Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOLR22-0950 APPROVED PLANS.pdf
COVER SHEET SCOPE OF WORK GENERAL NOTES REV NAME DATE COMMENTS A AC AFCI AZIM COMP DC (E) ESS EXT INT MAG MSP (N) NTS OC PRE-FAB PSF PV RSD TL TYP V W AMPERE ALTERNATING CURRENT ARC FAULT CIRCUIT INTERRUPTER AZIMUTH COMPOSITION DIRECT CURRENT EXISTING ENERGY STORAGE SYSTEM EXTERIOR INTERIOR MAGNETIC MAIN SERVICE PANEL NEW NOT TO SCALE ON CENTER PRE-FABRICATED POUNDS PER SQUARE FOOT PHOTOVOLTAIC RAPID SHUTDOWN DEVICE TRANSFORMERLESS TYPICAL VOLTS WATTS PAGE REV: A 8/15/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 THOMAS HOGGATT 74183 ASTER DR, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-183HOGG SHEET DESIGNER: SOREN PETERSON CUSTOMER RESIDENCE: TEL. (760) 774-6932 APN: 624-201-016 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 TABLE OF CONTENTS PAGE # DESCRIPTION PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 LAYOUT PV-4.0 ELECTRICAL PV-5.0 SIGNAGE PV-1.0 LEGEND AND ABBREVIATIONS SCALE: NTS MAIN PANEL INVERTER(S) AC DISCONNECT(S) DC DISCONNECT(S) PV LOAD CENTER SUB-PANEL CB ATTIC VENT FLUSH ATTIC VENT PVC PIPE VENT SATELLITE DISH T-VENT CHIMNEY FIRE SETBACKS SUNRUN METER METAL PIPE VENT DEDICATED PV METER SERVICE ENTRANCE IQ COMBINER BOX HARDSCAPE PROPERTY LINEINTERIOR EQUIPMENT SHOWN AS DASHED PL RAIL STANDOFFS & FOOTINGS SOLAR MODULES SE MP SP LC SM PM INV AC DC VICINITY MAP • ALL WORK SHALL COMPLY WITH 2019 CRC/CBC/CEBC, MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2019 CEC. • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2019 CEC. • PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II MODULES, ARE CLASS A FIRE RATED. • RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER 690.12(B). • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 11.25 AMPS MODULE SHORT CIRCUIT CURRENT. • 17.57 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (a) & 690.8 (b)]. • CONSTRUCTION WORK HOURS OCTOBER 1ST TO APRIL 30TH MONDAY - FRIDAY 7:00AM TO 5:30PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED CONSTRUCTION WORK HOURS - MAY 1ST THROUGH SEPTEMBER 30TH MONDAY - FRIDAY 6:00AM TO 7:00PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED #SSTAMPCS #ESTAMPCS • SYSTEM SIZE: 10295W DC, 7600W AC • MODULES: (29) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPB-355M • INVERTERS: (1) SOLAREDGE TECHNOLOGIES: SE7600H-USSN • RACKING: ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTER: SNR-DC-01249 • MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. • MAIN BREAKER DERATE: REPLACE NEW 200A MAIN BREAKER WITH NEW 125 AMP MAIN BREAKER. PL PL PL PL PL PL PL PLPLPL PL PL PL PL PAGE REV: A 8/15/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 THOMAS HOGGATT 74183 ASTER DR, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-183HOGG SHEET DESIGNER: SOREN PETERSON CUSTOMER RESIDENCE: TEL. (760) 774-6932 APN: 624-201-016 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SITE PLAN ARRAY PITCH PV AREA (SQFT) AR-01 9° 431.4 AR-02 9° 137.3179° TRUE AZIM MAG AZIM 77°89° 167° PV-2.0 #SSTAMPSP #ESTAMPSP NOTES: x RESIDENCE DOES NOT CONTAIN ACTIVE FIRE SPRINKLERS. ARRAY DETAILS: x TOTAL ROOF SURFACE AREA: 2252 SQFT. x TOTAL PV ARRAY AREA: 568.7 SQ FT. x PERCENTAGE PV COVERAGE: (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE AREA) * 100 = 25.3% SITE PLAN - SCALE = 1/16" = 1' (E) RESIDENCE (N) ARRAY AR-01 (N) ARRAY AR-02 (E) DRIVEWAY ASTER DR (E) GATE (E) POOL FIRE SETBACKS (18" TYP) ROOF PATHWAYS (3' TYP) (E) SHED ROOF PATHWAYS (3' TYP) (E) PATIO COVER (E) GATE (E) GATE SE MP INV LADDER ACCESS POINT LADDER ACCESS POINT MODULES WERE DESIGNED AT LEAST 18'' FROM THE ROOF RIDGE. ELEVATION VIEW SCALE: NTS 11'15' 8" PAGE REV: A 8/15/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 THOMAS HOGGATT 74183 ASTER DR, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-183HOGG SHEET DESIGNER: SOREN PETERSON CUSTOMER RESIDENCE: TEL. (760) 774-6932 APN: 624-201-016 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-3.0 