM B ,1YA • .+ram....+.. V�.�.nWW1.�aM'��+s+a.-C.v....f..r Va.M NI aNr` elnY flK Hl SYµh1c �.wr ti W W Mana•1 >'u Hlia �N.e «.rn :aW1 R.� 14 SI.r .s—Ir M..r—C------"TN.r—CrNana .r.a.—.. rWlOr1W MOAECT MTA Tq CARE, A COMEO1 BABE I a END OF APPENDIX Z AUDIO VIDEO SYSTEMS AND EQUIPMENT 2741 16 - 51