Loading...
HomeMy WebLinkAboutSOLR22-1078 PLANS.pdfMODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 SCOPE OF WORK VICINITY MAP PROJECT SITE(33.7517397,-116.3222002) CODE COMPLIANCE GENERAL NOTES SHEET INDEX 18 x REC ALPHA REC385AA PURE ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES SYSTEM SIZE:6.93 KW DC STC 6.59 KW DC PTC 6.52 KW AC CEC EQUIPMENT SUMMARY 18 REC ALPHA REC385AA PURE 01 SOLAREDGE SE7600H-US ENERGY HUB INVERTER 18 SOLAREDGE P505 POWER OPTIMIZERS ROOF TILT:18° AZIMUTH:166° 1 STORY BUILDING 2019 CA BUILDING CODE 2019 CA PLUMBING CODE 2019 CA FIRE CODE 2019 CA RESIDENTIAL CODE 2019 CA MECHANICAL CODE 2019 CA ENERGY CODE 2019 CA ELECTRICAL CODE 2017 NATIONAL ELECTRICAL CODE 2019 ENERGY COMPLIANCE T-24 THIS PROJECT SHALL COMPLY WITH PV-1 COVER PAGE PV-2 PLOT PLAN PV-3 ROOF PLAN PV-4 ELECTRICAL LINE DIAGRAM PV-5 ATTACHMENT DETAIL PV-6A LIST OF PLACARDS PV-6B OPTIMIZER CHART UL LISTED FOR ELECTRICAL AND FIRE SAFETY UL 1703 FOR MODULES AND UL 1741 FOR INVERTERS PER CITY SOLAR REQUIREMENTS NOTE: NO DISCHARGE OF ANY POLLUTANTS TO ANY STORM WATER DRAIN SYSTEM -SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. -THE SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND LOCAL UTILITY.UTILITY SHALL BE NOTIFIED PRIOR TO ACTIVATION OF SOLAR PHOTOVOLTAIC INSTALLATION. -ALL EXTERNAL CONDUIT AND FITTINGS SHALL BE RAIN TIGHT AND SHOULD BE APPROVED TO USE IN WET AND DRY LOCATIONS. -ALL CONDUITS AND EQUIPMENTS SHALL BE PAINTED TO MATCH THE EXISTING BACKGROUND. -THE PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH CBC SECTION 1609 TO WITHSTAND A MINIMUM OF 110 MPH WIND LOAD -DESIGN COMPLYING WITH LATEST EDITION OF CALIFORNIA ELECTRICAL CODE, NEC AND ALL LOCAL ORDINANCES. -SHOULD USE PROPER GROUND BAR AND KITS FOR GROUNDING -THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING. MECHANICAL OR BUILDING ROOF VENTS. -THE DISTANCE BETWEEN BOTTOM OF PANEL TO THE TOP OF ROOF SHOULD BE MIN 4". -BACKFEED BREAKER SHOULD BE AT THE OPPOSITE END OF BUS BAR. -INSTALLERS TO FOLLOW ALL LOCAL JURISDICTION GUIDELINES. -SEE THE SPECS SHEETS FOR ADDITIONAL INFORMATION. -THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS OF LOCAL UTILITY. -ALL NEC REFERENCES SHALL BE DIRECTLY INTERCHANGEABLE WITH CEC REFERENCES. -A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA . -WORKING DISTANCE AROUND ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. -NO VENTS ( PLUMBING, MECHANICAL OR DORMER) TO BE COVERED OR REROUTED AROUND SOLAR MODULES.RELOCATION TO BE DONE ONLY AFTER APPROVAL. - ALL LABELS AND PLACARDS SHALL BE ATTACHED ACCORDING TO NEC AND THE LOCAL AHJ. -METAL CONDUIT AND ENCLOSURE SHALL BE USED WHERE PV SOURCE OR OUTPUT CIRCUITS ARE RUN INSIDE THE BUILDING. -ALL OUTDOOR EQUIPMENT SHALL BE MIN NEMA 3R RATED. -PER CALIFORNIA RESIDENTIAL CODE (CRC) SECTIONS R314 AND R315 SMOKE ALARM AND CARBON MONOXIDE DETECTORS ARE RETROFITTED INTO THE EXISTING DWELLINGS. -ALL PHOTOVOLTAIC EQUIPMENT SHALL BE LISTED BY RECOGNIZED TESTING LAB. -ALL SOLAR ENERGY SYSTEMS SHALL MEET APPLICABLE HEALTH AND SAFETY STANDARDS REQUIREMENTS IMPOSED BY THE CITY AND STATE OF CALIFORNIA. -SOLAR ENERGY SYSTEMS FOR PRODUCING ELECTRICITY SHALL MEET ALL APPLICABLE SAFETY AND PERFORMANCE STANDARDS ESTABLISHED BY CALIFORNIA ELECTRIC CODE,THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, ACCREDITED TESTING LABORATORIES SUCH AS UNDERWRITER LABORATORIES AND WHERE APPLICABLE, RULES OF PUBLIC UTILITIES COMMISSION REGARDING SAFETY AND RELIABILITY. COVERSHEET STAMP PV1 66 ' - 1 0 " 63'-3"25'-0 " 41'-1" 141'-0" 7 2 ' - 2 " 7'± 3' ± 8'± 5'± JB INV MSP 3' - 0 " 3'-0" 3'-0 " 3' - 0 " 1' - 6 " 1' - 6 " 3'-0" 3'-0" MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 1 PLOT PLAN SCALE: 1/16"=1'-0"PV2 POINT LOAD CALCULATION PER ARRAY ITEM # OR LN FT WT (LBS)TOTAL WT (LBS) MODULES 18 41 738 RAILS 120 0.5 60.0 MOUNTS 30 0.5 15.0 MICRO INVERTER/ POWER OPTIMIZER 18 4.4 79.2 TOTAL WEIGHT 892.2 MODULE DIMENSIONS 71.70inx40.00 in 19.9 WEIGHT PER MOUNT 29.7 WEIGHT PER SQ FT(LBS/SQFT)2.5 WIND LOAD CALCS MODULES AND RACKING WEIGHT(W)892.2 LBS TOTAL MODULES AREA(A)358.2 SQFT WIND PRESSURE(PSF) P 35 PSF L=5/16" DIA LAG SCREWS 328 LBS/IN D=LAG SCREWS EMBEDEMENT 2.5 INCH QUANTITY OF LAG SCREWS(Q)30 QTY WIND SPEED:110 MPH EXPOSURE C RISK CATEGORY II PLOT PLAN PV2 ROOF AZIMUTH 166° FROM NORTH LOCATIONS OF DC CONDUCTORS CONDUIT WIRING SYSTEMS AND RACEWAYS FOR PHOTOVOLTAIC CIRCUITS SHALL BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE OR HIP OR VALLEY AND FROM HIP OR VALLEY AS DIRECTLY AS POSSIBLE TO AN OUTSIDE WALL TO REDUCE TRIP HAZARDS AND MAXIMIZE THE VENTILATION OPPORTUNITIES.CONDUIT RUNS BETWEEN SUB ARRAYS AND DC COMBINER BOX SHALL BE INSTALLED IN A MANNER THAT MINIMIZES THE TOTAL AMOUNT OF CONDUIT ON ROOF BY TAKING THE SHORTEST RUNS AND MINIMIZED IN THE PATHWAYS BETWEEN THE ARRAYS.DC WIRING SHALL BE INSTALLED IN A METALLIC CONDUIT OR RACEWAYS WHEN LOCATED WITHIN ENCLOSED SPACES IN A BUILDING. CONDUIT SHALL