LAYOUT #SSTAMP DESIGN CRITERIA MAX DISTRIBUTED LOAD: 3 PSF SNOW LOAD: 0 PSF WIND SPEED: 130 MPH 3-SEC GUST. S.S.LAG SCREWS: 5/16"X4.5": 2.5" MIN EMBEDMENT STRUCTURAL NOTES: x INSTALLERS SHALL NOTIFY ENGINEER OF ANY POTENTIAL STRUCTURAL ISSUES OBSERVED PRIOR TO PROCEEDING W/ INSTALLATION. x IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS), THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS FOLLOWS: xx ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS TO BE REDUCED BY 50% xx ALLOWABLE OVERHANG INDICATED ON PLANS TO BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS 8" SOLAR MODULE SNAPNRACK RACKING AND STANDOFF MODULE ELEVATION DETAIL - SCALE: NTS D1 - AR-01 - SCALE: 1/8" = 1'-0" PITCH: 9° AZIM: 89° D2 - AR-02 - SCALE: 1/8" = 1'-0" PITCH: 9° AZIM: 179° ROOF INFO FRAMING INFO ATTACHMENT INFORMATION Name Type Height Type Max Span OC Spacing Detail Max Landscape OC Spacing Max Landscape Overhang Max Portrait OC Spacing Max Portrait Overhang Configurati on AR-01 FLAT, MEMBRANE [FLUSH MOUNT] - OMNIBASE 1 LAG - UR 1-Story 2X4 PRE-FABRICATED TRUSSES ' - 5"24"ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTER: SNR-DC-01249 6' - 0"2' - 4"4' - 0"1' - 11" STACKED AR-02 FLAT, MEMBRANE [FLUSH MOUNT] - OMNIBASE 1 LAG - UR 1-Story 2X4 PRE-FABRICATED TRUSSES 5' - 5"24"ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTER: SNR-DC-01249 6' - 0"2' - 4"4' - 0"1' - 11"STACKED 3'-11"27'-8"22'-4" 1'-6" 11'-7" 1'-11" 7"48'-6"2'-11" 7'-4" 5'-9" 1'-11" 4' TYP 4' TYP 14'-5"24'-3"1'-5" 1'-6" 5'-9" 4'-9"4USVDUVSBM 0OMZ NEW 125A MAIN BREAKER (END FED) FACILITY GROUND(N) 40A PV BREAKER AT OPPOSITE END OF BUSBAR M METER #: SCE 222013734663 120/240 VAC SINGLE PHASE SERVICE UTILITY GRID NEW 200A MAIN PANELFACILITY LOADS 3 12 JUNCTION BOX OR EQUIVALENT SOLAREDGE TECHNOLOGIES: SE7600H-USSN WITH REVENUE GRADE METERING 7600 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT PV MODULES LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPB-355M (29) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (15) OPTIMIZERS (1) SERIES OF (14) OPTIMIZERS SOLAREDGE POWER OPTIMIZERS P401 CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND 1NONE (4) 10 AWG PV WIRE NONE (1) 6 AWG BARE COPPER 2 3/4" EMT OR EQUIV.(4) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 3 3/4" EMT OR EQUIV.(2) 8 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 PAGE REV: A 8/15/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 THOMAS HOGGATT 74183 ASTER DR, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-183HOGG SHEET DESIGNER: SOREN PETERSON CUSTOMER RESIDENCE: TEL. (760) 774-6932 APN: 624-201-016 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-4.0 ELECTRICAL #ESTAMP RAIL 6-12 AWG BARE COPPER WIRE 5/16"-18 SS BOLT SS SPLIT LOCK WASHER (TORQUE TO 16 FT-LBS) SNAPNRACK GROUND LUG BONDING CHANNEL NUT SS BONDING PINS NOTE: x ALL HARDWARE IS INCLUDED FROM MANUFACTURER x A MINIMUM OF ONE GROUND LUG IS TO BE INSTALLED ON EVERY CONTINUOUS ROW OF MODULES x GROUNDING LUG MAY BE INSTALLED IN EITHER RAIL CHANNEL x GROUNDING LUG MAY BE INSTALLED SO GROUND WIRE IS PARALLEL OR PERPENDICULAR TO RAIL x ENSURE SPLIT LOCK WASHER IS INSTALLED ON TOP OF COPPER WIRE SNAPNRACK GROUNDING SCALE: NTS ALL CONDUCTORS ARE RATED 90 DEGREES CELSIUS. SYSTEM CHARACTERISTICS - INVERTER 1 SYSTEM SIZE: SYSTEM OPEN CIRCUIT VOLTAGE: SYSTEM OPERATING VOLTAGE: MAX ALLOWABLE DC VOLTAGE: SYSTEM OPERATING CURRENT: SYSTEM SHORT CIRCUIT CURRENT: 10295 W 15 V 400 V 480 V 25.74 A 30 A P401 OPTIMIZER CHARACTERISTICS: MIN INPUT VOLTAGE: 8 VDC MAX INPUT VOLTAGE: 60 VDC MAX INPUT ISC: 11.75 ADC MAX OUTPUT CURRENT: 15 ADC MODULE CHARACTERISTICS LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPB-355M: OPEN CIRCUIT VOLTAGE: MAX POWER VOLTAGE: SHORT CIRCUIT CURRENT: 355 W 40.6 V 34.6 V 11.25 A PAGE REV: A 8/15/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 THOMAS HOGGATT 74183 ASTER DR, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-183HOGG SHEET DESIGNER: SOREN PETERSON CUSTOMER RESIDENCE: TEL. (760) 774-6932 APN: 624-201-016 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SIGNAGE PV-5.0 #ESTAMP ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), NEC 2017: 705.12(B)(2)(3)(c) NOTES AND SPECIFICATIONS: x SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2019 CEC ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. x SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. x LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. x LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. x SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. x DO NOT COVER EXISTING MANUFACTURER LABELS. INVERTER 1 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 30 15 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): CEC 2019: 690.53, NEC 2017: 690.53 LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 1O FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): CEC 2019: 690.31(G)(3), 690.31(G)(4), NEC 2017: 690.31(G)(3), 690.31(G)(4) IFC 2012: 605.11.1.4 WARNING! SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): CEC 2019: 705.12(B)(3), NEC 2017: 705.12(B)(3) WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b), NEC 2017: 705.12(B)(2)(3)(b) LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUT DOWN SWITCH PER CODE(S): CEC 2019: 690.56(C)(3), NEC 2017: 690.56(C)(3), IFC 2012: 605.11.1, IFC 2018: 1204.5.3, CFC 2019: 1204.5.3 ELECTRICAL SHOCK HAZARD WARNING LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B), NEC 2017: 690.13(B) ! PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54, NEC 2017: 690.54 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): CEC 2019: 690.56(C)(1)(a), NEC 2017: 690.56(C)(1)(a) 4" 3" POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: 74183 ASTER DR, PALM DESERT, CA, 92260 SOLAR PANELS ON ROOF SERVICE ENTRANCE AND PV BREAKER DISCONNECT INVERTER (EXT) UR-40 RAIL | UR-60 RAIL FOR USE WITH SNAPNRACK ULTRA SERIES RAILS INSTALLED ATTACHMENT DETAIL SNAPNRACK OMNIBASE EXPLODED OMNIBASE, TOP DESCRIPTION:DRAWING NUMBER:SCALE:DESIGNER: APPROVED BY: REVISION: Sunrun South LLC 595 MARKET STREET, 29TH FLOOR Ɣ SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 Ɣ FAX (415) 580-6902 THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTERSNR-DC-01249 1 6/22/2021 NEW DETAIL A 8/2/2021 DC000595 B 10/25/2021 DC000727 REV: BDATE: DNS 10/25/2021 DRAFTER:M.AFFENTRANGER W.ARBUCKLE M.AFFENTRANGER MJA MJA MJA BIN: 5 Solar Mounting Solutions 15 8 " 11 2 " 11 2 " 21 4 " SNAPNRACK ULTRA RAIL STANDARD STANDOFF ON OMNIBASE FOR MOUNTING TO VARIOUS ROOF TYPES REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH "BIN" NUMBER ON THIS DRAWING 5 16 " S.S. LAG SCREW MUST EMBED A MIN. OF 21 2 " INTO STRUCTURAL MEMBER REFER TO SNAPNRACK INSTALLATION MANUAL FOR 5 16 " HARDWARE TORQUE SPECIFICATIONS SNAPNRACK OMNIBASE CAN MOUNT IN ANY ORIENTATION ON THE ROOF RAILS CAN MOUNT ON ANY SIDE OF THE STANDOFF POST FOR LEVELING DETAILS, REFER TO SNAPNRACK DETAIL DRAWING "SNR-DC-00334 ULTRA RAIL, COMPONENT DETAIL, LEVELING SPACER ON STANDOFF" AND "SNR-DC-00447 ULTRA RAIL, COMPONENT DETAIL, UR LEVELING SPACER" *A POURED SEALANT-STYLE FLASHING MAY BE USED WHEN INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS SNAPNRACK, OMNIBASE SNAPNRACK STANDOFF, LENGTH VARIES SNAPNRACK, UR STANDOFF CLAMP ASSEMBLY. VARIES FOR FLUSH AND TILT APPLICATIONS MODULE HEIGHT OFF ROOF, RANGE: UR-40: 73 4 " - 87 8 " UR-60: 83 8 " - 91 2 " (SHOWN FOR 7" STANDOFF, ADJUST PER STANDOFF LENGTH) .70 BASE HEIGHT: 4.00 3.00 21 2 " MIN. EMBEDMENT INTO WOOD RAFTER 7" STANDOFF SHOWN, LENGTH VARIES SNAPNRACK, ULTRA RAIL (UR-40 SHOWN) SNAPNRACK, ULTRA RAIL (UR-40 SHOWN) STRUCTURAL MEMBER, WOOD RAFTER, TYP. ROOF DECKING, TYP. *FLASH STANDOFF APPROPRIATELY. 1" VENT PIPE FLASHING SHOWN, VARIES BY APPLICATION SNAPNRACK RUBBER RAIN COLLAR FOR 1" CONE FLASHINGS 5 16 " S.S. LAG SCREW WITH S.S. FLAT WASHER. CHOOSE LENGTH FOR PROPER EMBEDMENT 5 16 " S.S. LAG SCREW WITH S.S. FLAT WASHER. CHOOSE LENGTH FOR PROPER EMBEDMENT STRUCTURAL MEMBER, WOOD RAFTER, TYP. ROOF DECKING, TYP. ST O R E D G E ® solaredge.com Optimized battery storage with HD-Wave technology 5HFRUGEUHDNLQJZHLJKWHGHIÀFLHQF\ZLWK 200% DC oversizing Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020, per article 690.11 and 690.12 Embedded revenue grade production data, ANSI C12.20 Class 0.5 6PDOOOLJKWZHLJKWDQGHDV\WRLQVWDOO 0RGXODUGHVLJQIXWXUHUHDG\ZLWKRSWLRQDO upgrades to: Multi-inverter(*), scalable storage solution Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US 12-25 YEARWARRANTY DC-coupled storage for full or partial home backup Built-in consumption monitoring Direct connection to the SolarEdge smart EV charger SE3000H-US SE3800H-US SE6000H-US SE7600H-US UNITS OUTPUT - AC ON GRID Rated AC Power 3000 3800 6000 7600 W Maximum AC Power Output 3000 3800 6000 7600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max)59.3 - 60 - 60.5(2)Hz Maximum Continuous Output Current 12.5 16 25 32 A GFDI Threshold 1A 7RWDO+DUPRQLF'LᐎRUWLRQ7+'<3 % Power Factor DGMXᐎDEOHWR 8WLOLW\0RQLWRULQJ,VODQGLQJ3URWHFWLRQ&RXQWU\&RQÀJXUDEOH7KUHVKROGV Yes Charge Battery from AC (if Allowed)Yes Typical Nighttime Power Consumption <2.5 W OUTPUT - AC BACKUP(3) Rated AC Power in Backup Operation 2400 3050 4800 6100 W Peak AC Power (<10 sec) in Backup Operation 2700 3400 5400 6900 W AC L-L Output Voltage Range in Backup 211-264 Vac AC L-N Output Voltage Range in Backup 105-132 Vac AC Frequency Range in Backup (min - nom - max) 55 - 60 - 65 Hz Maximum Continuous Output Current in Backup Operation 10 12.7 20 25.5 A Peak AC Current (<10sec) in Backup Operation 11.25 14.2 22.5 30 A GFDI 1A THD <5 % OUTPUT - SMART EV CHARGER AC Rated AC Power 9,600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max) 59.3-60-60.5 Hz 0D[LPXP&RQWLQXRXV2XWSXW&XUUHQW#9JULG39DQGEDWWHU\40 Aac INPUT - DC (PV AND BATTERY) Transformer-less, Ungrounded Yes Max Input Voltage 480 Vdc Nom DC Input Voltage 380 400 Vdc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection NƼ6HQVLWLYLW\ INPUT - DC (PV) Maximum DC Power 6000 7600 12000 15600 W Maximum Input Current(4)8.5 10.5 16.5 20 Adc 0D[,QSXW6KRUW&LUFXLW&XUUHQW 45 Adc 0D[LPXP,QYHUWHU(FLHQF\99.2 % &(&:HLJKWHG(FLHQF\99 % 2-pole Disconnection Yes INPUT - DC (BATTERY) 6XSSRUWHG%DWWHU\7\SHV /*&KHP5(68+ 1XPEHURI%DWWHULHVSHU,QYHUWHU 1 or 2(5) Maximum Battery Capacity per Inverter 19.6 kWh Continuous Power Per Inverter 5000 W Peak Power 6900 W Max Input Current @240V 18 Adc 2-pole Disconnection Yes Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) SMART ENERGY CAPABILITIES Consumption Metering Built - in(6) %DWWHU\6WRUDJH With Backup Interface for service up to 200A; Up to 3 inverters*N:EDFNXSSRZHU*, and 60kWh EDFNXSFDSDFLW\* EV Charging 'LUHFWFRQQHFWLRQWR6PDUW(9FKDUJHU ADDITIONAL FEATURES 6XSSRUWHG&RPPXQLFDWLRQ,QWHUIDFHV 56(WKHUQHW:L)LRSWLRQDO&HOOXODU(7) 5HYHQXH*UDGH0HWHULQJ$16,&Built - in(6) Integrated AC, DC and Communication Connection Unit Yes Inverter Commissioning ZLWKWKH6HW$SSPRELOHDSSOLFDWLRQXVLQJEXLOWLQ:L)L$FFHVV3RLQWIRUORFDOFRQQHFWLRQ '&9ROWDJH5DSLG6KXWGRZQ39DQG%DWWHU\Yes, according to NEC 2014, NEC 2017 and NEC 2020 690.12 STANDARD COMPLIANCE 6DIHW\8/8/6$8/%8/8/&6$ *ULG&RQQHFWLRQ6WDQGDUGV IEEE1547, Rule 21, Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS $&2XWSXW&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* (9$&2XWSXW&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* '&,QSXW39&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* '&,QSXW%DWWHU\&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* Dimensions with Connection Unit (HxWxD);;;; LQPP Weight with Connection Unit OENJ Noise < 25 dBA Cooling Natural Convection Operating Temperature Range WRWR(7)Ü)Ü& Protection Rating NEMA 4X © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 11/2020/V01/ENG NAM. Subject to change without notice. 3HQGLQJÀUPZDUHXSJUDGH 7KHVHVSHFLÀFDWLRQVDSSO\WRLQYHUWHUVZLWKSDUWQXPEHUV6([[[[+866[[[[[RU6(+8666+[[[[DQGFRQQHFWLRQXQLWPRGHOQXPEHU'&'3+863[+)[ )RURWKHUUHJLRQDOVHWWLQJVSOHDVHFRQWDFW6RODU(GJHVXSSRUW (3) Not designed for standalone applications and requires AC for commissioning $KLJKHUFXUUHQWVRXUFHPD\EHXVHGWKHLQYHUWHUZLOOOLPLWLWVLQSXWFXUUHQWWRWKHYDOXHVVWDWHG :KHQFRQQHFWLQJWZR/*&KHP5(68EDWWHULHVHDFKEDWWHU\PXVWKDYHDGLIIHUHQWSDUWQXPEHU )RUFRQVXPSWLRQPHWHULQJFXUUHQWWUDQVIRUPHUVVKRXOGEHRUGHUHGVHSDUDWHO\6($&71$RU6($&71$XQLWVSHUER[ )RUERWK\UDQG\UGDWDSODQV Ã&XVWRPHULVUHVSRQVLEOHIRUYHULI\LQJWKDWWKHVLWHORFDWLRQKDVDGHTXDWHPRELOHFRYHUDJHE\WKHWKLUGSDUW\VHUYLFHSURYLGHUSULRUWRDQ\LQVWDOODWLRQE\DFFHVVLQJ https://www.solaredge.com/ ֿ products/communication/cellular-communication-options#/ Ã6RODU(GJHVKDOOQRWEHUHVSRQVLEOHRUOLDEOHIRUXQDYDLODELOLW\RUGLVFRQWLQXDQFHRIQHWZRUNFRYHUDJHLQDVSHFLÀFDUHDRUUHJLRQDQ\QHWZRUNGRZQWLPHRUSHUPDQHQWVHUYLFHVKXWGRZQ )XOOSRZHUXSWRDWOHDVW&)IRUSRZHUGHUDWLQJLQIRUPDWLRQUHIHUWRKWWSVZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVVHWHPSHUDWXUHGHUDWLQJQRWHQDSGI Connecting CTs to the Revenue Grade and Consumption Meter 6LQJOH3KDVH(QHUJ\+XE,QYHUWHU ZLWK3ULVP7HFKQRORJ\ Grid Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) PO W E R O P T I M I Z E R solaredge.com PV power optimization at the module-level 6SHFLÀFDOO\GHVLJQHGWRZRUNZLWK6RODU(GJH LQYHUWHUV 8SWRPRUHHQHUJ\ )OH[LEOHV\VWHPGHVLJQIRUPD[LPXPVSDFH XWLOL]DWLRQ )DVWLQVWDOODWLRQZLWKDVLQJOHEROW 1H[WJHQHUDWLRQPDLQWHQDQFHZLWKPRGXOH OHYHOPRQLWRULQJ 0HHWV1(&UHTXLUHPHQWVIRUDUFIDXOW SURWHFWLRQ$)&,DQG3KRWRYROWDLF5DSLG 6KXWGRZQ6\VWHP39566 0RGXOHOHYHOYROWDJHVKXWGRZQIRULQVWDOOHU DQGÀUHÀJKWHUVDIHW\ 6XSHULRUHIÀFLHQF\ 0LWLJDWHVDOOW\SHVRIPRGXOHPLVPDWFKORVVHV IURPPDQXIDFWXULQJWROHUDQFHWRSDUWLDO VKDGLQJ Power Optimizer For North America 33333333 25 YEARWARRANTY 6RODU(GJH7HFKQRORJLHV/WG$OOULJKWVUHVHUYHG62/$5('*(WKH6RODU(GJHORJR237,0,=('%<62/$5('*(DUHWUDGHPDUNVRUUHJLVWHUHGWUDGHPDUNVRI6RODU(GJH7HFKQRORJLHV,QF $OORWKHUWUDGHPDUNVPHQWLRQHGKHUHLQDUHWUDGHPDUNVRIWKHLUUHVSHFWLYHRZQHUV'DWH9(1*1$06XEMHFWWRFKDQJHZLWKRXWQRWLFH )RUGHWDLOHGᐎULQJVL]LQJLQIRUPDWLRQUHIHUWRKWWSZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVᐎULQJBVL]LQJBQDSGI ,WLVQRWDOORZHGWRPL[333ZLWK33333LQRQHᐎULQJ $ᐎULQJZLWKPRUHWKDQRSWLPL]HUVGRHVQRWPHHW1(&UDSLGVKXWGRZQUHTXLUHPHQWVVDIHW\YROWDJHZLOOEHDERYHWKH9UHTXLUHPHQW )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKᐎULQJLV: )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKᐎULQJLV: Power Optimizer For North America 33333333 Optimizer model (typical module compatibility) P320 (for 60-cell modules) P340 (for high- power 60-cell modules) P370 (for higher- power 60 and 72- cell modules) P400 (for 72 & 96-cell modules) P401 (for high power 60 and 72 cell modules) P405 (for high- voltage modules) P485 (for high- voltage modules) P505 (for higher current modules) INPUT 5DWHG,QSXW'&3RZHU : $EVROXWH0D[LPXP,QSXW9ROWDJH 9RFDWORZHᐎWHPSHUDWXUH 9GF 03372SHUDWLQJ5DQJH 9GF 0D[LPXP6KRUW&LUFXLW&XUUHQW (Isc) Adc 0D[LPXP'&,QSXW&XUUHQW Adc 0D[LPXP(FLHQF\% :HLJKWHG(FLHQF\98.8 % 2YHUYROWDJH&DWHJRU\II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) 0D[LPXP2XWSXW&XUUHQW Adc 0D[LPXP2XWSXW9ROWDJH 9GF OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) 6DIHW\2XWSXW9ROWDJHSHU3RZHU 2SWLPL]HU 9GF STANDARD COMPLIANCE (0&)&&3DUW&ODVV%,(&,(& 6DIHW\,(&FODVV,,VDIHW\8/ 0DWHULDO 8/9895HVLᐎDQW 5R+6 Yes INSTALLATION SPECIFICATIONS 0D[LPXP$OORZHG6\ᐎHP 9ROWDJH 9GF &RPSDWLEOHLQYHUWHUV $OO6RODU(GJH6LQJOH3KDVHDQG7KUHH3KDVHLQYHUWHUV 'LPHQVLRQV:[/[+ [[[[ [[ [[ [[ [[[[[[[[ [[ mm LQ :HLJKWLQFOXGLQJFDEOHV JUOE ,QSXW&RQQHFWRU 0& 6LQJOHRUGXDO 0&0& ,QSXW:LUH/HQJWK RU RU PIW 2XWSXW:LUH7\SH&RQQHFWRU 'RXEOH,QVXODWHG0& 2XWSXW:LUH/HQJWK PIW 2SHUDWLQJ7HPSHUDWXUH5DQJH Ü&Ü) 3URWHFWLRQ5DWLQJ ,31(0$3 5HODWLYH+XPLGLW\% 5DWHGSRZHURIWKHPRGXOHDW67&ZLOOQRWH[FHHGWKHRSWLPL]HU´5DWHG,QSXW'&3RZHUµ0RGXOHVZLWKXSWRSRZHUWROHUDQFHDUHDOORZHG 1(&UHTXLUHVPD[LQSXWYROWDJHEHQRWPRUHWKDQ9 )RURWKHUFRQQHFWRUW\SHVSOHDVHFRQWDFW6RODU(GJH )RUGXDOYHUVLRQIRUSDUDOOHOFRQQHFWLRQRIWZRPRGXOHVXVH310'050,QWKHFDVHRIDQRGGQXPEHURI39PRGXOHVLQRQHᐎULQJLQᐎDOOLQJRQH3GXDOYHUVLRQSRZHURSWLPL]HUFRQQHFWHG WRRQH39PRGXOH:KHQFRQQHFWLQJDVLQJOHPRGXOHVHDOWKHXQXVHGLQSXWFRQQHFWRUVZLWKWKHVXSSOLHGSDLURIVHDOV /RQJHULQSXWVZLUHOHQJWKDUHDYDLODEOHIRUXVH)RUPLQSXWZLUHOHQJWKRUGHU3[[[/[[[ )RUDPELHQWWHPSHUDWXUHDERYH&)SRZHUGHUDWLQJLVDSSOLHG5HIHUWR3RZHU2SWLPL]HUV7HPSHUDWXUH'H5DWLQJ7HFKQLFDO1RWHIRUPRUHGHWDLOV PV System Design Using a SolarEdge Inverter(7)(8) Single Phase HD-Wave Single phase Three Phase for 208V grid Three Phase for 277/480V grid 0LQLPXP6WULQJ/HQJWK 3RZHU2SWLPL]HUV 333 338 333 8 0D[LPXP6WULQJ/HQJWK3RZHU2SWLPL]HUV (9) 0D[LPXP3RZHUSHU6WULQJ ZLWK 6(866( 86 : 3DUDOOHO6WULQJVRI'LHUHQW/HQJWKVRU2ULHQWDWLRQV Yes 8/16/2022 RE: Structural Certification for Installation of Residential Solar THOMAS HOGGATT:74183 ASTER DR, PALM DESERT, CA, 92260 Attn: To Whom It May Concern Design Criteria Code 2019 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 10 psf V 130 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Composition shingle roofing over roof plywood supported by 2X4 Trusses at 24 inches. The slope of the roof was approximated to be 9 degrees. After review and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. projects@evengineersnet.com http://www.evengineersnet.com Structural Letter for PV Installation Date:8/16/2022 Job Address:74183 ASTER DR PALM DESERT, CA, 92260 Job Name:THOMAS HOGGATT Job Number:220815HT Scope of Work Table of Content Sheet 1 Cover 2 Attachment Uplift checks 3 Roof Framing Check 4 Seismic Check and Scope of work Engineering Calculations Summary Code 2019 California Building Code (ASCE 7-16) Risk category II Roof Dead Load Dr 10 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S 0 psf Wind Load (component and Cladding) V 130 mph Exposure C References NDS for Wood Construction Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. projects@evengineersnet.com http://www.evengineersnet.com Wind Load Cont. 130 mph ASCE 7-16 Figure 26.5-1B C 1.0 ASCE 7-16 Sec 26.8.2 0.85 ASCE 7-16 Table 26.10-1 0.85 ASCE 7-16 Table 26.6-1 0.99 ASCE 7-16 Table 26.9-1 31.05 psf 9.0 Degrees 1.1 0.6 (Wind Tunnel value) Uplift (W)Zone(1)Zone(2r)Zone(2e)Zone(3) Fig. 30-3-2 GCp=-2.1 -2.6 -2.7 -2.7 Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-43.04 -53.29 -55.34 -55.34 GCp=0.3 Figure 30.3-2 P=qh(GCp)(γE)(γa)=6.15 Equation 29.4-7 Rafter Attachments: 0.6D+0.6W (CD=1.6) Connection Check Attachement max. spacing=6 ft 5/16" Lag Screw Withdrawal Value=266 lbs/in Table 12.2A - NDS 2.5 in DFL Assumed Allowable Capacity=760 lbs (Lag Bolt) Zone Trib Width Area (ft)Uplift (lbs)Down (lbs) Zone(1)6 16.5 455.8 151.0 Zone(2r)6 16.5 557.3 151.0 Zone(2e)6 16.5 577.6 151.0 Zone(3)6 16.5 577.6 151.0 Conservative Max=577.6 <760 CONNECTION IS OK Risk Category = KZ = Kd = Ke = 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II V= Exposure = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs γE= γa= KZt = qh= 0.00256KzKztKdKeV2= Pitch = Lag Screw Penetration projects@evengineersnet.com http://www.evengineersnet.com Vertical Load Resisting System Design Roof Framing Trusses Snow Load Fully Exposed pg=0 psf Ct =1.1 Ce =0.9 Is =1.0 ps = 0 psf pf = 0 psf pfmin. = 0.0 psf 0 plf Max Length, L =9.4 ft Tributary Width, WT =24 in RLL =20 psf 19.75 plf Dr =10 psf 20 plf PvDL =3 psf 6 plf Load Case: DL w=26 plf M=177 lb-ft Mallowable = Sx x Fb'=309 lb-ft >177 lb-ft OK Load Case: DL+RLL DL+Lr=40 plf Mdown=271 lb-ft Mallowable = Sx x Fb'=429 lb-ft >271 lb-ft OK Load Case: DL+S DL+S=26 plf Mdown=177 lb-ft Mallowable = Sx x Fb'=412 lb-ft >177 lb-ft OK Load Case: DL+0.6W w=33.4 plf Mu=228 lb-ft Mallowable = Sx x Fb' (wind)=549 lb-ft >228 lb-ft OK Load Case: 0.6DL+0.6W w=28.0 plf Mu=191 lb-ft Mallowable = Sx x Fb' (wind)=549 lb-ft >191 lb-ft OK DL+0.45W+0.75(RLL or S)35 plf Mdown=240 lb-ft Mallowable = Sx x Fb'=549 lb-ft >240 lb-ft OK Member Capacity DF-L No.2 2X4 CL CF Ci Cr Fb =900 psi 1.0 1.3 1.0 1.15 1346 psi Fv =180 psi N/A N/A 1.0 N/A 180 psi E =1600000 psi N/A N/A 1.0 N/A 1600000 psi Emin =580000 psi N/A N/A 1.0 N/A 580000 psi Depth, d =3.5 in Width, b =1.5 in Cross-Sectonal Area, A =5.25 in2 Moment of Inertia, Ixx =5.35938 in4 Section Modulus, Sxx =3.0625 in3 Allowable Moment, Mall = Fb'Sxx =343.4 lb-ft DCR=Mu/Mall =0.63 < 1 Satisfactory Allowable Shear, Vall = 2/3Fv'A =630.0 lb DCR=Vu/Vall =0.29 < 1 Satisfactory Design Value Adjusted Value projects@evengineersnet.com http://www.evengineersnet.com Siesmic Loads Check Roof Dead Load 10 psf % or Roof with Pv 25.3% Dpv and Racking 3 psf Average Total Dead Load 10.8 psf Increase in Dead Load 3.4%OK Limits of Scope of Work and Liability The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. We have based our structural capacity determination on information in pictures and a drawing set titled PV plans - THOMAS HOGGATT. The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments. The calculations produced for this structure's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures. projects@evengineersnet.com http://www.evengineersnet.com Updated August 2021 The City of Palm Desert has implemented an expedited solar permitting process for solar photovoltaic systems 20kW AC or less. This checklist is required to be attached to all solar permits 20kW or less and the below requirements in compliance at the time of inspection. *HQHUDO5HTXLUHPHQWV •The photovoltaic system size is 20kW AC CEC rating or less. •The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. The roof structure must be sound with no more that two (2) roof covering materials. •The photovoltaic system is utility interactive (Battery storage is allowed). •Ground mounted PV system are not eligible and require a plan review. Planning Department Requirements •Existing Main Service Panel Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. •Maximum height of “tilted” panels shall not exceed eighteen (18) inches. •All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. •The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. •Modules shall be flush with one another and gaps between panels shall be minimized. •Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. Electrical Requirements •No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter: No more than two strings per MPPT input where source circuit fusing is not included Fuses (if needed) are rated to the series fuse rating of the PV module No more than one non-inverter-integrated DC combiner is utilized per inverter •For central inverter systems: No more than two inverters are utilized. •The PV system is connected to the load side of the utility distribution equipment. •Load calculations are required when de-rating an Main Service or Sub Panel. •A Solar PV Standard Plan (California Solar Permitting Guide) and supporting documentation (if applicable). Structural Requirements •A completed Structural Criteria and/or supporting documentation is attached to the plan set. •All ballast designed systems require a formal plan review with supporting structural design and justification. •An inspector may require to sample roof attachment hardware for depth and proper materials. Fire Safety Requirements •Clear access pathways provided. •Fire classification photovoltaic system is provided. •All required marking and labels are provided. •A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings Checklist - 20kW or less 8/18/22Applicant Signature: _____________________________________Date:_______________ Project Address: __________________________________________________________74183 ASTER DR PALM DESERT PERMIT CENTER 73510 Fred Waring Drive, Palm Desert, California 92260 (760) 776-6435 – permitcenter@cityofpalmdesert.org PHOTOVOLTAIC SMALL RESIDENTIAL 20kW OR LESS Minimum Submittal Requirements (Small Residential Rooftop Systems —20kW or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 20 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. 1. Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 20kW or less: Planning Department approval is required for over 20kW or when doubling main panel. Please coordinate directly at (760) 776-6483. Fire Marshall approval is not required for small residential rooftop systems at this time. Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2. Building Permit Application Form A permit application can be obtained in person or downloaded from the Department’s website at: www.pdpermits.com . 3. Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria’s, standard plan review timetables apply. Please consult a licensed designed professional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. 4. Project Submittal All projects must be submitted digitally to the following link: http://cpdftp.org/filedrop/PermitCenter or visit www.pdpermits.com for a direct link. 5. Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. The definition of “qualifying small residential rooftop solar systems” is all of the following: A solar energy system that is no larger than 20 kilowatts alternating current nameplate rating or 30 kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amen ded, renumbered, or re-designated from time to time. A solar energy system that is installed on a single or duplex family dwelling. (Must be a permitted roof structure) A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. New installations only. (Additions or alteration are through regular plan review timelines) PHOTOVOLTAIC SMALL RESIDENTIAL 20kW OR LESS Page 2 Updated June 2021 6. Plan Review and Permit Fees Permit Fees are approximately $266 depending on archiving materials. 7. Minimum Plan Set Requirements Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal’s Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. Product Specifications and Literature Provide all manufacturers’ specifications on all inverters, solar panels, combiner and disconnect boxes and solar panel anchorage system to be used. Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 20kW in size or smaller and can be downloaded within the City’s website. All submittals must be signed by a C-10 (Electrical Contractor) or C-46 (Solar Contractor) or licensed design professional. Electrical Plans should include the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings . Make and model of inverter(s) and/or combiner box if used. Single line diagram of system . List existing main panel ampage and new main panel or sub-panel ampage on the single line diagram, if applicable. Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. If batteries are to be installed, include them in the diagram and show their locations and venting . Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705 . Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department’s website or obtained in person. Projects not within the scope of this structural criteria may req uire a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: PHOTOVOLTAIC SMALL RESIDENTIAL 20kW OR LESS Page 3 Updated June 2021 The type of roof covering and the number of roof coverings installed. Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system . As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760) 776- 6420 – Monday through Friday (8AM to 4PM) (same day inspection will not be provided) Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 10 kilowatts. If PV system is over 10 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. Conductor’s ratings and sizes match plans. Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can save time and money by following these tips. Take time to review permit requirements of the local jurisdiction. Permitting rules and processes differ am ong different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. Contact the local electric utility early in the permitting process (solar PV installations). Local electric utilities have a completely separate approval process from the local jurisdiction’s permitting process. Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. Make sure that the solar installation that is built matches the submitted plans. The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections.