Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOLR22-1316 APPROVED PLANS.pdf
COVER SHEET SCOPE OF WORK GENERAL NOTES REV NAME DATE COMMENTS A AC AFCI AZIM COMP DC (E) ESS EXT INT MAG MSP (N) NTS OC PRE-FAB PSF PV RSD TL TYP V W AMPERE ALTERNATING CURRENT ARC FAULT CIRCUIT INTERRUPTER AZIMUTH COMPOSITION DIRECT CURRENT EXISTING ENERGY STORAGE SYSTEM EXTERIOR INTERIOR MAGNETIC MAIN SERVICE PANEL NEW NOT TO SCALE ON CENTER PRE-FABRICATED POUNDS PER SQUARE FOOT PHOTOVOLTAIC RAPID SHUTDOWN DEVICE TRANSFORMERLESS TYPICAL VOLTS WATTS PAGE REV: A 11/9/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 LYNNETTE TRUXAL 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-805TRUX SHEET DESIGNER: SAMEER CHOPRA CUSTOMER RESIDENCE: TEL. (253) 973-6565 APN: 622-330-003 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 TABLE OF CONTENTS PAGE # DESCRIPTION PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 LAYOUT PV-4.0 ELECTRICAL PV-5.0 SIGNAGE PV-1.0 LEGEND AND ABBREVIATIONS SCALE: NTS MAIN PANEL INVERTER(S) AC DISCONNECT(S) DC DISCONNECT(S) PV LOAD CENTER SUB-PANEL CB ATTIC VENT FLUSH ATTIC VENT PVC PIPE VENT SATELLITE DISH T-VENT CHIMNEY FIRE SETBACKS SUNRUN METER METAL PIPE VENT DEDICATED PV METER SERVICE ENTRANCE IQ COMBINER BOX HARDSCAPE PROPERTY LINEINTERIOR EQUIPMENT SHOWN AS DASHED PL RAIL STANDOFFS & FOOTINGS SOLAR MODULES SE MP SP LC SM PM INV AC DC VICINITY MAP • SYSTEM SIZE: 5625W DC, 6000W AC • MODULES: (15) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-375M • INVERTERS: (1) SOLAREDGE TECHNOLOGIES: SE6000H-USSN • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 • MAIN BREAKER DERATE: REPLACE EXISTING 200 AMP MAIN BREAKER WITH NEW 150 AMP 22K AIC RATED MAIN BREAKER. • ALL WORK SHALL COMPLY WITH 2019 CRC/CBC/CEBC, MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2019 CEC. • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2019 CEC. • PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II MODULES, ARE CLASS A FIRE RATED. • RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER 690.12(B). • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 11.6 AMPS MODULE SHORT CIRCUIT CURRENT. • 18.12 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A) & 690.8 (B)]. • CONSTRUCTION WORK HOURS OCTOBER 1ST TO APRIL 30TH MONDAY - FRIDAY 7:00AM TO 5:30PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED CONSTRUCTION WORK HOURS - MAY 1ST THROUGH SEPTEMBER 30TH MONDAY - FRIDAY 6:00AM TO 7:00PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED #SSTAMPCS #ESTAMPCS • EXISTING SOLAR SYSTEM INSTALLED. 6/30/2024 STAMPED 11/09/2022 PL PL PL PL PL PL PL PL PLPLPLPLPLPL PL PL PAGE REV: A 11/9/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 LYNNETTE TRUXAL 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-805TRUX SHEET DESIGNER: SAMEER CHOPRA CUSTOMER RESIDENCE: TEL. (253) 973-6565 APN: 622-330-003 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SITE PLAN ARRAY PITCH PV AREA (SQFT) AR-01 21° 117.7 AR-02 21° 58.8 AR-03 21° 117.7180° 168° 1° TRUE AZIM MAG AZIM 258°270° -11° PV-2.0 #SSTAMPSP #ESTAMPSP SITE PLAN - SCALE = 1/16" = 1'-0" NOTES: x RESIDENCE DOES NOT CONTAIN ACTIVE FIRE SPRINKLERS. ARRAY DETAILS: x TOTAL ROOF SURFACE AREA: 3404 SQ FT. x EXISTING PV ARRAY AREA: 954 SQ FT. x NEW PV ARRAY AREA: 294.2 SQ FT. x TOTAL PV ARRAY AREA: 1248.2 SQ FT. x PERCENTAGE PV COVERAGE: (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE AREA) * 100 = 36.67% MODULES WERE DESIGNED AT LEAST 18'' FROM THE ROOF RIDGE. (E) RESIDENCE (N) ARRAY AR-01 (N) ARRAY AR-02 (E) FENCE AV E N I D A C A L I F I A (N) ARRAY AR-03 (E) GATE (E) POOL FIRE SETBACKS (3' TYP) ROOF PATHWAYS (3' TYP) LCMP SE PMINVAC (E) DRIVEWAY (E) PV ARRAY LADDER ACCESS POINT ROOF PATHWAYS (3' TYP) LADDER ACCESS POINT INVINV (E) PERGOLA (E) PV EQUIPMENT ELEVATION VIEW SCALE: NTS 15' 11'-2" 3" #E#E#E#E#EE#E#EE#E#E#E#E#EEE#E#E#E#E#E#E#E#E#E####EE#EEEE#EE#E#E##EE#E###STSSSSSSSSSSSSSSSAMAMMAMMMMMAMAMMAMMAMAMMAMAMAMMMAPSPPSPSPSPPSPSPPPSPSPPSSPPSPPSSSPSPSPPSSPPPSPPPSPPSSPPSSPSPPSPSPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP 6/30/2024 STAMPED 11/09/2022 PAGE REV: A 11/9/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 LYNNETTE TRUXAL 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-805TRUX SHEET DESIGNER: SAMEER CHOPRA CUSTOMER RESIDENCE: TEL. (253) 973-6565 APN: 622-330-003 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-3.0 LAYOUT #SSTAMP ROOF INFO FRAMING INFO ATTACHMENT INFORMATION Name Type Height Type Max Span OC Spacing Detail Max Landscape OC Spacing Max Landscape Overhang Max Portrait OC Spacing Max Portrait Overhang Configuration AR-01 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X6 PRE-FABRICATED TRUSSES 8' - 