HomeMy WebLinkAboutELEC22-0072 PLANS-SPECS.pdfPr o j e c t N a m e Date Drawn: Drawn By: Revision No. Sheet No. 75 - 1 8 1 M e d i t e r r a n e a n A v e . Re n o v a E n e r g y C o r p Pa l m D e s e r t , C A 9 2 2 1 1 (7 6 0 ) 5 6 8 - 3 4 1 3 Co n t r a c t o r ' s L i c e n s e # 9 1 0 8 3 6 0 C1 COVER SHEET PROJECT CONTACTS: CONTRACTOR: RENOVA permits@renovaenergy.com Primary Contact: Matthew De La Torre Secondary Contact: Amy Dominguez SHEET INDEX GENERAL C1 COVER SHEET S1 SITE PLAN ELECTRICAL E1 PROJECT SIGNAGE E2 SINGLE LINE DATA SHEET BATTERY AC DISCONNECT DAVID THORNBURY 08/08/2022 APPLICABLE CODES: California Residential Code 2019 California Electrical Code 2019 National Electrical Code 2017 2019 California Amendments City of Palm Desert Municipal Code CONSTRUCTION HOURS: OCTOBER 1 THRU APRIL 30 Monday - Friday 7:00 am - 5:30 pm Saturday 8:00 am - 5:00 pm Sunday NOT ALLOWED Government Code Holidays NOT ALLOWED MAY 1 THRU SEPTEMBER 30 Monday - Friday 6:00 am - 7:00 pm Saturday 8:00 am - 5:00 pm Sunday NOT ALLOWED Government Code Holidays NOT ALLOWED SCOPE OF WORK: Project consists of installing a battery system comprised of: Sunpower SunVault, conduits w/fittings and wires and all necessary electrical equipment to provide a power source for the customer. VICINITY MAP Riverside County: APN 655100002 73 7 5 3 A G A V E L A N E PA L M D E S E R T , C A . 9 2 2 6 0 RI C H A R D S I M O N S ( E S S 4 5 5 3 4 ) EL I Z A B E T H M A N G ALL CONSTRUCTION SHALL COMPLY WITH THE 2019 CALIFORNIA RESIDENTIAL CODE, 2019 ELECTRICAL CODE BASED ON THE 2017 NATIONAL ELECTRICAL CODE. 200 AMP SUNPOWER SUNVAULT HUB+ SV-HUB-01-A 120/240 VOLT LOCATED INSIDE GARAGE NOTES: 1. THIS IS AN AC COUPLED STORAGE SYSTEM WITH BUILT-IN AC/DC INVERTER. STORAGE 26-2 (KWh) SUNPOWER ENERGY SYSTEM WITH SUNPOWER SUNVAULT HUB+. 2. THIS SYSTEM WILL BE INSTALLED INSIDE GARAGE. 3. BATTERY IS CONTAINED IN A SELF-CONTAINED NEMA 3R ENCLOSURE. 4. SYSTEM TO BE ANCHORED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. 5. BUILDING IS A SINGLE STORY DWELLING. 6. VISIBLE EXPOSED CONDUIT SHALL BE PAINTED TO MATCH. 7. SYSTEM INSTALLATION SHALL BE PER NEC 690 & 702 AND IS SUBJECT TO FIELD INSPECTION BY THE CITY. 8. HEAT ALARM TO BE INTERCONNECTED WITH EXISTING SMOKE ALARM. HEAT DETECTOR #HD135F 120 VOLT AC LOCATED INSIDE GARAGE NEXT TO ESS STORAGE 26-2 SUNPOWER ENERGY STORAGE SYSTEM #SPWR-M0011 120/240 VOLT LOCATED INSIDE GARAGE BATTERY SYSTEM SIZE: 26.0 kWh CEC AC SYSTEM SIZE: 13.584 kW AC 60 AMP AC DISCONNECT SQUARE-D #HU462AWK 600 VOLT; 4 POLE LOCATED NEXT TO MAIN EXISTING PV ARRAY EXISTING 100 AMP AC DISCONNECT 120/240 VOLT LOCATED NEXT TO MAIN DRI V E W A Y AG A V E L A N E EXISTING METER #223000-002588 EXISTING 400 AMP MAIN SERVICE PANEL 120/240 VOLT, 1Φ, 3W LOCATED ON SOUTHEAST EXTERIOR WALL PRO P E R T Y L I N E SIDE Y A R D POOL PR O P E R T Y L I N E SI D E Y A R D PR O P E R T Y L I N E BA C K Y A R D 75 - 1 8 1 M e d i t e r r a n e a n A v e . Re n o v a E n e r g y C o r p Pa l m D e s e r t , C A 9 2 2 1 1 (7 6 0 ) 5 6 8 - 3 4 1 3 Sheet No. Revision No. Date Drawn: Drawn By: Pr o j e c t N a m e : Co n t r a c t o r ' s L i c e n s e # 9 1 0 8 3 6 0 S1 SITE PLAN DAVID THORNBURY 08/08/2022 73 7 5 3 A G A V E L A N E PA L M D E S E R T , C A . 9 2 2 6 0 RI C H A R D S I M O N S ( E S S 4 5 5 3 4 ) EL I Z A B E T H M A N G NOTE: RED BACKGROUND WITH WHITE LETTERING 3/8" LETTER HEIGHT PROJECT SIGNAGE NOTES & PANEL SCHEDULE MAIN PANEL: MECHANICALLY ATTACHED WARNING THIS FACILITY IS EQUIPPED WITH A PHOTOVOLTAIC GENERATOR LOCATED ON THE ROOF AS SHOWN. THE SYSTEM MAY BE DISCONNECTED FROM THE FACILITY PER THE AC DISCONNECT AS SHOWN. VA LOAD A B TYPE C.B. BUS CO D E N R L TR P CONNECTED VA (CODE L): 29328 29.3 122.2 A B 14664 14664 PHASE TOTAL LOAD DESCRIPTION VA LOAD BA TYPEC.B. CO D E NRLTRP LOAD DESCRIPTION PANEL: SUNVAULT HUB+ LOCATION: GARAGE MOUNTING: SURFACE PANEL VOLTAGE: 240/120 V 1Φ,3W BUS: 200A N: NON-CONTINUOUS L: LONG-CONTINUOUS R: DEMANDABLE RECEPTACLES CIRCUIT CODE: CONNECTED VA (CODE R): CONNECTED VA (CODE N): TOTAL CONNECTED KVA: TOTAL PANEL AMPS: PHASE TOTALS A+B BATTERY RAPID SHUTDOWN (NEXT TO MAIN) ENERGY STORAGE SYSTEM (GARAGE) (E) CIRCUIT L 20 x x-(E) CIRCUIT L 20 - 2 - L L SUNVAULT HUB + WARNING ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. ENERGY BREAKER WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVER CURRENT DEVICE. MAIN PANEL THIS PANEL IS FED BY THREE SOURCES: UTILITY, BATTERY & SOLAR PHOTOVOLTAIC AC DISCONNECT RAPID SHUTDOWN SWITCH FOR PV & BATTERY SYSTEM 100A AC DISCONNECT RAPID SHUTDOWN DISCONNECT 1 OF 2 60A AC DISCONNECT WARNING ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. MAX AC OPERATING CURRENT: 28.3 A OPERATING AC VOLTAGE: 240 Volts MAIN PANEL PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS MARKING 1. THE MATERIAL USED FOR MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. MARKING AS REQUIRED IN SECTIONS R 331.2.2 THROUGH R331.2.4 SHALL HAVE LETTERS CAPITALIZED WITH A MINIMUM HEIGHT OF 3/8" WHITE ON RED BACKGROUND. (CRC R331.2.1) 2. THE MARKING CONTENT SHALL CONTAIN THE WORDS "WARNING; PHOTOVOLTAIC POWER SOURCE" (CRC R331.2.2) SAFEGUARDS 1. SOLAR BREAKER SHALL BE LISTED FOR USE IN EXISTING MAIN PANEL. ACCEPTED BREAKER REPLACEMENTS ARE EATON, SQUARE-D & GE. 2. ALL JUNCTION BOXES SHALL BE NEMA OUTDOOR/RAINTIGHT RATED. 3. WILEY CABLE CLIPS SHALL BE USED. 4. ALL EMT SHALL USE OUTDOOR RAINTIGHT COMPRESSION FITTINGS. 5. ALL EQUIPMENT SHALL BE LABELED. 6. ADD COMBINER / JUNCTION BOXES AS NEEDED. 7. AN INTERNAL BLOCKING DIODE IS PROVIDED IN EACH MODULE. 8. MODULE GROUNDING SHALL BE MADE VIA RACKING CLAMPS. 9. ALL NEUTRAL TO GROUND CONNECTIONS SHALL OCCUR IN THE MAIN PANEL. 10. EMT SHALL BE 3/4" MINIMUM. 11. JUNCTION BOX/ COMBINER BOX ENTRY SHALL USE COMPRESSION FITTINGS. NOTES 1. WIRE AND SIZES ARE AS INDICATED OR LARGER. 2. ALL EQUIPMENT IS BONDED BY MECHANICAL MEANS OR BY A GROUNDING CONDUCTOR. 3. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE #8 AWG COPPER GROUND WIRE AND BONDED TO THE EXISTING GROUNDING ELECTRODE SYSTEM. 4. CHANGES TO DESIGN NEED PRIOR ENGINEER APPROVAL. ALL WIRING BETWEEN AC MODULES SHALL BE PV-WIRE AND AC CABLE. ALL CONDUIT SHALL BE 3/4" EMT OR LARGER. ALL CONDUIT SHALL BE BONDED. ALL CONDUIT SHALL BE SUPPORTED BY RUBBER PYRAMID SUPPORTS. STEEL CITY 6"X6"X4" (OR LARGER) OUTDOOR JUNCTION BOXES SHALL BE USED AS NEEDED. ALL CONDUIT SHALL HAVE PLASTIC STRAIN RELIEF CONNECTORS TO PROTECT WIRES. (E) CIRCUIT L 20 x x-(E) CIRCUIT L 20 - 2 - L L (2) 40 x x 6792 6792 STORAGE 26-2 STORAGE 26-2 L L - (2) 40 - 2 - (E) CIRCUIT L 20 x x-(E) CIRCUIT L 20 - 2 - L L (E) CIRCUIT L 20 x x-(E) CIRCUIT L 20 - 2 - L L L L 60A AC DISCONNECT RAPID SHUTDOWN DISCONNECT 2 OF 2 MAIN PANEL PCS CONTROLLED CURRENT SETTING 130A THE MAXIMUM OUTPUT CURRENT FROM THIS SYSTEM TOWARDS THE MAIN PANEL IS CONTROLLED ELECTRONICALLY. REFER TO MANUFACTURER'S INSTRUCTIONS FOR MORE INFORMATION. MAIN PANEL (YOU ARE HERE) PV RAPID SHUTDOWN (NEXT TO MAIN) 1728 1728 1344 1344 1920 1920 1920 1920 960 960 (E) CIRCUIT L 20 x x-(E) CIRCUIT L 20 - 2 - L L 75 - 1 8 1 M e d i t e r r a n e a n A v e . Re n o v a E n e r g y C o r p Pa l m D e s e r t , C A 9 2 2 1 1 (7 6 0 ) 5 6 8 - 3 4 1 3 Sheet No. Revision No. Date Drawn: Drawn By: Pr o j e c t N a m e : Co n t r a c t o r ' s L i c e n s e # 9 1 0 8 3 6 0 E1 PROJECT SIGNAGE DAVID THORNBURY 08/08/2022 73 7 5 3 A G A V E L A N E PA L M D E S E R T , C A . 9 2 2 6 0 RI C H A R D S I M O N S ( E S S 4 5 5 3 4 ) EL I Z A B E T H M A N G CONDUIT SCHEDULE LOCATION CONDUCTORS CONDUIT 1 (3) #8 THWN-2, (3) #12 THWN-2, (1) #10 EGC 2" EMT 2 (3) 3/0 THWN-2, (1) #6 EGC 2" EMT E (3) #2 THWN-2, (1) #8 EGC 1-1/4" EMT SINGLE LINE DIAGRAM CALCULATIONS RELOCATE LOADS TO 200 AMP SUNPOWER SUNVAULT HUB+ SV-HUB-01-A 120/240 VOLT LOCATED INSIDE GARAGE AC CIRCUITS STORAGE TO SUNVAULT HUB + STORAGE 26-2 = 28.3 AMPS X 1.25 [PER NEC 215.2 (A)1] = 35.4 AMP (EACH INVERTER) = ((2) 40 AMP STORAGE BREAKERS) MAX VOLTAGE AC 240 VOLT. AC CONDUIT SHALL BE MOUNTED INSIDE GARAGE AND A MINIMUM OF 1" ABOVE ROOFTOP SURFACE. #8 WIRE = 55 AMPS X .82[PER NEC TABLE 310.15(B)(16) & PER NEC TABLE 690.31(A)] = 45.1 AMP ≥ 40 AMP ✓ (3) #8 THWN-2 AWG WIRE, (1) #10 THWN-2 GROUND 2" EMT @ 40% FILL PER NEC TABLE C.1 = (36) #8 THWN-2 WIRES ✓ SUNVAULT HUB + TO MAIN PANEL MAX OUTPUT = (41 MODS X 1.60 AMP + ((28.3 x 2) AMPS) X 1.25 [PER NEC 215.2 (A)1] = 152.8 AMPS (175A BREAKER) AC CONDUIT SHALL BE MOUNTED INSIDE GARAGE AND A MINIMUM OF 1" ABOVE ROOFTOP SURFACE. 3/0 WIRE = 225 AMPS X .82[PER NEC TABLE 310.15(B)(16) & PER NEC TABLE 690.31(A)] = 184.5 AMP ≥ 175 AMP ✓ (3) 3/0 THWN-2 AWG WIRE, (1) #6 THWN-2 GROUND 2" EMT @ 40% FILL PER NEC TABLE C.1 = (5) 3/0 THWN-2 WIRES ✓ MAIN PANEL BACKFEED CALCULATION EXISTING 400 AMP MAIN SERVICE PANEL EXISTING 350 AMP MAIN BREAKER 120% OF 400 AMP BUS: ALLOWABLE BACKFED AMPS [PER NEC 705.12(B)(2)] = 480 AMPS 480 AMP - 350 AMP MAIN BREAKER = 130 TOTAL AMP ALLOWABLE MAX OUTPUT = 41 MODS X 1.6 AMP X 1.25 [PER NEC 215.2 (A)1] = 82.0 AMPS MAX OUTPUT 82.0 AMPS ≤ 130 AMPS ✓ BACKUP 200A BUSLOADS LOADS 90A PVS6 GENERATION 125A BUS 2 15A NON-BACKUP 125A BUS 20A SOLAR BREAKER SUITABLE FOR DISCONNECTING MEANS PER NEC 690.13 40A STORAGE 26-2 SUNPOWER ENERGY STORAGE SYSTEM #SPWR-M0011, 120/240 VOLT LOCATED INSIDE GARAGE 1 1 60 AMP AC DISCONNECT SQUARE-D #HU462AWK 600 VOLT; 4 POLE LOCATED NEXT TO MAIN 40A BATTERY SYSTEM SIZE: 26.0 kWh CEC AC SYSTEM SIZE: 13.584 kW AC G BAR EXISTING 350A MAIN BREAKER 175 AMP SOLAR BREAKER EXISTING GROUNDING ELECTRODE TO UTILITY METER #223000-002588M EXISTING 400 AMP MAIN SERVICE PANEL 240/120 VOLT, 2-POLE LOCATED ON SOUTHEAST EXTERIOR WALL SERVICE EQUIPMENT IS CENTER FED N BAR EXIST. SOLAR ARRAY (41) SUNPOWER 425 WATT PHOTOVOLTAIC MODULES #SPR-M425-H-AC 20A 20A N BAR G BAR EXISTING 100 AMP AC DISC. 120/240 VOLT, 2P LOCATED NEXT TO MAIN EXISTING 125 AMP AC LOAD CENTER 240V, 2P LOCATED ON ROOFTOP 20A 20A 20A *FOR UTILITY PURPOSES ONLY:(41) ENPHASE IQ7HS-66-ACM-US (IQ7HS-66-ACM-US) 240V [SI1] INVERTERS EGC = EQUIPMENT GROUNDING CONDUCTOR, GEC = GROUNDING ELECTRODE CONDUCTOR #6 COPPER SOLID GROUND TO BE USED ON ROOFTOP WHEN NOT PROTECTED BY CONDUIT ALL BREAKERS SHALL BE 2 POLE UNLESS OTHERWISE NOTED ALL INNER-CIRCUIT WIRING SHALL BE #10 THWN-2 WIRE OR GREATER. E PCS OF THE SUNVAULT HUB+ WILL LIMIT THE AMOUNT OF BACKFEED CURRENT TO THE MAIN SERVICE PANEL. SETTING MUST NOT BE ACCESSIBLE TO NON-AUTHORIZED INDIVIDUALS. SEE LABEL ON E1 75 - 1 8 1 M e d i t e r r a n e a n A v e . Re n o v a E n e r g y C o r p Pa l m D e s e r t , C A 9 2 2 1 1 (7 6 0 ) 5 6 8 - 3 4 1 3 Sheet No. Revision No. Date Drawn: Drawn By: Pr o j e c t N a m e : Co n t r a c t o r ' s L i c e n s e # 9 1 0 8 3 6 0 E2 SINGLE LINE DAVID THORNBURY 08/08/2022 73 7 5 3 A G A V E L A N E PA L M D E S E R T , C A . 9 2 2 6 0 RI C H A R D S I M O N S ( E S S 4 5 5 3 4 ) EL I Z A B E T H M A N G SunPower Corporation proprietary information. This document is electronically controlled. The latest revision is available in the document management system. All printed copies are not controlled and may be outdated unless marked with a red ink “Controlled Copy” stamp. Title: Tech Note - SunVault™ Completion of Large-Scale Fire Testing (UL 9540A), 540838 RevA Date: 07/06/2021 Page 1 of 4 Form: 001-51499 Rev I Technical Notification Title SunVault™ Completion of Large-Scale Fire Testing (UL 9540A), 540838 RevA Date July 06, 2021 Authors Craig Walker, Principal Battery Engineer Application SunVault™ systems 1.0 Overview SunPower® SunVault™ energy storage system (ESS) units have completed large-scale fire testing as per UL 9540A Edition 4 2019. The testing results qualify SunVault ESS units for exceptions from certain installation requirements in fire code compliance beginning July 1, 2021 in California and in other jurisdictions. This Tech Note explains the SunVault ESS energy ratings, provides the test background information, and references fire code requirements where these UL 9540A test results should be considered for an exemption or an exception. 2.0 SunVault ESS and Aggregate Energy Ratings SunVault Model Number Description Rated Energy SV-BASE13-12-A Base ESS unit 13 kWh SV-ENERGY13-12-A Energy expansion ESS unit 13 kWh 2.1 Base and Energy Expansion Systems The base SunPower SunVault installation consists of one SV-BASE13-12-A ESS unit rated at 13 kWh (paired with one SunVault Hub+). Additional 13 kWh ESS units (SV-ENERGY13-12-A) can be added to increase the aggregate energy of the SunVault installation in 13 kWh increments. For example, a SunVault installation that combines the 13 kWh SV- BASE13-12-A ESS unit with a 13 kWh SV-ENERGY13-12-A ESS energy expansion unit would have an aggregate energy rating of 26 kWh. SunPower Corporation proprietary information. This document is electronically controlled. The latest revision is available in the document management system. All printed copies are not controlled and may be outdated unless marked with a red ink “Controlled Copy” stamp. Title: Tech Note - SunVault™ Completion of Large-Scale Fire Testing (UL 9540A), 540838 RevA Date: 07/06/2021 Page 2 of 4 Form: 001-51499 Rev I Technical Notification In a given installation, combining 13 kWh SV-BASE13-12-A ESS units with 13 kWh SV-ENERGY13-12-A units provides the ability to expand both the power and the energy of that particular system. Where the local fire code prescribes a maximum energy rating requirement for individual ESS units and for aggregate energy in a specific indoor or outdoor installation location, the SunVault individual ESS rating is 13 kWh and the aggregate energy rating is a multiple of 13 kWh which expands incrementally depending on the quantity of ESS units in the system, and does not exceed 104 kWh. 3.0 SunVault UL 9540A Standard Compliance The large-scale fire testing was conducted and reported by UL in accordance with UL 9540A Edition 4 2019, at their fire testing laboratory in Northbrook, IL. The testing and reporting were completed under UL Project #4789520191.8 (see Section 4.6 of this Tech Note). UL designed the test setup and data collection so that the results could be judged against the UL 9540A unit-level performance criteria for both indoor and outdoor wall-mounted residential ESS units. The SunVault test setup comprised three individual ESS units which represented all SunVault ESS models and which were wall mounted with 6″ (152 mm) separation distance between each unit. The center unit contained a battery module with heaters installed on a centrally located cell. This cell was externally heated at a rate of 4–7°C/minute until the cell exhibited a condition called thermal runaway. The test instrumentation recorded the effects of the resulting thermal event in accordance with UL 9540A data collection requirements. Note: UL 9540A test setup requirements prevented testing both wall-mounted and floor-mounted systems in a single test. Wall-mounted systems are considered to be worst case with respect to complying with the UL 9540A performance criteria, and for this reason we believe the test results from the report can be applied to floor- mounted ESS units as well. 4.0 Application to Fire Code Requirements SunVault systems must be installed according to applicable sections of the effective local fire code. Fire codes and fire code sections referenced in this document are intended to inform about requirements which may be excepted or addressed by the large-scale fire testing results. The inclusion of fire codes or fire code sections in this Tech Note does not necessarily imply applicability to all or to any SunVault installations. 4.1 ESS Spacing Exceptions UL determined that a thermal event initiated in one SunVault ESS unit did not propagate to the adjacent ESS units when the units were installed with 6″ (152 mm) of separation on either side of the initiating ESS unit (see pg. 4 of the report). The initiated thermal event was contained within the initiating battery module inside the initiating ESS unit, and no flaming was observed during the test (pg. 4). These results qualify SunVault ESS units for exception from the prescribed 36″ (914 mm) ESS spacing requirements that are part of many local fire codes. The exception permits SunVault installation with 6″ (152 mm) minimum separation distance between ESS units. Code references: • NFPA 1 (2018) 52.3.2.3.5 • NFPA 855 (2020) 15.5, 4.1.5 • IFC (2018)1206.2.8.3 • IFC (2021) 1207.11.2.1 • CFC (July 2021 Supplement) 1206.11.2.1, 1206.1.5 SunPower Corporation proprietary information. This document is electronically controlled. The latest revision is available in the document management system. All printed copies are not controlled and may be outdated unless marked with a red ink “Controlled Copy” stamp. Title: Tech Note - SunVault™ Completion of Large-Scale Fire Testing (UL 9540A), 540838 RevA Date: 07/06/2021 Page 3 of 4 Form: 001-51499 Rev I Technical Notification 4.2 Non-Combustible Construction UL determined that SunVault complies with the UL 9540A performance criterion for installation in locations with combustible constructions (pg. 5). This performance criterion requires that wall surface temperatures do not rise to greater than 97°C (174.6°F) above ambient. The maximum wall surface temperature rise achieved during SunVault UL 9540A testing was just 54°C (97.2°F) above ambient (pg. 22). The test result was achieved with the ESS units installed on black-painted plywood which is combustible and can exhibit a faster temperature rise when compared to gypsum. Consider SunVault’s compliance with the UL 9540A performance criterion for installation on combustible construction when evaluation construction requirements for ESS installation areas. Code references: • NFPA 855 (2020) 15.6.1(1) • CFC (July 2021 Supplement) 1206.11.3.4 4.3 Separation from Doors, Windows, and Means of Egress for Outdoor Installations The UL 9540A testing shows that a thermal event involving the system will not adversely impact occupant egress paths from doors or windows which are located at least 6″ from the edges of an ESS unit. Wall temperature was measured at 6″ intervals along a vertical line offset 6″ from the edge of the initiating ESS unit. The maximum temperature measured at each interval along this line was 10°C (18°F) above ambient (pg. 22). The maximum surface temperature of an adjacent ESS unit located 6″ from the initiating ESS unit was 9°C (16.2°F) above ambient (pg. 22). Additionally, no flaming or explosion hazards were observed. These observations show that occupant egress would not be affected from doors or windows located 6″ (152 mm) from the edge of an ESS. Code references: • NFPA 1 (2018) 52.3.2.1.4.5.2 • NFPA 855 (2020) 15.6.1(3) • IFC (2021) 1207.11.3.3 • IFC (2018) 1206.2.8.7.2 • CFC (July 2021 amendment) 1206.11.3(3) 4.4 Fire Suppression SunVault achieved the UL 9540A unit-level performance criteria for indoor wall-mounted ESS systems without the use of fire suppression. No flaming or explosion hazards were observed during the test. Automatic sprinkler systems or other methods of automatic fire suppression are not required for SunVault to comply with the UL 9540A unit-level performance criteria. Code reference: • NFPA 1 (2018) 52.3.2.7 4.5 Ventilation and Minimum Room Size SunVault ESS feature batteries of the lithium-ion variety and which do not produce flammable or toxic gas during charging, discharging, or normal use conditions. Lithium-ion batteries are not required to comply with ventilation or minimum room size requirements in the fire codes. Ventilation and minimum room size requirements in the fire codes do not apply to SunVault ESS. SunPower Corporation proprietary information. This document is electronically controlled. The latest revision is available in the document management system. All printed copies are not controlled and may be outdated unless marked with a red ink “Controlled Copy” stamp. Title: Tech Note - SunVault™ Completion of Large-Scale Fire Testing (UL 9540A), 540838 RevA Date: 07/06/2021 Page 4 of 4 Form: 001-51499 Rev I Technical Notification Code references: • NFPA 1 (2018) 52.3.2.8, 52.3.2.11 • NFPA 855 (2020) 15.11, 15.12 • IFC (2021) 1207.6 • IFC (2018) 1206.2.11.3, 1206.2.12 • CFC (July 2021 Supplement) 1206.11.8, 1206.11.9 Note: Always install SunVault systems according to the effective local fire code. Fire codes referenced in this Tech Note are provided to inform about requirements which may be excepted or addressed by the large-scale fire testing results. Inclusion of fire codes in this document does not necessarily imply applicability to all or to any SunVault installations. 4.6 UL 9540A Test Report Cover Page If you have any questions or would like to request additional information please contact SunPower regulatory compliance engineer Mark McMurtrey at mark.mcmurtrey@sunpowercorp.com. Thank you for helping us change the way our world is powered. This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 1 of 5 GFT-OP-11a (22-August-2019) Verification of Conformity Verification Number: 104395807CRT-001-VOC Applicant Name & Address: SunPower Corporation 1414 Harbour Way South Suite 1901 Richmond, CA 94804-3694 USA Product Description: Panelboard Ratings & Principle Characteristics: See Amendment 1 Models/Type References: SV-HUB-01-C, SV-HUB-01-B (It is paired with SunPower ESS (SV-BASE13-12-A OR SV-BASE13-12-B OR EQS- BASE13-11-A, Optional: SV-Energy13-12-A, SV-Energy13-12-B) Brand Names: SUNPOWER Specification<s>/Standards: Inverters, Converters, Controllers And Interconnection System Equipment For Use With Distributed Energy Resources [UL 1741:2010 Ed.2(Supplement A) + R:15Feb2018] Power Control Systems (PCS) Certification Requirement Decision 3/8/2019 Verification Issuing Office Name & Address: Intertek Testing Services NA, Inc., 3933 US Route 11, Cortland, NY 13045 USA Date of Tests: 2/1/2022 to 2/10/2022, 4/21/2022 to 5/10/2022 Test Report Number(s): 104106139CRT-001 Signature Name: Dishant Patel Position: Project Engineer Date: 8 March 2022 On the basis of the tests undertaken, the sample of the below product have been found to comply with the requirements of the referenced standards at the time the tests were carried out. This verification is part of the full test report and should be read in conjunction with it. This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 2 of 5 GFT-OP-11a (22-August-2019) Amendment 1  Hub+ Nameplate For Model # SV-HUB-01-C For Model # SV-HUB-01-B  PCS Ratings Operating Mode Import Only (Regular “import Only” mode testing was covered, but only with Zero export control and no control on import limit) Maximum PCS controlled current 80A, 100A, 120A, 140A, 160A and 166A max Average Open-loop Response time 1.83 Sec Maximum Open-loop Response time 2.45 Sec This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 3 of 5 GFT-OP-11a (22-August-2019)  Test List UL 1741 CRD Clause No. Test description Verdict 203.5 Step change in load test Pass 203.6 Step Change in Generation Test Pass 204.4 Export limiting from Energy Storage Systems Pass 205.5 Startup / Self Check Abnormal Tests Pass 205.7 Operating Abnormal Tests Pass  PCS Marking Following marking are applied on Hub+. This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 4 of 5 GFT-OP-11a (22-August-2019)  PCS Manual Hub+ instruction manual was provided with PCS information as required. it provides instruction on how to configure PCS. Also, a single line diagram and all the compatible Current Transformers and meters are included in the manual. This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 5 of 5 GFT-OP-11a (22-August-2019)  Revision Summary Date / project#site Engineer Description 26-May-2022/ G105027239CRT Dishant Patel Updated Model/Type References on Page 1 From ” SV-HUB-01-C (It is paired with SunPower ESS (SV- Base13-12-A OR SV-Base13-12-B, Optional: SV- Energy13-12-A, SV-Energy13-12-B)” To ” SV-HUB-01- C, SV-HUB-01-B (It is paired with SunPower ESS (SV- Base13-12-A OR SV-Base13-12-B OR EQS-BASE13-11-A, Optional: SV-Energy13-12-A, SV-Energy13-12-B)” Added Date of test 4/21/2022 to 5/10/2022 on Page 1. Added SV-HUB-01-B nameplate on Page 2. Updated Average Open-loop response time from ”0.054 sec” to ”1.83 sec”. END sunpower.com Datasheet Configurations and Specifications SunVault System Configuration 13-1 26-1 26-2 52-2 Included Component Model Numbers⁹ • One Hub+ • One SV-BASE13-12-B • One Hub+ • One SV-BASE13-12-B • One SV-ENERGY13-12-B • One Hub+ • Two SV-BASE13-12-B • One Hub+ • Two SV-BASE13-12-B • Two SV-ENERGY13-12-B DC Rated Energy 13 kWh (128 Ah) 26 kWh 26 kWh 52 kWh Max. Usable Energy (DC)1 12 kWh (118 Ah) 24 kWh 24 kWh 48 kWh Max. AC Continuous Backup Output Current 28.3 A continuous 56.6 A continuous Max. AC Output Fault Current 35.0 A 70.0 A AC Overcurrent Protection Device One 40 A / two pole Two 40 A / two pole Rated Single-Phase Load Supported (120 V) 4.8 kW (up to 5 minutes) 9.6 kW (up to 5 minutes) Rated Continuous Charge Power (grid tied and backup) 6.4 kW 12.8 kW Rated Continuous Discharge Power (grid tied) 6.0 kW 12.0 kW Rated Continuous Discharge Power (backup) 6.8 kW 13.6 kW Rated AC Continuous Output Current (grid tied) 25.0 A 50.0 A Load Start Capability (LRA) 43 A 52 A 86 A 104 A Rated Backup Discharge Power (kW)5 30 minutes 7.5 8.0 15.0 16.0 10 second 8.5 12.0 17.0 24.0 1 second 10.0 12.0 20.0 24.0 1 Some energy reserved for internal consumption. 2 Tested at 6 kW, 25°C conditions. 3 SunVault Hub+ rating is 200 A. 4 208 VAC is not supported at this time. 5 Values are rated at 25°C ambient. 6 Extended exposure reduces battery performance. 7 Two enclosures for 26 kWh; four for 52 kWh. 8 Additional hardware details in installation guide 9 SV-BASE13-12-B ships as a BASE and may be converted in the field to a BASE X. Hub+ SV-HUB-01-C accommodates single- and dual-inverter systems; SV-HUB-01-B accommodates single-inverter systems only. Some parameters can vary depending on site-specific conditions. See the SunVault Installation Guide 536685 for guidelines. See www.sunpower.com/facts for additional reference information. Specifications included in this datasheet are subject to change without notice. © 2022 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo, and SUNVAULT are trademarks or registered trademarks of SunPower Corporation in the U.S. and other countries as well. 1-800-SUNPOWER. 536812 RevE BA S E BA S E Hu b + BA S E X EN E R G Y BA S E Hu b + BA S E X EN E R G Y EN E R G Y BA S E Hu b + Hu b + sunpower.com Datasheet SunPower® SunVault™ Hub+™ Electrical Model Numbers SV-HUB-01-A, SV-HUB-01-B Applications Self-supply, backup, and cost savings Special Features 12 V jumpstart: YES / Generator control: YES / Rapid Power Off: YES Supported Backup Configurations • Whole home (up to 200 A service) • Partial home (up to 400 A service) Max. Allowed Service / Disconnect Rating 200 A Nom. Allowed Service Voltage 120 / 240 V 60 Hz, split phase Short Circuit Rating1 10 kA / 22 kA2 Overcurrent Protection Device Allowed3 100–200 A / service entrance rated AC Metering Solar meter: ANSI C12.20, < 0.5% RGM | Site meter: < 2% Connectivity Ethernet, WiFi, and cellular Backup Transition Seamless Load / Generation Breakers4 Refer to installation guide for available spaces Overvoltage Category OV IV Pollution Degree III Protection Class I Scalability5 Supports multiple storage and PV array systems in parallel 1 Higher short circuit rating is compatible with external suitable rated equipment. 2 With external J-Class fuse or CSR breaker. See the SunVault Installation Guide for guidelines. 3 Recommended service-rated circuit breaker type must be installed. 4 See the SunVault Installation Guide for guidelines. 5 See the SunVault Installation Guide for guidelines. Refer to www.sunpower.com/facts for additional reference information. For more details, see extended datasheet www.sunpower.com/datasheets. Specifications included in this datasheet are subject to change without notice. ©2021 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo, SUNVAULT, and Hub+ are trademarks or registered trademarks of SunPower Corporation in the U.S. and other countries as well. 1-800-SUNPOWER. Environmental Ambient Operating Temp. −4°F to 122°F (−20°C to 50°C) Shelf Ambient Temp. −22°F to 140°F (−30°C to 60°C) Humidity 0–95%, condensing Enclosure Type / Ingress Rating NEMA Type 3R / IP54 Max. Elevation 6560 ft (2000 m) Environment Indoor / Outdoor Mechanical Dimensions 17 w × 46 h × 6 in. d (43 × 117 × 15 cm) Weight 80 lb (36 kg) Mounting Options Indoor / Outdoor Conduit Entry Multiple; up to 3 in. Warranties, Certifications, and Compliance Warranty 10 years Certifications and Compliance • ANSI C12.20 (Class 0.5) • CSA C22.2 No. 107.1 • FCC Part 15 Subclass B • UL 67 • UL 869A • UL 1741 536813 RevB sunpower.com Datasheet SunPower® SunVault™ Energy Storage System (ESS) Performance SunVault Base SunVault Energy Expansion Model Number SV-BASE13-12-B SV-ENERGY13-12-B DC Rated Energy 13 kWh (128 Ah) Max. Usable Energy (DC)1 12 kWh (118 Ah) Battery Cell Chemistry Lithium iron phosphate (LiFePO4) Nom. Internal Battery Voltage 51.2 V CEC Weighted RTE Efficiency2 > 86% Individual DC Breaker Rating 125 A / two pole3 Max. AC Continuous Backup Output Current 28.3 A continuous Nom. AC Voltage (L–N–L) 120 / 240 VAC 60 Hz, split phase4 Max. AC Output Fault Current 35 A Max. Short Circuit Rating 10 kA AC Overcurrent Protection Device 40 A / two pole Max. Single-Phase Load Supported (120 V) 4.8 kW (up to 5 minutes) Power Factor (full-rated power) ± 0.85 Rated Continuous Charge Power (Grid tied & Backup) 6.4 kW Rated Continuous Discharge Power (Grid tied) 6.0 kW Rated AC Continuous Output Current (Grid tied) 25.0 A Rated Backup Discharge Power Continuous 6.8 kW Environmental Seismic Rating IEEE 693-2005, AC-156 Environmental Rating Indoor and outdoor rated Acoustic Noise Level < 50 dBA @ 1 m distance, 86°F (30°C) Recommended Operating Temp. 32°F to 86°F (0°C to 30°C) Ambient Operating Temp.6 14°F to 122°F (−10°C to 50°C) Shelf Ambient Temp. −4°F to 113°F (−20°C to 45°C) Initial Energy Reserve 30% Humidity 0–95% (non-condensing) Enclosure Type / Ingress Rating NEMA Type 3R / IP54 Max. Elevation 6560 ft (2000 m) Warranties, Certifications, and Compliance Warranty 10 years Certifications and Compliance • IFCC Part 15 Subclass B • IEEE 1547 • UL 1973 (UL 1642) • UL 1741 • UL 1741 SA (CA Rule 21) • UL 9540 • UL 9540A • UN 38.3 Mechanical User Interface Mobile app, LED panel Dimensions 64.5 h × 26 w × 14.8 in. d (164 × 66 × 38 cm)7 Weight • SV-BASE13: 270 lb (122.5 kg) w/inverter; 528 lb (239.5 kg) fully assembled • SV-ENERGY13: 400 lb (181.4 kg) fully assembled Mounting Options Wall or floor8 sunpower.com Datasheet Energy Storage System: Battery Performance Model SPWR-M0011 Rated Energy 6.5 kWh (128 Ah) Max. Usable Energy 6.0 kWh (118 Ah) Nom. Internal Battery Voltage 51.2 V Max. DC Continuous Output Current 96 A Short Circuit Rating 10 kA Overcurrent Protection Device 125 A / two pole Max. Continuous Power (charge / discharge) 3.5 kW / 4.5 kW Peak Surge Power (discharge; 1 sec.) 5 kW Round-Trip Efficiency @ 25°C 96% Overvoltage Category II Pollution Degree III Protection Class I See www.sunpower.com/facts for more reference information. For more details, see extended datasheet www.sunpower.com/datasheets Specifications included in this datasheet are subject to change without notice. © 2020 SunPower Corporation. All Rights Reserved. SUNPOWER and the SUNPOWER logo are registered trademarks of SunPower Corporation in the U.S. and other countries as well. 1-800-SUNPOWER. 534640 RevB Warranties, Certifications, and Compliance Warranty 10 years Certifications and Compliance • FCC Part 15 Subclass B • UL 1642 • UL 1973 • UN 38.3 Environmental Seismic Rating IEEE 693-2005 Environmental Rating Indoor rated Recommended Operating Temp. 32°F to 86°F (0°C to 30°C) Ambient Operating Temp. 14°F to 113°F (−10°C to 45°C) Storage Ambient Temp. • 7 days: −22°F to 140°F (−30°C to 60°C) • 6 months: −4°F to 113°F (−20°C to 45°C) Humidity 0–95% Enclosure Type / Ingress Rating NEMA 3R / IP55 Elevation 6560 ft (2000 m) Mechanical Dimensions 29.5 in. h × 19 w × 5.3 d (74.5 cm h × 47.5 w × 13.3 d) Weight 128 lb (58 kg) Mounting Options Wall mount Th e i n f o r m a t i o n p r o v i d e d i n t h i s d o c u m e n t a t i o n c o n t a i n s g e n e r a l d e s c r i p t i o n s a n d / o r t e c h n i c a l c h a r a c t e r i s t i c s o f t h e p e r f o r m a n c e o f t h e p r o d u c t s c o n t a i n e d h e r e i n . Th i s d o c u m e n t a t i o n i s n o t i n t e n d e d a s a s u b s t i t u t e f o r a n d i s n o t t o b e u s e d f o r d e t e r m i n i n g s u i t a b i l i t y o r r e l i a b i l i t y o f t h e s e p r o d u c t s f o r s p e c i f i c u s e r a p p l i c a t i o n s . It i s t h e d u t y o f a n y s u c h u s e r o r i n t e g r a t o r t o p e r f o r m t h e a p p r o p r i a t e a n d c o m p l e t e r i s k a n a l y s i s , e v a l u a t i o n a n d t e s t i n g o f t h e p r o d u c t s w i t h r e s p e c t t o t h e r e l e v a n t s p e c i f i c a p p l i c a t i o n o r u s e t h e r e o f . Ne i t h e r S c h n e i d e r E l e c t r i c I n d u s t r i e s S A S n o r a n y o f i t s a f f i l i a t e s o r s u b s i d i a r i e s s h a l l b e r e s p o n s i b l e o r l i a b l e f o r m i s u s e o f t h e i n f o r m a t i o n c o n t a i n e d h e r e i n . * P r i c e s a r e i n d i c a t i v e Feb 6, 2014 1 Product data sheet Characteristics HU462AWK SWITCH NOT FUSIBLE HD 600V 60A 4P NEMA12 Product availability: Non-Stock - Not normally stocked in distribution facility Price*: 1008.00 USD Main Commercial Status Commercialised Product or component type Single Throw Safety Switch [In] rated current 60 A Product certifications UL listed NEMA degree of protection NEMA 3R/12 galvannealed steel Device composition None Disconnector device type Non-fusible disconnect Short-circuit current 200 kA maximum Device mounting Surface Number of poles 4 Electrical connection Lugs Series name Heavy duty [Ue] rated operational voltage 600 V AC/DC AWG gauge 14...3 AWG copper or aluminium Ordering and shipping details Category 00116 - H&HU SW,4&6P,N12,30-200A Discount Schedule DE1 GTIN 00785901505105 Nbr. of units in pkg.1 Package weight(Lbs)29.60 Product availability Non-Stock - Not normally stocked in distribution facility Returnability Y Country of origin US Offer Sustainability Sustainable offer status Not Green Premium product RoHS Will be Compliant on 3Q2014 REACh Reference not containing SVHC above the threshold Contractual warranty Period 18 months Residential Solar System Installation Contract 04122022 Page 2 of 15 Owner Initials: ______ ______ RESIDENTIAL SOLAR SYSTEM INSTALLATION CONTRACT EFFECTIVE DATE: ______________________ CONTRACT NO: ___________________ “OWNER” individual(s)/entity in whom/which the title of the property is/are vested where the Roof is located; as such, signator(s) is/are authorized to enter into this Agreement as Owner(s): Name: ____________________________ ____________________________ Address: ____________________________ ____________________________ ____________________________ Phone: ____________________________ Email: ____________________________ System size kilowatts (DC): ______________ Service Number: ______________________ Meter number: ______________________ “CONTRACTOR”: Renova Energy Corp. 75-181 Mediterranean Ave. Palm Desert, CA 92211 (760) 568-3413 This is the address to which the Notice of Cancellation should be mailed. Consultant: _______________________ Consultant HIS License #: ____________ THIS CONTRACT IS A HOME IMPROVEMENT CONTRACT. OWNER IS ENTITLED TO A COMPLETELY FILLED-IN COPY OF THIS CONTRACT SIGNED BY BOTH PARTIES BEFORE WORK MAY BE STARTED. 1. Location of Project Residence ________________________________ ________________________________ ________________________________ ________________________________ 2. Construction Lender (if any) Name: ____________________________ Address: ____________________________ ____________________________ ____________________________ 3. Statement of Work and Description of System The solar energy system (“System”) that is described in this contract will be installed by the Contractor at the Project Residence that is described in Section 1. The System will be located at the Project Residence pursuant to the Proposal/Drawings, incorporated herein by reference, which Owner acknowledges that he/she/they has reviewed, signed and approved. Contractor will provide all labor and materials necessary for the installation of the System and will secure and pay for all required building permits. Contractor will be responsible for filing rebate and incentive forms with agencies on Owner’s behalf, where applicable. All work by Contractor under this contract is sometimes referred to as the “Project.” Unless specifically stated in Section 13 of this contract, the System will not include any repairs or modifications to the Project Residence, including the roof or any support structures, which are necessary to install the rssimons@pacbell.net 05/16/2022 CSH44582 Richard Simons Elizabeth Mang 73753 Agave Lane Palm Desert, CA 92260 (310) 849-5548 17.425 Luis Zuniga 133885 SP 73753 Agave Lane Palm Desert, CA 92260 RS EM EM Residential Solar System Installation Contract 04122022 Page 12 of 15 Owner Initials: ______ ______ IN WITNESS WHEREOF, the parties hereto have executed this contract as of the Effective Date. Dated: _______________ “OWNER” ______________________________________ Owner’s Signature ______________________________________ Print Name of Owner ______________________________________ Owner’s Signature ______________________________________ Print Name of Owner Dated: _______________ “CONTRACTOR” RENOVA ENERGY CORP., a California corporation By: _______________________________ Nate Lewis, Chief Sales Officer 05/16/2022 05/16/2022 Richard Simons Elizabeth Mang Richard Simons (May 16, 2022 15:53 PDT) RS Elizabeth Mang (May 16, 2022 16:40 PDT) Elizabeth Mang EM EM Nate Lewis (May 17, 2022 13:17 PDT)