Loading...
HomeMy WebLinkAboutThe Miistrelli Companies Lot 19_1 r V ..- .,.... ..� ,-. - ;*sc _,'...., r t� ,, ..-,�, a.. y• ,° .fie ..�: ib- _ Underground Service Alert PLANTING PLAN NOTES WCCA PLANTING LEGEND AND SCHEDULE I. All plantings noted on these drawings are schematically - 133 located and may require field adjusting. Final location For`Ministrelli Stone Eagle - Lot 19 of all plant materials shall be subject to the approval As of 414107 W G FO E-Y DIG of-theon scope arc 1tec -- APRX 2. Plant quantities listed is provided for the convenience QTY KEY BOTANICAL NAME COMMON NAME SIZE REMARKS f of the Contractor / client and Is not intended for TREES accurate bidding purpose. — - 5 IW CACIA WILLARDIANA WILLARD'S ACACIA 36"Box 5. Any and all plant substitutions must be approved by the PWtilli10 RDgc(JIR _ landscape architect In Wrlting. 2 CERCIDIUM FLORIDUM BLUE PALO VERDE 36"BOX S _ •O - ~ 4. Plant material listed may or may not have been approved 1 OLNEYA TESOTA IRONWOOD 48"BOX � �� �� 0 by the agricultural commissioner's office. Landscape f ® a contractor should contact developer for status of 2 F PITHECELOBIUM FLEXICAULE TEXAS EBONY 36"BOX STANDARD a a -__ agricultural commissioner's approval or denial. Plant SHRUBS; material not conforming wlth quarantine laws may be destroyed and civil action taken. 1 & CUPHEA LLAVEA BAT-FACED CUPHEA 5 GALLON 5. All plant material is subject to Inspection at the 6 O ENCELIA FARINOSA BRITTLE BUSH 1 GALLON —� t: discretion of the agricultural commissioner's office. � All plant material must be free from red scale 3 - '� 0 JUSTICIACALIFORNICA CHUPAROSA 5GALLON JIE (Aonldielia Aurantii). 1i +�+ Q JUSTICIA SPICIGERA MEXICAN HONEYSUCKLE 5 GALLON ram. 6. Landscape architect cannot assume responsibility for t7 � any plants utilized on site which are not shown on the 1 LARREATRIDENTATA CREOSOTE 5GALLON plans and have not been approved by the agricultural it O 2 ® LEUCOPHYLLUM LAEVIGATUM CHIHUAHUAN SAGE 5 GALLON commissioners off Ice. 'I. When specified, decomposed granite and/or desert cobble 2 ® LEUCOPHYLLUM LANGMANIAE'RIO BRAVO'TM 'RIO BRAVO'CHIHUAHUAN SAGE 5GALLON - �- shall extend under shrubs unless otherwise noted on plans. _ 7 RUELLIA PENINSULARIS RUELLIA(BA]A PETUNIA BUSH) 5 GALLON { 8. Finalize grading before laying out plants. Finish grade 3 c A of all planting areas shall insure positive drainage. SIMMONDSIACHINENSIS JOJOBA 15GALLON E g Hold sub-grade 2" below adjacent paving area to a11oW for mulch. 17 O SPHAERALCIAAMBIGUA GLOBEMALLOW DESERT MALLOW a R cam{ ^� a q. in the event of planting allowances, final plant VINESiESPALiERS e th the landscape architect and subject " 3.2 d shall be revs Wed WI SGap A j 1 � ANTIGONON LEPTOPUS QUEEN'S WREATH 5 GALLON O g p19 5&N �' E 6 to the owners approval. Upon approval, they shall be spotted Q -�- --"~�r � U in the field by the landscape architect. 2 z MACFADYENA UNGUIS-CATI MACFADYENA CATS CLAW VINE r'J �nl.�tJly 10. The Landscape Contractor shall provide an outline of the unit GROUNDCOVERs costs of plant allowances listed in the planting plan. These A unit prices Wiii be the basis for determining additions or COBBLE MIXED DESERT COBBLE 1"DIAMETER SONORA SHINERS subtractions to the plan. 21 d954• $�• da V DYSSODIA ACEROSA SHRUBBY DOGWEED 1 GALLON II. In all cases, refer to the planting plan for all planting layouts, a y planting information, plant quantity, type and 'all iiii .�- TRACHELOSPERMUM JASMINOIDES DWARF STAR JASMINE LINERS 8"O.C. condition required. CACTUSUCCULENTS i S •Q 12. Unless otherwise noted, keep plants set-back from paving 10 B AGAVE CHRYSANTHA GOLDEN-FLOWERED AGAVE 18"DIA.MIN. Gj edges as noted: � 1 � OPUNTL4 VIOLACEA VIOLET PRICKLY-PEAR CACTUS MIN.9 PADS 5 Trees minimum 10' O" g 5hrub5 and Accent Plants - minimum 3'-0" 3 ® PEDILANTHUS MACROCARPUS SLIPPER PLANT 5 GALLON Groundcover - minimum I'-O" Herbaceous Perennials - minimum i'-0" 1 Y^ YUCCA ROSTRATA BEAKED YUCCA T TRUNK Cacti Ill: 5uccvlents - minimum 5' -0" 15. When specified, pots are to be of type and size noted on plans. 5�� All pots shall be irrigated and hooked into the underground � s '`�° 2 �P CAM+ drainage system per construction detail. This shall be done o �.� r r - © IeP O prior to pouring concrete or concrete sub-base. O" j r.r.� r i p0 POT SCHEDULE CGURTYARD PLANT LIST & LEGEND ,. . ,ANOGGAP- APPX. SYMBOL CATALOG DESCRIPTION _ MANUFACTURER COLOR APPROX. KEY BOTANICAL NAME COMMON NAME SiZE REMARKSOTY jtt �'+ `'�'` P a�.+ ! • ? E QTY. # TREES + 36„ �� �' `� MPB �+ 12 CD CITRUS VAR 1 S-3 C10-26 SONORAN BOWL CONCRETE DESIGNS .'DWARF'. . TBD DWARF CITRUS 24^Box VIER.vARiEnr 10"x 25'/2" PHONE: (800)279-2278. BGt �+;' }"i• ` t O ` t ` 1 PUEBLO , ,. ,- � "'�, �,,�• 0 F-� P-2 C11-23 PUE O CONCRETE DESIGNS TBD SHRUBS '�` � - C� ''`• 20"x 23" : : PHONE: (800)279-2278 14 CL CALLISTEMON CITRINUS'LITTLE JOHN' DWARF LEMON BOTTLEBRUSH 5 GALLON O<N� GNP CH CUPHEA HYSSOPIFOLIA FALSE HEATHER '- I • --. . ._. ...._...�-.:.. _.... .�__�_ 5 GALLON # EP EURYOPS SPECIES EURYOPS 5 GALLON 4 2 FS FEIJOA SELLOWIANA PINEAPPLE GUAVA 5 GALLON 13 Gill. GAURA LINDHEIMERI NCN y `� - "} 8 01, Mi MORAEA IRIDIOIDES FORTNIGHT LILY 5 GALLON D 1 ', ` Q GS I k �• AS REQ'D PC PrrrOSPORUM'CREME DE MINT NCN 1 GALLON 18"O.C. 2 PS PLUMBAGO SCANDENS 1 , NCN - 5 GALLON I gpp.,6aWP• K�°'+� -a_oo '` MI �O OM a p ! VINESlESPALLIERS " 5 to :a! �+ O `•__ 'P,IC' t....- - •� 2 CS CALL[ANDRA SURiNAMENS POWDER PUFF 15 GALLON WiRErTRAIN-TO-WALL ;; � rw► �, - �fZ14 MI !�I MP MURRAYA PANICULATA ORANGE JESSAMINE 15 GALLON WIREITRAIN-TO-WALLMI U ART ! CS CACTI 1 SUCCULENTS GA I 6L : '.- :� 3 O �My. M 6 O ALOE BARBADENSIS MEDICINAL ALOE O and M t 5 GALLON GL ; -t �P CEREUS P RUVIANUS �UIEXICAN FENCE POST CACTUS 8'0/A HT. MULTI -, � ..,- , � `, �yG `, ti •., �;' G GL. �- APPROVED - ��L�������� CM�� ���� . FINAL LANDSCAPE PACKAC. 1 PA P U ARIAA N ' OD SGALLON Q , ell ck- 6 6I. H AVAI G DATE:��•�REM GROUNDCOVER C j GARAGE L w�''�`...• - OH G G Q GPR ll LANDSCAPEAGFIt _ A ANNUALS SEASONAL FLOWERS QUARTS 8"O.C.,VER. i E ERIGE RON KARVI NSKIA NUS'PROFUSION' SANTA BA RBA RA DAISY O GL O .. _....,.. T TRACHELOSPERMUM JASMINOIDES STAR JASMINE GAQAGE "' ,St O p is 1'«•D LINERS 8"O.C. � i;•, ,., GA GS 0 AS REQ'D V VERBENA RIGIDA PURPLE VERBENA 1GALLON 15"O.C. � - Gp�RP 6L AN F•,, 0�°`~- -'-, - E •� U t cJ�O Cp ,s: 5 J GL o BY: cL W cL DATE- s- Fs � A-� C O J , EP CL Cj a S _ _ o �jURA M�� c G b �. WARNING: PLANT MATERIAL MAY OR MAY NOT HAVE BEEN ® J o CV APPROVED �3Y THE AGRICULTURAL GOMMlSSIONER'S OFFICE. - ' � ;� �, •`�� J B L � LANDSCAPE CONTRACTOR SHOULD CONTACT DEVELOPER FOR J J v �► a z STATUS OFAGRI CULTURAL COMMISSIONER'S APPROVAL OR ® ELEC •POO HOMESTEAD ROAD VENIAL. PLANT MATERIAL NOT CONFORMING WITH QUARANTINE [3kF LAWS MAY BE DESTROYED AND G I V I L ACTION TAKEN. ALL PLANT MATERIAL 15 5U5JECT TO INSPECTION AT THE SITE T ° DISCRETION OF THE AGRICULTURAL COMM155IONER'5 OFFICE: y ° ° t0 " ALL PLANT MATERIAL MUST BE FREE FROM RED 50ALE P= w z, 41 (AONIDIELLA AURANTII) LANDSCAPE ARCHITECT CANNOT A55UME R.E5PONSIBILITY FOR OFF l ANY PLANTS UTILIZED ON SITE WHICH ARE NOT SHOWN ON THE Approved By: - - PLAN5ANLD HAVE NOT SEEN APPROVED 5Y THE AGRICULTURAL AM BIGHORN iAOUNTAINS IA GOMM155IONER'5 OFFICE. GOLF cLus Date: BIGHORN CANYONS GOLF clue CITY OF PAll DESEnT 4/5/O� DEPARTMENT OF Scale: CO Ut?1U ITY DEVELOPMENT 1/5 1 11 ,_Oa N.T.S. APPROVED BY: D By: ��o� 5�1 ❑C.C. :ES.NO. TAFF LETTER —, a 34 W,M1 !SUM O !� DR h � ❑P.C. R�� ❑I,,RC ACTION iF RM \ �,,� 1N�th ���: -%_ Job No a BY 0712 Date ON � a` MIS SHO:f_l COt�WENCE WITHIN Skeet N . 4R; orE YEAR oFTr: aFP1 v L BASE INFORMATION PROVIDED 5"r s — LP-1 REFER TO SHEET LP-2 FOR PLANTING DETA I L5 and 5FEG 1 F 1 CATI ON5 ISTRACT5 INC. ARCHITECTURE + INTERIOR DESIGN!, l FLANTINC==; Sf=EC,, 1F1C-., AT10N5 2.05 HEADERS >1 A. Steel headers shall be 'Ryerson Steel Edging System', 3/16" X 4" banding with appropriate stakes. FLANTINO DETAILS PLANT!NG SPECIFICATIONS y Los Angeles plant: (213) 265-7100. .01 GENERAL S. Redwood headers shall be construction grade redwood with redwood stakes. Refer to plan for sizes. b 1.0 SCOPE OF WORK 2.06 PLANT MATERIAL A. The Landscape Contractor shall provide all labor, materials, equipment, tools, permits, transportation, and services necessaryto furnish and install all planting and associated A. All plants shall be as listed in the legend and installed per details and ecificotions. p g at d work a shown on the Contract g p _-p 461 - -- documents and specified herein. B. All plant material shall be full healthy, shapely, disease and insect free, and of a size that is standard �d qVI B. The Landscape Contractor shall visit the construction site, take all measurements, and obtain any other for the nursery industry. NOTES PLANT SLI&MY HI&HER THA14 ALL TREES to HAVE LOWER &ROWN IN NURSERY information necessary for a complete and conclusive bid. G. All plant material shall have been grown under climatic conditions comparable to those of the subject BRANGHE5INTACT PLANT So THAT 501LLINE t OF ROOT BALL 15 6"BELOW site, unless of erwise specifically approved by the Landscape Architect. FINiSEDGRAPE 1.02 QUA I L I TY ASSURANCE VERIFY WiTtf LANDSCAPE ARCHITECT D. All TOPSOIL WATER BASIN,plants are subject to approval by the Landscape Architect. o A. Codes and �.