Loading...
HomeMy WebLinkAboutEl Pollo Loco_1 1 t WATER BUDGET CALCULATIONS: IRRIGATION NOTES VERIFICATION: �Clty of Pallm Dfte" ' "ESTIMATED WATER USE FOR Bank of America-Desert Gateway ETo (ZONE 4) 93.9" s The system is based on a 80p.s.l.and 40 g,p.m.minimum available at the discharge t i�#i011 1 a E big g outlet of the meter or other point of connection. The contractor shah verify the samelee LAWN-Square Feet = 0 sq.ft at the award of the contract. The contractor shall notify the Landscape Architect . TREES/SHRUBS/GC Square Feet = 4,672 90t. Immediately if the data Is significantly different and would adversely affect the operation i TOATAL LANDSCAPE Square Feet = 4,672 sq.ft of the system. Such notice shall be in writing and shall occur within 5 days of contract award for projects anticipated to take two weeks or longer or 72 hogs prior to Coll ftx noernent ,'�, .� rs�' r ,'r .~ .." . .�► . . . `" : • . . LOW CATEGORY TREESlSHRUBSiGC Square Fee# = 2,602 sq.ft r' • . M • r a sq• for projects anticipated to take two weeks or tes& ffi t MODERATE CATEGORY TREES/SHRUBSiGC Square Feet = 2,070 sq.ft SCHEMATIC 1 }The system features are shown schematically for graphic dwityy:install all piping and ESTIMATED ANNUAL APPLIED WATER USE valves in common trenches(the minknum caover noted In the legend Is required for the upper ++ recap sgalhMeslbce s 1 10 most Nne where feasible and Inside areas. Valves and main lines shall be located � rfi �� Low Water Hydrozone j TAtatagmw root %AdlerUri t EAAWU =93.9 x.2 x 2602 x.62/748/.90= in plarrhteW areas. ,,, € 45.0 CCF per Year Moderate Water Hydr+ozone CODES two W- sac 'Wow. 3 E The Irrigation system and all other mechanical,electrical,and structural systems be Fae illy s, WM EAAWU=93.9 x.5 x 2070 x.62!7481.90= !ns#aNed In accordance with all federal,state,and kxxd codes and manufacture specificatlone 1 �" r. i ® / . 140.0 CCF per Year reoomrrierhdatkarhs and requirements. Notify the Landscape Architect imrrmfttely in writing prior a Project Total EAAWU= y /// i 0 CV � V to signing a contract with the owner of any confikts. Conflicts noted Mer signing or after 7 0 o c' ; i a 185 CCF per Year the commencement of wok shall be the ads responsibility of the contractor. 4 # Win, 7 1 L J f E--• /�// /// / / i MAXIMUM ANNUAL APPLIED WATER USE - // } MAAWU =93.9 x.6 x 4672 x.62/748= HEAD ALLOWANCE -eaft (n �/ 218 CCF Year The contactor Is required to provide the owner with a complete project. Hafthe shah install any � � ' / additional treads,nozzle changes,valves,Irrigation litres,wire,etc.as necessary to accommodate Ntia her antpetaMsL LA This Pmject's EAAWU Is less than the MAAWU any nary feeld changes. The contractor shall make all needed changes as dir�d by the II MOlI COntToilt i' / Landsc ape Architect and provide the owner with a complete project at no additional oast to the 6* I / owner.The contractor is to also notify,the Landscape Architect should any major changes are IV~ 3 ex&19 66.709 / WATER CONSERVATION CONCEPT STATEMENT wry In the field prior to Installation. � o� le34Mt r lhosi�rHl tf ooa mom / T Project-Site: City of Palm Desert, California Par+cei#:30502 0-M 0.00oe Prroject Location: NEC Monterey Road and Marketplace CHECK VALVES t•oN► s ao 1ns Prior to ,Installer shall teal! and check Valves at the base of 1,04ettod"rMelts t. Q0f3 s9.t plantlrhg irrigation system provide any heads that display low end drelnage.These shall be Included In the oontrac kn price and o / Landscape Arc bite& Robert Curley'CummingsCurley and Associates WD a6o Ids 1 T1"so 0M0 0.6©0 shall be added as directed by the Landscape Architect and provide the owner with a complete Ho Tfus 3- tk 89.10 ' Submitted with this Project: project with no additional cost to the owner. TOM Ito 1. Maximum Annual Applied Water Allowance: GUARANTEE ? 9re The contractor shall guarantee the Irrigation system and all�components for the period of Conventional Landscape:218 CCF/Year one year after Lind acceptance by the Lie Architect. The contractor shall be responsible100 2. Estimated Annual for ash materials and labor associated with the guarantee,including but not limited to the rralrc / WOW Use }} Low Plant H CF/Year Hiydrozone loss of plant material or damage to structures due to the!allure or the Irrigation system. °'"t f EL / f Yd ahwrae► z«ia EM A AM a'dap�ewl s ,. aaraaer W& 0.0, 7/a an► , . ; Moderate Plant H rozones: 140 CCFNear 20.E .02 IM a: r4as e 6 / Estimated Armual Applied weber Use: 185 CCF/Year SLEEViNG 1 2924 � w The contractor shall be responsible for providing adequately sized Weaving to cif irrigation. 7 / o 3. EATAWU(185)<MAAWA(218) lighting,and other landscape components. The drawings are intended to be a guide only. Sleeves shah be dearly mairked during construction and shall occur under all pawed areas and shaft _ Q 4: Landscape Design Plan extend 1'minimum all #beyond Paving• sweet, zonat ft Linea! law a=aeloia >aser+eeea ' f uae,= sBoer O e>z roe kKK I !Onset 5. Irrigation Design plan _ .6s s,. - / Q N ELECTRICAL SERVICE b7 29 o ash 14s �} 1. , I Description of �. 16.97 os $st _ eheax 14a1 e> to This land n with similar weber needs .T Ail exposed 110V wires elect be placed in rigid m�condult and hid wired directly to 110V � � system service. All exposed low voltage wire for Irrigation and lighting shall also be placed in M efficiently irrigate all zones through the use of pressure 00mAwting b *kws and drip irrigation system. ��a conduit. # Q / {' U Ta711a try. Mafia e�Mw1M { 11"1 S / O 4 i p sewer Zextal l lies aoMat Aaaf r C' rneion 1=i�oea asAlr+ea�d / # yak* Q 20.89 0: 1064 am M D � ; / � I Date:January 31, 2006 Prepared By: 5729 a 1g34.� ales x� ss 4araarer 0 .9i ex °�16.97 / i LLJ 00, e`. k� +retire as...urer F / �/ f o to 4 .rr,4,. 4 LDWTNO / / /. 01son" zow a* ftqt Am FWM of fi vat* Mift it t ea ero 1 1049 aar I vow Ulm a / / / j z 28i99 G 177_4'I OSEx 1 714 0. i / / V I 5' 9 0 1".4"1 be4 14eh_ 0.7 i aEVeer 1547 0A 177,41 O a3 142E it !]: ' / / i a .ff. 7 Low f Mad�W661 XL4.i '' - // // V"* aFedw it &42 M: multi. *W"tow 40I � M 2.69 IMS51 oil set '14e CL71 57.29 0 3 5 sea r . 16# _S 1 ea 4E b € E AL. 2A ZOAt eaww„ Zanalasha met Viiae R 74% YN$ Vow 20A a. gag -746 1• $7 2a3 1 W.Mm 11.1at. 14e_ &7A 4... IRRIGATION LEGEND o. _ a.err rl yrtTY OFFPALM DESERT $ EPAR T MENT OF RECEIVED SYM NMFACTURER DESCRIPTION P.S.I. O P•M• COMMENTS IroW Tree And Skmb 91M COMIMUNITY DEVELOPMENT o Ruin Bird RWS 8CGa2-SOCK Tree/Palm Bubbler 30 0.50 Ia>Istd as per De>a6 TOt�IE Ob9d�llelRlf Uit S'!.#l� + a.Pn"C= _ s App /"� ._.. ,.�.���®sr MAY 4 2�0� ROPVID a C1'C.rZES.NO_ STAFF LETTER z an d I P�wC D to C. RES.NO_ ,WARC ACTION FORM .t g Meter/POC Localle POC to I / PUBLIC WORKS DEPARTMENT c o TBS RP Saddlow as Specified by CVWD ByCVWD BY CITY OF PALM DESERT Rain Bid GB Series Remote Control Valve,wfi)P4 D As Needed Install has Ddd 1>� 1� CC !aCT1CN S!sAlL CeNt�!leehaCEwlTHet for Flows less theeh 5 GPM,Ins Rain Bud RBY-1 WC-LSS Upstream from Valve L a ..Yt-A,1 a�U'S ArPROVALLZ Rain Bid RAIN BIRD XCZ-100-B-COM Install as per Detail,See Below for Drip Notes Q Rain Bhd IM-12 Watt Mount Corte WRSO-SEx Rain Sensor It as per Detail " '"f ��t� o y O W ce as Red&White Valve Co.. W"F Full Port Brsas Ball Valve In" s W Dew °\Q �~� � _ Rain Bid 44NP Quick-Coupling Valve InstaaM as per DetaaN i Y �� ��� O 0 W _ Z ox Sv vi Pacific Plastics Lateral t.Irhe-scthe"40 PVC Pipe 1_117 And smeller,galas 315 2*and Larger Install as per Dehatlha 0 C U M M I N G S C U R L E Y 11IB A S S O C I A T E S i N Pacific Plastic a Mainline-Sclwduls 40 PVC Pipe 1-V7 And Sma llw,Class 315 Y and Larger Install as per Detall (� Y Pacific P SI6 moft-Wodule 40 PVC Pipe Twice Pi wWre Bundle Sire Install as per Destell LAN c >1s C A w w A rt c m e T E c' -r es 2.31-07 Z U N Drip Zone-Shrubs ScfwKkft 40 Backbone wf Class 315 Laterals,RB-FIM4 Rleer 12isatall as per Detall 776 EAST GREEN SIREEr, SWE 240, PASAOENA, CAUFCRNIA 91 i 01 �r om O Q CA 3583 AZ 30100 377204 826.683.8182 7 204�3NM 311 L NV 57e CL.ARS 31s �TF � CALhF�` � J � Ce EMITTER SCHEDULE STATION NUI.-E Z U QTY PLANT MATRiAL EMITTER TYPE � O O t- 1 iCaactahslLow Category Steubs RAIN BIRD XERI-BUG EMITTER M20PC-1032/FRA24 2.0 GPH Way x 2 Moderate Category Shrubs RAIN BIRD XERi-BUG EMITTER PC-02-1032/FRg24• 5.0 GPH .7 VALVE GPM CVWD SIGNATURE BLOCK AREA a J w w VALVE SIZE- CL Cr1 0 � � *EQUIP EACH EMITTER WITH A PC-DIFFUSER 'D-#X'INDICATES DRIP ZONE VALVE 0 U PIPE I r CATES TREE DRIP VALVE ' ' .ate W W DRIP IRRIGATION LATERAL P E SIZING CHART INDICATES PALM DRIP VALVE --I CONTRACTOR TO VERIFY PRIOR TO INSTALLATION S W 11 GPM PIPE SIZE 0-5 1/2*CLASS 315 PLASTIC PiPE 5-9 31V CLASS 315 PLASTIC PIPE Martoat Place ay �' f a 9 1"CLASS 315 PLASTIC PIPE NOTE:SEE DETAILS FOR DRIP ZONE LAYOUT AND COMPONENTS > Sft 0 8 le 32 . Ll nO t GENERAL PLANTING NOTES 1. Installer shall be responsible for making himself familiar with all underground utilities, pipes and 13. in all cases "Root Bound"trees will not be accepted. c OW structures. Installer shall take sole responsibility for any cost incurred due to damage of said utilities. 3 * P 14. All Washing#onia Palms shall be as per the brown trunk height(BT) indicated on the planting t err 2. Installer shall not willfully proceed with construction as designed when it Is obvious that unknown plan and legend. exist that may not have been !known during design. `' � 2 3 obstructions and/or grade differences y ng esig { Dal r Caem Fosp {( 15. All Phoenix Palms shall be as per the brown trunk height(BT)as Indicated on the planting i 3. Installer shall have soils tested by a qualified agronomy laboratory prior to start of grading and plan and legend and matched to be of equal height In each area of use. ' installation. Materials and mixing of sod amendments, fertilizers,and back 91 for planting pits shall be in ,, r with recommendations of the soils " '° a'r • �� . ' . ., .� accordance agronomy report 16. Brown Trunk Height Br shall mean as measured from the ground line to the base of the * '`'r+ ' '" " 'a •• . . •i • ' '' ' Y~' ' • ' .• heart lest. J 7 ,.� < •tea-,(* 4.AN plant material shad be approved prior t0 Installation by the landscape Architect. � , �. _ • . � t � f �. :a `` , �; OO.. T t licensed Pathologist for"Verb ium Wilt"an "B I lug 5. Final location of all plant material shall be as shown on an. 17. All Palms must be certified by a ice og s# cyl It" d lack Diamond disease. Written documentation must be provided prior to planting. <`• j A :< ` e <A 4W4bM 4" 6.See details for staking method and plant pit dimensions. 18. No trees are to be planted within or above site site stem drain pipes, swales or retention 7. If conflicts arise between size of areas and plans, Installer to contact Construction Manager for 9 All Palms must be certified by a licensed Arborist for"Verticylium HVllt"and "Black Diamond" resolution. Failure to make such oonflk is known to the Construction Manager will result In Installer's disease. Written documentation must be provided prior to planting. 1 G ` liability to relocate the materials. E La 1t 2-a* =� ' C� C V c�Azr 8.All ground covers to be held bads 4"from edge of new shrubs typical and 2"from back of curbs 20. No trees are to be anted within or above site site storm drain s, swales or retention edge of walks. PIPe sad ' -c- basins. ; W V q . 9. Ground covers shall be triangularly spaced. 21. Final tree staking to be determined based on tree trunk structure. Related detail for bidding (� ' 10. Trees shall be located minimum V from walls, overhead,walks, 'headers within the project, unless purpose only. � +2a•La Mound otherwise shown. 22. The following shall be submitted to the Landscape Architect for review and approval of all 10 _ .. 11. All planting areas (except lawn and hydroseed areas)to be top dressed with 2"layer of compacted Pi P granite, P } ant material decomposed nits and cobble/stone to Installation: f� decomposed cantle. 1. Photo of all materials (including trunk structure of trees)noting nursery location. �a lid g 2. A review of all trees and shrubs shall take place prior to delivery from the nursery. 12. Remove stakes and trellis from vines aril espellers and secure to walls,fences and posts as per 3. A review of all plant material on-site and prior to Installation ?�' 4. Provide samples and sources of all D.G. and cobble material `t detail i� `., .� �� 5. The Landscape Architect reserves the right to reject and material at any time prior to the F - , o end of the end of the maintenance period. i { f 2 � PERCOLATION TEST "' The landscapeInstaller shall di as test areas)four 4 plant pits of 24"box size, or larger,at ; EL ~� r four 4 locations minimum within the b site. Pits are to be filled with water. The results this POLLO H test shall be to the landscapearchitect and owner 48 hours after initiating. test # i� Loco W shall be In actual location of trees as shown on the plan. Failure to carry out this test shall make / U M the landscape Installer liable for any and all trees that die due to poor water percolation beyond 2924 SQ. ter. f r the agreed guarantee period. OPTION 1 N Should the water drain out of the test pits at a normal rate Indicating good percolation then tree detail "A"and shrub planting detail "A" shall be utilized. ; w o OPTION 2 i `{ In the event any amount of water is left standing In the test pit(per the above procedure)24 $ `"` - p hours after Initiating the percolation test then the vertical mulching details for tree detail "B"and Er�ctu Mau a z iA r f shrub detail "B"shall apply to all trees and shrubs regardless of size. These details shall W J SF Q supersede all other planting details however the tree staking requirements of tree planting detail g� A shall remain Intact in either case. LLJ 2Das! � AS PER DEPARTMENT OF COMMUNITY DEVELOPMENT: 5 ,� #.,- O 1. Landscaping shall be Installed prior to request for final inspection. EncGr , } . '3 2. Landscape plan must be submitted and approved by the City Landscape Manager prior to 3 building permit Issuance. + z 3. Obtain City of Palm Desert Department of Community approval. ± p y V 4. Obtain Riverside County Fire Department Approval. 6 5 3 ''� LY '_. > DalGr Cara 3 QQ Csart i `W PLANTING LEGEND i • r 1 Q✓ Trees and Palms qxl S bol Scientific Name Common Name Code Name Plantin Size Water Use Character` , I 3Yh'n �Y 9 a � � 24"-Box LOW 0.2 True Multi or Low Brandt 48" • Caesaipinia c�calaco Cascalote Csca 3 Cercidium Hybrid'AZT AZT Hybrid Palo Verde CerAZT 1 24!-Box LOW 0.2 True Multi or Low Brandt a�48 l Foothill Palo 24"-Box LOW 0.2 Single Trunk Low Branch a�48" � -�-�1 � ��� # � ,. , `�'� �� �j'` Cercidlum microphyl um oo a Verde Cemi 2 -- % ��' ��' r f P is landulosa'AZT 24"-Box LOWIMOD 0.3 True Mufti or Low Branch @ 48" rosoP 9 Thornless Honey Prgl 2 ---------- Mesquite Washingtonia robusta Mexican Fan Palm Waro 3 12' Brown trunk HIGH 0.8 -` ... .. Cleaned and Skinned ..�. ..i... o AZT Denotes Arid Zone Trees Variety: Mesa, Arizona: 480-987-9094 * Branching height indicates maximum clearance from grade ' Shrubs, Cacti, Groundcovers Cassia arternisloides Feathery Cassia Caart 6 5-Gal LOW 0.2 ..: o�e�. Dales greggii Trailing Indigo DalGr 7 1-Gal LOW 0.2 {� Dales frutesc ens'Sierra Negra' Black Dales Dalf 17 5-Gal MOD 0.5 Echinocactus grusonii Barrel Cactus EncGr 11 5-Gal Low 0.2 CUMMINGS C U R L E Y n A S S 0 C I A T E S, 1 * a- 0 Fouquiena spiendens ocotillo Fosp 5 5-7 canes LOW 0.2 LAN N D s C A 19 ! A !4 C M i T 6 C T S 31 DECOMPOSED GRANITE NOTES: ne�G�sr�r, sum 240, P ►, cuvoRxu► g 110� � °�.°�. �� z p H loe rvifiora Red H 18 1-Gal LOW 0.2 Tom.. 7CO4 3.8I82 F of c��.�� J �� pa yucca � cn seas Az�o s oo ur a»zaa rsa a i g NV S" czaae s 1 Q z Leucophyllum frutescens Texas Ranger Let 3 5-Gal LOW/MOD 0.3 DECOMPOSED GRANITE (D.G.)- INSTALL A 2" (MIN.) (AFTER COMPACTION) o� LAYER OF 'SANGRIA FINES' DECOMPOSED GRANITE Ld J Lantana 'New Gold' Lantana LanNG 18 1-Gal MOD 0.5 W/STABILIZER CONTINUOUS IN ALL PLANTERS UNDER CVWD SIGNATURE BLOCK AREA Q p Cassalpinia mexicana Mexican Bird of Paradise Caem 2 5-Gal LOW 0.2 ALL TREES AND SHRUBS AS INDICATED. AVAILABLE THROUGH � i2 SOUTHWEST BOULDER& STONE (760)751-3333. BEFORE z J ' Dasylldon kmgissims Mexican Grass DasL 12 5-Gal LOW 0.2 PLACING GRANITE, COMPACT SUB-GRADE TO 85%. W AFTER PLACING GRANITE: RAKE SMOOTH, WET TO ENTIRE DEPTH, Penstemon spuerbus Superb Penstemon PenSup - 1 Gal Q 24" O.C. ALLOW TO DRY, THEN LiGHTLY SCARIFY.SURFACE WITH A LEAF RAKE. KEEP TOP OF GRANITE 1" BELOW ADJACENT RECEN ED Southwest Boulder& Stone-Chamois Beige 314" Crushed Rock-2" Layer WALKS AND CURBS. Southwest Boulder&Stone- Sangria Fines Decomposed Granite-2 Layer After Compaction DO NOT ALLOW GRANITE TO TOUCH THE TRUNK OF ANY " 0 8 is 32 �� Baas LIO Q All Planting Areas Unless Otherwise Noted PLANT. INSTALL AFTER INSTALLATION OF PLANT MATERIAL MAKING NOTE OF PLANT HEIGHT SO THEY ARE NOT BURIED BY D,G.. PUBLIC Southwest Boulder&Stone-Crests Landscape Boulder Bouti See Plan, 4'-8'fJ� �n OF � Ds NOTE: ALL VALVES TO BE INSTALLED a TRBflSTAKINGVISHILL BE N FIELD BASED ON TRUNK BITIJC7LHiE IN GROUND COS AREASDETAILLPRFRONDED FOR BIDDING PURPOSES ONLY. PLANT CROWN OF ROOTBALL YID POSSIBLE FIISH ORAOE TEMPORARY WATER BASIN ^ Ha ,� • FLUSH WITH FINISH GRADE 7IN GROUND GONER AREAS FLUSH IN TURF AREAS qP� SCHEDULE 40 PVC y k'' "MACH / WON-PRESSURE LATERAL LINE __ FISDaft PVC SCH 80 APPLE(t.EN(I!TN A8 REQUIRM RAIN$ENSQR DEVICE •o 9-,J'x'X 18'X 1 r TAN PLASTIC VALVE BOX MARiQS>'Ibf.Y AND 0 INDEPENDENT STATION COMPUTER STATION NUMBER ON COVER;REFER TO MANS d SPECS WALL � � SEE LEOBiD FOR CONTROLLER SPEC, FOR MANUFACTURERS TAN IN COLOR P ourpooR WALL MDUNTPREPAREDPREPAREDNATIVE SITE�r 'SNAP-TTTIF WIRE COibECfOR NOT OR APPROVED EQUAL. SOIL FOR PLANTS PROVIDE MIN.24•CUM TYPE EXPANSION LOOP SPEC84M PLANTING MIX FOR ALL OTHERS WATER XWM TIE'Nb2INSTALLATION 8 TAMP TO REMOVE AIR UH018T111D W1TNEPIPME TRUNK) i5 BUCK PLUSH FILTER CONTROL POCKETS AT BOTTOM OF 1X NCH METAL CONDUET ZONE ROT; PIT SOIL AND FITTINGS RAN BIRD MODE.XCZ SERFS (INCLUDES 1 WU9Q BACK FLUSH FLIIR VALVE, 2X CIA.OF ROOTBALL (DOUBLE • CHECK VALVE AND OR OONTAl�t TREE STAKING t , JlNNC710N SOD( SCH SO NIPPLES) TRUNK NETALLATIOP4I INCH METAL CONDUIT D v DUCK BILL S=' its 11TTIKR POWER POW 9UPPlAtO PRESSURE REGULATU7R, • CONNECT TO DEDICATED 120Y 15 AMP 8 VRIRNG DIRECTIONOF BIREAIOeR WITH"OWOFf SWITCH'INATTACK TO BLILDNG WAIL PN LEVAI PREVAILING F_[.ECTRrAL ROOM ♦ RUN TO� WBD MARK SWITCH:IRRIGATION OONTROLL 'E 8CHEDULE 40 PVCII( CiROANN OF ROOT BALL!`ABOVE F#NI8F4 ! WIRES TO REMOTE CONTROL VALVE PRESSURE MAIN LINE GRAM e OOMMON BRICK 2.CONSTRUCT TAMPED BERM WATER BASIN AKE 5 1 OF 4 AROUND EACH SHRUB TYPICAL UNLESS 90 TREE PLA TM OET,AL RAW BIRD Gi4 AW MOLM ROD iQT. N"WASHED GRAVEL INSTRUCTED OTHERWISE BY THE LANDSCAPE FOR STA KE13 NSTALL AS PER MANUF.SPECS.AND 3 MCH M*#J UM DEPTH ARCHITECT. CALL LAND90APE ARCHITECT TO LOCAL CODE DIRECT BURIAL CONTROL VERIFY. FINISH ORApE AND GROUND WIRES DI WALL MOUNT IRRIGATION CONTROLLER.,ea.„ 6 DRIP CONTROL VALVE XCZ SERIES 10 IRRIGATION RAIN SENSOR SHRUB PLANTING DETAIL "B" VERTICAL MULCHN0 0 TREE STAKING TIE DETAIL Ism, FIJJBHE WITH GRADE LEGMD VIEW 1. �COINTROI. KR MIANLNE, MAINLINE LATERAL. WNRNG N to^X 10.11C ROUND PLASTIC VALVE BOX TO CEY#VR LATERAL,THE PiPE PIPE CONDUIT •{1 WJ TAN COVER MARIED'IVICNATION �. BACKBONE LATERAL — PVC sd4E1XR.E 40 VALVE'R�TO PLANS AND ,'�. MNA1'R�L FLUSH VALVE. SAMNE�� 7=E 1:1 SLOPESPECIFICATIONS FOR APPROVEMANUREBALLVALBALLVALVE �4. DRIP LATERAL - CLASS 315 PVC U-vk / � FOW4 L GRADE w RIPER TO PLAN AID sPECFIcnsEDNEB SLR CROWN OF RODTeAtLFORTYPEANDAPPROVED MJWUFAORI 4LEVEL Oft SLIGINTL� ��� / c MOVE NIGH GRADE,WITHY CORNER O YES pr1IIMUM 2 REQINRED)ATTACH PER S•MIL I.D.PLASTIC PPE EXTENSION �,r w OF ROOTBALL AT LINE OF STMONG OEfAES:ADJUST ONLY ENO GH TO LENGTH AS REQUIRED PLAN VIEW ORIGINAL GRADE TAKE UP SLACK 3 4 WIRE VINO OONE%Ni LODGEPOLE PNE STATE(8).2•DIAMETER X,2' ONR PLACE MINIMUM r FROM TRLMNC.DO NOT ALLOW STAKES TO PENETRATE ROOTBALL X x e MIL COMPACTED eOL 1 1 RAKE OUT AS �rSOHEOLE 40 PVC 4 4 4 0 PR�RE MNiUINLINE '. DIRECTED BY NOTES d SPECS // 7-0 X TIE A 24 INCH LOOP IN SO/j RUN WI I NG SENi:ATH ALL 80LVENT VIRLD/ALL WIRING AT"NOEB / ,y. L SCHEDULE 80 PVC COUPLING AND BESIDE MARIIE. . PLASM PPNGTO OF DIRECTION OF 3(r y -}! (2 REQUIRED)ED) TAPE AND BUNDLE AT BE SNANOD N OR GREATER UNTIE _ x - ' v 10 FOOT INTERVALS. TRENCH AS SHOWN AFTER ALL CONINECTIONB T .. � i1O?E8;ir -y 1T1 a I 8.8CFEDtLE SO PVC NIPPLE ON WINDWARD HE HAVE BEEN MADE. Pnt,$ ST SINGLE AKES 80 i THAT PREVAILING COMMONS R D) X I= WINDS MOVETREE BETWEENSTAKES _ DOUBLE$TAKING ADJACENT TO WALKS. ' (MN.2 REQUIRED) STRERTS OR PEDESTRIAN PATHS SHALL BE NOTE: MINIMUM 1 CUBIC 1. SLEEVE BELOW ALL HM1DSCAPE ELEMENTS WITH SCHEDULE 40 PVC TWICE THE DIA ETER OF 3 • SET PARALLEL TO EDGE OF PAVEMENT V r- FOOT GRAVEL THE PPE OR WIRE BUNDLE WITHIN. TIES SHALL BE: ALL VALVE BOXES TO BE INSTALLED N f y GROUND COVER AREAS:REFER TO PLAN Z FOR PPE AND WIRE BURIAL DEPTHS SEE SPECIFICATIONS. T 1^INCH 1!L(SNNd E 8TAlUE)OR Y.LT.SRAW L i FOR LOCATIONS X 1HDTH R007BALL ICE STAKE)EIY vJ.T.COMPANY �. 2 BALL VALVE rtOTtoenaa X 2 4 11 PIPE & WIRE TRENCHING 16 SHRUB PLANTING ON SLOPES „�,�. 1 TREE STAKING ON SLOPES I'IISFI GRADETOP OF MULCH � 4•MIN.CLEAPIANCE SEE sTALW7NNG TR UETAL F CROWN FLUSH WITH • Q FINAL GRADE QUICK-0oUPLNG VALVE /// / 2•im LooGEpoLE PINE Q VALVE BOX WiTH COVER 2WC BELEAm � �� ""'" 'PAVING STAKE$x iZ LONG;PLACE Q I b INCH BtZE 2 2 PANNo �,C�/\ / oCTRNN STI ON wH NN FROM TRILM DO BRASS NIPPLE t / NOT ALLOW STONE TO W C AS REQUIRED) a . PENETRATE ROOTBALL. aN�ssAIaNG DErAK. +-- r i 34NON MINIMUM DEPTH OF 394NCH WASHED GRAVEL 2 2 ..rr.-.. Q AS SPECIFIED BRASS STREET ELL , L ON D.