CITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
STAFF REPORT
REQUEST: APPROVE AN EXEMPTION TO THE BIDDING REQUIREMENT
AS PROVIDED IN MUNICIPAL CODE SECTION 3.32.090 TO
ALLOW SOLE SOURCE PROCUREMENT FROM GREENDAY,
LLC, INDIO, CALIFORNIA; AUTHORIZE PURCHASE OF
REPLACEMENT PLANTER BOXES; AND APPRORIATE
$57,842.40 FROM UNOBLIGATED RECYCLING FUND
(PROJECT 997-16)
SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works
CONTRACTOR: Greenday, LLC
43-180 Sunburst Street
Indio, California 92201
DATE: July 9, 2015
CONTENTS: Proposal
Box Location Exhibit
Vicinity Map
Recommendation
By Minute Motion:
1. Approve an Exemption from the Bidding Requirement as provided in
Municipal Code Section 3.32.090 to allow sole source procurement
from Greenday, LLC, Indio, California, for replacement community
garden planter boxes;
2. Authorize the purchase of 28 replacement community garden planter
boxes in the amount of $52,584.00;
3. Authorize the Finance Director to set aside a 10 percent contingency in
the amount of $5,258.40;
4. Appropriate $57,842.40 from Unobligated Recycling Fund; and
5. Authorize the City Clerk to advertise and call for bids for the irrigation
and soil materials at such time appropriate to coordinate with the box
delivery.
Staff Report Contract No. C34580
Approve Bidding Exception and Authorize Purchase of Replacement Planter Boxes
Page 2 of 3
July 9, 2015
Funds are available, after appropriation, in Account No. 2364618-4400100, Recycling
Fund; and for the irrigation repair and soil material in Account No. 234618-4400100,
Park and Recreation Capital Outlay Fund.
Background
The San Pablo Community Gardens located along the west side of San Pablo Avenue
between Royal Palm Drive and Santa Rosa Way was originally constructed in the late
1990s. It is comprised of four separate garden areas: Guadalupe, Catalina, San
Nicholas, and Santa Rosa. The planter boxes were constructed using a recycled wood
and plastic product made to resemble wooden boards. The boards are now badly
warped and material is no longer available for on -going repairs.
In investigating appropriate repair materials, staff located a recycled glass and concrete
product that is produced in the Coachella Valley. The material was recently used on El
Paseo for the trash receptacles and benches, and for replacement picnic tables and
benches in various City parks. The material is manufactured using a minimum of 70
percent post -consumer glass, and will minimize maintenance costs while increasing the
longevity of each planter. The recycled material is also less susceptible to sun damage,
and any necessary replacement parts can be easily obtained through the local
manufacturer. A number of replacement planter options were evaluated by both the
landscape and engineering staff, and these planter boxes were determined to be the
best product for sustainability and longevity.
There are currently two different sized boxes in use at the Guadalupe Gardens. The
replacement planter box sizes will be uniform at 4' x 10', allowing for four additional
planter boxes to be placed in the Guadalupe Garden for a total of 28 planter boxes.
Staff is also requesting authorization at this time to call for bids for the installation of a
new water efficient irrigation system and planter box preparation. City crews will be
used for the demolition of the current garden area and grading in preparation to receive
the new planter boxes. This will minimize the down time for the community gardeners.
In order to minimize inconvenience and unavailability of garden plots, staff is only
addressing the Guadalupe Garden area at this time. The construction period is
estimated to be between 75 and 90 days, making the Guadalupe Garden available for
the fall planting season. It is staff's desire to rehabilitate the remaining San Pablo
Community Gardens in subsequent years.
Staff Report Contract No. C34580
Approve Bidding Exception and Authorize Purchase of Replacement Planter Boxes
Page 2 of 3
July 9, 2015
Fiscal Analysis
The proposed cost for the initial manufacturing, assembly, and delivery of the garden
planter boxes is $52,548.00. On -going maintenance will not be affected by this action,
and staff anticipates a reduction in water usage with the newly designed boxes and
irrigation system.
Prepared By:
— Y/
Randy C ez, L dscape Supervisor
9Z�lj'lw
Paul S. Gibson, Director of Finance
n M. Wohlmuth, City Manager
Departierft 4ead:
Mark Grey ood, P.E"
Director of ubli W ks
Frankie
Director of Special Programs
Contract No. C34580
GREENDAY LLC Page: 2 Date: May 28, 2015
Bid to: City of Palm Desert Project: Community Gardens
We propose hereby to furnish material and labor - complete in accordance with specifications
below, for the sum of:
ONE THOUSAND EIGHT HUNDRED SEVENTY-EIGHT / PER. CONTAINER dollars
$1,878.00 — INCLUDES TAX ON MATERIAL
25% DEPOSIT REQUIRED PRIOR TO MANUFACTURE:
BALANCE DUE UPON COMPLETION AND/OR DELIVERY
Authorized Signature
*Note: This proposal is good for 30 days.
We hereby submit specifications and estimates for:
- -FABRICATE & INSTALL 4' x 10' x 30" HIGH PLANT CONTAINERS, 5" THICK IN 6
SECTIONS
ALL INTERSECTIONS OF PANELS TO BE CONNECTED WITH A HINGE JOINT, SECURED
WITH 17GA., 1 3/8 " GALVANIZED PIPE WITH TREATED RE -BAR INSIDE PIPE BURIED IN
GROUND 6" AT 6 POINTS. THESE PIPES WILL BE FILLED WITH CEMENT AND RECYCLED
GLASS TO SOLIDIFY CONNECTION. THE INSIDE OF ALL HINGE JOINTS WILL BE
COATED WITH 4.5 OZ ALKLAI RESISTANT MESH AND CEMENTIOUS WATERPROOF
COATING. ALL CONTAINERS WILL HAVE A MINIMUM OF 70% RECYCLED GLASS
CONTENT.
- THE WORK TO BE DONE CONSISTS OF FURNISHING ALL MATERIAL, EQUIPMENT,
TOOLS, LABOR AND INCIDENTALS, INCLUDING BUT NOT LIMITED TO
TRANSPORTATION, DELIVERY AND ASSEMBLE AS REQUIRED BY DRAWINGS.
SPECIFICATIONS AND CONTRACT DOCUMENTS FOR THE ABOVE STATED PROJECT. THE
PRICE PER CONTAINER IS COMPLETE INCLUDING ALL APPLICABLE TAXES.
- ALL PLANT CONTAINERS WILL BE SEALED WITH A GLOSS, STAIN RESISTANT
WATERPROOFING -SEALER, ON TOP AND ON THE EXTERIOR.
- TOTAL COST PER CONTAINER: $1,878.00 — INCLUDES TAX ON MATERIAL
Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and we hereby
accept. You are authorized to do the work as specified. Payment will be made as outlined above.
Date of Acceptance:
re
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according
to standard practices. Any alteration or deviation from specifications below involving extra costs will
executed only upon written orders, and will become an extra charge over and above the estimate. All
agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado,
and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance.
NOTICE
"Under the Mechanic's Lien Law (California Code of Civil Procedure, Section 1181 et seq.), any contractor,
subcontractor, laborer, supplier or other person who helps to improve your property but is not paid for his
work or supplies, has a right to enforce a claim against your property. This means that after a court
hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the
indebtedness. This can happen even if you have paid your own contractor in full. If the manufacturer,
subcontractor, laborer, or supplier remains unpaid."
Page 2 of 2
'
. 4Ln
•
a;„
i
m IL
d
fr-
C;
,i
i
c
'i
n
- - -
-._
�i
k
Contract No. C34580
®F YAI.MD
San Pablo Community Gardens
@ Guadalupe
�crNFORMA�®� Date: 2015 VICINITY MAP