Loading...
HomeMy WebLinkAbout25 Design Svcs Haystack Road Traffic CalmingMEETING DATE: PREPARED BY: REQUEST: Recommendation STAFF REPORT CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT December 16, 2021 Audrey Nickerson, Project Manager Approve Amendment No. 2 to Contract C37870A with KOA Corporation of Monterey Park, California, for engineering design services in an amount not to exceed $229,122.96 for Haystack Road Traffic Calming and Safety Improvements (Project No. 667-21). By Minute Motion: 1) Approve Amendment No. 2 to Contract C37870A with KOA Corporation of Monterey Park, California, for design services in an amount not to exceed $229,122.96; 2) Appropriate $230,000 from the Measure A Fund 231 for the Haystack Road Traffic Calming and Safety Improvements project; 3) Authorize the Mayor to execute the agreement; and 4) Authorize the City Manager to execute any additional amendments and related documents associated with this contract based on staff's recommendations. Upon approval of the actions above, funds will be available from the Measure A Fund. An amendment to add this project in the City's Measure A CIP List has been submitted to the Riverside County Transportation Commission (RCTC) for approval. Strategic Plan Objective The proposed projects will further the goals of the Strategic Plan by providing a safe, efficient, and reliable transportation system for residents and visitors. Background At its May 28, 2020, meeting, the City Council awarded Contractor No. C37870A in an amount of $720,431.00 to KOA Corporation of Monterey Park, California, for professional engineering, landscape architecture and design services for the CV Link Painters Path Spur Improvement (Bump and Grind to El Paseo) Project. The project has since been renamed to PD Link. December 16, 2021 — Staff Report Haystack Road Traffic Calming and Safety Improvements Design Amendment Page 2 of 4 Following an April 2, 2021, automobile collision at the intersection of Haystack Road and Heliotrope Drive, the City Manager directed the Public Works Department to develop a strategy to address community concerns over motorist speeding, and safety for all roadway users along Haystack Road. City staff chose to amend the PD Link contract with KOA for the Haystack Road Traffic Calming and Safety Improvements project for these reasons: • The consultant developed methodology for the PD Link project that will serve as an appropriate template for conducting the Haystack Road project; • The consultant is following an effective community engagement strategy for PD Link, and has established relationships within the Palm Desert community; • Strategies to improve roadways within the PD Link project mirror aspects of community concerns being heard regarding Haystack Road, including improvements to lower motorist travel speeds, increasing pedestrian and bicycle safety, and expanding multi -modal connections within Palm Desert. • Amending the existing contract with KOA Corporation is an expedient alternative to commence design and implementation of Haystack Road improvements KOA prepared the Haystack Road Traffic Calming and Safety Study, which was presented to City Council on November 18, 2021. The study contains the following: • A summary of existing conditions along the Haystack Road corridor • A summary of stakeholder engagement • General transportation improvements that may address issues associated with intersection safety, speed management, pedestrian improvements, and bicycle improvements • Proposed implementation plan — priority approach based on effectiveness, durability, cost, and timing The City Council directed staff to implement: • Intersection safety improvements at Alamo Drive, Chia Drive, and Moon Lane; and • A Class IV golf cart/bikeway on the north side of the roadway Priority FY 2021/2022 Beyond FY 2022/2023 Estimated Improvement Cost * Establish all -way stop control at Alamo Drive, Chia Drive, and Moon Lane (accompanied by sidewalk ramps, marked crosswalks, cross street placards, and