Loading...
HomeMy WebLinkAboutSOLR22-1090 APPROVED PLANS.pdfMODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 SCOPE OF WORK VICINITY MAP PROJECT SITE(33.6962495,-116.3799334) CODE COMPLIANCE GENERAL NOTES SHEET INDEX 36 x PANASONIC EVPV400H ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES SYSTEM SIZE:14.40 KW DC STC 13.72 KW DC PTC 13.58 KW AC CEC EQUIPMENT SUMMARY 36 PANASONIC EVPV400H 01 SOLAREDGE SE11400H-US INVERTER 36 SOLAREDGE P505 POWER OPTIMIZERS ROOF TILT:14° AZIMUTH:180° 1 STORY BUILDING 2019 CA BUILDING CODE 2019 CA PLUMBING CODE 2019 CA FIRE CODE 2019 CA RESIDENTIAL CODE 2019 CA MECHANICAL CODE 2019 CA ENERGY CODE 2019 CA ELECTRICAL CODE 2017 NATIONAL ELECTRICAL CODE 2019 ENERGY COMPLIANCE T-24 THIS PROJECT SHALL COMPLY WITH PV-1 COVER PAGE PV-2 PLOT PLAN PV-3 ROOF PLAN PV-4 ELECTRICAL LINE DIAGRAM PV-5 ATTACHMENT DETAIL PV-6A LIST OF PLACARDS PV-6B OPTIMIZER CHART UL LISTED FOR ELECTRICAL AND FIRE SAFETY UL 1703 FOR MODULES AND UL 1741 FOR INVERTERS PER CITY SOLAR REQUIREMENTS NOTE: NO DISCHARGE OF ANY POLLUTANTS TO ANY STORM WATER DRAIN SYSTEM -SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. -THE SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND LOCAL UTILITY.UTILITY SHALL BE NOTIFIED PRIOR TO ACTIVATION OF SOLAR PHOTOVOLTAIC INSTALLATION. -ALL EXTERNAL CONDUIT AND FITTINGS SHALL BE RAIN TIGHT AND SHOULD BE APPROVED TO USE IN WET AND DRY LOCATIONS. -ALL CONDUITS AND EQUIPMENTS SHALL BE PAINTED TO MATCH THE EXISTING BACKGROUND. -THE PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH CBC SECTION 1609 TO WITHSTAND A MINIMUM OF 97 MPH WIND LOAD -DESIGN COMPLYING WITH LATEST EDITION OF CALIFORNIA ELECTRICAL CODE, NEC AND ALL LOCAL ORDINANCES. -SHOULD USE PROPER GROUND BAR AND KITS FOR GROUNDING -THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING. MECHANICAL OR BUILDING ROOF VENTS. -THE DISTANCE BETWEEN BOTTOM OF PANEL TO THE TOP OF ROOF SHOULD BE MIN 4". -BACKFEED BREAKER SHOULD BE AT THE OPPOSITE END OF BUS BAR. -INSTALLERS TO FOLLOW ALL LOCAL JURISDICTION GUIDELINES. -SEE THE SPECS SHEETS FOR ADDITIONAL INFORMATION. -THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS OF LOCAL UTILITY. -ALL NEC REFERENCES SHALL BE DIRECTLY INTERCHANGEABLE WITH CEC REFERENCES. -A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA . -WORKING DISTANCE AROUND ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. -NO VENTS ( PLUMBING, MECHANICAL OR DORMER) TO BE COVERED OR REROUTED AROUND SOLAR MODULES.RELOCATION TO BE DONE ONLY AFTER APPROVAL. - ALL LABELS AND PLACARDS SHALL BE ATTACHED ACCORDING TO NEC AND THE LOCAL AHJ. -METAL CONDUIT AND ENCLOSURE SHALL BE USED WHERE PV SOURCE OR OUTPUT CIRCUITS ARE RUN INSIDE THE BUILDING. -ALL OUTDOOR EQUIPMENT SHALL BE MIN NEMA 3R RATED. -PER CALIFORNIA RESIDENTIAL CODE (CRC) SECTIONS R314 AND R315 SMOKE ALARM AND CARBON MONOXIDE DETECTORS ARE RETROFITTED INTO THE EXISTING DWELLINGS. -ALL PHOTOVOLTAIC EQUIPMENT SHALL BE LISTED BY RECOGNIZED TESTING LAB. -ALL SOLAR ENERGY SYSTEMS SHALL MEET APPLICABLE HEALTH AND SAFETY STANDARDS REQUIREMENTS IMPOSED BY THE CITY AND STATE OF CALIFORNIA. -SOLAR ENERGY SYSTEMS FOR PRODUCING ELECTRICITY SHALL MEET ALL APPLICABLE SAFETY AND PERFORMANCE STANDARDS ESTABLISHED BY CALIFORNIA ELECTRIC CODE,THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, ACCREDITED TESTING LABORATORIES SUCH AS UNDERWRITER LABORATORIES AND WHERE APPLICABLE, RULES OF PUBLIC UTILITIES COMMISSION REGARDING SAFETY AND RELIABILITY. COVERSHEET STAMP PV1 MS P JB IN V 3' - 0 " 1' - 6 " 1' - 6 " 1'-6"3'-0" 