�•tandards E To facilitate proper each shall come from the 4 X BALL DIAMETER,TEMPORARY TEMPORARY WATER BA51N ;W Work, materials, and installation shall comply with all pertinent codes, regulations, and industry standards pp p plant nursery identified by botanical name. FINISHED GRADE FINISHM&RAPE of workmanship. F. Plant quantities listed in legend are approximate and for Landscape Contractor's convenience only. _ BACKFILLMIXt -NATIVE SC IF APPROVEDTECa a a Q All plant uantitles shall conform to the planting plan. _ LINE BY LANDSCAPE ARCHITECT B. License p q Racy `'---•.. SCARIFY SIDES OF PLANT HOLE Roor .3/4 NATIVE 501E I/4 GLEAN � All work shall be performed by a C-21 California licensed Landscape Contractor. BAGKFI►-L MIX BALL AND ROOT BALL B� COARSE SAND C. Permits and Inspections 3.00 IMPLEMENTATION ROOT BALL TO REST ON FIRM, I. The Landscape Contractor shall obtain, coordinate, and pay for any permits, fees, and agency 5.01 PREPARATION -- - , UNDISTURBED SOIL TO PREVENT SETTLIWZP inspections as required and submit all certificates of approval upon completion of work. The Landscape 'a Contractor shall clean and clear the site as necessary prior to planting. All area to be X "HOLE DIAMETER 2. The Landscape Contractor Is responsible for submitting necessary plans to the Agriculture planted shall be free of debris of all types including plaster chips, concrete spillage, chemicals in soil, NOTES, THAN. 1/5 LA SER I.STAKE ALL 24'AND 300 BOX STANDARD TRUNK NOTEr VERIFY 5UPPORTIN&TREE WITH 2 X 4 BRACES BALL nails an fasteners, etc. TREES PER THIS DETAIL. W Department for approval. 2.REFEa TO NOTES ON TREE GUYING DETAIL D. insurance 3.02 FINISH GRADING 3.SPRING LOADED TREE-TIE W-64 BY The Landscape Contractor shall carry all Workers' Compensation, public liability and property damage A. Finish grade all planting areas to a smooth and even condition, making certain that no water pockets AI.DEN ENTERPRISES(818)336-3512 insurance as required by all applicable codes $ regulations,. or irregularities remain. Slope all planted and grass areas a minimum 1/4 inch per I foot per plan and E. Site Verification away from buildings. All planting areas shall be finish graded to comply with contours and elevations TR F'L.A�ITING DETAIL PALM TR F'LAI�ITING DETAIL Prior to commencement of work, the Landscape Contractor shall verify, at the site, all conditions shown or noted on planting plan. and dimensions shown on the plan necessary to achieve the intended design of the planting plan. B. Hold all finish grades for planted, gravel, or cobble areas a minimum 1 1/2" below adjacent f latwork or - Any discrepancies shall be reported immediately to the Landscape Architect/General Contractor. as directed by the Landscape Architect. o •CBI N O F. Coordination G. Remove all objects such as rocks, debris, clods, or other extraneous material from the topsoil and r transport away from job site. d The Landscape Contractor is responsible for coordinotinc3 this work with the staff of the Living Desert. 3.05 TREE STAKING To V V�p - PLANrSLIGH � D �p FINISHED&RAVE Hl � TRIANGULARLY 5PAGE PLANTS O 100. 0 �1P TYPICAL ON CENTER SPACING p G. Adherence to Drawings / On Site Adjustments A. The Landscape Contractor shall stake all centers of tree hole locations and locate stakes as dimensioned I"LAYER OF MULCH A5 SPECIFIED FOR FILL GOVERA&E on plan or scale from plan. Stakes shall be wood, a minimum of 36" long, and labeled with tree name. ' 7_�:FINISHED TOPSOIL BERM u: The Landscape Contractor is responsible for strict adherence to the Contract documents. All plants, Staking shall not be done until all site work that affects tree planting in any way is either placed or lined out. &RAPE + + + + + + z aproducts, and materials shall be provided as indicated on the documents. An than es or substitutionsN T TT o y g This includes but is not limited to mounding, boulder and stepping ad - `i T must be approved b the Landscape Architect in writin Landsca e Contractor shall pp g p placement, headers, f latwork, q SCARIFY SIDES WITH SHOVEL, + v pp y p g• p and walls. � 5OIL IF MECHANICAL AU&ER USED take full responsibility for adjustments to any material or work that is not approved. B. Landscape Architect will review and approve all stake locations prior to any hole dig. Landscape S�-L1. K 'S BACKFILL MIX + + { + O u pr H. Personnel Contractor shall notify Landscape Architect a minimum of 2 working days prior to staking comp letion. - 501L BALL TO REST OF FIRM, ��� 0 Planting shall be performed by personnel familiar with planting procedures and under the supervision of Note: Trees include any plant listed as such in the plant legend. - _- _ - - UNDISTURBED SOIL TOPREVENr '��I/20FON-GENTERDISTANGETO Ea1,AL F� a 3.04 PLANT LAYOUT / BORDER STAKING ED6E OF PAVIN6,CURB OR WALL �/ o a qualified planting foreman. The planting foreman shall be on the job, at the site, whenever planting is in T ��t IG progress. A. All other plants shall be set (in containers) in their locations for final adjustments and location approval by DIAMETER I.SPACE 6ROUNDGOVER PLANT PER THIS DETAIL ONLY Landscape Architect. Notify Landscape Architect a minimum of 2 working days prior to plant setting. s X CANN DIAAPPRMETER WFE:N PLANT CENTERS ARE NOT SHOWN ON PLAN 1. Machinery 2.VERIFY ON THE PLAN ANP WITH LANO-SCAP9 ARCH TECT r 8. Landscape Contractor shaiI line out on the ground the borders between different groundcovers when I.BERMS SHOWN ARE FOR TEMPORARY IRRI&ATioN, WHICH SHRUB MASSES AND ARE To F+�t Landscape Contractor shall I rovide/use proper machinery for tree placement and planting. A crane must UNLESS NOTED OTHERWISE BE PLANTED ON&RID SYSTEM p p p p y p p g' these are not separated by headers. Landscape Architect will review and approve this layout. be used for: 1) Any tree 56" box or larger; 2) Palms 6' or larger (brown trunk height) unless otherwise Immediately after layout approval, Landscape Contractor shall stake the approved layout with 12" wood stakes. approved by Landscape Architect. 5.05 EXCAVATION J. Plant Stockpiling A. Excavation for all plants shall be per detail. Q_f5H_ L.ANTI NG DETAIL.Plants stockpiled on site prior to planting shall be maintained properly and protected from sun, drying, B. Landscape Contractor shall notify Landsca e Architect/General Contractor of an obstruction orRUB, �.."ESPALIER/ GROUNI�GDVR wind, machinery, or an other damage. Plants deemed damaged by Landscape Architect hard, impervious sub-soil conditions immediately. y shall be replaced Nith an equal plant at no additional cost. G. In areas of hard soil, plant holes shall be square in shape. I2'-0` TYPICAL VERIFY WITH LANDSCAPE ARCHITECT K. Care in Planting 3.06 PLANTING SET BOULDERS 50 THAT CONCAVE Proper care shall be utilized in the handling and placement of all plant material. Breaking of limbs, 12&AUGeGALVANIZED HIRE TYPICAL AND UNNATURAL*AREAS ARE skinning of bark, etc.. will not be allowed. Any !ant which the Landscape Architect/General Contractor A. All plant holes except those for cacti and succulents shall be thoroughly watered prior to setting the plant PAINT WIRE TO MATCH WALL SOIL LEVELBURIED COMPACT SOIL TO PREVENT determines is damaged shall be replaced byte Landscape Contractor at no additional cost. in the hole. ATTACH WIRE TO WALL WITH SETTLIN& B. All trees shall be laced adjusted, and planted under the direction of the Landscape Architect. o A A R�CAL) SECTION ` L. Protection of Existing Conditions Landscape Contractor shall notify Landscape Architect a minimum of 3 workin days prior to the tree r ``� TTOG�`T POiLL o � A BOULDER INSTALLATION (FLAT) 1. Landscape Contractor shall protect all existing plants, utilities, structures, hardscape, etc. planting date. If deemed necessary by Landscape Architect, Landscape Con ractor shall 4� MAXIMUM OFb'-O"ONCEN� SET BOTTOM I/S OF BOULDER from damage of any kind. Any item deemed damaged by Landscape Architect/General relocate/replant any tree planted without Landscape Architects direction unless otherwise approved - TRAIN PLANT ACROSS WIRE TO BELOW&RAPE TOMVENT Contractor shall be replaced by the Landscape Contractor at no additional cost. and shall be responsible for the health of the tree and the Cost of the relocation. $ FULL HEI&HTANDWIDTH MOVSMENTOR`ROCKING` 2. No equipment or storage of materials w111 be allowed to occur within the dri line of an existing tree. C. Install all plant per planting details in locations approved b the Landscape Architect/General Contractor. o ° m FINISHED GRADE ro J, FINISHED 6RAVE p y g p p p pp y p _ SET BOULDERS 5O THAT CONCAVE The Landscape Contractor shall coordinate with the General Contractor and be responsible for the D. Set plant in upright position in the center of the hole and compact the backfill mixture around the ball of �AMBURIEP erection of a barrier/fence, as approved b Landscape Architect, at the dri line of each existing tree COMPACT SOIL TO PREVENT a pp y p p 9 roots. seGrloN 1~ prior to the commencement of any work. NOTEt ESPALIER TO BE TRAINED IN A FAN SHAPE BOULDER INSTALLATION (VERTICAL E. Thoroughly water each plant when the hole is 2/5 full. After watering, tamp the soil in place until the TO PROVIDE FOR FULL WALLCOVERAGE ) �, O M. Reviews and Inspections surface of the backfill is level with the' surrounding area and the crown of the plant is at the finished grade UNLESS NOTED OTHERWISE Refer to Landscape Supervision/Observation Schedule of the surrounding area. E•l [�■i N. Submittals by Landscape Contractor F. Remove all containers, .boxes, straps, non-essential stakes, trellises, etc, from plants and remove from W I. Availability List site. A � PAL I�R TRAINING DATA I L � E3DULD�R DATA I L. �l � Within 30 days of signing the contract, the Landscape Contractor shall provide the Landscape CG. Treat all planted areas, gravel, and rock/cobble areas with pre-emergent weed agent per manufacturer's Architect with a complete materials list of plants, including complete data on source, size, specifications. quantity, and availability. Any substitutions of plant types, species, sizes (including palm heights), l� or quantity must be approved by the Landscape Architect prior to this time. W If credits or deducts in the contract are required due to substitutions, the Landscape Contractor 1 ' g. --' SOIL LEVEL a 5oIL MIXTURE PER shall submit these with the materials list submittal. SPECIFICATIONS 3.07 CACTI/SUCCULENTS PER 2. Plant Photos and Spec. IRRI&ATION PLAN if Landscape Contractor shall meet with the Landscape Architect prior to planting to establish correct planting ru+TERPRooF For TO FINISHED&RAPE a The Landscape Contractor shall provide the Landscape Architect with photos and size specifications rocedures. This includes: Plant c e SEAL SEAM AT PIPE AND POT p core, handling, damage (replacement and guarantees) soil preparation, of all trees that are not previously tagged off by the Landscape Architect. These trees will be subject root pruning, irrigation system, initial watering, and watering schedules. "TERRA-BOND'FILTER CLOTH to approval by the Landscape Architect. Refer to legend for any other plants requiring photo 1-I/2" L3YEROFGDARSELYGRUSHED submittal to the Landscape Architect. Photos shall be submitted to the Landscape Architect a 3.08 GLEAN UP K, /4" VAMETSR minimum of CIO days prior to commencement of job. FINISH SURFACE OF PAVINOMARDSCAPE A. During construction, the Landscape Contractor shall keep premises as clear as possible of materials : :; ,:.:,�::,•:,:�,,.::, : ;;.�.;:y::: ;: ..;;.,; 3. Unit Costs and debris. 1" IRRIGATION PIPE PER PLAN Within 30 days of signing the contract, the Landscape Contractor shall submit a detailed schedule 2`DIA,IETERPVCPIPE - outlining the description of work and the dates for completion to the Owner, the Landscape Architect, B. Upon completion of the work under this section, the Landscape Contractor shall remove from the for coordination of reviews and integration of other work. premises all surplus materials, tools, equipment, rubbish, and debris resulting from his work, and 4•DIAMETER PIPE OR PER O. Guarantee shall leave the installation site in a clean, neat condition. SPECIFICATIONS I. The Landscape Contractor shall guarantee all trees (including replacement plants) for a period of 4.00 MAINTENANCE one year and all shrubs, vines/espaliers, and groundcover plants for a period of CIO days following The Landscape Contractor shall provide for C10 days maintenance after the job is totally completed and has 4 final acceptance of the planting portion of the contract. The Landscape Contractor shall be been accepted by the Landscape Architect. At the and of the maintenance period, a final inspection shall be �'OT IRR./ DRAINAGE �� responsible for missing or vandalized materials until final acceptance by the Landscape made by the Landscape Architect as related to the maintenance. � Architect. I�15TAL.LATiON DETAIL. � U 2. This guarantee excludes theft, vandalism, or natural disaster after final acceptance. During the 055ERVATI � N guarantee period, the Landscape Contractor shall check all planting and otherwise make the y W caner aware of any adverse conditions that may affect the plant material. The Landscape Contractor shall be responsible for any manufacturer's or supplier's warranties during the 1.00 GENERAL � � guarantee period. 1.01 SCOPE OF WORK BOUL r;)ER SPECA F I CATI ONS 4114 Cd 3. Replacement: Any material included in this contract that is either dead, missing, or in unsatisfactory a g y The Landscape Architect shall make a minimum of the scheduled ,. Unless otherwise coordinated with General Contractor,Landscape U condition as determined b the Landscape Architect shall be replaced with equivalent material Contractor shall be responsible for supplying all boulders as shown on the 0 e� y p p q, site reviews as outlined below. The Landscape Contractor is responsible for scheduling plan. Landscape Architect w111 review and approve boulders on-site. at the Landscape Contractor's expense. Root condition and new growth that has occurred since and coordinating his work accordingly. All site reviews shall be scheduled with Landscape e�cted are to be size as drawn on Staking Plan or boulders will be "0 I� planting must be taken into account so that replacement plants match existing plants of the same ..-, p g p p 9 p Architect a minimum of two (2) working days prior to review. Should the variety. 2. A minimum of 20% additional boulders of varying sizes over the amount Landscape Contractor choose to complete work prior to a review or approval by Landscape Indicated on the plan shall provide for placement by the Landscape _ Architect he does so at his own risk and may be required to uncover, Architect 1n the field. 2.00 MATERIALS � PRODUCTS ' y q. replant, or adjust work as necessary at his expense. �� 2.01 SOIL MIXTURES 1.02 S i TE REVIEWS 3. Unless otherwise coordinated with General Contractor, the Landscape A. General _-_- Rough grades and mounding. Contractor shall be responsible Port e� ___ a. Selection and placement of boulders, Including the water . All of the ingredients are to be thoroughly mixed prior to installation in pots, as backfill. _ Header location lined out on site. features. Landscape Contractor shall scale-the staking plan for B. Backfill Soil Mixture _-__ Boulder-placement supervision, approximate size and location of boulders. Landscape Contractor shall create his own backfill mixture. by e by mixing 2 parts native topsoil and I part Refer to Grading Plans for areas of soli rate boulders _ Staked tree locations. and the heights of grades these boulders will be retaining. soil amendment. ____ Drain line review - open trench. Cd Irrigation mainline and lateral - open trench. b. Any excavation and fine grading necessary to set the boulders. ckf i I I Mixture G. Palm Ba --- g Backfill mixture for all Washingtonio palms shall consist of Glean coarse sand. Native soil may ----- Plant approval -- on site, in containers. 4. Landscape Architect shall review and approve boulder selection and 0___ direct and/or approve boulder placement on-site and as used In water �,, _ Tree placement and facing, under direction of Landscape Architect. Features. The contractors shall notify the Landscape Architect 48 hours in C/) be used for this mixture if It is sandy in nature and is approved by Landscape Architect. ____ Staked light locations. advance of when boulder work is to begin. r���-"�'>✓>>=,,.� ��>- iEEGk r/11� T-F. �I - _-_- Pot drainage / Irrigation stub location review. 5. Boulders are to be burled a minimum of 1/5 their diameter and are to be Approved By: re�y.•�-rzrr�y�. �n--'r�c� laced In as 'natural'manner as possible using the Ian lacement as a - ----- Soil amendment Installation. p g p p guide. Plant location a rovo l - ail shrubs, vines, espaliers, and groundcovers, 6. Y uide boulders are used as a retaining wall, boulders are to be •�:� Tl ,-�T�4K.��lNIR� _ in Containers se pin their locations. rectangular in character with vertical sides so as to form a solid soli Date: barrier. All boulders retaining soil are to have the voids between boulders �I/3/O-i -'--"" handpicked with concrete and smaller rocks. The backside voids are to be . __-- Drains in place. hand-packed with concrete and waterproofed to eliminate any water d kage an staining. tale: ____ Pot location and Installation review. lea NO SCALE ____ Irrigation equipment, layout, and operation review. I. Pro erequipment shall be used In boulder placement. Examples of acceptabl qvipment are crane and boulder sling or hydraulc grapple. Drawn By: Light fixture review and adjustment. Examples of non-acceptable equipment are bobcat, tractor or any other DR �'TTM" ____ Nighttime light fixture review and adjustment. equipment that pushes or dumps boulders and does not allow for in-air j rottation of boulders for proper placement. Verify selected boulder Job No. -r ---- Final inspection of all completed work and punch list. placement equipment with Landscape Architect prior to placement. 8. Refer to Boulder Schedule, for type and color of boulders 0712 ' _....__ On site punch list Completion review for final acceptance. and rubble-rock. Sheet No. ____ 30 day walk-through of contract maintenance. ____ Walk-through of contract maintenance for final acceptance. ��_� ' rF:r�Ijirne,J F• i s ..,. .. r E�:. ...ate ". u. F - "- +i •5 �.: .. �. .a .<.,- ,.. 'sre.. .`t*... ate,' �_,.. .h ,.. ,. .._ _ ...� .�« -. ,,..-; d�"r. +4".� . N- , < .. . a¢... _.. �4f. ... �. .. .�. ._ e _, i.. ��.-..av .. _.r .,;` ••" .1, '`° 'gib .. Via. . � � ., ry. a .,� ., -,. < ,...,. .,. . �. � � . � _�-. , w,. ,:t .„.,: , ....a «.". .r .,. .,...... t"...- ."...,._ _ .. .._. , .. -.. .....,. ... ....,.. ,_.tea_. .. .. ". .Y. � .3. -,.,,.. P^ � � I Underground Service Alert o _ Call: TOLL FREE -d IRRIGATION NOTES =n (SATIoN. PLA DIAS r . I ION LATERAL5 -�''"�� r�HA I CL ITV STALL �/ MAI �I•Iow �1'IL _ -_ _ 0 AID G W09E YOU -DIG I. The Landscape Contractor is responsible for full irrigation coverage IRR ^,I QurPMENY LA AREAS, of all new plant materials installed. y p I AI.L L EMI KS�P ND R5 ON SIDE V ` o� Nr EMITTER PVC PIPE SiZINCG CHA.R7 vo 2. The Landscape Contractor shall install the specified system in accordance vilth _ �- `• �_ the attached schedules, notes, details, and specifications. + e I�H o -180 GPH lie" a 1 E FT AN 6HT SHALL 6E REINSTALLED lal-360 GPH 5/411 IL _ T 1>:RSEDOE 362-84o GPH 1" •�✓ 5. The Contractor shall verif the operating pressure and notifylandscape architectG ° of any differences prior to verify or ordering of material . p -- .wru:i � � VERii~'Y ACTU QUANTITIES AND FiNAL LOCATION OF PLANT MATERIAL 841-isbo GPH WITH THE OWNER' PRESENTATIVE BEFORE ANY INSTALLATION OF THE a Q a Q Q If the contractor fails to notify landscape architect, he (she) is financially responsible for any -a�oaC IRRI6ATIONSYsr�M. THE P I NCG CHART necessary system alterations that result. I� LANDSCAPE CONTRACT SHALL VERIFY CONTROLLER ACTUAL siZ.>r, _ 5 DOWER SOURCE AND LOCA710NAT TIME OF INSTALLATION -''�' 4. Unless otherwise noted this system has been specified for a maximum water GP s/4 y pressure of 65 PSI. For drip irrigation systems adjust system to a maximumGPM 25 M i-I W static pressure of 30 PSI. TOE 41 - b0 GPM '`•�� 5. The Landscape Contractor shall be responsible for cutting and patching of / I D /- hardscape as required for sleeve installation. NEE ' / ___�---- 6. Controller shall be installed as per manufacturers specifications. Controller, type 5 __-- size and uantities to be determined b the valve re uirements and point of J .�..--•"'"' connections. Verify controller location with the landscape architect rior to installations. 7. Install PVC mainline and laterals according to the irrigation and piping schedules. I r♦p I p = TB • ---'" _---- C 8. Valves shall be signed as noted, with f low not exceeding manufacturers specifications. / 4 , / O a -, 1. Final locations of valve boxes and bockflow revention devices shall be approved r-- 2 I , > C by landscape architect prior to installation. Valve boxes shall be. square top �. �, ,, � adjacent walks or curbs and flush with the final F 1+ Z X n 10. Work shall conform to all construction codes and regulations. Ar II. See Sheet LI-5 for complete Irrigation System notes. R e0 �• a R I O ���,/ / PO /' ~ �` '4 G l; 3,+ , pG 1A 11 LAVING r i. , R �.• . N ,4 Wei COO41 1 -,Oaw K Arc FO 'r C ; e �^ oco Ale A,RG � , ~ • O �J A� GARAGE / EORy oM T L O g ay o'. I B CL :r GP 'Q A. _.• G Ott ;AGt~ o . . 0 / L / o � - - o 2 � I/4 1,/4 / 1 0177 c J c a.+ 4 E"= I%Q• L NOTE: IN ALL T 4" SGH. 40 PVC, SLEEVES AT � DRIVEWA GROSSING. 4-1 t_ U Q I TB 2 � � 4� AI NOTE: CONVECT IRRIGATION MAINLINE TO RESi ENGE a WATER METER SERVICE LINE. 65 ------------ r 1C11 3 •~ V1 3, Approved By: ' llate: : Scale: 11 1 1-0 11 { Drawn 13y: RV Job No. 0712 Sheet No. BA�5E INFORMATION PROVIDED BY REFER TO SHEET L I --5 FOR I RRI&ATION DETAILS and SPEC I E I CATI ONS STRACTS INC. ARCHITECTURE + INTERIOR DESIGNNEE I >"' 1w PALM DE5ER7 WATER BUDGET CALCULA7ION5 PLANTING PALETTE TREES / PALMS / SPECIMEN PLANTS WATER USAGE' PLANT *1; City of Palm Desert BOTANICAL NAME COMMON NAME SIZE QUANTITY OF PLANTS FACTO y PARKIN50NIA FLORIDA PALO BREA 36" BOX 2 L 0.2 Water Calculation Chart ACACIA WILLARDIANA BLUE PALO VERDE 56' BOX 5 L 0.2 0 CITRUS DWARF DWARF CITRUS 24" BOX 2 M 0.5 OLNEYA TE50TA IRONWOOD 48" BOX I L O.2 Maximum Water Allowance (MWA EBENOP5IS EBANO TEXA5 E$0NY 36" BOX 2 L 0.2 11 Q a Q a Q Input Zone �'1� Square Footage Calculations Tree&Shrub Square foot 2845 W Turf Square foot 0 (� Total Square foot Cobble/Boulder 0 Total Waterfeature Square footage 0 Total Landscape Square f 2845 4 Zone No. Eto Water Adj. Total Conversion Factors Total SHRUBS U Factor Sq.ft. 0.6 4s MWA WATER USAGE, PLANT TQ 1 57.01 0.5 2845 0.62 748 67.219211 OF PLANTS FACTO tr1 2 $6.82 0.5 0 0.62 748 0 50TANICAL NAME COMMON NAME SIZE QUANTITY 3a 751 0.5 0 0.62 748 0 ENGELIA FARIN05A BRITTLE BUSH I GAL. 6 L 0.2 3b 88 0.5 0 0.62 748 0 .0/ 4 93.9 0.5 0 0.62 748 01 JUSTICA CAL1FORNIGA CHUPAROSA 5 GAL. 3 M 0.5 sty LARREA TRI17ENTATA CREOSOTE 5 GAL. I L 0.2 _ SIMMONDSIA CHINEN515 JOJOBA 15 GAL. 3 L 0" e 0.2 a N � Estimated Water Use SPHAERALGIA AM6I6UA GLOBEMALLOW 5 GAL IZ L 0.2 W JUSTIGIA SPIGIGERA MEXIGAN HONEYSUGkLE 5 GAL. !I L 0.2 ,.� Total Number of plants 14s GUPHEA LLAVEA BAT-FACED GUPHEA 5 GAL. I L 0.2 O Number of plants by water use /oof Total-Lan dscape Square Footatle LEUGOPHYLLUM LAEVIGATUM GHIHUAHUAN 5A6E 5 GAL. 2 L 0.2 1 Low 76 0.514 1460.946 L' d 2 Low/Mod 0.000 0.000 LEUCOPHYLLUM LANGMANIAE 'RIO BRAY 5 GAL. 2 L 0.2 v c. 3 Mod 60, 0.405 1153.378 CALLISTEMON GITRINUS 'LITTLE JOHN' DWARF LEMON BOTTLEBRUSH 5 GAL. 14 L 0.2 z a 4 Mod 1 Hi 0.000 0.000 �)GUPHEA HY550FIFOLIA FALSE HEATHER 5 GAL. II L 0.2 L w a 5 High 0.000 0.000 �, r A a 6 Low Trees 10 0.068 192.230 EURYOPS 5PEGIES EURYOP5 5 GAL. 4 M 0.5 7 LowlModTre 0.000 0.000 O FEIJOA 5ELLOY41ANA PINEAPPLE GUAVA 5 GAL. 2 M 0.5 8 Mod Trees 2 0,014 38.446 � a 9 Mod/Hi Tree 0.000 0,000 GAURA LINDHEIMERI NGN 5 GAL. 13 M 0.5 ' 10 High Trees 0.000 0.000 MORAEA IRIDIOIDES FORTNIGHT LILY 5 GAL. 8 M 0.5 a Total 148 PITTOSPORUM 'CREME DE MINT' WIN I GAL. A5 REQ'D M OS SHRUBS FLUMBAC70 50ANDENS NGN 5 GAL, 2 M OS Mandirrirgation System Type: Zone Irr. Eff. Area SeasorrslPlatuFacrer: SpraylBublDrip 1 0.9 1461 1 Low Shrub W Season Zonal eo Plant Area Conversion Factors Estimated Value Factor sq.ft 0.62 748 trl.Eff. Water Use spring 12.54 0.2 1460.946 0.62 748 0.9 3.37 Summer 34.77 0.2 1460,946 0.62 740 0.9 9.36 Fall-Winter 9.7 1 0.2 1 1460.946 0.62 74B 0.9 2.61 TOTAL I I I I16.34 Plantlirrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor: ACCENTS / SUCCULENTS / CACTI t� SparylBublDrlp 1 0.000 2 LowlMod Shrub WATER USAGE: PLANT season Zonal Eto Plant Area Conversion Factors BUrnated Value Factor sq.ft 0,62 748 Irri.Err. water use BOTANICAL NAME COMMON NAME SIZE QUANTITY OF PLANTS FACTO Spring 12.54 0.35 0 0.62 748 0 ALOE BARBADENS15 MEDICINAL ALOE I GAL. 6 L 0.2 Summer 34.77 0.35 0 0.62 748 0 CEREU5 PERUVIANU5 PERUVIAN TREE GATU5 6' O/A HT. I L 0.2 Fad-Winter 9.7 0.35 0 0.62 749 o ,TOTAL 0.001 GEREU5 HILDMANNIANUS(NEW) PORTULAGARIA AFRA ELEPHANT'S FOOD 5 GAL. I L 0.2 Plantllrrlgation System Type: Zone irr.Eff. Area Seas anal Plant Factor: pray rip 1 1153.378 3 hod Shrub Season Zonal Etc Plant Area Convers ion Factors Estimated Value Factor 9q.ft 0.62 748 M.Err. Water Use Spring 12.54 0.5 1153.378 0.62 748 0.9 6.66 summer 34.77 0.5 1153.378 0.62 748 0.9 18.47 Faii-winteType:stem TOTAL r 9.7 0.5 1153.378 0.62 748 0.9 35.15 WATER USAGE' PLANT Q Plantflrrl0 y atlon S T e: Zone Irr. Eff. Area Seasonal Plant Factor: VINES OF PLANTS FACTO LO SpraylBublDrip 1 0.000 4 hlod►Hgh Shrub IW Season Zonal Eto Plant Area Cbrwerslon Factors Estimated ANTIGONON LEPTOPUS QUEEN'S WREATH 5 GAL. I M 0.5 Value Factor sq.ft 0.62 748 1 Inn.Err. Water use MACFADYENA UN6UI5 GATI GAT'5 CLAW VINE 5 GAL. 2 M 0.5 Spring 12.54 0.65 0 0.62 749 1 0 Sumner 34.77 0.65 0 0.62 748 o GALLIANDRA SURINAMENS POWDER PUFF 15 GAL. 2 M 0.5 Faii-winter 9.7 0.65 0 0.62 748 0 MURRAYA PANIGULATA ORANGE JESSAMINE 15 GAL. 2 M TOTAL 0.q0.5 Plantflulgatlon System Type: Zone Irr.Eff. Area Seasonal Plant Factor. SpraylBublDrlp 1 0.000 5 hiigh Shrub Season Zonal Eto Plant Area Estimated Value Factor sq.ft 0.62 748 rn.Eff. Water Use GROUNDCOVER WAT�R USAG PLANT Spring 12.54 0.8 0 0.62 748 0 Summer 34.77 0.8 0 0.62 748 o OF PLANTS FACTOR9 Fall-Winter 9.7 0.8 0 0.62 748 0 ANNUAL5 SEASONAL FLOWER5 QUARTS rT7 TOTAL 0. 1�1 TRAGHELOSPERMUM JASMINOID=STAR JASMINE LINERS 544 50. FT. M 0.8 �..� TREES VERBENA RIC71DA PURPLE VERBENA l GAL. Plantllrrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor. ERIGERON KARVIN5KIANU5 5TANTA BARBARA DAISY SpraylBublDrlp 1 0.76` 192.230 6 Low Tree DYSSODIA ACER05A SHRUBBY DOGWEED I GAL. 21 M 0.5 Season Zonal Eto Plant Area Corwersion Factors Estimated value Factor sq.ft 0.62 748 M.Err. Water Use Spring 12.77 0.2 192.2297 0.62 748 0.75 0.53 LONE M McntllM H HI6H Summer 34.77 0.2 192.2297 0.62 748 0.75 1.48 !r`Ir I-' l..L/1 V l�!r �T �I �f Fait-Winter 9.7 0.2 192.2297 0.62 748 0.75 0.41 TOTAL 2.42 Plantllrrigation System Type: Zone Irr.Eff. Area Seasonal Plant Factor: SpraylBublDrlp 1 0.75 0.000 7 Low I Mod Tree Season Zonal Eto Plant Area Conwersion Factors Estimated Value Factor sq,ft 0.62 748 trl.Erf. water use spring 12.54 0.35 0 0.62 748 0.75 as Dimmer 34.77 0.35 0 0.62 748 0.75 Fall-Winter 9.7 0.35 0 0.62 748 0.75 4-04 TOTAL I I I0.0 cri Plantllrrigation System Type: Zone Irr.Eff. Area Seasonal Plant Factor: U SpraylBublDrlp 1 0.75 .7 38.446 8 Mod Tree season Zonal Etc Plant Area CorwersbnFactors Estimated Value Factor sq.ft 0.62 74B trl,Elf. Water Use Spring 12.54 0.5 38.44595 o.62 748 0.75 0.27 0 Sunnier 34.77 0,5 38.44595 0.62 748 0.75 0.74 A Fall-Winter 9.7 0.5 38.44595 0.62 748 0.75 0.21 TOTAL I i 1 1.21 O .cd t� Plantllrrigatlon System Type: Zone Irr.Eff. Area Sea sonsl Plant Factor: p"C SpraylBublDrlp 1 7 0.000 9 ModiNghTree Season Zonal Etc Plant Area Conversion Factors Estimated Value Factor sq.ft 0.62 748 Ird,Err. Water Use spring 12.54 0.65 0 0.62 748 0 ly • Summer 34.77 0.65 0 0.62 748 0 Fall-Winter 9.7 0.65 0 0.62 748 0 TOTAL I I I I 1 0.00 � O Plantlirrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor: SpraylBublDrlp 1 0.76. 0.000 10 HghiTree season Zonal Eto Plant Area Cbrrverslon Factors Estimated • PRO Value Factor sq.ft 0.62 748 Irri.Eff, Water Use Spring 12.54 0.8 0 0.62 748 0.75 Summer 34.77 0.8 0 0.62 748 0.75 •!■■� Fall-Winter 9.7 0.8 0 0.62 748 0.75 TOTAL 0.00 Total Tree And Shrub 49.25 PlanUlrrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor. M SpraylBublDrip 1 0.8` 344 11 ANNUALS Season Zonal Eto Plant Area Corwersion Factors Estimated Value Factor sq.ft 0.62 748 Irrl.Eff. Water Use Spring 12,54 0.76 344 0.62 748 0.8 3.4 Summer 34.77 0.6 344 0.62 748 0.8 7.44 Fall-Winter 9.7 0.76 344 0.62 748 0.8 2.63 TOTAL I I I 1 13.46 Approved By: Fetal Tulf 13.46 I Plantflrrigation System Type: Zone Irr.Eff. Area 5easonalPlartFactor: Date: Waterfeature 1 1 14 12 Moving Season Zonal Eto Plant Area Convers ion Factors Estimated 4/27/O� Value Factor sq.ft 0.62 746 IrrLEff. Water Use Scale: Spring 12.54 1.2 14 0.62 748 1 0.17 NONE Summer 34.77 1.2 14 0.62 748 1 0.48 Fall-Winter 9.7 1.2 14 os2 748 1 0.14 Drawn By: TOTAL 0.79 RV Total Waterfeature 0.79 job No. Total Estimated Water Use 63.51 0712 Sheet No. LI-2 1.00 IRRIGATION SYSTEM SCOPE OF WORK O A. Work In this section includes rovidin all labor, material D. The Irriqatlon material shall Include but shall not necessarily cl.00 IRRIGATION SYSTEM INSTALLATION PROCEDURES: •0 q q d equipment, tools, permits, an transpogrtatlon necessaryy to be Itmitud to the followings: furnish and install a complete irrigation system with 10 % A. Irrigation plan is diagrammatic,. Irri otion laterals and mainlines coverage of designated areas Shown on the drawings and 1. PLASTIC, PIPE: shown In hcrdscape Is for clarity onl? Install all irrigation specified herein. a. Extended from 100% virgin polyvinyl chloride (PVC). equipment In planter bed areas. Landscape Contractor shall -t 1i verify actual location of power source and controller before MAIN 5l�PLY LATERALS Outside diameter of plastic pipe s ail be the same size an tart anon installation.p bgoletwo 120VOLr IRRIC�/4TION L.EC�END B, The work shall include but shall not necessarily be limited as Iron pipe, with plain ends, All pipe and fittings y g to the following unless specified otherwise: shall be in accordance with the Society of Plastic FEDCO MODEL 805Y = ' ' I = , 1. The Landscape Contractor shall visit the construction site, Industry Standards. B. Install all emitters and tree bubblers on I phill side of plant 1 II -iI o 1- =tu u take all me surements, and obtain any other information material. Emitters shall be install two (2" above finish Garade, - I SYMBOL DESCRIPTION MANUFACTURER AND MODEL # LU � necessary for a complete and conclusive bid. any emitter left at an unacceptable height shall be reinstalled = = _ = III Will uz y p b. Pipe shall be continuously and permanentlymarked with &L 1}W11 SIATLY ILIMS To ea INSTALL NAIra1Re'ACV=It%-Me6TAkr am VAS Nt at n0 cost to the owner. ` IrNrtrtwm n+AcconaAJlce rdTN Luc sta-11arAI L Rn CVDIr to rm R a9Alc ALL l VOLT MrA I" Q the following information anufactvrer's name normal f e KVWA9R41Z MTK.LATIOh CIW"HIWINIAI(ai K NO=% Mg IN 4-JIM ��**n��r+�m Z- 2. Orderin , furnishing, and Installin materials for com lete p p erecn-lemldt(s, TANVALVCImIVIONAVEL WftL1e-I}(-VLV• I(A•COMAvlttVMLOCAL M POINT OF CONNECTION- S/4" meter, static pressure a 65 PSI. v g' size; PVC, type, S.D.R. or pressure rating; and extrusion C. Verif actual uantities and final location of lont material , ,' ,e� , Union o system ncluding pipping, valves, fT�tings, backflow pr�ventor yp p g% q, p (Unless 5peclfied Otherwise), dripper lateral lines, automatic date. with time owner s representative before any instal lotion of the �•(orper1oM�)• "' :� Irrigation system. controller, and final adjustment o Imes to Insure complete Concrete Splash Pad MAIN SUPPLY,LATERAL wIRINts coverage. c. All plastic pipe shall be handled with care and shall be D. Install Ralnbird PCS screens as required to eliminate mistin and orrost point n�� AND INIRING 24Vft'r D� BAGKFLOA PROTECTION- Febco 805Y per focal and state code. v v 5. Trenching, stockpiling excavation materials and refilling especially protected from prolonged exposure to sunlight. overspray unto hardscape, streets, and structures (If required). 1;4VLII c 11 Q Q a a Q trenche , (nciuding compaction of back Fill and installs on _of sleeves. ANassem iesshte sreepulaoe ssibleill riot aeo rricacame. - MAINLINE PIPING-Schedule 4O PVC, using deep socket design schedule 40 fittings. r4 d, Protect all PVC, plastic pipe from damage during construction ID.DO IRRIGATION MAINLINE AND LATERAL L1NE5: ""'°..'"bne.sh°l>Eabea�°.�e'�I.'°I'P."°al° III - """L'M �'- ""' """ 4. Line volts a connections to the irri�cI otion controllers and and storage. Itt�enamB,ntenenc.�ee:e�llenedti„1 - °txies. KRIM*OR IMINIs low voltaga control wiring From conrollers to remote control A. Entire sL�stem shall be cap ed and pressurized to 125 PSI and Suggested24•minlmumcrearanoefromva(vebnay. _ ���T awwo In"ma�aemrw valves. shall ret�ialn so for a six (6, hour period. Check all joints and A"L W$Ar,101ALL erwm .aT�- 2. PVC, FITTINC75: connections for leaks. Repair and correct as necessar . '"" NMMIMM LATERAL PIPING- 1/2" Glass 015 PVC Usingdes socket design Schedule 40 fittin s 5. Replacement of unsatisfactory materials. a. Plastic fittinggs shall be of polyvinyl chloride(PVG), Type Prior to backfill contractoerp to contact Git of Palm Desert lndeca e p g g ' I Schedule 4FO N.S.F. and of IPS solvent weld or scyowed Ins actor for pressure test of mainline, y p DOUBLE GHEGK W 6. Cleanup, inspection and approval. � � p tyype, Losco, 5loone(some manufacturer as of pipe). Where BACKFLOIN PREVENTION UNIT TRENCH DETAIL Faso ?. Operational tests, threads are required, these shall be injectedmolded and B. THE ENTIRE SYSTEM SHALL BE FLUSHED PRIOR TO INSTALLATION � No scAL>e (�)�NO SCALE LATERAL PIPING- 3/4" and up Glass 200 PVC, using deep socket design Schedule 40 fittings. Schedule 80. A�1 connections shall be solvent welded. OF SPRINKLER HEADS. Wherever necessoru Landscape 8. "As Built" record drawings, shop drawings, warrontles Contractor shall Install anti-droln check valves Eprimaelly on slope I"I and guarantees. areas) to alleviate low head drainage/erosion. b. Plastic to plastic -joints shall be, solvent-weld Joints, El ELECTRIC CONTROLLER- One Ralnbird ESP-MG-12, wall mounted. Oci. Verify underground utility locations. Pipe solvent shall be Johns-Manville "B1ue" solvent weldII.00 IRRIGATION HEADS: Verify actual location and power source with owner'scement. C) A. Sprinkler heads alongstreet curbs shall be setback 18" from STANDARDi 6ATIONBOX AP•C&CH representative, 2.00 CODES, PERMITS, FEES, LICENSE AND INSURANCE: C. Plastic to metal joints shall be with male adapters. the all street curbin 5rinkler heads along Interior sidewalks FL�NSDoVALVI: n QQ tcTwcAL LINCTtoM eox male adapter shall be hand tigghtened, plus one turn with a shall be install - to 6 from any edge o�f walks, drive or path. „T"AL Ali 1 A. All work and materials shall be in full accordance with the sirs wrench. Joint compoundshali be Permatex Type CONTROLLER - WALL MOUNTED latest rules and re ulations of the National Electric Code, the pyp o CONTWCrOR TO PROVIDE LAMMTED COLOR ELECTRIC VALVE- Ralnbird EFB-CP in a Jumbo Irri anon box. � Plumbing ,ode, published b the Western Plumbing Officials (Only Schedule plastic may be threaded), B. Irrigation hoods to legend fort height ofeQmittoed ales grinklers. CODED MAP LOCATED d( SECURED INSIDE r FINI5H6RAUE g e y p (e.g. Sta. t - Tree Drip, Stu. 2-Turf Curb) a N Association; and other applicable State and local laws or g g f p p- p ®CONDUIT-PvC regulations. Nothing in these Drawings or Specifications Is to g REMOTE CONTROL VALVES: O 00 Degree PVC Sweeps in �J 9 a be construed to permit work not comforming to these codes. a. All valve locations are shown schemoticall on irrigation Ian ' 120 VOLT INPUT O t S N BALL VALVE- Hammond model #8g01 full port ball valve brass line size In Irrigation box,:� and need to be verified with and approved by Owgner's p 24 VOLT OtrtPur ., 12.00 AUTOMATIC, CONTROLLER: Re resentative/General Contractor. Irri otton valves will not c cc B. The Landscape Contractor shall promptly notify the Owner's be al lowed in gross areas unless approved b Owner's A. The Landscape Contractor shall be responsible ' , 1. Common wire to be white and central wire to be C Reprosentative/General Contracor of an work outlined on g r p y p far the final black unless otherwise noted. �j >+ y Representative/6eneral Gontracto electrical connection from the power source (BY OTHERS) to z fta a Non shall be made between controller and F-+ w the pions or specfficatfonS that is not in accordance with p Female aentrol Va�e.a^Ian atharwlee noted. FILL BOx WITH I/2"PEA sRAVEL GARDEN VALVE- Champion Inverted Hose Bib I-402 In a irrigation box. o a a livable laws codes and regulations. Without such controller as indicated on plan. Final controller location 7. All exposed wire to be Installed In candu". p 9 shall be verified with and ap proved by Owner's Representative. a. Control to De minimum Aym /, ores control prMe lecturers spec�e to atlaI,er o Ds Grounded as O 99 G>a N no ice and appropriate modifications by the Owners 4. VALVE BOXES: s, 120 roll Dower b be provided by others, all .hare LPYG LATERfy LINE Re resentot ve, the Landscape Contractor shall assume full a. Valve boxes shall be tan Carson No. cil0 er Cit Of Palm be according!o local code• w o responsibility for any work executed whlah is Contrary to p y 4 E. Contractor will connect controller to power source and 5M PLAN FOR II+ Q •r such laws, odes, and regulations. requirements. Mark lid "irrigation Control Valve". Install B. Attach a typewritten le end Inside each controller door, stating 3 4 a supply labor,ega,pment a( material needed far sold Ao M ,I the areas overed by each remote control valve, connection. Owner to supply power. Contractor to NOS, 2 above grade in groundcover areas. field venry location of power source prior to submitting INSTALL AT LOVOT POINT AND/OR AT END OF LATERAL PIPING AS NEEDED. PSI GPM RADIUS tti r Bed. Vm*per oa Q lt node. C. License: a W All work shall be performed by a G-21 Catlfornia licensed 15.00 COVERAGE TEST: TREE FLOOD BUBBLER-Ralnbird 1404 so 1.00 - Contractor. TREE DEEP WATERING BUBBLER 5. VALVE CONTROL WIRE: A. When the sprinkler system is completed the Landscape 3 CONTROLLER-kNALL MOUNT DRIP END FLUSH VALVE a. Valve control wire shall be installed per code. Wherever Contractor, in the presence of the Landscape Architect D. Permits and Ins actions: lace wire in common trench with mainline. Wire or Owner's Representative shall perform a test which indicates '�' No scALE p possible, No scALE The Landsca a Contractor shall obtain, coordinate, and a for p � p p pay shall be L-a proved for direct burial in ground, size the water coverage afforded tho lonting areas is complete, STREAM BUBBLER-Ralnbird 5F-B 30 1.5 5'any permits, fees, and a envy inspections as required and #l4-1 NNLE55pSPECIFIED DIFFERENTLY 09 iRRJ&ATION PLAN) adequate, and do not sprinkle any Structure walls, walks su56(t all Certfffcates of approval upon compiet(on of work. minimum with maximum voltage drop of 5% between valve or paved areas. The Landscape Contractor shall furnish all E. Insurance: and controller. Common ground wire shall have white materials and perform all work required to correct any The Landscape Contractor shall Carry all Worker's Gompensatton, Insulating jacket; control wire shall have Jacket of color Inadequacles disclosed. other than white. 5 Ilces shall be made with �2006-5 public liability and propertydamage insurance as required by Bvchonon splice Caps and 5M #5516 5cotchlok seal asks. 14.00 GLEAN UP: DRIP VALVE EQUIPMENT ASSEMBLY: ail applicable codes, reguations, and the General Contractor. h p p 10" Round valve box W/Iid ��� "'d'"`W-wenD" Finish grade aoaeoev.wlrrevasAOArar( °1AT�o ttuir�."en`p7�lM��Tm tNaixr. AU. burin construction, the Landscape Contractor shall keep �^;�� FINISHd*AVC BALL VALVE-Hammond model #b901 full port ball valve line size bronze �4 F. Site Verification: 6. SLEEVING: promises as clear as possible of materlal and debris. I•Nw(f;CM L(o Prior to commencement of work, the Landscape Contractor shall a. Landscape Contractor shall provide all irrigation verify all conditions and dimensions shown on the plans necessary sleeving (Unless Specified Otherwise) under all hardscape. B. Upon completion of the work under this section, the Landscape ,/\\/ ��� ELECTRIC, VALVE-Irri-Trot Ultra Flow 1" "700 series to odhieve the intended design of the irrigation system. Any Coordinate all underground PVC, sleeves work with the Contractor shall remove from the remises all surplus material, gg p TRIG VALVItt discrepancies shall be reported immediately to Owner's Owner's RepresentatTve/General Contractor. All sleeving tools, eqg�uipment rubbish, and debris resulting from his work, \\ -' Representative/Genera! Contractor. required shall be Schedule 40 PVC, pipe and shall be a and shoif leave the installation site In a Cloon, neat condition. //, BRICK SUPPORT(, OF 2 ) I VWVc� DRIP FILTER- Ag. Products 4E-I" with 150 mesh p LNe IN=TorrloNAU min mum two sizes larger than lateral or, mainline piping. � G- Coordination: BALL VALVE hue mainline d1i 11.111"c 40_ PRESSURE REGULATOR- Wilkins #CIO or approve ectival The Landscape Contractor is responsible for coordinating this -• . euatsueaorrcwrne work with all other trades. This ir'tcludes, but is not limited' GC '.�„¢a"� to, provisions for raceways and sloe as well as water and 6.00 IMPLEMENTATION: y ' �'►� �etaic rmT power sources. All irrigator work shalt be coordinated with I Cu.ft. pea gravel � H wLINIIII F; and approved by Owners Representative/General Contractor. A. Prior to installation, Landscape Contractor shall verify static ressure at project site. This system is do I nod to dperote 15.00 LANDSCAPE INSPECTION SCHEDULE: PVC male adopters � ► PSf 6PH from 24 gpm at a maximum static pressure o 65 P51. H. 5chedul(n 1. sleeving/Grading Q DRIP EMITTER- Roinbird X13-I0PG-1052 20 1.0 For mainline water pressure testing refer to note 10.00 (a) Gee eraldca a Contractor shall notify Owner's Representative/ Pressure testing requirements per the Git of Palm Desert. Gore ractor not less than two (2) workingdays in advance t FULL PORT BALL VALVE ELECTRIC VALVE y a. Sleeve diameter, type, depth and of any requested observation. y Notify Owners eg dis� epanCl General Contractor it the site location. No scALE 6 No wtl- DRIP EMITTER- Reninblyd XB-20?0-1052 20 2.0 immediately of any discrepancies and proceed as directed. b. Soil surface drainage, elevations and t. Layyout Of Work: B. Coordinate the installation of all irrigation materials, trash (Including weeds 4rubble). NOTE:INSTALL THREADED a 1. TP4 Landscapo Contractor shall stake out the Irrigation including pipe, with the Landscape Drawings to avoid interfering EMITTERS. REFER TO NOTE: INSTALL EMITTERS ON SCH. 60 RI5ER5(TYPIGAL). system as shown on the drawings. These areas s15a11 be IRRIGATION LEGEND. 9 with the planting of trees, shrubs or other plant material. 2. Hardsca e/Boulders - Gobble ""�'°°°rv`"�"`a yy p rRelweNa Rea�.Aaae-Lott a:: eARson aox-e rTso cFtecked by the Landscape Contractor and Owner's Representative tR,at-swlaN eldemaip .+ LMO"L VALYC /General Contractor before Construction is started. Any ,°,,,,Me WX OOLO1t6 trees In Tlrt'�ren in Platers changqes, deletions shall be determined at this G. All irrigation Imes, valves, and wirin shown on plan under a. Sidewalk and wall layout. rMOdRADC 0 END SELF-FLU5HINCG VALVE- Ag. Products FGH valve in Irrigation valve box. H C ; » ahecfc. paving are schematic only. Install tFase Items in planting b. Utilities location. 2' 0MiN �** FINISH GRADE [�] areas whenever possible, except when Imes must cross paving to I�1 �■■! 2. The Landscape Contractor is responsible for adherence to connect planting areas or unless noted on plan. C. Boulder type, size, weight RaaloTedortneoLVALVC A �( Lae am `4 the contract documents relative to equipment type, size and placement. FILLIRcWr BALL VALVE p LM as y. installation, and location. However, the Landscape Contractor D. Irrigation deli Her shall approve all design Changes due to site scn.atllo sa "sat l%•i shall make minor adjustments, modifications, and previsions pplarr changges, �r scaling elprlors In lrri otion plan too guarantee 5. Irrigation System Rough - In •• ,d t W.tel"4o to the irrigation system, as required, to conform to size 100% sprinkler coverage. Irrigation Contractor shall assume Full g y g .d(411016110W Is""rests 2 -- 1/2 INCH MARLEX conditions and to provide consistent 100% coverage of responsibility for 100% Coverage when Infield changes are made a. Trench depth and location. - =•� .` �• ' ••' 0 w.` me.Is •=M suel:ur:larvcH"Is STREET ELLS � all irrigation areas. without approval from Irrigation designer. . • .M We . M .R;OWN'S •;;. a'�� •°�' VALVE IDENTIFICATION KEY: ~r � b. Pipe size and class. - ' . ` . eSAawoftYLYe V 5. Any deviation from the contract documents shall be verified E. Irrigation designer shall not be responsible for improper c. Pressure test (125 PSI for 6 hours). f e KWLMP"0s LATERAL LINE Controller Letter � Station Number � W with the Owner's Representative/6eneral Contractor prior ope-rotion of egetem due to LondscUpe Gontractoll not Installing PVC TEE SCH. 40 PVC to any Irrigation system installation. The Landscape the Irrigation system per plan, poor workmanship, Installing OR ELBOW LINE SIZE �I Contractor shall take full responsibility for ad justprnents to the wrong pipe size, or Inadequate static pressure from water source. 4. Plant Material (trees shrubs) LINE SIZE any material or work that it not approved. It shall be the responsibility o the Landscape Contractor to notify a. Condition. Valve Size the Irrigation designer of any site or equl ment changges on approved irrigation plans prior to an installation of the irrigation system DRIP AND POT I RR I G. \/ALYE ASS'SEMBLY so as to rovid design modif(cations. g y b. Type. "� EMITTER INSTALLATION DETAIL 3.00 SUPERVISION And WORkMANSHIP: p g � �� Cl. F. Provide Owner or his representative with all o eratir instructions, c. Placemant. s✓ Na SCALs Type Coverage-Bubbler, Tree Bubbler, Drip, M"'I The Landsca a contractor, personals or through an authorized and p competent representative, shall supervise the work constantly, and tools, keys, etc, as required for operation and mainte ante shall as for as possible keep the some Forman and workman of the irrigation system. 5. Ground Cover (decomposed granite) LARGE VALVE BOX GPM Through Valve on the job from commencement to completion. The workmonshl of FINISH GRADE TtCE 9 .� p p G• Upon completion of the landscape and irrigation Installation, the a. Type. 4•W"TEGAF-DrIIIZ_I4A6•dkLholnit • the entire job must In ever Hay be first class, and only yp ND54•GAF40(*-NO/A4TM2=1 � y y y Landscape Contractor shall also provide �wner with two (2) sets experienced and competent workmen will be allowed on the job, of "As Built Drawings" of the Installed Irrigation system. b. Depth and spacing. PAW CWWHATCB°A- H. Record oc-CurotaIg on one set of reproducible prints of the C. Compaction. drawings, a reCorcl plan drawing shoking any changes. Keep It rI#mORADC(in plelbrbeda h 4.00 GUARANTEE: u to•-date as the project Is under construction. n addition, 6. Final CHAMPION 0 finenSion for two permanent points of reference the location of , INVERTED HOSE Iolsara►regplr.a-I 4. - Cd A. All material and workmanship shall be guaranteed and shall the pressure supply line, valve plug tees, and control wire. BIB-1-402 {, 0II perform to the complete satisfaction of Owner's Representative/ a. Irrigation. ,•SOFLSo RISER W,T Q-�4/eo•LOW MAP FMPLER , . llfl� General Contractor for a minimum of one year after completion TAPE AT THREADLD "ON, AlTAGN runt EMT TAPE ALOW -1 � rO .D0 BAGKFLO PREVENTER: ENDS ttlrnRQ ONK FAINT'pro TO MATW D,6, • O r( S acceptance of the job. During this guarantee period, ail W 1) Valves, boxes and wiring, (LENGTH AS REQUIRED) F.vc.LAnstALute • • :� required repairs and ad ustmenEs, Includln adjustment to grade, A- Provide and install backflow reventer unit (Unless S eciFled "+�('CL° °•"° NI IIim shall be made without additional expense or repairs to other work. Otherwise) per State and Lodal Health Department codes and li) GontroEler operation and schedule. NAm�etkplLiaNeaRwe I) • iIII �I� . •�■I U current listings. Backf low protection unit shall be located ill) Sprinkler, bubbler and/or drip emitter O p In such manner as to allow for Screening plant material. p I' 3W REBAR LENGTH B. All damage to paving,�tanttreg, structures, and other g � p type, flow rate, and quantity per (ant. "BREQ'D lilt � o o improvements dire to s ttlem nt of Improperl compacted Refer to plan for location. yp q y p p WISTAINLESSSTEAL trench backfill shall be promptly repaired to the satisfaction of I CLAMPS I�iII Y • . . �y SCH.40 SxBXT Owner's Re resentative/General Contractor at no additional Iv) Overall operation. TEE III�� �1IIII P 8.00 TRENCHING: `' - _ expense. v) As built. �IIII A. Trenching shall be free of all rocks, debris, and sharp , ��� G. This guarantee excludes theft, vandalism, natural disaster, or articles. Back fillln shall be accomplished in a manner to 2 THREADED STREET MAIN WATER SUPPLY LINE work on the system by others after final acceptance. The insure no further se Clement of dutch and to match adjacent b. Tree staking. ELL w/rEFI.ANTAPE Landsca a Contractor shall check, clean, and adjust all Irrigation AT THREADED ENDS, CON p j g grades. No back filling shall be done until scheduled lateral Imes and otherwise insure adequate operation of the observation are made. C. Overall. system throughout the guarantee period. GARDEN VALVE TREE IRRIGATION DETAIL B. Gap or plug o eningqs as pipeline 1s assembled to prevent entrance of dirt or ogbs�ructldn b forlef n ob ects. Remove ca s or luggs when No SCALE �.■Iy 5.00 MATERIALS: necessary to continue assembl-y. T915 15 ESPEGIALLYpORITIGAC NO SHRUB AREAS FOR DRIP LATERAL LINES. A. All work and materials shall be in full accordance with the SLIF SAW 5==rOYMMIDI"01di latest rules and regulations of the National Electric Codes, the c. Install mainline pipes, lateral ppippes, and wirin In common Uniform Plumbing Codes, published by the Western Plumbing trench wherever ossible. Mt�ir111ne pipe shal1q have a minimum Officials Association; and other applicable State or IocaT laws of 24" cover (3 " � MM MM SM W K •i■■I 1� cover under roads and streets). Laterai pipes r�o.12 OW w.Ia 75MIEM AFFr.IMAMY""FROM END. �..I or regulations. Nothing in these Drawings or Specifications is shall have a minimum of 12" cover (18" cover under roads and THST ENDS TO6eTNIi �■�I to be construed to permit work not conarming to these codes, streets). Provide a minimum of 4" of sand all around pipe for sTe�+I •t„� runs under streets, driveways, and vehicular access areas. B. All a uipment shall be as listed In the legend details and Provide o minimum 24" cover for all wiring. Tape and bundle AMY$CALMTOOUTSIMOF8EALIN6PLU& wirin at 10' Intervals. Tie a loose 20" loop to all wirin at Changes FILL GAVNYWITH4EALER specif ed herein. Install all ec�,uipment per details and qq p 9 � � specifications or manufacturers recommendations. Any of direction greater than 50". Untle all loopafter all connectiols substitutions shall be approved by Owner's Representative/6eneral have been made. Contractor to contact Cit of Palm Desert landscape f ins ector to Schedule a pressure test of the mainline prior to backft111n 7!:M:W Kam ENDS. Contractor and Gtty O Palm Desert In writing. Any unspecified tridnches. Landscape contractor shall have all current City of Palm Dessert CRiW 91.29YU AW cA r OFF EXAMS KRE. w equipment shall be replaced at Landscape Contractor s expense. business license. STEP a� G. When the Specifications call for materials or construction of Nr DAM F O B" ="° C a better gUality or larger size than required b the above mentioned rules and regulations, the Spec Ificotlyons shall take precedence over-the requirements of the sold rules and FU3H 9EALI"FLUID INTO DA5E eon. Approved B regulations. The Landscape Contractor shall furnish without p y arty, extra chorge art iddittonat mater•1at and Labor whey required by the compliance wlh these rules and regulations, thouggh the work Fu914rdI:tEyTOeFaDOFISAeocaErTO be not mentioned 1n these particular Specif lcations or SKHn on the ,� ,�SCAL[NS Or cON=TTOK Drawings. Date: 4/3/0-1RAIN9IRD FEN-TITH Wi1Ztr'CGNt�GTOR. .SCitie: Underground Service Alert STW4 NONE OR o Drawn By: CA: TO TYPICAL MIRE GONNEGTION DETAIL RV 1-•800 NO SCALE Job No. 422-4133 0712 TWO WORKING DAYS BEFORE YOU DIG Sheet No. LI-3 _ - 4 Underground Service Alert Call: TOIL FREE -o 1-800 Stone Eagle Development-3107 �� TWO W R G PAY—FORE YOU IG f LIGHTING LEGEND APPX. SYMBOL CATALOG#/ MANUFACTURER DESCRIPTION QTY. FIXTURE Cn ACCENTlUPLIGHTS 7 DL-13 FOCUS MR.16,50 WATT FLOOD,CAMEL UPLIGHT PHONE: (213) 696-3993 FINISH 7 DL-17 ( FOCUS MR.11,20 WATT FLOOD,CAMEL _ a UPLIGHT PHONE: (213)696-3993 FINISH 1 _— � iE72S£DOR PATHLiGHTS 7 AL-06 FOCUS 18 WATT, CAMEL FINISH _ W AREA/PATH LIGHT PHONE: (213) 696-39930 k seTt �'" &%-ROCK �- UNDERWATER LIGHTSx• �'—"'~ 2 POOL/SPA LIGHT 250 WATT UNDERWATER �nI MISCELLANEOUS '- serve t i 1 BQ-09-FD FOCUS MRr11,20 WATT, BRONZE FINISH *' BARSEQUE LIGHT PHONE: (213) 696.3993 sas7 NE 26 63.. NOTES: 1. LIGHTING CONTRACTOR SHALL PROVIDE 24" LONG WOOD STAKES TO MARK LOCATIONS OF ALL LIGHT FIXTURES.ALL FIXTURE LOCATIONS TO BE REVIEWED .w AND APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. .} 7t>P ,CIS Q 2. VERIFY ALL TRANSFORMER LOCATIONS WITH LANDSCAPE ARCHITECT PRIOR TO _ n INSTALLATION. 9,5 e ..�-.. Z a r�J 3. REVIEW ALL CIRCUITING AND SWITCHING WITH OWNER PRIOR TO INSTALLATION. t ' � S ® ; w r" COORDINATE THE INSTALLATION OF ANY REQUIRED ADDITIONAL SWITCHES WITH ELECTRICAL CONTRACTOR. cJ A M 4. ALL FIXTURES TO BE INSTALLED ON A PHOTOCELL CIRCUIT. S `� 5. INSTALL SPJ LANDSCAPE SPLiCEPOST ON ALL ABOVE GRADE LIGHT FIXTURES. 6. ELECTRICAL WIRES AND CONDUIT SHALL NOT BE VISIBLE. SOURCE OF LIGHTING a IS NOT TO BE VISIBLE FROM THE NEIGHBORS LOT OR FROM V� STREET SIDE. \ ` �•� 7. SOME FIXTURES TO BE ON SECURITY CIRCUIT, VERIFY FIXTURE LOCATION. 5 _ �.�+ 18�✓� ¢ ON, [�] "to„ ; o O '.r PG O a Gp P LIGHTING N OT � • �� . .. P>= �.�,�` E5 P 1. All light fixture locations are da rommoticoII shown. Actual locations shall be verified in the r � R°` � g ��' •t g g y + 36 .. ..• M 9 field by the landscape architects O +`` ` P °�'• 2. All fixtures finishes shall be as specified on plan. eQ F ` ,,.. o ,;jr; • 0 5. Whenever possible, use landscape plantings to shield landscape accent lights from public view. e of covers available to screen light source. G Otherwise, contact manufacturer to verify type, g a°, O o 1r P� R � � 4. All work and materials shall conform to local codes and are subject to approval by the client ?� P (10 representative. 36,E ✓. Contractor shall submit cut sheets for all fixtures and equipment for this installation. �0 TAI R = o C6. install electrical conduit at the edges of planting areas so as not to interfere with plant hole ; Mi excavation. Any electrical that interferes with tree hole excavation shall be routed around 5p "� o ° oVOCM excavations g CGOLP ART L ;4 M l� M1 7. Ail light fixtures to be installed per manufacturers specifications. All electrical work and wiring �Ro;jN o to conform to city, county, state, and federal regulations. �' 1G� I 3 Mi �. ,RAGE , '� goa°°M `' A,1 •` Q '.` rr � 8. Contractor shall coordinate the landscape lighting with other trades and other electrical work GL , '' F75 to ensure a complete and integrated installation. Contractor shall provide and install all conduit, boxes wrin , fixtures, lamps, switches transformers etc, for a complete installation. Lighting plan indicates design intent only and is not an electrical plan. a �; &0 GL H ,� 3 • `„ GL G H H G y,1P• Q, - GL p.1G q. Coordinate all lighting connections to panel and switch location with General Contractor. .- Q GH G P l0. All wiring shall be sized to provide optimum performance of lamp. 11. 5ee 5heet LL-2 for complete Lighting 5ystem notes. °P °E ,'r W BA cL° GpQA GL " f L ���xi« ,.•.ter .�...r�� .��. P¢ .....;:. ' o o ,� 1 1 V y . cri r, Q I:s D J EP cL ', O r� 0 AN p,L S L .C40.' U ELEc a x ® rn a 0 • � W a� `P Approved By: Date: Ot 4/5/O`7 S cale: y Drawn By: � DR Job No. 0712 Sheet No. I C� TI NCB DETA I 5 and S 'EG ! I GATT ON5 BASE INFORMATION PR'OVIi7ED BY LL-1 REFER TO SHEET L.L.-2 FOR Lr L- STRACTS INC. ARCHITECTURE INTERIOR DESI&N MCI 3„r Underground Service Alert 0 Call TOIL FREE completion of Aork. 5.00 IMPLEMENTATION ---- 1-800 C* D. Insurance 5.01 LI(SHT FIXTURES AND EOUIPMENT 422-4133 7-The Electrical Contractor shall carry all Horker's Compensation, public. liability and property damage Insurainae as required by all applir-oble codes, regulations and the, c7enerol A. All light fixture locations ore shoHn approximately on the, draHings. Actual locations sholl be, TWO WOREING DAYS BEFORE YOU DIG Contractor. determined in the field after the trees, shrubs and vine/espollors, to L70 illuminated hove been--Planted. All final locotions, shall be approved by Landscape Architect.E. Site Verif Ication ­:ARFA LIGHTING,'!,LIGHT NG,­Prior to commencement of Hork, the Electrical Contractor shall verify, at the site, all '(46(1) 14111aS4 U)A141 ill.:L'OPT-IONS conditions as shoHn on the plans cis necessary to achieve the Intended design of the �-61!.TtON M lighting system. Any discrepancies shall be reported Immediately to the 5. Approved light fixture locations sholl be staked by Electrical Contractor. Stakes shall be Hood,Landsc,ope Architects 6oneral Contractor. a minimum of 24" long, and labeled. Lt I I:I F. Coordination 0. Light Pixtures, are to be locoted a minimum of 6" from the edges of paving and ross areas. rA I%,ik-wom i irolso-The Electrical Contractor shall be responsible for the coordination of his Hork Hith all other trades on the project, to Insure an efficient and complete, Installation. This Includes V. Electrical Contractor shall Install gravel drainage sumps at all r4ell light buried ballast, or wordInoting all fixture and olectricol line locotions Hith the Londscope, Controctor to assure buried jwnatlon box locations Hhon hard, clay, =d/or Impervious soil conditions ore that plant material Hill not be disturbed. The locations of all conduit or sleeves under encountered, or as directed by the Landscape Architect.concrote paving, Hall% etc. shall be, coordinated prior to construction. All lighting Hork shall f be coordinoted Hith and approved by the C-enoral Cortroctor. E. The or-tval locations of the items such as photocell, time clock, and time clock byposs sHitch at q 4 W W i5r.0 a 3.5"ky it X I I'ly itIttv.W I N�S*it t 7X ill.11"11 )Y. 14, ;L. Ji JOW Iashol I be vorif[eel Hith the Landscape Architect prior to Installation. I I I"I I It I OW low,V1341 541 MY 41 AJI - ..;. ,JID..Flit UAll itih"i CA11AW1kWiil' 40 A Mn 4,,lI;d" osii Alw*44ti llMI ioitr IKf M -'If Oftwr)AM 11 scg ... . (I ,, V IIll OF! I olowai.'. C.600W.411 F ;W,M witc I 11a i i�op"P4 A gi I I k I 4%�tor shall notify the Landscape Architect 6anoral Contractor not less F. Electrical Contractor sholl verify requirements, quantity, and locations of exterior Haterproof The Electrical Contror 1:4 &ill than tHo (2) Horking days in advance of ang requested observation. Refer to duplex outlets and phone Joicks, Hith the OHnor prior to Instoillation. Install outlets as local ILordscope / Observation Schedule. codes permit. rq*r0CC-L.A., Cr`W4x-,Sr A.-aac 2Q APA* 1'0ZJT0<CEST011 OFT.'to tiibitkl�fl,essary to Facilitate n l boxes shall be provided in the racoHoly system Hhere nor IH. Adherence to DraHlrgs On Site Adjustments conduit and conductor Installation.1. The Electrical Contractor is responsible for adherence to the contract documents relative to equIpment type, size, installation, and location. HoHover, the Electrical Contractor shall H. Electrical Ccintractor is responsible for determining the quantity of IoIN voltago transformers make minor aid ustments, modifications, and revisions to the system, as required, to conform required for Hork. Locate tronsFormers per droHings or Landscape Are-hitect's Instructions.to any material or Hork that Is not approved. oj�OFF a0,I. Stop lights shall be installed per manufacturer's specifications. IIts L�2. Any -deviation from the contract documents shall be verified HIth the Landscape A u T 0 Arahltort 6eneral Contractor prior to installation. The Electrical Contractor Shall take full TO tIpI responsibility for adjustments to any material or Hork that is not opproved. I ...........I. I III 2r.It 4 1. if V 4 5.02 CIRCUITIR'yo AND SHITCHIN6 1. Equipment Approval $A I ow itl iii,;.il tile.,it is I kv:",1AV;%41 S.Q6 I INV C.1 1)I I $4 Th'A'YWI 5-0 14%V t)Ill I 1.41 (l-ontrols, and equipment are to be approved by the Landscape All lighting fixtures, outlets, c 161 AMCUM AIRCEFUNIV: KL54: 401 A I ACCUJI Architect prior to purchase. Any Items Hhlah ore installed but not approved shall be removed A. Conduit and Hiring runs ore, shovin schematically. Building and site conditions Hill determine the rl�A ill M and replaced at the Eloctrical Controator's expense. All cotalog numbers shall be verified Hith actva I runs.descriptions prior to making any pvrahases. ti r in B. The entire Installation shall be electrically continuous and shall be grounded in accordance sttd* tor dusk J. Prepaid Items Hith Article 250 of the NEC. daun Some aloctricol items specified on the droHings may be furnished as propurrhosed items by Q r the OHner. These Items shall be verified and coordinated Hith the, Oviner prior to making any C. Ele6tricol Contractor shall provide, all sleav[ng necessary for lighting system unless otherNise C I UC.k r purchases of related equipment. coordinated v4lth 6oneral Controator. tab t"M be Net !or i!fw., I*L DAUM IK. Protection of Existing Conditions P. All Hiring in exterior locotions or In exposed interior locations shall be installed in conduit, 0ime vill yary wiLh t.'re cungiric-buried at the Electricol Contractors Can "Off" u- I emi)1,n constaot unless othervilse noted. LoH voltage cable may be direct iZ sx A4116 11.III 0) !�-Fl Ifiw4t t2'ky IV W 6�*il x 6' 1241 V Ili,'A 1. The, Elec-tric-al Contractor sholl, at his oyin expense, repair, reploce, and maintain In option. 1";I J�9.1w itt.I at w;4 No.nI S4 i4l tbi kill"Ie b AX-Q, t service any utilities, facilities, or services (underground, abovaground, exterior, intOrl0r) .�,: F, .- 0 W C4 ;I.. .41;Fa tSpoA-�'lei?MtI CaU "ROM Ah' Ili lu at oplilot.Ff Ic4d tit a4r"i it',W.v litkIK:CUT' 9 tcrfi damaged, broker or otherHise rendered inoperative during the course of electrical Hork. E. All empty conduit shall be provided Hith a 200 pound test nylon fish line.-leatrical Contractor shall carefully check the locations of all vriderground utilities L79 I0111'c�l 604hl;N 4WI11.3111V Am MR I fi I ICLI IT :40ikmoitl 1!44W4IlW1A III tW A Att I W I 14 thorough examination of all avolloble doto and by rovleY4 Hith the utility companies. F. All conduit and Hiring shall be installed along the edges of planting areas so as not to interfere Hith plant hole excavations. Any electrical Items HhIch interfere Hith planting holes shall be 2. The Electrical Contractor shall be, hold financially responsible for all damage to landscape relocated at the Electrical Contractor's expense.materials by hie Hork or by his personnel, Including replacement and installation by the ae Contractor. 6. All branch 6Trault Hiring shall be connected to 15 or 20 Ampere, I Pole alrault breaker(s). FXT7-RIOR LI &HTIN& CONTROLS �'L_ ' 5 UFLI ':�'H�T �6�F A�T H�L 1 ,��-:,H�T All circuit numbers are shoNn for arbitrary designation only and sholl be determined by the 7 FO US L. Vemolition and Relocation Electrical Contractor. All multl-olrault runs shall be coordinated for proper phase and neutral The Electrical Contractor shall be responsible for the demolition and relocation of all evipment, arrangement. �f �US�1:;)L�- I �7U�FL�16 H Hh1ch interferes Hilth the electrical Hork. He shall oleo be responsible for all cutting,patching,and painting necessary for the completion of the oloctrIcal Hork. H. The Electrical Contractor shall provide Hiring, conduits, and grounding for the pool and spC lights. The Pool Contractor shall furnish the pool and spa lights and Installation in the Halls.M. 5lubmittols by Electrical Contractor All Hork shall be in accordonce rilth Article 650 or the NEC.1. Shop DroHings 1. All sHitching shall be verified Hith Architect's electrical plan, Sheet and Hith the &eneral Electrical Contractor shall submit 4 sets of shop droHinigs Por -all electrical equipment such Contractor.cis lighting fixtures, devices, lopq voltage transformers, time clocks, photocells, dimming systems, and controls to the Landscape Architect for approval prior to making orly purchases.2. As-Build ProHings, wkfn,Electrical Contractor shall keep occuratelly dimensioned r"ords of changes and deviations 3.05 CLEAN UP from the original contract droHings, including prec1so locations of concoolod and underground Hork. Recordings shall be made by ruled lines on a set of reproducible drCI and the A. During construction, the Electrlaol Contractor shall keep the promises cis cloor as possible of ... .......�11 droHings, shall be delivered to the Landscope Architect at the completion of the project. materials and debris.B. Upon aompletion of the Hork under this section, The Electrical Contractor shall remove Prom N. Acceptonae the promises all surplus materials, tools, equipment, rubbish, and debris resulting from hie,Upon completion of Hork, the Londsoope Architect P4111 rovievi the eleatricai Hork to verify system Hork, and shall leave the installation site In a clean, neat condition. ...... i II, I 4fin Cifit',11iijow, jFI operation and performance to determine final acceptance. citv.i EwA0 AI C.N..k OkAkt".g IW3:*7111W lorip 0. &uorontea t 'A 0 -0 Dix.The Electrical Contractor shall qvorantoo in Hritinig for a period of one (1) geor Form the dato of HrItten acceptance of Hork that all the materials, equipment, and labor Furnished by him re free from dePects. The Contractor shall further uarantee that if any material or equipment Is Pound to be defective Hithin the guarantee period because of fouI4 manufacture or foultly installation I such material or(in the sole opinion of the Landscape Architet), he P4111 replace and instal equipment Althout further expense to the ONner. 77.I7::2.00 MATERIALS All lighting equipment shall be- as listed in the Legend, Potolls, and as specified herein. III my 1 ustm.viq icmm 10-145(6fttill i..:114 rilf,cl wook-6 to 12V 1 3NkA## I:3!I lbrdA4#Into alft I (SuFrAed by by.4aw Wailtril. Ing:2.01 JUNCTION FULL BOXES All junction or pull boxes shall be sized for the quantity and size of conductors to be Installed.Boxes In dry, interior locations shall be metallic.. Boxes In exterior locations sholl be metallic.Boxes In exterior locations shall be a cast, Heatherproof type. .�Part.O.GSIC 91I 2.02 TRANSFORMER Lovi voltage transformers shall be UL rocogmized, aloss, 5, Hith 120 volt primary Hindings, and isolated I12 volt secondary Hindings. Autotransformor type is not acceptable. Transformers In exterior locations shall be UL approved for Hot locations. �-�'RiI ..FI-579 RI ay.�Unit'go:..... . 22011 2.05 CONDUIT �Ht lI a tit-rium im Fri -n% %citiv 64xi lln-�Tl)-I 091F....1.Fl.All I underground conduit shall be 5ohodule 40 PVC, unless othorHiso noted. All joints shall be solvent Hielded For wter-tight eomee-tions. Hhere underground condult stubs up cibove grade, provide- r)91d isteel conclult. All undergrovnd conduit shall be sooled HIth a suitable compound at the building Ji", .,�kfd W,QW 4%h,(I'M.,W.AA k C."'t entrances and at connections to boxes to prevent entrance of moisture and gases.2.04 HIRE A. Dry, Interior Locations ROTO L I TF F I XTURE P05T All Hiring for lighting and poNer circults In dry, Interior locations shall be type, NM non-metallic,sheathed cable, Hith copper conductors tand boo volt insulation, unless otherHiso noted. Hire& CIS sized No. 6 AVA& and larger shall stranded. Hires sized No. 10 AV46 and smaller sholl be solid.B. Exterior Locations 0 All Hiring in exterior locations shall be o single conductor copper Hith 600 type THHN/THNN *Poo insulation, unless otherHiso noted. Hires sized No. a AH& and larger shall be stranded. Hires Cd sized No. 10 A4A* and smaller shall be solid. U C. LI Voltage Ir-4 All IoH voltage cable shall be UL listed, approved for direct burial. The cable shall be three conductor, 12 Sougo stranded, rated 150 volt, Hith PVC Insulation, ultraviolet stabilized. The Electrical Controlator sholl be, responsible for determination of voltage drop on all IoH voltage runs. Any runs Hhich exce4od 2 volts drop shall be provided with No. 10 A;A*. P*PW* II0 P*4 P* 0 Approved By; Date: 4�3/0-7 Cale: NONE Drawn.By:Job No. 0712 Sheet No. LL-2 Ti: 1 .1 T �l I .-.,.Cn