Loading...
HomeMy WebLinkAboutInfo Rprt - Striping - Shepherd Ln Btwn Julie Ln-Frnk SinatraCITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: RECEIVE AND FILE INFORMATION RELATED THE STRIPING OF SHEPHERD LANE BETWEEN JULIE LANE AND FRANK SINATRA DRIVE SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works DATE: October 8, 2015 CONTENTS: Typical Striping Layout Exhibit Reduced Size — Concept Striping Plan Vicinity Map Recommendation By Minute Motion, receive and file information related to signing and striping improvements on Shepherd Lane between Julie Lane and Frank Sinatra Drive. Background From Julie Lane south to Frank Sinatra Drive, Shepherd Lane is a fully improved 52-foot wide collector street. This street section currently is un-striped. The location of Shepherd Lane is shown on the attached Vicinity Map. At the request of a City Council member, staff reviewed potential roadway striping configurations along this section of Shepherd Lane. Upon review of the potential configurations, staff determined that Shepherd Lane should be striped with a two-way left turn lane, one travel lane in each direction (north -south), and painted bike/golf cart lanes on each side of the roadway. Please note that installation of the bike/golf cart lanes will restrict on -street parking along this section of Shepherd Lane. The attached Typical Striping Layout Exhibit depicts the typical striping configuration for Shepherd Lane. The attached Reduced Size — Concept Striping Plan depicts the striping layout along the complete section of Shepherd Lane. Staff Report Informational item — Striping of Shepherd Lane Page 2of2 October 8, 2015 Installation of the signing and striping improvement along this section of Shepherd Lane will be included with this year's annual citywide striping project. The annual Citywide striping will be advertised for bid in late October and the project should be underway by January 2016. Fiscal Analysis Installation of the signing and striping improvements on Shepherd Lane between Julie Lane and Frank Sinatra Drive is estimated to cost $10,000. The cost of the annual Citywide striping project will increase by this amount with the Shepherd Lane improvements included in the project. Prepared B Depa a ad: Mark . Dier4s,P.rF-. Mark G e wood, P. Trans rtation Engineer Directorlof r ublic Works Paul S. Gibson, Director of Finance City Manager G iPub WorkslStaff ReportsQ01510ctober 802 Information Item - Shepherd Lane StripinglSR - Informational Item on Shepherd Lane Striping docx t f� > .: %� \, « \ IN3§2: a. : c LLJ U— CD w w F- w cc LU � CL t" j uj i m uj 0 LLJ