62'-1" 12 3 ' - 8 " 3 0 ' - 7 " 10 5 ' - 3 " 84'-0" 18 ' ± 5'± 3 1 ' ± 12'± 3'-0" MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 1 PLOT PLAN SCALE: 1/16"=1'-0"PV2 POINT LOAD CALCULATION PER ARRAY ITEM # OR LN FT WT (LBS) TOTAL WT (LBS) MODULES 36 41 1476 RAILS 240 0.5 120.0 MOUNTS 46 0.5 23.0 MICRO INVERTER/ POWER OPTIMIZER 36 4.4 158.4 TOTAL WEIGHT 1777.4 MODULE DIMENSIONS 71.70inx40.00 in 19.9 WEIGHT PER MOUNT 38.6 WEIGHT PER SQ FT(LBS/SQFT)2.5 WIND LOAD CALCS MODULES AND RACKING WEIGHT(W)1777.4 LBS TOTAL MODULES AREA(A)716.4 SQFT WIND PRESSURE(PSF) P 35 PSF L=5/16" DIA LAG SCREWS 328 LBS/IN D=LAG SCREWS EMBEDEMENT 2.5 INCH QUANTITY OF LAG SCREWS(Q) 92 QTY WIND SPEED:97 MPH EXPOSURE C RISK CATEGORY II PLOT PLAN PV2 ROOF AZIMUTH 180° FROM NORTH LOCATIONS OF DC CONDUCTORS CONDUIT WIRING SYSTEMS AND RACEWAYS FOR PHOTOVOLTAIC CIRCUITS SHALL BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE OR HIP OR VALLEY AND FROM HIP OR VALLEY AS DIRECTLY AS POSSIBLE TO AN OUTSIDE WALL TO REDUCE TRIP HAZARDS AND MAXIMIZE THE VENTILATION OPPORTUNITIES.CONDUIT RUNS BETWEEN SUB ARRAYS AND DC COMBINER BOX SHALL BE INSTALLED IN A MANNER THAT MINIMIZES THE TOTAL AMOUNT OF CONDUIT ON ROOF BY TAKING THE SHORTEST RUNS AND MINIMIZED IN THE PATHWAYS BETWEEN THE ARRAYS.DC WIRING SHALL BE INSTALLED IN A METALLIC CONDUIT OR RACEWAYS WHEN LOCATED WITHIN ENCLOSED SPACES IN A BUILDING. CONDUIT SHALL RUN ALONG THE BOTTOM OF THE LOAD BEARING MEMBERS ROOF COVERAGE ARRAY AREA 716.4 SQFT ROOF AREA 4468.0 SQFT %COVERAGE 16.0 %<33 NOTE: A 36 INCH WIDE PATHWAY SHALL BE PROVIDED TO THE EMERGENCY ESCAPE AND RESCUE OPENING DRIVE WAY BACKYARD SWIMMING POOL ROOF 1 ROOF 1:36 MODULES ROOF TILT@14° AZIMUTH@180° 36" FIRE PATHWAY PER CFC 605.11.1.2.1 ROOF ACCESS POINTS CRC R24.7.0 36" FIRE PATHWAY PER CFC 605.11.1.2.1 ROOF ACCESS POINTS CRC R24.7.0 (N)MAIN SERVICE PANEL AND (N)SOLAR BREAKER (N)INVERTER (IN GARAGE) AGAVE LN (E)WALL AND GATE PORTOLA AVE MA R I P O S A D R (E)WALL AND GATE MS P JB IN V 17 ' - 5 " 5' - 8 " 50'-5"2'-4" 27 ' - 8 " 13 ± 3 - 1 / 2 " RO O F S L O P E 72" O.C MAX 1/3*L MAX TYP END MOUNTING CLIP,TYP MID MOUNTING CLIP,TYP SOLAR STANDARD RAIL TYP 1/3*L MAX TYP 13 ± 3 - 1 / 2 " MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 LEGEND JB INV SUB MSP ACD - JUNCTION BOX - INVERTER - AC DISCONNECT - MAIN SERVICE PANEL - SUB PANEL - ATTIC VENTS - DORMER VENTS -SKYLIGHT -CHIMNEY -PRODUCTION METERPM A/C -AIR CONDITON UNIT -SOLAR MODULES -FIRE ACCESS PATHWAY M -ELECTRIC METER CB -COMBINER BOX ROOF PLAN SCALE: 3/32"=1'-0"PV3 71 . 7 0 " 40.00" TYPICAL RACK MOUNT LAYOUT SCALE: 3/16"=1'-0"PV3 46 QTY ATTACHMENT POINTS @ 72" O.C MAX ROOF PLAN PV3-CONDUIT ON ROOF PANASONIC EVPV400H 1 2 2X4 TRUSS@24" O.C TYPE ROOF 1 NOTE: PV BREAKER IN MAIN SERVICE PANEL SERVES AS A MEANS OF AC DISCONNECT 690.15(D)(1) ROOF AZIMUTH 180° FROM NORTH ROOF 1:36 MODULES ROOF TILT@14° AZIMUTH@180° (N)MAIN SERVICE PANEL AND (N)SOLAR BREAKER (N)INVERTER (IN GARAGE) AGAVE LN PORTOLA AVE MA R I P O S A D R = = = = = = -+-+-+ -+-+-+ STRING 1=12 MODULES = = = = = = -+-+-+ -+-+-+ EGC DC -DC POWER OPTIMIZER P505 STRING 3=12 MODULES PHOTOVOLTAIC ARRAY = = = = = = -+-+-+ -+-+-+ STRING 2=12 MODULES THWN-2 3/4" EMT AWG#10 POS=RED NED=BLACK AWG#8 G=GREEN JUNCTION BOX AWG #10 PV WIRE IN FREE AIR POS = BLACK NEG = WHITE AWG #6 G = BARE CU = 11.4 KW SOLAREDGE INVERTER AND INTEGRATED DC DISCONNECT EQUIPPED WITH RAPID SHUT DOWN THWN-2 IN 3/4" EMT (3)AWG #6 L1 = BLACK L2 = RED N = WHITE (1)AWG #8 G = GREEN (N)200 A MAIN DISCONNECT (N)225 A MAIN SERVICE