% V BRICK((1 OF 2) D� AREA PVC CAP�� irT MIN. � TREE ROOTBALL BRASS APPLE a TFERl6 x FORM BALKIER WiTH ((LENGTH AS S O 11�ORARY 3•CONTINUOUS RIM 24• TO WATERINGBAEN YSICES ,Q LflI1ENb FLASH GRADE FAH GRADE OF PLANTING PIT :pWy t BRASS STREETELL 1. SCH 40 PVC LATERAL UK FROM ELBMRIC CONTROL W►LVE PAYIKNL CLASS 316 PVC (SEE LEDEND FOR & MKi FTTT - SIZE AS REQUIRED. � /�C - W -. PVC MMINLIE PPE \' 4. DRIP EMITTER ASSEMBLY (SEE DETM S) / /zy�/��� r tkIDIB1RNDF.D BOL ~ MNANL mx 8PFJ1R8 TIbANBfTiON TNNUi NTT 5. YL F1AlSH VALVE (SEE DUALS) �j� \ i\�/�//\�/��/�/�`/ PREPARED NATIVE SITE SOIL WITH SS OOJJUR B. DISTANCE TO SHRUB/GC CENTER FOR DESERT PLANTS - ''- - 0 BRASS ELL SPECIFIED PLANTING MIX rt 7. SHRUB AS PER PLANTB� PLAN FOR ALL OTHERS WATER d 2 X BALL DIA 3X BALL DUI TAMP TO REMOVE AIR POCKETS, I 94 REBNR STAKE PVC CAP gypoow PUDDLE AND SETTLE AFTER NOTF- W y Wl STAINLESS STEEL GEAR cRaurPs OR EQUivALANT NOTE-WHENEVER PLACE EMfT'TETt UPH1kl. NOTES: SETTING TREE 1.STAKE TO ITT eRJ►tNctl� Z CLAMPS R EQUIV MATERIAL STEM 1.ALL PVC IRRRIGATiON SLEEVES TO BE SC"PPE. AS NECESSARY FOR FIRM SUPPORT. PLACE SPEEFIED BY 2 ALL JOINTS TO BE SOLVENT WELDED AND WATERTIGHT. QED EARTH I TIE SHALL NOT TOUCH OR RUB V) 1.1FURiISH FITTINGS AND PIPING NOMINALLY 86ZED IDENTICAL EMITTERS &WHERE THERE IS MORE THAN ONE SLEEVE, AWACENT TRUNKS OR BRAHOHM TO NOMINAL QUICK COUPLING VALVE NET SIZE. EXTEND THE SMALLER SLEEVE TO 2N NICHES MINIMUM ABOVE FINISH GRADE. 4. MECHANICALLY TAMP TO W%PROCTOR. Q 3 QUICK-COUPLING VALVE TTYPICAL DRIP LAYOUT SYSTEM TO. 1 SLEEVING ,wrote 17 TREE PLANTING DETAIL "A" MULTI-TRUNK TREE STAKING _ r IN—ter Norc nacsaa�txfu ALL VALVES TO BE MULLED FLUSH�TUURFAREASND COVER�AD DPFt1SER EXJO CAP aJOF/reoavAmsTPERu�I aWw 4noL6 +•NM== WX0rt4TN116tFW0ETAL NOTES PC—DIFFUSER AS NEEDED Fart Poa NMRX �s DO"OF e,a. +s GAL -i nag �► IN GROUND COVER AREAS 40 PVC TO QUICK to a w W eaa a nay I.ALL FRONDS SHALL BE TEED WiTH WHERE POSSIBLE COUPLER(SEE PLAN) ORGANIC TWINE PRIOR TO PIM71I Xi 9-Ij?X IV X 11•TAN PLASTIC 4• 2.ALL iLACKFN.L TO BE WATER JETTiD VALVE BOO(MARKED RCV AND FINIAL GUNNEL DURING PLANTING FOR MAXIMUM STATION NUMBER ON COVER: STABILITY. REFER TO PUNS S SPECS 8.PALM TREE INSTALLATION SHALL POLYFLEX RISER CONFORM TO VERTICAL MULCHING G FOR MANIUFACTiIRAIN BIRD , DETAIL WHEN APPLICABLE. .� $ VIAP•TITE WI RE CONNECTOR 1 4 a KiT OR APPROVED EQUAL; PLACE CROWN OF ROCITSALL PROVIDE MN.24•CURL FLUSH WITH FINISH GRACE TYPE EXPANSION LOOP SCHEDULE 40 PVC V3-12 ABOVE (NTH AS REQUIRED 12• PAC or FINISH GRADE GRADE ELECTWC CONTROL VALVE REF6t TO iRRIGATKXN LEGEND 'N'dNPORARY SCMEDUA E 40 P4JiC MWE WATERING BASH J!e MULCH ADAPTER(2 ) 315 PVC LATERAL BBUR�Y I FDNIBH it GRADE tx } SEE SONG CHARTNOOTBALL SCHEDULE 40 PVC; .p OF BOULDER PREPAWN®NATNE SITE SCARIFY IW%COURSE WASHED i NO SSURE LATERAL F 4 SOL FOR DESERT OF PLANTING PiT BUILDERS SAD,JET W WATERPLANTS ., I LINE f „ t PLANTING MIX _ AS SAND iS PLACED N HOLE - • >� �ANDBOTTOM Z� MIN.1 CU.FT.GRAVEL I FOR ALL OTHERS WATER )N+• (TESTl�R 3A NiTY) sr,. ;' » R \ dOPOCKET8 PUDDLE AND - 'I ''� PR M o E _ a :.; r SETTLE AFTER U � - 1 - { l 1 17 - UNDISTURBED EARTH UNDISTURBED URBED EARTH 1 1l PRESSURE 40 PVC 2 X BALL DiA PRESSURE MAIN LIE SCHEDULE 40 PVC TEE PALM PLANTING DETAIL ° I 4 ELECTRIC REMOTE CONTROL VALVE 8 EMITTER DETAIL 13 BOULDER PLACEMENT rOT�, 18 TREE PLANTING DETAIL "B"VERTICAILMRN.CH.NG 4���ti SHRUSIGPIOUNDCOVER FLUSH IN TURF AREAS 2•INAREAS\ t-INCH GRATE ° TYPICAL CONTAINER OROMN V ROLM PLASTIC VALVE BOX BUBBLER . OR 24 BOX TREE,CENTERED WJ COVER MNARKEo'FLt18H4 VALVE' IN PIT AND VERTICAL K TAN IN CUM REFER TO PLANS FIB GRADE TEMPORARY WATE3R BASH ^ �'' PLANT ROOT CROIMV .8 • FLUSH WITH FINAL GRAMANUFACTURERS DE AM SPECIFICATIONS FOR APPROVED2 SFECIRED oN {, C� .J It RMBIRD, PLANTIINGPLAN I/rSIULYALYEBVObOS8 [� _+ CUMMINGS CURLEYwASSOCIAT ES, IN PLASTIC BI.P X 8LP fl 4:18LOPE O `SAT LAN O S C A Wm E A R C m ! T E C T 8 1-0T L •e e RAIN RUNE RwseoG soac a try oRIONAL GRAoe 776 EA51 GREENSiREETEL.i, S 6 6.683 8 t 8 2A, CAUFOFNNu 9 t U! 0�,�� CAL R �r Q O GLUE ALL FITTINGS 8'MLIL IA PLASTIC PPE EXTENSION PREPARED SITE SET CROWN OF ROOTBALL CA 3N9NS3 AZ 30 i 00 UIT 377204 NM!3 U E NNW/LS70 CI.ARS 3 19 LENGTH AS REQURW . / PEA GRAVEL-FILL TO BOTTOM SOL FOR DESERT PLANTS LEVEL OR SLKRHRY ABOVE BPECIFIID PRINTING MlIX ISH GRADE,WITH CORNER O '� OF ROCTBALL AT LINE OF 124NCH PVC SOH 80 NIPPLE FOR ALL OTHERS WATER d TAMP TO(REMOVE AIR �ONA GRADE •y• ti 12aN M 90•DEGREE ELBOW POCKETS AT BOTTOM OF EARTHUNDISTURBED PIT p J 81fam PPE,124NM SWING ASSEMBI Y CVWD SIGNATURE BLOCK AREA O --.@-8CHED LE b1b PVO OFtlP PVC LINE OlkOFROOTBALL � SOL2X C ER Q r 60I440TEEORELLLd �� d , - JL LATERAL PIPE EMOTE I _ y� 141i; - _ COMMON BIRlCltB _ WITH GLUED HliTNGS � (MIN.2 RE UIFIED) CUT TO i2•MAX.FROM GRADE r BASKET WEAVE CANISTEPtr :- `—UNDISTURBED NATVE SOIL NM. MNIIRJM 1 cuelD • REC IVED ALL VALVE DOES TO BE INSTALLED N FOOT GRAY OF ROOTBALL GROU D OOV AREAS; REF ER TO PLAN �WhDTH ER FOR LOCUTIONS 5 DRIP IRRIGATION FLUSH VALVE 9 TREE/PALM BUBBLER w,0.,,, L14) SHRUB PLANTING DETAIL W C19) TREE PLANTING ON SLOPE Av 4 6 LIO CITY OF PA IM DESERT PLANTING SPECIFICATIONS SCOPE OF WORK A. GENERAL WORK PROCEDURES Sorts Report Undisturbed soil at bottom of pit; fill soil around Nils The Contractor shall be responsible for obtaining soils testing ball of plant using back fill as specified and water concurent with,backfilling shall follow best # practice. Immediately i Work procedurest customary p and sort amendment recommendations. Sorts testing shall ately after planting.. stake trees to prevent damage from 9 0 be completed and test results and amendment recommendations wind as per details only if needed. * All materials shall be best available. Do not begin soil preparation submitted to the Owner's Representative a minimum of Grade areas around plants to finish grade and dispose of excess and planting until irrigation work in and around planting areas is fifteen (15) days before commencement of any planting. complete, tested, and approved. The testing laboratory shall be Soil and Plant Laboratory, Post Office Box 117449 412 South Lyon Street, Santa Ana, Water: Immediately after planting, water shall be applied to each Pre-moisten: Special care shall be taken to pre-moisten the soil to California 92711-1744, Telephone: (714) 558-8333, or approved tree and shrub in such a manner so as to not disturb back fill or a depth of six inches (6") for all planting areas and to ensure that equal as approved by the Owner's Representative. mulch and to the extent that all materials in the planting hole are plants are prevented from drying during planting operations. The testing laboratory for soils analysis shall use the following thoroughly saturated. criteria for soil testing: USDA Agricultural Suitability Test � Weeding before and during preliminary grading and finish grading: Al! per Handbook 60, to include Baron presence and content; and F. MAINTENANCE AND GUARANTEE (90 DAYS) weeds, stoloniferous grasses, Nut Grass, and Johnson Grass, shall be University of California Soil Fertility Test. dug out by the roots and disposed of off-site. Interpretations, fertilization and soil amendment recommendations, All landscape material and installation shall be guaranteed against any and comments regarding these tests are required. a adL all poor, inadequate, or inferior materials and/or workmanship for a • Soils test sites shall occur not more than 250 feet on center in the period of not less than ninety (90) days. All tree species (including palms trees) Litter: All planting cans and containers, empty bags, and debris and underground irrigation equipment shall be guaranteed for no less than a ° shall be removed from the site upon completion of each days work. planting areas, unless otherwise noted on plans. g All sidewalks or pavement shall be swept or washed clean daily. Samples of all import soil from each source shall also be submitted period of 1 year. to the soils testing laboratory for analysis, B. SOILS TESTS Samples of all import soil from each source shall also be submitted to the soils testing laboratory for analysis, interpretation and recommendations The landscape installer shalt obtain at least (3) soil samples. _ o prior to placement, blending or back--filling, _ The testing laboratory shall be Soil and Plant Laboratory, 1594 North Main Street, Orange, CA 92867, Telephone (714) 282-8777, or approved Soil Preparation Conformance Test d equal by the Owner or the Owner's Authorized Agent. In order to determine if the specified quantities of soil amendments have- Q < been used, a sample of each soil amendment shall be delivered by the V The testing laboratory for soils analysis shall use the following Contractor to a plant/soils laboratory acceptable to the Owner's Representative a criteria for soil testing: USDA Agricultural Suitability Test per within fifteen (15} days after recording of the Contract. From the sample, o Handbook 60, to include Boron presence and content; and University of the testing laboratory will prepare a control mix in accordance with the specifications California Soil Fertility Test. resulting from the required soil tests. After the soil amendments Q have been thoroughly mixed into the planting areas, soil samples will Interpretations, fertilization and soil amendment recommendations, and be taken can compared with the laboratory control mix. Deviation comments regarding these tests are required from the control mix shall not exceed twenty percent (20%). o .� n Soils test sites shall occur not more than 250 feet on center in all Plants: All plants shall be healthy, of normal growth, well rooted, z : and free from diseases, insects, insect eggs, and larvae. The roots cn planting areas, unless otherwise noted on plans, shall show no evidence of having been restricted, deformed or Q Samples of all import soil from each source shall also be submitted root-bound at any time. Varieties and sizes of plants shall be as p po � specified on the plans. Plants shall be subject to inspection and � to the sorts testing laboratory for analysis, interpretation and approval or rejection by the Owner or the Owner's Authorized recommendations prior to placement, blending or back filling < Representative on the site at any time before or during progress of In order to determine if the specified quantities of soil amendments Work for size, variety, condition, latent defects, or damage. Rejected plants shall be removed from the site immediately. ,_. .i= have been used, a sample of each soil amendment shall be delivered by • :�:u a:4 the Landscape Contractor to a plant/soils laboratory acceptable to the Plants imported from outside of Califomia must have agricultural Owner's Representative within fifteen (15) days after recording of the inspection tags amd must be certified free of disease/pests. Local Contract. From the sample, the testing laboratory will prepare a nursery plants must be certified clean of red imported fire ants. control mix in accordance with the specifications resulting from the Special care shall be taken to insure that plants in containers are RECEIVEDg I required soil tests. Soil samples will be taken and compared with the watered. j laboratory control mix. Deviation from the control mix shalt not exceed twenty percent (20%). Substitutions: All materials must be furnished as specified unless accepted in writing by the City of Palm Desert, P"�TY WORKS DESERT DEPARTMENT C. GUARANTEES and the owner's authorized representative prior to installation. %AMNDip � � Curley All soil material installed under this Contract shall be guaranteed against any and-all poor, inadequate or inferior materials and/or E. INSTALLATION �� w workmanship. Poor quality or faulty materials or workmanship, as Sol[ conditioning: As per soil laboratory report and recommendation 0 determined b the Soil Testing Laboratory, shall be replaced with based on the plant materials being installed C U M M 1 S C U R L E Y A A S S O C I A T E S INC T y g p L. A N Cf 8 C A � E A !! c N F T C G` T � �.a7 U 770 Ear Gt�Sir, SurnE 240, NsAmm, Cmpma 9! 10! �,� •".°=` � 0 materials as originally specified, at the Landscape Contractor's �.. szs.a�3.s t s2 '� of ,L� 0 expense. Tree and Shrub planting: Excavate pits with vertical sides for all �,3aa3 u '� s"�`` 3'� �a,e �'� plants, shrubs, and trees. Pits shall be same depth of root ball or o 0 D. MATERIALS shallower and twice their width. Planting height of shrubs and tree CVWD SIGNATURE BLOCK AREA O crowns to be one inch above finish grade unless otherwise noted on � C Native backfill only for desert plants the plan. W J a_ Planting Mix: All soil back fill inputs for trees, shrubs, and w vines, unless otherwise noted, shall be prepared in accordance to the results and recommendations of the soils report. L4nO i f i IRRIGATION SPECIFICATIONS SCOPE OF WORK C. INSTALLATION 'S gin A. GENERAL IRRIGATION SPECIFICATIONS Spacing of sprinkler heads and locations of valves and back flow raven#ton devices shall be as indicated on the drawin s. An , Ig P g Y It is the intention of these specification to accomplish the work deviation from the drawings must have the approval in writing m which will from the Owner or the Ow of installing a sprinkler system wh c operate �n an ro nets Authorized Representative. efficient and satisfactory manner according to the workmanlike � � standards established for sprinkler operation. Trenches for all mainline piping shall provide a minimum earth 4 cover of 18" above the top of the pipe barrel; trenches for all j The work included in these specifications shall consist of lateral piping shall provide a minimum earth cover of 12". 2 furnishing all labor, tools, materials, appliances, tests, permits, etc., necessary for the installation of a landscape All mainlines in the system shall be capped and pressure tested sprinkler system as shown herein. No substitutions shall be made at 125 PSI for a period of six hours. Contractor to contact City ! without prior acceptance by the Owner, the Owner's Authorized Representative, and/or governing agencies. Materials not of Palm Desert landscape inspector for pressure test of mainline � approved may be rejected by owner, his authorized agent, or prior to backfilling trenches. Any leaks found shall be corrected by removing the leaking pipe or fitting and installing � governing agencies and replaced with required materials at the g Irrigation Contractor's expense, new materials. This test shall be repeated until all leaks are eliminated. Compact trench back fill to a relative dense equal P tYi The system shall efficiently and evenly irrigate all areas and be to adjacent undisturbed soils to prevent settlement. l left compete in every respect and shall be et ready for operation to the satisfaction of the Owner or the Owner's Authorized The Work shall not be covered or enclosed until it has been tested, inspected, and approved by the City of Palm Desert Inadscape Representative. inspector. Y All local Municipal and State laws and rules and regulations I V) V governing or relating to any portion of this work are hereby D. RECORD AND AS-BUILT DRAWINGS W incorporated into and made part of these specifications, and - a their provisions shall be carried out by the Irrigation Contractor. Provide and keep up-to-date on a daily basis a complete as-built record, redlined on blueprint, showing all deviations from plans to a `� s actual installation. The drawings shall show approved substitutions ` Fumish to the Owner a complete "as-built" drawing on a sepia a of size, material s name, model number an l name, manufacturer's bd showing exact locations of all items installed. These sepias are W to be delivered upon or before final inspection. catalog number. These drawings shall be available for inspection Q at all times. ! 0 „ N Should it become evident that unknown obstructions, grade Dimension the location of the following items from two (2) a differences, or differences in the area dimensions exist that permanent points of reference, such as building corners, sidewalks, , might not have been considered in the engineering, such road intersection, etc.: obstructions or differences shall be brought to the Owner's or o AC the Owner's Authorized Representative's Immediate attention. a• Point of connection to existing water lines. W in the event that the Irrigation Contractor fails to provide b. Connection to existing electrical power. z notice, the Irrigation Contractor shall assume full responsibility c. Ball valves. _ L for any and all revisions required. d. Routing of sprinkler pressure lines (dimension 'a maximum 100 feet along routing). The Irrigation Contractor shall become familiar with all grade e. Remote control valves. `W differences, locations of walls, retainingwalls, tree locations, f. Routing of control wiring. � a paving, etc. The Irrigation Contractor shall coordinate with the g. Ends of all pipeline stubs. General Contractor and other subcontractor for the locations h. Remote control valve wire splices. and the installation of pipe sleeves through walls, under roadways, paving, structures, etc. Deliver as-built Record Drawings as required by Section 01720 to R z the Owners Representative before the date of the final inspection, i... B. MATERIALS Delivery of the as-built drawings will not relieve the Irrigation Contractor of the responsibility of furnishing required information RECEIVED All state r min shall P that may be omitted from the drawings. s a • c pressure mains be VC Schedule 40. Y 9 4 zoa Z 2 All sprinkler lateral piping shall be a minimum of PVC Class 200. o 2 All fittings shall be high-impact, side-gated PVC Schedule 40. PUBLIC WORKS DEPARTMENT All control wiring shall be color coded and sized per valve ' CITY of PALM DESERT manufacturer's specifications: 14 gauge minimum. "ii°SF CurCCA ley ka�i f { CUMMINGS CURLEYnASSOCIAT ES IN n"` * O t LAN DUCARK ARCH 1 T K C T 2'3t'W oral• 776 Easy GREEN STREW, StmE 240, PASJ1mk CAIJFORw 91 10 t 0 \� TM_ 628.683.8182 rF OPcl►LVF 0 j C^3a83 AZ 30100 UT 377204 N M 31 2 NY 578 CLARS319 ! Z o p J CVWD SIGNATURE BLOCK AREA o { U W J W t i 17 i Jj5 1 i F L4v1 { i E. CONTROLLER CHARTS H. TOOLS AND EQUIPMENT k As-built drawings shall be approved by the Owner's Representative Furnish the following tools and equipment as a part of this contract: before controller charts are prepared. a. Two (2) sets of special tools required for removing, disassembling Provide one controller chart for each controller supplied. and adjusting each type of sprinkler and valve supplied on this The chart shall show the area controlled by each remote control project. Rom valve. A different color shall be used to indicate the area of coverage for each station. Valve station numbers shall correspond b. Two (2) keys for each automatic controller. to the Record Drawings. A reproduction of the Record Drawings C. Two (2) quick coupler keys and matching hose swivels for each shall be used for this purpose. type of quick coupling valve installed. } The above mentioned equipment shall be turned over to the Owner's Following approval of charts by the Owner's Representative, they Representative at the conclusion of the project. Before final shall be hermetically sealed between two (2) layers of ten (10) mil. inspection can occur, evidence must be shown that the Owner or the p E thick plastic sheeting. Owner's Authorized Representative has received this material. € Controller charts must be completed and approved prior to final I. MAINTENANCE AND GUARANTEE (90 DAYS) # i review of irrigation system. The irrigation system shall be maintained by Irrigation Contractor for F. OPERATION AND MAINTENANCE MANUAL ninety (90) days after completion and acceptance of all planting. This shall include the adjustment of nozzles, valves, time clocks etc. o Provide two (2) individually bound manuals detailing operation and as necessary to promote healthy and vigorous plant growth. A final maintenance requirements for irrigation systems. Manuals shall be inspection shall be made by the Owner or the Owner's Authorized delivered to the Owner's Representative no later than ten (10) days Representative to verify the following: spray coverage, cycle times, prior to completion of work. quick coupler or hose bib locations, controller chart, etc. V* Provide the following in each manual. J. CITY OF PALM DESERT INSPECTION SCHEDULE 1 ) Sleeving/Grading a. Index sheet, stating Irrigation Contractor's name, address, a. Sleeve Diameter, type, depth and location a telephone number, and name of person to contact. b. Sail surface drainage, elevations, and trash (including weeds & rubble) Q b. Guarantee statement. 2) Hardscape/Boulders-Cobble I c. Equipment list providing the following for each item: a. Sidewalk and wall layout manufacturer's name, make and model number, name and b. Utilities location v � aaddress of local manufacturer's representative; spare parts c. Boulder type, size weight.and placement list, product brochures, service � s and. maintenance manuals 3} Irrigation System Rough-in a on all items in the installation, and detailed operating a. Trench depth and location a and maintenance instructions for major equipment. b. Pipe Size and class > d. Manufacturer's warranties and guar antees I meat antees for all equip c. Pressure test (125 psi for 6 hours) installed. 4) Plant Material (trees & shrubs) W - G. SPARE PARTS AND MAINTENANCE MATERIALS a. Condition z b. Type a c. Placement Provide products, spare parts, and maintenance materials in i quantities specified, in addition to that required for completion 5) Ground Cover (Decomposed Granite) W of Work. Coordinate delivery to project site with the Owner or the a. Type Q y Owner's Authorized Representative and obtain receipt prior to final b. Depth and Spacing payment. c. Compaction 6) Final .j a. Irrigation r j i} Valves, boxes, and wiring k, ii) Controller operation and schedule RECEIVED ii) Sprinkler, bubbler and/or drip emitter type, flow rate ~- and uanti r lant ' -- M f 4 M06 Z q type p =Q z b. Tree Staking i Pt1BLIC WORKS DEPARTMEN CITY OF PALM DESERT C. Overall r ,. SCapE � �,� � cu , bow, i d f a !ram eco 'A y� 1 4 CUMMINGS CURLEYwASSOCIAT ES, IN 0 L A m Q S c A P 'z Are c W 1 'P t c r S � '� 0 776 EOS GREEN STREET, SUITE 240, P, �Iu N& Cw ► 91 101 0r� �°"� P Q TEL 626.683.8 t 82 � OF cA+.�F� � CA 3583 AZ 30100 11T 377204 NM 312 W 878 CLAR5 314 o z , o } CVWD SIGNATURE BLOCK AREA p � U L482