Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
The Ministrelli Companies Lot 20_1
n , , ,;Ys. _efl ?.c, r fNa 1 "> ,,,n"'°51 Yam•. ? 1 �`:' uK.h,� .� '�Y.f.;$ v �"' _ Underground Service Alert PLANTING PLAN NOTES -- 1 Call: TOLL, FREE b 1. All plantings noted on these drawings are schematically W(i(;A PLANTING LEGEND AND SCHEDULE 1-800 Iota ed and may require field adjusting. Final location x - r 422-4133 „t s - - - of all plant materials shall be subject to the approval Or Ministretli Stone Eagle - LOt 2ID TWO WORKING- DAYS BEFORE YOU DIG of the landscape architect. s o 4 9/07 - _ - • 5 2. Plant quantities fisted 15 provided for the convenience APRX - of the Contractor / Client and is not intended for3_n_. KEY BOTANICAL NAME COMMON NAME SIZE REMARKS ' accurate bidding purpose. TREES 3. An and 3 rat 'lirttt� � r p all plant substitutions must be approved b the cE a M P Ecox / , p pp PALO BREA 46"80X VERT•MULTIp landscape architect In writing. � �_•- o 4 �� WASHINGTONIA FILIFERA 4. Plant material listed may or may not have been approved CALIFORNIA FAN PALM SEE PLAN BROWN TRUNK HT. ( 0 SHRUBS 1 ��} V by the agricultural commissioner's office. Landscape 7 � (� contractor should contact developer for status of 1 no CASCALQTi: ` •� ° Gj Q a a a agricultural commissioner's approval or denial. Plant cAESALPINIACAcAco /� ilj�( V � { x` f material not (15 conforming with quarantine laws may be 1 CORDIA BOISSIERI TEXAS OLIVE 36"BOX - " destroyed and civil action taken. •� �e 4 cP COR PARVIFOLIA LTRLELEAF CORDIA 15 GALLON a. All plant material is subject to inspection at the DIA discretion of the agricultural commissioner's office.g 12 O EN FARINOSA BRITTLE BUSH 5 GALLON All plant material must be free from red scale (Aonidiella Aurantit). 13 O JUSTICIA CALIFORNICA CHUPAROSA 15 GALLON 6. Landscape architect cannot assume responsibility for 30 Q 7USTICIA SPICIGERA MEXICAN HONEYSUCKLE 5 GALLON any plants utilized on site which are not shown on the plans and have not been approved by the agricultural 1 '-T LARREATRIDENTATA CREOSOTE l01��1 '�-- 0 commissioner's office. SALVIA LEUCANTHA MEXICAN BUSH SAGE 5 GALLON 1. When specified, decomposed granite and/or desert cobble (/ / shall extend under shrubs unless otherwise noted on plans. 4 O SIMMONDSIACHINENSIS JOJOBA 15 GALLON 5 8. Finalize grading before laying out plants. Finish grade 15 Q SPHAERALCIA AMBIGUA GLOBEMALLOW(DESERT MALLOW) 5 GALLON 0 \ of all planting areas shall Insure positive drainage. w® TAGETES LEMMONII x� / ro C $ Hold sub-grade 2" below adjacent paving area to allow for mulch. �Yl�•� M LEMON MARIGOLD,MOUNTAIN 5GALLON PIN OLD � q. In the event of planting allowances, final plant selections z PO .4 9 Q ZAUSCHNERIA CALIFORNICA CALIFORNIA FUCSHIA 5 GALLON shall be reviewed with the landscape architect and subject i� p � to the owners approval. Upon approval, they shall be spotted VINES/ESPALIERSiS- - tn the field by the. landscape architect. 5 N—�r ANTIGONON LEPTOPUS QUEEN'S WREATH S�d�l (/�10. The Landscape Contractor shall provide an outline of the unit GROUNDCOVERS �. costs of plant allowances listed in the planting plan. These unit prices wil) be the basis for determining additions or 6 d DYSSODIAACEROSA SHRUBBY DOGWEED 1 GALLON 10, S / J J LM + o' �A S a L subtractions to the plan. - 5 0 _ J 16 11. In all cases r oplantingJ efer t thet�"'", plan for all planting 4 � MUHLENBERG'IARIGENS DEER GRASS � J SEA layouts, planting information, plant quantity, type and �j G�QlLriYt J SPA + condition required, HERBACEOUS PERENNIALS50 _ 12. Unless otherwise noted, keep plants set-back from paving 5 C PENSTEMON PARRYI PARRY PENSTEMON 1 GALLON edges as noted: CACTIISUCCULENTS Li i 2 © YUCCA ROSTRATA BEAKED YUCCA ii Trees - minimum 10'-O" LM Shrubs and Accent Plants - minimum 3'-0" r Groundcover - minimum I'-O" Herbaceous Perennials - minimum I'-O" a I6' � j 1 L�iA WF ti .F r.. y p 5_1 -1 Cacti 1 pL ;,.Cacti 4 Succulents - minimum 3' -0" ` TR• 1 13. When specified, pots are to be of type and size noted on plans. � � CIP , oWOW All pots shall be irrigated and hooked into the underground � . ",^_ • rainage system per construction detail. This shall be done - �.• prior to pouring concrete or concrete sub-base. a ' ASTV b; � 1 _... � Utz POT SCHEDULE COURTYARD PLANT LIST & LEGEND ' � D 0 o ERVICE R -I- ❑ ` i TG o a� GAwAGE Ki APPX. SYMBOL CATALOG DESCRIPTION MANUFACTURER COLOR APPROX. KEY BOTANICAL NAME COMMON NAME SiZE REMARKS ' QTY- OTYTREES 3 S-i C10L-26 SONORAN CONCRETE DESIGNS TBD 1 CD CITRUS VAR,'DWARF' . DWARF CITRUS 36^BOX LEMON ' MASTER . 13 x 25 /. W/LEGS PHONE: (800)279-2278 •, t�; ti} i ,J A . A�,• O , ` I 3 P-2 C11-23 PUEBLO CONCRETE DESIGNS TBD ' t CL� � ,-J GAR 20 x 23" SHRUBS PHONE: (800)279-2278 .� 1; • "nrinc ._ ^— � ;K' 3 P-3 C11-28 PUEBLO CONCRETE DESIGNS TBD 10 EJ EU 5 GALLON PHORBIA'JERRYS CHOICE' NCN 1i+ S • d ��Mi f ` , , d� .�I �• •• � GARAGE t:, i+ /q , 25"x 28" PHONE: 800 279-2278 �{ ( ) 15 LM LAVANDULA MULTIFIDA LAVENDER 5 GALLON RUELLlA KATIE �,,�,,� ..- �, , 6 O RUELLIA BRITTONIANA'KATIE' ���IW.1 B `- z _ _ _ ,+• air` i A� • �'S : fir/ `' b'• 5 VINESlESPALLIERS O 'I; ' iS ,I DiIVI M ,31 ' Ob ' 2 BK BOUGAINVlLLEA'BARBARA KARST' BOUGAINVILLEA 15 GALLON ^� LM -- -.. GM 5 CS iCALLiANDRA SURINAMENS POWDER PUFF 15 GALLON WIRE-TO-WALL 14 2 RI POSA'ICEBERG' BEDROOM ROSE 15 GALLON WIRE-TO-WALL Z x�ik,. 'TER ; a� r U LEM T °'a CACTI I SUCCULENTS -3 ° `- . , "rr O s x r _ E 10 AA AGAVE ANGUSTIF PATIO OLIA VAR. MARGINATA 1/3-15 GALLON, O .gip . 2/3-5 GALLON 3 AGAVE GEMINIFLORA TWIN FLOWER AGAVE 5 GALLON - 8 19 czar :-C1. P-3 -46 ._ALOE BARBADENSIS - - -- ---MEDICINAL ALOE -5 GALLON �.� �-���� _.,<'- ••- � 2 AF ALOE FEROX TREE ALOE 24"HT. 6 AT ALOE STRiATA CORAL ALOE 5 GALLON • 0.._.o_ 1 CM CERE P RUVIAN�S Iy$TIOS' GIANT CLUB CACTUS 5'O/A HT. MULTI gall-1 2 AT � 23 EC iNOC GRU ONII GOLDEN BARREL CACTUS '/-12',V-8"DIA, i�'; mar°�• y�RY rr��1 T 1 14 LM 'LEMAIREOCERE A ' C,OuFtTyARO .U ° AT US M RGINATU5 MEXICAN FE NCE NCE POST S 5 - 6 HT. MULTI ,: 1. u y a K 2 F W a a�a'• 2 PL f'ACHEPODIUM KAMERE! CLUB FOOT - -S'O/A/HT. MULTI - - - _ G POOL and i» EJ ED 1 PEDILANTHUS MACROCARPUS SLIPPER PLANT 15 GALLON �` �O n ` ,G cd SPA ' + O" ~ .. APr�OV f 2 PA PORTULACARIAAFRA ELEFHANTSF �ZJ EQUiP SEAT �L ®• FINAL LANDSCAPE ACKAGE FOOD 15 GALLON PROSTRATE p K K Gas ' GP GP GP DAT 7.02 GP •i� U •' GROUNDCOVER �� GUEST PARKIN& LANDSCAPEMANAG COYOTE COBBLE BK and (tlRNAR�� 1'DIA. 'fRA 2 lb GRANITE 2" tRi?A V COLOR WALL- . TH1g AREA ® 7RACHELOSPERMUM JASMlNOIDES STAR JASMINEoN ��''�' NGE j0R PL LINERS B O.C. +� r I $ 1200 AL. 09.47' o. v ;v F.ry N C • WARN 1 NG: PLANT MATERIAL MAY OR MAY NOT HAVE BEEN Cn 8 ' APPROVED B`Y THE AGRICULTURAL COMM155IONER'S oF>^I z LANDSCAPE CONTRACTOR SHOULD CONTACT DEVELOPER--F14000 STATUS OFASRICULTURAL COMMISSIONER'S APPROVAL O .� HOMESTEAD ROAD DENIAL. PLANT MATERIAL, NOT CONFORMING WITH GQUARANT4 - � LANS MAY BE DESTROYED AND CIVIL ACTION TAKEN. •�{ 51 TE 1 1 AFL' ALL PLANT MATERIAL 15 SUBJECT TO I N5fD1=C ON AT THE+` a� I7 10 DISCRETION OF THE AGRICULTURAL COMMISSIONER'S OFFICE. 9 I 11 , 1 W a ZI ALL PLANT MATERIAL MUST BE FREE FROM RED SCALE - �GiTY OF PAL DESERT(AONIDIELLA AURANTIl) o / / DEPARTMENT OF 9 � r COS M.UNITY GEVEL0PI.1,E"'.'7 0 LAND50APE ARCHITECT CANNOT ASSUME RESPONSIBILITY FOR ,1 APPROVED BY: ANY PLANTS UTILIZED ON SITE WHICH ARE NOT SHOWN ON THE ❑C.C..kES. NO,, TAFF LETy EER approved By: b1�HDRN 1619U►stT�A+S { I�LANSAN - 0 P C. RES.NO 0,o,RC AC'nON FORM GOLF CLUB t D HAVE NOT BEEN AFFROVED BY THE AGRICULTURAL BIGHORN cC BONS COMMISSIONER'S OFFICE. By s S10 E "' C"NSTRUCTION SHALL COP NIFNCE WITHIN to N �� A � scra ITY MAPN.T.S. � �}'•�-• F j Oa // Druvm By: _ s !✓ , MAY 3 2007 F DA . ,_. w Job No. nPPART �S 3 Sheet No, _ -SASE INFORMATION PROVIDED BY - REFER TO SHEET L f=-2 FOR PL"AN71 NCB DETA I L"S arld SPECI GATT oN5 5TRAGT5 INC. ARCHITECTURE + INTERIOR DESI&N ". -- - - W„ ,: .a- ,,.- .tea•. s""n - -=` -. .oa "v *-0uT4s t 'z--?" A FLANTIN& 5FEC.., 1F1C_.-, AT10N5 10 2.05 HEADERS FLAN71 NC::� DE7A 1 LS A. Steel headers shall be 'Ryerson Steel Edging System', 3/16" X 4" banding with appropriate stakes. PLANTING SPECIFICATIONS Los Angeles plant: (215) 268-7I00. N 1.00 GENERAL B. Redwood headers shall be construction grade redwood with redwood stakes. Refer to plan for sizes. 1.01 SCOPE OF WORK 2.06 PLANT MATERIAL A. The Landscape Contractor shall provide all labor, materials, equipment, tools, permits, transportation, A. All plants shall be as listed in the legend and Installed per details and specifications. and services necessary to furnish and Install all planting and associated work_as shown on the contract p _ documents and specified herein. B. All plant material shall be full healthy, shapely, disease and insect free, and of a size that is standard " for the nursery Industry. pJO�, PLNT A SL16HM r H16HER THAN V B. The Landscape Contractor shall visit the construct€on site, take all measurements, and obtain any other ALL TREES to HAVE LOWER GROWN IN NURSERY information necessary for a complete and conclusive bid. C. All plant material shall have been grown under climatic conditions comparable to those of the subject BRANCHES INTACT PLANT 50 THAT 501L LINE y p OF ROOT BALL 15 6"BELOW V Q site, unless otherwise specifically approved by the Landscape Architect. FINISHED GRADE 1.02 QUAILITY ASSURANCE D. All plants are subject to approval b the Landscape Architect. TOP501LWATERBASIN, ��FY wITH� `�APE ARGHITEGT y p cv A. Codes and Standards 4 X BALL.DIAMETER,TEMPORARY TEMPORARY WATER BASIN m �- E. To facilitate proper placement, each plant shall come from the nursery identified by botanical name. FINISHED GRADE FINISHED : INISED H GRADE '> Work, materials, and installation shall comply with all pertinent codes, regulations, and industry standards F. Plant quantities listed in legend area approximate, and for Landscape Contractor's convenience only. ,� SAGKFILLMIX- NATIVE SOIL IF APPROVED Q a a a Q All plant quantities shall conform to the planting plan. _ LINE BY LANDSCAPE ARCHITECT o B. License BAGKFILL MIX BALL O ND ROOTIDES B� F PLANT HOLE OO .�ANAA� C. Permits and Inspections TII E SOIL 1/4 GLEAN ❑ All work shall be performed by a 0-27 California licensed Landscape Contractor. 3.00 IMPLEMENTATION - - _ . I ROOT BALL TO REST ON FIRM, I. The Landscape Contractor shall obtain, coordinate, and pay for any permits, fees, and agency 3.01 PREPARATION - -- - - �I BW SOIL TO PREVENT p q pp p p p y p planting. 3 X HALL HOLE DIAMETER Inspections as required and submit all certificates of approval upon completion of work. The Landscape Contractor shall clean and clear the site as necessary prior to lantin All area to be DIAMETER MIN. I/3LARGER planted shall be free of debris of all types including plaster chips, concrete spillage, chemicals in soil, NOTE5i THAN ROOT BALL 2. The Landscape Contractor is responsible for submitting necessary plans to the Agriculture 1.STAKE ALL 24 AND 30 BOX STANDARD TRUNK NOTEt VERIFY SUPPORTING TREg WITH 2 X 4 BRACES Department for approval. nails and fasteners, etc. 2.REFERTO OITESONDETA(L. TREE 6UYINGDETAIL W D. Insurance 3.02 F1N15H GRADING 3.SPRING ELNTEERDPRRIS TREE-TIE)56 s2 N The Landscape Contractor shall carry all Workers' Compensation, public liability and property damage A. Finish grade all planting areas to a smooth and even condition, making certain that no water pockets insurance as required by all applicable codes 4 regulations,. or irregularities remain. Slope all planted and grass areas a minimum 1/4 inch per I foot per plan and V away from buildings. All planting areas shall be finish graded to comply Mth contours and elevations TREE PLANTING DETAIL PALM TREE PLANTING DETAIL E. Site Verification shown or noted on planting plan. Prior to commencement of work, the Landscape Contractor shall verify, at the site, all conditions and dimensions shown on the plan necessary to achieve the intended design of the planting plan. B. Hold all finish grades for planted, gravel, or cobble areas aminimum l I/2" below adjacent flatwork or o Any discreponcles shall be reported immediately to the Landscape Architect/General Contractor. as directed by the Landscape Architect. - G. Remove all objects such as rocks, debris, clods, or other extraneous material from the topsoil and a F. Coordination transport away from job site. a The Landscape Contractor is responsible for coordinating this work with the staff Of the w 1 9Q PLANT SLIGHTLY HNSHF.R THAN TRIANGULARLY SPACE PLANTS Q '� C Living Desert. 3.03 TREE STAKING FINISHED GRADE 10 -� A. The Landscape Contractor shall stake all centers of tree hole locations and locate stakes as dimensioned 1"LAYER OF MULCH ASSPE IFEDF CENTER OVERAGE J► � G. Adherence to Drawings / On Slte Adjustments on plan or scale from Ian. Stakes shall be wood, a minimum of 56" long, and labeled with tree name. TOPSOIL$ERM The Landscape Contractor is responsible for strict adherence to the contract documents. All plants, Staing shall not be done until ail site work that affects tree planting in anyway is either placed or lined out. FIN15HWORADE + + + + + + Q � � 9 � r materials shall be provided as indicated o e documents. An h o s T TO e oducts and mat is n the can es or svbstltutl nT p p y g This Includes but is not I limited to mounding, boulder and stepping pad placement, headers, f latwork, 4 SCARIFY SIDES WITH SHOVEL, w e must be approved by the Landscape Architect in writing. Landscape Contractor shall and walls. SOIL IF MECHANICAL AUGER USED + + take full responsibility for adjustments to any material or work that is not approved. B. Landscape Architect will rev€ew and approve all stake locations prior to any hole dig. Landscape rALL Q_�+)O' BACKFILL MIX + + + + v H. Personnel Contractor shall notify Landscape Architect a minimum of 2 working days prior to staking completion. - SOIL BALL TO REST OF FIRM, Planting shall be performed by personnel familiar with planting procedures and under the supervision of Note: Trees include an lent listed as such in the lent legend. - semiUNDISTURBEDSOILTOPREv>�rtr I/2OF ON-CENTER,CURB OR TO E�,AL 0 y p p g SETTLINGS EDGE OF PAVING,CURS oR WALL a qualified planting foreman. The planting foreman shall be on the job, at the site, whenever planting is in 3.04 PLANT LAYOUT / BORDER STAKING D,GAR NOTE progress. A. All other plants shall be set (in containers) in their locations for final adjustments and location approval by APPROX I.SPACE 6ROUNDGOVER PLANT PER THIS DETAIL ONLY LZVMLandscape Architect. Notify Landscape Architect a minimum of 2 workin days prior to plant setting. 3 X CAN DIAMETER WHEN PLANT CENTERS ARE NOT SHOWN ON PLAN p y p g y p p g• 2.VERIFY ON THE PLAN AND WITH LANDSCAPE ARCHITECT 1. Machinery B. Landscape Contractor shall line out on the ground the borders between different groundcovers when 1.SER1-s Sir ARE FOR TEWORAW iRR(6Arf0N, WHICH SHRUB MASSES AND GROUNDGOVERS ARE To Landscape Contractor shall provide/use proper machinery for tree placement and planting. A crane must UNLESS NOTED O�RHISE. BE PLANTED ON GRID SYSTEM p p p p y p p g• these are not separated by headers. Landscape Architect will review and approve this layout. be used for: 1) Any tree 56" box or larger; 2) Palms 6' or larger (brown trunk height) unless otherwise Immediately after layout approval, Landscape Contractor shall stake the approved layout with 12" wood stakes. approved by Landscape Architect. 3.05 EXCAVATION J. Plant Stock i lin A. Excavation for all plants shall I be per detail. PLANTI NC, DETA I L GROUNDGOVEi�' S�='AG I NG DETA i L r p g p p SHRUB ES PAL I ER (SROUNDCOVER Plants stockpiled on site prior to planting shall be maintained properly and protected from sun, drying, B. Landscape Contractor shall notify Landscape Arch€test/General Contractor of any obstruction or Ni nd, machinery, or any other damage. Plants deemed damaged by Landscape Architect hard, impervious sub-soil conditions immediately. shall be replaced with on equal plant at no additional cost. C. In areas of hard soil, plant holes shall be scLuore in shape. VERIFYI^IITH PEARGHITEGr K. Care in Planting 3.06 PLANTING Aro�n,,.,�w,SO�`,�A� Proper care shall be utilized in the handling and placement of all plant material. Breaking of limbs, 126AUc5E6ALVANIZEDWIRETYPIG4L BURIED p g p p g A. All plant holes except those for cacti and succulents shall be thoroughly watered prior to setting the plant PAINT WIRE TO MATCH WALL 501L LEVEL will not be allowed. Any plant which the Landscape Architect/General Contractor COMPACT skinning of bark, etc. in the hole. ATTACH WIRE TO WALL WITH SETTLING determines is damaged shall be replaced byte Landscape Contractor at no additional cost. GALVANIZEDSGREWS(YYPIGAU SECTION W B. All trees shall be placed, adjusted, and planted under the direction of the Landscape Architect. ° ►. ' PAINT OVIUVIS AND WIRE BOULDER INSTALLATION (FLAT) L. Protection of Existing Conditions Landsca e Contractor shall I notify Landsca e Architect a minimum of 3 workin da s prior to the tree r ° WIC o BCE SPACED AT A I. Landscape Contractor shall protect all existing plants, utilities, structures, hardscape, etc. planting Landscape If deemed necessary by Landscape Architect, Landscape Contractor shall 4� MAXIMUM OF ON CENTER y0- E----TRAIN PLANT ACROSS WIRE TO SET BOTTOM 1/5 OF BOULDER from damage of any kind. Any item deemed damaged by Landscape Architect/General relocate/replant any tree planted without Landscape Architects direction unless otherwise approved BELOW GRADE To PREVENT �GL� FULL HEIGHT AND WIDTH MOYEMENT OR*ROCKING' Contractor shall be replaced by the Landscape Contractor at no additional cost. and shall be responsible for the health of the tree and the cost of the relocation. g >- � • FINISHED GRADE FINISHED GRADI~ 2. No equipment or storage of materials will be allowed to occur within the dripline of any existing tree. C. Install all plant per planting details In locations approved by the Landscape Architect/General Contractor. ° ° - I I l SET'AREAS THAT coNCAVE The Landscape Contractor shall coordinate with the General Contractor and be responsible for the D. Set plant in upright position in the center of the hole and compact the backfill mixture around the ball of i- - COMPAGT SOIL TOPREVENT a Z erection of a barrier/fence, as approved by Landscape Architect, at the dripline of each existing tree roots. SECTION - SETTLING H prior to the commencement of any work. NOTE, ESPALIER TO BE TRAINED IN A FAN SHAPE BOULDER INSTALLATION (VERTICAL) E. Thoroughly water each plant when the hole is 2/5 full. After watering, tamp the soil in place until the TO PROVIDE FOR FULL WALL COVERAGE M. Reviews and Inspections surface of the backfill is level with the surrounding area and the crown of the plant is at the finished grade UNLESS NOTED OTHEMISE E•I Refer to Landscape Supervision/Observation Schedule of the surrounding area. W N. Submittals by Landscape Contractor F. Remove all containers, boxes, straps, non-essential stakes, trellises, etc. from plants and remove from 1. Availability List site. T=51=AL. 1 ER TRAINING DETAIL BOULDER DETA I L Within 30 days of signing the contract, the Landscape Contractor shall provide the Landscape G. Treat all planted areas, gravel, and rock/cobble areas with pre-emergent weed agent per manufacturer's Architect with a complete materials list of plants, Including complete data on source, size, specifications. quantity, and availability. An substitutions of plant types, species, sizes (lncludin palm heights), v a. y y- y p yp � p gp g or quantity must be approved by the Landscape Architect prior to this time. SOIL LEVEL If credits or deducts in the contract are required due to substitutions, the Landscape Contractor SOiL MIXTURE PER a shall submit these with the materials list submittal. SPECIFICATIONS 3.07 CACTI/SUCCULENTS IRRIGATION HEAD PER IRRIGATION PLAN L AATERPROOF` POT TO FINISHED GRADE a 2. Plant Photos and 5 ecificatIons Landscape Contractor shall meet with the Landscape Architect prior to planting to establish correct planting = The Landscape Contractor shall provide the Landscape Architect Mth photos and size specifications procedures. This includes: Plant care, handling, damage (replacement and guarantees) soil preparation, SEAL SEAM A7 PIPE AND POT OF all trees that are not previously tagged off by the Landscape Architect. These trees will be subject root pruning, irrigation system, initial watering, and watering schedules. _ PF - FILTER CLOTH to approval by the Landscape Architect. Refer to legend for any other plants requiring photo = 1-1/2"LAYER OF COARSELY CRUSHED ROCK,3/4"-I'DIAMETER submittal to the Landscape Architect. Photos shall be submitted to the Landscape Architect a 3.08 GLEAN UP FW5H SURFACE OF 1wA1/rN6/HAR175GAPe minimum of O(O days prior to commencement of job. A. During construction, the Landscape Contractor shall keep premises as clear as possible of materials �:>�.= -::t •� y 3. Unit Costs and debris. IRRIGATION PIPE PER PLAN Within 50 days of signing the contract, the Landscape Contractor shall submit a detailed schedule 2'DIAMETERPvcPi 'S - outlining the description of work and the dates for completion to the Owner, the Landscape Architect, B. Upon completion of the work under this section, the Landscape Contractor shall remove from the ti for coordination of reviews and integration of other work. premises all surplus materials, tools, equipment, rubbish, and debris resulting from his work, and 4'DIAMETERPinORPER shall leave the installation site In a clean, neat condition. SPECIFICATIONS O. Guarantee cd 1. The Landscape Contractor shall guarantee all trees (including replacement plants) for a period of 4.00 MAINTENANCE The Landscape, Contractor shall rovide for O10 days maintenance after the job is total) completed and has " one year and all shrubs, vines/espallers, and groundcover plants for a period of 10 days following p p y J y p been accepted b the Landscape Architect. At the end of the maintenance period, a final ins ection shall be POT I RR./ DRA AI NA final acceptance of the planting portion of the contract. The Landscape Contractor shall be p y p p p •N■y responsible for missing or vandalized materials until final acceptance by the Landscape made by the Landscape Architect as related to the maintenance. INSTALLATION DETAIL V Architect. 2. This guarantee excludes theft, vandalism, or natural disaster after final acceptance. During the \ /ATION guarantee period, the Landscape Contractor shall check all planting and otherwise make the 055EF;� Owner aware of any adverse conditions that may affect the plant material. The Landscape '�j Contractor shall be responsible for any manufacturer's or supplier's warranties during the 1.00 GENERAL a Cd guarantee period. 1.01 SCOPE OF WORK BOULDER SPECIFICATIONS ao © a, 3. Replacement: Any material included in this contract that is either dead, missing, or in unsatisfactory The Landscape Architect shall make a minimum of the scheduled I. Unless otherwise coordinated with General Contractor, Landscape U N condition as determined b the Landscape, Architect shall be replaced with equivalent material Contractor shall be responsible Hill for supplying all vebouldersulr shown on the y p p q, site reviews as outlined below. The Landscape Contractor Is responsible for scheduling plan. Landscape Architect will review and approve boulders on-site. at the Landscape Contractor's expense. Root condition and new growth that has occurred since Boulders are to be size as drawn on Staking Plan or boulders well be and coordinating his work accordingly. All site reviews shall be scheduled with Landscape reheated. planting must be taken into account so that replacement plants match existing plants of the some Architect a minimum of two (2) workin da s rior to review. Should the v varlet g y p 7. A minimum of 20SK additional boulders of varying sizes over the amount ,�/ � O y Landscape Contractor choose to complete work prior to a review or approval by Landscape Indicated on the plan shall provide for placement by the Landscape W Architect In the field. Architect, he does so at his own risk and may be required to uncover, �4 2.00 MATERIALS PRODUCTS replant, or adjust work as necessary at his expense. GP* 2.01 SO 1 L MIXTURES 1.02 S 1 TE REVIEWS 3.Unless otherwise coordinated wlth General Contractor, the Landscape Contractor shall be responsible Porgy e� A. General _ Rough grades and mounding. a. 5electlon and placement of boulders, including the water I. All of the ingredients are to be thoroughly mixed prior to installation in pots, as backfill. ____ Header location lined out on site. features. Landscape Contractor shall scale-the Staking plan for approximate size and location of boulders. Iv B. Bockfil i Soil Mixture ____ Boulder placement supervision. Refer to Grading Plans for areas of soil retention by boulders Landscape Contractor shall create his own backfill mixture by mixing 2 parts native topsoil and I part --------- Staked tree locations. and the heights of grades these boulders will be retaining. C� soil amendment. ---- Drain line review - open trench. R= w ,. Irrigation mainline and lateral - open trench. b. Any excavation and fine grading necessary to set the boulders. G. Palm Backfill Mixture _ Plant approval - on site, in containers. p p � ___ 4. Landscape Architect shall review and approve boulder selection and 0 Backfill mixture for all Washingtonia palms shall consist of clean coarse sand. Native soil may direct and/or approve boulder placement on-site and as used In water _ Tree placement and facing, under direction of Landscape Architect. features. The contractors shall notify the Landscape Architect 48 hours In be used for this mixture if it is sandy in nature and is approved by Landscape Architect. _-_,- Staked light locations. advance of when boulder work Is to begin. 2_G0 o >r_I=t'4F. r Il-91; I 5. Boulders are to be burled a minimum of 1/5 their diameter and are to be Approved By: �,�-�-err,-,z���--i�� �i���. ___..... Pot drainage / irrigation stub location review. ____ Soil amendment installation. placed in as 'natural'manner as possible using the plan placement as a guide. ____ Plant location xproval - all shrubs, vines, espaliers, and groundcovers, b. Where boulders are used as a retaining wall, boulders are to be ��1-� 5r"�+4��E5>-ice- in containers se in their locations. rectangular In character with vertical sides so as to form a solid soil Date: barrier. All boulders retaining soil ore to have the voids between boulders 4/a/07 A. ��'I=ice- ---- handpicked with concrete and smaller rocks. The backside voids are to be ____ Drains in lace. hand-packed with concrete and waterproofed to eliminate any water Scale: p leakage and staining. _ Pot location and installation review. NO SCALE '-T�'e1� � �' �. Proper e ui ent shall be used In boulder placement. Examples of p a ul Drawn By: Irrigation equipment, layout, and operation review. acceptable equipment are crane and boulder sling or hydraulic grapple. ____ Light fixture review and adjustment. Examples of non-acceptable equipment are bobcat, tractor or any other DR i• IAi:..�, egq,wpment that pushes or dumps b Nara and does not al low for In-air Job No. • ____ Nighttime light fixture review and adjustment. ratatlon of boulders for proper placement. Verlfy selected boulder ____ Final inspection of all completed work and punch IiSt. placement equipment with Landscape Architect prior to placement. 0713 ____ On site punch list completion review for final acceptance. 6. Refer to Boulder Schedule,for type and color of boulders and rubble-rock. Sheet No. 30 day walk-through of contract maintenance. ____ Walk-through of contract maintenance for final acceptance. LP-2 r�r�l�irr>_d E, .. Underground Service Alert R �`o Cali.: TOLL FREE 1-800 A: 422-4133 IRRIGATION NOTES TWO WORE ING DAYS BEFORE YOU DIG I. The Landscape Contractor is responsible for full irrigation coverage t of all new plant materials installed. ; Sam 2. The Landscape Contractor shall Install the specif led�'system in accordance with NE the attached schedules, notes, details, and specifications. / ( ' o NE .� lu 5. The Contractor shall verify the operating pressure and notify landscape architect - - - -- r'y O >~ of any differences prior to installation or ordering of materials. L-• 1 <1 If the contractor fails to notify landscape architect, he (she) is financially responsible for any Cj• °a I <1 a a ,— �x , ;:: °+• necessary system alterations that result. ---- 4. Unless otherwise noted, this system has been specified for a maximum water , pressure of 65 PSI. For drip irrigation systems adjust system to a maximum Static pressure of 50 PS1. �1 5. The Landscape Contractor shall be responsible for G?tting and patching of hardscape as recLuired for sleeve installation. (o. Controller shall be installed as per manufacturers specifications, Controller, type 2 size and quantities to be determined by the valve requirements and point of connections. Verify controller location with the landscape architect prior to installations. 5 a,7. Install PVC mainline and laterals according to the irrigation and piping schedules. +p �� - I 8. Volves shall be signed as noted, with flow not exceeding manufacturers specifications. • C) q. Final locations of valve boxes and bockf low prevention devices shall be approved V-WPo o e by landscape architect prior to installation. Valve boxes shall be square to I2 I I S ' adjacent walks or curbs and flush with the final grade. I T ® � " O 10. Work shall conform to a I I construction codes and regulations. LM + OGIA A 10 4 II. See Sheet LI-3 for complete Irrigation System notes. _ , 943b' , gEAT + h~ � SPA + _} ''��„`� � •� � (11 I ' r I r - A LM f I W L.OGGIA NF t o n rr-ASTV rj/err` 4p�00M i.... . ti 0LV,�JE I • URN GARA01 GE 1 i KiTC ° t .f I E ii dy CLO 11�� I B GA GARAGEE ,s 1 c ! 1 IO ' _ _ �' ��r" ► A O I 'ORa~ p1NOM " ;:- t; 5 i•I LM 14woo OOM Le ewT rr� I pp�•f10 'iIF II/4 s O _. .. 0 p o _ ±i a a'r 2 Ei1TRy ARfl ' ❑ NOTE: INST LL TW " CH. 40 PVC SLE •,r 2 couRN ' DR I V NAY RO I NG. w �1 k OOM .1 R 1 �s a td c PQO4 On cLo ROLLS + o° Qt� G GA51'�• I D % �.•- .,,, ` 4 G `"'r . U ` TRASH 0/4 4 V4 1Q9.47zo � ® �` 4 O —_� v �d j ��- Pl��TkL. ONE PH EM TTi .' FE i M7� Q n,M . r Approved By: Date: 4/1/07 Scale: Drawn By: ' Job No. { 0713 Sheet No. BASE INFORMATION PROVIDED BY LI-1 ! REFER TO SHEET L I --3. FOR I RRI GAT I ON DETAILS and SPFC I F I CAT I ON5 5TRACT5 INC. ARCHITECTURE + INTERIOR DE51 CAN . -.. ..__m. .. ,.t• ... '°!r'.�'• ._ .- . , •_. - - - ;... ,s. .x._. .. e ».... 4- .._. ....s_ ..4.4.,..a,.. <..,..,,. ..k. n. .. c ±u...... w4 �.. .:� ,u ,..5. «s PALM DI+5EER7 kNA7F_R 1:31,11D(�E7 CALCULA71ONS ' r- PLANTHNG PALETTE TREES / PALMS/SPECIMEN PLAINTS WATER USAGE' ANT BOTANICAL NAME COMMON NAME SIZE QUANTITY OF PLANTS FACTO FARKIN50NIA PRAECOX PALp gip, 4$" BOX 5 L 0.2 City of Palm Desert WA5HINGTONIA FILIFERA CALIFORNIA FAN PALM SEE PLAN 4 M 0.5 Water Calculation Chart CITRUS DWARF DWARF CITRUS 56" BOX I M 0.5 .y Maximum Water Allowance (nnwA) C Input Zone ;1 Square Footage Calculations Tree& Shrub Square foot 3122 Turf Square foot 0 Total Square foot Cobble/Boulder 0 Total Wa[erfeature Square footage 0 SHRUBS � Total Landscape Square f 3122 WATER US PLANT Zone No. Eto Water AT. Total Conversion0.62Fac8 Total BOTANICAL NAME COMMON NAME SIZE QUANTITY OF PLAN FACTO O Factor Sq.R. 0. 48 Miq►A T� 1 5T01 0.5 3122 0.62 748 73.763928 ENGELIA FARIN05A BRITTLE BU514 5 GAL. f2 L 0.2 - 2 66.75 0.5 0 0.62 748 0 JU5TICA GALIFORNICA GHUPAROSA 15 GAL. 15 M 0.5 3a 75 0.5 0 0,62 748 o J 3b 881 0 0.62 7481 0 LARREA TRIDENTATA CREOSOTE 5 GAL. I ��i 1' •� 4 93.9 0.5 0 0.62 748 0 C ' 5IMMOND5IA GHINENSIS JOJOBA 15 L 0,2 GAL. 4 L 0.2 Q� � SPHAERALCIA AMBIGUA GLOBEMALLOW 5 GAL 15 L 02 ^/ � Estimated Water Use a a ZAUSCHNERIA GALIFORNIGA CALIFORNIA FU05HIA 5 GAL. q M OS fit o � MUHLENBERGIA RIGENS DEER GRASS 5 GAL. Total Number of plants 239 JU5TIGIA 5PIGIGERA MEXIGAN HONEYSUCKLE 5 GAL. 4 M OS b 30 L 0.2 °Q° CD GAE5ALPINIA GACALACO GA5GALOTE 24" BOX I L 0.2 y, a Number of plants by water use %of Total Landscape Square Footage GORDIA BOI551ERI 56" BOX I L 0.2 � V 1 Low 162 0.678 2116.167 GORDIA PARVIFOLIA 15 GAL. 4 L 0.2 i' z 2 Low/Mod 0.000 0.00o LITTLELEAF CORDIA G q 3 Mod 69 0.289 901.331 LAVANDULA "JLTIFIDA LAVENDER 5 GAL• 15 M 0.5 A w 4 Mad!HI 0.000 0.000 Q 5 High 0.000 0.000 RUELLIA BRITTONIANA 'KATIE' RUELLIA 'KATIE' 5 GAL. 6 L 0.2 -�6 Low Trees 3 0.013 39.188 PEN5TEMON PARRYI PARRY PENSTEMON . 5 M OS 0 v 7 Low/Mod Tree 0.000 0.000 I GAL 8 Mad Trees 5 0.021 65.314 G 9 ModrHi Tree 0.000 0.000 10 High Trees 0.000 0.000 a Total 239 SHRUBS Plantflrtlgation System Type: Zone Irr.Eff. Area Seasonal Plant Factor. SprayfBublDrip 1 0.9 2116 1 Low Shrub M� season Zonal Eto plant Area Conversion Factors Estimated value Factor sq.ft. 0.62 74B Irrl.Eff. Water Use Spring 12.54 1 0.2 2116.167 0.62 748 0.9 4.89 Sumner 34.77 0.2 2116.167 2 748 0.9 13.55ACCENTS/ SUFail-Wtnter 9.7 0.2 as2116.167 0.62 748 0.93.78TOTAL 22.22CCU LENTS / CACTI WATER USAGE PLANT Plantllydgatlon System Type: Zone Irr. Eff. Area SeasonalPiantFactor BOTANICAL NAME COMMON NAME SIZE QUANTITY OF PLANTS FACTO SparyfBublDrip 1 0.000 2 LowlMod Shrub Season Zonal Eto plant Area Conversion Factors Estimated YUCCA ROSTRATA BEAKED YUCCA 5' TRUNK 2 L 0.2 Value Factor sq.ft. 0.62 748 Irri.Erf. Water Use AGAVE GEMINIFLORA TWIN FLOWER AGAVE 5 GAL 5 L 0.2 Spring 12.54 0.35 0 0.82 748 0 EGHINOGAGTUS GRUSONII GOLDEN BARREL CACTUS 5EE PLAN 25 Summer 34.77 0.35 0 0.62 748 0 L 0.2 Fall-Wirter 9.7 0.35 0 0.62 748 01 AGAVE ANGUSTIFOLIA VAR. MARGINATA 15/5 GALS. 10 L 0.2 TOTAL 0.0o ALOE BARBADEN515 MEDICINAL ALOE I GAL. 12 L 0.2 ALOE FEROX TREE ALOE 2 L 02 Piantllrrigation System Type: Zone Irr. Eff. Area Seasonal PlantFactor: ALOE STRIATA CORAL ALOE 6 L 0.2 SpraZonal to 1 0,9 Conversion F 3 Mod Shrub CEREU5 PERUVIANUS PERUVIAN TREE CARUS V O/A HT. I L 0.2 Season Zonal Eto Plan Area Conversion Factors Estimated GEREUS HILDMANNIANUS (NEW} value Factor sq.ft. 0.62 748 Irri.BY. Wrier Use Spring 12.54 0.5 901.3305 0.62 748 0.9 5.20 F-UFHORBIA JERRY'S CHOICE NGN 5 GAL. 10 L 0.2 sunnrrer 34.77 0.5 901.3305 0.62 748 0.9 14.43 Fall-Writer 9.7 0.5 901.3305 0.62 748 0.9 4.03 PACHYPODIUM LAMEREI CLUB FOOT 0.20 TOTAL 23.66 PEDILANTHUS MAGROCARPUS SLIPPER PLANT 15 GAL. I L 0.2 H Plantllrrigatlan System Type: Zone Irr.Elf. Area Seasonal Plant Factor: LEMAIREOCEREUS MAR61NATUS MEXIGAN FENCE POST V-6 HT. 14 L 0.2 SpraylBublDrip 1 0.000 4 Modifth Shrub PORTULAGARIA AFRA ELEPHANT'S FOOT 15 GAL. 2 L 0.2 Season Zonal Eto plant Area Conversion Factors Estimated value Factor sq,ft. 0.62 1 748 Irrl.Eff. Water Use Spring 12.54 0.65 0 0.62 1 748 0 Summer 34.77 0.65 0 0.62 748 0 Fall-Winter 9.7 1 0.65 0 0.62 748 0 1 TOTAL I I I0,00 v VINES WATER USAGS PLANT Plantllrrl ation Type: OF PLANTS FACTO g System T e: Zone Irr. Eff. Area Seasonal Plant Factor: SpraylBublDrip 1 0.000 6 High Shrub ANTIGONON LEPTOPUS OUEEN'S AREATH 5 GAL. 5 M 0.5 !� Season Zonal Mart Area Estimated aterU ROSA 'ICEBERG' R05E 15 GAL. 5 M 0.5 VValuea Factor sq.ft. 0.62 748 1rr1.Bt. Water Use spring 12.54 0.8 0 0.62 748 0 BOUGAINVILLEA BOUGAINVILLEA 5 GAL. 2 M OS summer 34.77 0.8 0 0.62 748 0 'BARBARA KARST' Fall-tarter 1 9.7 1 0.8 0 CIA2 748 0 TOTAL 0.00 GALLIANDRA SURINAMANS POWDER PUFF 15 GAL. 5 M 0.5 �■.� TREES Plant/irrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor. SpraylBublDrlp 1 0.75 38.18a 6 Low Tree Season Zonal Eto Plant Area Conversion Factors Estimated GROUNDCOVER WATER USAG PLANT value Factor sq.ft. 0.62 748 Irri.et. WaterUseOF PLANTS FACTO spring 12.54 0.2 39.18828 0.62 748 0.75 0.11 Summer 34.77 0.2 39.18828 0.62 748 0.75 0.30 DYSSODIA ACER05A SHRUBBY DOGWEED I GAL. 6 M OS Fail-wiser 9.7 0.2 39.18828 0.62 748 0.75 0.08 TRAGHELOSPERMUM JA5MINOID TAR JA5MINE LINERS 102 50. FT. M O g TOTAL 0.49 Piantlirrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor: SprayfBublDrip 1 0.76:. 0.000 7 Low l Mod Tree Season Zonal Eto plant Area Corve sIon Factors t stmated • Value Factor sq.ft. 0.62 748 Irri.B'f. Water Use tzi Spring 12.54 0.35 0 0.62 748 0.75 0 summer 34.77 0.35 0 0.62 748 0.75 L _ LON, M MEP I UM, H _ H 16H � Fall-Witter 9.7 0.35 0 D.62 748 0.75 L/ 4.4 TOTAL 0 00 U Plantllrrigatlen System Type: Zone Irr.Eff. Area Seasonal Plant Factor: SpraVBub1Drip 1 0,76 66.314 6 Mod Tree Season Zonal Eto Plant Area Conversion Factors Estimated Value Factor sq.ft. 0.62 74B Irrl.Eff. Water Use Spring 12.54 0.5 65.31381 0.62 748 0.75 0.45 Sumner 34.77 0.5 65.31381 0.62 748 0.75 1.25 Fall-winter 9.7 0,5 65.31381 o.62 1 748 0.75 0,35 TOTAL I I I 2.06 Plantilrrisgation System Type: Zone Irr. Eff. Area Seasonal Plant Factor: O SprayfBublDrip 1 0.000 9 Mod/High Tree Season Zonal Eto Mart Area Conversion Factors Estimated Value Factor sq,ft. 0.62 748 Irri.9'f. Water Use Spring 12.54 0.66 0 0.62 748 0 f� Summer 34.77 0.65 0 0.62 748 0 - R Fall-Winter 9.7 0.65 0 0.62 748 0 TOTAL 0.00 Plantlirrigation System Type: Zone Irr. Eff. Area Seasonal Plant Factor: SpraVBublDrlp 1 0.75`, 0.000 10 High Tree Season Zonal Eto Plant Area Conversion Factors Estimated Value Factor sq.ft, 0.62 748 Irrl.Eff. Water Use Spring 12.54 0.8 0 0.62 748 0.75 •� Summer 34.77 0.8 0 0.62 74B 0.75 Fall-Winter 9.7 0.8 0 0.62 748 0.75 TOTAL 0.00 Total Tree And Shrub 48.44 Plantilrrlgation System Type: Zone Irr. Eff. Area Seasonal Plant Factor. w �•' BUBBLERS 1 09 102 11 ANNUALS O Season Zonal Eto Plant Area conversion Factors Estimated Value Factor sq.it. 0.62 748 Irri.8'1. Water Use 4-4 spring 12.54 0.8 102 0.62 748 0.9 0.94 Sumner 34.77 0.8 102 0.62 748 0.9 2.61 Fall-winter 9.7 0.8 102 0.62 749 0,0 0,]g Approves By; TOTAL 4.4 Total Tuff 4.28 Date: PlanUlrripation System Type: Zone Irr. Eff: Area Seasonal Plant Factor: 4/2-7/0-7Waterfeature 1 1 20 12 STATIONARY Season Zonal Eto Plant Area Conversion Factors �tlmated Scale: Value Factor sq.ft. 0.62 74B Irrl.Eff. Water Use NONE Spring 12.54 1.2 20 0.62 748 1 0.25 Summer 34.77 1,2 20 0.62 7ae 1 0.69 Drawn By: Fall-winter 9.7 1.2 20 0.62 74B 1 0.19 RV TOTAL 1.13 Job No, Total Waterfeature 1.13 (��' 1 Total Estimated Water Use 58•85 ShcetNo. V / „7 LI-2 r s 0 TO BE I N5TALLED BY WORK MAC LY LATEtZA1.s Ir�Ns LANDSGA�PE CONTRACTOR 120 VOLT 1.00 IRRIGATION SYSTEM SCOPE OF A. Work in this section includes providing all labor, material D. The Irri anon material shall include but shall not necessarily 01.00 IRRIGATION SYSTEM INSTALLATION PROCEDURES: FEBCO MODEL B05Y -IRA F 19(il Rill ul_� §l _ ,b. ®quipment, tools, permits, ond, tronspdrtatlon necessaryy to be limited to the followings: j Furnish and Install a complete Irrigation system with 100% A. Irri otion Ian is die rammatic. irri otion laterals and mainflnes =11 v C I = I IRRI&ATIO�_LE67E ND coverage of designated areas s own on the droHings and I. PLASTIC PIPE: she n in h rdscope 1 for clarity onIg. Install all Irrigation = aoui ment In planter bed areas. Landsca a Contractor shall Al.r w,nteu�YLumowee inTmcceAtsetso-N:vsatur&LAnyoxeallotYN,vc speelFled herein. a. Extended from 100% virgin polyvinyl chloride (PVC). ` IWrAtrspetAeedrmre"MTN ur<sIu-:WXLPollDW10rWW"Ac •: ��*►��� Outside diameter of plastic, pipe s ali be the same size ve,l actual location of power source an controller before suxrAenlOeneeTALLATION C�w¢rmrrarraessr�• PLUTN •m,m *�� o Wr ICATOW TNi VA K e:wsare. roar ua'tx-ner M���MM�K. B. The work shall include but shall not necessarily be limited as iron pipe, with plan ends, pipe and fittings any 1 ligation Installation. l�dmurn Cmeborveeaod Union SYMBOL DESGRIPTiON MANUFACTURER AND MODEL # v to the Following unless specifled otherwise: shall be in accordance With the Society of Plastic plans(or per localcade). FLOW Tin I. The Landsca a Contractor shall visit the construction site, Industry Standards. B. Install all emitters and tree bubblers onr phill slide of plant v z p material. Emitters shall be install two (2 1 above finish gqrade, Concrete Splash Pad MAIN SUPPLY,LATERAL wIRIN:s M POINT OF CONNECTION- 5/4 meter, static pressure ® 65 P51. z take all measurements, and obtain any other information any emitter left at an unacceptable height shall be rein5talied From pointoiconnection AND WIRING, N24 IRIN-T p � ~- necessary for a complete and conclusive bid. b. Pipe shall be continuously and permanently marked with at no cost to the owner. of potable TO BE INSTALLED BY CY,1N.D. o the followin Information: onufacturer`s name, normal. 1 e - Jr �. Orderinct, Furnishing, and Installing materials for com late g p p s stem rncludin r In valves, fittin s, backflow roventor size; PVC, type, S.D,R, or pressure rating; and extrusion G. Verif actual quantities and final location of plant material = -2 ,A„0 system g p p g' g p date, with tide owners representative before an instal lotion of the NOTE:Locate where spillage will not be objectionable. = -IIIW- 111 y O (Unless specifled Otherwise), dripper lateral Imes, automatic Irrigation system. p y AN assemblies should be accessible forpertodle III _ HAINure = lls I J.�C..� BAGKFLOW PROTECTION- Febco 805Y to be Installed by Landscape vv controller, and final adjustment of lines to insure complete g y testing and maintenance an established by local _ covers e• Owes. rtIr3MI6o1TDrrIs TeAwa.sae,xuwa14P" Contractor per local and state code. 9 cov All plastic pipe shall be handled with care and shall be D. install Ralnbird PC5 screens as required to eliminate mistin� and Suggested 24'minimum clearance h°mvalvebocy. AM4 AT o a Q Q a Q 5. Trenchin , stockcling excavation materials and refillin especially protected from prolonged exposure to sunlight. oversproy unto hardscape, streets, and structures (If requir d). �u rmr.rrreTKr caeeanans cc�� row NOUN woe trenche� includi 9 compaction of back fill and instollatlon MAINLINE PIPING-Schedule 40 PV0 using deep socket design schedule 40 fittings. of sleeves. d. Protect all PVC plastic pipe from damage during construction 10.00 IRRIGATION MAINLINE AND LATERAL LINES: DOUBLE CHECK 4. Line voltage connections to the Irrigation controllers and and storage. low voitaga control wiring from controllers to remote control A. Entire stlstem shall be cap ed and pressurized to 125 PSI and E3A0I<FLOW PREVENTION UNIT TRENCH DETAIL V) valves. shall remain so for a six 6r hour period. Check all joints and No 2 �� LATERAL PIPING- 1/2" Glass 515 PVC, using des socket design Schedule 40 fittings. 2. PVC. FITTINGS: connections for leaks. Repair and correct as necessary. g fo g g r', 5. Replacement of unsatisfactory materials. a. Plastic fittin s shall be of polyvinyl chloride(PVG), Type Prior to backflll contractor to contact City of Palm Desert landscape PQ E, Schedule xFO N.5.F. and of IPS solvent weld or screwed inspector for pressure test of mainline. 6. Cleanup, inspection and approval. type, Lasco, Sloane(same manuFactvrer as of ape). Where "1. Operational tests. threads ore re uired, these shall be Injected molded and B. THE ENTIRE SYSTEM SHALL BE FLUSHED PRIOR TO INSTALLATION LATERAL PIPING- 3/4" and up Glass 200 PVC. using deep socket design Schedule 80. A71 connections shall be solvent welded. OF SPRINKLER HEADS. Wherever necessorcI, Landscape Schedule 40 fittings. 5. "As Built" record drawings, shop drawings, warranties Contractor shall install anti-drain check valves (primar'lly on sloper 1 g b. Plastic to plastic Joints shall be solvent-weld joints. areas) to alleviate low head drains a/eroslon. and Uarantees. g STANDARD IRRIGATION EOX A.P.A NS E a. Verifyunderground utility locations. Pipe solvent shall be Johns-Manville "Blue" solvent weld t E.WTRICAt.JUWYIONBOX FLU5HIN61 VALVEELECTRIC CONTROLLER- One Ralnbird ESP-MG-12, wall mounted. g y cement. I I.00 IRRIGATION HEADS: e«Q,req*sid O A. Sprinkler heads alon street curbs shall be setback 18" from ®CONTROLLER -WALL MOUNTED Verify actual location and power source with owner's 2.00 GORES, PERMITS, ;3i?��Nollm: �CONT R'�O&SE" INSIDE R �iwsrl FEES, LICENSE AND INSURANCE: c. Plastic to metal ,Joints shall be with male adapters. the all street curbing rinkler heads along Interior sidewalks (e.g. Sid. t - Tree Drip, Ste. 2 -Tarr Curb) representative. male adapter shall be hand tightened, plus one turn with a shall be Install 4" to 6 from any edge of walks, drive or path. �CONDUIT - PVC A. All work and materials shall be in full accordance with the strap wrench. Joint compound shall be Permatex Type II 4 qo Degree PVC Sweep, latest rules and regulations of the National Electric Code, the B. Irri ation heads on a riser will not be ermitted aloe O Plumbin Code, ubffshed b(� the Western Plumbin Officials (Only Schedule plastic may be threaded). q p tzo VOLT INPUTAsaociatlon; andpother ap 1icable State and local laws or flatF�ork. ReFer to legend for height df all pop-up sprinklers. 4 VOLT OUTPUT re ufatlons. Nothin in these Drawin s or ecifications Is to 11419HORADEr MOISTURE SENOR- Watermark 2 zone moisture senor9 9 9 3. REMOTE CONTROL VALVES:be construed to permit work not comforming to these codes. a. All valve locations are shown schematicall on irri ation Ian �j 1. Common win to be white and control win to be and need to be verified with and approved b Owner's p 3 black union othmrlsa noted, pp y 12.00 AUTOMATIC. CONTROLLER: 2. No splices shell be made between controller and Representative/General Contractor. Irrigation valves Hill not romate control valves unless otherwise noted. PILL BOX NTH Vie PEA GRAVEL O B. The Landscape Contractor shall pTomptE notify the Owner's duit be allowed in Toss areas unless a proved by owner's A. The Landscape Contractor shall be res responsible for the final ;; Cen exposed m torsbe mnimum"ATron/t4 one control ELECTRIC VA - ° Re rest.ntative/General Gontraotor of ai work outlined an ,� win to seer controllK eontroperio be grounded de LYE- RQInblyd EFB GP in a Jumbo Irrigation box. $ p y Representotly /General Contracto . electrical connection From the power source (BY OTHERS) to per to each con eler. catlans g �! the plans or speclficatlons that Is not In accordance with controller as Indicated on plan. Final controller location e. 120 volt power to be provided by others, all shall PVC,LATMAL LINT: TAN IN COLOR IN PLANTER BE05 �" C applicable laws, codes, and regulations. Without such shall be verified with and approved by Owner's Representative. 4 be accard,nq to local code. SIM PLAN FOR SIZE W notice and appropriate modifications by the Owner's 3 4 3 e• Contractor will connect controller to power mums and T h 4. VALVE BOXES: supply ti n. Oequipment ar to tsupply power.&material naContractoeded for rato NOTE 6� ld Re resentat ve, the Landscape Contractor shall assume full a. Valve boxes shall be tan Carson No. a10 per City Of Palm field verty location at power sourceprier to wtrmktinq Z a respponslbllitu for any work executed which is contrary to p „y B. Attach a t pewritten legend inside each controller door, stating Old.Instep per local code. INSTALL AT LONE$T POINT'AND/OR AT EV OF LATERAL PIPING,As MOW. C ti 6 requirements. Mark lid Irrigation Control Volvo". Install the areas covered b aFach remote control valve. BALL VALVE-Hammond model #8a01 Full port ball valve brass line size in Irrigation box. such laws, c des, and regulations. y 2 above grade in groundcover areas. TAN IN COLOR IN PLANTER BEDS g Z 'Q 111-so A G. License: work shall be performed a G-2? California licensed 15.00 COVERAGE TEST: Tie N Contractor. p VALVE CONTROLLER-WALL MOUNT END 5ELF-FLU5HING VALVE 5. . VolCONTROL WIRE A. When the sprinkler system 1s completed the Landscape ' NO SCALE NO SCALE GARDEN VALVE- Champion Inverted Hose Bib 1-402 in a Irrigation box. a. Valve control wire shall be Installed per code. Wherever Contractor, in the pr sense of the Landscape Architect D. Permits and Inspections: possible, place wire In common trench with mainline. Wire or Owner's Representative shall perform a test which indicates TAN IN COLOR IN PLANTER $EDS The Landscape Contractor shall obtain, coordinate, and pay for shall be UL-a proved for direct burial In ;;round, size the water cov rage afforded the �lantlnq areas 1s complete, any permits, fees, and agency inspections as required and #14-1 (UNLESS SPECIFIED DIFFERENTLY 09 IRRIGATION PLAN) adequate, and doss not sprinkle a y stru ure walls, Walks submit all certificates o approval upon completion of Work. minimum with maximum voltage drop of 5% between valve or pawed areas. The Landscape Contractor shall furnish all g p materials and perform all worK required to correct any Q� and controller. Common round wire shall have white E. Insurance: g inadequacies disclosed. The Landscape Contractor shall carry all Worker's Compensation, insulating Jacket; control wire shall have Jacket of color public llability and property damage insurance as required by other than white. 5pllees shalt be made with #2006-5 Toere.saare _WWMAMVALvRtt X P51 GPM RADIUS all applicable codes, regulations, and the General Contractor. 5uchonon splice caps and 5M #5576 Scotchlok seal packs. 14.00 GLEAN UP: 10" Round valve box w/lid a a„soaw40TR04r„a.PIM a„A►, Upw4,.-,tt,�e.2'tw pp g MW M er"n h Finish grade L'4ti "rf/Iran in TREE FLOOD BUBBLER-RAinbird 1404 50 0.50 F+� A. Duran construction, the Landscape Gontraotor shall keep TAN IN COLOR mnui im DD9GO l•mretteleADl: 0 - Z F. Site Verification: 6. SLEEVING: premises as clear as possible of material and debris. M1M1salmUP TWO PER TREE UNLESS SPECIFIED OTHERWISE. Prior to commencement of work, the Landscape Contractor shall a. Landscape Contractor shall pprovide all irrigation Verifyy sary sleeving (Unless SpeclFted Otherwise) under all hardscape. Gontraotor shall remove from the premises ail surplus all conditions and dimensions shown on the plans neces B. Upon completion of the work under this section, the Landscape to ac-hleve the intended design of the irrigation system. Any Coordinate all underground PVC. sleeves work with the mater'fal, discre oncles shall be reported immediate) to Owner's Owner's Re resentative/General Contractor. All sleevin tools, equipment rubbish, and debris resulting from his work, Re resentative/General Contractor. y required shall be Schedule 40 PVC. pipe and shall be a g and shalt leave I;he installation site in a clean, neat condition. �// BRICK SUPPORT(l OF 2 } MALLVALveamma, p minimum two sizes larger than lateral or mainline piping. weetm(oPTION040 STREAM BUBBLER-Ralnbird 5F-5 50 1.5 5' G. Coordination: BALL VA PVC mainline M "°° MA,#VC aeaae4o LVE The Landscape Contractor is responsible for coordinotinq this ect�e80Pyr,Nrfta work with all other trades. This l6aludes, but is not limited" = • • b - • •••�- ecttmutneolw*Nrru 6.00 IMPLEMENTATION. - TAa Tarts • ~" � to, provisions for racewa s and sieevin as well as water and CITY OF PALM DESERT power sources. All irrigation work shall"be coordinated with and approved Owner's Re resentative/General Contractor. A. Prior to installation, Landsca a Contractor shall verify static T CUM. ea ravel �� M `� � HAINfillemYter! DRIP and POTS VALVE EQUIPMENT ASSEMBLY IN JUMBO IRRIGATION BOX: pp p pressure at project site. This system is designed to 6perate 15.00 LANDSCAPE INSPECTION SCHEDULE: P g eatTlsa�ttie FMM,til PlTra16 Tom 24 gpm at a maximum static pressure o 65 P51. - PVC male adapters eeoroe TAN IN COLOR IN PLANTER BEDS H. Schedulin : For mainline water pressure testing refer to note 10.00 (a) I. Sleeving/Grading The Londscope, Contractor shall notify Owner's Representative/ Pressure testing requirements per the City of Palm Desert. a. Sleeve diameter, type, depth and General Contractor not less than two (2) Working days in advance Notif Owner's Re resentative/General Contractor at the site BALL VALVE-Hammond model #8901 full port ball valve line size bronze of any requested observation. immediately of any discrepancies and proceed as directed. location. FULL FORT BALL VALVE G ELECTRIC VALVE b. Soil surface drainage, elevations and NO SCAB v i,(o SCALE I. Layout Of Work: 5. Coordinate the installation of all irrigation materials, trash (Including weeds $rubble). Iln ELECTRIC, VALVE-Irri-Trot Ultra Flow P "100 series I. TFIe Landscape Contractor shall stake out the Irrlqatlon Including pipe, with the Landscape Drawings to avoid interfering system as shown on the drawings. These areas sFiail be with the planting of trees, shrubs or other plant material. 2. Hardsca e/Boulders - Gobble NOTE:INSTALL THREADED �� checked by the Landsca a Contractor and Owner's Representative p EMITTERS. REFER TO DRIP FILTER- Ag. Products 4E-I with 150 mesh /General Contractor before construction is started. Any o. Sidewalk and wall layout. eu®ut.t:00PMNOW11.11 IRRIGATION LEGEND. ahanQgas, deletions shall be determined at this G. All Irrigation lines, valves, and wiringq shown on plan under _ *"'•"1°10'111LAWt-LM61= c1M0014 Wc-0 rw VALVE x chec,R. paving gore schematic only. Install tftse Items in planting b. Utilities location. 1i CON11`O` '"@ :;,h;uK,T„tin.t,,, areas whenever possible, except when lines must cross paving to TOE PRESSURE REGULATOR- Wilkins #q0 2. The Landscape Contractor is responsible for adherence to connect planting areas or unless noted on plan. c. Boulder type, size, weight 2" MIN FINISH GRADE the contract documents relative to egvi ment type, size and placement. 00 installation, and location. However, the Landsca a Contractor D. Irrigation designer shall approve ail desi n changqes due to site Iteloteearrltol.VALVE C shall make minor adjustments, modifications, and previsions plory chancies, or scaling etYors in Irrigation plan to guarantee 5. Irrigation System Rough - In LIMem PSI GPH to the irrigation system, as reqq�uired, to conform to size 100% spr nkler coverage. Irrlgatlon ontractor shall assume full LKILL ast an conditions and to provide conslstent 100% coverage of responsibility for 100% coverage when infield changes are made a. Trench depth and location. Schedule 80 riser ❑ DRIP EMITTER- Rainbird X5-05PG-1032 20 0.50 w all irrigation areas, without approval from Irrigation designer. tad MIL-WC.§C+I UZ 40 b. Pipe size and class. '• sueo"torvcteling 2 - 1/2 INCH MARLEX 5. An deviation From the contract documents shall be verified E. Irri ation desi ner shall not be responsible for Improper .. .. _. .0 .. . . we* .. .. a)! r ` yy operation of s stem due to Landscape Gontractornot Installing cov Pressure test (125 PSI for 6 hours). :j� • , _ e��G STrzEET ELLS DRIP EMITTER- Rainbird XB-IOPG-1052 20 1.0 v witFi the Owners Representative/General Contractor prior p p g l-- oALVAtum>on •� a4erc.rw e.ew' to any Irrigation system installation. The Landscape the irrigation system per plan, poor workmanship, Installing • - •.. ., + `:•• '"°"^�" Contractor shall take full responsibility for adjustments to the wrong pipe size, or inadequate static pressure from water source. 4. Plant Material (trees 4 shrubs) • � • • . • •• ►w1+.trrt,rLe� O r� an material or work that is not approved. It shall be the responsibility of the Landscape Contractor to notify • . HAM 1.'14"n71N' !ri y pp the irrigation designer of any site or equipment chancci�es on approved a. condition. PVC TEE SCH. 40 PVC LATERALN SZE : DRIP EMITTER- Rainblyd XB-20PG-1032 20 2.0 �••,i irrigation plans prior to any Installation of the irrigation system b. T OR ELBOW 5.00 SUPERVISION And WORKMANSHIP: so as to provide design modifications. Type. LINE SIZE F. Provide Owner or his representative with all operating Instructions, c• Placement. NOTE. INSTALL EMITTERS ON SCH. 80 R15ER5(TYPIGAL). The Landscape Contractor, personallyor through an authorized and p p W competent representative, shall su eervise the v'fork constantly, and tools, keys, etc, as required for operation and matnteliance shad as for as possible keep the same Forman and workmany of the Irrigation system. S. Ground Cover (decomposed granite) ..r DRIP IRRIG. VALVE ASSEMBLY EMITTER IN5TALLATION DETAIL Pt on the job from commencement to completion. The workmanship of G. Upon completion of the landscape and Irrigation Installation, the a. Type. No SCALE 8 the enure job must in ever wa be first class, and only o NO SCALE j every y y Landscape Contractor shall also provide weer with two (2) sets experienced and competent workmen will be allowed on the job. of "As Built Drawings" of the installed Irrigation system. b. Depth and spacing. END SELF-FLUSHING VALVE- Ag. Products FGH valve in irrigation valve box. H. Record accurate) on one set of re roduclble prints of the C. Compaction. LARGE VALVE SOX drawings, a record plan drawing shoking any changes. Keep it TAN COLOR I.y 4.00 GUARANTEE: upp-to-Bats as the project Is under construction. Tn addition, FINISH GRADE dimension for two permanent points of reference the location of 6. Final A. All material and workmanship shall be gvaronteed and shall the pressure supply tine, valve plug tees, and control wire. Perform to the complete satisfaction o'f Owner's Representative/ a. Irrigation. - , General Contractor for a minimum of one year after completion "1.00 BACKFLOW PREVENTER: 4 acceptance of the Job. Duran this guarantee period, all 1) Valves, boxes and wiring. _ FINISHdRAN Anplateredd b . required repairs and adjustments, Including adjustment to grade, A. Provide and install backflow prevent-or unit (Unless specifled shall be made without additional expense for repairs to oi-her work. Otherwise) per State and Local Health Department codes and ii) Controller operation and schedule. j �iw�tTEDHOSE ' ' n rat, current listings. Backflow protection unit shall be located 1tt) Sprinkler, p SIB-' IMPIn such manner as to aliow for screenin plant material. bubbler and/or dra emitter 01A, IA I 11111011 B. All damae to ppaving, planting), structures, and other g p t e, flow rate, and quantity per font. ,•SCH.80 RISER wrr D-m,/241LoNs. wtAf►�t►tPILTM improvements dUe to sbttlemdnt of Im ro erl com acted Refer to plan for location. type, q y p p t t TAPE ATTHREADLD CWM ATTArutrtlnteua'rTAreA1." § VALVE IDENTIFICATION KEY: trnch backflll shall be promptly re olredp to the satisfaction of ENDS. CNI ATgR rLd�T 1'�E ro PtATGH Di. § p p y p iv) Overall operation. (LENGTH As REQUIRED) F.Y.C.RVIi.LATEr+AL u►e illy •Cd expense. Representative/General Gontraotor at no additional 8.00 TRENCHING: p trs`ttcttnLx►m,o --IIII IiII I h Controller Letter 4 Station Number eX ease. NArtvE ep14�are-eaAoe A. Trenching shall be free of all rocks, debris, and sharp v) As built. C. This guarantee excludes theft, vandalism, natural disaster, or articles. Back fillin shall be accomplished in a manner to 3/4•RESARLENGTH (40 work on the system by others after final acceptance. The Insure no Further settlement of dltch and to match adjacent b. Tree staking. I� ASRECID Illp : •'' 03 Landsca a Contractor shall check clean, and adjust all Irrigation W/STAINLESSSTEAL �' ,p r j g grades. No back filling shall be done until scheduled CLAMPS - - Valve Size '~ U lateral lines and otherwise insure adequate operation of the observation are made. c. Overall. SCH.40SXSXT system throughout the guarantee period. TEE �IIII�IIII "`'` I milli B. Gap or plug o�ppeninngqs as pipeline is assembled to prevent entrance mill of dirt or d6si:ructiern by N:eelgn ob eats. Remove caps or luggs when "- L4- Lldi,, 5.00 MATERIALS: necessary to continue assembly. TRI5 15 ESPECIALLY CRITICAL IIII Type Coverage-Bubbler, Tree Bubbler, Drip � FOR DRIP LATERAL LINES. 2 THREADED STREET MAIN WATER SUPPLY LINE A ELL O A. All work and materials shall be In full accordance with the AT THREADED ENDS. latest rules and regulations of the National Electric Codes, the G. Install mainline pi as, lateral pIpes, and wirinq in common Uniform Plumbing Codes, published by the Western Plumbingg trench wherever �ossibie. Mdililine pipe sholT have a minimum GPM Through Volvo Officials AssocTat(on; and other app-1lcable State or IocaT laws of 24" cover (50" cover under roads and streets). Lateral pipes GARDEN VALVE TREE I RR I G�TI ON DETA�I L or regulations. Nothing in these DDrawin s or ecifications is shall have a minimum of 12" cover (18" cover under roads and to be construed to permit work not conforming to these codes. streets). Provide a minimum of 4" of sand all around pipe for at NO SCALE ( No SCALE c,HRu� �R��c' runs under streets, driveways, and vehicular access areas. N B. All a uipment shall be as listed in the legend details, and Provide a minimum 24" cover for all wiring. Tape and bundle wirin at 10 Intervals. Tle a loose 20 loop in all wirin at changes specif ed herein. Install all earuipment per details and p 9 tsuPeASesoctceTovtax�wllz>_r. s ecifications or manufacturers recommendations. An of direction greater than 50 . Untie all too after all connections p y have been m5de. Contractor to contact Git9 of Palm Desert landscape substitutions shall be approved by Owner's Representative/General ins actor to schedule a pressure test of the mainline prior to backfillinq Contractor and City Of Palm Desert in writing. Any unspecified trariches. Landscape contractor shall have all current City of Palm De3ert Now r(oaroresmesM&K a equipment shall be replaced at Landscape Contractors expense. business license. Nei.IZAM Nei,la STW 1PARE9 APPROXIMATELY"'FROM 010. Truer EN"Toeerlim G. When the Specifications call for materials or construction of g� a better gUality or larger size than required byy the above •s~ mentioned rules and regulations, the speclflcatfons shot I APPLYl ►v�MTN 5122ALM °r s>1`LI"6 PLue' take precedence over-the requirements of the said rules and regulations. The Landscape Contractor shall furnish without • any extra charge an additional material and labor when required by-the compliance wlfh these rules and regulations, though the work 71c-,,w W.E aovmAIR ows. be not mentioned in these articular ecifications or sFiown on the CRIMPV-1emANPO'rOPPrXio KRE. Drawings. p 51W Z FOAL DASD°OGKET OVER WIRE END tc A4 PAR AS POSOIDI.E. W J l°113H 5eAd.lti6 RJIb INTO dA31:306tcXi'. � 0 STEP 8 PUSH MIRED TO END OP SAW SOCKET TO AdsSupt COMPLETE lPALINB OP GONNi�GTION Approved 13y: RAINCIRD PEN-T1TE PURE C 1,INZOTOR. STEP 4 Date: 4/q/O-r TYPICAL MIRE CONNECTION DETAIL Scale: Underground Service Alert NO :ALE DmNntB NONE p� .•iw-n �Yp�}p�� y. Cali. {VU FREE R\/ n 1-800 Job No. 422-4133 0713 TWO iVORKING DAYS BEFORE YOU DIG Sheet No. LI-3 7 .. ' .sag ?.�'. ._.......,, ,.. .J. ....�- ,..,,;,.. ,,`D'.<�" .??'.. ..�!,.^;,_. ,h^.t. ..`� .i�"�.^.;.. .t„.,.x" d�a .}.. ��, ... x :. : . 'mu ':-.. :. ...*>^ - .. ...•*fir. Underground Service Alert _ - co o Call: TOLL FREE -� — s 1-800 - 422-4133 TWO WORKING DAYS BEFORE YOU DIG i Ministrelli Stone Eagle- Lot 20 4J3107 _f LIGHTING LEGEND "` k . 05 o APPX. SYMBOL CATALOG#i MANUFACTURER DESCRIPTION -� ? QTY. FIXTUREARM- - • � I 11DGE ACCENTNPLIGHTS - rr I 9 - DL-13 FOCUS MRA6, 50 WATT FLOOD,CAMEL UPLIGHT PHONE: (213)696-3993 FINISH TOE 11 DL-17 FOCUS MR.11, 20 WATT FLOOD,"CAMEL UPLIGHT PHONE: (213)696-3993 FINISH r � PATHLiGHTS 6 Q AL-06 FOCUS 18 WATT, CAMEL FINISH , AREAfPATH LIGHT PHONE: (213)696-3993 IA 10� UNDERWATER LIGHTS +� o 3 POOUSPA LIGHT 250 WATT / •:, �. � UNDERWATER ' ~" MISCELLANEOUS 7. • � Poo � -....0 .� 1 SO-09-FD FOCUS MR.11, 20 WATT, BRONZE FINISH �� � • _ •_,�,•-.. , yy� •.,� � � BARBEQUE LIGHT PHONE: (213)696-3993 FIXTURE POST ROTO-LITE COLOR DESERT SAND PHONE: 760 ' ' 0 `? ( }86305800 16+ • tS" ,{ � 5 5 .1 PW a n q �oGG fit o NOTES: 1, LIGHTING CONTRACTOR SHALL PROVIDE 24 LONG WOOD STAKES TO MARK LOCATIONS OF ALL LIGHT FIXTURES.ALL FIXTURE LOCATIONS TO BE REVIEWED � •.E �. SEAT yyp,L�. r AND APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. I "^ �'" O J + o 2. VERIFY ALL TRANSFORMER LOCATIONS WITH LANDSCAPE ARCHITECT PRIOR TO F - s, -� � ..•.. ".., „, `T � A INSTALLATION. + ` n RI � ' 3. REVIEW ALL CIRCUITING AND SWITCHING WITH OWNER PRIOR TO INSTALLATION. p�• �2 + 0 : a COORDINATE THE INSTALLATION OF ANY REQUIRED ADDITIONAL SWITCHES WITH �1Ot ELECTRICAL CONTRACTOR. �� REA AM I I ' 4. ALL FIXTURES TO BE INSTALLED ON A PHOTOCELL CIRCUIT. s' ,� 16 `•' ;„••., .•` �r LOGGIA. � - '"••'f ... �\ LOGG 5. INSTALL SPJ LANDSCAPE SPLICEPOST ON ALL ABOVE GRADE LIGHT FIXTURES. ° � �... - ', � _ . 6. ELECTRICAL WIRES AND CONDUIT SHALL NOT BEVISIBLE. SOURCE OF LIGHTING �' �Q _�'" ��• •" "• �j + W GD ' . / , t IS NOT TO BE VISIBLE FROM THE NEIGHBORS LOT OR FROM - STREET SIDE. O 7, SOME FIXTURES TO BE ON SECURITY CIRCUIT,VERIFY FIXTURE LOCATION. i�i i�! ! r. . �p�ROOM .� r'r, ART • LIGHTING NOTES p ' , ' GAc t:. N T ' s. ' KITc � � � L1V� 1. All light fixture iocations are diagrammatically shown. Actual locations shall be verified In the n + -- field b the lands g y -y landscape architect L � .� � ' ... ° _�__ MASTER `._° .. ! +, ,+ ..I 2. All fixtures finishes shall be as specified on plan. , . O � eA em o o•o Cl_ '� 'gRA. 5. iNhenever possible, use landscape plantings to shield landscape accent lights from public view. F, Otherwise, contact manufacturer to verify type of covers available to screen light source. �. GARAGE 4. All work and materials shall conform to local codes and are subject to approval by the client representative ,,� . r +;; r-" i a G5 .oe ;; " u ��E ` daRaS 5 5. Contractor shall submit cut sheets for all fixtures and equipment for this installation. Tv, ' _ �.•� , I4 6. Install electrical conduit at the edges of planting areas so as not to interfere with plant hole p A •.,, ,:. .::.: excavation. Any electrical that interferes with tree hole excavation shall be routed around excavation. Z �� TAR ,00M I� LEME T ,f h J .......... Gf l�l ?. All light fixtures to be installed per manufacturers specifications. All electrical work and wiring d. to conform to city, county, state, and federal regulations. - 8. Contractor shall coordinate the landscape lighting with other trades and other electrical work � ��°° eA'M to ensure a complete and integrated installation. Contractor shall provide and install all conduit, �,��� ��� � '�• .. p 1 ❑ < .� 4 . .� o � CL- ... :.boxes, wiring, fixtures, lamps, switches, transformers, etc, for a complete installation. Lighting plan �M .,. 0 - • : Indicates design intent only and is not an electrical plan. � -"•'" ci. Coordinate all lighting connections to panel and switch location with General Contractor. 2 �% cw Q TM •, A 8 EY TR t1 ;'.....;. �iDURTY - ! !; 2 t� - t0. All wiring shall be sized to provide optimum performance of lamp. � �pRooM A. 11. See Sheet LL-•2 for complete Lighting System notes. a SPA and CUo +t �a >EOUIP ....a SEAT yyALL 4.1,+ ® o 4us G " - - - - - - - - 6K and .NRiyARo -- ...r TRAS►� 2 c • �� NT. yyp,LL PL G, - 15 AteA �---- a y�ANGE �oR �\ .i� U $ i2G� j o34'0? 109.47. ..---„ y Cn x N a x •� a a~ Ems, 5 Cz Approved By: rn 0 N O Date: O Drawn By: RV/I7R, wJob No. 0713 ,, Sheet No. 05 � ,� BASE iNI=ORMATION PR01lIDED �3Y REFER TO SHEET LL-2 FOR L I&HTI NG DETA I L5 and SPECIFICATIONS LL-1 5TRACTS INC. ARCHITECTURE + INTERIOR DESI(SN 41 J v Underground Service Alert R 0 Can: TOIL FREE completion of Hork. 5.00 IMPLEMENTATION Ak- 1-800 422-4133 D. Insurance 5.01 LIGHT FIXTURES AND EGUiPMENT The Electrical Contractor shall carrig all Viorker's Compensation, public llability and property damage insuranao as required oil applicable codes, regWations and the General A. All light fixture locations re shoylin opproximateig on the, drortings. Actual locations shall be TWO WORIaNG DAYS BEFORE YOU DIG Contractor. determined in the field after the trees, shrvl:e and vine/lespollers to be- illuminated have, been planted. All final locations sholl be approved N Landscape, Architect. LIGHT111 E. Site Ver otlon ,trical Controctor shall verify, at the site, all % UtF��!!,' �:� ,i- AL413�Prior to commencement of v4ork, the Eler _OPTUONSI�.. �'�OPTJONS conditions cis shop4n on the plans as ncessarg to ciahlove the Intended design of the At lighting s9stem. Ang discrepancies shall be reported Immedlatelyi to the B. Approved light fixture locations shall be staked bg Electrical Controator. Stakes sholl be v400d, f Landscape Architeat5 General Contractor. a minimum of 24" long, and labeled. B l:'witnii 0. Light fixtures are to be located a minimum of 6" from the edges of paving andrass areas, F. Coordination The Electrical Contractor shall be responsible for the coordination of his V40rk Hith all 0 t,t, to Insure an efficient and complete Installation. This Inalutdos 12. Electrical Contractor shall Install gravel drainage sumps at oil vqoll light buried ballast, or other trades on the projer coordinating all fixture and electrical line, locations P41th the Landscape Contractor to assure bvirled junction box locations vihon hard, and/or Impervious soil conditions are d. The locations of all conduit or sleeves under cor as directed bg the Landscape Arahltoct. that plant material r4lll not be disturbe Conarate paying, r4alls, etz- sholl be, coordinated prior to constrvation. All lighting viork shall tIY 711% 13 4 t _W ilbe coordinated Yilth and approved bg the General Controator. E. The actual locations of the items such as photocell, time clock, and time alock b9poss sy4itch r t�:Ch Aki�Qtxrp Un 1:� Ak shall be verified Nith e Londsoope Architect prior to installation, 1 411 R it ht III. P"ATIC FIKI P I m. CWPWAIXIINW�Sceftad P-U F. Electrical Contractor shall vorlfg requirements, quantity, and locations of exterior viaterproof t4r_4 11 AL.f):;4 12W.im Of Ishi 155 W4 1W 4tipt 0 ML flit. actor not less tThe Electrical Contractor shall notlf9 the Landscape Architect Conerol Contr .54'OKI? than tp4o (2) imorking days in advance of any requested observation. Refor to duplex outlets and phone Jacks Pqlth the Oviiner prior to Instollation. Instal I outlets as local 20 AW..3 T-424iOOK CENTL codes permit. H C( $ill Landscape Observation Se-hedule. � ;.'- 6. Junction and pull boxes shall be provided in the rareiNay s9storn Pihore necessary to for111tote 26 fK"I TIW_ "VCK�LOCAIW K.Aff H. Adherent,-, to Provilngs, I on Site Adjustments c-ondult and conductor Installation.1. The Electrical Contractor is responsible for adherence to the contract documents relative to tequipment type, size, installation, and location. Hov4ovor, the Electrical Contractor shall H. Electrical Contrctor Is responsible Por determining the quantity of loiH voltage transformers but$:required for Yqork. Locate transformers per draNings or Landscape Architect's, instructions. make minor adjustments, modifications, and revisions to the system, cis required, to conform to any material or r4ork that Is not approved. orr 0 1. Stop lights shall be installed per monuffnaturer's specifications. r tip ;j .�1.1 , 1.:.7, . . ". , -. :��:,,AU TQ 2. Any deviation from the contract documents sholl be verified rilth the Landscape Architect General Contractor prior to Installation. The Electrical Contractor shall take, full 1"V. IPH rosponsiblllt� for adjustments to any material or viork that is not approved. LIA At i4l:� i w fl1�, pursilmlimll.%NOM A0111 5.02 CIRCUITRY AND SHITCHIN6 6 41 L 1. Equipment Approval Ita A All lighting fixtures, outlets, controls, and ecLylpment. ore to be approved bg the Land5cope !�Architect prior to pvrchow. Any items vilhiah are installed bvt not approved shall be removed A. Conduit and vqlring rune, are shopm schemotIcally. Building and site conditions Y4111 cletermine. tho -4- and replaced at the Electrical Contractor's expense. All catalog numbers shall be, verified P41th actual runs. descriptions prior to making any purchases. B. The entire Installation shall be electrically continuous and shall be grounded in accordance to k. ad�ustk-d for dulsk to J. Prepaid Items vilth Article 250 of the NEC. dawn cre-a o6, some electrical items specified on the drovilngs mag be furnished as prepurchosed Items by 71M. Ofsr,- ta to the Ov4ner. These Items shall be verified and coordinated v4ith the Oyiner prior to making any C. Electrical Contractor shall provide oil sleeving necessary for lighting system unless otherv0se coordinated Yilth General Controctor. r OrF >1 3p.- .,r -.00 am) ..... ...... purchases of related equipment. tab to tie set !o AV1f0 U P. All Wring in exterior loctions or In exposed Interior locations shall be installed in conduit, Otro_ vi 11 Yary *i th t.se utnging K. Protection of ExIsting Conditions fe It 4'.IV, I.H k,it N lt, W h., If i 6XI ij:,11 remain znsuo unless othermse noted. Lovi voltage cable may be direct-burled at the Electrical Contr t J''Al IL Mlt:(�U -M fli ilk; Oqki 1. The Electrical Contractor shall, at his oyin expense, repair, replace, and maintain In option. Ir.;kj; oA.sUftrU,n e-j IN 600w :alrt.31tr. 94%1�Oil e�,t t" 1-4 ..MP, service ang utilities, facilities, or services (underground, above round, exterior, interior) 0 lopflUk A Of":KnTF.t i,;tr4 C, A] C6 a I ap*�.kiii i ill tG 9Z V Op 0%;E. All empty conduit shall be provided Mth a 200 pound test nglon fish line. oplick-out oudamaged, broken or othervilse rendered Inoperative during the course of electrical Y4ork. !44 VA ft.Lit "'I'sh '"t The Electrical Contractor shall aoriefullg aheck the locations of all underground vtllitles bg thorough examination of all available data and L79 rovloiN rilth the, vtllltg companies. F. All conduit and v41ring shall be In5tlled along the edges of planting areas so as not to interfere Hith plant hole excavations. Any electrical items Yqhlrh interfere Y41th planting holes shall be 2. The Electrical Contrac-tor sholl be hold flnanaloll� responsible for all damage to landscape relocated at the Electrical Contrctor's expense. a tor. (5. All branch circult vqlring shall be connected to 15 or 20 Ampere, I Pole circuit brooker(s). Iudlng replacement and installation bg the materials bg his v4ork, or bg his personnel, Ine EXTERIOR LI &HTINr--7 CONTROLS All cirovit numbers are shoNn for arbltrarg designation only and shall be determined by the L. Pomolltlon ond Relocation Eletrical Controctor. All multi-alravit runs shall be coordinated for proper phase and neutral �F O�C�US L�- 'l �IU I�=L�16 H�T The 51oatrical Contractor sholl be, responsible, for the demolition and relocation of all equipment arrangement. )Shlch intorfero5 Hith the electrical 94ork. He shall also be responsible for all cutting,potching, md painting necessary for the completion of the eloatrical Hork. H. The Electrical Contractor shall provide voring, conduits, and grounding for the pool and spa lights. The Pool Contractor shall furnish the pool and spa lights and Installation in the rialls. M. Submittals by Electrical Contractor All v4ork shall be In accordance viith Article 680 or the NEC. 1. Shop Vrov4ln95 1. All wilte-hing shall be verified Mth Architect's feloctrl6ol plan, Sheet and Hith the General Electrical Contractor shall submit 4 sets & shop droi4ings, for all electrical equipment such Contractor. as lighting fixtures, devices, lov4 voltage transformers, time clocks, photocells, dimming systems, and controls to the Landscape Architect for approval prior to making any purchases. AL 2. As-WId Vravqlngs Electrical Controator shall keep accurately dimensioned records of changes and deviations S.05 CLEAN UP from the original contract ldroviings, including precise locations of concealed and underground r4ork. Recordings shall be made by ruled lines on a set of reproducible dramn,95 and the A. Pvring construction, the Eloatrical Contractor shall keep the promises as clear as possible of droy4ings shall be delivered to the Landscape Architect at the completion op the project. materials and debris. acto a r B. Upon completion of the v4ork under this section, The Electrical Contr r sh It emove from N. Acceptance the promises all surplus materials, tools, equipment, rubbish, and debris resulting from his Upon completion of riork, the Landscape Archltect Y4111 revieN the eleatrical riork to vorIF9 system ::.Sint v4ork, and shall leave the installation site In a clean, neat condition. t operation and performance to determine f inal acceptance. C, 1131nm I .1pi: NT 0 DIX 0. Guarantee Ad W, The Electrical Contractor shall guarantee in v4riting for a period of one (1) gear form the date of HrItton occeptance of r4ork that all the materials, equipment, and labor furnished bg him are Proo Prom defects. The Contractor shall further guarantee that if ang material or equipment Is found to be dePective Y41thin the guarantee period because of faulty monuPoature or foultq installation (in the sole opinion of the Landscape Architact), he Poll replace and Install such material or ...... equipment Hithout ong further expense to the OHner. 2.00 MATERIALS -77=,77777 IT%V All lighting eqvipment sholl be as listed in the Legend, Votalls, and as spealflod herein. liti.'IGAPI'LICATIOS*S4C(iili?'Ut-l�'��� 2.01 JUNCTION PULL BOXES ontltg and size of conductors to be Installed. All Junction or pull boxes shall be sized for the cLv Boxes in dry, interior locations shall be metallic. Boxes in exterior locations shall be metallic.. Boxes In exterior locotions shall be a cast, viecitherprooF type. Part4#GSIC 2.02 TRANSFORMER Lovii voltage. transformers shall be UL recognized, class 5, Hith 120 volt primary Y41ndingS and Isolated 12 volt secondary vAindings. Autotransformor type is not acceptable. Transformers in exterior locations L .......... shall be UL approved for Piet locations. 82-579 Flain rig a 20�- 760463-5000 FOX,11 W 5-M ip,Ift-1 t r 4�17%V 3"If x 4 f.1%Y qve zonmc V 1).t3 I 2.05 CONVUIT WA USA 114*4: 51A fluzitExtriIl', i;let All underground conduit shall be Schedule 40 PVC, unless otherNise noted. All joint$ shall be solvent ls, prcv1da rigid elefe-6 Plor iNoter-bight aomeations. Mere undergrouncl r-ondult stubs up L tKLI -ondult. All underground condvil; sholl be sealed Yqlth a suitable compound at the building steel c entrances and at connections, to boxes to prevent entrance of moisture and gases. 2.04 HIRE A. t7rig, Interior Locations 55a LI &HT ROTO LITE FIXTURE- 1=05T ,rior loacitions shall be t9po NM non-motallic, All r4fring for IlghtIngand pov4er c1ravIts In dry, Into sheathed cable, Pilth copper conductors and 600 volt lKsuflatton, unless othery0se noted. Hires Cd sized No. a AV4& and larger shall be stranded. Hires sized No. 10 AH6 and smaller shall be, d0 5. Exterior Locations All P41rIng In exterior locations shall be a single, condvator copper rilth 600 type THHN/rHNN Cd Insulation, unless otheri,4190 noted. Alres sized No. 0 AA& and larger shall be stranded. Hires sized No. 10 AH6 and smaller sholl be solid. Lo;K; Voltage All IoN voltage coble shall be UL listed, approved for diret burial. The cable shall be three conductor, 12 gouge stranded, rated 150 volt, v4lth PVC insulation, ultraviolet stabilized. The, Electrical Controctor shall be responsible for determination of voltage drop on oil loY4 voltage rune. Any rune Nhich exceed 2 volts drop shall be, provided v4lth No. 10 AH6. Cd POO POO Cd 0 C4 Approved By: Date: Scale: NONE Drawa By: Job No. 0713 Sheet No. LL-2 T1 T 11 T1 tAt