Loading...
HomeMy WebLinkAboutC39020 BIDS - Const of El Paseo Pedestrian Imprvmnts 810-20CONTRACT NO. C39020 STAFF REPORT CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT MEETING DATE: July 11, 2019 PREPARED BY: Randy Bowman, Senior Engineer REQUEST: Authorize the City Clerk to advertise a Notice Inviting Sealed Bids for the construction of the El Paseo Pedestrian Improvements (Project No. 810-20). Recommendation By Minute Motion, authorize the City Clerk to advertise a Notice Inviting Sealed Bids for the construction of the El Paseo Pedestrian Improvements (Project No. 810-20). This project was included in the proposed Measure A 5-Year Capital Improvement Project (CIP) Program, which is pending funding approval. Strategic Plan Obiective The El Paseo Pedestrian Improvements Project fulfills priorities identified in the City's Strategic Plan, including the following: • Tourism and Marketing — Priority 1: "Improve access to Palm Desert and its attractions to enhance the ease of lifestyle." • Transportation — Priority 1: "Create walkable neighborhoods and areas within Palm Desert that would include residential, retail, services and employment centers, and parks, recreation and open space to reduce the use of low occupancy vehicles." • Transportation — Priority 3: `De-emphasize single/low-occupancy vehicles and optimize modes of travel (bus, carpool, golf -cart, bicycle and pedestrian). " • Land Use - Priority 4: "Create a mixed -use city core integrating shopping, dining, lodging, and housing." In addition, the El Paseo Pedestrian Improvement Project, along with a parklet pilot program that staff is drafting, addresses the following initiatives listed in the Economic Development Strategic Plan approved by Council in 2018: • Revitalization of the El Paseo Key Commercial Corridor • Facilitate long-term market strengthening of the El Paseo District • Align City placemaking and other development plans and strategies with key City -designated infrastructure elements • Tie actions on behalf of targeted development projects and special events to benefits they offer to the concept of "placemaking" July 11, 2019 - Staff Report Authorization to Bid the El Paseo Pedestrian Improvements (Project No. 810-20) Page 2 of 3 Background Analysis The City's General Plan identifies El Paseo as a key commercial roadway. This roadway prioritizes property access and includes a very high level of pedestrian amenities. The cross-section for El Paseo consists of four vehicular travel lanes, two parking lanes, and a wide median with trees and landscaping. Dedicated left turn lanes are provided as well as a right turn lane where warranted. While sidewalks and on -street parking exist along the corridor, the vibrant pedestrian activity on El Paseo warrants additional measures to enhance pedestrian safety and promote a more pedestrian -friendly environment. On September 6, 2018, the City Council approved the El Paseo Master Plan Alternatives (EPMPA) and the El Paseo Retail Market Study (as an appendix) prepared by Gibbs Planning Group to guide potential street configurations for El Paseo. The City Council also authorized staff to begin implementation of near -term recommendations as stated in the EPMPA, and to research and prepare a demonstration project utilizing concepts found in the EPMPA. The City Council also authorized the City Manager to sign applications for any and all grant funding sources in conjunction with said near -term recommendations or demonstration projects. The City has already implemented one of the near -term EPMPA recommendations, which is to eliminate the need for a pedestrian to push the signal button to cross the street. This recommendation was implemented in November 2018. The near -term EPMPA recommendations to improve pedestrian crosswalk markings and provide mid -block crossings for pedestrians will be satisfied with this proposed improvement project. Staff has engaged an engineering design consultant to prepare bid documents for the construction of a pedestrian safety project, which consists of the following elements: 1. Pavement rehabilitation, new wheelchair ramps as needed, and enhanced painted crosswalks and painted bulb outs at the intersections of El Paseo with: • San Pablo Avenue • Larkspur Lane 2. Install raised midblock crosswalks with in -pavement crosswalk lights, flashing signs, pavement markings, and enhanced painted crosswalk at: • Gardens at El Paseo on El Paseo • Mamma Gina's on El Paseo • Hotel Paseo on Larkspur Lane Proposed enhanced crosswalks in this project feature decorative painting within the crosswalks, with colors and patterns designed by the City's branding and marketing staff and their consultant. July 11, 2019 - Staff Report Authorization to Bid the El Paseo Pedestrian Improvements (Project No. 810-20) Page 3 of 3 The improved pedestrian crosswalks in this project will also compliment a pilot program to allow parklets/dining decks along El Paseo, which staff is preparing to present to the City Council on August 22, 2019. The pilot program would allow restaurants to construct a temporary dining deck within parking space(s) that would be used as a dining table. If approved by the City Council in a follow up presentation, staff would develop an application/temporary permit with design standards and locations. The El Paseo Pedestrian Improvement Project will have a 30-day window for completion, nestled between the completion of a needed slurry seal of the entire El Paseo corridor and the City's annual Golf Cart Parade, which is scheduled for October 27, 2019. Given the precise window for construction, staff is planning to advertise the project immediately upon approval by the City Council. Any feedback from the City Council will be incorporated into the bidding documents as an addendum. Fiscal Analvsis There is no fiscal impact with this action beyond advertising costs. The cost for the construction of the project is estimated at around $950,000, and the funding for the project is included in the FY 2019-20 CIP List through Measure A funding. LEGAL REVIEW DEPT. REVIEW FINANCIAL REVIEW CITY MANAGER Approved as to Form i Robert W. Hargreaves Tom Garcia, P.E. `-Ja4t M. Moore Lauri Aylaian City Attorney Director of Public Works Director of Finance City Manager ATTACHMENTS: Vicinity Map El Paseo Pedestrian Improvements Plans ro N c a E a a CL E cl c� �4>w a a CL a a CL uw ❑t 0 ry N L r � x ���,liilllill YF y■ Y1 YF f F��fF •.Y�f. � Yf � 4+ v ■i + lo r • a! i I I •R .K PIP lk w W U) ■■■■ins � .� 7 �two" i 11 N t411 � fY � s■ I I I Y Df P H I M OESENi 7;—i 10 FkI D WAR ING DRIV1 PALM DESI%%RI. CAIIH)RNIA 92.160-2578 TkI.: 7 60 3 46-o6 i i inl r, ru�o(halmdcun org May 3, 2019 Jenny Chan Management Analyst, Planning and Programming Riverside County Transportation Commission 4080 Lemon Street, 31 Floor Riverside, California 92502-2208 Subject: Measure A Capital Improvement Program Dear Jenny, Enclosed for Commission consideration is the City of Palm Desert's proposed 2019/2020 — 2023/2024 Five -Year Measure A Capital Improvement Program, as well as Project Status Report for Fiscal Year 2018/19, and the signed Maintenance of Effort Certification Statement. Please note that the Portola 1-10 Interchange Project has a carryover of $15,110,660 in Fiscal Year 19/20; however, the project is currently in the design phase. The City expects the construction phase to begin before the end of 2020. This will significantly reduce the City's high carryover amount. The Five -Year Program will be reviewed in the near future by our City Council. If the City Council makes any changes to the program, a revised version will be submitted to you for approval. If no changes are made, please treat this as the official submittal. If you have any questions, please contact me or Bertha A. Gonzalez, Accounting Specialist, at (760) 346-0611, extension 473, or at bgonzalezC�citvofpalmdesert.orq. Sincerely, /J l Tom Garcia, P.E. Director of Public Works Enclosure cc: Lauri Aylaian, City Manager Janet M. Moore, Director of Finance J. Luis Espinoza, Assistant Director of Finance ca MEASURE A IF LOCAL STREETS AND ROADS PROGRAM FY 2019/20 Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-0611 Date: May 3, 2019 FY 2017/18 Audited Measure A Balance: $ 21,970,019 FY 2018/19 (Revised) Measure A Revenue: 2,948,000 FY 2018/19 Project Status Report expenses: 672,658 Estimated Prior Year Measure A Balance: 24,245,361 Estimated FY 2019/20 Measure A Allocation: 2,842,000 Estimated Measure A Available for FY 2019/20 Projects: $ 27,087,361 Item No. Project Name / Limits Project Type Total Project Measure A Cost Funds 2019/20 Portola Interchange at 1-10 Estimated carryover FY 18/19 Interchange Project $ 79,800,000 $ 5,000,000 2020-01 $15,110,660 Cook Street Widening - Phase II, Fred Waring to Frank Sinatra Street Widening Estimated carryover FY 18/19 Project 2020-02 $3,655,500 Citywide Pavement Management Program $ 9,665,500 $ 3,655,500 Estimated carryover FY 18/19 Maintenance Project $ 7,478,855 $ 5,500,000 $3,000,000 2020-03 FY 19/20 request $2,500,000 Citywide Traffic Signal Hardware Upgrades Street Improvement Estimated carryover FYI 8/19 Project $ 1,087,064 $ 1,012,064 $612,064 2020-04 FY 19/20 request $400,000 Citywide Street Striping and Lane Improvements Estimated carryover FY 18/19 Maintenance Project $ 757,293 $ 757,293 $432,293 2020-05 FY 19/20 request $325,000 FY 2019-20 Page 1 of 8 MEASURE A LOCAL STREETS AND ROADS PROGRAM Jefferson Street Interchange Project @ 1-10 Interchange Project $ 312,500 $ 117,795 Estimated carryover FY 18/19 2020-06 $117,795 Triple Left Turns at Washington and Street Improvement Fred Waring Project $ 500,000 $ 500,000 Estimated carryover FY 18/19 $500,00 2020-07 Citywide ADA Curb Ramp Modifications Estimated carryover FY 18/19 Maintenance Project $ 235,043 $ 150,043 $100,043 2020-08 FY 19/20 request $50,000 Citywide Bridge Inspection & Repair Program Estimated carryover FY18/19 Maintenance Project $ 300,000 $ 300,000 $200,000 2020-09 FY 19/20 request $100,000 Gerald Ford East of Cook Improvements Maintenance Project $ 265,000 $ 265,000 Estimated carryover FYI 8/19 2020-10 $265,000 Washington Street Traffic Upgrade Project, Palm Royale to 42nd Street Improvement $ 150,000 $ 150,000 Estimated carryover FY 18/19 Project 2020-1 1 $150,000 Traffic Signal Modification - Hwy 1 1 1 at Parkview / Painters Path Maintenance Project $ 50,000 $ 45,384 Estimated carryover FY 18/19 $45,384 2020-12 San Pablo Improvements, Hwy 1 1 1 to Magnesia Falls Street Improvement $ 15,000,000 $ 2,655,967 Estimated carryover FY 18/19 Project 2020-13 $2.655,967 Traffic Management Center Street Improvement $ 960,000 $ 210,000 2020-14 FY 19/20 request $210,000 Project El Paseo Master Plan Roadway Street Improvement Improvements Project $ 1,450,000 $ 1,200,000 2020-15 FY 19/20 request $1,200,000 TOTAL $ 118,011,255 $ 21,519,046 FY 2019-20 Page 2 of 8 RCT� MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-061 1 Date: May 3, 2019 Estimated Prior Year Measure A Balance: $ 5,568,315 Estimated FY 2020/21 Measure A Allocation: $ 2,913,000 Estimated Measure A Available for FY 2020/21 Projects: $ 8,481,315 Item No. Project Name / Limits Project Type 2020/21 Citywide Pavement Maintenance Project $ 2021-01 Management Program Citywide Street Striping and Lane Maintenance Project $ 2021-02 Improvements Citywide Traffic Signal Hardware Street Improvement $ 2021-03 Upgrades Project Citywide ADA Curb Ramp Street Improvement $ 2021-04 Modifications Project Citywide Bridge Inspection & Maintenance Project $ 2021-05 Repair Program 2021-06 Cook Street Widening - Phase II Widening Project 2021-07 2021-08 TOTAL FY 2020-21 Page 3 of 8 Total Project Measure A Cost Funds 3,500,000 $ 2,500,000 325,000 $ 325,000 400,000 $ 400,000 75,000 $ 50,000 100,000 $ 100,000 9,665,500 2,400,000 $ 14,065,500 $ 5,775,000 MEASURE A IF LOCAL STREETS AND ROADS PROGRAM FY 2021122 Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-061 1 Date: May 3, 2019 Estimated Prior Year Measure A Balance: $ 2,706,315 Estimated FY 2021 /22 Measure A Allocation: $ 2,986,000 Estimated Measure A Available for FY 2021/22 Projects: $ 5,692,315 Item No. Project Name / Limits Project Type Total Project Measure A Cost Funds 2021 22 2022-01 Citywide Pavement Management Program Maintenance Project $ 3,500,000 $ 2,500,000 Citywide Street Striping and Lane Maintenance Project 1 $ 325,000 $ 325,000 2022-02 improvements Citywide Traffic Signal Hardware Street Improvement $ 300,000 $ 300,000 2022-03 Upgrades Project Citywide ADA Curb Ramp Street Improvement $ 75,000 $ 50,000 2022-04 Modifications Project 2022-05 Citywide Bridge Inspection & Repair Program Maintenance Project 1 $ 100,000 $ 100,000 2022-06 Cook Street Widening - Phase II Widening Project $ 9,665,500 $ 2,000,000 2022-07 2022-08 TOTAL $ 13,965,500 $ 5,275,000 FY 2021-22 Page 4 of 8 RCTC MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-061 1 Date: May 3, 2019 Estimated Prior Year Measure A Balance: $ 417,315 Estimated FY 2022/23 Measure A Allocation: $ 3,061,000 Estimated Measure A Available for FY 2022/23 Projects: $ 3,478,315 Item No. Project Name / Limits Project Type Total Project Measure A Cost Funds 2022/23 Citywide Pavement Maintenance Project $ 3,500,000 $ 2,500,000 2023-01 Management Program Citywide Street Striping and Lane 325,000 325,000 2023-02 Improvements Maintenance Project Citywide Traffic Signal Hardware Street Improvement 300,000 300,000 2023-03 Upgrades Project Citywide ADA Curb Ramp Street Improvement 75,000 50,000 2023-04 Modifications Project Citywide Bridge Inspection & 100,000 100,000 2023-05 Repair Program Maintenance Project 2023-06 2023-07 2023-08 TOTAL $ 4,300,000 $ 3,275,000 FY 2022-23 Page 5 of 8 ROTC MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-061 1 Date: May 3, 2019 Estimated Prior Year Measure A Balance: $ 203,315 Estimated FY 2023/24 Measure A Allocation: $ 3,138,000 Estimated Measure A Available for FY 2023/24 Projects: $ 3,341,315 Item No. Project Name / Limits Project Type Total Project Measure A Cost Funds 2023/24 Citywide Pavement Maintenance Project $ 3,500,000.00 $ 2,500,000.00 2024-01 Management Program Citywide Street Striping and Lane Maintenance Project $ 325,000.00 $ 325,000.00 2024-02 Improvements p Citywide Traffic Signal Hardware Street Improvement $ 300,000.00 $ 300,000.00 2024-03 Upgrades Project Citywide ADA Curb Ramp Street Improvement $ 75,000.00 $ 50,000.00 2024-04 Modifications Project Citywide Bridge Inspection 8 Maintenance Project $ 100,000.00 $ 100,000.00 2024-05 Repair Program 2024-06 2024-07 2024-08 TOTAL $ 4,300,000 $ 3,275,000 FY 2023-24 Page 6 of 8 MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: PALM DESERT Prepared by: Tom Garcia, P.E., Director of Public Works Phone #: 760-346-0611 Date: May 6, 2019 Anticipated Measure A Funds Estimated/ Expended (Est Actual item No. Project Name / Limits Project Type Total Cost thru 6/30/2019) Completion Status Portola Interchange at Interstate 10 Interchange Project $ 71,993,000 2019-01 $ 333,712 Sept 2022 design phase Cook Street Widening - Phase II, Fred Street Widening 2019-02 Faring to Frank Sinatra Project $ 9,665,500 2022 scoping phase II Citywide Pavement Management Maintenance Project $ 4,000,000 2019-03 Program 2019 working on specs Citywide Traffic Signal Hardware Street Improvement $ 695,170 2019-04 Upgrades Project $ 320,737 2019 scoping Citywide Street Striping and Lane Maintenance Project $ 432,293 2019-05 Improvements Oct 2019 out to bid Jefferson Street Interchange Project Interchange Project $ 312,500 2019-06 9 1-10 $ 8,209 TBD Indio Triple Lett Turns at Washington and Street Improvement $ 500,000 2019-07 Fred Waring Project 2021 Project Status Report FY18-19 Page 7 of 8 MEASURE A LOCAL STREETS AND ROADS PROGRAM Citywide ADA Curb Ramp Maintenance Project $ 160,043 2019-08 Modifications TBD scoping Citywide Bridge Inspection Program Maintenance Project $ 200,000 reviewing Caltrons 2019-09 TBD Report Gerald Ford East of Cook Maintenance Project $ 265,000 finalizing 2019-10 Improvements Dec 2019 agreement Washington Street Traffic Upgrade Street Improvement $ 150,000 finalizing 2019-1 1 Project, Palm Royale to 42nd Project 2020 agreement Citywide Interconnect System Street Improvement $ 293,000 included with traffic 2019-12 Improvement Project Project $ 10,000 Jan 2020 signal hardware Citywide Controller Cabinet Maintenance Project $ 336,000 included with traffic 2019-13 Assembly Upgrades Program Dec 2019 signal hardware Traffic Signal Modification - Hwy I I 1 at Parkview / Painters Path Maintenance Project $ 50.000 2019-14 Jan 2020 To bid in May San Pablo Improvements, Hwy I I I to Street Improvement $ 15,000,000 construction 2019-15 Magnesia Falls Project May 2020 awarded TOTAL $ 104,052,506 $ 672,658 Project Status Report FYI 8-19 Page 8 of 8 FY 2019120 MAINTENANCE OF EFFORT CERTIFICATION STATEMENT The undersigned agrees and certifies for the city of Palm Desert (the "Agency") that sales tax transportation funds received pursuant to Ordinance No. 02-001 of the Riverside County Transportation Commission ("Measure A") shall be used in compliance with the Commission's Maintenance of Effort Guidelines and a base year amount of $2,398,146, approved by the Commission at its September 14, 2011 meeting, and that the Agency shall not use such funds to replace discretionary local funds previously expended by the Agency for local transportation purposes. The Agency hereby acknowledges that the failure of the Agency to continue such local expenditure shall result in a reduction or loss of Measure A funds. Additionally, the Agency commits to expending Measure A Local Streets and Roads funds for projects listed in the Five Year Capital Improvement Plan as approved by Riverside County Transportation Commission. Dated: Ay1)r. .2019 CITY MANAGER 1 � ECRETARY