PANEL BI-DIRECTIONAL UTILITY METER 1 PHASE, 3 WIRE 120/ 240 V (N) PV BREAKER 60A DPB LOCATED AT OPPOSITE END OF MAIN BREAKER NEW, IF NO EXISTING GROUNDING ELECTRODE MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 120% RULE ON UPPER BUS BAR MAIN SERVICE PANEL RATING 225A MAIN BREAKER RATING DERATED 200A 120% OF MAIN PANEL RATING 225*1.2=270A MAX SOLAR BACKFEED 270-200=70A SOLAR BREAKER SIZE 60A BACKFEED COMPLIES WITH NEC 705.12(D)(2) 60A <70A ELECTRICAL DIAGRAM PV4 ELECTRICAL NOTES: 1.) ALL EQUIPMENT TO BE LISTED BY UL OR RECOGNIZED TESTING LABORATORY. 2.) ALL PLACARDS AND SIGNAGE REQUIRED BY LATEST EDITION OF CEC AND NEC WILL BE INSTALLED AS REQUIRED. 3.) ALL THE CONDUIT RUNS SHALL HAVE SUFFICIENT WEATHER PROOF JUNCTION BOXES/COMBINER BOXES. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC AND CEC 5.) ALL PV ARRAYS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION AND ALL THE MOUNTING METALLIC EQUIPMENT SHALL BE GROUNDED ACCORDING TO MANUFACTURER INSTRUCTIONS. 6.) ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC ENGRAVED OR MACHINE PRINTED LETTER IN A CONTRASTING COLOR .THE PLAQUE SHALL BE ATTACHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHODS AND SHALL BE UV RESISTANT IF EXPOSED TO DIRECT SUNLIGHT. 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. 8.) AL THE PHOTOVOLTAIC SYSTEMS AND REQUIRED WIRINGS SHALL BE INSTALLED BY QUALIFIED PERSONNEL ONLY 9.) MICRO INVERTER SHALL CONTAIN GROUND FAULT DETECTION AND INTERRUPTION DEVICES. 10.) ALL WIRES ARE SIZED ACCORDING TO TEMPERATURE DERATING AND LOCATION. 11.) IF THE EXISTING GROUNDING ELECTRODE SYSTEM CANNOT BE VERIFIED OR IS ONLY METALLIC WATER PIPING, CONTRACTOR SHALL INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE AS PER CALIFORNIA RESIDENTIAL CODE CRC SECTIONS R14 AND R15 PROVIDE SMOKE ALARMS ON THE FOLLOWING LOCATIONS: 1.SMOKE ALARM IN ALL SLEEPING ROOMS. 2.CO ALARMS IN ALL SLEEPING ROOMS WITHIN WHICH FUEL BURNING APPLIANCES ARE INSTALLED. 3.SMOKE ALARMS AND CO ALARM IN AREA PRECEDING SLEEPING ROOMS (SUCH AS HALLWAY),AND 4.SMOKE ALARM AND CO ALARM ON EACH STORY LEVEL OF THE DWELLING INCLUDING BASEMENTS AND HABITABLE ATTIC ROOMS STRING #1=12 MODULES STRING #2=12 MODULES STRING #3=12 MODULES INVERTER #1 SPECIFICATIONS MANUFACTURER / MODEL #SOLAREDGE SE11400H-US NOMINAL AC POWER 11.4 KW NOMINAL OUTPUT VOLTAGE 240 VAC NOMINAL OUTPUT CURRENT 47.5 A AC CONDUCTOR AMPACITY FROM INVERTER TO MAIN SERVICE PANEL INVERTER CURRENT=47.5A MAX CURRENT=1.25X47.5=59.375A AWG#6 DERATED AMPACITY 75X0.87X1.0=65.25A, 65.25A>59.375A, THEREFORE AC WIRE SIZE IS VALID CALCULATIONS FOR CURRENT CARRYING CONDUCTORS: DC CONDUCTOR AMPACITY FROM MODULE TO JUNCTION BOX TO INVERTER IMAX PER BRANCH =IMPX1.25=15X1.25=18.75A AWG#10 DERATED AMPACITY 40X0.65X0.8=20.8A 20.8A>18.75A,THEREFORE DC WIRE SIZE IS VALID NOTE: UPGRADE THE MAIN PANEL FROM EXISTING 200/200 TO NEW 225/200 MAIN PANEL NOTE: PV BREAKER IN MAIN SERVICE PANEL SERVES AS A MEANS OF AC DISCONNECT 690.15(D)(1) SOLAR MODULE SPECIFICATIONS MANUFACTURER / MODEL #PANASONIC EVPV400H VMP 42.1V IMP 9.51A VOC 48.8V ISC 10.25A TEMP. COEFF. VOC -0.24%/°K MODULE DIMENSION 71.70"L x 40.00"W x 1.20"D (In Inch) PTC RATING 381.00W 18" 4 " 1 4 ° 6'-11" MAX 6'-0" 6'-0" 6'-0" MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 SOLAR PANEL PORTRAIT 2X4 TRUSS @ 24" O.C ATTACHMENT DETAILS PV5 1 ATTACHMENT TYPE: PEGASUS S TILE REPLACEMENT MOUNT (CONCRETE S TILE ROOF) SCALE: NTSPV5 2X4 TRUSSES @24"O.C (E)1/2" CDX PLYWOOD (2) 5/16"x3-1/2" SS LAG BOLT@ 6' O.C Max. OVER EXISTING SHEATHING AND ROOF TRUSSES AS SHOWN. MIN 2-1/2" PENETRATION IRONRIDGE XR10 RAIL (E)CONCRETE S TILE ROOF MAX 1 LAYER MASTIC, MESH AND MASTIC FLASHING PEGASUS S TILE REPLACEMENT MOUNT MS P JB IN V MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 ! WARNING ! ELECTRIC SHOCK HAZARD THE TERMINALS ON LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION (690.13(B) CEC AT ALL "J" BOXES, COMBINER BOX,ENCLOSURES/EMT ENCLOSURES/DISCONNECTS ! WARNING ! POWER SOURCE OUTPUT CONNECTIONS, DONOT RELOCATE THIS OVER CURRENT DEVICE NEC 705.12 (B)(2)(3)(b)PLACED ON MAIN PANEL/BREAKER LOCATION PV SOLAR BREAKER DO NOT RELOCATE THIS OVERCURRENT DEVICE PLACED ON SOLAR BREAKER ! WARNING ! ! WARNING ! DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC CEC 705.12 D(3),NEC 690.59 ON MAIN PANEL ! WARNING ! PHOTOVOLTAIC POWER SOURCE ON ALL CONDUITS SPACED AT MAX 10 FT PHOTOVOLTAIC SOLAR ON ROOF PLACARDS PV6A POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCE WITH DISCONNECT LOCATED AS SHOWN CAUTION PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT 47.5 A NOMINAL OPERATING AC VOLTAGE 240 V CEC 690.54 PLACED ON MAIN PANEL SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS WITHIN 3 FT OF MAIN PANEL/AC DISCONNECT/STRING INVERTER PLAQUES SHALL BE PLASTIC ENGRAVED IN A CONTRASTING COLOR TO THE PLAQUE. PLAQUE SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR ADHESIVE.WARNING LABELS WHITE LETTERS ON RED BACKGROUND AND NON-BOLD ARIAL OR SIMILAR FONT.MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT CEC 690.56 C(3) PLACED WITHIN 3 FT OF RAPID SHUT DOWN SWITCH DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ! WARNING ! PHOTOVOLTAIC POWER SOURCE CEC 690.31 (G)3-4 ON ALL EMT CONDUIT, ENCLOSURE,COMBINER BOXES,DISCONNECTS ! ! WARNING ! TURN OFF PHOTOVOLTAIC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27 C, COMBINER BOX, ENCLOSURE/CONDUIT ENCLOSURE/DISCONNECT RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM MAIN SERVICE PANEL AND SOLAR BREAKER INVERTER (IN GARAGE) PHOTOVOLTAIC SYSTEM MAXIMUM VOLTAGE 480V MAXIMUM CIRCUIT CURRENT 30.5A MAXIMUM RATED OUTPUT CURRENT DC-DC CONVERTER 15A PLACED ON INVERTER DC DISCONNECT LABEL ! WARNING ! TURN OFF AC DISCONNECT PRIOR TO WORKING INSIDE PANEL PLACED ON MAIN PANEL AGAVE LN MS P JB IN V MODULE WATT: 400 W (36)PANASONIC EVPV400H SYSTEM SIZE:14.40 KW DC (STC) :13.72 KW DC (PTC) :13.58 KW AC (CEC) (01)INVERTER:SOLAREDGE SE11400H-US (36)POWER OPTIMIZER: P505 AZIMUTH:180° ROOF TILT:14° MOUNTING HEIGHT:1-STORY SIGNATURE AND SEAL X STATE LICENSE#LICENSE CLASS C-46 EXPIRE DATE 02/29/2024 IAN TALLEY RESIDENCE JURISDICTION PALM DESERT CITY OF DRAWING INFORMATION REV # DESCRIPTION DATE PERMITTING DRAWN BY REVISION PROJECT NAME AND ADDRESS DATE:09/15/2022 SHEET NAME SHEET NUMBER 73625 AGAVE LN PALM DESERT,CA,92260 PHONE:(805)791-0876 OCCUPANCY TYPE:V-B GROUP:R APN:655110014 SJ SUNLOGIX ENERGY 77585 ENFIELD LN SUITE A PALM DESERT,CA,92211 PHONE:760-844-6507 CONTRACTOR:ZACHARY N GAMEZ 1063414 OPTIMIZER CHART PV6B OPTIMIZERS/MICRO-INVERTERS CHART 73625 AGAVE LN PALM DESERT, CA 92260 TALLEY, IAN Prepared For: SUN LOGIX 77585 ENFIELD LN, SUITE A PALM DESERT, CA 92211 760-844-6507 Design Criteria 1- Code: CALIFORNIA BLDG CODE 2019 / ASCE 7-16 2 - Wind: 97 MPH, Exposure: C 3 - Wood Species: DF-L No. 1 (SG = 0.5 ) Notice: Use restrictions of these calculations. The attached Calculations are valid only when bearing original signature hereon. Contractor/Client to verify existing dimensions/conditions prior to construction & solar racking is installed per manufacturer span requirements. The use of these calculations is solely intended for the above mentioned project. 1-844-PV ELITE | info@yoursolarplans.com 3000 E. Birch Street Suite 201 | Brea CA 92821 9/15/2022 Structural Calculations for SOLAR POWER SYSTEM CONNECTION CHECK AT: Job: 9/15/22, 3:57 PM ATC Hazards by Location https://hazards.atcouncil.org/#/wind?lat=33.6963085&lng=-116.3799645&address=73625 Agave Ln%2C Palm Desert%2C CA 92260 1/1 This is a beta release of the new ATC Hazards by Location website. Please contact us with feedback. The ATC Hazards by Location website will not be updated to support ASCE 7-22. Find out why. Hazards by Location Search Information Address:73625 Agave Ln, Palm Desert, CA 92260 Coordinates:33.6963085, -116.3799645 Elevation:460 ft Timestamp:2022-09-15T22:57:43.531Z Hazard Type:Wind ASCE 7-16 MRI 10-Year 67 mph MRI 25-Year 73 mph MRI 50-Year 78 mph MRI 100-Year 83 mph Risk Category I 91 mph Risk Category II 97 mph Risk Category III 103 mph Risk Category IV 108 mph ASCE 7-10 MRI 10-Year Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. MRI 25-Year Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. MRI 50-Year Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. MRI 100-Year Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. Risk Category I Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. Risk Category II Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. Risk Category III-IV Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. ASCE 7-05 ASCE 7-05 Wind Speed Special Region mph You are in a special wind region. Please contact the Authority Having Jurisdiction. The results indicated here DO NOT reflect any state or local amendments to the values or any delineation lines made during the building code adoption process. Users should confirm any output obtained from this tool with the local Authority Having Jurisdiction before proceeding with design. Please note that the ATC Hazards by Location website will not be updated to support ASCE 7-22. Find out why. Disclaimer Hazard loads are interpolated from data provided in ASCE 7 and rounded up to the nearest whole integer. Per ASCE 7, islands and coastal areas outside the last contour should use the last wind speed contour of the coastal area – in some cases, this website will extrapolate past the last wind speed contour and therefore, provide a wind speed that is slightly higher. NOTE: For queries near wind-borne debris region boundaries, the resulting determination is sensitive to rounding which may affect whether or not it is considered to be within a wind-borne debris region. Mountainous terrain, gorges, ocean promontories, and special wind regions shall be examined for unusual wind conditions. While the information presented on this website is believed to be correct, ATC and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in the report should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the report. 460 ft Map data ©2022 Google, INEGI Report a map error ASCE 29.4.4 Rooftop Solar Panels Parallel to the Roof Surface on Buildings of All Heights and Roof Slopes. Roof Slope =14 ° Roof Shape Gable Tributary Width s =6.00 ft Tributary Length l =2.99 ft Effective Area Ae =17.93 ft2 Height of Structure h =15 ft Wind Speed V =97 mph Exposure Category C Building Width B =60 ft Building Length L =60 ft Zone Width a =6ft Elevation Height zg =460 ft Wind Directionality Kd =0.85 Topography Factor Kt =1.00 Ground Elevation Factor Ke =0.98 Velocity Pressure Exposure Coefficient Kz =0.85 Velocity Pressure qz = 0.00256KzKztKdKeV2 =17.09 psf Solar Array Pressure Equalization a =0.76 Array Edge Factor E =1.50 Zone GCp p = qz(GCp)(E)(a) 3-- 3r 3.44 -67.48 3e 2.93 -57.53 2-- 2r 2.93 -57.53 2e - - 2n 2.93 -57.53 1-- 1' - - LAG SCREW ANALYSIS Loads Wind Pressures qz =-57.53 psf Solar Panel Load QD =3 psf Panel Length l =5.975 ft Panel Width b 3.3333 ft Attachment Spacing s =6ft Portrait Tributary Area At =17.93 ft2 Wind Load PW = qz * At =-1031 lbs Dead Load PD = QD * At =53.775 lbs Uplift Pa = 0.6 PD + 0.6 Pw =-586 lbs Landscape Tributary Area At = b * s =10 ft2 Wind Load PW = qz * At =-575 lbs Dead Load PD = QD * At =30 lbs Uplift Pa = 0.6 PD + 0.6 Pw =-327 lbs Lag Screw Specific Gravity of Lumber SG =0.50 (Douglas Fir-Larch) Diameter of Lag Screw D =5/16 in Withdraw Design /in 1800*SG3/2*D3/4 =266 lbs/in Depth of Embedment lp =2.50 in Total Nominal Withdrawal Value W = W * l p =665 lbs Load Duration Factor CD =1.6 Withdrawal Design Value W' = W * C D =1064 lbs Demand Capacity Ratio DCR = Pa / W'=0.55 < 1 OK ASCE 30.3.2 Design Wind Pressure Beam/ Top Chord Check Roof Slope =14 ° Roof Shape Gable Tributary Width s =2.00 ft Tributary Length L =27.67 ft Effective Area A = L ( MAX [ s , L/3] )=100 ft2 Height of Structure h =15 ft Wind Speed V =97 mph Exposure Category C Building Width B =60 ft Building Length L =60 ft Zone Width a =6ft Elevation Height zg =460 ft Wind Directionality Kd =0.85 Topography Factor Kt =1.00 Ground Elevation Factor Ke =0.98 Velocity Pressure Exposure Coefficient Kz =0.85 Velocity Pressure qz = 0.00256KzKztKdKeV2 =17.09 psf Internal Pressure Coefficient (GCpi)=-0.18 Zone GCp p = qz [(GCp) - (Gcpi)] 3-- 3r 1.80 -33.84 3e 2.25 -41.54 2-- 2r 2.25 -41.54 2e - - 2n 2.25 -41.54 1-- 1' - - Beam/ Top Chord Check Lumber: Moment Demand # of Attachment per Rafter NA =Span :Orientation Lenght (ft) : Dead Load Roof Material:QD =psf Live Load QLr =psf Wind Load p = psf Snow Load QS =psf Rafter Spacing s = in Wind Load, Portrait Portrait UL = Wind Load, Landscape Landscape UW = Linear Dead Load wd =plf Live Load wLr = plf Start ft Start ft End ft End ft Snow Load ws = plf Start ft Start ft End ft End ft Ma, Moment D lb-ft D+Lr lb-ft D+S lb-ft 0.6D+0.6W lb-ft D+0.45W+0.75Lr lb-ft D+0.45W+0.75S lb-ft Moment Capacity Framing Member Size Lumber Grade : DF-L No. 1 CM = 1 Ct = 1 Cr=CF = fb =psi Cfu =Ci = Breadth b = in Depth d = in Section Modulus Sx = bd 2 / 6 =in3 Bending Stress Capacity Fb = CM * Ct * Cr * C F * fb =psi Table 4.3.1 NDS 2015 Deflection Limit E = ksi I =in4 Transient Deflection in Transient Deflection Allowed > [OKAY] Total Deflection in Total Deflection Allowed > [OKAY] -41.54 DF-L No. 1 6 j lj (ft)pd,j (lbs) pw,j (lbs) ps,j (lbs) Portrait 1 6.4 53.8 -745 0.0 10.9 53.8 -745 -745 0.0 4 16.8 53.8 -745 0.0 0.0 5.00 7.00 7.00 7.00 1.67 Portrait 3 12.4 53.8 17.00 1234Eave 2 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 6 22.8 53.8 -745 0.0Portrait5 18.4 53.8 -745 0.0 34 40 0.0 0.0 0.0 0.0 0 0.0 Portrait 0 0.030 -415 0 0 0.0 0 5.67 0 0 0.0 Portrait 5.67 0.0Portrait0 0.0 0.0 AT (ft2) 17.925 10 pd (lbs) 53.775 -745 pw (lbs) ps (lbs) 0 23.60 2x4 1.15 1.5 27.67 23.60 27.67 1000 1.50 3.50 232 240 232 452 214 214 DCR 0.9 1553 psi D 908 psi 0.58 3.06 1725 CD Fb' = CD * Fb ASD Load Ma / Sx 1.15 1984 psi D+S 908 psi 0.46 OKAY OKAY 1.25 2156 psi D+Lr 942 psi 0.44 OKAY 1.6 2760 psi 0.194 433 120 1700 5.36 0.6D+0.6W 1772 psi 0.64 OKAY 1.0 1 20 0.00 24 Tile 0.183 460 180 1.6 2760 psi D+0.45W+0.75S 840 psi 0.30 OKAY 1.6 2760 psi D+0.45W+0.75Lr 840 psi 0.30 OKAY 𝑴𝒙ൌ𝑹𝒊ሺ𝒙െ𝑳𝒊ሻെ𝑷𝒋𝒙െ𝒍𝒋െ 𝒘𝒅𝒙𝟐 𝟐 ‐600.0 ‐400.0 ‐200.0 0.0 200.0 400.0 600.0 0.000 5.000 10.000 15.000 20.000 25.000 30.000 EISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2019 Part 10 Chapter 5 Section 502.5) PV System Weight Module Model Panasonic Panel Weight W panel =45lbs Number of Panels NPV =36 Total PV System Weight W PV = W panel * NPV =1620 lbs Existing Roof Weight Roof Weight QD =17.0 psf Building Length Lbuild =60 ft Building Width W build =60 ft Roof Area Abuild =3600 ft2 Building Perimeter Pbuild =240 ft Wall Height ht =8ft Wall weight Qwall =15 psf Interior wall weight Qint =10 psf Roof Load W floor = Abuild * QD =61200 lbs Wall LoadW wall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =32400 lbs Total Story Weight W build = W floor + W wall =93600 lbs Percentage Weight Increase WPV / Wbuild = 1.73% < 10% OKAY Updated August 2021 The City of Palm Desert has implemented an expedited solar permitting process for solar photovoltaic systems 20kW AC or less. This checklist is required to be attached to all solar permits 20kW or less and the below requirements in compliance at the time of inspection.  *HQHUDO5HTXLUHPHQWV •The photovoltaic system size is 20kW AC CEC rating or less. •The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. The roof structure must be sound with no more that two (2) roof covering materials. •The photovoltaic system is utility interactive (Battery storage is allowed). •Ground mounted PV system are not eligible and require a plan review. Planning Department Requirements •Existing Main Service Panel Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. •Maximum height of “tilted” panels shall not exceed eighteen (18) inches. •All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. •The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. •Modules shall be flush with one another and gaps between panels shall be minimized. •Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. Electrical Requirements •No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter:  No more than two strings per MPPT input where source circuit fusing is not included  Fuses (if needed) are rated to the series fuse rating of the PV module  No more than one non-inverter-integrated DC combiner is utilized per inverter •For central inverter systems: No more than two inverters are utilized. •The PV system is connected to the load side of the utility distribution equipment. •Load calculations are required when de-rating an Main Service or Sub Panel. •A Solar PV Standard Plan (California Solar Permitting Guide) and supporting documentation (if applicable). Structural Requirements •A completed Structural Criteria and/or supporting documentation is attached to the plan set. •All ballast designed systems require a formal plan review with supporting structural design and justification. •An inspector may require to sample roof attachment hardware for depth and proper materials. Fire Safety Requirements •Clear access pathways provided. •Fire classification photovoltaic system is provided. •All required marking and labels are provided. •A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Applicant Signature: _____________________________________Date:_______________ Project Address: ________________________________________________________ Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings Checklist - 20kW or less Page 1 of 4 The definition of “qualifying residential rooftop solar systems” is all of the following: A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ·A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. Electrical main panel upgrade included with solar plan (Review required if doubling in size) CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems—30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. 1.Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. Fire Marshall approval is not required for small residential rooftop systems at this time. Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2.Building Permit Application Form A permit application can be obtained in person or downloaded from the Department’s website at: www.cityofpalmdesert.org 3.Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria’s, standard plan review timetables apply. Please consult a licensed designed prof essional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 2 of 4 4.Project Submittal All projects can be submitted in person at:City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert, California 92260 5.Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6.Plan Review and Permit Fees ·Plan Review Fee is $203. ·Permit Fees are approximately $266 depending on archiving materials. 7.Minimum Plan Set Requirements ·Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11”X17” to Maximum of 24”X36”). Include a separate Site and Roof Layout Plan for the Riverside County Assessor’s Office. ·Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. ·Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal’s Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf ·Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. ·Product Specifications and Literature Provide all manufacturers’ specifications on all inverters, solar panels, combiner and discon nect boxes and solar panel anchorage system to be used. ·Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City’s website. All submittals must be signed by a C -10 (Electrical Contractor) or C-46 (Solar Contractor) or licensed design professional. Electrical Plans should include the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings . Make and model of inverter(s) and/or combiner box if used. Single line diagram of system . Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 3 of 4 If batteries are to be installed, include them in the diagram and show their locations and venting . Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705 . Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department’s website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: The type of roof covering and the number of roof coverings installed . Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system . As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760) 776- 6420 Monday through Friday (8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. Conductor’s ratings and sizes match plans. Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. Page 4 of 4 QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can save time and money by following these tips. Take time to review permit requirements of the local jurisdiction. Permitting rules and processes differ am ong different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. Contact the local electric utility early in the permitting process (solar PV installations). Local electric utilities have a completely separate approval process from the local jurisdiction’s permitting process. Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. Make sure that the solar installation that is built matches the submitted plans. The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections.