HomeMy WebLinkAboutC37010B Reject Bids Civic Center Administrative Lobby Rnvtns 724-17(L';
C. C~ - f, -
CONTRACT NO. C37010B
STAFF REPORT
CITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
MEETING DATE: September 12, 2019
PREPARED BY: Emily Roethler, Project Manager
REQUEST: Reject all bids submitted for the construction of the Civic Center
Administration Lobby Renovations (Project No. 724-17).
Recommendation
By Minute Motion:
1) Reject all bids received for the construction of the Civic Center
Administration Lobby Renovations.
2) Authorize staff to re -advertise and call for sealed bids in early 2020.
Funding for this project is in the Fiscal Year (FY) 2019-20 Capital Improvement Program
(CIP) budget, Account No. 4504161-4400100.
Strateaic Plan
While not a specific Strategic Plan Objective, this renovation of the Administration Lobby
will provide for increased safety for those employees tasked with duties in this area.
Backaround
McAuliffe & Co. was selected in 2017 to redesign the Administration Lobby at the Palm
Desert Civic Center. During the design process, the architect took into consideration the
safety and well-being of all staff and the public that use this lobby. In order to achieve this
goal, the renovations include constructing a new secure reception area for front lobby
staff, removing and replacing the existing tile, removing the existing display case and
replacing with a custom display case, and installing custom seating for visitors.
The Civic Center Administration Lobby Renovations project was advertised for bids for
construction on July 17, 2019, and July 24, 2019. On August 6, 2019, sealed bids were
received and opened by the Office of the City Clerk with the following results:
CONSULTANT LOCATION BID AMOUNT
Caltec Corp Westminster, CA $350,000.00
RS Construction & Development, Inc. Upland, CA $440,822.43
September 12, 2019 - Staff Report
Reject Bids for Administration Lobby Renovations and Re -Bid (Project No. 724-17)
Page 2of2
Three (3) days after bids were opened and verified, the low bidder, Caltec Corporation,
submitted a letter formally withdrawing their bid. The letter explained there was a clerical
error on their submitted bid. The City Attorney and staff reviewed the letter and bid, and
confirmed their request to withdraw as valid. With Caltec Corporation's withdrawal, only one
qualified bidder remained. Staff evaluated the second bid from RS Construction and
Development ($440,822.43), which is about twenty percent (20%) higher than the low bid
and significantly higher than the Engineer's Estimate ($372,728.00).
Due to the lack of qualified bidders on the project and discrepancy in bid amounts, staff is
requesting to re -advertise this project in early 2020. This would provide for construction in
the off-season, with the goal of minimizing the disturbance to staff and visitors to the Civic
Center caused by construction related activities.
Fiscal Analvsis
This project is included in the City's Fiscal Year 2019-20 CIP budget; therefore, no fiscal
impact beyond the contract amount is expected.
LEGAL REVIEW DEPT. REVIEW FINANCIAL
REVIEW
I
NIA .r
Robert W. Hargreaves Tom Garcia, P.E. Ja et M. Moore
City Attorney Director of Public Works irector of Finance
City ManagerTLaur�ylaian. /
�� r
ATTACHMENTS: Vicinity Map
Bid Withdraw Letter
ASSISTANT CITY
MANAGER_
Firestine
rant City Manager
RWIkFE-RIiAi?
.rte���os►�w,4r
r
Lw— 1
3 a s J
Givic Genter Administration Lobby
Renovation
Project No. 724-17
1:4,547 Contract No. C37010B
CALTEC
CORPORATION
August 09, 2019
Tom Garcia, Director Public Works
Rachelle D. Klassen, City Clerk
City of Palm Desert
73-510 Fred Waring Drive
Palm Desert, CA 92260
VIA: Email and Fedex
REF: Civic Center Administration Lobby Renovation
Project No. 724-17
Contract No. C37010B
Bid Withdraw
Dear Mr. Garcia:
I am writing in reference to above project's bid opening, which took place on 8/6/2019 at 2:00pm.
After further review of bid documents, CALTEC Corp. has determined there has been a clerical error made in
filling out its bid that makes its bid materially different than is intended.
CALTEC Corp. has carefully inspected all corners of the work with satisfaction and correctly estimated all cost of
Material, Labor, Tools, Equipment, General Conditions, and Overhead and Profit.
Despite of cost estimate and quote from Dexcon Corporation (listed subcontractor) for partial scope of the work,
CALTEC Corp. removed cost estimate of this portion from total project cost and mistakenly did not transfer quote
price of this portion of the work from bid sheet to final estimated cost of the project. This mistake made our bid
materially different as we intended it to be.
Pursuant to California Public Contract Code Section 5100, 5103, CALTEC Corp. requests the Authority relieves
CALTEC Corp. of its bid due to mistake made and accepts the withdraw of our bid for above referenced project.
Please feel free to c ntact me directly at 714-717-1638 should you have any questions.
Sincerely,
Hamid Abghari
President
CALTEC Corp.
Cc: Emily Roethler, Project Manager, Carlos Hernandez, Project Manager