Loading...
HomeMy WebLinkAboutPrchs - 4 Trffc Sgnl Cntrllr Cbnt Assemblies - 571-15CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: AUTHORIZE THE PURCHASE OF FOUR TRAFFIC SIGNAL CONTROLLER CABINET ASSEMBLIES IN THE AMOUNT OF $98,602.88 (PROJECT NO. 571-15) SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works VENDOR: Econolite Group, Inc. 3360 E. La Palma Avenue Anaheim, CA 92806 DATE: September 24, 2015 CONTENTS: Bid — Econolite Group, Inc. Vicinity Map Recommendation By Minute Motion, authorize the purchase of four complete traffic signal controller cabinet assemblies in the amount of $98,602.88. Funding is available for this purchase in Account No. 2134294-4400100. Background Currently on Highway 111 and Highway 74, there are 11 signalized intersections being controlled using Type 332 cabinet assemblies with specialized signal controller units. The signal controller units are no longer being produced, and repair support for the units is no longer provided by the equipment manufacturer. Replacement units are not readily available in the event of controller failure. Also, the controller cabinet assemblies will not be compatible with the citywide ATMS Ethernet communication network that is to be implemented in the next few years. This is the first of the three year annual Controller Cabinet Assembly Upgrade Program to replace the 332 cabinet assemblies with the city's standard NEMA TS2 controller assemblies. The four new controller cabinet assemblies will replace existing assemblies at the following locations: • Highway 111 at Park View Drive/Painters Path • Highway 111 at Desert Crossings Drive • Highway 111 at El Paseo/Town Center Way • Highway 111 at San Luis Rey Avenue These locations are shown on the attached vicinity map. Staff Report Authorize Purchase of Four Signal Controller Cabinet Assemblies Page 2 of 2 September 24, 2015 Minor controller cabinet foundation modifications are needed to accommodate the new assemblies. Foundation modifications and installation of the new controller assemblies will be performed by city crews. Econolite Group, Inc., is the sole source provider of traffic signal controller equipment that is compatible with the city's central signal control system. Staff requested and received a quote from Econolite Group, Inc., in the amount of $98,602.88 for the purchase and delivery of four complete traffic signal controller cabinet assemblies. A copy of their quote is attached for reference. Fiscal Analysis There is no fiscal impact beyond the purchase price for the controller cabinet assembly. Man-hours for city crews to install the cabinet and minor material costs to modify the controller cabinet foundations are estimated at $1,000.00 per location for a total of $4,000.00 for all the four locations. Prepared By: Mark . Diercks, P.E. Tra sportation Engineer txTS. Gibson, Director of Finance roval: n M. Wohlmuth, City Manager Depa Mark Gleeowood, P.E" Directoe of Public Works ECONOLITE Quote Date: September 09, 2015 To: 'aim Desert, CA; City of Re: HWY 111 CABINETS r3-510 Fred Waring Drive Econolite Reference: Q-14487-Y311_9 'aim Desert, CA 92260 kttn: Mark Diercks Item # Part # Qty Description Price per Extended 1 CABINET - TS2-1 PNG 4 TS2-TYP1 R-CABINET BUILT TO S18,924.00 $75,696.00 W/CONTROLLER WITH CITY SPECS. for: INCLUDES: CONTROLLER -COBALT 16 POS MAIN PANEL Computer Drawer 12 Red Jumpers 12 Load switches 1 Flasher 4 FTR'S 16 CH MMU EDI eip 2- 8 Position Det Racks EVP Wiring 16- Detectors Aegis Testing 2 COB21120210000 4 Cobalt TS1/TS2-T2 controller, 110V, $3,900.00 $15,600.00 8MB Datakey & Receptacle, FSK Card conf for 9 pin, Touch SW HWY111/Park View Hwy 111/Desert Crossings HWY 111/ Town Center HWY 111/San Luis Rey SubTotal $91,296.00 Shipping & Handling' Taxes" $7,306.88 TOTAL $98,602.88 (iA �17P,r;l Page 1 of 2 ECONOLITE Quote Note: Each product listed in this quotation is available for purchase separately at the itemized price listed. Unless specifically requested or noted on this quotation, the product(s) quoted herein may or may not comply with any Buy America requirements. The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or legally privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited except as required by law. Quote Valid For: 60 days FOB: Econolite Factory Terms: Net 30 days from date of shipment *Shipping: Included **Taxes: Estimated Toyw K.i rk.l44-,& Tom Kirkland -Account Manager tkirkland@econolite.com Shipping Date: 9 weeks ARO, approved credit terms and submittal approval when applicable E'. t d Page 2 of 2 Q o PARK VIEW DR Q Z Q U = Q a R WRINGLi U w o wCATALINA 4+1 z W Z N ROYAL PALM Y G N A ALE S N 0 0 a EL ASEO _ Z w Y �Q SHADOW MT > � Q 0 o W IONWOOD DESERT _ GRAPEVINE F N W J N O - PROJECT LOCATION 0 0 z VICINITY MAP DATE: 09 09 2015 SCALE: NTS CONTROLLER CABINET ASSEMBLY UPGRADE PROGRAM (PROJECT NO. 571-15) SHEET NO. D MS DEPARTMENT OF PUBLIC WORKS CITY OF PALM DESERT