RUN ALONG THE BOTTOM OF THE LOAD BEARING MEMBERS ROOF COVERAGE ARRAY AREA 358.2 SQFT ROOF AREA 5042.0 SQFT %COVERAGE 7.1 %<33 NOTE: A 36 INCH WIDE PATHWAY SHALL BE PROVIDED TO THE EMERGENCY ESCAPE AND RESCUE OPENING DRIVE WAY BACKYARD AR R O W H E A D D R (E)WALL AND GATE (E)MAIN SERVICE PANEL AND (N) SOLAR BREAKER ROOF 1 ROOF 1:18 MODULES ROOF TILT@18° AZIMUTH@166° (N)INVERTER (IN GARAGE) 36" FIRE PATHWAY PER CFC 605.11.1.2.1 ROOF ACCESS POINTS CRC R24.7.0 (E)WALL AND GATE JB INV MSP 17 ' - 1 " 2' - 8 " 20'-2"27'-0" 28 ' - 8 " 13 ± 3 - 1 / 2 " RO O F S L O P E 72" O.C MAX 1/3*L MAX TYP END MOUNTING CLIP,TYP MID MOUNTING CLIP,TYP SOLAR STANDARD RAIL TYP 1/3*L MAX TYP 13 ± 3 - 1 / 2 " MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 LEGEND JB INV SUB MSP ACD - JUNCTION BOX - INVERTER - AC DISCONNECT - MAIN SERVICE PANEL - SUB PANEL - ATTIC VENTS - DORMER VENTS -SKYLIGHT -CHIMNEY -PRODUCTION METERPM A/C -AIR CONDITON UNIT -SOLAR MODULES -FIRE ACCESS PATHWAY M -ELECTRIC METER CB -COMBINER BOX ROOF PLAN SCALE: 1/8"=1'-0"PV3 71 . 7 0 " 40.00" TYPICAL RACK MOUNT LAYOUT SCALE: 3/16"=1'-0"PV3 30 QTY ATTACHMENT POINTS @ 72" O.C MAX ROOF PLAN PV3-CONDUIT ON ROOF REC ALPHA REC385AA PURE 1 2 2X4 TRUSS@24" O.C TYPE NOTE: PV BREAKER IN MAIN PANEL ACTS AS A MEANS OF AC DISCONNECT 690.15(D)(1) ROOF 1 NOTE: (E)ROOF TYPE IS CLAY TILE COMP SHINGLE INSET ON CLAY TILE ROOF IS REQUIRED ROOF AZIMUTH 166° FROM NORTH AR R O W H E A D D R (E)MAIN SERVICE PANEL AND (N) SOLAR BREAKER ROOF 1:18 MODULES ROOF TILT@18° AZIMUTH@166° (N)INVERTER (IN GARAGE)NOTE: CONDUIT IN ATTIC = = = = = = -+-+-+ -+-+-+ STRING 1=09 MODULES = 7.6 KW SOLAREDGE INVERTER AND INTEGRATED DC DISCONNECT EQUIPPED WITH RAPID SHUT DOWN THWN-2 3/4" EMT AWG#10 POS=RED NED=BLACK AWG#8 G=GREEN JUNCTION BOX = = = = = = -+-+-+ -+-+-+ EGC DC -DC POWER OPTIMIZER P505 STRING 2=09 MODULES PHOTOVOLTAIC ARRAY AWG #10 PV WIRE IN FREE AIR POS = BLACK NEG = WHITE AWG #6 G = BARE CU THWN-2 IN 3/4" EMT (3)AWG #8 L1 = BLACK L2 = RED N = WHITE (1)AWG #8 G = GREEN BI-DIRECTIONAL UTILITY METER 1 PHASE, 3 WIRE 120/ 240 V NEW, IF NO EXISTING GROUNDING ELECTRODE (N) PV BREAKER 40A DPB LOCATED AT OPPOSITE END OF MAIN BREAKER EXISTING CENTER FED 200A RATED SQUARE D MAIN SERVICE PANEL (E)200A RATED MAIN DISCONNECT MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 ELECTRICAL DIAGRAM PV4A STRING #1=09 MODULES STRING #2=09 MODULES NOTE: PV BREAKER IN MAIN PANEL ACTS AS A MEANS OF AC DISCONNECT 690.15(D)(1) MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 120% RULE ON UPPER BUS BAR MAIN SERVICE PANEL RATING 200A MAIN BREAKER RATING 200A 120% OF MAIN PANEL RATING 200*1.2=240A MAX SOLAR BACKFEED 240-200=40A SOLAR BREAKER SIZE 40A BACKFEED COMPLIES WITH NEC 705.12(D)(2) 40A =<40A ELECTRICAL DIAGRAM PV4B ELECTRICAL NOTES: 1.) ALL EQUIPMENT TO BE LISTED BY UL OR RECOGNIZED TESTING LABORATORY. 2.) ALL PLACARDS AND SIGNAGE REQUIRED BY LATEST EDITION OF CEC AND NEC WILL BE INSTALLED AS REQUIRED. 3.) ALL THE CONDUIT RUNS SHALL HAVE SUFFICIENT WEATHER PROOF JUNCTION BOXES/COMBINER BOXES. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC AND CEC 5.) ALL PV ARRAYS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION AND ALL THE MOUNTING METALLIC EQUIPMENT SHALL BE GROUNDED ACCORDING TO MANUFACTURER INSTRUCTIONS. 6.) ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC ENGRAVED OR MACHINE PRINTED LETTER IN A CONTRASTING COLOR .THE PLAQUE SHALL BE ATTACHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHODS AND SHALL BE UV RESISTANT IF EXPOSED TO DIRECT SUNLIGHT. 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. 8.) AL THE PHOTOVOLTAIC SYSTEMS AND REQUIRED WIRINGS SHALL BE INSTALLED BY QUALIFIED PERSONNEL ONLY 9.) MICRO INVERTER SHALL CONTAIN GROUND FAULT DETECTION AND INTERRUPTION DEVICES. 10.) ALL WIRES ARE SIZED ACCORDING TO TEMPERATURE DERATING AND LOCATION. 11.) IF THE EXISTING GROUNDING ELECTRODE SYSTEM CANNOT BE VERIFIED OR IS ONLY METALLIC WATER PIPING, CONTRACTOR SHALL INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE AS PER CALIFORNIA RESIDENTIAL CODE CRC SECTIONS R14 AND R15 PROVIDE SMOKE ALARMS ON THE FOLLOWING LOCATIONS: 1.SMOKE ALARM IN ALL SLEEPING ROOMS. 2.CO ALARMS IN ALL SLEEPING ROOMS WITHIN WHICH FUEL BURNING APPLIANCES ARE INSTALLED. 3.SMOKE ALARMS AND CO ALARM IN AREA PRECEDING SLEEPING ROOMS (SUCH AS HALLWAY),AND 4.SMOKE ALARM AND CO ALARM ON EACH STORY LEVEL OF THE DWELLING INCLUDING BASEMENTS AND HABITABLE ATTIC ROOMS INVERTER #1 SPECIFICATIONS MANUFACTURER / MODEL #SOLAREDGE SE7600H-US NOMINAL AC POWER 7.6 KW NOMINAL OUTPUT VOLTAGE 240 VAC NOMINAL OUTPUT CURRENT 32 A AC CONDUCTOR AMPACITY FROM INVERTER TO MAIN SERVICE PANEL INVERTER CURRENT=32A MAX CURRENT=1.25X32=40A AWG#8 DERATED AMPACITY 55X0.87X1.0=47.85A, 47.85A>40A, THEREFORE AC WIRE SIZE IS VALID CALCULATIONS FOR CURRENT CARRYING CONDUCTORS: DC CONDUCTOR AMPACITY FROM MODULE TO JUNCTION BOX TO INVERTER IMAX PER BRANCH =IMPX1.25=15X1.25=18.75A AWG#10 DERATED AMPACITY 40X0.65X0.8=20.8A 20.8A>18.75A,THEREFORE DC WIRE SIZE IS VALID SOLAR MODULE SPECIFICATIONS MANUFACTURER / MODEL #REC ALPHA REC385AA PURE VMP 41.2V IMP 9.35A VOC 48.5V ISC 10.18A TEMP. COEFF. VOC -0.26%/°K MODULE DIMENSION 71.70"L x 40.00"W x 1.20"D (In Inch) PTC RATING 366.0W 18" 4 " 1 8 ° 6'-0" MAX 6'-0" 6'-0" 6'-0" 6 " M A X MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 SOLAR PANEL PORTRAIT 2X4 TRUSS @ 24" O.C ATTACHMENT DETAILS PV5 1 ATTACHMENT TYPE: PEGASUS COMP MOUNT ((N) COMP ROOF UNDER MODULES, (E) CLAY TILES ELSEWHERE)) SCALE: NTSPV5 2X4 TRUSSES @24"O.C (E)1/2" CDX PLYWOOD 5/16"x3-1/2" SS LAG BOLT@ 6' O.C Max. OVER EXISTING SHEATHING AND ROOF TRUSSES AS SHOWN. MIN 2-1/2" PENETRATION PEGASUS RAIL PEGASUS COMP MOUNT PEGASUS FLASHING (N)COMPOSITION SHINGLE ROOF UNDER ALL MODULES (MAX ONE LAYER) (E)CLAY TILE OUTSIDE OF MODULE INSTALLATION AREA NOTE: (E)ROOF TYPE IS CLAY TILE COMP SHINGLE INSET ON CLAY TILE ROOF IS REQUIRED JB INV MSP MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 ! WARNING ! ELECTRIC SHOCK HAZARD THE TERMINALS ON LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION (690.13(B) CEC AT ALL "J" BOXES, COMBINER BOX,ENCLOSURES/EMT ENCLOSURES/DISCONNECTS ! WARNING ! POWER SOURCE OUTPUT CONNECTIONS, DONOT RELOCATE THIS OVER CURRENT DEVICE NEC 705.12 (B)(2)(3)(b)PLACED ON MAIN PANEL/BREAKER LOCATION PV SOLAR BREAKER DO NOT RELOCATE THIS OVERCURRENT DEVICE PLACED ON SOLAR BREAKER ! WARNING ! ! WARNING ! THREE POWER SOURCE SECOND SOURCE IS PV, THIRD IS ESS CEC 705.12 D(3),NEC 690.59 ON MAIN PANEL ! WARNING ! PHOTOVOLTAIC POWER SOURCE ON ALL CONDUITS SPACED AT MAX 10 FT PHOTOVOLTAIC SOLAR ON ROOF PLACARDS PV6A POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCE WITH DISCONNECT LOCATED AS SHOWN CAUTION PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT 32 A NOMINAL OPERATING AC VOLTAGE 240 V CEC 690.54 PLACED ON MAIN PANEL SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS WITHIN 3 FT OF MAIN PANEL/AC DISCONNECT/STRING INVERTER PLAQUES SHALL BE PLASTIC ENGRAVED IN A CONTRASTING COLOR TO THE PLAQUE. PLAQUE SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR ADHESIVE.WARNING LABELS WHITE LETTERS ON RED BACKGROUND AND NON-BOLD ARIAL OR SIMILAR FONT.MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT CEC 690.56 C(3) PLACED WITHIN 3 FT OF RAPID SHUT DOWN SWITCH DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ! WARNING ! PHOTOVOLTAIC POWER SOURCE CEC 690.31 (G)3-4 ON ALL EMT CONDUIT, ENCLOSURE,COMBINER BOXES,DISCONNECTS ! ! WARNING ! TURN OFF PHOTOVOLTAIC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27 C, COMBINER BOX, ENCLOSURE/CONDUIT ENCLOSURE/DISCONNECT RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM PHOTOVOLTAIC SYSTEM MAXIMUM VOLTAGE 480V MAXIMUM CIRCUIT CURRENT 20A MAXIMUM RATED OUTPUT CURRENT DC-DC CONVERTER 15A PLACED ON INVERTER DC DISCONNECT LABEL ! WARNING ! TURN OFF AC DISCONNECT PRIOR TO WORKING INSIDE PANEL PLACED ON MAIN PANEL MAIN SERVICE PANEL AND SOLAR BREAKER INVERTER (IN GARAGE) AR R O W H E A D D R JB INV MSP MODULE WATT: 385 W (18)REC ALPHA REC385AA PURE SYSTEM SIZE:6.93 KW DC (STC) :6.59 KW DC (PTC) :6.52 KW AC (CEC) (01)INVERTER:SOLAREDGE SE7600H-US ENERGY HUB (18)POWER OPTIMIZER: P505 AZIMUTH:166° ROOF TILT:18° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 DEBORAH BEUTLER RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/12/2022 SHEET NAME SHEET NUMBER 507 ARROWHEAD DR PALM DESERT,CA,92211 PHONE:(626)379-8219 OCCUPANCY TYPE:V-B GROUP:R APN:632690020 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 OPTIMIZER CHART PV6B OPTIMIZERS/MICRO-INVERTERS CHART rec Alphα® pure Series Product Specifications α experience performance wp405 20.3 w ft2 ELIGIBLE LEAD-FREE rohs cOMPLIANT www.recgroup.com Re f : P M - DS - 1 2 - 0 1 - Re v - C 10 . 2 1 Founded in 1996, REC Group is an international pioneering solar energy company dedicated to empowering consumers with clean, affordable solar power. As Solar’s Most Trusted, REC is committed to high quality, innovation, and a low carbon footprint in the solar materials and solar panels it manufactures. Headquartered in Norway with operational headquarters in Singapore, REC also has regional hubs in North America, Europe, and Asia-Pacific. GR GR GR GR GR 1821±2.5 [71.7±0.1] 901 [35.5]460 [18.1] 97 5 ± 2 . 5 [ 3 8 . 4 ± 0 . 1 ] 1100 [43.3] 1200 [47.2] 30 [1.2] 22.5 [0.9] 671 ±3 [26.4 ±0.12] 11±0.2 [0.43±0.01] 6. 6 ± 0 . 2 [ 0 . 2 6 ± 0 . 0 1 ] 20.5±0.5 [0.8±0.02] 6.0±0.2 [0.24±0.01] 28 [1.1] 10 1 6 ± 2 . 5 [ 4 0 ± 0 . 1 ] 17 [ 0 . 7 ] 45 [1.8] 153.7 [6.05] 153.7 [6.05] Measurements in mm [in] Sp e c i f i c a t i o n s s u b j e c t t o c h a n g e w i t h o u t n o t i c e . CERTIFICATIONS WARRANTY LOW LIGHT BEHAVIOUR TEMPERATURE RATINGS * MAXIMUM RATINGS Irradiance (W/m²) Typical low irradiance performance of module at STC: Re l . E f f i c i e n c y ( % ) Nominal Module Operating Temperature:44°C (±2 °C) Temperature coefficient of PMAX:-0.26 %/°C Temperature coefficient of VOC:-0.24 %/°C Temperature coefficient of ISC:0.04 %/°C *The temperature coefficients stated are linear values IEC 61215:2016, IEC 61730:2016, UL 61730 IEC 62804 PID IEC 61701 Salt Mist IEC 62716 Ammonia Resistance UL 61730 Fire Type Class 2 IEC 62782 Dynamic Mechanical Load IEC 61215-2:2016 Hailstone (35mm) IEC 62321 Lead-free acc. to RoHS EU 863/2015 ISO 14001:2004, ISO 9001:2015, OHSAS 18001:2007, IEC 62941 Standard REC ProTrust Installed by an REC Certified Solar Professional No Yes Yes System Size All ≤25 kW 25-500 kW Product Warranty (yrs)20 25 25 Power Warranty (yrs)25 25 25 Labor Warranty (yrs)0 25 10 Power in Year 1 98%98%98% Annual Degradation 0.25%0.25%0.25% Power in Year 25 92%92%92% See warranty documents for details. Conditions apply ELECTRICAL DATA Product Code*: RECxxxAA Pure Power Output - PMAX (Wp) 385 390 395 400 405 Watt Class Sorting - (W)0/+5 0/+5 0/+5 0/+5 0/+5 Nominal Power Voltage - VMPP (V) 41.2 41.5 41.8 42.1 42.4 Nominal Power Current - IMPP (A) 9.35 9.40 9.45 9.51 9.56 Open Circuit Voltage - VOC (V) 48.5 48.6 48.7 48.8 48.9 Short Circuit Current - ISC (A) 10.18 10.19 10.20 10.25 10.30 Power Density (W/sq ft)19.3 19.6 19.8 20.1 20.3 Panel Efficiency (%) 20.8 21.1 21.3 21.6 21.9 Power Output - PMAX (Wp)293 297 301 305 309 Nominal Power Voltage - VMPP (V) 38.8 39.1 39.4 39.7 40.0 Nominal Power Current - IMPP (A) 7.55 7.59 7.63 7.68 7.72 Open Circuit Voltage - VOC (V) 45.7 45.8 45.9 46.0 46.1 Short Circuit Current - ISC (A) 8.16 8.20 8.24 8.28 8.32 Values at standard test conditions (STC: air mass AM 1.5, irradiance 10.75 W/sq ft (1000 W/m²), temperature 77°F (25°C), based on a production spread with a tolerance of PMAX, VOC & ISC ±3% within one watt class. Nominal module operating temperature (NMOT: air mass AM 1.5, irradiance 800 W/m², temperature 68°F (20°C), windspeed 3.3 ft/s (1 m/s). * Where xxx indicates the nominal power class (PMAX) at STC above. GENERAL DATA Cell type: 132 half-cut REC heterojunction cells with lead-free, gapless technology 6 strings of 22 cells in series Glass:0.13 in (3.2 mm) solar glass with anti-reflection surface treatment Backsheet:Highly resistant polymer (black) Frame:Anodized aluminum (black) Junction box:3-part, 3 bypass diodes, IP68 rated in accordance with IEC 62790 Connectors: Stäubli MC4 PV-KBT4/KST4, 12 AWG (4 mm²) in accordance with IEC 62852 IP68 only when connected Cable:12 AWG (4 mm²) PV wire, 43+ 47 in (1.1 + 1.2 m) accordance with EN 50618 Dimensions:71.7 x 40 x 1.2 in (1821 x 1016 x 30 mm) Weight:45 lbs (20.5 kg) Origin:Made in Singapore STC NMOT 85 90 95 100 105 200100 300 400 500 600 700 800 900 1000 Operational temperature:-40 ... +185°F (-40 ... +85°C) Maximum system voltage:1000 V Maximum test load (front): + 7000 Pa (146 lbs/sq ft)* Maximum test load (rear):- 4000 Pa (83.5 lbs/sq ft)* Max series fuse rating:25 A Max reverse current:25 A * See installation manual for mounting instructions. Design load = Test load / 1.5 (safety factor) Product SPECIFICATIONS REC ALPHA PURE SERIEs > Product SPECIFICATIONS Lead-Free Single Phase Energy Hub Inverter with Prism Technology For North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US(1) 12-25 YEAR WARRANTY Optimized battery storage with HD-Wave technology Record-breaking 99% weighted efficiency with 200% DC oversizing Small, lightweight, and easy to install Modular design, future ready with optional upgrades to: DC-coupled storage for full or partial home backup Built-in consumption monitoring Direct connection to the SolarEdge smart EV charger Multi-inverter, scalable storage solution With enhanced battery power up to 10kW Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020, per article 690.11 and 690.12 Embedded revenue grade production data, ANSI C12.20 Class 0.5 solaredge.com HO M E BA C K U P Single Phase Energy Hub Inverter with Prism Technology For North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US(1) SE3000H-US SE3800H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US UNITS OUTPUT - AC ON GRID Rated AC Power 3000 3800 @ 240V 3300 @ 208V 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V W Maximum AC Power Output 3000 3800 @ 240V 3300 @ 208V 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V W AC Frequency Range (min - nom - max) 59.3 - 60 - 60.5(2) Hz Maximum Continuous Output Current @ 240V 12.5 16 25 32 42 47.5 A Maximum Continuous Output Current @ 208V - 16 24 - - 48.5 A GFDI Threshold 1 A Total Harmonic Distortion (THD) <3 % Power Factor 1, adjustable -0.85 to 0.85 Utility Monitoring,IslandingProtection,Country ConfigurableThresholds Yes Charge Battery from AC (if allowed) Yes Typical Nighttime Power Consumption <2.5 W OUTPUT - AC BACKUP(3) Rated AC Power in Backup Operation(4) 3000 3800 6000 7600 10000 10300 W 7600* 10300* AC L-L Output Voltage Range in Backup 211 - 264 Vac AC L-N Output Voltage Range in Backup 105 - 132 Vac AC Frequency Range in Backup (min - nom - max) 55 - 60 - 65 Hz Maximum Continuous Output Current in Backup Operation 12.5 16 25 32 42 43 A 32* 43* GFDI 1 A THD <5 % OUTPUT - SMART EV CHARGER AC Rated AC Power 9600 W AC Output Voltage Range 211 - 264 Vac On-Grid AC Frequency Range (min - nom - max) 59.3 - 60 - 60.5 Hz Maximum Continuous Output Current @240V (grid, PV and battery) 40 Aac INPUT - DC (PV AND BATTERY) Transformer-less, Ungrounded Yes Max Input Voltage 480 Vdc Nom DC Input Voltage 380 Vdc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600kΩ Sensitivity INPUT - DC (PV) Maximum DC Power @ 240V 6000 7600 12000 15200 22000 22800 W 15200* 22800* Maximum DC Power @ 208V - 6600 10000 - - 20000 W Maximum Input Current(5) @ 240V 8.5 10.5 16.5 20 27 31 Adc 20* 31* Maximum Input Current(5) @ 208V - 9 13.5 - - 27 Adc Max. Input Short Circuit Current 45 Adc Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V 98.5 @ 208V % 2-pole Disconnection Yes * Supported with PN SExxxxH-USMMxxxxxx or SExxxxH-USMNxxxxxx (1) These specifications apply to inverters with part numbers SExxxxH-USSMxxxxx or SExxxxH-USSNxxxxxx and connection unit model number DCD-1PH-US-PxH-F-x (2) For other regional settings please contact SolarEdge support (3) Not designed for standalone applications and requires AC for commissioning. Backup functionality is only supported for 240V grid (4) Rated AC power in Backup Operation are valid for installations with multiple inverters. For a single backup inverter operation, rated AC power in Backup is 90% of the value stated (5) A higher current source may be used; the inverter will limit its input current to the values stated Single Phase Energy Hub Inverter with Prism Technology For North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US(1) SE3000H-US SE3800H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US UNITS INPUT - DC (BATTERY) Supported Battery Types SolarEdge Energy Bank, LG RESU Prime(6) Number of Batteries per Inverter Up to 3 SolarEdge Energy Bank, up to 2 LG RESU Prime Continuous Power(7) 6000 7600 10000 W Peak Power(7) 6000 7600 10000 W Max Input Current 16 20 26.5 Adc 2-pole Disconnection Yes SMART ENERGY CAPABILITIES Consumption Metering Built - in(8) Backup & Battery Storage With Backup Interface (purchased separately) for service up to 200A; Up to 3 inverters EV Charging Direct connection to Smart EV charger ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, Cellular(9), Wi-Fi (optional),SolarEdge Energy Net (optional) Revenue Grade Metering, ANSI C12.20 Built - in(8) Integrated AC, DC and Communication Connection Unit Yes Inverter Commissioning With the SetApp mobile application using built-in Wi-Fi Access Point for local connection DC Voltage Rapid Shutdown (PV and Battery) Yes, according to NEC 2014, NEC 2017 and NEC 2020 690.12 STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1741 PCS, UL1699B, UL1998, UL9540, CSA 22.2 Grid Connection Standards IEEE1547, Rule 21, Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS AC Output and EV AC Output Conduit Size / AWG Range 1'' maximum / 14-4 AWG DC Input (PV and Battery) Conduit Size / AWG Range 1'' maximum / 14-6 AWG Dimensions with Connection Unit (H x W x D) 17.7 x 14.6 x 6.8 / 450 x 370 x 174 17.7 x 14.6 x 6.8 / 450 x 370 x 174 17.7 x 14.6 x 6.8 / 450 x 370 x 174 in / mm 17.7 x 14.6 x 6.8 / 450 x 370 x 174* Weight with Connection Unit 26 / 11.8 26 / 11.8 41.7 / 18.9 lb / kg 41.7/ 18.9* Noise < 25 < 25 < 25 < 50 dBA < 50* Cooling Natural Convection Operating Temperature Range -40 to +140 / -40 to +60(10) ˚F / ˚C Protection Rating NEMA 4 (6) The part numbers SExxxxH-USxMxxxxx only support the SolarEdge Energy Bank. The part numbers SExxxxH-USxNxxxxx support both SolarEdge Energy Bank and LG RESU Prime batteries Requires supporting inverter firmware (7) Discharge power is limited up to the inverter rated AC power for on-grid and backup applications (8) For consumption metering current transformers should be ordered separately: SECT-SPL-225A-T-20 or SEACT0750-400NA-20 units per box. Revenue grade metering is only for production metering (9) Information concerning the Data Plan's terms & conditions is available in the following link: https://www.solaredge.com/sites/default/files/se-communication-plan-terms-and-conditions-eng.pdf (10) Full power up to at least 50°C / 122°F; for power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: March 14, 2022 DS-000031-NAM. Subject to change without notice. Power Optimizer For North America P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 25 YEAR WARRANTY PV power optimization at the module-level Specifically designed to work with SolarEdge inverters Up to 25% more energy Superior efficiency (99.5%) Mitigates all types of module mismatch losses, from manufacturing tolerance to partial shading Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module- level monitoring Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid Shutdown System (PVRSS) Module-level voltage shutdown for installer and firefighter safety solaredge.com P O W E R OP T I M I Z E R Power Optimizer For North America P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 Optimizer model (typical module compatibility) P320 (for 60-cell modules) P340 (for high- power 60-cellmodules) P370 (for higher- power 60 and 72- cell modules) P400 (for 72 & 96-cellmodules) P401 (for high power 60 and 72 cell modules) P405 (for high- voltage modules) P485 (for high- voltage modules) P505 (for higher current modules) INPUT Rated Input DC Power(1) 320 350 370 400 485 505 W Absolute Maximum Input Voltage (Voc at lowest temperature) 48 60 80 60 125(2) 83(2) Vdc MPPT Operating Range 8 - 48 8 - 60 8 - 80 8-60 12.5 - 105 12.5 - 83 Vdc Maximum Short Circuit Current (Isc) 11 11.02 11 10.1 11.75 11 14 Adc Maximum DC Input Current 13.75 12.5 14.65 12.5 17.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 98.6 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0, UV Resistant RoHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Compatible inverters All SolarEdge Single Phase and Three Phase inverters Dimensions (W x L x H) 129 x 153 x 27.5 / 5.1 x 6 x 1.1 129 x 153 x 33.5 / 5.1 x 6 x 1.3 129 x 153 x 29.5 / 5.1 x 6 x 1.16 129 x 159 x 49.5 / 5.1 x 6.3 x 1.9 129 x 162 x 59 / 5.1 x 6.4 x 2.3 mm / in Weight (including cables) 630 / 1.4 750 / 1.7 655 / 1.5 845 / 1.9 1064 / 2.3 gr / lb Input Connector MC4(3) Single or dual MC4(3)(4) MC4(3) Input Wire Length 0.16 / 0.52 0.16 or 0.9 /0.52 or 2.95(5) 0.16 / 0.52 m / ft Output Wire Type / Connector Double Insulated / MC4 Output Wire Length 0.9 / 2.95 1.2 / 3.9 m / ft Operating Temperature Range(6) -40 to +85 / -40 to +185 ˚C / ˚F Protection Rating IP68 / Type 6P Relative Humidity 0 - 100 % (1)Rated power of the module at STC will not exceed the optimizer “Rated Input DC Power ”. Modules with up to +5% power tolerance are allowed (2)NEC 2017 requires max input voltage be not more than 80V (3)For other connector types please contact SolarEdge (4)For dual version for parallel connection of two modules use P485-4NMDMRM. In the case of an odd number of PV modules in one string, installing one P485 dual version power optimizer connected to one PV module. When connecting a single module seal the unused input connectors with the supplied pair of seals(5)Longer inputs wire length are available for use. For 0.9m input wire length order P401-xxxLxxx(6)For ambient temperature above +85°C / +185°F power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for more details PV System Design Using a SolarEdge Inverter(7)(8) Single Phase HD-Wave Single phase Three Phase for 208V grid Three Phase for277/480V grid Minimum String Length (Power Optimizers) P320, P340, P370, P400, P401 8 10 18 P405, P485, P505 6 8 14 Maximum String Length (Power Optimizers) 25 25 50(9) Maximum Power per String 5700 (6000 with SE7600-US - SE11400- US) 5250 6000(10) 12750(11) W Parallel Strings of Different Lengths or Orientations Yes (7) For detailed string sizing information refer to: http://www.solaredge.com/sites/default/files/string_sizing_na.pdf (8) It is not allowed to mix P405/P485/P505 with P320/P340/P370/P400/P401 in one string (9) A string with more than 30 optimizers does not meet NEC rapid shutdown requirements; safety voltage will be above the 30V requirement (10) For 208V grid: it is allowed to install up to 6,500W per string when the maximum power difference between each string is 1,000W(11) For 277/480V grid: it is allowed to install up to 15,000W per string when the maximum power difference between each string is 2,000W © SolarEdge Technologies Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2021 DS-000044-1.3-NA. Subject to change without notice. 405 Tech Brief Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect against buckling and safely and efficiently transfer loads into the building structure. Their superior spanning capability requires fewer roof attachments, reducing the number of roof penetrations and the amount of installation time. XR Rail Family Force-Stabilizing Curve Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist. The curved shape of XR Rails is specially designed to increase strength in both directions while resisting the twisting. This unique feature ensures greater security during extreme weather and a longer system lifetime. Compatible with Flat & Pitched Roofs Roof Mount utilizes XR Rails, along with optional all-in-one attachments, to secure systems flush against residential roofs. Corrosion-Resistant Materials XR Rails are compatible with FlashFoot and other pitched roof attachments. IronRidge offers a range of tilt leg options for flat roof mounting applications. All XR Rails are made of 6000-series aluminum alloy, then protected with an anodized finish. Anodizing prevents surface and structural corrosion, while also providing a more attractive appearance. XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. © 2019 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. Version 1.14 Tech Brief Rail Selection The following table was prepared in compliance with applicable engineering codes and standards. Values are based on the following criteria: ASCE 7-10, Roof Zone 1, Exposure B, Roof Slope of 7 to 27 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed span tables and certifications. Load Rail Span Snow (PSF)Wind (MPH)4’5’ 5”6’8’10’12’ None 100 120 140 XR10 XR100 XR1000 160 10-20 100 120 140 160 30 100 160 40 100 160 50-70 160 80-90 160 XR100 XR100 is the ultimate residential mounting rail. It supports a range of wind and snow conditions, while also maximizing spans up to 8 feet. • 8’ spanning capability • Heavy load capability • Clear & black anodized finish • Internal splices available XR10 XR10 is a sleek, low-profile mounting rail, designed for regions with light or no snow. It achieves 6 foot spans, while remaining light and economical. • 6’ spanning capability • Moderate load capability • Clear & black anodized finish • Internal splices available XR1000 XR1000 is a heavyweight among solar mounting rails. It’s built to handle extreme climates and spans up to 12 feet for commercial applications. • 12’ spanning capability • Extreme load capability • Clear anodized finish • Internal splices available COMP MOUNT Flashings, L-Feet and SS lags with bonded EPDM washers are included in each 24-pack All-In-One Kit Packaging Manufactured with advanced materials and coatings to outlast the roof itself 25-Year Warranty Fully IBC/CBC Code Compliant Exceeds ASCE 7-16 Standards Code Compliant Tested to AC286 without sealant Water seal elevated 0.9” above 6XSHULRU:DWHUSURRƓQJ A Better Day on the Job Pegasus Solar Inc | 506 West Ohio Avenue, Richmond, CA 94804 | T: 510.210.3797 | www.pegasussolar.com Simple 3-Piece Design Watertight For Life Pegasus solar’s comp mounts are a cost effective, high-quality option for rail installations on com position shingle roofs. Designed to last decades, the one-piece flashing with elevated cone means there is simply nothing to fail. 1RSUHVVƓWVRUGHFNOHYHO EPDM washers to fail One-Piece Flashing with Elevated Cone Encapsulating Design Raises the water seal 0.9” Above roof deck PSCR-UMM0PSCR-UBBDTPSCR-UBB0 PSCR-UMMDT . 1 Drill pilot hole in the center of the rafter. 2 Optional: Apply a “u-shape” of sealant to the underside of the ŴDVKLQJDQGSRVLWLRQ under 2nd shingle course, cone over pilot hole. 4 Drive lag to required depth. Attach rail per rail manufacturer’s instructions. 3 Place L-Foot over cone and install lag with washer through L-Foot. COMP MOUNT Pegasus Solar Inc | 506 West Ohio Avenue, Richmond, CA 94804 | T: 510.210.3797 | www.pegasussolar.com 1.9” 3.5” 2.3” COMP MOUNT INSTALL KITSSPECIFICATIONS SKU PSCR-UBB0 PSCR-UBBDT SPCR-UBBH PSCR-UMM0 PSCR-UMMDT Finish L-Foot Type Open Slot Open Slot Open Slot Open Slot Open Slot Kit Contents L-Foot, Flashing, 5/16” x 4 1/2” SS Lag with metalized EPDM washer L-Foot, Flashing, 5/16” x 4 1/2” SS Lag with metalized EPDM washer and Pegasus Dovetail T-bolt w/ Nut L-Foot, Flashing, 5/16” x 4 1/2” SS Lag with metalized EPDM washer and M10 Hex Bolt w/ Nut L-Foot, Flashing, 5/16” x 4 1/2” SS Lag with metalized EPDM washer L-Foot, Flashing, 5/16” x 4 1/2” SS Lag with metalized EPDM washer and Pegasus Dovetail T-bolt w/ Nut Roof Type Composition Shingle &HUWLƓFDWLRQV Install Application Railed Systems Compatible Rail Most Kit Quantity 24 Boxes per Pallet 72 COMP MOUNT INSTALL KITSSPECIFICATIONS Black L-Foot And Black Flashing IBC, ASCE/SEI 7-16, AC286 Mill L-Foot And Mill Flashing Protected under US Patent: 10,998,847. Additional patents pending. All rights reserved. ©2022 Pegasus Updated August 2021 The City of Palm Desert has implemented an expedited solar permitting process for solar photovoltaic systems 20kW AC or less. This checklist is required to be attached to all solar permits 20kW or less and the below requirements in compliance at the time of inspection.  *HQHUDO5HTXLUHPHQWV •The photovoltaic system size is 20kW AC CEC rating or less. •The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. The roof structure must be sound with no more that two (2) roof covering materials. •The photovoltaic system is utility interactive (Battery storage is allowed). •Ground mounted PV system are not eligible and require a plan review. Planning Department Requirements •Existing Main Service Panel Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. •Maximum height of “tilted” panels shall not exceed eighteen (18) inches. •All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. •The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. •Modules shall be flush with one another and gaps between panels shall be minimized. •Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. Electrical Requirements •No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter:  No more than two strings per MPPT input where source circuit fusing is not included  Fuses (if needed) are rated to the series fuse rating of the PV module  No more than one non-inverter-integrated DC combiner is utilized per inverter •For central inverter systems: No more than two inverters are utilized. •The PV system is connected to the load side of the utility distribution equipment. •Load calculations are required when de-rating an Main Service or Sub Panel. •A Solar PV Standard Plan (California Solar Permitting Guide) and supporting documentation (if applicable). Structural Requirements •A completed Structural Criteria and/or supporting documentation is attached to the plan set. •All ballast designed systems require a formal plan review with supporting structural design and justification. •An inspector may require to sample roof attachment hardware for depth and proper materials. Fire Safety Requirements •Clear access pathways provided. •Fire classification photovoltaic system is provided. •All required marking and labels are provided. •A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Applicant Signature: _____________________________________Date:_______________ Project Address: ________________________________________________________ Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings Checklist - 20kW or less Page 1 of 4 The definition of “qualifying residential rooftop solar systems” is all of the following: A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ·A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. Electrical main panel upgrade included with solar plan (Review required if doubling in size) CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems—30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. 1.Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. Fire Marshall approval is not required for small residential rooftop systems at this time. Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2.Building Permit Application Form A permit application can be obtained in person or downloaded from the Department’s website at: www.cityofpalmdesert.org 3.Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria’s, standard plan review timetables apply. Please consult a licensed designed prof essional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 2 of 4 4.Project Submittal All projects can be submitted in person at:City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert, California 92260 5.Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6.Plan Review and Permit Fees ·Plan Review Fee is $203. ·Permit Fees are approximately $266 depending on archiving materials. 7.Minimum Plan Set Requirements ·Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11”X17” to Maximum of 24”X36”). Include a separate Site and Roof Layout Plan for the Riverside County Assessor’s Office. ·Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. ·Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal’s Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf ·Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. ·Product Specifications and Literature Provide all manufacturers’ specifications on all inverters, solar panels, combiner and discon nect boxes and solar panel anchorage system to be used. ·Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City’s website. All submittals must be signed by a C -10 (Electrical Contractor) or C-46 (Solar Contractor) or licensed design professional. Electrical Plans should include the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings . Make and model of inverter(s) and/or combiner box if used. Single line diagram of system . Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 3 of 4 If batteries are to be installed, include them in the diagram and show their locations and venting . Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705 . Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department’s website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: The type of roof covering and the number of roof coverings installed . Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system . As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760) 776- 6420 Monday through Friday (8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. Conductor’s ratings and sizes match plans. Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. Page 4 of 4 QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can save time and money by following these tips. Take time to review permit requirements of the local jurisdiction. Permitting rules and processes differ am ong different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. Contact the local electric utility early in the permitting process (solar PV installations). Local electric utilities have a completely separate approval process from the local jurisdiction’s permitting process. Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. Make sure that the solar installation that is built matches the submitted plans. The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections.