HomeMy WebLinkAboutSOLR22-1188 APPROVED PLANS.pdfCOVER SHEET SCOPE OF WORK GENERAL NOTES REV NAME DATE COMMENTS A AC AFCI AZIM COMP DC (E) ESS EXT INT MAG MSP (N) NTS OC PRE-FAB PSF PV RSD TL TYP V W AMPERE ALTERNATING CURRENT ARC FAULT CIRCUIT INTERRUPTER AZIMUTH COMPOSITION DIRECT CURRENT EXISTING ENERGY STORAGE SYSTEM EXTERIOR INTERIOR MAGNETIC MAIN SERVICE PANEL NEW NOT TO SCALE ON CENTER PRE-FABRICATED POUNDS PER SQUARE FOOT PHOTOVOLTAIC RAPID SHUTDOWN DEVICE TRANSFORMERLESS TYPICAL VOLTS WATTS PAGE REV: A 10/19/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 MARK IVERSON 77542 ASHBERRY CT, PALM DESERT, CA, 92211 PROJECT NUMBER: 113R-542IVER SHEET DESIGNER: MODESTO NUNEZ CUSTOMER RESIDENCE: TEL. (503) 314-2238 APN: 632-600-019 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 TABLE OF CONTENTS PAGE # DESCRIPTION PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 LAYOUT PV-4.0 ELECTRICAL PV-5.0 SIGNAGE PV-1.0 LEGEND AND ABBREVIATIONS SCALE: NTS MAIN PANEL INVERTER(S) AC DISCONNECT(S) DC DISCONNECT(S) PV LOAD CENTER SUB-PANEL CB ATTIC VENT FLUSH ATTIC VENT PVC PIPE VENT SATELLITE DISH T-VENT CHIMNEY FIRE SETBACKS SUNRUN METER METAL PIPE VENT DEDICATED PV METER SERVICE ENTRANCE IQ COMBINER BOX HARDSCAPE PROPERTY LINEINTERIOR EQUIPMENT SHOWN AS DASHED PL SE MP SP LC SM PM INV AC DC VICINITY MAP • ALL WORK SHALL COMPLY WITH 2019 CRC/CBC/CEBC, MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2019 CEC. • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2019 CEC. • PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II MODULES, ARE CLASS A FIRE RATED. • RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER 690.12(B). • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 11.43 AMPS MODULE SHORT CIRCUIT CURRENT. • 17.85 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A) & 690.8 (B)]. • CONSTRUCTION WORK HOURS OCTOBER 1ST TO APRIL 30TH MONDAY - FRIDAY 7:00AM TO 5:30PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED CONSTRUCTION WORK HOURS - MAY 1ST THROUGH SEPTEMBER 30TH MONDAY - FRIDAY 6:00AM TO 7:00PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED #SSTAMPCS #ESTAMPCS RAIL STANDOFFS & FOOTINGS SOLAR MODULES• SYSTEM SIZE: 19710W DC, 13600W AC • MODULES: (54) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M • INVERTERS: (1) SOLAREDGE TECHNOLOGIES: SE7600H-USSN, (1) SOLAREDGE TECHNOLOGIES: SE6000H-USSN • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 • MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 150 AMP MAIN BREAKER. PL PL PL PL PL PL PL PLPLPL PL PL PL PAGE REV: A 10/19/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 MARK IVERSON 77542 ASHBERRY CT, PALM DESERT, CA, 92211 PROJECT NUMBER: 113R-542IVER SHEET DESIGNER: MODESTO NUNEZ CUSTOMER RESIDENCE: TEL. (503) 314-2238 APN: 632-600-019 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SITE PLAN ARRAY PITCH PV AREA (SQFT) AR-01 19° 333.4 AR-02 18° 431.4 AR-03 19° 215.7 AR-04 18° 78.490° 78° 90° 78° 360° TRUE AZIM MAG AZIM 258°270° 348° PV-2.0 #SSTAMPSP #ESTAMPSP NOTES: x RESIDENCE DOES NOT CONTAIN ACTIVE FIRE SPRINKLERS. ARRAY DETAILS: x TOTAL ROOF SURFACE AREA: 4117 SQFT. x TOTAL PV ARRAY AREA: 1058.9 SQ FT. x PERCENTAGE PV COVERAGE: (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE AREA) * 100 = 25.7% SITE PLAN - SCALE = 1/16" = 1'-0" (N) ARRAY AR-01 (N) ARRAY AR-02 (N) ARRAY AR-03 (N) ARRAY AR-04 (E) SHED (E) RESIDENCE (E) DRIVEWAY (E) GATE (E) GATE ROOF PATHWAYS (3' TYP) 3' ROOF PATHWAYS (1.5' PER HIP) FIRE SETBACKS (18" TYP) SE MP AC LCINVINV (E) POOL ASHBERRY CT LADDER ACCESS POINT LADDER ACCESS POINT MODULES WERE DESIGNED AT LEAST 18'' FROM THE ROOF RIDGE. MODULE ELEVATION VIEW: 10'-7"14'-1"16'-6" 3" PAGE REV: A 10/19/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 MARK IVERSON 77542 ASHBERRY CT, PALM DESERT, CA, 92211 PROJECT NUMBER: 113R-542IVER SHEET DESIGNER: MODESTO NUNEZ CUSTOMER RESIDENCE: TEL. (503) 314-2238 APN: 632-600-019 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-3.0 LAYOUT #SSTAMP DESIGN CRITERIA MAX DISTRIBUTED LOAD: 3 PSF SNOW LOAD: 0 PSF WIND SPEED: 130 MPH 3-SEC GUST. S.S. LAG SCREW 5/16"X4.5"x1/4" MIN. EMBEDMENT STRUCTURAL NOTES SOLAR MODULE SNAPNRACK RACKING AND TILE ROOF HOOK MODULE ELEVATION DETAIL - SCALE: NTS 3" ROOF INFO FRAMING INFO ATTACHMENT INFORMATION Name Type Height Type Max Span OC Spacing Detail Max Landscape OC Spacing Max Landscape Overhang Max Portrait OC Spacing Max Portrait Overhang Configuration AR-01 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X4 PRE-FABRICATED TRUSSES 4' - 8" 24" ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 6' - 0" 2' - 4" 6' - 0"2' - 3"STAGGERED AR-02 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X4 PRE-FABRICATED TRUSSES 6' - 7"24"ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 6' - 0"2' - 4"6' - 0" 2' - 3" STAGGERED AR-03 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X4 PRE-FABRICATED TRUSSES 4' - 8"24"ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 6' - 0"2' - 4"6' - 0" 2' - 3"STAGGERED AR-04 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X4 PRE-FABRICATED TRUSSES 4' - 9"24"ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 6' - 0"2' - 4"6' - 0" 2' - 3"STAGGERED D1 - AR-01 - SCALE: 3/32" = 1'-0" AZIM:270° PITCH: 19° D2 - AR-02 - SCALE: 3/32" = 1'-0" AZIM:360° PITCH: 18° D3 - AR-03 - SCALE: 3/32" = 1'-0" AZIM:90° PITCH: 19° D4 - AR-04 - SCALE: 1/16" = 1'-0" AZIM:90° PITCH: 18° 7'-4"38'-1"8'-4" 9'-4" 11'-7" 11" 10'-4"3'-6"10'-4"6'-11" 6' TYP 20'-8"34'-7"9'-1" 2'-6" 17'-5" 1'-2" 8'-2"24'-3"8'-6" 9'-6" 11'-7" 9" 6' TYP 23'-11"13'-10"14'-1" 6' TYP 7'-1" 5'-9" 5'-3" INSTALLERS SHALL NOTIFY ENGINEER OF ANY POTENTIAL STRUCTURAL ISSUES OBSERVED PRIOR TO PROCEEDING W/ INSTALLATION. * IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS), THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS FOLLOWS: ** ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS TO BE REDUCED BY 50%. ** ALLOWABLE OVERHANG INDICATED ON PLANS TO BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS. 4USVDUVSBM 0OMZ NEW 150A MAIN BREAKER (END FED) FACILITY GROUND(N) 80A PV BREAKER AT OPPOSITE END OF BUSBAR M METER #: SCE 222011-923527 120/240 VAC SINGLE PHASE SERVICE UTILITY GRID EXISTING 200A MAIN PANELFACILITY LOADS (N) LOCKABLE BLADE TYPE AC DISCONNECT SQUARE D DU323RB 3R, 100A,2P 120/240VAC 4 (N) 100A PV LOAD CENTER 40A BREAKER (A) 35A BREAKER (B) JUNCTION BOX OR EQUIVALENT 12 SOLAREDGE TECHNOLOGIES: SE7600H-USSN 7600 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT PV MODULES LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M (31) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (16) OPTIMIZERS (1) SERIES OF (15) OPTIMIZERS SOLAREDGE POWER OPTIMIZERS P401 JUNCTION BOX OR EQUIVALENT 12 PV MODULES LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M (23) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (13) OPTIMIZERS (1) SERIES OF (10) OPTIMIZERS SOLAREDGE POWER OPTIMIZERS P401 SOLAREDGE TECHNOLOGIES: SE6000H-USSN 6000 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT 3 3 NOTE: TOTAL PV BACKFEED = 71A USED FOR INTERCONNECTION CALCULATIONS 4 CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND 1NONE (4) 10 AWG PV WIRE NONE (1) 6 AWG BARE COPPER 2 3/4" EMT OR EQUIV.(4) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 3 3/4" EMT OR EQUIV.(2) 8 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 4 1" EMT OR EQUIV.(2) 4 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 PAGE REV: A 10/19/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 MARK IVERSON 77542 ASHBERRY CT, PALM DESERT, CA, 92211 PROJECT NUMBER: 113R-542IVER SHEET DESIGNER: MODESTO NUNEZ CUSTOMER RESIDENCE: TEL. (503) 314-2238 APN: 632-600-019 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-4.0 ELECTRICAL #ESTAMP RAIL 6-12 AWG BARE COPPER WIRE 5/16"-18 SS BOLT SS SPLIT LOCK WASHER (TORQUE TO 16 FT-LBS) SNAPNRACK GROUND LUG BONDING CHANNEL NUT SS BONDING PINS NOTE: x ALL HARDWARE IS INCLUDED FROM MANUFACTURER x A MINIMUM OF ONE GROUND LUG IS TO BE INSTALLED ON EVERY CONTINUOUS ROW OF MODULES x GROUNDING LUG MAY BE INSTALLED IN EITHER RAIL CHANNEL x GROUNDING LUG MAY BE INSTALLED SO GROUND WIRE IS PARALLEL OR PERPENDICULAR TO RAIL x ENSURE SPLIT LOCK WASHER IS INSTALLED ON TOP OF COPPER WIRE SNAPNRACK GROUNDING SCALE: NTS SYSTEM CHARACTERISTICS - INVERTER 1 SYSTEM SIZE: SYSTEM OPEN CIRCUIT VOLTAGE: SYSTEM OPERATING VOLTAGE: MAX ALLOWABLE DC VOLTAGE: SYSTEM OPERATING CURRENT: SYSTEM SHORT CIRCUIT CURRENT: 11315 W 16 V 400 V 480 V 28.29 A 30 A P401 OPTIMIZER CHARACTERISTICS: MIN INPUT VOLTAGE: 8 VDC MAX INPUT VOLTAGE: 60 VDC MAX INPUT ISC: 11.75 ADC MAX OUTPUT CURRENT: 15 ADC MODULE CHARACTERISTICS LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-365M: OPEN CIRCUIT VOLTAGE: MAX POWER VOLTAGE: SHORT CIRCUIT CURRENT: 365 W 40.7 V 34.2 V 11.43 A SYSTEM CHARACTERISTICS - INVERTER 2 SYSTEM SIZE: SYSTEM OPEN CIRCUIT VOLTAGE: SYSTEM OPERATING VOLTAGE: MAX ALLOWABLE DC VOLTAGE: SYSTEM OPERATING CURRENT: SYSTEM SHORT CIRCUIT CURRENT: 8395 W 13 V 380 V 480 V 22.09 A 30 A ALL CONDUCTORS ARE RATED 90 DEGREES CELSIUS. PAGE REV: A 10/19/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 MARK IVERSON 77542 ASHBERRY CT, PALM DESERT, CA, 92211 PROJECT NUMBER: 113R-542IVER SHEET DESIGNER: MODESTO NUNEZ CUSTOMER RESIDENCE: TEL. (503) 314-2238 APN: 632-600-019 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SIGNAGE PV-5.0 #ESTAMP LABEL LOCATION: MAIN SERVICE PANEL ADJACENT TO MAIN SERVICE BREAKER. PER CODE(S): NEC 2020: 705.12(B)(3)(2), NEC 2017: 705.12(B)(2)(3)(b), NEC 2014: 705.12(D)(2)(3)(c), NEC 2011: 705.12(D)(4), CEC 2019: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), NEC 2017: 705.12(B)(2)(3)(c) NOTES AND SPECIFICATIONS: x SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2019 CEC ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. x SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. x LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. x LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. x SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. x DO NOT COVER EXISTING MANUFACTURER LABELS. INVERTER 1 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 30 15 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): CEC 2019: 690.53, NEC 2017: 690.53 LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 1O FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): CEC 2019: 690.31(G)(3), 690.31(G)(4), NEC 2017: 690.31(G)(3), 690.31(G)(4) IFC 2012: 605.11.1.4 WARNING! SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): CEC 2019: 705.12(B)(3), NEC 2017: 705.12(B)(3) WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b), NEC 2017: 705.12(B)(2)(3)(b) LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUT DOWN SWITCH PER CODE(S): CEC 2019: 690.56(C)(3), NEC 2017: 690.56(C)(3), IFC 2012: 605.11.1, IFC 2018: 1204.5.3, CFC 2019: 1204.5.3 ELECTRICAL SHOCK HAZARD WARNING LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B), NEC 2017: 690.13(B) ! SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): CEC 2019: 690.56(C)(1)(a), NEC 2017: 690.56(C)(1)(a) 4" 3" INVERTER 2 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 30 15 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): NEC 2017: 690.53, CEC 2019: 690.53 PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54, NEC 2017: 690.54 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: 77542 ASHBERRY CT, PALM DESERT, CA, 92211 SERVICE ENTRANCE AND PV BREAKER DISCONNECTAC DISCONNECT PV LOAD CENTER INVERTER (EXT) SOLAR PANELS ON ROOF UR-40 RAIL | UR-60 RAIL FOR USE WITH SNAPNRACK ULTRA SERIES RAILS INSTALLED ASSEMBLY ATTACHMENT DETAIL OFFSET DETAIL SECTION D-D SCALE 7:24 SECTION E-E SCALE 1 / 4 ATTACHMENT DETAIL CDDEE DESCRIPTION:DRAWING NUMBER:SCALE:DESIGNER: APPROVED BY: REVISION: Sunrun South LLC 595 MARKET STREET, 29TH FLOOR Ɣ SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 Ɣ FAX (415) 580-6902 THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. ULTRA RAIL, ATTACHMENT DETAIL, ULTRA RAIL ADJUSTABLE TILE HOOK TO RAFTERSNR-DC-00437 1 2/6/2020 NEW DETAIL 2 11/6/2020 EDITED NOTES REV: 2DATE: DNS 11/6/2020 DRAFTER:D.RYAN W.ARBUCKLE D.RYAN Solar Mounting Solutions DR DR1 BIN: 15 8 " 11 2 " 11 2 " 21 4 " SNAPNRACK ADJUSTABLE TILE HOOK FOR USE WITH SNAPNRACK ULTRA RAIL TILE ROOF MOUNT ASSEMBLY MAY BE USED FOR S, W, AND FLAT TILE PROFILE ROOFS REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH "BIN" NUMBER ON THIS DRAWING 5 16 "P S.S. LAG SCREWS MUST EMBED A MIN. OF 21 2 " INTO STRUCTURAL MEMBER REFER TO SNAPNRACK INSTALLATION MANUAL FOR 5 16 "P HARDWARE TORQUE SPECIFICATIONS UNLESS STATED OTHERWISE RAIL MAY BE MOUNTED TO THE UPSLOPE OR DOWNSLOPE SIDE OF THE TILE HOOK RAILS CAN BE LEVELED UP TO 11 4 " USING THE SLOT IN THE TILE HOOK TILE HOOK ARM CAN BE LEVELED 7 16 " RELATIVE TO THE BASE STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE = SPF #2 MINIMUM SPECIFIC GRAVITY = 0.42 ALLOWABLE FASTENER UPLIFT = 820 LBS ALLOWABLE FASTENER LATERAL = 250 LBS MINIMUM FASTENER EDGE DISTANCE = 0.5" MINIMUM FASTENER END DISTANCE = 2.2" STEP 1: REMOVE TILES TO EXPOSE ROOF DECKING SEALANT STEP 2: DRILL 2 QTY. 3 16 "‘ PILOT HOLES INTO RAFTER. SEAL ROOF PENETRATIONS WITH APPROPRIATE SEALANT. FASTEN BASE TO ROOF WITH 2 QTY. 5 16 "‘ LAG SCREWS WITH FLAT WASHERS ROOF TILE ("S" PROFILE), TYP. STRUCTURAL MEMBER, WOOD RAFTER, TYP. ROOF DECKING, TYP. ENSURE 21 2 " MINIMUM EMBEDMENT INTO WOOD MEMBER TILE BATTEN, TYP. ROOF DECKING, TYP. ROOF TILES ("S" PROFILE), TYP. STRUCTURAL MEMBER (RAFTER) HOOK ARM CAN BE OFFSET FROM RAFTER UP TO 6" IN EITHER DIRECTION TO LINE UP WITH LOW POINT IN S-TILES MODULE HEIGHT OFF ROOF, RANGE: UR-40: 71 4 " - 815 16 " UR-60: 77 8 " - 99 16 " P5 16 " STAINLESS LAG SCREWS WITH 5 16 " STAINLESS FLAT WASHERS UR-60 RAIL (UR-40 RAIL SIMILAR) SNAPNRACK ADJUSTABLE TILE HOOK ARM MAY BE RELOCATED ON BASE WHERE REQUIRED SNAPNRACK ADJUSTABLE TILE HOOK BASE SNAPNRACK UR-60 RAIL SNAPNRACK ULTRA RAIL ADJUSTABLE TIE HOOK ASSEMBLY P5 16 " STAINLESS CARRIAGE BOLT WITH FLANGE NUT R E E N I IGER LARUTCURTS AINROFILACFOETAT S G N E LANOISSEFORPDERETSE H C A Z HTENEKL N AP Exp. 3-31-23 No. S3878 R U ST O R E D G E ® solaredge.com Optimized battery storage with HD-Wave technology 5HFRUGEUHDNLQJZHLJKWHGHIÀFLHQF\ZLWK 200% DC oversizing Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020, per article 690.11 and 690.12 Embedded revenue grade production data, ANSI C12.20 Class 0.5 6PDOOOLJKWZHLJKWDQGHDV\WRLQVWDOO 0RGXODUGHVLJQIXWXUHUHDG\ZLWKRSWLRQDO upgrades to: Multi-inverter(*), scalable storage solution Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US 12-25 YEARWARRANTY DC-coupled storage for full or partial home backup Built-in consumption monitoring Direct connection to the SolarEdge smart EV charger SE3000H-US SE3800H-US SE6000H-US SE7600H-US UNITS OUTPUT - AC ON GRID Rated AC Power 3000 3800 6000 7600 W Maximum AC Power Output 3000 3800 6000 7600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max)59.3 - 60 - 60.5(2)Hz Maximum Continuous Output Current 12.5 16 25 32 A GFDI Threshold 1A 7RWDO+DUPRQLF'LᐎRUWLRQ 7+' <3 % Power Factor DGMXᐎDEOHWR 8WLOLW\0RQLWRULQJ,VODQGLQJ3URWHFWLRQ&RXQWU\&RQÀJXUDEOH7KUHVKROGV Yes Charge Battery from AC (if Allowed)Yes Typical Nighttime Power Consumption <2.5 W OUTPUT - AC BACKUP(3) Rated AC Power in Backup Operation 2400 3050 4800 6100 W Peak AC Power (<10 sec) in Backup Operation 2700 3400 5400 6900 W AC L-L Output Voltage Range in Backup 211-264 Vac AC L-N Output Voltage Range in Backup 105-132 Vac AC Frequency Range in Backup (min - nom - max) 55 - 60 - 65 Hz Maximum Continuous Output Current in Backup Operation 10 12.7 20 25.5 A Peak AC Current (<10sec) in Backup Operation 11.25 14.2 22.5 30 A GFDI 1A THD <5 % OUTPUT - SMART EV CHARGER AC Rated AC Power 9,600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max) 59.3-60-60.5 Hz 0D[LPXP&RQWLQXRXV2XWSXW&XUUHQW#9 JULG39DQGEDWWHU\ 40 Aac INPUT - DC (PV AND BATTERY) Transformer-less, Ungrounded Yes Max Input Voltage 480 Vdc Nom DC Input Voltage 380 400 Vdc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection NƼ6HQVLWLYLW\ INPUT - DC (PV) Maximum DC Power 6000 7600 12000 15600 W Maximum Input Current(4)8.5 10.5 16.5 20 Adc 0D[,QSXW6KRUW&LUFXLW&XUUHQW 45 Adc 0D[LPXP,QYHUWHU(੕FLHQF\99.2 % &(&:HLJKWHG(੕FLHQF\99 % 2-pole Disconnection Yes INPUT - DC (BATTERY) 6XSSRUWHG%DWWHU\7\SHV /*&KHP5(68+ 1XPEHURI%DWWHULHVSHU,QYHUWHU 1 or 2(5) Maximum Battery Capacity per Inverter 19.6 kWh Continuous Power Per Inverter 5000 W Peak Power 6900 W Max Input Current @240V 18 Adc 2-pole Disconnection Yes Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) SMART ENERGY CAPABILITIES Consumption Metering Built - in(6) %DWWHU\6WRUDJH With Backup Interface for service up to 200A; Up to 3 inverters*N:EDFNXSSRZHU*, and 60kWh EDFNXSFDSDFLW\* EV Charging 'LUHFWFRQQHFWLRQWR6PDUW(9FKDUJHU ADDITIONAL FEATURES 6XSSRUWHG&RPPXQLFDWLRQ,QWHUIDFHV 56(WKHUQHW:L)L RSWLRQDO &HOOXODU(7) 5HYHQXH*UDGH0HWHULQJ$16,&Built - in(6) Integrated AC, DC and Communication Connection Unit Yes Inverter Commissioning ZLWKWKH6HW$SSPRELOHDSSOLFDWLRQXVLQJEXLOWLQ:L)L$FFHVV3RLQWIRUORFDOFRQQHFWLRQ '&9ROWDJH5DSLG6KXWGRZQ 39DQG%DWWHU\ Yes, according to NEC 2014, NEC 2017 and NEC 2020 690.12 STANDARD COMPLIANCE 6DIHW\8/8/6$8/%8/8/&6$ *ULG&RQQHFWLRQ6WDQGDUGV IEEE1547, Rule 21, Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS $&2XWSXW&RQGXLW6L]H$:*5DQJH  PD[LPXP$:*  PD[LPXP$:* (9$&2XWSXW&RQGXLW6L]H$:*5DQJH  PD[LPXP$:*  PD[LPXP$:* '&,QSXW 39 &RQGXLW6L]H$:*5DQJH  PD[LPXP$:*  PD[LPXP$:* '&,QSXW %DWWHU\ &RQGXLW6L]H$:*5DQJH  PD[LPXP$:*  PD[LPXP$:* Dimensions with Connection Unit (HxWxD);;;; LQPP Weight with Connection Unit   OENJ Noise < 25 dBA Cooling Natural Convection Operating Temperature Range WRWR(7)Ü)Ü& Protection Rating NEMA 4X © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 11/2020/V01/ENG NAM. Subject to change without notice.  3HQGLQJÀUPZDUHXSJUDGH  7KHVHVSHFLÀFDWLRQVDSSO\WRLQYHUWHUVZLWKSDUWQXPEHUV6([[[[+866[[[[[RU6(+8666+[[[[DQGFRQQHFWLRQXQLWPRGHOQXPEHU'&'3+863[+)[  )RURWKHUUHJLRQDOVHWWLQJVSOHDVHFRQWDFW6RODU(GJHVXSSRUW (3) Not designed for standalone applications and requires AC for commissioning  $KLJKHUFXUUHQWVRXUFHPD\EHXVHGWKHLQYHUWHUZLOOOLPLWLWVLQSXWFXUUHQWWRWKHYDOXHVVWDWHG  :KHQFRQQHFWLQJWZR/*&KHP5(68EDWWHULHVHDFKEDWWHU\PXVWKDYHDGLIIHUHQWSDUWQXPEHU  )RUFRQVXPSWLRQPHWHULQJFXUUHQWWUDQVIRUPHUVVKRXOGEHRUGHUHGVHSDUDWHO\6($&71$RU6($&71$XQLWVSHUER[  )RUERWK\UDQG\UGDWDSODQV Ã&XVWRPHULVUHVSRQVLEOHIRUYHULI\LQJWKDWWKHVLWHORFDWLRQKDVDGHTXDWHPRELOHFRYHUDJHE\WKHWKLUGSDUW\VHUYLFHSURYLGHUSULRUWRDQ\LQVWDOODWLRQE\DFFHVVLQJ https://www.solaredge.com/ ֿ products/communication/cellular-communication-options#/ Ã6RODU(GJHVKDOOQRWEHUHVSRQVLEOHRUOLDEOHIRUXQDYDLODELOLW\RUGLVFRQWLQXDQFHRIQHWZRUNFRYHUDJHLQDVSHFLÀFDUHDRUUHJLRQDQ\QHWZRUNGRZQWLPHRUSHUPDQHQWVHUYLFHVKXWGRZQ  )XOOSRZHUXSWRDWOHDVWƒ&ƒ)IRUSRZHUGHUDWLQJLQIRUPDWLRQUHIHUWRKWWSVZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVVHWHPSHUDWXUHGHUDWLQJQRWHQDSGI Connecting CTs to the Revenue Grade and Consumption Meter 6LQJOH3KDVH(QHUJ\+XE,QYHUWHU ZLWK3ULVP7HFKQRORJ\ Grid Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) PO W E R O P T I M I Z E R solaredge.com PV power optimization at the module-level 6SHFLÀFDOO\GHVLJQHGWRZRUNZLWK6RODU(GJH LQYHUWHUV 8SWRPRUHHQHUJ\ )OH[LEOHV\VWHPGHVLJQIRUPD[LPXPVSDFH XWLOL]DWLRQ )DVWLQVWDOODWLRQZLWKDVLQJOHEROW 1H[WJHQHUDWLRQPDLQWHQDQFHZLWKPRGXOH OHYHOPRQLWRULQJ 0HHWV1(&UHTXLUHPHQWVIRUDUFIDXOW SURWHFWLRQ $)&, DQG3KRWRYROWDLF5DSLG 6KXWGRZQ6\VWHP 39566 0RGXOHOHYHOYROWDJHVKXWGRZQIRULQVWDOOHU DQGÀUHÀJKWHUVDIHW\ 6XSHULRUHIÀFLHQF\  0LWLJDWHVDOOW\SHVRIPRGXOHPLVPDWFKORVVHV IURPPDQXIDFWXULQJWROHUDQFHWRSDUWLDO VKDGLQJ Power Optimizer For North America 33333333 25 YEARWARRANTY Œ6RODU(GJH7HFKQRORJLHV/WG$OOULJKWVUHVHUYHG62/$5('*(WKH6RODU(GJHORJR237,0,=('%<62/$5('*(DUHWUDGHPDUNVRUUHJLVWHUHGWUDGHPDUNVRI6RODU(GJH7HFKQRORJLHV,QF $OORWKHUWUDGHPDUNVPHQWLRQHGKHUHLQDUHWUDGHPDUNVRIWKHLUUHVSHFWLYHRZQHUV'DWH9(1*1$06XEMHFWWRFKDQJHZLWKRXWQRWLFH  )RUGHWDLOHGᐎULQJVL]LQJLQIRUPDWLRQUHIHUWRKWWSZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVᐎULQJBVL]LQJBQDSGI  ,WLVQRWDOORZHGWRPL[333ZLWK33333LQRQHᐎULQJ  $ᐎULQJZLWKPRUHWKDQRSWLPL]HUVGRHVQRWPHHW1(&UDSLGVKXWGRZQUHTXLUHPHQWVVDIHW\YROWDJHZLOOEHDERYHWKH9UHTXLUHPHQW  )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGL੔HUHQFHEHWZHHQHDFKᐎULQJLV:  )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGL੔HUHQFHEHWZHHQHDFKᐎULQJLV: Power Optimizer For North America 33333333 Optimizer model (typical module compatibility) P320 (for 60-cell modules) P340 (for high- power 60-cell modules) P370 (for higher- power 60 and 72- cell modules) P400 (for 72 & 96-cell modules) P401 (for high power 60 and 72 cell modules) P405 (for high- voltage modules) P485 (for high- voltage modules) P505 (for higher current modules) INPUT 5DWHG,QSXW'&3RZHU         : $EVROXWH0D[LPXP,QSXW9ROWDJH 9RFDWORZHᐎWHPSHUDWXUH         9GF 03372SHUDWLQJ5DQJH       9GF 0D[LPXP6KRUW&LUFXLW&XUUHQW (Isc)     Adc 0D[LPXP'&,QSXW&XUUHQW     Adc 0D[LPXP(੕FLHQF\% :HLJKWHG(੕FLHQF\98.8 % 2YHUYROWDJH&DWHJRU\II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) 0D[LPXP2XWSXW&XUUHQW Adc 0D[LPXP2XWSXW9ROWDJH   9GF OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) 6DIHW\2XWSXW9ROWDJHSHU3RZHU 2SWLPL]HU ” 9GF STANDARD COMPLIANCE (0&)&&3DUW&ODVV%,(&,(& 6DIHW\,(& FODVV,,VDIHW\ 8/ 0DWHULDO 8/9895HVLᐎDQW 5R+6 Yes INSTALLATION SPECIFICATIONS 0D[LPXP$OORZHG6\ᐎHP 9ROWDJH  9GF &RPSDWLEOHLQYHUWHUV $OO6RODU(GJH6LQJOH3KDVHDQG7KUHH3KDVHLQYHUWHUV 'LPHQVLRQV :[/[+ [[[[ [[ [[ [[ [[[[[[[[ [[ mm LQ :HLJKW LQFOXGLQJFDEOHV      JUOE ,QSXW&RQQHFWRU 0&  6LQJOHRUGXDO 0&   0&  ,QSXW:LUH/HQJWK  RU RU   PIW 2XWSXW:LUH7\SH&RQQHFWRU 'RXEOH,QVXODWHG0& 2XWSXW:LUH/HQJWK   PIW 2SHUDWLQJ7HPSHUDWXUH5DQJH   Ü&Ü) 3URWHFWLRQ5DWLQJ ,31(0$3 5HODWLYH+XPLGLW\%  5DWHGSRZHURIWKHPRGXOHDW67&ZLOOQRWH[FHHGWKHRSWLPL]HU´5DWHG,QSXW'&3RZHUµ0RGXOHVZLWKXSWRSRZHUWROHUDQFHDUHDOORZHG  1(&UHTXLUHVPD[LQSXWYROWDJHEHQRWPRUHWKDQ9  )RURWKHUFRQQHFWRUW\SHVSOHDVHFRQWDFW6RODU(GJH  )RUGXDOYHUVLRQIRUSDUDOOHOFRQQHFWLRQRIWZRPRGXOHVXVH310'050,QWKHFDVHRIDQRGGQXPEHURI39PRGXOHVLQRQHᐎULQJLQᐎDOOLQJRQH3GXDOYHUVLRQSRZHURSWLPL]HUFRQQHFWHG WRRQH39PRGXOH:KHQFRQQHFWLQJDVLQJOHPRGXOHVHDOWKHXQXVHGLQSXWFRQQHFWRUVZLWKWKHVXSSOLHGSDLURIVHDOV  /RQJHULQSXWVZLUHOHQJWKDUHDYDLODEOHIRUXVH)RUPLQSXWZLUHOHQJWKRUGHU3[[[/[[[  )RUDPELHQWWHPSHUDWXUHDERYHƒ&ƒ)SRZHUGHUDWLQJLVDSSOLHG5HIHUWR3RZHU2SWLPL]HUV7HPSHUDWXUH'H5DWLQJ7HFKQLFDO1RWHIRUPRUHGHWDLOV PV System Design Using a SolarEdge Inverter(7)(8) Single Phase HD-Wave Single phase Three Phase for 208V grid Three Phase for 277/480V grid 0LQLPXP6WULQJ/HQJWK 3RZHU2SWLPL]HUV  333 338   333 8  0D[LPXP6WULQJ/HQJWK 3RZHU2SWLPL]HUV    (9) 0D[LPXP3RZHUSHU6WULQJ  ZLWK 6(866( 86      : 3DUDOOHO6WULQJVRI'L੔HUHQW/HQJWKVRU2ULHQWDWLRQV Yes 19/10/2022 RE: Structural Certification for Installation of Residential Solar        MARK IVERSON:77542 ASHBERRY CT, PALM DESERT, CA, 92211 Attn: To Whom It May Concern Design Criteria Code 2019 California Building Code (ASCE 7‐16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 15 psf V 130 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Curved S‐Tile roofing over roof plywood supported by 2X4 Pre‐Fabricated Trusses at 24 inches. The slope of the roof was approximated to be 18 and 19 degrees. After review and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. projects@evengineersnet.com http://www.evengineersnet.com Structural Letter for PV Installation Date: 19/10/2022 Job Address:77542 ASHBERRY CT PALM DESERT, CA, 92211 Job Name:MARK IVERSON Job Number:221019MI Scope of Work Table of Content Sheet 1 Cover 2 Attachment Uplift checks 3 Roof Framing Check 4 Seismic Check and Scope of work Engineering Calculations Summary Code 2019 California Building Code (ASCE 7‐16) Risk category II Roof Dead Load Dr 15 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S 0 psf Wind Load (component and Cladding) V 130 mph Exposure C References NDS for Wood Construction Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications.  projects@evengineersnet.com http://www.evengineersnet.com Wind Load Cont. 130 mph ASCE 7‐16 Figure 26.5‐1B C 1.0 ASCE 7‐16 Sec 26.8.2 0.85 ASCE 7‐16 Table 26.10‐1 0.85 ASCE 7‐16 Table 26.6‐1 1.00 ASCE 7‐16 Table 26.9‐1 31.11 psf 18.0 Degrees 1.1 0.6 (Wind Tunnel value) Uplift (W)Zone(1) Zone(2r) Zone(2e) Zone(3) Fig. 30‐3‐2 GCp=‐2.1 ‐2.6 ‐2.7 ‐2.7 Eq. 29.4‐7 P=qh(GCp)(γE)(γa)=‐43.11 ‐53.38 ‐55.43 ‐55.43 GCp=0.3 Figure 30.3‐2 P=qh(GCp)(γE)(γa)=6.16 Equation 29.4‐7 Rafter Attachments: 0.6D+0.6W (CD=1.6)  Connection Check Attachement max. spacing= 6 ft 5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A ‐ NDS 2.5 in DFL Assumed Allowable Capacity= 760 lbs (Lag Bolt) Zone Trib Width Area (ft) Uplift (lbs) Down (lbs) Zone(1)6 16.5 456.5 151.1 Zone(2r)6 16.5 558.1 151.1 Zone(2e)6 16.5 578.5 151.1 Zone(3)6 16.5 578.5 151.1 Conservative Max=578.5 < 760 CONNECTION IS OK Risk Category = KZ = Kd = Ke = 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II V= Exposure = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs  γE= γa=  KZt = qh= 0.00256KzKztKdKeV2= Pitch = Lag Screw Penetration projects@evengineersnet.com http://www.evengineersnet.com Vertical Load Resisting System Design Roof Framing Trusses Snow Load Fully Exposed pg= 0 psf Ct =1.1 Ce =0.9 Is =1.0 ps = 0 psf pf = 0 psf pfmin. = 0.0 psf 0 plf Max Length, L = 6.6 ft Tributary Width, WT =24 in RLL =20psf 19.02 plf Dr =15psf 30 plf PvDL =3 psf 6 plf Load Case: DL w= 28 plf M= 93 lb‐ft Mallowable = Sx x Fb'= 309 lb‐ft > 93 lb‐ft OK Load Case: DL+RLL DL+Lr= 41 plf Mdown=137 lb‐ft Mallowable = Sx x Fb'= 429 lb‐ft > 137 lb‐ft OK Load Case: DL+S DL+S= 36 plf Mdown=120 lb‐ft Mallowable = Sx x Fb'= 412 lb‐ft > 120 lb‐ft OK Load Case: DL+0.6W w= 43.4 plf Mu=145 lb‐ft Mallowable = Sx x Fb' (wind)= 549 lb‐ft > 145 lb‐ft OK Load Case: 0.6DL+0.6W w= 34.0 plf Mu=113 lb‐ft Mallowable = Sx x Fb' (wind)= 549 lb‐ft > 113 lb‐ft OK DL+0.45W+0.75(RLL or S)45 plf Mdown=151 lb‐ft Mallowable = Sx x Fb'= 549 lb‐ft > 151 lb‐ft OK Member Capacity DF‐L No.2  2X4 CL CF Ci Cr Fb =900 psi 1.0 1.3 1.0 1.15 1346 psi Fv =180 psi N/A N/A 1.0 N/A 180 psi E = 1600000 psi N/A N/A 1.0 N/A 1600000 psi Emin =580000 psi N/A N/A 1.0 N/A 580000 psi Depth, d = 3.5 in Width, b = 1.5 in Cross‐Sectonal Area, A = 5.25 in2 Moment of Inertia, Ixx =5.35938 in4 Section Modulus, Sxx =3.0625 in3 Allowable Moment, Mall = Fb'Sxx =343.4 lb‐ft DCR=Mu/Mall =0.32 < 1 Satisfactory Allowable Shear, Vall = 2/3Fv'A =630.0 lb DCR=Vu/Vall =0.29 < 1 Satisfactory Design Value Adjusted Value projects@evengineersnet.com http://www.evengineersnet.com Siesmic Loads Check Roof Dead Load 15 psf  % or Roof with Pv 25.7% Dpv and Racking 3 psf Average Total Dead Load 15.8 psf Increase in Dead Load 2.9%OK  Limits of Scope of Work and Liability The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. We have based our structural capacity determination on information in pictures and a drawing set titled PV plans ‐MARK IVERSON. The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments. The calculations produced for this structure's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures.  projects@evengineersnet.com http://www.evengineersnet.com Section 220.83 Existing Dwelling Unit Part #1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Amps Box A (VA) 36.24 8697 Part #2 - Section 220.83 (B)(2),(3)a, b, c, d - Appliances and Dedicated Circuits: Size in VA Size in VA 1500 N/A 3000 N/A 1000 N/A 600 N/A 1000 N/A 1600 N/A N/A N/A N/A N/A 9600 N/A 5760 Amps Box B (VA) 9600 140.25 33660 Total VA from Parts #1 and #2 combined:Box A + Box B =42357 Total VA 42357 First 8,000 VA @ 100%8000 Remaining VA @ 40% Remaining VA =34357 34357 x 40% =13742.8 VA Adding First 8000 VA 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits:21742.8 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits:90.60 Amps Part #3 - Section 220.83 (B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100% of all the Heating or A/C loads in VA:11,856 VA 100% of all the Heating or A/C loads in Amps:49.40 A VA Volts Amps Parts #1 & #2 21742.8 240 90.60 Part #3 11,856 240 49.40 Total VA for all Parts:33,599 Totals Service/Feeder Load 140.00 Refrigerator(s) Microwave(s) Totals for Part #2:Sub-Panel Dryer Range Oven Cooktop Amps 36.2375 Job Code 113R-542IVER Totals from all Parts Dedicated circuit Total for Part #1: Water Heater House Square Footage 2899 Article 220 - Service/Feeder calculation for (address): 77542 Ashberry Ct Palm Desert CA USA 92211 Building VA (watts) 8697 Laundry Appliance Circuit(s) Dishwasher(s) Disposal(s) Dedicated circuit SOLAR ENERGY SYSTEM DISCLOSURE DOCUMENT This disclosure shall be printed on the front page or cover page of every solar energy contract for the installation of a solar energy system on a residential building. The TOTAL COST for the solar energy system (including financing and energy / power cost if applicable) is: $68,853.43 To make a complaint against a contractor who installs this system and/or the home improvement salesperson who sold this system, contact the Contractors State License Board (CSLB) through their website at www.cslb.ca.gov (search: “complaint form”), by telephone at 800‐321‐CSLB (2752), by writing to P.O. Box 26000, Sacramento, CA 95826. If the attached contract was not negotiated at the contractor's place of business, you have a Five‐Day Right Cancel the contract, pursuant to Business and Professions Code (BPC)section 7159, as noted below. For further details on canceling the contract, see the Notice of Cancellation, which must be included in your contract. Five‐Day Right to You, the buyer, have the right to cancel this contract within five business days. You may cancel by e‐mailing, mailing, faxing, or delivering a written notice to the contractor at the contractor's place of business by midnight of the fifth business day after you received a signed and dated copy of the contract that includes this notice. Include your name, your address, and the date you received the signed copy of the contract and this notice. This document was developed through coordination of the California Contractors State License Board and the California Public Utilities Commission pursuant to Business and Professions Code section 7169. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 1 Sunrun BrightSave™ Prepaid Agreement Mark Iverson 77542 Ashberry Ct, Palm Desert, CA, 92211 Take Control of Your Electric Bill $500 Amount Due at Signing 25 Years Agreement Term Length $68,353 Amount Due at Installation (includes sales tax) $0.104 Implied cost per kWh (excluding upfront payment, if any) WE’VE GOT YOU COVERED WITH OUR WORRY-FREE SERVICE We provide hassle-free design, permitting, and installation. We monitor the system to ensure it runs properly. We warrant, insure, maintain and repair the system. We also provide a 10- year roof warranty. Selling your home? We guarantee the buyer will qualify to assume your agreement. A SOLAR SYSTEM DESIGN FOR YOUR HOME You get a 19.71 kW DC Solar System With 54 Solar Panels and 2 Inverter(s) Which will produce an est. 27,796 kWh in its first year And offset approx. 94% of your current estimated, electricity usage YOUR SALES REPRESENTATIVE: Alexander Gu alexander.gu@sunrun.com DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 2 DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 3 This Prepaid Power Purchase Agreement (the "Agreement")is entered into by and between Mark Iverson (“Customer”or “homeowner”or “you”)and Sunrun Installation Services Inc.,a Delaware corporation, together with its successors and Assignees (“Sunrun”or “we”together with Customer,the “Parties”,each a “Party”),as of the Effective Date for the sale and purchase of all electric energy generated by a solar photovoltaic system (the “Solar System”)to be installed on or at your home located at 77542 Ashberry Ct Palm Desert,CA 92211 (the “Home”).Sunrun is pleased to provide you with solar electric power for a twenty-five (25)year term. You are entitled to a completely filled out copy of this Agreement signed by both you and Sunrun before any Work begins.This Agreement is effective as of\od\______(the “Effective Date”).The Effective Date listed in the preceding sentence is the date on which the last Party signed this Agreement.Please read the entire Agreement and ask any questions you may have. Table of Contents A.Documents to be Incorporated into the Agreement.…………………………………... lists Exhibits (including certain notices)incorporated into your Agreement. Page 1 B.Payment Terms,Rebates,&Credits...……………………………………………………. includes your payment terms,your payment schedule,any rebates and credits that you or Sunrun may receive,and our late payment policy. Page 1 C.Our Warranties…...…………………………………………………………………………….. explains our equipment,workmanship,roof penetration,and damages warranties. Page 3 D.Performance Guarantee ……………………………………………………………………... explains estimated performance of the Solar System. Page 4 E.Design and Installation..………………………………………………………………………. includes a description of the design &installation process &the timeline for installation. Page 5 F.Change Orders..……………………………………………………………………………….. explains the process for modifying the Solar System design. Page 9 G.Additional Information..……………………………………………….………………………. includes important information about the term of your Agreement,actions not included in design and installation,dispute resolution,and Sunrun’s insurance coverage. Page 9 H.Notices of Right to Cancel..………………………………………………………..…………. explains the Parties’rights to cancel the Agreement. Page 17 Documents to be Incorporated Into the AgreementA. Exhibit A:Guaranteed Output and Purchase Price Exhibit B:Legal Notices Exhibit C:Notice of Cancellation Exhibit D:Payment Forms Exhibit E:Data Usage and Disclosure Payment Terms,Rebates,and CreditsB. Payment Terms1. Deposit (due at signing)$500 (the “Deposit”) Balance Payment (due at Installation Start Date) $68,353 (the “Balance Payment”) (Includes sales tax) Total Payments $68,853 Implied cost per kWh $0.104 Sunrun Installation Services Inc. Sunrun BrightSave™ Prepaid Power Purchase Agreement DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 9/23/2022 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 4 Balance Payment2. The Balance Payment amounts may change if the final Solar System design differs from the preliminary Solar System design (as further discussed in Sections E and F below). You agree to pay Sunrun the Deposit and the Balance Payment in the amounts and on the dates seta. forth above. The Deposit is payable to Sunrun Inc.by credit card,money order or a check drawn on a United Statesb. bank account. The Balance Payment are payable to Sunrun Inc.by money order or a check drawn on a United Statesc. bank account. Payment of Taxes3. The payments specified in Section B(1)above do not include taxes (unless specifically noted therein).Ifa. any taxes (including,but not limited to,sales and transaction taxes and including any associated interests and penalties)are assessed on these payments,the sale of electric energy,the Home,or the transaction itself,and are paid by Sunrun rather than you,you agree to pay or reimburse Sunrun for all such taxes,except to the extent that you are prohibited from doing so by applicable laws. In addition,you agree to reimburse Sunrun for any taxes,including any associated interests andb. penalties,assessed on the Solar System that Sunrun may incur. To the extent that Sunrun seeks reimbursement from you,you agree that Sunrun may seek a fullc. reimbursement from you for the total amount incurred by Sunrun,or,at its sole discretion,set up a separate payment plan with you to recover the total amount incurred by Sunrun. Late Payment.If Sunrun does not receive your payment by the due date listed on the invoice,Sunrun4. may charge you an administrative late fee equal to the lesser of (i)one and a half (1.5%)percent per month on the portion of your balance that is more than thirty (30)days past due,and (ii)the maximum amount permitted under and subject to applicable law.This late fee is not an interest charge,finance charge,time price differential or other such charge or payment of a similar nature. Net Metering Service.5. As of the In-Service Date,you must take service from the Standard Net Metering Serviceand itsa. associated terms ("NEM Service")provided by your Utility.You agree that you will continue to take NEM Service for as long as this Agreement is in effect.You agree to take the NEM Service currently in effect for this Utility or,in the event that the NEM Service is no longer in effect,you agree to use a substitute metering program as chosen by Sunrun in its sole discretion. You agree to execute all documentation associated with the NEM Service,or any substitute meteringb. service,and any refund,credit,or rebate program promptly at the request of Sunrun,its representatives or affiliates,and/or the Utility.If you do not return such documentation within seven (7)days following any such request,Sunrun may invoice you for an amount equal to the amount of rebates it otherwise would have received had you returned such documentation. The point where the Solar System connects to the Home's connection to your Utility is calledc. “Interconnection.”For the purposes of calculating performance guarantee payments,if any,under Section D,you agree that title to and risk of loss for the electric energy provided under this Agreement shall pass from Sunrun to you when the electric energy reaches Interconnection.You further agree that electrical energy provided under this Agreement is measured at the time when electrical energy reaches Interconnection. Supplemental Energy;Rebates &Credits6. All electric energy produced by the Solar System will be available to you for use at the Home pursuant toa. this Agreement.If,at any time,you need more electric energy than is being produced by the Solar DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 5 System ("Supplemental Energy"),you will be responsible for purchasing that Supplemental Energy from another supplier,such as your Utility and for paying any fees associated with such Supplemental Energy that the other supplier may charge. You agree that Sunrun alone will receive any credit,rebate,environmental attribute,solar renewableb. energy credit,or other payment or offset (the “Incentive”)that may be attributable to the Solar System. All Incentives will be the sole property of and transferable by Sunrun. Notwithstanding anything to the contrary contained herein and without limiting the other rights,if any,ofc. Sunrun with respect to incentives attributable to the Solar System,you agree that Sunrun will receive any federal tax credits that may be attributable to the Solar System,and that such federal tax credits will be the sole property of and transferable by Sunrun.Sunrun’s expected federal tax credits associated with the Solar System have been factored into the calculation of your Lease Payment. If you purchase the Solar System from Sunrun,you will own and be entitled to proceeds from the sales ofd. solar renewable energy credits earned after the date you purchase the Solar System from Sunrun. Our WarrantiesC. Warranties1. Workmanship Warranty.We warrant our Work for a period ofa. twenty-five (25)years after installation (the “Warranty Period”), except as provided below with respect to our roof penetration warranty.During the Warranty Period we will,at our expense, repair or replace any material or Work covered under this Agreement.Our Workmanship Warranty includes but is not limited to the following: Roof Penetration Warranty.We warrant that roof penetrations made by the Solar System and(i) impacting the Home’s roof will be weather-tight for a period of 10 years after installation. Damage Warranty.We will either repair or reimburse you for damage we cause during installation to(ii) the Home,your belongings or your property,as limited by Sections C(2),E and G. Sunrun will maintain and repair the Solar System for the Initial Term and any Renewal Terms.(iii) Equipment Warranty.Sunrun warrants all equipment for the duration of the Initial Term.If parts fail duringb. the term of this Agreement,Sunrun will use commercially reasonable efforts to replace them with like equipment;however,you acknowledge that due to parts availability and other factors,this may not be possible.Sunrun agrees that any change in equipment will not reduce the Guaranteed Output set forth in Section D. End of Term Warranty.At the end of the Initial Term or at the end of a Renewal Term,should either youc. or Sunrun wish to end the Agreement,Sunrun will remove the Solar System at no cost to you and return the Home to a condition similar to its condition prior to installation of the Solar System,excepting ordinary wear and tear (including,but not limited to,wear and tear resulting from local weather conditions)and wear and tear that can be expected due to the presence of the Solar System on the Home for the 25-year term (including,but not limited to,uneven wear and tear and uneven discoloration). Warranty Exceptions and Exclusions2. The Roof Penetration Warranty shall be void and voidable if work is performed by you or your contractorsa. on the roof during the 10 year warranty period. WE INSURE AND MAINTAIN THE SYSTEM FOR 25 YEARS AFTER INSTALLATION. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 6 The Roof Penetration Warranty does not cover any (i)leaks that occur in areas of the Home’s roof notb. impacted by the Solar System,(ii)pre-existing and/or underlying failures of the Home’s roof or (iii) foreign objects acting on the Home’s roof (e.g.hail,golf balls,etc.). The Workmanship Warranty does not apply to the following:c. Work performed or materials used by anyone other than us or our Installation Partners;(i) Any materials that were modified,repaired or attempted to be repaired by anyone other than(ii) Sunrun or its Installation Partners without Sunrun’s prior written approval; Any damages resulting from your breach of the Agreement;(iii) Any damage not caused by us,our Installation Partners or a Solar System defect;(iv) Damage resulting from ordinary wear and tear;(v) Damage resulting from mold,fungus and other organic pathogens;(vi) Shrinking/cracking of grout and caulking;(vii) Fading of paints and finishes exposed to sunlight;and(viii) Damage caused by ball strikes(i) You acknowledge that installation of the Solar System may void any roofing warranty of the roof manufacturer or roof installer.We assume no responsibility if our Work voids your roofing warranty. Before installation,you should check with the roofer or builder concerning any impact the Solar System will have on a roof warranty. Your initials indicate that you have read,understood and accepted the provisions set forth in this section C(2). Agreed and accepted by:\i1\_______(Initials) Contacting Sunrun to Fix the Solar System.Sunrun will monitor the Solar System to proactively address3. any problems that may arise.Nevertheless,if you think there is an issue with the Solar System that is covered by any of the warranties specified above,please contact Sunrun at 855-478-6786 or by email at customercare@sunrun.com.Sunrun will use commercially reasonable efforts to fix any issue covered by a warranty as soon as possible after it becomes aware of such issue. Performance GuaranteeD. Production Estimate1. Sunrun estimates that the Solar System will be capable of generating 27,796 kilowatt-hours of electrica. energy during its first year of operation.Actual production may vary due to natural variation in weather patterns,the physical specifications of the Home’s roof(s),the required placement of the Solar System on your roof,and other conditions.Your Lease Payment is fixed,and not tied to the actual output of the Solar System. Due to expected panel degradation,Sunrun estimates that the Solar System will be capable ofb. generating 654,761 kilowatt-hours ("kWh")during the Initial Term.(the “Estimated Output”). Guaranteed Output.Subject to the conditions set forth in this Section D,Sunrun guarantees that the2. Solar System will generate ninety (90%)of the Estimated Output during the Initial Term of this Agreement as set forth in Exhibit A (the "Guaranteed Output").Subject to the conditions set forth in this Section D,Sunrun will issue you a refund if the Solar System does not generate the Guaranteed Output. Sunrun will not issue you a refund for any Solar System underproduction resulting from any system failure or lost production caused by reasons other than (a)a Solar System defect,(b)shading due to the weather or (c)shading conditions that were present at the Home at the commencement of installation. For the avoidance of doubt,Sunrun will not issue you a refund for underproduction arising from any of the following: DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 7 Underproduction arising from your failure to comply with your obligations under the Agreement.· Underproduction arising from shading conditions (other than weather)different from those that· were present at the Home at the commencement of installation. Underproduction as a result of a grid failure disabling the Solar System.· Underproduction arising from you causing or requesting the Solar System to be shut down or to· generate significantly less electric energy. Underproduction arising from damage to the Solar System caused by foreign objects acting on· the Solar System (e.g.hail,golf balls,etc.) Sunrun makes no other representation,warranty or guarantee of any kind regarding the Solar System’s actual or expected output or performance and any other express or implied warranties are hereby disclaimed. Your initials indicate that you have read,understood and accepted the provisions set forth in this Section D(2). Agreed and accepted by:\i1\_______(Initials) Overproduction.If,over the course of the Initial Term,the Solar System produces more energy than the3. predicted Guaranteed Output,then the extra energy will be yours at no additional cost.Sunrun may use this overproduction amount to offset future underproduction in a given period should the Actual Output attributable to such period be less than the Guaranteed Output attributable to such period. Actual Output and Refunds.On the 24 month anniversary of the In-Service Date and on every 24 montha. anniversary thereafter (each,a “Guarantee Date”),Sunrun will calculate the "Actual Output"of the Solar System.For the purposes of this Agreement,"Actual Output"shall mean the amount of electric energy generated by the Solar System to date plus any kWh for which you have previously received a refund. Subject to Section D(2),if the Actual Output is less than the Guaranteed Output for that Guarantee Date set forth on Exhibit A,Sunrun will issue you a refund.This refund will be calculated by subtracting the Actual Output for that Guarantee Date from the Guaranteed Output for that Guarantee Date,and multiplying the result by the refund per kWh amount as set forth for that Guarantee Date on Exhibit A. For the last year of the Initial Term (year 25),the guarantee period will be 12 months. __ __ Design and InstallationE. Our Work;Description of Materials.1. Our work on the Solar System includes:a. design,permitting and supply of the equipment and material typically necessary for a complete and(i) operable Solar System; installation of the Solar System;(ii) acquisition of approval from your Utility;and(iii) assistance with any applicable rebate program paperwork set forth in Section B(6)(collectively,the(iv) “Work””). The primary equipment used for the Solar System will typically include a series of interconnectedb. photovoltaic panels,one or more inverters,racking materials,and a production meter.Other materials generally used as the “balance of system”are disconnects,breakers,load centers,wires,and conduit. Solar System Production and Energy Consumption Monitoring;Data.2. For example,if in year 10 the system was expected to have generated 62,000kWh cumulatively and actual generation was 61,500,and your refund rate is $0.13,we will credit your account based on the 500kWh the system fell short multiplied by your refund rate,i.e.500kWh x $0.13 =$65. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 8 Installation and Maintenance of Metering and Monitoring Equipment.a. Production Monitor.During installation or at any time thereafter during the Term,we may install or(i) replace production monitoring devices to measure the energy produced by the Solar System (the “Production Monitor”).Through the Production Monitor,we will collect Solar System production and performance data (“Performance Data”). Energy Consumption Monitor.During installation or at any time thereafter during the Term,we may(ii) install or replace energy consumption monitoring devices (the “Consumption Monitor”).Through the Consumption Monitor,we may collect and store information about energy usage at the Home (“Usage Data”). Access to Monitors.You acknowledge and agree that the Production Monitor and the Consumption(iii) Monitor will be part of the Solar System,and that you must provide Sunrun with access to the Home in order to install,operate,maintain,repair and replace the Production Monitor and the Consumption Monitor. Internet Connection.In order to ensure the proper functioning of the Production Monitor and the(iv) Consumption Monitor,if possible,you must provide the Solar System with continuous access to a functioning broadband internet connection with one (1)wired Ethernet port and standard electrical outlet,at your cost.If you are unable to provide the Solar System with an internet connection in accordance with the foregoing sentence,the Home must be located in an area with cellular service that is acceptable to us in our discretion. Monitor Damage or Inaccuracy.Sunrun uses the Production Monitor to monitor and record your(v) electricity production,and promptly respond to any production issues.To the extent the Production Monitor has any inaccuracies during any given period as a result of your actions or the actions of any other person unrelated to Sunrun (including,without limitation,any failure to maintain internet connection or cellular service as provided in clause (iv)above),Sunrun will deem that the Solar System has produced 100%of Estimated Output during such period for purposes of the Production Guarantee set forth in Section D.You will be responsible for any damage to the Production Monitor or Consumption Monitor that is caused by you or any other person unrelated to Sunrun.If the Production Monitor breaks or malfunctions other than as a result of your actions or the actions of any other person unrelated to Sunrun,Sunrun will,in good faith,estimate the amount of electric energy actually produced during the malfunction in order to determine whether you are owed a payment under the Production Guarantee set forth in Section D. Data Usage and Disclosure.We may combine the Usage Data and Performance Data with each otherb. and with other data,including,without limitation,personally identifiable information (collectively,“Data”). Our possible uses and disclosure of the Data are described in Exhibit E.We will never sell any personally identifiable Data to a third party without your prior written consent. Communications Equipment.During installation or at any time thereafter during the Term,we may installc. or replace communication equipment (for example,an antenna)(the “Communication Equipment”)at the Home.The Communication Equipment may or may not be used in connection with the Solar System.We may use the Communication Equipment to improve the quality of cellular and/or internet connectivity in your area.We may also sell the right to use the Communications Equipment in the manner described above to a third party.You understand that consenting to the foregoing is not a condition of purchase. Do you consent?\eqctxt1\ Design3. Sunrun or its Installation Partners will provide you with a preliminary Solar System design then willa. schedule a time to visit your Home to confirm that the preliminary design will fit on your Home’s roof and finalize the design (the “Site Survey”).The design of the Solar System is dependent on the physical specifications of the Home’s roof(s),site conditions such as placement of ventilation systems,roof DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Y Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 9 conditions,etc.,any of which may affect the placement of the Solar System on your roof.The Home’s Solar System design will be finalized following a Site Survey of the Home by Sunrun. The final design of the Solar System will be presented to you prior to installation.You will have five (5)b. business days after receipt of the design to request a design change.Otherwise,you will be deemed to have approved the Solar System design.Sunrun will use commercially reasonable efforts to accommodate requests for changes.With your written,deemed,or verbal approval,installation may begin. If,during or after the Site Survey,we discover any concealed or hidden conditions or issues with thec. Home that may delay or prevent completion of the Solar System once we start installation,we will explain the issue to you,determine if additional costs are required to correct the problem and,if so, propose a change order.It may be necessary that you undertake site preparation prior to installation. Installation4. Installation will be performed by Sunrun's licensed,bonded affiliate,Sunrun Installation Services Inc.,ora. by another licensed,bonded contractor (an “Installation Partner”)that meets Sunrun's quality standards. Sunrun requires its Installation Partners to employ licensed personnel as required by applicable state law,regulations or codes,and to carry insurance as set forth in Section G(6)below. Sunrun or its Installation Partners will obtain any permits needed for installation of the Solar System.Youb. agree to cooperate with Sunrun and assist Sunrun in obtaining any permits needed,including the NEM documentation referenced in Section B(5). If Sunrun or its Installation Partner damages the Home during installation,we will repair the damage wec. caused at no cost to you. Sunrun,its Installation Partners and agents shall keep the Home reasonably free from waste materials ord. rubbish caused by their operations.Prior to the In-Service Date,Sunrun and its agents shall remove all tools,construction/installation equipment,machinery,waste materials and rubbish from and around the Home. Sunrun reserves the right,at Sunrun’s sole discretion,to install a critter guard with the Solar System.e. Guards can help protect the Solar System from pests or rodents that can damage components of the Solar System. Access to the Home5. You agree to grant Sunrun and its Installation Partners access to the Home for the purpose of designing,a. installing,operating,testing the Solar System and performing Sunrun’s obligations under this Agreement. Sunrun agrees to give you reasonable notice when Sunrun needs to access the Home for any of the foregoing purposes and will endeavor to restrict such access to normal business hours. When requested by Sunrun or when necessary,you agree to allow Sunrun and constructionb. professionals (an engineer,architect,or licensed contractor or their representative)hired by Sunrun to access the Home to inspect any buildings,including roofs,prior to installation of the Solar System to ensure that the Home can accommodate the Solar System. You must provide us with power and water for use during installation.c. You agree to make best efforts to provide a safe and secure work environment for Sunrun and itsd. Installation Partners at the Home throughout Solar System installation,the Initial Term and any Renewal Terms Miscellaneous.6. Sunrun has the authority and sole discretion to use Installation Partners or agents to perform or assista. Sunrun in performing Sunrun's obligations. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 10 If Work excluded from this Agreement in Section E(7)must be performed in order to properly effect theb. installation of the Solar System,you agree to contract separately,and at your own expense,with a contractor who has been designated by or approved by Sunrun to perform such obligation.In this instance,Sunrun will not unreasonably withhold such approval. If you plan to move or temporarily disconnect the Solar System to allow for maintenance of and/or repairc. to the Home,you agree,at your expense,either (i)to hire Sunrun to perform this work or (ii)to obtain Sunrun's approval of your contractor,who you agree must carry commercial general liability policy in an amount not less than one million ($1,000,000)dollars per occurrence and name “Sunrun Installation Services Inc.and its successor or assigns”,as additional insureds. You agree that you will not make any modifications,improvements,revisions or additions to the Solard. System or take any other actions that could damage or void any applicable warranty set forth in Section C without Sunrun’s prior written consent.If you make any modifications,improvements,revisions or additions to the Solar System,they will become part of the Solar System and shall be Sunrun’s sole property. If applicable programs exist in your utility service area,you agree to allow Sunrun,from time to time,toe. remotely administer and operate the Solar System in connection with demand response or other programs to optimize your electricity costs or to maintain the reliability of the electrical grid. Exclusions.We do not do or provide any of the following under this Agreement:7. removal or disposal of any material containing asbestos or any other hazardous material;a. movement of your personal items around the Home;b. upgrades to the electrical panel or electrical service or additional costs associated with moving thec. current electrical meter; installation or repair of fences;d. repair of any pre-existing roofing damage resulting from a substandard roof or pre-existing substandarde. roof installation work; structural framing work for any part of the roof or structure,including concealed substandard framing;f. correction of mistakes of another contractor or subcontractor (for example,if the Home was not built tog. code); removal and replacement of existing rot or insect infestation;h. testing or remediation of mold,fungus,mildew or organic pathogens;i. painting of conduit or other structural parts;j. upgrades for Utility access requirements such as special locks or 24-hour access gates;k. Homeowners Association (“HOA”)review,permitting or fees,however we will support your efforts tol. coordinate with your HOA; professional engineering services;m. correction of structural integrity problems (for roof mounted systems)or evaluation and correction ofn. ground stability under or near the Solar System (for ground mounted systems); removal of trees;o. any studies or permitting beyond the basic building permit;orp. monitoring services associated with any monitoring equipment that is provided directly by a manufacturerq. and subject to the manufacturer’s terms and conditions. Optimization Services Authorization for Optimization Services Sunrun may in the future include Optimization Services. Depending on where you live and the System, you may qualify to participate in one or more programs, including government technology rebates, performance incentives, utility demand response programs or other bill management opportunities. In each of these future programs if feasible, with your vehicle manufacturer’s consent, a portion of the energy stored in your vehicle’s battery may be sent back into your local electrical grid to improve its efficiency and/or reliability. In DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 11 exchange for the permission to manage the System and participate in these programs, you will be compensated. Sunrun may enroll the System in one or more programs if and when it becomes eligible to do so in your location. Sunrun will fully control and optimize the System’s activities to generate incremental savings and value. This will not affect our obligations in your customer agreement. Participation in Optimization Services will remain in effect unless you opt out, which you can do by contacting Sunrun using the information provided below. Enrollment Process For the programs in which Sunrun enrolls or un-enrolls the System, Sunrun will notify you of 1) how your System may be affected; 2) how you will be compensated; 3) the expected participation duration; 4) the program partners; and 5) any additional authorizations or advanced partnership Sunrun needs from you to participate. Your Authorizations and Obligations You authorize Sunrun to act in the following capacities: To act as your sole Demand Response Provider, Energy Services provider, or equivalent agent,1. consultant or aggregation partner for your respective utility and grid operator. To request and receive utility billing records, billing history (including tariff changes,2. surcharges, riders, etc.) and all meter usage data used for bill calculation for all of your service account(s) associated with the Equipment, as specified herein, that may be furnished by the Utility or other energy service providers, for the duration of this agreement. Participation in utility demand response programs without Sunrun may affect your3. eligibility to participate in Sunrun Optimization Programs. In such cases, Sunrun will exercise sole discretion over which other utility programs you may participate in and assist in unenrolling you if necessary. You agree to not use any of the following devices to participate in utility or grid operator demand response programs: Portable or standby gas- or fuel-fired generator(s)1. Energy generation, control, or management devices (e.g., a ‘smart’ water heater) not2. approved and/or managed by Sunrun Change OrdersF. If Sunrun requests a modification to the terms of the Agreement,Sunrun will notify you in writing of the requested change and will ask you to accept the modified terms by executing a change order.Failure to respond to a change order request within five (5)business days may lead to a cancellation of the Agreement pursuant to Section H. __ _ Additional InformationG. Agreement Term1. Initial Term.The Initial Term of the Agreement begins on the In-Service Date and continues in effect fora. twenty-five (25)years following the In-Service Date,unless canceled or terminated earlier in accordance For example,if upon completing the Site Survey it is determined that the contracted system size will not fit,and we have to reduce the system size by a panel or two we would create a change order which reflects a lower payment due to less production. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 12 with the terms of this Agreement.Within a reasonable period of time following its occurrence,Sunrun will notify you of the In-Service Date. Renewal Term.At the end of the Initial Term,the Agreement will be automatically renewed for anb. additional one-year term ("Renewal Term").Sunrun will provide you with your new rate for electric energy at the beginning of the Renewal Term and each successive Renewal Term,if any.The new price per kWh shall be equal to ten percent (10%)less than the “average cost of electric energy”as established by your Utility or its successor.“Average cost of electric energy”shall be the price you would otherwise pay for electric energy to your Utility,or its successor for the 12 months preceding the start of each Renewal Term..The Agreement will continue to automatically renew for additional one-year terms at the end of each Renewal Term.Sunrun will perform Sunrun's obligations under this agreement for as long as the Solar System remains economically viable. Sunrun will make a good faith effort to notify you between thirty (30)and sixty (60)days before the(i) end of the Initial Term of (i)your end of term options and (ii)the estimated rate for electric energy in the first Renewal Term (if applicable). The Agreement will not automatically renew if either Party gives the other Party written notice of(ii) termination (x)at least thirty (30)days prior to the expiration of the Initial Term or the applicable Renewal Term,or (y)within fifteen (15)days after Sunrun provides you with the written estimated rate for electric energy in the upcoming Renewal Term,whichever is later. Termination2. At the end of the Initial Term or at the end of a Renewal Term,should either you or Sunrun end the Agreement,Sunrun will remove the Solar System at no cost to you.Written notice of termination must be provided at least thirty (30)days prior to the expiration of the applicable term. Subject to the exclusions set forth in Sections C and E,Sunrun will return the Home to a condition similar to its condition prior to installation of the Solar System.You must notify Sunrun in writing of any deficiencies in restoration within five (5)business days of removal or a municipal building inspector’s approval of the Work. Customer Obligations.You acknowledge and agree to the following:3. Your local utility is Southern California Edison (the “Utility”).You agree that the Home will remaina. connected to your Utility for the Initial Term and any Renewal Terms and that you will notify Sunrun prior to changing your Utility. That you will purchase all electric energy generated by the Solar System at the prices set forth in thisb. agreement. The Solar System is removable equipment owned by Sunrun or its affiliates and is not considered ac. fixture or otherwise part of the Home. The Solar System will not be subject to any lien,security interest,claim,mortgage or deed of trust(i) that may be imposed on or assessed against your interest in the Home,or any other property belonging to you.Neither Sunrun nor our Installation Partners will apply a lien to your title to the Home. However,you agree that Sunrun or a Sunrun affiliate may file any UCC-1 financing statement or(ii) other filing that confirms ownership of the Solar System. The foregoing notwithstanding,any contractor,subcontractor or materialman who provides goods or(iii) services pursuant to this Agreement and who is not paid may have a valid legal claim against the Home known as a mechanic’s lien. The Solar System will be used primarily for household purposes and will not be used to heat a swimmingd. pool. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 13 You may not sell,give away,transfer,pledge,remove,relocate,alter,tamper with or damage the Solare. System or associated meters and/or monitors at any time.Any attempts to tamper with,damage or modify the Solar System will be considered beyond reasonable wear and tear use of the Solar System. You further acknowledge that removal of the Solar System from the Home for any reason may require Sunrun to refund,at your cost,Incentives provided in respect of the Solar System. You agree:to keep trees,bushes and hedges trimmed so that the Solar System retains shading andf. conditions present at the time of installation to not modify the Home in a way that shades the Solar System;to not permit or allow to exist any condition or circumstance that would cause the Solar System not to operate as intended at the Home;and to promptly notify Sunrun if you think the Solar System is damaged or appears unsafe or if the Solar System is stolen. You will refrain from attempting to clean,fix,or modify the Solar System, unless expressly permitted tog. do so by Sunrun.If any condition exists with respect to the Solar System which you think may be affecting performance or if you believe the Solar System has accumulated snow,is excessively soiled,is damaged or otherwise appears unsafe,please notify Sunrun at 225 Bush Street,Suite 1400,San Francisco,CA 94104,customercare@sunrun.com,855-478-6786.We may remedy the condition if it is deemed necessary by Sunrun to do so,put you in contact with certified partners who can remedy the condition,or provide you with instructions on how to remedy such situation (e.g.use a hose to spray the panels from ground level). You agree that Sunrun may (i)call you and (ii)send pre-recorded and text messages to you at the phoneh. number you provided regarding the installation,maintenance,and administration of your Solar System using automated telephone technology even if your phone number is listed on any national or state “o Not Call”list.Message and data rates may apply. Agreed and accepted by:\i1\_______(Initials) You further agree that Sunrun may (i)call and (ii)send pre-recorded or text messages,to the phone number you provided about other Sunrun products and services,using an autodialer,even if your phone number is listed on any national or state “Do Not Call”list.Message and data rates may apply.You further understand that consenting to the foregoing is not a condition of purchase.You will have the opportunity to opt out of any marketing messages. Do you consent?\cctxt1\ Purchase of Solar System4. Option to Purchase.You have the option to purchase the Solar System at the following times during thea. Initial Term: Upon the fifth (5th)anniversary of the In-Service Date(i) At the end of the Initial Term;(ii) If you sell the Home during the Initial Term;and(iii) Under the circumstances described in Section G(10)(b).(iv) Notice of Intent to Purchase.To purchase the Solar System pursuant to this Section,you must deliver ab. written notice to Sunrun of your intent to purchase within sixty (60)days of the applicable date and deliver payment to Sunrun within thirty (30)days of receiving an invoice from Sunrun for the purchase price. Purchase Price.The purchase price will be the fair market value ("FMV")of the Solar System at the timec. of the purchase.Sunrun will determine the FMV of the Solar System by hiring an independent appraiser to estimate the value of a comparable in-service photovoltaic solar system in your state and Utility service area.This valuation will take into account the Solar System’s age,location,size and other market characteristics such as equipment type,service costs,the value of electricity in your area,and any applicable Incentives.In addition,if the Solar System is purchased prior to the fifth (5th)anniversary of the In-Service Date,the FMV will include the recapture of any federal tax credits. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Y Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 14 Termination of Agreement upon Purchase;Right to Monitor.After you purchase the Solar System,thisd. Agreement will terminate and neither you nor Sunrun will have any remaining obligations under this Agreement.For the avoidance of doubt,after termination,Sunrun will not provide you with any maintenance or repair services unless you enter into a separate agreement with Sunrun for Sunrun or its Installation Partner to perform these services at your expense.If possible,Sunrun will assign to you any equipment warranties still in effect for the Solar System.Sunrun reserves the right to continue to measure the performance of the Solar System after termination of the Agreement. Sale of Home,Assignment and Foreclosure5. Sale of Home.If you sell the Home you:a. May transfer all rights and obligations under this Agreement to the new owner,provided that the new(i) owner (a)meets Sunrun’s credit requirements of a FICO score of 650 or higher and (b)agrees in writing to be bound by all of the terms and conditions set forth herein;or May transfer all rights and obligations under this Agreement to the new owner,provided that the new(ii) owner (a)(i)qualifies for a mortgage to purchase the Home or (ii)purchases the Home in cash and (b)the new owner agrees in writing to be bound by all of the terms and conditions set forth herein;or Will be deemed to have terminated this Agreement and Sunrun may exercise its rights under Section(iii) G(10)if: You sell or otherwise transfer your interest in the Home without either purchasing the Solar1. System or assigning this Agreement to the new owner in accordance with the terms of this Section,or The new owner refuses to assume the Agreement.2. Assignment of Agreement.b. Sunrun may,without your consent,assign,lease,sublease,or transfer the Solar System and this(i) Agreement,along with all rights and obligations hereunder,to any third party (each,an "Assignee"), for any purpose,including without limitation,collection of unpaid amounts,financing of the Solar System's installation,or in the event of an acquisition,corporate reorganization,merger or sale of substantially all of Sunrun’s assets to another entity. If Sunrun assigns the Agreement,Sunrun will continue to operate and maintain the Solar System until(ii) you receive written notice otherwise.Sunrun requests a minimum of fifteen (15)days’prior written notice if you wish to transfer this Agreement pursuant to Section G(5)(a)(i)or (ii). All assignments shall be made in writing.Inquiries and notices regarding assignment shall be(iii) directed to you at the Home and shall be directed to Sunrun at the address set forth in Section G(12). Foreclosures.c. If foreclosure proceedings are filed involving the Home,you shall be in default of the Agreement(i) pursuant to Section G(10)and the Agreement shall terminate without notice to you and Sunrun may exercise any of its remedies,including but not limited to removal of the Solar System. For example,in year 2 you decide to move.You can purchase your solar system by contacting Sunrun 50 days before your moving date.Sunrun will use a third party to determine the price.You must pay your invoice before you move. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 15 Fannie Mae and Federal Housing Finance Agency Guidance for foreclosures.The Federal Housing(ii) Finance Agency (FHFA)is the conservator of and responsible for ensuring that the lending agencies Fannie Mae and Freddie Mac serve as a reliable source of liquidity and funding for housing finance. For all property financed by a Fannie Mae loan,FHFA guidelines require,and you and Sunrun (as1. applicable)agree: That the Home will remain connected to your Utility for the Initial Term and any Renewal(i) Terms. That in the event the Home is foreclosed upon,the lender shall have the discretion to:(ii) Terminate the Agreement and require Sunrun to remove the Solar System;1. Assume your obligations under the Agreement without payment of any transfer or similar2. fee;or Terminate the Agreement and enter in to a new agreement with Sunrun under terms no3. less favorable than the original Agreement. Sunrun agrees not to be named loss payee (or named insured)on your insurance policy/ies2. covering the Home. Review the Fannie Mae Selling Guide effective November 3,2015,Section B2-3-04,available at3. www.fanniemae.com,for more information. Your initials indicate that you have read,understood and accepted the provisions set forth in this Section G(5). Agreed and accepted by:\i1\_______(Initials) Insurance6. Sunrun is responsible for insuring the Solar System:a. Sunrun carries insurance covering damage to and theft of the Solar System;(i) Sunrun carries commercial general liability insurance (“CGL”)and workers’compensation insurance(ii) underwritten by Arthur J.Gallagher &Co.Insurance Brokers of California,Inc.(“Gallagher”). Sunrun carries worker’s compensation insurance for all employees.(iii) Upon damage or destruction of the Solar System,you will not be entitled to receive or retain anyb. insurance proceeds.In cases where we bear the risk of loss,our sole obligation to you will be to repair or replace the Solar System to the extent required by any equipment warranty. During the Initial Term of this Agreement you agree to carry insurance covering damage to the Home,c. including damage resulting from the Solar System and not due to the gross negligence of Sunrun.It is your responsibility to determine whether installation of the Solar System will impact your existing coverage and if additional insurance is required. Sunrun requires its Installation Partners to maintain the following insurance coverages:d. Workers compensation,subject to statutory limits;(i) Employers liability,with a minimum of one million ($1,000,000)dollars each occurrence;(ii) Commercial general liability,in an amount not less than one million ($1,000,000)dollars per(iii) occurrence and two million ($2,000,000)dollars annual aggregate; Commercial automobile liability,in an amount not less than a combined bodily injury and property(iv) damage limit of one million ($1,000,000)dollars per accident; DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 16 Excess liability insurance with a limit of one million ($1,000,000)dollars per occurrence and in the(v) annual aggregate in excess of the limits of insurance provided above;and Any other insurance required by applicable laws or regulation.(vi) Your initials indicate that you have read,understood and accepted the provisions set forth in this Section G(6) Agreed and accepted by:\i1\_______(Initials) Limitations of Liability7. SUNRUN MAY BE LIABLE TO YOU AND ANY OTHER PERSON FOR DAMAGES OR LOSSES DIRECTLY ATTRIBUTABLE TO ITS NEGLIGENCE OR WILLFUL MISCONDUCT.TOTAL LIABILITY FOR SUCH DIRECT DAMAGES OR LOSSES WILL IN NO EVENT EXCEED ONE MILLION US DOLLARS ($1,000,000.00).THIS WILL BE THE SOLE AND EXCLUSIVE REMEDY AND ALL OTHER REMEDIES OR DAMAGES AT LAW OR EQUITY ARE WAIVED,EVEN IF YOU HAVE GREATER RIGHTS UNDER THE LAWS OF THE STATE IN WHICH YOUR HOME IS LOCATED,WHICH YOU SHOULD CONSULT.SUNRUN IS NOT RESPONSIBLE FOR ANY CONSEQUENTIAL,INCIDENTAL, PUNITIVE,EXEMPLARY OR INDIRECT DAMAGES,LOST PROFITS OR LOSSES RELATING TO THIS AGREEMENT,IN TORT OR CONTRACT,INCLUDING ANY NEGLIGENCE OR OTHERWISE. YOU SHALL INDEMNIFY,DEFEND,PROTECT,SAVE AND HOLD HARMLESS SUNRUN,ITS EMPLOYEES,OFFICERS,DIRECTORS,AGENTS,FINANCING PARTNERS,SUCCESSORS AND ASSIGNS FROM ANY AND ALL THIRD PARTY CLAIMS,ACTIONS,COSTS,EXPENSES (INCLUDING REASONABLE ATTORNEYS’FEES AND EXPENSES),DAMAGES,LIABILITIES,PENALTIES, LOSSES,OBLIGATIONS,INJURIES,DEMANDS AND LIENS OF ANY KIND OR NATURE ARISING OUT OF,CONNECTED WITH,RELATING TO OR RESULTING FROM YOUR NEGLIGENCE OR WILLFUL MISCONDUCT;PROVIDED,THAT NOTHING HEREIN SHALL REQUIRE YOU TO INDEMNIFY SUNRUN FOR ITS OWN NEGLIGENCE OR WILLFUL MISCONDUCT.THE PROVISIONS OF THIS PARAGRAPH SHALL SURVIVE TERMINATION OR EXPIRATION OF THIS AGREEMENT. EXCEPT AS EXPRESSLY PROVIDED HEREIN,SUNRUN MAKES NO WARRANTY OR REPRESENTATION,EITHER EXPRESS OR IMPLIED,REGARDING ITS OBLIGATIONS OR THE SOLAR SYSTEM.THERE IS NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,AND ANY AND ALL IMPLIED WARRANTIES ARE DISCLAIMED TO THE FULLEST EXTENT PERMISSIBLE UNDER STATE AND FEDERAL LAW.ANY WARRANTY EXPRESSLY PROVIDED FOR IN THIS AGREEMENT EXCLUDES CONSEQUENTIAL AND INCIDENTAL DAMAGES TO THE FULLEST EXTENT PERMISSIBLE UNDER STATE AND FEDERAL LAW AND LIMITS THE DURATION OF ANY WARRANTIES NOT EXPRESSLY PROVIDED HEREIN TO THE FULLEST EXTENT PERMISSIBLE UNDER STATE AND FEDERAL LAW. Limitations on Damages8. IN NO EVENT WILL WE BE LIABLE TO YOU OR TO ANYONE FOR LOSS OF PROFITS,DAMAGES FROM POWER INTERRUPTION OR OTHER SPECIAL,CONSEQUENTIAL,INCIDENTAL OR INDIRECT DAMAGES. Force Majeure9. Sunrun is not responsible for any delay or failure in the performance under this Agreement if the delay or failure is due to Force Majeure.“Force Majeure”means any event,condition or circumstance beyond the reasonable control of,and not caused by,Sunrun’s fault or negligence.Force Majeure includes,without limitation,acts of God such as storms,fires,floods,lightning and earthquakes,sabotage or destruction by a third party of the Solar System,war,riot,acts of a public enemy or other civil disturbance,or a strike,walkout,lockout or other significant labor dispute.Force Majeure does not include economic hardship or insufficiency,unavailability,failure,or diminishment of solar resources,except as a result of an event that would otherwise qualify as a Force Majeure. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 17 In order to claim Force Majeure as a reason for non-performance,Sunrun must give you notice within fourteen (14)days following its occurrence and estimate how long it will last and what the potential impact is on the Agreement.If Sunrun claims Force Majeure,it must: make reasonable attempts to continue to perform under the Agreement;a. quickly take action to correct the problem caused by the Force Majeure;b. make reasonable efforts to limit damage to you;andc. notify you when the Force Majeure event ends and performance will resume as contemplated in this Agreement. Default and Remedies10. DEFAULT BY CUSTOMER;SUNRUN’S REMEDIES:a. You will be in default under the Agreement if:(i) You terminate this Agreement under Section G(5)(a)(iii);1. You provide any false or misleading financial or other information to obtain this Agreement;2. You assign,transfer,or encumber this Agreement or any part of the Solar System without3. Sunrun’s prior written consent; You make a general assignment for the benefit of creditors,file a petition in bankruptcy,appoint a4. trustee or receiver,or have all or substantially all of your assets subject to attachment,execution or other judicial seizure,or you become insolvent or unable to pay your debts,or vacate or abandon the Home;. Foreclosure proceedings are filed involving the Home;5. You (1)fail to provide us with the information,approvals or access to the Home we need in order6. to do the Work or (b)fail to make a payment when due,and,in either case,you fail to correct the problem in ten (10)days.In addition,to any other remedies described herein,upon the occurrence of any event described in the foregoing sentence,and prior to expiration of the 10 day cure period,Sunrun may stop Work.Sunrun will give you written notice of our reasons for stopping Work. If you fail to perform any other material obligation that you have undertaken in this Agreement,7. including doing something you have agreed not to do,and such failure continues beyond a period of fourteen (14)days after you receive notice of such failure. If any events described in Section G(10)(a)(i)occur,Sunrun may,upon notice to you,exercise one or(ii) more of the following remedies,in its sole discretion: Sunrun may terminate the Agreement;1. Sunrun may,subject to any cure rights provided herein or under applicable law,have the right to2. disconnect the Solar System and/or enter the Home and remove the Solar System.We will provide at least ten (10)days’advanced written notice of our intent to disconnect the Solar System; If,as a result of your default,Sunrun removes the Solar System,you will be obligated to pay3. Sunrun an amount equal to the value of any federal,state and local Incentives that Sunrun must return as a result of such removal; Sunrun may exercise any other remedies available to Sunrun at law or in equity.4. SUNRUN’S DEFAULT;YOUR REMEDIES.In addition to any other remedies you have under thisb. Agreement,if Sunrun (i)makes a general assignment for the benefit of creditors,files a petition in DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 18 bankruptcy,appoints a trustee or receiver,or has all or substantially all of its assets subject to attachment,execution or other judicial seizure,or (ii)fails to perform an obligation under the Agreement and such failure continues beyond a period of ninety (90)days after we receive notice of such failure (provided,in each case,this Agreement is otherwise in full force and effect prior to such event),you will have the option to purchase the Solar System as set forth in Section G(4). Dispute Resolution11. This Section sets forth the procedure for resolving disputes related to the Agreement (the "Dispute"). Unless otherwise agreed in writing,the Parties agree to continue to perform each Party's respective obligations under this Agreement during the course of the resolution of the Dispute. INFORMAL DISPUTE RESOLUTION.The Parties agree to first try to resolve informally and in good faitha. any Dispute.Accordingly,you agree to send a written notice of the Dispute to the address listed in Section G(12)of the Agreement.Sunrun will send a written notice of Dispute to the Home’s address.If the Parties do not reach an informal agreement to resolve the Dispute within forty-five (45)days after the notice of Dispute is received,you or Sunrun may commence a formal proceeding as detailed below.All applicable statutes of limitation and defenses based upon the passage of time shall be tolled for the 45 days during which the parties try to informally resolve any Dispute.If you claim deficiencies in the Solar System’s installation or performance,you must allow us to visually inspect the Solar System and obtain or download pertinent performance data from the Solar System. ARBITRATION.IF THE PARTIES CANNOT RESOLVE THE DISPUTE INFORMALLY,THEb. DISPUTE,INCLUDING THE DETERMINATION OF THE SCOPE OR APPLICABILITY OF THIS AGREEMENT TO ARBITRATE,WILL BE RESOLVED BY BINDING ARBITRATION BEFORE ONE ARBITRATOR. ARBITRATION MEANS YOU WAIVE YOUR RIGHT TO A JURY TRIAL AND ALL DISPUTES SHALL BE DECIDED BY AN ARBITRATOR.THIS AGREEMENT TO ARBITRATE DISPUTES IS GOVERNED BY THE FEDERAL ARBITRATION ACT ("FAA").THE ARBITRATION SHALL BE ADMINISTERED BY JAMS PURSUANT TO ITS STREAMLINED ARBITRATION RULES & PROCEDURES.THE ARBITRATION WILL BE OVERSEEN BY THE JAMS OFFICE NEAREST TO THE HOME.JUDGMENT ON THE AWARD MAY BE ENTERED IN ANY COURT HAVING JURISDICTION.THIS CLAUSE SHALL NOT PRECLUDE PARTIES FROM SEEKING PROVISIONAL REMEDIES IN AID OF ARBITRATION FROM A COURT OF APPROPRIATE JURISDICTION.THE ARBITRATOR MAY,IN THE AWARD,ALLOCATE ALL OR PART OF THE COSTS OF THE ARBITRATION,INCLUDING THE FEES OF THE ARBITRATOR AND THE REASONABLE ATTORNEY FEES OF THE PREVAILING PARTY. You may,in arbitration,seek all remedies available to you under this Agreement as interpreted underc. California law.If there is a conflict between the JAMS Rules and this Agreement,this Agreement will govern.Sunrun will pay the costs for initiating arbitration proceedings whether you or Sunrun prevails in arbitration.Other fees,such as attorneys’fees and expenses of travel to the arbitration,will be paid in accordance with JAMS Rules.If the arbitrator finds in your favor,Sunrun will pay your attorney’s fees and expenses of travel to the arbitration.The arbitration hearing will take place in the federal judicial district of the Home,unless you and Sunrun agree to another location in writing.In order to initiate arbitration proceedings,you or Sunrun must take the following actions: Write a demand for arbitration.The demand must include a description of the Dispute and the amount(i) of damages you are seeking.The form of Demand for Arbitration can be found under ADR Forms at www.jamsadr.com. Send three (3)copies of the demand for arbitration to the JAMS location at Two Embarcadero(ii) Center,Suite 1500,San Francisco,California 94111. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 19 Send one copy of the demand for arbitration to the other Party.You and Sunrun agree to receive(iii) service of process of the arbitration demand by registered or certified mail,return receipt requested, at your billing address and Sunrun’s principal executive office,respectively. In accordance with the FAA and the JAMS Rules,the arbitrator’s decision will be final and binding.Anyd. right to appeal is likewise governed by the FAA and JAMS Rules.Any arbitration award may be enforced in any court with jurisdiction.For more information about JAMS and its Streamlined Arbitration Rules & Procedures,visit www.jamsadr.com,or call 1.800.352.5267.. CLASS ACTION WAIVER.ARBITRATION MUST BE ON AN INDIVIDUAL BASIS.AS A RESULT,e. NEITHER YOU NOR SUNRUN MAY JOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER ”CUSTOMERS”,OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY GENERAL CAPACITY. Your initials indicate that you have read,understood and accepted the provisions set forth in this Section G(11). Agreed and accepted by:\i1\_______(Initials) Written Notice &General Correspondence12. All notices,demands or requests related to this Agreement must be in writing and will be sent to the Customer at the Home’s mailing address or email address identified under your signature to this Agreement.We will primarily use email to communicate with you,unless you request correspondence solely via first class mail.Any notice or communication made in electronic form will have the same legal effect and enforceability as if made in non-electronic form. Correspondence,notices,demands or requests should be sent to Sunrun at: c/o Sunrun Inc. Attn:Legal Department 225 Bush Street,Suite 1400 San Francisco,CA 94104 Phone:855-478-6786 Email:customercare@sunrunhome.com Governing Law.Unless otherwise prohibited by law,this Agreement shall be interpreted in accordance13. with and governed by the laws of the State in which the Home is located,without regard to any conflicts of laws principles thereof. You agree that Sunrun has the right to periodically check your consumer credit report.Sunrun may report14. information about your performance under this Agreement to consumer reporting agencies.Late payments,missed payments or other defaults hereunder may be reflected in your credit report. You agree that Sunrun has the right to obtain photographic images of the Solar System and the Home,15. and to use such photographic images for internal and quality control purposes.Sunrun will not use photographic images of the Solar System or the Home in its marketing and promotional materials without first obtaining your express written approval. This Agreement is binding upon,and inures to the benefit of,the Parties and their respective heirs,16. executors,administrators,legal representatives,successors and assigns. This Agreement supersedes any prior understandings,agreements,or representations by or between the17. parties,written or oral,to the extent they related in any way to the subject matter hereof. Entire Agreement.You agree that this Agreement constitutes the entire agreement between you and18. Sunrun.If any provision is declared to be invalid,that provision will be deleted or modified,and the rest of the Agreement will remain enforceable.The terms of this Agreement that expressly or by their nature DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 20 survive termination shall continue thereafter until fully performed,which shall include,without limitation, the obligation to make payments hereunder. Notices of Right to CancelH. We May Revoke Our Offer To Enter Into This Agreement In Our Sole Discretion If You Do Not Accept,1. Sign And Send The Agreement To Us By The Tenth (10th)Calendar Day After The Date We Present It To You. In Addition To The 10-Day Right To Cancel,Which Is Described On the Signature Page and Exhibit C,2. You May Cancel The Agreement Without Penalty and Have Your Deposit and Balance Payment Refunded By Sunrun Within a Reasonable Period of Time Following Cancellation: If we fail in some material way to perform the Work,and do not correct such failure within ninety daysa. (90)after receiving written notice from you pursuant to Section G(13)that details the nature of the failure to perform and the date on which you first noticed the incident; If Sunrun requests a change to the Agreement pursuant to Section F,and you do not agree to suchb. change; If it is determined that you must pay for any site improvements (to accommodate a Solar System);orc. __ __ If,for a period of one hundred eighty (180)days after the Effective Date Installation of the Solar Systemd. has not commenced,and you have fulfilled all of your obligations under this Agreement,including making the Home accessible to Sunrun and in a state ready to permit installation. We May Cancel This Agreement If:3. prior to the commencement of installation,there is a change in the Solar System’s annual energya. production estimate,expressed in kWh,provided by the National Renewable Energy Laboratory PVWatts Calculator. concealed conditions that you knew about or reasonably should have known about are discovered thatb. prevent installation or would result in reduced estimated system production as set forth in Section B; you delay in correcting pre-existing conditions that prevent installation of the Solar System;c. you fail to respond to Sunrun’s or its Installation Partner’s questions and requests and cause Solard. System installation to be delayed for thirty (30)or more days as a result of your unresponsiveness; a change in Solar System design changes the expected costs and benefits of this Agreement to Sunrun;e. cellular service or internet service is no longer available at the Home or if the availability of cellular orf. internet service significantly decreases,in which case Sunrun will refund you the Deposit within a reasonable period of time following cancellation if such lack of,or decrease in,cellular service or internet service is through no fault of your own Sunrun requests a change to the Agreement pursuant to Section F,and you do not agree to such changeg. within five (5)business days after you are notified of such request,in which case Sunrun will refund you the Deposit and Balance Payment within a reasonable period of time following cancellation. prior to the commencement of installation,there are any changes or proposed changes to yourh. applicable Utility tariff (including any changes to net metering ,net metering not being extended or For example,if upon completion of the Site Survey we recommend that the roof should be replaced prior to the solar installation,but you do not have the means to complete the re-roof,then you may cancel the agreement. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 21 continued on the same terms,or for any other reason the Solar System does not qualify or is otherwise ineligible for net metering or expected Incentives),we may cancel this Agreement,in which case Sunrun will refund you the Deposit within a reasonable period of time following cancellation. prior to the commencement of installation,the Solar System fails to qualify for any expected Incentivesi. (including Incentives based on your household income or similar criteria), we may cancel this Agreement, in which case Sunrun will refund you the Deposit within a reasonable period of time following cancellation. YOUR INITIALS BELOW INDICATE THAT YOU: Are eighteen (18)years of age or older;· Are the owner of legal title to the Home and that every person or entity with an ownership interest in· the Home has agreed to be bound by the terms of the Agreement; Have read,understood and accepted the explanation of estimated energy output,energy sources,· contract term and payment terms; Have understood that Sunrun has the right to check your credit;· Agree that Sunrun will make a final determination of your eligibility in its sole discretion;· Acknowledge that you are responsible for making all payments under the terms of a 25-year· Agreement; Acknowledge that Sunrun will communicate with you via email and that you must maintain a working· email address in order to receive these communications; Acknowledge that you will continue to receive a monthly bill from your Utility;· Acknowledge that the Solar System is owned by Sunrun Installation Services Inc.and/or its affiliates;· and Acknowledge that you have been advised on your right to cancel this Agreement.· Agreed and accepted by:\i1\_______(Initials) [Signature Page Follows] DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 22 By signing below,you acknowledge that you have reviewed and received a complete copy of the Agreement without any blanks.Such Agreement shall be the complete understanding between the Parties. SUNRUN INSTALLATION SERVICES INC. Signature:\os\___________________ Print Name:\on\__________________ Date:\od\_______________________ Title:\ot\________________________ Federal Employer Identification Number:26-2841711 IF YOU CHOOSE TO PAY BY CHECK,MAKE CHECKS OUT TO SUNRUN INC.NEVER MAKE A CHECK OUT TO A SALES REPRESENTATIVE.OUR SALES REPRESENTATIVES ARE NOT AUTHORIZED TO RECEIVE CHECKS IN THEIR OWN NAMES. YOU,THE BUYER,MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE TENTH BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. Customer Primary Account Holder Secondary Account Holder (Optional) \s1\____________________________________\s2\_______________________________ Signature Mark Iverson Signature \d1\____________________________________\n2\_______________________________ Date Print Name Email Address*:\em1\ Mailing Address:77542 Ashberry Ct Palm Desert, CA 92211 Phone:\ph1\ *Email addresses will be used by Sunrun for official correspondence, such as sending invoices. Sales Consultant By signing below I acknowledge that I am Sunrun accredited,that I presented this agreement according to the Sunrun Code of Conduct,and that I obtained the homeowner's signature on this agreement. \r1\___________________________________________ Signature \r2\___________________________________________ Print Name \r4\___________________________________________ Sunrun ID number \r3\___________________________________________ State Sales Registration Number DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 (503) 314-2238 9/23/2022 lamarkiemark@gmail.com 110627 SP 1353926332 Alexander Gu Carlos Solano Project Operations 9/23/2022 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 23 Exhibit A Guaranteed Output and Purchase Price When you sign the Agreement,you will pay Sunrun a Deposit of $500.At the start of installation of the Solar System,you will pay Sunrun a Balance Payment of $68,353 (includes sales tax). As specified below,Sunrun will issue you a refund if Actual Output is less than Guaranteed Output to date. Please see Section D of the Agreement for additional information,including certain limitations. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 24 Year Performance Guarantee (kWh Output to Date) 2 49,908 4 99,318 6 148,235 8 196,664 10 244,610 12 292,077 14 339,072 16 385,597 18 431,659 20 477,260 22 522,408 24 567,104 25 589,285 Refund per kWh if Guaranteed Output is Not Met $0.104 $0.110 $0.117 $0.124 $0.131 $0.139 $0.148 $0.157 $0.166 $0.176 $0.187 $0.198 $0.211 After the Initial Term,if this Agreement is renewed in accordance with Section G(1),Sunrun shall,on each anniversary of the In-Service Date,establish a new price per kWh that is equal to ten percent (10%)less than the “average cost of electric energy”as established by your Utility or its successor.“Average cost of electric energy”shall be the price you would otherwise pay for electric energy to your Utility or its successor for the 12 months preceding the start of each Renewal Term. Please note that Utility rates and utility rate structures are subject to change.These changes cannot be accurately predicted.Projected savings from the Solar System are therefore subject to change.Tax incentives are subject to change or termination by executive,legislative or regulatory action. Agreed and accepted by:\i1\_______(Initials) DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 25 EXHIBIT B LEGAL NOTICES LEGAL NOTICE FOR CALIFORNIA HOME IMPROVEMENT CONTRACTS MECHANICS LIEN WARNING (Calif.Business &Professions Code §7159(e)(4)) MECHANICS LIEN WARNING:Anyone who helps improve your property,but who is not paid,may record what is called a mechanics'lien on your property.A mechanics'lien is a claim,like a mortgage or home equity loan,made against your property and recorded with the county recorder. Even if you pay your contractor in full,unpaid subcontractors,suppliers,and laborers who helped to improve your property may record mechanics'liens and sue you in court to foreclose the lien.If a court finds the lien is valid,you could be forced to pay twice or have a court officer sell your home to pay the lien.Liens can also affect your credit.To preserve their right to record a lien,each subcontractor and material supplier must provide you with a document called a “20 day Preliminary Notice.”This notice is not a lien.The purpose of the notice is to let you know that the person who sends you the notice has the right to record a lien on your property if he or she is not paid. BE CAREFUL.The Preliminary Notice can be sent up to 20 days after the subcontractor starts work or the supplier provides material.This can be a big problem if you pay your contractor before you have received the Preliminary Notices.You will not get Preliminary Notices from your prime contractor or from laborers who work on your project.The law assumes that you already know they are improving your property. PROTECT YOURSELF FROM LIENS.You can protect yourself from liens by getting a list from your contractor of all the subcontractors and material suppliers that work on your project.Find out from your contractor when these subcontractors started work and when these suppliers delivered goods or materials.Then wait 20 days,paying attention to the Preliminary Notices you receive. PAY WITH JOINT CHECKS.One way to protect yourself is to pay with a joint check.When your contractor tells you it is time to pay for the work of a subcontractor or supplier who has provided you with a Preliminary Notice,write a joint check payable to both the contractor and the subcontractor or material supplier.For other ways to prevent liens,visit CSLB's Internet Web site at www.cslb.ca.gov or call CSLB at 800-321-CSLB (2752). REMEMBER,IF YOU DO NOTHING,YOU RISK HAVING A LIEN PLACED ON YOUR HOME. This can mean that you may pay twice,or face the forced sale of your home to pay what you owe. By signing below,you acknowledge receipt of the foregoing legal notice. Agreed and accepted by:\i1\_______(Initials) Sunrun Signature:\os\_____________ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 26 INFORMATION ABOUT CONTRACTORS’STATE LICENSE BOARD (CSLB) (Calif.Business &Professions Code §7159(e)(5)). CSLB is the state consumer protection agency that licenses and regulates construction contractors. Contact CSLB for information about the licensed contractor you are considering,including information about disclosable complaints,disciplinary actions and civil judgments that are reported to CSLB. Use only licensed contractors.If you file a complaint against a licensed contractor within the legal deadline (usually four years),CSLB has authority to investigate the complaint.If you use an unlicensed contractor,CSLB may not be able to help you resolve your complaint.Your only remedy may be in civil court,and you may be liable for damages arising out of any injuries to the unlicensed contractor or the unlicensed contractor's employees. For more information: Visit CSLB’s Internet Web site at www.cslb.ca.gov. Call CSLB at 1-800-321-CSLB (2752) Write CSLB at P.O.Box 26000,Sacramento,CA 95826 By signing below,you acknowledge receipt of the foregoing legal notice. Agreed and accepted by:\i1\_______(Initials) Sunrun Signature:\os\_____________ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 27 SUNRUN SOLAR SYSTEMS WARNING: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 28 EXHIBIT C NOTICE OF CANCELLATION DATE OF AGREEMENT:\od\_________________ YOU MAY CANCEL THIS TRANSACTION,WITHOUT ANY PENALTY OR OBLIGATION,WITHIN TEN (10)CALENDAR DAYS FROM THE ABOVE DATE. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENT MADE BY YOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 CALENDAR DAYS FOLLOWING RECEIPT BY SUNRUN INSTALLATION SERVICES INC.OF YOUR CANCELLATION NOTICE AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL,YOU MUST MAKE AVAILABLE TO SUNRUN OR THE CONTRACTOR,OR A SUNRUN DESIGNEE AT YOUR RESIDENCE,IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE;OR YOU MAY,IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF SUNRUN INSTALLATION SERVICES INC.REGARDING THE RETURN SHIPMENT OF THE GOODS AT SUNRUN INSTALLATION SERVICES INC.'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO SUNRUN INSTALLATION SERVICES INC.AND SUNRUN INSTALLATION SERVICES INC.DOES NOT PICK THEM UP WITHIN TWENTY (20)DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO SUNRUN INSTALLATION SERVICES INC.,OR IF YOU AGREE TO RETURN THE GOODS TO SUNRUN INSTALLATION SERVICES INC.AND FAIL TO DO SO,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION,EMAIL A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE,OR ANY OTHER WRITTEN NOTICE,TO CANCELLATIONS@SUNRUN.COM OR MAIL THIS CANCELLATION NOTICE TO SUNRUN INSTALLATION SERVICES INC.AT 1800 ASHTON BLVD,LEHI, UT 84043,PH:1-855-478-6788. I HEREBY CANCEL THIS TRANSACTION. CUSTOMER SIGNATURE:___________________ DATE:__________________ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 9/23/2022 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 29 EXHIBIT C DUPLICATE COPY NOTICE OF CANCELLATION DATE OF AGREEMENT:\od\_________________ YOU MAY CANCEL THIS TRANSACTION,WITHOUT ANY PENALTY OR OBLIGATION,WITHIN TEN (10)CALENDAR DAYS FROM THE ABOVE DATE. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENT MADE BY YOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 CALENDAR DAYS FOLLOWING RECEIPT BY SUNRUN INSTALLATION SERVICES INC.OF YOUR CANCELLATION NOTICE AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL,YOU MUST MAKE AVAILABLE TO SUNRUN OR THE CONTRACTOR,OR A SUNRUN DESIGNEE AT YOUR RESIDENCE,IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE;OR YOU MAY,IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF SUNRUN INSTALLATION SERVICES INC.REGARDING THE RETURN SHIPMENT OF THE GOODS AT SUNRUN INSTALLATION SERVICES INC.’S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO SUNRUN INSTALLATION SERVICES INC.AND SUNRUN INSTALLATION SERVICES INC.DOES NOT PICK THEM UP WITHIN TWENTY (20)DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO SUNRUN INSTALLATION SERVICES INC.,OR IF YOU AGREE TO RETURN THE GOODS TO SUNRUN INSTALLATION SERVICES INC.AND FAIL TO DO SO,THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION,EMAIL A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE,OR ANY OTHER WRITTEN NOTICE,TO CANCELLATIONS@SUNRUN.COM OR MAIL THIS CANCELLATION NOTICE TO SUNRUN INSTALLATION SERVICES INC.AT 1800 ASHTON BLVD,LEHI, UT 84043,PH:1-855-478-6788. I HEREBY CANCEL THIS TRANSACTION. CUSTOMER SIGNATURE:___________________ DATE:__________________ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 9/23/2022 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 30 EXHIBIT D Payment Forms As a Sunrun customer,you agree to pay your Deposit andBalance Payment by check drawn on a US bank account or by money order. You will receive all invoices via email unless you contact Sunrun directly by phone at 855-478-6786 or by email at customercare@sunrun.com to request invoices be sent through the US mail. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 31 Check/Money Order Deposit Form Sunrun customers paying Deposits or Balance Payments by check or money order must (i)enclose this document with each payment and (ii)include your Sunrun Customer ID number in the memo line of your check. Please send payments to:Sunrun Inc. P.O.Box 511612 Los Angeles,CA 90051-8167 Customer Name:_____________________________________ Customer/Proposal ID #:_____________________________________ Customer Address: _____________________________________ _____________________________________ _____________________________________ Amount Enclosed:$____________________________________ Description of Payment:O Deposit O Balance Payments O January O February O March O April O May O June O July O August O September O October O November O December Date:_____________________________________ Notes:________________________________________________________________________ For Accounting Purposes Only Account Coding:____________________________________ Fund:____________________________________ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 32 EXHIBIT E Data Usage and Disclosure This Exhibit E describes the circumstances in which and purposes for which we may use or disclose Data. Data Usage:We may use Data for the following purposes (in each case to the extent permitted by law):a. (1)to operate,maintain,provide,and enhance the Solar System;(2)for our internal purposes,including, without limitation,research and development,improvement of our product and service offerings,and creation of new product and service offerings;(3)to customize content and communications we may provide to you;and (4)for other purposes so long as the Data does not contain personally identifiable information (including where Data has been deidentified). Data Disclosure.We will not disclose any Data other than in the following circumstances:(1)where theb. Data does not contain personally identifiable information (including where Data has been deidentified); (2)in order to provide our products or services to You (including working with third-party service providers who may assist us in collecting,hosting,maintaining,analyzing or otherwise processing Data for us);(3)if required to do so by any law or regulation or in the good-faith belief that such action is necessary to comply with any law or regulation,in response to a court order,judicial or other government subpoena or warrant,or to otherwise cooperate with law enforcement or other governmental agencies; (4)if we believe,in good faith,disclosure is appropriate or necessary to (A)take precautions against liability,(B)protect us or others from fraudulent,abusive,or unlawful uses or activity,(C)investigate or defend against any third-party claims or allegations,(D)protect the security or integrity of our services and any facilities or equipment used to make our service available,or (E)protect our property or other legal rights (including,but not limited to,enforcement of our agreements),or the rights,property,or safety of others;(5)to our assignees,affiliates,actual or prospective lenders,financing parties, investors,insurers,and acquirers;(6)disclosure to contractors,service providers and other third parties we use to support our business and who are bound by contractual obligations to keep personal information confidential and use it only for the purposes for which we disclose it to them;and (7)for any purpose for which you have provided your express consent. Your initials indicate that you have read,understood and accepted the provisions set forth in this Exhibit E. Agreed and accepted by:\i1\_______(Initials) DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 33 PRODUCT ACKNOWLEDGEMENT FORM I, Mark Iverson, acknowledge that Sunrun has provided me a proposal overview of the system ownership option and associated benefits through the Costco Solar Program. However, I confirm that I have requested to move forward with a product option that is not available through the Costco Solar Program. I acknowledge that in pursuing this option, I am not purchasing my solar system through Costco, and I understand that I will not be eligible for the Costco benefits, including the Costco Shop Card reward. I further understand that any issues with my order, including but not limited to issues related to sales, installation, performance, repairs, or maintenance, will need to be resolved exclusively by Sunrun. This is not a Costco transaction. Costco will be unable to assist in any capacity. Questions? Questions or concerns regarding your project should be directed to the project team at Sunrun, or to Sunrun Customer Care at 1-855-478-6786 or customercare@sunrun.com. Accepted by: Your signature indicates that you have read, understand and accept the information listed above. Customer Signature:\s1\ Customer Name: Mark Iverson Date:\d1\ DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 9/23/2022 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 34 REQUIRED FOR NEW HOMEOWNERS WITHOUT REQUISITE BILL HISTORY SYSTEM SIZING DISCLOSURE Sunrun requires that customers have 12 months of electricity bill history in their current home to ensure accurate system sizing. Because you are a new homeowner and do not have 12 months of electricity bill history in your current home, Sunrun has sized your system using average data from its existing customer base along with information you provided regarding anticipated electricity usage. By initialing below you acknowledge that: Sunrun has sized this Solar System without obtaining information regarding your specific electricity· consumption, typically based on 12 months of electricity bill history. The Solar System may not be sized to offset an optimal portion of your future electricity consumption,· and/or may produce more electricity than you consume. You are responsible for paying Sunrun for all electricity produced by the Solar System,even if the Solar· System produces more electricity than you consume. Although Sunrun has sized the Solar System using available data,Sunrun and its sales partner have made no promises or representations to you that the Solar System is appropriately sized to save you money or cause you to use less utility power than you otherwise might use. Agreed and accepted by:\i1\_______(Initials) DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 35 SUNRUN INSTALLATION SERVICES INC. PACE Addendum to Sunrun BrightSave® Prepaid Power Purchase Agreement RECITALS This Addendum describes certain amended and/or additional terms and conditions of your receipt ofI. and payment for electric energy to be supplied by a solar photovoltaic system that will be installed at your property and owned and maintained by Sunrun Installation Services Inc., a Delaware corporation, together with its successors and Assignees (“Sunrun” or “we”). Mark Iverson (“Customer”or “homeowner”or “you”)have entered into that certain Prepaid PowerII. Purchase Agreement (the "Agreement") with Sunrun (Sunrun, together with Customer, the “Parties”, and each a “Party”) for the sale and purchase of all electric energy generated by a solar photovoltaic system (the “Solar System”)to be installed on or at your home located at 77542 Ashberry Ct Palm Desert,CA 92211 (the “Home”)for a twenty-five(25)year term. You and Sunrun are entering into this addendum (this “Addendum”) to the Agreement in order toIII. accommodate financing your Deposit and Balance Payment (as such terms are defined in Section B.1 of the Agreement) through a Property Assessed Clean Energy (“PACE”) program currently offered in the State of California (including, but not limited to, the Open Pace program sponsored by the California Statewide Communities Development Authority). Any such sponsor of a PACE program shall be referred to herein as the “PACE Sponsor” and such financing shall be referred to herein as the “PACE Financing”. Unless otherwise expressly stated herein, all Section references herein shall refer to Sections of theIV. Agreement. AMENDMENTS Definitions. Capitalized terms not otherwise defined in this Addendum shall have the meanings set forth inA. the Agreement. Amendments to Section B (Payment Terms, Rebates and Credits)B. The Payment Terms table set forth in Section B of the Agreement is hereby amended and restated as1. follows: __ Deposit (due on the In-Service Date)$500 (the “Deposit”) Balance Payment (due on the In-Service Date) $68,353 (the “Balance Payment”) (Includes sales tax) Cost per kWh,year one $0.104 __ Section B.1 is hereby amended to include a new Section B.1(d) as follows:2. “d. Each of the Deposit and Balance Payment shall be due on the In-Service Date. Sunrun understands that you intend to finance the Deposit and Balance Payment through a PACE program, and to use the proceeds from the closing of your PACE Financing to pay the Deposit and Balance Payment. If for any reason your PACE Financing is delayed or does not close, you agree that you remain responsible for timely paying the Deposit and Balance Payment when due.” Amendments to Section E (Design and Installation)C. Section E.3 is hereby amended to include a new Section E.3(d) as follows:1. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 36 “d. Sunrun represents and warrants that the Solar Facility will be an eligible renewal energy resource under the California Renewables Portfolio Standard Program (California Public Utilities Code Section 399.11 et. seq.).” Section E.4 is hereby amended to include a new Section E.4(f) as follows:2. “f. You agree to promptly (and in all cases within 5 business days from receipt thereof) execute all documentation required by or associated with achieving the In-Service Date at Sunrun’s request, including (but not limited to) any applicable certificate of completion.” Section E.4 is hereby amended to include a new Section E.4(g) as follows:3. “g. Sunrun agrees that as long as any outstanding balance remains on the PACE Financing, no assignee, creditor, partner, or owner of Sunrun shall have the right to remove or permanently decommission the Solar System.” Section E.6(c) is hereby amended and restated to include a new last sentence as follows:4. “c. If you plan to move or temporarily disconnect the Solar System to allow for maintenance of and/or repair to the Home, you agree, at your expense, either (i) to hire Sunrun to perform this work or (ii) to obtain Sunrun’s approval of your contractor, who you agree must carry a commercial general liability policy in an amount not less than one million ($1,000,000) dollars per occurrence and name “Sunrun Installation Services Inc. and its successor or assigns” as additional insureds. Notwithstanding the foregoing, as long as any outstanding balance remains on the PACE Financing, neither Sunrun nor you shall remove the Solar System or disconnect or restrict delivery of electricity from the Solar System to you or any subsequent owner of the Home.” Section E.6(d) is hereby amended and restated to include a new last sentence as follows:5. “d. You agree that you will not make any modifications, improvements, revisions or additions to the Solar System or take any other actions that could damage or void any applicable warranty set forth in Section C without Sunrun’s prior written consent. If you make any modifications, improvements, revisions or additions to the Solar System, they will become part of the Solar System and shall be Sunrun’s sole property. Furthermore, as long as any outstanding balance remains on the PACE Financing, you agree not to make any modifications, improvements, revisions or additions to the Solar System that would disconnect or restrict delivery of electricity from the Solar Facility to you or any subsequent owner of the Home.” Amendments to Section G (Additional Information)D. Section G.5(a) is hereby amended and restated as follows:1. “a. Sale of Home. If you sell the Home you: May transfer all rights and obligations under this Agreement to the new owner, provided that the(i) new owner (a) meets Sunrun’s credit requirements of a FICO score of 650 or higher and (b) agrees in writing to be bound by all of the terms and conditions set forth herein. Notwithstanding the foregoing, as long as any outstanding balance remains on the PACE Financing, the right to receive the electricity from the Solar System through this Agreement shall automatically be transferred with the title to the Home, whether the title is transferred by voluntary sale, judicial or nonjudicial foreclosure, or by any other means. Contact Sunrun’s Customer Care Department at customercare@sunrunhome.com to obtain an assignment agreement. Or; May transfer all rights and obligations under this Agreement to the new owner, provided that the(ii) new owner (a) qualifies for a mortgage to purchase the Home or (b) purchases the Home in cash and either you or the new owner pays Sunrun a $250.00 credit check exemption fee. Notwithstanding the foregoing, as long as any outstanding balance remains on the PACE Financing, the right to receive the electricity from the Solar System through this Agreement shall automatically be transferred with the title to the Home, whether the title is transferred by voluntary sale, judicial or nonjudicial foreclosure, or by any other means. Or; Will be deemed to have terminated this Agreement and Sunrun may exercise its rights under(iii) Section G(10) if: DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 37 You sell or otherwise transfer your interest in the Home without either purchasing the Solar1. System or assigning this Agreement to the new owner in accordance with the terms of this Section, or The new owner refuses to assume the Agreement.2. Section G.5(c)(i) is hereby amended and restated as follows:2. “(i) If foreclosure proceedings are filed involving the Home, you shall be in default of the Agreement pursuant to Section G(10) and the Agreement shall terminate without notice to you and Sunrun may exercise any of its remedies, including but not limited to removal of the Solar System. Notwithstanding the foregoing, as long as any outstanding balance remains on the PACE Financing, Sunrun shall not remove the Solar System or restrict delivery of electricity from the Solar System to you or any subsequent owner of the Home.” Section G.10(a)(ii)(2) is hereby amended and restated as follows:3. “(b) Sunrun may, subject to any cure rights provided herein or under applicable law, have the right to disconnect the Solar System and/or enter the Home and remove the Solar System. We will provide at least ten (10) days’ advance written notice of our intent to disconnect or remove the Solar System. Notwithstanding the foregoing, as long as any outstanding balance remains on the PACE Financing, Sunrun shall not remove the Solar System or restrict delivery of electricity from the Solar System to you or any subsequent owner of the Home.” Section G is hereby amended to include a new Section G.19 as follows:4. “19. The Parties acknowledge that the PACE Sponsor is a third party beneficiary of this Agreement until the PACE Financing has been fully paid and only until that time, the Parties cannot enter into any material amendments to this Agreement without the PACE Sponsor’s consent.” Amendment to Exhibit A (Guaranteed Output and Purchase Price)E. The first paragraph of Exhibit A to the Agreement is hereby amended and restated as follows:1. “When you sign the Agreement, you will pay Sunrun $0. On the In-Service Date of the Solar System, you will pay Sunrun a Deposit of $500 and a Balance Payment of $68,353.” Miscellaneous ProvisionsF. No Other Amendments or Modifications. Except as specifically amended by this Addendum, all other1. provisions of the Agreement are hereby reaffirmed and remain in full force and effect as written. Any and all notices, requests, certificates and other documents or instruments executed and delivered concurrently with or after the execution and delivery of this Addendum may refer to the Agreement without making specific reference to this Addendum, but all such references shall be deemed to include this Addendum, unless the context shall otherwise require. Governing Law. Unless otherwise prohibited by law, this Addendum shall be interpreted in accordance2. with and governed by the laws of the State of California, without regard to any conflict of laws principles thereof. Entire Agreement and Severability. You agree that the Agreement, as amended by this Addendum,3. constitutes the entire agreement between you and Sunrun. If any provision is declared to be invalid, that provision will be deleted or modified, and the rest of this Addendum will remain enforceable. The terms of this Addendum that expressly or by their nature survive termination shall continue thereafter until fully performed, which shall include, without limitation, the obligation to make payments hereunder. Counterparts. This Addendum may be executed in one or more counterparts, each of which shall4. constitute an original but all of which, taken together, shall constitute but one and the same agreement. [Signature page follows] DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 38 SUNRUN INSTALLATION SERVICES INC. Signature:\o2\___________________ Print Name:\o3\__________________ Date:\o1\_______________________ Title:\o4\________________________ Customer Primary Account Holder Secondary Account Holder (Optional) \s4\____________________________________\s5\_______________________________ Signature Mark Iverson Signature \s3\____________________________________\s6\_______________________________ Date Print Name DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 Sunrun Installation Services Inc.. | 225 Bush Street, Suite 1400,, San Francisco, CA 94104 | 888.GO.SOLAR | CSLB No. 750184 Generation Date: 9/23/2022 Proposal ID: PK49ALD7LAKV-A Version 2019Q4V1 39 DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 My Custom S olar Desig n Prepared by Alexander Gu, 09/23/2022 \s 1\ Customer S ignature \d1\ D ate My Information Mark I verson 77542 Ashberry Ct Palm D esert, CA 92211 System Annua l Usa ge 29,782 kWh Estimated System Size 19.71 kWp Estimated Annual System Production 27,796 kWh Estimated Energy Offse t 94% Modules (54) LONGi Green Energy Technology Co Ltd, L R4- 60HPH-365M Inverters 1 x SolarEdge Technologies SE6000H-USSN 1 x SolarEdge Technologies SE7600H-USSN Approval I have reviewed My Custom Solar D esign and approve of the placement of solar panels identified above. I understand that the actual number of panels and their precis e placement may vary based on engineering, installation, and s olar energy production considerations, including roof type, shade, and other factors. DocuSign Envelope ID: B07E4B28-28FF-4125-AE2A-EAE1432A9749 9/23/2022 Certificate Of Completion Envelope Id: B07E4B2828FF4125AE2AEAE1432A9749 Status: Completed Subject: Customer Agreement REPLACE_FOR [[RecipientName]] (PK49ALD7LAKV-A) Source Envelope: Document Pages: 41 Signatures: 7 Envelope Originator: Certificate Pages: 6 Initials: 12 Sunrun eSignAdmin AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 595 Market St.,29th Floor San Francisco, CA 94105 sunrun_esign_admin@sunrun.com IP Address: 13.110.74.8 Record Tracking Status: Original 9/23/2022 2:11:15 PM Holder: Sunrun eSignAdmin sunrun_esign_admin@sunrun.com Location: DocuSign Signer Events Signature Timestamp H Mark Iverson lamarkiemark@gmail.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 76.32.12.125 Signed using mobile Sent: 9/23/2022 2:11:19 PM Viewed: 9/23/2022 2:12:06 PM Signed: 9/23/2022 2:19:10 PM Electronic Record and Signature Disclosure: Accepted: 9/23/2022 2:05:45 PM ID: bef6a75b-278a-4665-8658-66d190b44a49 Alexander Gu alexander.gu@sunrun.com 05/07/2022 Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 76.32.12.125 Sent: 9/23/2022 2:19:12 PM Viewed: 9/23/2022 2:19:31 PM Signed: 9/23/2022 2:19:38 PM Electronic Record and Signature Disclosure: Accepted: 9/23/2022 2:19:31 PM ID: 2b2bdc31-78fb-4395-8a53-1f36de387eb6 Carlos Solano carlos.solano@sunrun.com Project Operations Security Level: .Email ID: 6dcd9668-cda4-4af9-b507-89a39acfa211 9/23/2022 3:32:50 PM Signature Adoption: Pre-selected Style Using IP Address: 52.117.183.140 Sent: 9/23/2022 2:19:41 PM Resent: 9/23/2022 3:32:47 PM Viewed: 9/23/2022 3:33:04 PM Signed: 9/23/2022 3:33:12 PM Electronic Record and Signature Disclosure: Accepted: 4/16/2021 8:00:24 AM ID: 39706bc4-7f25-4023-a550-69d8379f94bc In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/23/2022 2:11:19 PM Certified Delivered Security Checked 9/23/2022 3:33:04 PM Signing Complete Security Checked 9/23/2022 3:33:12 PM Completed Security Checked 9/23/2022 3:33:12 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure CONSUMER DISCLOSURE From time to time, Sunrun Inc. (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. PLEASE READ THE INFORMATION BELOW CAREFULLY AND THOROUGHLY, AND IF YOU CAN ACCESS THIS INFORMATION ELECTRONICALLY TO YOUR SATISFACTION AND AGREE TO THESE TERMS AND CONDITIONS, PLEASE CONFIRM YOUR AGREEMENT BY CLICKING THE 'I AGREE' BUTTON AT THE BOTTOM OF THIS DOCUMENT. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for thirty (30) days after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, please request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 8/7/2013 10:17:58 AM Parties agreed to: H Mark Iverson, Alexander Gu, Carlos Solano How to contact Sunrun Inc.: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: customercare@sunrun.com You may also contact us in writing at 45 Fremont Street, 32nd Floor, San Francisco, CA 94105 or by phone at 1-855-478-6786. To advise Sunrun Inc. of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at customercare@sunrun.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address. In addition, you must notify DocuSign, Inc. at 1-866-219-4318 to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from Sunrun Inc. To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must contact us by (a) sending us an e-mail to customercare@sunrun.com, (b) writing to us at Sunrun Inc, 45 Fremont Street, 32nd Floor, San Francisco, CA 94105, or (c) calling us at 1-855-478-6786, and in connection with your request you must state your e-mail address, full name, US Postal address, and telephone number. To withdraw your consent with Sunrun Inc. To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. contact us by (a) sending us an email to customercare@sunrun.com, (b) writing to us at Sunrun Inc., 45 Fremont Street, 32nd Floor, San Francisco, CA 94105, or (c) calling us at 1-855-478-6786, and in connection with your request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X Browsers: Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader: Acrobat® or similar software may be required to view and print PDF files Screen Resolution: 800 x 600 minimum Enabled Security Settings: Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Notices Any notice or other communication to be made hereunder, even if otherwise required to be in writing under other provisions of this Consent or any other documents or agreements that have been provided to you in connection with this Consent, may alternatively be made in an electronic record transmitted electronically to the electronic addresses provided by you. Any notice or other communication made in electronic form will have the same legal effect and enforceability as if made in non-electronic form. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that:  I can access and read and have accessed, read and understood the terms of this ELECTRONIC CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Sunrun Inc. as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Sunrun Inc. during the course of my relationship with you. Entire Agreement Provision This agreement and the consumer disclosure statement executed by the customer in conjunction with and simultaneously with its review and acceptance of the terms set forth herein constitute the entire agreement between the parties with respect to the subject matter hereof and supersede any prior understandings, agreements, or representations by or between the parties, written or oral, to the extent they relate in any way to the subject matter hereof. Updated June 2021 This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1.Submittal Requirements −Completed permit application form. This permit application form can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits −Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits/solar- information −Provide a standardized or simplified photovoltaic plan that demonstrates: Title or Cover Sheet noting the 2019 California Electrical Code. Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. A simplified Electrical Plan: 1.Locations of main service or utility disconnect 2.Total number of modules, number of modules per string and the total number of strings 3.Make and model of inverter(s) and/or combiner box if used 4.Single-line diagram of system 5.Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit −Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1.The type of roof covering and the number of roof coverings installed 2.Type of roof framing, size of members and spacing 3.Weight of panels, support locations and method of attachment 4.Framing plan and details for any work necessary to strengthen the existing roof structure 5.Site-specific structural calculations 6.Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings Updated June 2021 These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1.General Requirements ☐The photovoltaic system size is 30kW AC CEC rating or less. ☐The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. ☐The photovoltaic system is utility interactive. ☐Permit application and declaration is completed and attached. 2.Planning Department Requirements ☐Existing MPU Amps Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW.☐Maximum height of “tilted” panels shall not exceed eighteen (18) inches. ☐All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. ☐The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. ☐Modules shall be flush with one another and gaps between panels shall be minimized. ☐Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. 3.Electrical Requirements ☐No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter: 1)No more than two strings per MPPT input where source circuit fusing is not included 2)Fuses (if needed) are rated to the series fuse rating of the PV module 3)No more than one non-inverter-integrated DC combiner is utilized per inverter ☐For central inverter systems: No more than two inverters are utilized. ☐The PV system is connected to the load side of the utility distribution equipment. ☐A Solar PV Standard Plan and supporting documentation is completed and attached. 4.Structural Requirements ☐A completed Structural Criteria and supporting documentation is attached Wind and Seismic (if required). 5.Fire Safety Requirements ☐Clear access pathways provided. ☐Fire classification photovoltaic system is provided. ☐All required marking and labels are provided. ☐A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Applicant Signature _________________________________________________________ Date _____________ Project Address______________77542 ASHBERRY CT________________________________________ 10/19/22 Page 1 of 4 The definition of “qualifying residential rooftop solar systems” is all of the following: A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ·A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. Electrical main panel upgrade included with solar plan (Review required if doubling in size) CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems—30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. 1.Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. Fire Marshall approval is not required for small residential rooftop systems at this time. Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2.Building Permit Application Form A permit application can be obtained in person or downloaded from the Department’s website at: www.cityofpalmdesert.org 3.Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria’s, standard plan review timetables apply. Please consult a licensed designed prof essional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 2 of 4 4.Project Submittal All projects can be submitted in person at:City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert, California 92260 5.Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6.Plan Review and Permit Fees ·Plan Review Fee is $203. ·Permit Fees are approximately $266 depending on archiving materials. 7.Minimum Plan Set Requirements ·Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11”X17” to Maximum of 24”X36”). Include a separate Site and Roof Layout Plan for the Riverside County Assessor’s Office. ·Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. ·Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal’s Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf ·Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. ·Product Specifications and Literature Provide all manufacturers’ specifications on all inverters, solar panels, combiner and discon nect boxes and solar panel anchorage system to be used. ·Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City’s website. All submittals must be signed by a C -10 (Electrical Contractor) or C-46 (Solar Contractor) or licensed design professional. Electrical Plans should include the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings . Make and model of inverter(s) and/or combiner box if used. Single line diagram of system . Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 3 of 4 If batteries are to be installed, include them in the diagram and show their locations and venting . Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705 . Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department’s website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: The type of roof covering and the number of roof coverings installed . Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system . As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760) 776- 6420 Monday through Friday (8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. Conductor’s ratings and sizes match plans. Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. Page 4 of 4 QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can save time and money by following these tips. Take time to review permit requirements of the local jurisdiction. Permitting rules and processes differ am ong different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. Contact the local electric utility early in the permitting process (solar PV installations). Local electric utilities have a completely separate approval process from the local jurisdiction’s permitting process. Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. Make sure that the solar installation that is built matches the submitted plans. The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections.