HomeMy WebLinkAbout2022-10-05 ARC Special Meeting Agenda Packet
City of Palm Desert Page 1
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT, CALIFORNIA
SPECIAL MEETING
AGENDA
(HYBRID MEETING)
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference and there
will be no in-person public access to the meeting location.
• To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/83648797515,
Zoom Webinar ID: 836 4879 7515.
• To participate by telephone call (213) 338-8477 or (669) 219-2599, Zoom Webinar ID: 836
4879 7515. To provide a public comment please press *9 to raise your hand.
• Written public comment may also be submitted to planning@cityofpalmdesert.org. Emails
received by 9:30 a.m. prior to the meeting will be distributed to the Commission. Any
correspondence received during or after the meeting will be distributed to the Commission as
soon as practicable and retained for the official record. Emails will not be read aloud except
as an ADA accommodation.
1. CALL TO ORDER
2. ROLL CALL
3. NON-AGENDA PUBLIC COMMENT: This time has been set aside for the public to address
the Architectural Review Commission on issues that are not on the agenda for up to three
minutes. Because the Brown Act does not allow the Commission to act on items not listed on
the agenda, members may briefly respond or refer the matter to staff for a report and
recommendation at a future meeting.
4. ACTION CALENDAR
A. FINAL DRAWINGS
1. CASE NOS: PP 18-0009 – Amendment #2 (SP/PP21-0002)
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration of an Amendment No.
2 to the DSRT SURF project (PP18-0009 and SP/PP21-0002), adding 45 hotel rooms
including revisions to the interior layout and exterior architecture of the hotel and surf
center facility located at the 17.69-acre site within Desert Willow Golf Resort.
Wednesday
October 5, 2022
12:30 p.m.
Special Meeting
Architectural Review Commission Special Meeting Agenda October 5, 2022
City of Palm Desert Page 2
APPLICANT AND ADDRESS: Desert Wave Ventures, PO Box 147, Solano Beach,
CA 92075
LOCATION: Vacant 17.69-acre site within Desert Willow
ZONE: Planned Residential (PR)-5
RECOMMENDATION:
1. The ARC determines that the requirements of the Findings have been met based
on the analysis and approves the request.
2. Modifications required by the ARC be added to the motion as a condition of
approval.
B. MISCELLANEOUS
None
5. INFORMATIONAL REPORTS & COMMENTS
A. ARCHITECTURAL REVIEW COMMISSIONERS
B. CITY STAFF
6. ADJOURNMENT: The next Regular Meeting will be held on October 11, 2022, at 12:30 p.m.
Architectural Review Commission Special Meeting Agenda October 5, 2022
City of Palm Desert Page 3
AFFIDAVIT OF POSTING
I hereby certify under penalty of perjury under the laws of the State of California that the
foregoing agenda for the Architectural Review Commission Special Meeting was posted on
the City Hall bulletin board and City website not less than 24 hours prior to the meeting.
Melinda Gonzalez
Recording Secretary
PUBLIC NOTICES
Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the designated
office for inspection of records in connection with this meeting is the Development Services
Department, City Hall, 73-510 Fred Waring Drive, Palm Desert. Staff reports for all agenda
items and documents provided to a majority of the legislative bodies are available for public
inspection at City Hall and on the City’s website at www.cityofpalmdesert.org.
Americans with Disabilities Act: It is the intention of the City of Palm Desert to comply with
the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at
this meeting, or in meetings on a regular basis, you will need special assistance beyond what
is normally provided, the city will attempt to accommodate you in every reasonable manner.
Please contact the Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the
meeting to inform us of your needs and to determine if accommodation is feasible.
CITY OF PALM DESERT
DEVELOPMENT SERVICES DEPARTMENT
ARCHITECTURAL REVIEW COMMISSION MEMORANDUM
To: Honorable Chair and Members of the Commission
From: Rosie Lua, Planning Manager
Date: October 5, 2022 (Continued from September 13, 2022)
Case No: PP 18-0009 – Amendment #2 (SP/PP21-0002)
Subject: Consideration of an Amendment No. 2 to the DSRT SURF project (PP18-0009
and SP/PP21-0002), adding 45 hotel rooms including revisions to the interior
layout and exterior architecture of the hotel and surf center facility located at the
17.69-acre site within Desert Willow Golf Resort.
BACKGROUND
On November 14, 2019, the City Council approved the DSRT SURF Specific Plan (SP),
Precise Plan (PP), and Tentative Tract Map (TTM) by Resolution 2019-82 and adopted
Resolution No. 2019-83 certifying an Environmental Impact Report (EIR), SCH No.
2019011044, Mitigated Monitoring and Reporting Program, and adopted a Statement of
Overriding Consideration in evaluating potentially adverse environmental impacts. The land
use allowances in the Specific Plan included a six-acre surf lagoon, up to 350 hotel rooms,
and 88 residential villas.
On February 4, 2021, Desert Wave Ventures, LLC, applied for amendments to the approved
SP, PP, and TTM, including an addendum to the EIR. The proposed project included a 5.5-
acre surf lagoon and surf center facilities, 92 hotel rooms, 83 residential units, circulation,
parking, and landscaping on the 17.69-acre site within the Desert Willow Golf Resort, and an
off-site parking location in close proximity.
On January 27, 2022, the City Council approved the applicant’s request for amendments to
the DSRT SURF Project, Resolution No. 2022-09 approving Amendment No. 1 to the SP,
Precise Plan, Tentative Tract Map, and a Disposition and Development Agreement for DSRT
SURF.
On September 2, 2022, Desert Wave Ventures, LLC submitted revisions to the hotel and surf
center. The revised plans were prompted by the addition of 45 hotel rooms by inserting a new
floor between the third and fourth floors while staying within the same building envelope of the
hotel. More specifically, adding the additional floor resulted in a new row of windows and
balconies, and changed the visual articulation to the building. The massing and building envelope
of the hotel did not change from the originally approved project. Furthermore, the applicant has
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 2 of 11
October 5, 2022 (Continued from September 13, 2022)
identified new locations for murals, which have been added to the project as placeholders,
pending review by the Cultural Arts Committee.
On September 13, 2022, the ARC meeting did not have a quorum to proceed with the agenda
item, therefore, a special meeting was set for October 5, 2022.
PROJECT SUMMARY
A. Property Description:
The Project site is approximately 17.69 acres, located on the west side of Desert Willow
Drive, north of Country Club Drive, and south of the Desert Willow Clubhouse. The lot is
irregularly shaped and is bounded by the Desert Willow golf course on the west, south,
and east of the proposed Project. The existing Desert Willow Clubhouse parking lot borders
the northern property line. Approximately three (3) acres at the northeast corner of the site
are developed with parking lot improvements for the Desert Willow Clubhouse and the
remaining fourteen (14) acres of the site were mass graded as part of the Desert Willow
development but remain undeveloped.
B. Zoning and General Plan Designation:
Zone: DSRT SURF Specific Plan
General Plan: Resort and Entertainment/Suburban Retail
C. Adjacent Zoning and Land Use:
North: PR - 5 – Desert Willow Clubhouse/parking and golf course (Hole 18)
South: PR - 5 – Desert Willow golf course (Hole 15)
East: PR - 5 – Desert Willow golf course (Hole 7)
West: PR - 5 – The Westin Desert Willow Villas
Project Description
The project request is an amendment to the architecture for the approved DSRT SURF. The
changes are summarized below for the hotel and surf center facility.
Hotel:
The overall hotel building square footage and proposed height have changed slightly from the
approved project. The hotel building exterior has modified in response to interior layout
changes and response from market conditions.
The following are the interior layout modifications:
• Ground floor:
o The ground floor space of the lobby, restaurant, bar, and back of house spaces
has remained the same.
o Relocation of internal Stair #2 by one bay to create room for a suite on the 4th
and 5th floors.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 3 of 11
October 5, 2022 (Continued from September 13, 2022)
• Second floor:
o The second level of parking has been extended over the back of house area of
the hotel to create additional back of house space.
o Employee Lounge, restrooms, pool equipment, and administrative offices are
located on this mezzanine.
• Third floor:
o The third level meeting room size has been increased to 2,400 square feet with
a 1,000 square foot pre-function space. It incorporated the exterior patio space
into the meeting room footprint. This resulted in designing wrap around windows
at the meeting rooms overlooking the surf lagoon and patios, creating an indoor-
outdoor relationship under the shade of a deep overhang.
o The fitness center has been relocated to face onto the pool deck to have
connectivity to the pool deck area.
o The third level spa has been increased from 1,035 square feet to 1,200 square
feet.
• Fourth floor:
o This floor was added with the same layout and footprint of the typical guest room
floor. This new floor added 45 rooms for a total of 137 hotel rooms.
• Fifth floor:
o The suites at the northwest corner were rotated to provide views and balconies
overlooking the surf lagoon.
The following are the exterior architecture modifications:
East Elevation Changes
• Increased row of windows due to increase in the number of rooms in the hotel.
• Removal of exterior wall tile and replaced with stucco.
• Slight increase in roof elements as part of the revision.
• Metal Awnings – Changed metal awning design.
• Added Mural (art design is a placeholder).
• Balconies added at fourth story on right side.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 4 of 11
October 5, 2022 (Continued from September 13, 2022)
West Elevation Changes
• Increased row of windows due to increase in the number of rooms in the hotel.
• Removal of exterior wall tile, replaced with stucco.
• No roof elements or parapets were increased as part of the revision.
• Metal Awnings – Changed metal awning design.
• Third story, left side, meeting room expands onto patio.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 5 of 11
October 5, 2022 (Continued from September 13, 2022)
South Elevation Changes
• Increased row of windows due to increase in the number of rooms in the hotel.
• Reduction of exterior wall tile and replaced with stucco.
• Replaced balcony metal rails with glass.
• Podium element lowered.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 6 of 11
October 5, 2022 (Continued from September 13, 2022)
North Elevation Changes
• Stone removed from right side of garage entry.
• Third, fourth, and fifth stories simplified to sand colored single material.
• Awnings added and windows aligned.
• Suites at fourth and fifth stories rotated to face surf lagoon.
• Increased row of windows due to increase in the number rooms in the hotel.
• Removal of exterior wall tile, replaced with stucco.
• Reduction of stone veneer, replaced with stucco.
• Metal Awnings – Changed the metal awning design and added awnings.
• Removal of upper balcony area and extended lower balcony area.
• Reduction of plane changes due to increased window areas for added keys.
• Roof element changes at roof overhang facing surf center.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 7 of 11
October 5, 2022 (Continued from September 13, 2022)
Surf Center
The general comments related to the changes to the Surf Center include the following:
• Materials were simplified to tie to the hotel.
• Colors were generally lightened to tie to the hotel.
• The interior received some minor tweaks to the retail and sales counter areas to better
accommodate the guest experience on site with beverage and food sales,
consumption, and the flow of guest traffic.
East Elevation Changes
• Removal of wall tile, replace with stucco.
• Removal of metal panel and masonry block and replaced with stucco.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 8 of 11
October 5, 2022 (Continued from September 13, 2022)
West Elevation Changes
• Removal of wall tile/stone veneer, replace with stucco.
• Slight reduction of roof elements as part of the revision.
South Elevation Changes
• Removal of tall awning and extended lower awning to entry way (storefront includes
added windows.)
o The canopy was simplified to tie into the building architecture.
o The roof over the locker rooms was reduced since that height is not required
over the small spaces of the showers, restrooms, and changing areas.
• Removal of wall tile, replace with stucco.
• Removal of stone veneer and add a tile mosaic/mural design on shower wall area (art
design is a placeholder.)
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 9 of 11
October 5, 2022 (Continued from September 13, 2022)
North Elevation Changes
• Removal of wall tile, replace with stucco.
• Removal of metal panel and masonry block and replace with stucco.
• The storefront has been expanded to enhance the indoor-outdoor connection.
• Left wall has been identified as a possible mural location.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 10 of 11
October 5, 2022 (Continued from September 13, 2022)
ZONING ORDINANCE SUMMARY
The DSRT SURF Specific Plan is the regulatory document for the project site. The proposed
revisions to the project require ARC approval. Findings for ARC decisions are listed under
PDMC Section 25.68.040 – Findings of the ARC.
The design review findings pursuant to Section 25.68.040 are the following:
A. That the proposed development conforms to any legally adopted development
standards.
The proposed changes do not affect the project’s conformance with the legally adopted
development standards set forth by the DSRT SURF Specific Plan.
B. That the design and location of the proposed development and its relationship to
neighboring existing or proposed developments and traffic is such that it will not impair
the desirability of investment or occupation in the neighborhood; and that it will not
unreasonably interfere with the use and enjoyment of neighboring existing or proposed
developments and that it will not create traffic hazards or congestion.
The proposed modifications do not affect the architectural character of the project or
its relationship to existing or proposed development in the area. The changes do not
alter the area and massing. The total of 137 hotel rooms is within the land use
allowances that review density of development on the site. The proposed exterior
modifications will not impair the desirability of investment or occupation in the
neighborhood and will not unreasonably interfere with the use and enjoyment of
neighboring existing or proposed developments and will not create traffic hazards or
congestion.
C. That the design and location of the proposed development is in keeping with the
character of the surrounding neighborhood and is not detrimental to the harmonious,
orderly, and attractive development contemplated by this title and the General Plan of
the City.
The architectural modifications to the proposed development do not adversely affect
the compatibility of project with the character of the surrounding neighborhood and is
not detrimental to the harmonious, orderly, and attractive development contemplated
by the DSRT SURF Specific Plan, zoning code, and General Plan.
D. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of
good composition, materials, textures, and colors.
The proposed modifications alter the exterior material palette of the project, however,
the design still utilizes high-quality finishes and features a quality contemporary design
characterized by articulated building forms, varying building materials and textures,
varying rooflines, balconies, and desert compatible colors.
PP 18-0009 – Amendment #2 (SP/PP21-0002)
DSRT SURF
Page 11 of 11
October 5, 2022 (Continued from September 13, 2022)
E. That the proposed use conforms to all the requirements of the zone in which it is located
and all other applicable requirements.
The proposed modifications to the project do not affect the project’s conformance with
legally adopted development standards set forth by the DSRT SURF Specific Plan. The
project conforms with all applicable development standards.
F. That the overall development of the land shall be designed to ensure the protection of
the public health, safety, and general welfare.
The proposed modifications consist of exterior material changes and will not adversely
affect the public health, safety, and general welfare. All changes shall be designed to
comply with applicable Health and Safety Codes.
STAFF RECOMMENDATION
Staff recommends the ARC determines that the requirements of the Findings have been met
based on the analysis and approves the request.
Staff further recommends that modifications required by the ARC be added to the motion as
conditions of approval.
Attachment: 1. DSRT SURF – Proposed Changes
2. January 27, 2022, Approved Plans
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
1
2022-09-02
AREIAL VIEW
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
2
2022-09-02
SURF CENTER AREIAL VIEW
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
3
2022-09-02
HOTEL PERSPECTIVE 1
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
4
2022-09-02
HOTEL PERSPECTIVE 2
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
5
2022-09-02
HOTEL PERSPECTIVE 3
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
6
2022-09-02
SURF CENTER PERSPECTIVE
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
7
2022-09-02
HOTEL WEST ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
01 04 0203 PREVIOUS DESIGN
REVISED PROGRAM DESIGN
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
8
2022-09-02
HOTEL NORTH ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
02 03 0104
PREVIOUS DESIGN
REVISED PROGRAM DESIGN
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
9
2022-09-02
HOTEL EAST ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
02030104 PREVIOUS DESIGN
REVISED PROGRAM DESIGN
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
10
2022-09-02
HOTEL SOUTH ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
02 01 0304
PREVIOUS DESIGN
REVISED PROGRAM DESIGN
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
11
2022-09-02
SURF CENTER ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
03 0301 01 010202
PREVIOUS DESIGN WEST ELEVATION PREVIOUS DESIGN SOUTH ELEVATION
REVISED PROGRAM DESIGN WEST ELEVATION REVISED PROGRAM DESIGN SOUTH ELEVATION
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
12
2022-09-02
SURF CENTER ELEVATION COMPARISON
SCALE: 3/32”=1’
0 16’32’8’
02 01 0301030102
PREVIOUS DESIGN EAST ELEVATION PREVIOUS DESIGN NORTH ELEVATION
REVISED PROGRAM DESIGN EAST ELEVATION REVISED PROGRAM DESIGN NORTH ELEVATION
Benjamin Moore - Wind’s Breath
Benjamin Moore - Spice Gold
Benjamin Moore - Cabot Trail
Benjamin Moore - Spanish Brown
ELEVATION KEYNOTES
01
02
03
04
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
13
2022-09-02
STACKED RUBBLE
METAL PANEL
HORIZONTAL LOUVERS
SURF CENTER, HOTEL & MATERIAL PALETTE
OCOTILLO
PERFORATED METAL PANEL
FIXED LOW-E GLAZING
STOREFRONT GLAZING
GLASS RAILING
COMPOSITE WOOD SIDING/CEILING
METAL CANOPY
MASONRY BLOCK METAL FENCE
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
14
2022-09-02
PAINTED STUCCO
Benjamin Moore - Wind’s Breath
PAINTED STUCCO
Benjamin Moore - Spice Gold
PAINTED STUCCO
Benjamin Moore - Cabot Trail
PAINTED STUCCO
Benjamin Moore - Spanish Brown
PAINTED STUCCO
ACCENT PAINTS - DEEP INKY NAVY / DARK OLIVE
SURF CENTER, HOTEL & MATERIAL PALETTE
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
15
2022-09-02
HOTEL PORTE COCHERE LIGHTING RENDERING
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
16
2022-09-02
SURF CENTER ENTRY LIGHTING RENDERING
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
17
2022-09-02
SCALE: 3/32”=1’
0 16’32’8’
HOTEL ROOF PLAN
ELEVATION ABOVE ROOF = 3’ELEVATION ABOVE ROOF = 3’
ELEVATION ABOVE ROOF = 8’-6”ELEVATION ABOVE ROOF = 8’-6”
ELEVATION ABOVE ROOF = 12’-6”ELEVATION ABOVE ROOF = 12’-6”
ELEVATION ABOVE ROOF = 3’ELEVATION ABOVE ROOF = 3’
ELEVATION ABOVE ROOF = 6’-1”ELEVATION ABOVE ROOF = 6’-1”
ELEVATION ABOVE ROOF = 5’ELEVATION ABOVE ROOF = 5’
ELEVATION ABOVE ROOF = 10’ELEVATION ABOVE ROOF = 10’
ELEVATION ABOVE ROOF = 1’-9”ELEVATION ABOVE ROOF = 1’-9”
ROOFTOP ROOFTOP
MECHANICAL MECHANICAL
UNIT = 52” UNIT = 52”
ROOFTOP ROOFTOP
MECHANICAL MECHANICAL
UNIT = 52” UNIT = 52”
ROOFTOP ROOFTOP
MECHANICAL MECHANICAL
UNIT = 52” UNIT = 52”
ROOFTOP ROOFTOP
MECHANICAL MECHANICAL
UNIT = 52” UNIT = 52”
ROOFTOP ROOFTOP
MECHANICAL MECHANICAL
UNIT = 52” UNIT = 52”
ELEVATION ABOVE ROOF = 5’ELEVATION ABOVE ROOF = 5’
ELEVATION ABOVE ROOF = 3’ELEVATION ABOVE ROOF = 3’
ELEVATION ABOVE ROOF = 5’ELEVATION ABOVE ROOF = 5’
ELEVATION ABOVE ROOF = 9’-6”ELEVATION ABOVE ROOF = 9’-6”
ELEVATION ABOVE ROOF = 2’-6”ELEVATION ABOVE ROOF = 2’-6”
ELEVATION ABOVE ROOF = 5’ELEVATION ABOVE ROOF = 5’
ELEVATION ABOVE ROOF = 5’ELEVATION ABOVE ROOF = 5’
ELEVATION ABOVE ROOF = 12’-6”ELEVATION ABOVE ROOF = 12’-6”
ROOF DRAIN, TYPICALROOF DRAIN, TYPICALELEVATION ABOVE ROOF = 5’-6”ELEVATION ABOVE ROOF = 5’-6”ROOF SLOPE, TYPICALROOF SLOPE, TYPICAL ELEVATION ABOVE ROOF = 3’ELEVATION ABOVE ROOF = 3’
ROOFTOP ROOFTOP
PARAPETPARAPET
EXTENSIONEXTENSION
ROOFTOP CONDENSING UNITS ROOFTOP CONDENSING UNITS
TYPICAL = 52” TYPICAL = 52”
44 LF
26 LF
33 LF
26.5 LF
19.5 LF
15.5 LF
Scale
Job No.
Date
DSRT SURF
PALM DESERT, CA
DESERT WAVE VENTURES, LLC 2020-239
18
2022-09-02
SCALE: 1/8”=1’
0 16’8’
SURF CENTER ROOF PLAN
ELEVATION ABOVE ROOF = 8’ELEVATION ABOVE ROOF = 8’
ELEVATION ABOVE ROOF = 9’-6”ELEVATION ABOVE ROOF = 9’-6”
ELEVATION ABOVE ROOF = 7’ELEVATION ABOVE ROOF = 7’
ELEVATION ABOVE ROOF = 4’ELEVATION ABOVE ROOF = 4’
ROOF ACCESS HATCH = 15”ROOF ACCESS HATCH = 15”
ROOF DUCTING, TYPICAL = 24” MAX HEIGHTROOF DUCTING, TYPICAL = 24” MAX HEIGHT
ROOF DUCTING, TYPICAL = 24” MAX HEIGHTROOF DUCTING, TYPICAL = 24” MAX HEIGHT
ROOFTOP MECHANICAL UNIT, TYPICAL = 52” HEIGHTROOFTOP MECHANICAL UNIT, TYPICAL = 52” HEIGHT
ROOF DRAIN TYPICAL = 12” ABOVE ROOF ROOF DRAIN TYPICAL = 12” ABOVE ROOF