HomeMy WebLinkAbout2020-07-14 ARC Regular Meeting MinutesCITY OF PALM DESERT
ARCHITECTURAL REVIEW COMMISSION
MINUTES
JULY 14, 2020
(VIRTUAL ZOOM MEETING)
CALL TO ORDER
The meeting was called to order at 12:30 p,m.
ROLL CALL
Commissioners
Chris Van Vliet, Chair
Karel Lambell, Vice Chair
Allan Levin
Michael McAuliffe
Jim McIntosh
Jim Schmid
John Vuksic
Current Meeting
Present Absent
X
Also Present
Ryan Stendell, Director, Community Development
Eric Ceja, Principal Planner
Kevin Swartz, Associate Planner
Nick Melloni, Assistant Planner
Russell Grance, Director, Building & Safety
Pedro Rodriguez, Code Supervisor
Deborah Glickman, Economic Dev
Wayne Olsen, Economic Dev
Janine Judy, Recording Secretary
Cancelled meeting: 12/24/19, 3110/20, 3/24/20, 4/14/20
ORAL COMMUNICATIONS
APPROVAL OF MINUTES: June 23, 2020
Action:
Year to Date
Present
Absent
8
2
9
1
10
9
1
9
1
9
1
9
1
Commissioner Levin moved to approve the June 23, 2020 meeting minutes.
Motion was seconded by Commissioner Lambell and carried by a 6-0-1 vote,
with Lambell, Levin, McAuliffe, McIntosh Schmid, and Vuksic voting YES and
Van Vliet absent.
ARCHITECTURAL REVIEW COMMISSION
MINUTES
V. CASES:
A. Final Drawings:
None
B. Preliminary Plans:
July 14, 2020
The Architectural Review Commission considered Case PP 19-0010, but it was
incorrectly listed on the agenda as "Waring Medical Plaza SARC 19-0010."
Commissioner Vuksic recused himself from this project and left the meeting.
1. CASE NO: "PP 19-0010"
APPLICANT AND ADDRESS: DMA, 35493 Veranda Avenue,
Wildomar, CA 92595
NATURE OF PROJECTIAPPROVAL SOUGHT: Consideration of a
recommendation to the Planning Commission for approval to construct a
two-story 18,434-square-foot, multi -tenant light industrial building: Alpha
Holdings Building.
LOCATION: 73-725 Dinah Shore Drive
ZONE: SI
Mr. Nick Melloni, Assistant Planner, presented a request for approval to
construct a two-story 18,434-square-foot light -industrial building on
Dinah Shore Drive. The building will feature suites for up to three tenants.
The building architecture is characterized by simple rectangular massing
and forms, which are consistent with the intended industrial nature of
future building tenants. Primary entrances to the respective suites are
oriented towards Dinah Shore Drive (Dinah Shore). Each of these
entrances is highlighted by a covered entry projecting outwards from the
primary mass of the main building. The side and rear elevations feature
limited articulation, with the rear featuring industrial style roll -up doors.
The exterior finish palette consists of various shades of gray and stacked
stone veneer. The building design screens roof -mounted equipment and
exhaust vents with a continuous six-foot parapet wall. Electrical
equipment and fire risers will be located within a room towards the rear
of the building. Roof drains and gutters will be located within the walls of
the building. The majority of site landscaping is concentrated along the
street frontage within the proposed retention basis. The landscape
palette consists of a mix of desert -native shrubs, and accent plants
including various agave and yucca. Trees, including Blue Palo Verde and
Chitalpa Pink Dawn will be placed within the parking areas and around
the rear and side perimeter of the development. The project generally
GAPlaning%JardneJudV%ARMlMinutee120201200714nin.doex Page 2 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
ACTION:
July 14, 2020
complies with the development standards for the SI zone, with the
exception of the landscape coverage requirement, as the SI zone doesn't
not have a specific landscaping coverage requirement. Staff
recommends preliminary approval of the project as purposed and allow
the project to move forward to a public hearing with the Planning
Commission.
Commissioner Lambell was concerned with the lack of shade noted on
the renderings and asked the architect what can be done to avoid this
becoming just a flat face. MR. DAVE MADDEN, architect, pointed out
that the articulation is achieved by the three (3) entryway covers one on
each side of the high tower. The covered entries with the rock veneer
stick out 4 to 6' from the building
Commissioner Levin and MR. MADDEN discussed the lack of recess on
the windows. MR. MADDEN said on the front elevation he will take the
four center windows on the left and right side of the entryway, double
frame a wall in front of it and recess them 4" to 6". Commissioner
McAuliffe thinks that will work and suggested they double frame and set
the windows to the inside to give them about 6" of recess.
Commissioner McAuliffe and MR. MADDEN discussed the areas for the
roof drains. MR. MADDEN said they will have interior drains one on the
left and one on the right that will drain towards the front with pickups in
the roof to catch the water.
Commissioner Levin moved to approve subject to double -framing and
setting windows to the inside on either side of the primary entry to create
additional recess and architectural interest, as well as shading. Motion
seconded by Commissioner McAuliffe and carried by a 5-0-1-1 vote, with
Lambell, Levin, McAuliffe, McIntosh, and Schmid, voting YES, Vuksic
abstaining and Van Vliet absent.
2. CASE NO: PP/CUP 20-0003
APPLICANT AND ADDRESS: CHANDI ENTERPRISES LLC, Attn:
Toni Merrihew, 42270 Spectrum Street, Indio, CA 92203
NATURE OF PROJECTIAPPROVAL SOUGHT: Consideration to
approve a mixed -use project consisting of approximately 16,500 square
feet of retail/office uses on the ground floor, and 60 residential units (1-
3 bedrooms) on the second and third floors; Chandi Mixed -Use
Project.
LOCATION: SEC Fred Waring Drive & San Pablo Avenue
ZONE: DE
G.UnanningUenineJudMRC%lMintmtoW0201x00714udmdocx Page 3 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
July 14, 2020
Mr. Kevin Swartz, Associate Planner, reminded the Commission this
came before them September 24, 2019 for review of a conceptual
design for a mixed -use project consisting of approximately 16,500-
square-feet of retail/office uses on the ground floor and 60 residential
units (1-3 bedrooms) on the second and third floors. This vacant
property is located across from City Hall on the corner of Fred Waring
Drive (Fred Waring) and San Pablo Avenue (San Pablo) and is zoned
Downtown Edge which allows for mixed -use development up to three
stories. A year or two ago the City Council awarded the property to the
Chandi Group to develop a three- (3) story mixed -use project. The one
bedroom units will be approximately 711 square feet, two bedroom units
wIll be a little over 1,000 square feet, and a few three bedroom units will
be a little over 1,300 square feet. On the ground floor there will be about
16,000 square feet of retail/commercial facing San Pablo. Mr. Swartz
presented the parking summary and stated they have met the parking
requirements. He pointed out an art piece that will be a focal point
facing the intersection, as well as having an outdoor plaza atmosphere
and an inviting atmosphere of cafes, restaurant or bars on the corner of
San Pablo and Santa Rosa Way. He said the importance of this project
is being the first three story mixed -use development.
MS. TONI MERRIHEW, Chandi Group USA, reminded the Commission
that about a year ago they brought an early conceptual design to them,
as well as a couple of the City Council members for review and
comments. After meeting with the City, they took the suggestions back
to their architectural design team, but unfortunately the plans weren't
evolving and Mr. Chandi made the decision to start with a new
architectural team and they are excited with the current changes.
MR. MIKE BOYD, Architect with Danielian Associates, said this is a
prime site along San Pablo and Fred Waring and they wanted to take
advantage of these two corners of the site to create some interesting
public spaces and allow the public to come into the retail commercial
layer. It is also important to give the apartment residents a feeling of
security and separation from that public realm. They have created a
resort like deck with pool, spa and other amenities on the roof of the
garage and the two level parking structure will not be seen from the
street. The challenge with the building size is having enough articulation
in the elevations so they created an exciting street scene with a lot of
massing breakups.
MR. LOUIS BRETANA, Lead Designer with Danielian Associates said
they are trying to create a building that gives a sense of space and
engage with City Hall, and a street scene that helps with interaction with
San Pablo. They articulated the building to reduce the mass and used
a landscape palette that will respond to the desert environment that
won't deteriorate in the extreme heat. He described the screen shapes
and balconies to help shade the sun, a dynamic corner at San Pablo
G.VionningUanineJudykARC%lMlnutesUO2Uk2OU7l4min.dace Page 4 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
July 14, 2020
and Santa Rosa Way (Santa Rosa) with a cafe and outdoor dining
space. He liked the constraints of the building shape as it creates a real
dynamic outdoor space that isn't so uniform, as well as an expanded
pedestrian and vehicular experience.
MR. JOE WICENTOWICH, Senior Project Manager with Danielian
Associates, provided an overview of the building systems, the type of
construction and how they are bringing services into the building. He
described the two points of entry; one off Fred Waring and the other off
Santa Rosa that will provide access for trash pickup and other
supplementary loading and unloading. The overall building composition
is a non-combustible podium type structure with concrete and steel on
the first level for retail commercial, as well as the parking and wood
construction on top of the podium and fire rated as required. The rooftop
units will all be centralized over the roof areas and hidden with a 5' to 6'
mechanical screening. The only thing they are not accounting for right
now is the placement of the boiler pad that is a program requirement
which will be discussed with the client. In lieu of water heaters in each
individual unit, they may have a central boiler with appropriate
screening. The central room in the parking area will be towards the
back. They will make accommodations for condensing units on the
backside or adjacent to the residential units. The fire riser room will
probably occur in the trash area. They will provide space for mechanical
systems to allow ventilation and will have a lot of openings available.
MR. CHRIS HERMANN, Hermann Design Group, presented renderings
for resident active space, a fitness center, and covered cabana type
seating areas, a little pool, outdoor seating, tables, chairs, a barbecue
area and a fire pit. He explained that the deck is raised a couple steps
to get a pool depth of about three feet. There will be raised planters with
palm trees and tubular steel fencing.
MR. OPUS GARZA -- Hermann Design Group, pointed out and
described the three points of access with gates on the east side. He
explained that their plan was to soften up all the hard scape by planting
in a hierarchy with the first row low and tight and the background a little
higher to provide screening.
The Commission and the applicants discussed the locations of the
elevators and all points of access to the project, as well as resident's
access to the pool from their apartments.
The Commission reviewed and discussed how the project relates to the
single family home on the east elevation along Santa Rosa. The
landscape team said they could provide privacy screening for the home.
The Commission was concerned that landscaping would not be
adequate for this three-story project and suggested they explore a
landscaped terrace above the parking garage to create architectural
treatments or a landscaped privacy screen for the balconies.
G.VienningUenineJudylAHCllMinvto$W020%200714min.docx Page 5 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
July 14, 2020
Commissioner McIntosh suggested they show in true scale the massing
of the relationship of the building and the existing residential home to
the east.
The Commission and applicant discussed the recesses and eyebrows
on the windows to help shade the residential units. Commissioner
Vuksic suggested the eyebrows over the windows project 1 8" to 24" and
said they need to be constructed at that depth.
The Commission reviewed and discussed the openings in the building's
design for cross flow and ventilation in the courtyard. The applicant
provided the rendering to show the openings and after further
discussion said they will take another look at this.
The Commission and the applicant discussed the onsite storm water
retention plan. Mr. Swartz stated that Public Works is working on this
with the applicant.
The Commission asked about the utilities for both the commercial and
the residential units. The applicant said the residential units will have
central air units and each unit will stand alone for water, gas and
electricity. Commissioner Levin suggested they indicate on the plans
the locations of all utilities and mechanical rooms for commercial and
residential units. He also asked where the meters will be located and if
they will be visible. He asked them to show that on their renderings as
well.
The Commission had further conversation about the neighboring
adjacent property. Commissioner McAuliffe suggested the applicant
provide a simple massing of the home to see it in section and even in
perspective. He said it will also be important in how they further develop
this area with landscape or additional architectural treatment.
The Commission reviewed the parking structure and Commissioner
McAuliffe said since the structure is concrete he suggested that it will
be important that the concrete is treated as an architectural finish and
detailed in a way where it looks like a finished product and not an
unfinished parking deck, particularly because it is so close to the
residential property on the east elevation.
Commissioner McAuliffe left at 1:50 p.m.
The Commission discussed the large stone surfaces on the building.
Commissioner Vuksic said the stone surfaces/pieces need to be sized
appropriately for the scale of the large wall surfaces and the same
applies to the accent tiles_
The Commission discussed the material for the mechanical screening_
The applicant stated they haven't picked out a specific product but it will
GAPIanningUanlne JudMRC%lMInuies120201200714min.doex Page 6 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
July 14, 2020
be something more architectural versus utilitarian. Commissioner
Vuksic was concerned that the tenants on the upper levels will see the
mechanical units and suggested they re-examine the visibility of the
screening from the 3rd floor units.
Commissioner Vuksic referred to the vertical windows with eyebrows on
either side of the open area on the corner of Fred Waring and San Pablo
that are pretty significant. He suggested they fur the walls to read as
slots on the south elevation to have more than 3" of recess.
Commissioner Vuksic told the applicants as they move forward with the
schematic design to submit more details to the floor plans, roof plans,
parking plan, and design details. Mr. Swartz reminded the applicant
and the architect that they will have to submit a sign program and to
start thinking about where the signs will be located and to show them
on the renderings.
Commissioner Schmid asked the applicants if they have considered
solar panels on the roof. The applicant said they will meet with their
energy consultant but it is something they definitely will research. MS.
MERRIHEW said Mr. Chandi has indicated his preference to install
solar on this building.
ACTION:
Commissioner Vuksic moved to continue subject to: 1) eyebrows over the
windows project 18"-24" and need to be constructed at that depth; 2)
explore a landscape terrace above the parking garage on the east elevation
to create architectural treatments or landscaping as a privacy screen for the
balconies and for the existing residential homes; 3) create openings for
cross flow or ventilation for the courtyard; 4) address on -site storm water
retention plans with the Public Works department; 5) indicate location of all
utilities and mechanical rooms for commercial and residential units; 6) show
in true scale the massing of the relationship of the building and the existing
residential home to the east; 7) the exterior finish of the parking deck needs
to be a treated architectural finish and detailed in a way to appear as a
finished project and not an unfinished parking deck; 8) the stone
surfaces/pieces need to be sized appropriately for the scale of the large
wall surfaces. Same applies to the accent tiles; 9) re-examine the visibility
of mechanical screening from the 3rd floor residents; 10) fur walls to read as
slots on south elevation; 11) as the applicant moves forward with the
schematic design, submit more details to the floor plans, roof plans, parking
plan, and design details; 12) indicate approximate signage locations on
renderings; and 13) eventually, a Sign Program will be required at a later
date. Motion seconded by Commissioner McIntosh and carried by a 5-0-2
vote, with Lambell, Levin, McIntosh, Schmid, and Vuksic voting YES, and
McAuliffe and Van Vliet absent.
GAPlanningUenina JudMFtO1MInuses120201200714min.doe: Page 7 of 8
ARCHITECTURAL REVIEW COMMISSION
MINUTES
C. Miscellaneous Items:
None
VI. COMMENTS
July 14, 2020
The Commission and staff discussed Avenida Senior Living, the proposed sculptures
for the turn -around on San Pablo Avenue (San Pablo), and the second phase of the
San Pablo street project.
VII. ADJOURNMENT
Commissioner Levin moved to adjourn the Architectural Review Commission meeting
at 2:25 p.m.
a
ERIC CEJA
PRINCIPAL PLAN R
SECRETARY