stop ahead warning signs Construct Class IV golf cart/bikeway on the north side of the roadway (requires slurry seal of entire roadway) * Costs include design and construction. $65,000 $950,000 December 16, 2021 — Staff Report Haystack Road Traffic Calming and Safety Improvements Design Amendment Page 3 of 4 In addition, Council requested that staff identify pedestrian and bicycle connectivity from the PD Link corridors to Haystack Road. City staff propose a second amendment to the contract with KOA to continue with the design of the Haystack Road Traffic Calming and Safety Improvements project for these reasons: • The consultant recently completed the Haystack Road Traffic Calming and Safety Improvements Study. • The consultant has followed a methodology for the PD Link project that will serve as an appropriate template for conducting the Haystack Road project. • The consultant is following an effective community engagement strategy for CV Link Connectors project and has established relationships within the Palm Desert community. • Amending the existing contract with KOA Corporation is an expedient alternative to commence the Haystack Road project. On November 29, 2021, KOA Corporation submitted a detailed proposal for design services with a proposed cost of $229,122.96. Fiscal Analysis An amendment to add this project in the City's Measure A CIP List has been submitted to the Riverside County Transportation Commission (RCTC). Funds will not be encumbered or expended until RCTC has approved the amendment; there will be no impact to the City's general fund for the project. The following table summarizes the anticipated cost of the projects. Project Contract No. C37870A Amendment No. 1 Amendment No. 2 Funding Source New Construction Tax Measure A Measure A Year FY20/21 FY21/22 FY21 /22 1 Bolded amount is the subject of this request Description PD Link Design Haystack Road Traffic Calming Study Haystack Road Traffic Calming Design Amount' $720,431.00 $99,897.00 $229,122.96 Total Project Cost $1,049,450.96 December 16, 2021 — Staff Report Haystack Road Traffic Calming and Safety Improvements Design Page 4 of 4 LEGAL REVIEW FINANCIAL Approved as to Form DEPT. REVIEW REVIEW N/A .Andy ,Firestine Robert W. Hargreaves City Attorney Andy Firestine Assistant City Manager ;1.et 141.11flflt Janet M. Moore Director of Finance City Manager: L. Todd Hileman: L_. TOGaG4 t t%1evu a v� Attachments: 1. Contract Amendment No. 2 2. Vicinity Map CITY COUNCIL 1CTION APPROVE?) VV DENIED RECEIVED OTHER MEET AYES: NOES: Te- ABSENT: NOON' ABSTAIN: NVt1e-- VERIFIED BY 1J i t I S (-s Original on File with City Clerk's Office It P Amendment ASSISTANT CITY MANAGER .Andy Firestine Andy Firestine Assistant City Manager rni CONTRACT NO. C37870A AMENDMENT NO. 2 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF PALM DESERT AND KOA CORPORATION Contract No. C37870A 1. Parties and Date. This Amendment No. 2 to the PROFESSIONAL SERVICES AGREEMENT is made and entered into as of this 16TH day of December, 2021, by and between the City of Palm Desert ("City") and KOA CORPORATION, a California Corporation with its principal place of business at 1100 Corporate Center Drive Suite 201, Monterey Park, CA 91754 ("Consultant"). City and Consultant are sometimes individually referred to as "Party" and collectively as "Parties." 2. Recitals. 2.1 Agreement. The City and KOA Corporation have entered into an agreement entitled "PROFESSIONAL SERVICES AGREEMENT" dated May 28, 2020 ("Agreement" or "Contract") for the purpose of retaining the services of Consultant to provide certain professional services. 2.2 Amendment. The City and KOA Corporation desire to amend the Agreement for additional professional services related to the Haystack Road Traffic Calming and Safety Improvements project in the amount of $229,122.96. The Parties have heretofore entered into that Amendment No. 1 dated May 13, 2021. 2.3 Amendment Authority. This Amendment No. 2 is authorized pursuant to Section 3.6.14 of the Agreement. 3. Terms. 3.1 Schedule of Services. Section 3.2.2 of the Agreement is hereby amended in its entirety to read as follows: "Consultant shall perform the Services in a prompt and timely manner in accordance with the Schedule of Services set forth in Exhibit "A" and Exhibit "B" attached hereto and incorporated here by reference. Consultant represents that it has the professional and technical personnel required to perform the Services expeditiously. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services." 3.2 Compensation. Section 3.3.1 of the Agreement is hereby amended in its entirety to read as follows: "Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" and Exhibit "B" attached hereto and incorporated here by reference. The total compensation shall not exceed One Million Forty Nine Thousand Four Hundred Fifty and 96/100 Dollars ($1,049,450.96) without written approval of the City Council or City Manager, as applicable." 3.3 Continuing Effect of Agreement. Except as amended by this Amendment No. 2, all Page 1 of 7 72500.00001 \32445060.1 (Revised 10-06-20) CONTRACT NO. C37870A other provisions of the Agreement remain in full force and effect and shall govern the actions of the parties under this Amendment No. 2. From and after the date of this Amendment No. 2, whenever the term "Agreement" or "Contract" appears in the Agreement, it shall mean the Agreement as amended by this Amendment No. 2. 3.4 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 2. 3.5 Severabilitv. If any portion of this Amendment No. 2 is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect. 3.6 Counterparts. This Amendment No. 2 may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument. [SIGNATURES ON FOLLOWING PAGE] Page 2 of 7 72500.00001 \32445060.1 (Revised 10-06-20) CONTRACT NO. C37870A SIGNATURE PAGE FOR AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF PALM DESERT AND KOA CORPORATION IN WITNESS WHEREOF, the Parties have entered into this Amendment No. 2 to the PROFESSIONAL SERVICES AGREEMENT as of the day and year first above written. CITY OF PALM DESERT KOA CORPORATION Approved By: KATHLEEN KELLY MAYOR Attested By: Norma I. Alley, MMC, City Clerk Approved As To Form: By: Best Best & Krieger LLP City Attorney Signature Name Title Signature Name Title Page 3 of 7 72500.00001 \32445060.1 (Revised 10-06-20) CONTRACT NO. C37870A Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On , 20, before me, , Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER ▪ Individual ▪ Corporate Officer Partner(s) Title(s) ❑ Limited General ❑ Attorney -In -Fact ❑ Trustee(s) ❑ Guardian/Conservator • Other: Signer is representing: Name Of Person(s) Or Entity(ies) Page 4 of 7 DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above 72500.00001 \32445060.1 (Revised 10-06-20) OONTRACT NO. C37070A Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On 20, before me, , Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER Individual Corporate Officer Title(s) Partner(s) ▪ Attorney -In -Fact ▪ Trustee(s) ❑ Guardian/Conservator • Other: Signer is representing: Name Of Person(s) Or Entity(ies) Limited ▪ General Page 5of7 DESCRIPTION OF ATTACHED DOCUMENT Title or Type of Document Number of Pages Date of Document Signer(s) Other Than Named Above 72500.00001 \32445060.1 (Revised 10-06-20) CONTRACT NO. C37870A EXHIBIT "A" SCOPE OF SERVICES, SCHEDULE OF SERVICES, AND COMPENSATION Page A-1 72500.00001 \32445060.1 (Revised 10-06-20) CONTRACT NO. C37870A EXHIBIT "B" SCOPE OF SERVICES, SCHEDULE OF SERVICES, AND COMPENSATION Page B-1 72500.00001 \32445060.1 (Revised 10-06-20) Haystack Road Traffic Calming Improvements A z lV JTIolve r Jtreet c t1jN� Flripayy Mcdir .e+, a. Ala !MOO enua de,....,"q f i N - PE E tl Silt Cedar Street Desert Holly Street .e.2f fi. T orsikii,e':,III 0 e • E2 8 2 Zit 19* di 140 Loma Vista Lane Buckboard Trail II2JE M.u„q Mor Barg\y v �� am. At _ 1 I 1 J Monte a '. ■ dr.y� �cCi�7p Alai Isadsod as 911e0 P C i 2. $ 4 Y Ado . ;l 1 omeot tJ r.uau 31, 4-1 Lo II lk Location Map