4"24"ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 6' - 0" 2' - 4" 6' - 0" 2' - 3" STAGGERED AR-02 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X6 PRE-FABRICATED TRUSSES 5' - 4"24":h^d>d/>,KK<͕^Zt/E' ^EZͲͲϬϬϰϯϳ 6' - 0"2' - 4"6' - 0" 2' - 3"STAGGERED AR-03 CONCRETE TILE [CURVED - S] - TILE HOOK - UR 1-Story 2X6 PRE-FABRICATED TRUSSES 5' - 4"24":h^d>d/>,KK<͕^Zt/E' ^EZͲͲϬϬϰϯϳ 6' - 0"2' - 4"6' - 0" 2' - 3"STAGGERED DESIGN CRITERIA MAX DISTRIBUTED LOAD:3 PSF SNOW LOAD:0 PSF WIND SPEED: 130 MPH 3-SEC GUST. S.S.LAG SCREWS: 5/16"X4.5": 2.5" MIN EMBEDMENT STRUCTURAL NOTES: x INSTALLERS SHALL NOTIFY ENGINEER OF ANY POTENTIAL STRUCTURAL ISSUES OBSERVED PRIOR TO PROCEEDING W/ INSTALLATION. x IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS), THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS FOLLOWS: xx ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS TO BE REDUCED BY 50% xx ALLOWABLE OVERHANG INDICATED ON PLANS TO BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS SOLAR MODULE SNAPNRACK RACKING AND TILE ROOF HOOK MODULE ELEVATION DETAIL - SCALE: NTS 3" D1 - AR-01 - SCALE: 3/32" = 1'-0" AZIM:270° PITCH: 21° D2 - AR-02 - SCALE: 1/8" = 1'-0" AZIM:1° PITCH: 21° D3 - AR-03 - SCALE: 1/8" = 1'-0" AZIM:180° PITCH: 21° 6' TYP 10'-4" 10'-4" 2' 17'-1" 10' 9'-4" 27'-11" 8'-5" 34'-8" 8" 3'-2" 6' TYP 10'-4" 17'-6" 5'-9" 16'-8" 3'-3" 8'-10" 9' 3'-2"3'-6" 1'-1" 6' TYP 6'-10"13'-10" 1'-11" 8'-9" 10'-2"3'-1" 3' 3'-6" 3'-5" 2'-4" 1'-6" 6" 1'-11" 22'-7" #S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S##S##SS#S##SS#SSSS#S#S#S#SS######STSTSTSTSSTTSSTSTSTSTTSTSTSSTSTSTSSTSSTTSTSTSTSTSTSTSTSTSTTSTSTSTTSSTTTTSTTTTAMAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAP 6/30/2024 STAMPED 11/09/2022 CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND 1 NONE (2) 10 AWG PV WIRE NONE (1) 6 AWG BARE COPPER 2 3/4" EMT OR EQUIV.(2) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 3 3/4" EMT OR EQUIV.(2) 8 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 E EXISTING NEW 150A MAIN BREAKER (END FED) FACILITY GROUND(N) 100A PV BREAKER AT OPPOSITE END OF BUSBAR M METER #: SCE 222011855192 120/240 VAC SINGLE PHASE SERVICE UTILITY GRID EXISTING 225A MAIN PANELFACILITY LOADS 3 JUNCTION BOX OR EQUIVALENT 12 SOLAREDGE TECHNOLOGIES: SE6000H-USSN 6000 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT PV MODULES LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-375M (15) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (15) OPTIMIZERS SOLAREDGE POWER OPTIMIZERS P401 M LGATE 120-LTEx 200A, 600V CELLULAR, NO ETHERNET, VERIZON NETWORK (E) SUNRUN LOCUS PRODUCTION METER (E) LOCKABLE BLADE TYPE AC DISCONNECT SQUARE D DU323RB 3R, 100A,2P 120/240VAC (E) 100A PV LOAD CENTER 40A BREAKER (A) 30A BREAKER (B) JUNCTION BOX OR EQUIVALENT SMA: SB 7000-US 7000 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT PV MODULES TRINA SOLAR: TSM-240PA05.05 (32) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (16) OPTIMIZERS (1) SERIES OF (16) OPTIMIZERS JUNCTION BOX OR EQUIVALENT PV MODULES TRINA SOLAR: TSM-240PA05.05 (21) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (12) OPTIMIZERS (1) SERIES OF (9) OPTIMIZERS SMA: SB 5000TL-US 5000 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI, RAPID SHUTDOWN COMPLIANT (E) 70A PV BREAKER E EXISTING SYSTEM E EE E E EEE PAGE REV: A 11/9/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 LYNNETTE TRUXAL 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-805TRUX SHEET DESIGNER: SAMEER CHOPRA CUSTOMER RESIDENCE: TEL. (253) 973-6565 APN: 622-330-003 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-4.0 ELECTRICAL #ESTAMP RAIL 6-12 AWG BARE COPPER WIRE 5/16"-18 SS BOLT SS SPLIT LOCK WASHER (TORQUE TO 16 FT-LBS) SNAPNRACK GROUND LUG BONDING CHANNEL NUT SS BONDING PINS NOTE: x ALL HARDWARE IS INCLUDED FROM MANUFACTURER x A MINIMUM OF ONE GROUND LUG IS TO BE INSTALLED ON EVERY CONTINUOUS ROW OF MODULES x GROUNDING LUG MAY BE INSTALLED IN EITHER RAIL CHANNEL x GROUNDING LUG MAY BE INSTALLED SO GROUND WIRE IS PARALLEL OR PERPENDICULAR TO RAIL x ENSURE SPLIT LOCK WASHER IS INSTALLED ON TOP OF COPPER WIRE SNAPNRACK GROUNDING SCALE: NTS ALL CONDUCTORS ARE RATED 90 DEGREES CELSIUS. SYSTEM CHARACTERISTICS - INVERTER 1 SYSTEM SIZE: SYSTEM OPEN CIRCUIT VOLTAGE: SYSTEM OPERATING VOLTAGE: MAX ALLOWABLE DC VOLTAGE: SYSTEM OPERATING CURRENT: SYSTEM SHORT CIRCUIT CURRENT: 5625 W 15 V 380 V 480 V 14.8 A 15 A P401 OPTIMIZER CHARACTERISTICS: MIN INPUT VOLTAGE: 8 VDC MAX INPUT VOLTAGE: 60 VDC MAX INPUT ISC: 11.75 ADC MAX OUTPUT CURRENT: 15 ADC MODULE CHARACTERISTICS LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR4-60HPH-375M: OPEN CIRCUIT VOLTAGE: MAX POWER VOLTAGE: SHORT CIRCUIT CURRENT: 375 W 41.1 V 34.6 V 11.6 A PAGE REV: A 11/9/2022 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 LYNNETTE TRUXAL 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-805TRUX SHEET DESIGNER: SAMEER CHOPRA CUSTOMER RESIDENCE: TEL. (253) 973-6565 APN: 622-330-003 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SIGNAGE PV-5.0 #ESTAMP ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), NEC 2017: 705.12(B)(2)(3)(c) NOTES AND SPECIFICATIONS: x SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2019 CEC ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. x SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. x LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. x LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. x SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. x DO NOT COVER EXISTING MANUFACTURER LABELS. INVERTER 1 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 15 15 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): CEC 2019: 690.53, NEC 2017: 690.53 LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 1O FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): CEC 2019: 690.31(G)(3), 690.31(G)(4), NEC 2017: 690.31(G)(3), 690.31(G)(4) IFC 2012: 605.11.1.4 WARNING! SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): CEC 2019: 705.12(B)(3), NEC 2017: 705.12(B)(3) WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b), NEC 2017: 705.12(B)(2)(3)(b) LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUT DOWN SWITCH PER CODE(S): CEC 2019: 690.56(C)(3), NEC 2017: 690.56(C)(3), IFC 2012: 605.11.1, IFC 2018: 1204.5.3, CFC 2019: 1204.5.3 ELECTRICAL SHOCK HAZARD WARNING LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B), NEC 2017: 690.13(B) ! PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54, NEC 2017: 690.54 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): CEC 2019: 690.56(C)(1)(a), NEC 2017: 690.56(C)(1)(a) 4" 3" LABEL LOCATION: MAIN SERVICE PANEL ADJACENT TO MAIN SERVICE BREAKER. PER CODE(S): NEC 2020: 705.12(B)(3)(2), NEC 2017: 705.12(B)(2)(3)(b), NEC 2014: 705.12(D)(2)(3)(c), NEC 2011: 705.12(D)(4), CEC 2019: 705.12(B)(2)(3)(b) POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: 40805 AVENIDA CALIFIA, PALM DESERT, CA, 92260 SOLAR PANELS ON ROOF SERVICE ENTRANCE AND PV BREAKER DISCONNECT INVERTER (EXT) (E) PV EQUIPMENT (E) PV ARRAY UR-40 RAIL | UR-60 RAIL FOR USE WITH SNAPNRACK ULTRA SERIES RAILS INSTALLED ASSEMBLY ATTACHMENT DETAIL OFFSET DETAIL SECTION D-D SCALE 7:24 SECTION E-E SCALE 1 / 4 ATTACHMENT DETAIL CDDEE DESCRIPTION:DRAWING NUMBER:SCALE:DESIGNER: APPROVED BY: REVISION: Sunrun South LLC 595 MARKET STREET, 29TH FLOOR Ɣ SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 Ɣ FAX (415) 580-6902 THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. ULTRA RAIL, ATTACHMENT DETAIL, ULTRA RAIL ADJUSTABLE TILE HOOK TO RAFTERSNR-DC-00437 1 2/6/2020 NEW DETAIL 2 11/6/2020 EDITED NOTES REV: 2DATE: DNS 11/6/2020 DRAFTER:D.RYAN W.ARBUCKLE D.RYAN Solar Mounting Solutions DR DR1 BIN: 15 8 " 11 2 " 11 2 " 21 4 " SNAPNRACK ADJUSTABLE TILE HOOK FOR USE WITH SNAPNRACK ULTRA RAIL TILE ROOF MOUNT ASSEMBLY MAY BE USED FOR S, W, AND FLAT TILE PROFILE ROOFS REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH "BIN" NUMBER ON THIS DRAWING 5 16 "P S.S. LAG SCREWS MUST EMBED A MIN. OF 21 2 " INTO STRUCTURAL MEMBER REFER TO SNAPNRACK INSTALLATION MANUAL FOR 5 16 "P HARDWARE TORQUE SPECIFICATIONS UNLESS STATED OTHERWISE RAIL MAY BE MOUNTED TO THE UPSLOPE OR DOWNSLOPE SIDE OF THE TILE HOOK RAILS CAN BE LEVELED UP TO 11 4 " USING THE SLOT IN THE TILE HOOK TILE HOOK ARM CAN BE LEVELED 7 16 " RELATIVE TO THE BASE STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE = SPF #2 MINIMUM SPECIFIC GRAVITY = 0.42 ALLOWABLE FASTENER UPLIFT = 820 LBS ALLOWABLE FASTENER LATERAL = 250 LBS MINIMUM FASTENER EDGE DISTANCE = 0.5" MINIMUM FASTENER END DISTANCE = 2.2" STEP 1: REMOVE TILES TO EXPOSE ROOF DECKING SEALANT STEP 2: DRILL 2 QTY. 3 16 " PILOT HOLES INTO RAFTER. SEAL ROOF PENETRATIONS WITH APPROPRIATE SEALANT. FASTEN BASE TO ROOF WITH 2 QTY. 5 16 " LAG SCREWS WITH FLAT WASHERS ROOF TILE ("S" PROFILE), TYP. STRUCTURAL MEMBER, WOOD RAFTER, TYP. ROOF DECKING, TYP. ENSURE 21 2 " MINIMUM EMBEDMENT INTO WOOD MEMBER TILE BATTEN, TYP. ROOF DECKING, TYP. ROOF TILES ("S" PROFILE), TYP. STRUCTURAL MEMBER (RAFTER) HOOK ARM CAN BE OFFSET FROM RAFTER UP TO 6" IN EITHER DIRECTION TO LINE UP WITH LOW POINT IN S-TILES MODULE HEIGHT OFF ROOF, RANGE: UR-40: 71 4 " - 815 16 " UR-60: 77 8 " - 99 16 " P5 16 " STAINLESS LAG SCREWS WITH 5 16 " STAINLESS FLAT WASHERS UR-60 RAIL (UR-40 RAIL SIMILAR) SNAPNRACK ADJUSTABLE TILE HOOK ARM MAY BE RELOCATED ON BASE WHERE REQUIRED SNAPNRACK ADJUSTABLE TILE HOOK BASE SNAPNRACK UR-60 RAIL SNAPNRACK ULTRA RAIL ADJUSTABLE TIE HOOK ASSEMBLY P5 16 " STAINLESS CARRIAGE BOLT WITH FLANGE NUT R E E N I IGER LARUTCURTS AINROFILACFOETAT S G N E LANOISSEFORPDERETSE H C A Z HTENEKL N AP Exp. 3-31-23 No. S3878 R U ST O R E D G E ® solaredge.com Optimized battery storage with HD-Wave technology 5HFRUGEUHDNLQJZHLJKWHGHIÀFLHQF\ZLWK 200% DC oversizing Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020, per article 690.11 and 690.12 Embedded revenue grade production data, ANSI C12.20 Class 0.5 6PDOOOLJKWZHLJKWDQGHDV\WRLQVWDOO 0RGXODUGHVLJQIXWXUHUHDG\ZLWKRSWLRQDO upgrades to: Multi-inverter(*), scalable storage solution Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US 12-25 YEARWARRANTY DC-coupled storage for full or partial home backup Built-in consumption monitoring Direct connection to the SolarEdge smart EV charger SE3000H-US SE3800H-US SE6000H-US SE7600H-US UNITS OUTPUT - AC ON GRID Rated AC Power 3000 3800 6000 7600 W Maximum AC Power Output 3000 3800 6000 7600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max)59.3 - 60 - 60.5(2)Hz Maximum Continuous Output Current 12.5 16 25 32 A GFDI Threshold 1A 7RWDO+DUPRQLF'LᐎRUWLRQ7+'<3 % Power Factor DGMXᐎDEOHWR 8WLOLW\0RQLWRULQJ,VODQGLQJ3URWHFWLRQ&RXQWU\&RQÀJXUDEOH7KUHVKROGV Yes Charge Battery from AC (if Allowed)Yes Typical Nighttime Power Consumption <2.5 W OUTPUT - AC BACKUP(3) Rated AC Power in Backup Operation 2400 3050 4800 6100 W Peak AC Power (<10 sec) in Backup Operation 2700 3400 5400 6900 W AC L-L Output Voltage Range in Backup 211-264 Vac AC L-N Output Voltage Range in Backup 105-132 Vac AC Frequency Range in Backup (min - nom - max) 55 - 60 - 65 Hz Maximum Continuous Output Current in Backup Operation 10 12.7 20 25.5 A Peak AC Current (<10sec) in Backup Operation 11.25 14.2 22.5 30 A GFDI 1A THD <5 % OUTPUT - SMART EV CHARGER AC Rated AC Power 9,600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max) 59.3-60-60.5 Hz 0D[LPXP&RQWLQXRXV2XWSXW&XUUHQW#9JULG39DQGEDWWHU\40 Aac INPUT - DC (PV AND BATTERY) Transformer-less, Ungrounded Yes Max Input Voltage 480 Vdc Nom DC Input Voltage 380 400 Vdc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection NƼ6HQVLWLYLW\ INPUT - DC (PV) Maximum DC Power 6000 7600 12000 15600 W Maximum Input Current(4)8.5 10.5 16.5 20 Adc 0D[,QSXW6KRUW&LUFXLW&XUUHQW 45 Adc 0D[LPXP,QYHUWHU(FLHQF\99.2 % &(&:HLJKWHG(FLHQF\99 % 2-pole Disconnection Yes INPUT - DC (BATTERY) 6XSSRUWHG%DWWHU\7\SHV /*&KHP5(68+ 1XPEHURI%DWWHULHVSHU,QYHUWHU 1 or 2(5) Maximum Battery Capacity per Inverter 19.6 kWh Continuous Power Per Inverter 5000 W Peak Power 6900 W Max Input Current @240V 18 Adc 2-pole Disconnection Yes Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) SMART ENERGY CAPABILITIES Consumption Metering Built - in(6) %DWWHU\6WRUDJH With Backup Interface for service up to 200A; Up to 3 inverters*N:EDFNXSSRZHU*, and 60kWh EDFNXSFDSDFLW\* EV Charging 'LUHFWFRQQHFWLRQWR6PDUW(9FKDUJHU ADDITIONAL FEATURES 6XSSRUWHG&RPPXQLFDWLRQ,QWHUIDFHV 56(WKHUQHW:L)LRSWLRQDO&HOOXODU(7) 5HYHQXH*UDGH0HWHULQJ$16,&Built - in(6) Integrated AC, DC and Communication Connection Unit Yes Inverter Commissioning ZLWKWKH6HW$SSPRELOHDSSOLFDWLRQXVLQJEXLOWLQ:L)L$FFHVV3RLQWIRUORFDOFRQQHFWLRQ '&9ROWDJH5DSLG6KXWGRZQ39DQG%DWWHU\Yes, according to NEC 2014, NEC 2017 and NEC 2020 690.12 STANDARD COMPLIANCE 6DIHW\8/8/6$8/%8/8/&6$ *ULG&RQQHFWLRQ6WDQGDUGV IEEE1547, Rule 21, Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS $&2XWSXW&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* (9$&2XWSXW&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* '&,QSXW39&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* '&,QSXW%DWWHU\&RQGXLW6L]H$:*5DQJH PD[LPXP$:* PD[LPXP$:* Dimensions with Connection Unit (HxWxD);;;; LQPP Weight with Connection Unit OENJ Noise < 25 dBA Cooling Natural Convection Operating Temperature Range WRWR(7)Ü)Ü& Protection Rating NEMA 4X © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 11/2020/V01/ENG NAM. Subject to change without notice. 3HQGLQJÀUPZDUHXSJUDGH 7KHVHVSHFLÀFDWLRQVDSSO\WRLQYHUWHUVZLWKSDUWQXPEHUV6([[[[+866[[[[[RU6(+8666+[[[[DQGFRQQHFWLRQXQLWPRGHOQXPEHU'&'3+863[+)[ )RURWKHUUHJLRQDOVHWWLQJVSOHDVHFRQWDFW6RODU(GJHVXSSRUW (3) Not designed for standalone applications and requires AC for commissioning $KLJKHUFXUUHQWVRXUFHPD\EHXVHGWKHLQYHUWHUZLOOOLPLWLWVLQSXWFXUUHQWWRWKHYDOXHVVWDWHG :KHQFRQQHFWLQJWZR/*&KHP5(68EDWWHULHVHDFKEDWWHU\PXVWKDYHDGLIIHUHQWSDUWQXPEHU )RUFRQVXPSWLRQPHWHULQJFXUUHQWWUDQVIRUPHUVVKRXOGEHRUGHUHGVHSDUDWHO\6($&71$RU6($&71$XQLWVSHUER[ )RUERWK\UDQG\UGDWDSODQV Ã&XVWRPHULVUHVSRQVLEOHIRUYHULI\LQJWKDWWKHVLWHORFDWLRQKDVDGHTXDWHPRELOHFRYHUDJHE\WKHWKLUGSDUW\VHUYLFHSURYLGHUSULRUWRDQ\LQVWDOODWLRQE\DFFHVVLQJ https://www.solaredge.com/ ֿ products/communication/cellular-communication-options#/ Ã6RODU(GJHVKDOOQRWEHUHVSRQVLEOHRUOLDEOHIRUXQDYDLODELOLW\RUGLVFRQWLQXDQFHRIQHWZRUNFRYHUDJHLQDVSHFLÀFDUHDRUUHJLRQDQ\QHWZRUNGRZQWLPHRUSHUPDQHQWVHUYLFHVKXWGRZQ )XOOSRZHUXSWRDWOHDVW&)IRUSRZHUGHUDWLQJLQIRUPDWLRQUHIHUWRKWWSVZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVVHWHPSHUDWXUHGHUDWLQJQRWHQDSGI Connecting CTs to the Revenue Grade and Consumption Meter 6LQJOH3KDVH(QHUJ\+XE,QYHUWHU ZLWK3ULVP7HFKQRORJ\ Grid Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) PO W E R O P T I M I Z E R solaredge.com PV power optimization at the module-level 6SHFLÀFDOO\GHVLJQHGWRZRUNZLWK6RODU(GJH LQYHUWHUV 8SWRPRUHHQHUJ\ )OH[LEOHV\VWHPGHVLJQIRUPD[LPXPVSDFH XWLOL]DWLRQ )DVWLQVWDOODWLRQZLWKDVLQJOHEROW 1H[WJHQHUDWLRQPDLQWHQDQFHZLWKPRGXOH OHYHOPRQLWRULQJ 0HHWV1(&UHTXLUHPHQWVIRUDUFIDXOW SURWHFWLRQ$)&,DQG3KRWRYROWDLF5DSLG 6KXWGRZQ6\VWHP39566 0RGXOHOHYHOYROWDJHVKXWGRZQIRULQVWDOOHU DQGÀUHÀJKWHUVDIHW\ 6XSHULRUHIÀFLHQF\ 0LWLJDWHVDOOW\SHVRIPRGXOHPLVPDWFKORVVHV IURPPDQXIDFWXULQJWROHUDQFHWRSDUWLDO VKDGLQJ Power Optimizer For North America 33333333 25 YEARWARRANTY 6RODU(GJH7HFKQRORJLHV/WG$OOULJKWVUHVHUYHG62/$5('*(WKH6RODU(GJHORJR237,0,=('%<62/$5('*(DUHWUDGHPDUNVRUUHJLVWHUHGWUDGHPDUNVRI6RODU(GJH7HFKQRORJLHV,QF $OORWKHUWUDGHPDUNVPHQWLRQHGKHUHLQDUHWUDGHPDUNVRIWKHLUUHVSHFWLYHRZQHUV'DWH9(1*1$06XEMHFWWRFKDQJHZLWKRXWQRWLFH )RUGHWDLOHGᐎULQJVL]LQJLQIRUPDWLRQUHIHUWRKWWSZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVᐎULQJBVL]LQJBQDSGI ,WLVQRWDOORZHGWRPL[333ZLWK33333LQRQHᐎULQJ $ᐎULQJZLWKPRUHWKDQRSWLPL]HUVGRHVQRWPHHW1(&UDSLGVKXWGRZQUHTXLUHPHQWVVDIHW\YROWDJHZLOOEHDERYHWKH9UHTXLUHPHQW )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKᐎULQJLV: )RU9JULGLWLVDOORZHGWRLQᐎDOOXSWR:SHUᐎULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKᐎULQJLV: Power Optimizer For North America 33333333 Optimizer model (typical module compatibility) P320 (for 60-cell modules) P340 (for high- power 60-cell modules) P370 (for higher- power 60 and 72- cell modules) P400 (for 72 & 96-cell modules) P401 (for high power 60 and 72 cell modules) P405 (for high- voltage modules) P485 (for high- voltage modules) P505 (for higher current modules) INPUT 5DWHG,QSXW'&3RZHU : $EVROXWH0D[LPXP,QSXW9ROWDJH 9RFDWORZHᐎWHPSHUDWXUH 9GF 03372SHUDWLQJ5DQJH 9GF 0D[LPXP6KRUW&LUFXLW&XUUHQW (Isc) Adc 0D[LPXP'&,QSXW&XUUHQW Adc 0D[LPXP(FLHQF\% :HLJKWHG(FLHQF\98.8 % 2YHUYROWDJH&DWHJRU\II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) 0D[LPXP2XWSXW&XUUHQW Adc 0D[LPXP2XWSXW9ROWDJH 9GF OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) 6DIHW\2XWSXW9ROWDJHSHU3RZHU 2SWLPL]HU 9GF STANDARD COMPLIANCE (0&)&&3DUW&ODVV%,(&,(& 6DIHW\,(&FODVV,,VDIHW\8/ 0DWHULDO 8/9895HVLᐎDQW 5R+6 Yes INSTALLATION SPECIFICATIONS 0D[LPXP$OORZHG6\ᐎHP 9ROWDJH 9GF &RPSDWLEOHLQYHUWHUV $OO6RODU(GJH6LQJOH3KDVHDQG7KUHH3KDVHLQYHUWHUV 'LPHQVLRQV:[/[+ [[[[ [[ [[ [[ [[[[[[[[ [[ mm LQ :HLJKWLQFOXGLQJFDEOHV JUOE ,QSXW&RQQHFWRU 0& 6LQJOHRUGXDO 0&0& ,QSXW:LUH/HQJWK RU RU PIW 2XWSXW:LUH7\SH&RQQHFWRU 'RXEOH,QVXODWHG0& 2XWSXW:LUH/HQJWK PIW 2SHUDWLQJ7HPSHUDWXUH5DQJH Ü&Ü) 3URWHFWLRQ5DWLQJ ,31(0$3 5HODWLYH+XPLGLW\% 5DWHGSRZHURIWKHPRGXOHDW67&ZLOOQRWH[FHHGWKHRSWLPL]HU´5DWHG,QSXW'&3RZHUµ0RGXOHVZLWKXSWRSRZHUWROHUDQFHDUHDOORZHG 1(&UHTXLUHVPD[LQSXWYROWDJHEHQRWPRUHWKDQ9 )RURWKHUFRQQHFWRUW\SHVSOHDVHFRQWDFW6RODU(GJH )RUGXDOYHUVLRQIRUSDUDOOHOFRQQHFWLRQRIWZRPRGXOHVXVH310'050,QWKHFDVHRIDQRGGQXPEHURI39PRGXOHVLQRQHᐎULQJLQᐎDOOLQJRQH3GXDOYHUVLRQSRZHURSWLPL]HUFRQQHFWHG WRRQH39PRGXOH:KHQFRQQHFWLQJDVLQJOHPRGXOHVHDOWKHXQXVHGLQSXWFRQQHFWRUVZLWKWKHVXSSOLHGSDLURIVHDOV /RQJHULQSXWVZLUHOHQJWKDUHDYDLODEOHIRUXVH)RUPLQSXWZLUHOHQJWKRUGHU3[[[/[[[ )RUDPELHQWWHPSHUDWXUHDERYH&)SRZHUGHUDWLQJLVDSSOLHG5HIHUWR3RZHU2SWLPL]HUV7HPSHUDWXUH'H5DWLQJ7HFKQLFDO1RWHIRUPRUHGHWDLOV PV System Design Using a SolarEdge Inverter(7)(8) Single Phase HD-Wave Single phase Three Phase for 208V grid Three Phase for 277/480V grid 0LQLPXP6WULQJ/HQJWK 3RZHU2SWLPL]HUV 333 338 333 8 0D[LPXP6WULQJ/HQJWK3RZHU2SWLPL]HUV (9) 0D[LPXP3RZHUSHU6WULQJ ZLWK 6(866( 86 : 3DUDOOHO6WULQJVRI'LHUHQW/HQJWKVRU2ULHQWDWLRQV Yes Current Renewables Engineering Inc. Professional Engineer info@currentrenewableseng.com Design Criteria: Subject: Structural Certification for Installation of Residential Solar re job: Attn.: To Whom It May Concern Observation of the condition of the existing framing system was performed by an audit team of After review of the field observation data, structural capacity calculations were performed in accordance with applicable building codes to determine adequacy of the existing roof framing supporting the proposed panel layout. Please see full Structural Calculations report for details regarding calculations performed and limits of scope of work and liability. The design criteria and structural adequacy are summarized below: 11-09-2022 11-09-2022 Sunrun Inc. Lynnette Truxal Sunrun Inc. ROOF 1: Tile roofing supported by 2x6 Truss @ 24 in. OC spacing. The roof is sloped at approximately 21 degrees and has a max beam span of 12.2 ft between supports. Roof is adequate to support the imposed loads. Therefore, no structural upgrades are required. Code: 2019 CBC, ASCE 7-16, Ult Wind Speed: 130 mph, Ground Snow: 0 psf, Min Snow Roof: 0 psf 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com 595 Market St 40805 Avenida Califia, Palm Desert, CA 92260, USA Attn.: To Whom It May Concern re job: The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. All mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Design Criteria: Current Renewables Engineering Inc. Professional Engineer info@currentrenewableseng.com 11-09-2022 Page 1 of 9 11-09-2022 Sunrun Inc. 595 Market St Lynnette Truxal 40805 Avenida Califia, Palm Desert, CA 92260, USA I certify that the roof structure has sufficient structural capacity for the applied PV loads. Code: 2019 CBC, ASCE 7-16, Live Load: 20 psf Ult Wind Speed: 130 mph Exposure Cat: B Ground Snow: 0 psf Min Snow Roof: 0 psf 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Roof Properties: Roof Type = Roof Pitch (deg) = Mean Root Height (ft) = Attachment Trib Width (ft) = Attachment Spacing (ft) = Framing Type = Framing Size = Framing OC Spacing (in.) = Section Thickness, b (in) = Section Depth, d (in) = Section Modulus, Sx (in3) = Deflection Limit D+L (in) = Deflection Limit S or W (in) = Attachments Pattern = Framing Upgrade = Sister Size = Wood Species = Wood Fb (psi) = Wood Fv (psi) = Wood E (psi) = CD (wind) = Cd (snow) = CLS = CM = Ct = CL = Ci = CF = Cfu = Cr = F'b wind (psi) = F'b snow (psi) = F'v wind (psi) = F'v snow (psi) = M allowable wind (lb-ft) = M allowable snow (lb-ft) = V allowable wind (lbs) = V allowable snow (lbs) = E' (psi) = Moment of Inertia, lx (in ) = Unsupported Span (ft) = Upper Chord Length (ft) = Page 2 of 9 Tile 21.0 13.0 2.75 6.0 Truss 2x6 24.0 1.5 5.5 7.562 20.797 12.225 4.4 2.933 Fully Staggered No NA DF 900.0 180.0 1600000.0 1.6 1.15 1.0 1.0 1.3 1.0 1.15 2152.8 1547.32 288.0 207.0 1356.71 975.14 1584.0 1138.5 Roof 1 1600000.0 22.0 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Load Calculation: Dead Load Calculations: Panels Dead Load (psf) = Roofing Weight (psf) = Decking Weight (psf) = Framing Weight (psf) = Misc. Additional Weight (psf) = Existing Dead Load (psf) = Total Dead Load (psf) = Wind Load Calculations: Ultimate Wind Speed (mph) = Directionality Facto r, kd = Topographic Factor, kzt = Velocity Press Exp Factor, kz = Velocity Pressure, qz (psf) = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = Design Pressure Up, p_1 (psf) = Design Pressure Up, p_2 (psf) = Design Pressure Up, p_3 (psf) = Design Pressure Down, p (psf) = Snow Load Calculations: Ground Snow Load, pg (psf) = Min Flat Snow, pf_min (psf) = Sloped Snow, ps_min (psf) = Snow Importance Factor, Ic = Exposure Factor, Ce = Thermal Factor, Ct = Flat Roof Snow, pf (psf) = Slope Factor, Cs = Sloped Roof Snow, ps (psf) = Page 3 of 9 3.0 9.0 2.0 0.945 1.0 12.945 15.945 130.0 0.85 1.0 0.701 25.764 -1.5 -2.167 -2.453 0.465 -26.666 -38.527 -43.607 16.0 Roof 1 0.0 0.0 0.0 1.0 0.9 1.1 0.0 1.0 0.0 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Lag Screw Checks: Ref. Withdrawal Value, W (lb/in) = (Cm = Ct = Ceg = 1.0) CD = Adjusted Withdrawal Value, W' (lb/in) = Lag Penetration, p (in.) = Allowable Withdrawal Force, W'p (lbs) = Applied Uplift Force (lbs) = Uplift DCR = Ref. Lateral Value, Z (lbs) = (Cm = Ct = CΔ = Ceg = 1.0) CD = Adjusted Lateral Value, Z' (lbs) = Applied Lateral Force (lbs) = Angle of Resultant Force, α (deg) = Adjusted Interaction Lateral Value, Z'α (lbs) = Lateral DCR = Page 4 of 9 Roof 1 266.0 0.9 243.0 17.739 1.483 1036.818 0.017 266.0 1.6 425.6 2.5 1064.0 -200.597 0.189 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Attachment Type = Allowable Up Force (lbs) = Allowable Down Force (lbs) = Allowable Side Force (lbs) = Applied Uplift Force (lbs) = Uplift DCR = Applied Down Force (lbs) = Down DCR = Applied Lateral Force (lbs) = Lateral DCR = Attachment Checks: Page 5 of 9 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Roof 1 -200.597 0.335 169.512 0.367 17.739 0.064 Custom 598.0 462.0 276.0 Lynnette Truxal Roof Framing Checks: LC1: D+S Force Checks: Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC2: D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC3: D+0.75(S+0.6W) Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC4: 0.6D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = Page 6 of 9 Lynnette Truxal 501.0 235.0 975.0 1138.0 0.514 0.206 Roof 1 803.0 376.0 1357.0 1584.0 0.592 0.238 727.0 341.0 1357.0 1584.0 0.536 0.215 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com 602.0 282.0 1357.0 1584.0 0.444 0.178 LC2: S LC3: W (Down) Deflection Checks (Service Level): LC1: D+L LC4: W (Up) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Page 7 of 9 0.749 4.4 0.17 0.0 2.933 0.0 0.104 2.933 0.035 0.173 2.933 0.059 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com (Existing W + Additional W)/(Existing W) = Weight Increase: Existing Weight: Total Additional PV Weight (lbs) = Seismic Check: The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Wall Weight (psf) = Tributary Wall Area (ft2) = Total Wall Weight (lbs) = Roof Weight (psf) = Roof Area (ft2) = Total Roof Weight (lbs) = Total Existing Weight (lbs) = Page 8 of 9 17.0 1390.0 23630.0 12.945 4410.0 57088.83 80718.83 2940.3 1.036 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Limits of Scope of Work and Liability: Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Page 9 of 9 Lynnette Truxal 1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com Section 220.83 Existing Dwelling Unit Part #1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Amps Box A (VA) 30.79 7389 Part #2 - Section 220.83 (B)(2),(3)a, b, c, d - Appliances and Dedicated Circuits: Size in VA Size in VA 1500 N/A 3000 3840 1000 N/A 600 N/A 1000 N/A 1600 N/A 5760 N/A N/A N/A N/A N/A N/A Amps Box B (VA) 3840 92.25 22140 Total VA from Parts #1 and #2 combined:Box A + Box B =29529 Total VA 29529 First 8,000 VA @ 100%8000 Remaining VA @ 40% Remaining VA =21529 21529 x 40% =8611.6 VA Adding First 8000 VA 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits:16611.6 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits:69.22 Amps Part #3 - Section 220.83 (B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100% of all the Heating or A/C loads in VA:19,200 VA 100% of all the Heating or A/C loads in Amps:80.00 A VA Volts Amps Parts #1 & #2 16611.6 240 69.22 Part #3 19,200 240 80.00 Total VA for all Parts:35,812 Totals Service/Feeder Load 149.22 Refrigerator(s) Microwave(s) Totals for Part #2:Pool Equipment Dryer Range Oven Cooktop Amps 30.7875 Job Code 113R-805TRUX Totals from all Parts Dedicated circuit Total for Part #1: Pool Equipment Water Heater House Square Footage 2463 Article 220 - Service/Feeder calculation for (address): 40805 Avenida Califia Palm Desert CA USA 92260 Building VA (watts) 7389 Laundry Appliance Circuit(s) Dishwasher(s) Disposal(s) Dedicated circuit Updated June 2021 This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1.Submittal Requirements −Completed permit application form. This permit application form can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits −Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits/solar- information −Provide a standardized or simplified photovoltaic plan that demonstrates: Title or Cover Sheet noting the 2019 California Electrical Code. Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. A simplified Electrical Plan: 1.Locations of main service or utility disconnect 2.Total number of modules, number of modules per string and the total number of strings 3.Make and model of inverter(s) and/or combiner box if used 4.Single-line diagram of system 5.Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit −Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1.The type of roof covering and the number of roof coverings installed 2.Type of roof framing, size of members and spacing 3.Weight of panels, support locations and method of attachment 4.Framing plan and details for any work necessary to strengthen the existing roof structure 5.Site-specific structural calculations 6.Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings Updated June 2021 These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1.General Requirements ☐The photovoltaic system size is 30kW AC CEC rating or less. ☐The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. ☐The photovoltaic system is utility interactive. ☐Permit application and declaration is completed and attached. 2.Planning Department Requirements ☐Existing MPU Amps Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW.☐Maximum height of “tilted” panels shall not exceed eighteen (18) inches. ☐All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. ☐The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. ☐Modules shall be flush with one another and gaps between panels shall be minimized. ☐Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. 3.Electrical Requirements ☐No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter: 1)No more than two strings per MPPT input where source circuit fusing is not included 2)Fuses (if needed) are rated to the series fuse rating of the PV module 3)No more than one non-inverter-integrated DC combiner is utilized per inverter ☐For central inverter systems: No more than two inverters are utilized. ☐The PV system is connected to the load side of the utility distribution equipment. ☐A Solar PV Standard Plan and supporting documentation is completed and attached. 4.Structural Requirements ☐A completed Structural Criteria and supporting documentation is attached Wind and Seismic (if required). 5.Fire Safety Requirements ☐Clear access pathways provided. ☐Fire classification photovoltaic system is provided. ☐All required marking and labels are provided. ☐A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Applicant Signature _________________________________________________________ Date _____________ Project Address______________________________________________________________________________40805 AVENIDA CALIFIA 11/10/22 Page 1 of 4 The definition of “qualifying residential rooftop solar systems” is all of the following: A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ·A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. Electrical main panel upgrade included with solar plan (Review required if doubling in size) CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems—30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. 1.Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. Fire Marshall approval is not required for small residential rooftop systems at this time. Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2.Building Permit Application Form A permit application can be obtained in person or downloaded from the Department’s website at: www.cityofpalmdesert.org 3.Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria’s, standard plan review timetables apply. Please consult a licensed designed prof essional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 2 of 4 4.Project Submittal All projects can be submitted in person at:City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert, California 92260 5.Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6.Plan Review and Permit Fees ·Plan Review Fee is $203. ·Permit Fees are approximately $266 depending on archiving materials. 7.Minimum Plan Set Requirements ·Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11”X17” to Maximum of 24”X36”). Include a separate Site and Roof Layout Plan for the Riverside County Assessor’s Office. ·Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. ·Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal’s Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf ·Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. ·Product Specifications and Literature Provide all manufacturers’ specifications on all inverters, solar panels, combiner and discon nect boxes and solar panel anchorage system to be used. ·Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City’s website. All submittals must be signed by a C -10 (Electrical Contractor) or C-46 (Solar Contractor) or licensed design professional. Electrical Plans should include the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings . Make and model of inverter(s) and/or combiner box if used. Single line diagram of system . Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 3 of 4 If batteries are to be installed, include them in the diagram and show their locations and venting . Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705 . Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department’s website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: The type of roof covering and the number of roof coverings installed . Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system . As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760) 776- 6420 Monday through Friday (8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. Conductor’s ratings and sizes match plans. Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. Page 4 of 4 QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can save time and money by following these tips. Take time to review permit requirements of the local jurisdiction. Permitting rules and processes differ am ong different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. Contact the local electric utility early in the permitting process (solar PV installations). Local electric utilities have a completely separate approval process from the local jurisdiction’s permitting process. Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. Make sure that the solar installation that is built matches the submitted plans. The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections.