Loading...
HomeMy WebLinkAbout_SOLR22-1120_Lagudis Upgrade Solar DrawingsGOVERNING CODES THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: ·2019 California Building Code ·2019 California Residential Code ·2019 California Green Building Standard Code ·2019 California Plumbing Code ·2019 California Mechanical Code ·2019 California Electrical Code ·2019 California Fire Code ·2019 California Energy Code ·2016 International Property Maintenance Code ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES NEW UPGRADED SITE MAP & PV LAYOUT ELECTRICAL 1-LINE DIAGRAM ATTACHMENT LAYOUT SYSTEM LABELING DETAIL RSD DATA SHEET INVERTER DATA SHEET SHEET INDEX PLOT PLAN MODULE DATA SHEET RACKING DATA SHEET PV 1.0 PV 2.0 PV 3.0 PV 4.0 PV 5.0 D 6.0 D 7.0 D 8.0 D 9.0 NEW SYSTEM RATING ELECTRICAL INFORMATION MAIN SERVICE PANEL BUS SIZE: MAIN SERVICE BREAKER SIZE: MOUNTING SYSTEM: BUILDING INFORMATION ONE STORY HOUSE CONSTRUCTION TYPE: V-B OCCUPANCY: R3 ROOF: Joist 2 x 12 @ 16" O.C. White Elastomeric Parcel Number: VICINITY MAP (SCALE: NTS) SATELLITE VIEW (SCALE: NTS) GENERAL NOTES 1.All electrical materials shall be new and listed by recognized electrical testing laboratory Custom made equipment shall have complete test data submitted by the manufacturer attesting to its safety 2.Outdoor equipment shall be NEMA 3R rated or equivalent 3.All metallic equipment shall be grounded 4.Contractor shall obtain electrical permits prior to installation and shall coordinate all inspections, testing commissioning and acceptance with the client, utility co. and city inspectors as needed. 5.The electrical contractor shall verify the exact locations of service points and service sizes with the serving utility company and comply with all utility companies requirements. 6.Drawings are diagrammatic only, routing of raceways shall be option of the contractor unless otherwise noted and shall be coordinated with other trades. 7.If the roof material or the roof structure not adequate for PV installation, call the engineer of record print to installation. The contractor is responsible to verify that the roof is capable of withstanding the extra weight. 8.If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire size. Final drawings will be red-lined and updated as appropriate. 9.Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for providing and installing all materials and services required by the strictest conditions noted on the drawings or in the specifications to ensure complete compliance and longevity of the operable system required by the engineer of record. PHOTOVOLTAIC NOTES: 1.Rooftop mounted photovoltaic panels and modules shall be tested, listed and identified by recognized testing laboratory 2.Solar system shall not cover any plumbing or mechanical vents 3.Modules and support structures shall be grounded unless racking has integrated ground. 4.Removal of an interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 5.All PV modules and associated equipment and wiring shall be protected from physical damage. 6.Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons while energized. 7.Inverter is equipped with integrated DC disconnect, thus providing ground fault protection 8.All conductors shall be copper and 75 deg rated 9.A single conductor shall be permitted to be used to perform the multiple functions of dc grounding, AC grounding and bonding between AC and DC systems. 10.Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. 200A 175A 09/20/2022 Property Address: Owner: 655052010 Lagudis Upgrade Property Type:Single Family Residence Drawn by:New@engineerinc.io Date: 73460 Agave Ln Palm Desert, CA 92260 Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 CONTRACTOR SWH NEW EQUIPMENT SUMMARY DC 6.400KW STC AC 4.640KW NAMRPLATE 16 HANWHA 400 WATT MODULES WITH IQ8+ MICROINVERTERSWITH IQ8+ 0.29W MICROINVERTERS EXISTING EQUIPMENT SUMMARY 18 HANWHA 395 WATT MODULES WITH IQ7+ 0.29 W MICROINVERTERS TOTAL SYSTEM RATING DC 13.510KW STC AC 9.86KW NAMEPLATE EXISTING SYSTEM RATING DC 7.110KW STC AC 5.22 KW NAMEPLATE EMT type Conduit (N) Solar Module (N) Junction Box Fire Setback Line JB ....................... ........................ ............... ............. ............. MSP (N) Main Service Panel200A INDEX (N) Microinverter SITE MAP & PV LAYOUT PV 1.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 ECB (E) Enphase Combiner Box.... CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: NEW SOLAR MODULES ___ Hanwha 400Watt Model #Q.PEAK DUO ML-G10+ 16 16 NEW INVERTER INVERTER TYPE: Micro: ___ Enphase IQ8+ Model # IQ8PLUS-72-2-US(240V) (E) Solar Module............... Total Roof Area: 5502 Total Module Area: 748 13.59% of Coverage EXISTING SOLAR MODULES ___ Hanwha 395Watt Model #Q.PEAK DUO ML-G10+ 18 18 EXISTING INVERTER INVERTER TYPE: Micro: ___ Enphase IQ7A Model # IQ7A-72-2-US(240V) Agave Ln 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k 3' fire setback 3' fire setback MSP ECB JB1 Existing Solar PV Array 18 - Hanwha 395W Modules 18 - IQ7A Microinverters Roof Pitch: 1 Deg Modules Pitch: 10 Deg Orientation: 175 DegJB2 JB4 JB5 a a a a a a a a a a a b b b JB3 b b b bJB6 b b b bJB7 3' fire setback 3' fire setback 3' fire setback 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k 3 ' f i r e s e t b a c k c c c c c c c c c c c c JB8 JB9 JB10 JB11 JB12 3' fire setback New Solar PV Array 16 - Hanwha 400W Modules 16 - IQ8+ Microinverters Roof Pitch: 1 Deg Modules Pitch: 10 Deg Orientation: 175 Deg SCALE:3/32" = 1'-0" 180 ° 90 ° 270 ° 0° S W N E NEW UPGRADED ______ MAIN SERVICE PANEL 120/240V, 1P, 3W NEW NON CENTER _____ MAIN C/B GEC #4 AWG (N) GROUNDING ELECTRODE SYSTEM MAIN METER NOTE: Service Panel does not contain center fed Main Breaker: 200A 175A PV 2.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 ELECTRICAL 1-LINE DIAGRAM (3) #6 AWG THWN/THWN-2 (1) #8 AWG GND 3/4'' EMT, 2 FEET CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: HANWHA 400W MODULES16 16 ENPHASE IQ8+ MICROINVERTERS INSTALLED (2) 20A PV 2-POLE C/B ENVOY MONITORING DEVICE (E)ENPHASE AC COMBINER (2-POLE OCPD)120/240V FACTORY INSTALLED (6) #10 AWG THWN/THWN-2 (1) #8 AWG GND 3/4'' FMT, 23 FEET Service Entrance Underground 1 2BR A N C H CI R C U I T A J BOX 1 NEMA3R PV ARRAY RATING WIRE SIZE CALCULATION BRANCH CIRCUIT - A BRANCH CIRCUIT - A Number Modules 11 Type (E)Hanwha 395 Watt Q.PEAK DUO ML-G10+Number OF Microinverters in Circuit 11 Number MicroInverters 11 Type Enphase IQ7A Microinverters IQ7A-72-2-US(240V)Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts)Watts STC, (Watts/Module) 11 * 395=4345 Branch Circuit Total Current (A)11 * 1.45 * 1.25 = 19.93 Array Currents I-SC 11.10 A I-MP 10.71 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.27 V V-MP 36.88 V BRANCH CIRCUIT - B BRANCH CIRCUIT - B Number Modules 7 Type (E)Hanwha 400 Watt Q.PEAK DUO ML-G10+Number OF Microinverters in Circuit 7 Number MicroInverters 7 Type Enphase IQ7A Microinverters IQ7A-72-2-US(240V)Microinverter Maximum Output Current (A)1.45 Total DC Wattage (Watts)Watts STC, (Watts/Module) 7 * 395=2765 Branch Circuit Total Current (A)7 * 1.45 * 1.25 = 12.68 Array Currents I-SC 11.10 A I-MP 10.71 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.27 V V-MP 36.88 V BRANCH CIRCUIT - C BRANCH CIRCUIT - C Number Modules 12 Type Hanwha 400 Watt Q.PEAK DUO ML-G10+Number OF Microinverters in Circuit 12 Number MicroInverters 12 Type Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V)Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts)Branch Circuit Total Current (A)12 * 1.21 * 1.25 = 18.15 Array Currents I-SC 11.16 A I-MP 10.64 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.06 V V-MP 37.59 V FROM JBOX TO ENPHASE COMBINER BOX Maximum Continius Current (A)19.93 More Than 3 CCC Adjist. Factor 0.8 Adjusted Conductor Ampacity(A)19.93 / 0.8 = 24.91 Raceway Height From Roof (Temp 39+22=61C)3 1/2"# of wire( # BC *2)6 Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.71 Temp. Derate Factor (max. continous current divided ambient tem. Factor (A)24.91 / 0.71 = 35.08 Wire Size from NEC Table 310.15(b)16 10 AWG FROM ENPHASE COMBINER BOX TO MAIN PANEL Total Number Of Microinverters 34 Total Amps From All Microinverters (A)34 * 1.21 = 41.14 Consider Continuous (A)41.14 X 1.25 = 51.425 Temp. Derate Factor(0.91 at wall of the Building) (A)Wire Size from NEC Table 310.15(b)16 Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.91 Watts STC, (Watts/Module) 12 * 400=4800 INSTALL (1) 20A PV 2-POLE C/B HANWHA 395W MODULES18 18 ENPHASE IQ7A MICROINVERTERS 1 2BR A N C H CI R C U I T A J BOX 2 NEMA3R 1 2BR A N C H CI R C U I T A 4 J BOX 3 NEMA3R 1 2BR A N C H CI R C U I T A 3 J BOX 4 NEMA3R 1 2BR A N C H CI R C U I T B 3 J BOX 5 NEMA3R 1 2BR A N C H CI R C U I T B 4 J BOX 6 NEMA3R 1 2BR A N C H CI R C U I T B 4 J BOX 7 NEMA3R 1 2BR A N C H CI R C U I T C J BOX 8 NEMA3R 1 2BR A N C H CI R C U I T C J BOX 9 NEMA3R 1 2BR A N C H CI R C U I T C J BOX 10 NEMA3R 1 2BR A N C H CI R C U I T C 3 J BOX 11 NEMA3R 1 2BR A N C H CI R C U I T C 3 J BOX 12 NEMA3R 3 3 3 ENPHASE Q CABLE (2) #12 AWG PV WIRE (1) #6 AWG EGC FREE IN THE AIR EXISTING 60A SOLAR BREAKER EXISTING (4) #10 AWG THWN/THWN-2 (1) #8 AWG GND 3/4'' EMT (6) #10 AWG THWN/THWN-2 (1) #8 AWG GND 3/4'' EMT BRANCH CIRCUIT - B BRANCH CIRCUIT - B Number Modules 4 Type Hanwha 400 Watt Q.PEAK DUO ML-G10+Number OF Microinverters in Circuit 4 Number MicroInverters 4 Type Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V)Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts)Watts STC, (Watts/Module) 4 * 400=1600 Branch Circuit Total Current (A)4 * 1.21 * 1.25 = 6.05 Array Currents I-SC 11.16 A I-MP 10.64 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.06 V V-MP 37.59 V 6.05 + 12.68 = 18.73Total Branch Circuit Total Current (A) 51.425 ÷ 0.91 = 56.62 6 AWG NOTE: REWIRING OF EXISTING STRINGS REQUIRED FOR BALANCE BUS DERATING CALCULATION Total Solar Current Derated 60 A Total Solar Current Derated Main OCD 175 A Bus Ampacity 200 X 1.25 = 240A Total Main + Solar OCD 175A + 60A = 235 A Derated Bus Ampacity 240A < Total 235A --> Bus OK CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: 180 ° 90 ° 270 ° 0° S W N E SYSTEM LABELING DETAIL PLACARD LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER PV ARRAY MICRO INVERTERS METER MAIN SERVICE PANEL TO BE LOCATED ON AC COMBINER AND MAIN SERVICE PANEL AC COMBINER AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLARPHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUT DOWN Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). 56.82 LABEL 1 LABEL 2 LABEL 3 LABEL 4 LABEL 5 LABEL 6 5 DIRECTORY MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated PV 3.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: TO BE LOCATED ON AC COMBINER TO BE LOCATED ON AC COMBINER TO BE LOCATED ON AC COMBINER AND MAIN SERVICE PANEL (MAP PLACARD SEE DETAIL BELOW) TO BE LOCATED ON MAIN SERVICE PANEL FIXED COVER DETAIL - MAP PLACARD AC COMBINER 1 32 3 6 4 EXISTING SOLAR PV ARRAY SOLAR PV ARRAY SERVICE POINT & UTILITY METERING ENPHASE COMBINER BOX You Are Here 5 PLOT PLAN LEGEND MSP Main Service Panel................ PV 4.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 Enphase Combiner BoxECB.......... CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: Agave Ln 101'-2" 133'-4" 101'-2" 133'-4" DRIVEWAY POOL PROPERTY LINE MSP ECB 19'-6" 15' 41'-7" 56'-3" 22'-8" SCALE:1/16" = 1'-0" 180 ° 90 ° 270 ° 0° S W N E ATTACHMENT LAYOUT DESIGN CRITERIA Modules: Max Distributed Load: 3 PSF POINT LOAD CALCULATION PER ARRAY Module Weight (lbs) # Of Modules Total Module Weight (lbs) Rack Weight (lbs) Microinverters Weight (lbs) Total System Weight (lbs) # Of Standoffs Max Span Between Standoffs (in) Loading Per Standoff (lbs) Total Area (sq.ft.) Loading (PSF) 41 48 23.64 352 2.75 RAIL ATTACHMENT Joist 2 x 12 @ 16" O.C. 16 PV 5.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify New@engineerinc.io if any issues are found. These Plans are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. Attachments to be installed in a staggered orientation to properly distribute loads. Drawn by:New@engineerinc.io 09/20/2022DATE: 48.5 776 155.2 38.08 969.29 16 10° Solar Panels SWH Solar Warehouse L-Feet Roof White Elastomeric Joist 2 x 12 @ 16" O.C. SWH Tilt Mount System MODULES ON ROOF SWH ATTACHMENT DETAILS INVERTER DATA SHEET D 6.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: ENPHASE RAPID SHUTDOWN, COMPATIBILITY WITH PV D 7.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: MODULE DATA SHEET D 8.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: D 9.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Lagudis Upgrade 73460 Agave Ln Palm Desert, CA 92260 CONTRACTOR RACKING DATA SHEET Beach Cities Solar Lic #: 976962 Phone number: (310) 977-6285 Address: 1147 W Amar ST San Pedro, CA 90732 Drawn by:New@engineerinc.io 09/20/2022DATE: