HomeMy WebLinkAbout2022-11-08 ARC Regular Meeting Agenda Packet City of Palm Desert Page 1 ARCHITECTURAL REVIEW COMMISSION CITY OF PALM DESERT, CALIFORNIA AGENDA (HYBRID MEETING) City Hall, Development Services Conference Room 73-510 Fred Waring Drive Palm Desert, CA 92260 Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference. There will be in-person public access to the meeting location. OPTIONS FOR PARTICIPATING IN THIS MEETING: • Attend the meeting in the Development Services Conference Room at Palm Desert City Hall, 73510 Fred Waring Drive, Palm Desert, CA 92260. • To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/83648797515, Zoom Webinar ID: 836 4879 7515. • To participate by telephone call (213) 338-8477 or (669) 219-2599, Zoom Webinar ID: 836 4879 7515. To provide a public comment please press *9 to raise your hand. • Written public comment may also be submitted to planning@cityofpalmdesert.org. Emails received by 9:30 a.m. prior to the meeting will be distributed to the Commission. Any correspondence received during or after the meeting will be distributed to the Commission as soon as practicable and retained for the official record. Emails will not be read aloud except as an ADA accommodation. 1. CALL TO ORDER 2. ROLL CALL 3. NON-AGENDA PUBLIC COMMENT: This time has been set aside for the public to address the Architectural Review Commission on issues that are not on the agenda for up to three minutes. Because the Brown Act does not allow the Commission to act on items not listed on the agenda, members may briefly respond or refer the matter to staff for a report and recommendation at a future meeting. 4. CONSENT CALENDAR: All matters listed on the Consent Calendar are considered routine and may be approved by one motion. The public may comment on any items on the Consent Agenda within the three-minute time limit. Individual items may be removed by Commissioners for a separate discussion. Tuesday November 8, 2022 12:30 p.m. Regular Meeting Architectural Review Commission Agenda November 8, 2022 City of Palm Desert Page 2 A. APPROVAL OF MINUTES RECOMMENDATION: Approve the Architectural Review Commission Regular Meeting minutes of October 25, 2022. CONSENT ITEMS HELD OVER: Items removed from the Consent Calendar for separate discussion will be considered at this time. 5. ACTION CALENDAR A. FINAL DRAWINGS 1. CASE NO: MISC21-0019 Amendment No.1 NATURE OF PROJECT/APPROVAL SOUGHT: Request for approval for a revision to the Design Review approval for the Lennar University Park Tract 36342 to allow a modification of propose roofing materials and fascia trim material. APPLICANT AND ADDRESS: Lennar Homes, Corona, CA 92879 LOCATION: University Park TTM 36342 ZONE: Planned Residential (PR) 18 units per acre RECOMMENDATION: 1. The ARC determines the requirements of the findings have been met based on staff’s analysis and approves the request with conditions. 2. The applicant shall select a new roof tile color for Color Scheme 8 – Adobe Ranch, which substantially conforms with the original approval. 3. The applicant shall revise the color scheme for existing units painted in Color Scheme 8 to ensure colors are compatible with the red roof color. 4. Modifications required by the ARC be added to the motion as conditions of approval. 2. CASE NO: MISC22-0013 Amendment No.1 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a revision to the Design Review approval for Mechanic’s Bank, a new 3,830 square-foot building located within the Jensen’s Shopping Center at 73611 Highway 111, and review of Architectural Review Commission conditions of approval. APPLICANT AND ADDRESS: McAuliffe & Co. Architects, Palm Desert, CA 92260 LOCATION: 73611 Highway 111 ZONE: Downtown Core Overlay (D-O) RECOMMENDATION: 1. The ARC determines the requirements of the findings have been met based on staff’s analysis and approves the request as presented. 2. Modifications required by the ARC be added to the motion as conditions of approval. Architectural Review Commission Agenda November 8, 2022 City of Palm Desert Page 3 B. MISCELLANEOUS 1. CASE NO: PP/CUP20-0003 NATURE OF PROJECT/APPROVAL SOUGHT: Final Review of Landscape Plans for Chandi Mixed Use. APPLICANT AND ADDRESS: Chandi Group USA, Indio, CA 92203 LOCATION: 73515 Fred Waring Drive ZONE: Downtown Edge District (DE) RECOMMENDATION: Non-Action Item 2. CASE NO: PP/CUP21-0004 NATURE OF PROJECT/APPROVAL SOUGHT: Final Review of Project Construction Plans for Vitalia Apartments. APPLICANT AND ADDRESS: Pacific West Communities, Inc., Eagle, ID. LOCATION: APN 694-310-009, Southwest corner of Gerald Ford Drive and Rembrandt Parkway ZONE: Planned Residential (PR) 20 units per acre RECOMMENDATION: Non-Action Item 6. INFORMATIONAL REPORTS & COMMENTS A. ARCHITECTURAL REVIEW COMMISSIONERS B. CITY STAFF • Construction Drawings Subcommittees C. ATTENDANCE REPORT 7. ADJOURNMENT: The next Regular Meeting will be held on November 22, 2022, at 12:30 p.m. Architectural Review Commission Agenda November 8, 2022 City of Palm Desert Page 4 AFFIDAVIT OF POSTING I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda for the Architectural Review Commission was posted on the City Hall bulletin board and City website not less than 72 hours prior to the meeting. Melinda Gonzalez Recording Secretary PUBLIC NOTICES Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the designated office for inspection of records in connection with this meeting is the Development Services Department, City Hall, 73-510 Fred Waring Drive, Palm Desert. Staff reports for all agenda items and documents provided to a majority of the legislative bodies are available for public inspection at City Hall and on the City’s website at www.cityofpalmdesert.org. Americans with Disabilities Act: It is the intention of the City of Palm Desert to comply with the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at this meeting, or in meetings on a regular basis, you will need special assistance beyond what is normally provided, the city will attempt to accommodate you in every reasonable manner. Please contact the Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the meeting to inform us of your needs and to determine if accommodation is feasible. City of Palm Desert Page 1 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES ARCHITECTURAL REVIEW COMMISSION CITY OF PALM DESERT, CALIFORNIA MINUTES (HYBRID MEETING) Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference and there will be no in-person public access to the meeting location. 1. CALL TO ORDER A Regular Meeting of the Architectural Review Commission was called to order by Chair Vuksic on Tuesday, October 25, 2022, at 12:31 p.m. 2. ROLL CALL Present: Commissioners Dean Wallace Colvard, Nicholas Latkovic, Michael McAuliffe, Francisco Sanchez, Vice Chair McIntosh, and Chair John Vuksic. Absent: None City Staff Present: Richard Cannone, Director of Development Services; Rosie Lua, Deputy Director of Development Services; Nick Melloni, Senior Planner, and Melinda Gonzalez, Recording Secretary, were present at Roll Call. 3. NON-AGENDA PUBLIC COMMENT Chair Vuksic opened and closed the non-agenda public comment period. No public comments were provided. 4. CONSENT CALENDAR Associated staff reports, memos, attachments, and discussion on the following items can be viewed by visiting the Architectural Review Commission Information Center website at, https://www.cityofpalmdesert.org/our-city/committees-and-commissions/commission- information. MOTION BY COMMISSIONER COLVARD, SECOND BY COMMISSIONER LATKOVIC, CARRIED 6-0, to approve the consent calendar. Tuesday October 25, 2022 12:30 p.m. Regular Meeting Architectural Review Commission Minutes October 25, 2022 City of Palm Desert Page 2 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES A. APPROVAL OF MINUTES MOTION BY COMMISSIONER COLVARD, SECOND BY COMMISSIONER LATKOVIC, CARRIED 6-0, to approve the Architectural Review Commission Special Meeting minutes of October 5, 2022. MOTION BY COMMISSIONER COLVARD, SECOND BY COMMISSIONER LATKOVIC, CARRIED 6-0, to approve the Architectural Review Commission Regular Meeting minutes of October 11, 2022, with comments. CONSENT ITEMS HELD OVER: Items removed from the Consent Calendar for separate discussion will be considered at this time. None 5. ACTION CALENDAR A. FINAL DRAWINGS 1. CASE NOS: PP/CUP22-0006 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration of a recommendation to the Planning Commission for approval of a Precise Plan, Conditional Use Permit, and a Mitigated Negative Declaration to construct a 394-unit market-rate multifamily community consisting of thirteen three-story apartment buildings, a two-story fitness center, a single-story clubhouse, two (2) pool areas, and private outdoor recreation areas on an 18.67-acre site located at the southwest corner of Frank Sinatra Drive and Portola Avenue (APNs: 620-400-030 and 620-400-031). APPLICANT AND ADDRESS: Hayes Dietrich, LLC, Edina, MN 55436 LOCATION: SW Corner of Frank Sinatra Drive and Portola Avenue ZONE: PR-22 (Planned Residential – 22 dwellings per acre) Senior Planner, Nick Melloni, narrated a PowerPoint presentation on the item and responded to Commission inquiries. Cody Dietrich and Calvin Hayes, Applicant(s), and their team including, Christine Pecard, with ESG Architecture and Design, and Mike Rowe, with MSA Consulting, presented additional details on the project and answered questions from the Commission. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Chair Vuksic opened the public comment period. The following comments were provided: Edith Taylor, a Palm Desert resident, asked if there were any changes to the proposed Type C building and voiced concerns regarding existing external guide poles and added there was discussion about having electrical installed underground. Jeff Cameron, a Palm Desert resident, voiced opposition for the project, stating the design appeared “corporate,” and not community. Further concerns included massing Architectural Review Commission Minutes October 25, 2022 City of Palm Desert Page 3 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES of buildings and the sound of traversing vehicles bouncing off building walls that are too close to the street. Cameron Cameron, a Palm Desert resident, voiced opposition for the project, noting concerns regarding overall building height including revised parapets which add height. Further concerns were regarding the project design which was compared to a school dormitory and presented utilitarian and boxy. Linda James, a Palm Desert resident, voiced concerns regarding the building height which will block her views. Pam Hoekstra, a Palm Desert resident, voiced concerns regarding added height to three story buildings placed on a grade that sits higher than the curb. Further concerns were the building design which presented as industrial and requested assurance the proposed landscaping will be part of the final landscape plan. There being no others desiring to speak, the public comment period was closed. Following discussion, MOTION BY CHAIR VUKSIC, SECOND BY COMMISSIONER MCAULIFFE, CARRIED 6-0 to: 1. Recommendation of denial of Case No. PP/CUP22-0006 with comments. 2. Balconies should be better integrated into the architectural design. 3. Revisit horizontal eyebrow element. 4. Revisit sloped parapets, including visibility of backside of parapet at its peak, ensure it cannot be seen by the public from all vantage points. If peak is visible ensure its massing is such that it appears as three-dimensional architecture. 5. Revisit and improve massing along street frontages to break down massing, create better hierarchy, and variation. 6. Create more interest through use of one and two-story elements that overlap different vertical sections of the building. During the course of deliberation, individual Commissioner(s) offered commentary as follows. The below points do not necessarily reflect consensus: • Support for incorporating more green space as shown in alternative parking option plan provided by applicant. • Revisit horizontal eyebrow element incorporated into the balconies, integrate element into building versus it appearing as an extension to the building. • Consider variation in building types and setbacks to avoid repetition and allow relief of large masses along street frontages. • Reconsider sloped parapets, they do not enhance architecture, high corners are not cohesive with desert architecture, and add height that is unnecessary. • Building walls appear flat, add more depth in between planes. • Revisit metal panel elements and how they terminate into window. • Walls at stairwells and balconies need to be thickened. 2. CASE NOS: MISC22-0009 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a request for a new front entry façade modification and minor addition to the Palm Desert Community Center located within the Civic Center Park. Architectural Review Commission Minutes October 25, 2022 City of Palm Desert Page 4 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES APPLICANT AND ADDRESS: Desert Recreation District, Indio, CA 92201 LOCATION: 43900 San Pablo Avenue ZONE: Public (P) Senior Planner, Nick Melloni, narrated a PowerPoint presentation on the item and responded to Commission inquiries. Troy Strange, Applicant, and his architect, Matt Acton with Holt Architecture, presented additional details on the project and answered questions from the Commission. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Chair Vuksic opened and closed the public comment period. No public comments were provided. Following discussion, MOTION BY VICE CHAIR MCINTOSH, SECOND BY COMMISSIONER LATKOVIC, CARRIED 6-0 to: 1. Approve Case No. MISC22-0009 with conditions. 2. Narrow entry signage a minimum of six inches from top and bottom. 3. Revisit size, scale, and placement of Desert Recreation District logo placed in recess next to the entry door to avoid overcrowding of area. During the course of deliberation, individual Commissioner(s) offered commentary as follows. The below points do not necessarily reflect consensus: • Recommend “Palm Desert Community Center” be placed in a single line on entry signage. • Consider use of light or light fixtures to accent building walls. • Consider removing spokes on back of entry signage and make it a solid cover. • Consider extending spokes past front of entry signage to add an additional element of design. 3. CASE NOS: PP/EA 22-0005 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration of a recommendation to the Planning Commission for approval of a Precise Plan for West Coast Storage Facility, a 53,604 square-foot personal storage facility located at the northwest corner of Dick Kelly Drive and Dinah Shore Drive. APPLICANT AND ADDRESS: Scott A. Mommer Consulting, Peoria AZ, 85383 LOCATION: NWC - Dick Kelly Drive and Dinah Shore Drive ZONE: Service Industrial (SI) Senior Planner, Nick Melloni, narrated a PowerPoint presentation on the item and responded to Commission inquiries. Scott Mommer, Applicant, and his team including Christian Serrano, Jim Fitzpatrick, Architects, and Collen Nolan, Landscape Architect, presented additional details on the project and answered questions from the Commission. Architectural Review Commission Minutes October 25, 2022 City of Palm Desert Page 5 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES Discussion on the item ensued with Commissioners providing comments and concerns for the project. Chair Vuksic opened and closed the public comment period. No public comments were provided. Following discussion, MOTION BY COMMISSIONER MCAULIFFE, SECOND BY COMMISSIONER LATKOVIC, CARRIED 6-0 to: 1. Approve Case No. PP/EA22-0005 with conditions. 2. Remove the four storage units which connect the east and west building segments and replace with a further recessed screen wall and additional landscaping. 3. Remove sloped metal panel detail and change to a vertical detail which stops approximately 12 inches from the top of parapet. (Reference Pg. A-9) 4. Cobble be further studied per Commission’s comments as to the layout. The design should incorporate a more continuous undulating design. 5. Signage shall comply with the Palm Desert Municipal Code and not utilize raceways, backers, or phone numbers. 6. The walls of the trash enclosure shall be finished with stucco to match the primary building. 7. All roof mounted mechanical equipment should be screened from all vantages of surrounding public areas with consideration to the varying parapet heights. 8. The offsets of the masses shown in the presentation be maintained as the project is developed into construction documents. 9. Any glass not under an awning be recessed a minimum of six inches from any and all adjacent surfaces. During the course of deliberation, individual Commissioner(s) offered commentary as follows. The below points do not necessarily reflect consensus: • Be mindful of ribbed line detail of metal panels used for tower element as this will be reviewed in the project’s final construction documents. B. MISCELLANEOUS None 6. INFORMATIONAL REPORTS & COMMENTS A. ARCHITECTURAL REVIEW COMMISSIONERS In response to inquiry, Deputy Director of Development Services, Rosie Lua, informed the ARC’s comments regarding the denied case would be conveyed to the next body who reviews and takes action on the project. Because the case is a Precise Plan Application and a Condition Use Permit Application staff will seek clarification from the City attorney as to whether the project will be reviewed by the Planning Commission or City Council. Brief discussion was held on the sculptures that are planned to be installed and those that are already installed on the roundabouts on San Pablo. Vice Chair McIntosh left the meeting at 3:45 p.m. due to a conflicting obligation. Regarding inquiry of a potential project near the entrance of Desert Willow, Deputy Director Lua and Senior Planner, Nick Melloni, reported this area has been used for different purposes including a staging area for DSRT Surf, a storage area for the City Architectural Review Commission Minutes October 25, 2022 City of Palm Desert Page 6 ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES during a rehabilitation project for Cook street, and a storage area for a rehabilitation project for Southern California Edison. Deputy Director Lua and Senior Planner Melloni provided explanation as to Palm Desert Municipal Code Ordinance 25.68.40 Findings of the ARC, Section C, and general purview of the ARC, in response to request for clarification. B. CITY STAFF Deputy Director Lua and Senior Planner Melloni provided an update on Palm Villas Apartments, Refuge Specific Plan which was approved through the Planning Commission and the Smartlink Group AT&T monopalm cell tower. C. ATTENDANCE REPORT The attendance report was provided with the agenda materials. The Commission took no action on this matter. 7. ADJOURNMENT The Architectural Review Commission adjourned at 4:07 p.m. Respectfully submitted, Melinda Gonzalez, Senior Administrative Assistant Recording Secretary ATTEST: Rosie Lua, Deputy Director of Development Services Secretary APPROVED BY ARC: __/__/2022 CITY OF PALM DESERT DEVELOPMENT SERVICES DEPARTMENT ARCHITECTURAL REVIEW COMMISSION MEMORANDUM To: Honorable Chair and Members of the Commission From: Nick Melloni, Senior Planner Date: November 8, 2022 Case No: MISC 21-0019 – Amendment #1 Subject: Consideration of a revision to the Design Review approval for the Lennar University Park Tract 36342 to allow a modification of propose roofing materials and fascia trim material. BACKGROUND On August 24, 2021, the Architectural Review Commission (ARC) approved Case No. MISC21- 0019 for a design review of the architecture for a 196-unit residential tract located at the northwest corner of University Park Drive and College Drive. The project was approved in a 6-0 vote subject to the following condition of approval: 1) Applicant will provide accurate color samples for the revised color schemes to Planning Staff. Per the requirement of the condition, the applicant provided the revised color scheme containing eight total schemes to Planning Staff. Staff received the update and granted approval of a building permit. During development, the applicant selected an alternative roof tile for each of the eight approved color schemes. This revision will require the approval of a design review amendment by the ARC. Staff has reviewed the color schemes and finds the colors substantially conform with the ARC approval, which the exceptions of the roofing for scheme 2 and scheme 8. Staff has provided further analysis and recommendations in this staff report. In addition to the revision to the color scheme, the applicant is requesting the ARC approve a change to the existing building fascia trim from a Hardie board material to a wooden fascia trim. PROJECT SUMMARY Project Description The project is a request by the applicant, Lennar, to revise the roof tile and fascia trim of an approved residential tract. The tract is a non-gated community comprised of a mix of two-story residential product types including 64 duplex units, 84 cluster units, and 48 single-family detached lots, totaling 196 dwelling units. MISC 21-0019 – Lennar 196 Amendment No.1 Page 2 of 5 November 8, 2022 The applicant has proposed an alternative roof tile for each of the eight-unit types. Staff has reviewed the proposed tiles and found them to be in substantial conformance with the original approval with the exception of Color Scheme 2 and Color Scheme 8. The community is presently under construction and nearing completion of its first phase consisting of 24 units. There are some instances of Color Schemes 2 and 8 which are nearly completed with the new roof tiles. Roof Tile Modifications Figure 1 - Color Scheme 2 - Spanish Original Final MISC 21-0019 – Lennar 196 Amendment No.1 Page 3 of 5 November 8, 2022 The proposed color of the new tile for Color Scheme 2 is notably redder than the original approval. Staff finds that, though there is a variation, the color is consistent with the traditional Spanish style roof color and recommends approval. Figure 2 - Color Scheme 8 - Adobe Ranch Original Final The proposed tile is notably different in terms of shape and color. The original roof tile was a flatter tile finished in a blend of grey, brown and taupe. The proposed tile is an “S” shape and features an earthen red color. Staff recommends the ARC direct the applicant to revise the roof tile for Scheme 8 to a more consistent color consisting of greys and browns on all future units. Staff also MISC 21-0019 – Lennar 196 Amendment No.1 Page 4 of 5 November 8, 2022 recommends that the ARC direct the applicant to prepare an alternative color scheme for any existing units developed with Color Scheme 8 to ensure the existing roof color is compatible with exterior paint colors. Fascia Trim Modification The residential architecture of the tract was approved with fascia trim constructed using cementitious fiber boards (Hardie Board). During construction, the applicant has found that this material breaks easily and is causing delays and repairs to units. This also creates a concern for the long-term maintenance of the trim as future homeowners cannot alter the trim. The image below (Figure 3) shows an instance where the hard facia has been damaged on an existing unit. Figure 3 – Broken Hardie Board Fascia In response to this issue, the applicant is requesting ARC approval to utilize wood instead of the Hardie Board for the fascia trim. The ARC has voiced concerns over the maintenance issues associated with wood due to sun damage. The applicant finds that the maintenance of wood will lead to fewer issues than Hardie Board for future homeowners and will rely upon the Homeowner’s Association (HOA) to ensure the wood is maintained. MISC 21-0019 – Lennar 196 Amendment No.1 Page 5 of 5 November 8, 2022 ANALYSIS Development Standards The proposed changes do not alter the development standards of the existing units. The changes are only exterior material changes, and the project is still in conformance with the original approval. ZONING ORDINANCE SUMMARY ARC approval is required for all design reviews applications per PDMC Section 25.68.020 (A). The original case was approved by the ARC and therefore, substantial alterations to the plan must return for ARC approval. STAFF RECOMMENDATION Staff recommends the ARC determines that the requirements of the findings have been met based on the analysis and approves the request as presented with the following condition: 1. The applicant shall select a new roof tile color for Color Scheme 8 – Adobe Ranch, which substantially conforms with the original approval. 2. The applicant shall revise the color scheme for existing units painted in Color Scheme 8 to ensure colors are compatible with the red roof color. If major design comments arise during the discussion, Staff recommends the ARC clearly outline the requested changes and incorporate the comments as conditions of approval. Attachment: 1. Project Exhibits from the Applicant 2. ARC Notice of Action dated September 2, 2021 3. ARC Minutes dated August 24, 2021 October 27, 2022 City of Palm Desert RE: University Park by Lennar It has come to our attention that the color and materials the city has on file for the community University Park by Lennar Homes have not been updated after a necessary change to the manufacturer of the roof tiles. The roof tiles on the approved color and materials boards are manufactured by Eagle. As construction approached because of availability, lead time and generally supply chain issues it was necessary to change to Boral roofing. Boral is able to commit to Lennar to deliver the type, color and quantities within the construction schedule with an agreeable contract. KTGY facilitated this change in manufacture by selecting comparable types and colors by Boral. We believe the change of manufacturer does not affect the character, aesthetic, or design vision of the homes or community as approved by the city. The selected colors and type of roof tiles for the construction of the homes are substantially equivalent to those approved by the city of Palm Desert. Sincerely, KTGY Group, Inc. Lennar Homes Jennifer Johnson Chris Texter, AIA Jennifer Johnson Principal Project Manager 12 5 Architecture + Planning 888.456.5849 ktgy.com UNIVERSITY PARK - DUETS PALM DESERT, CA # 2020-0836 SCHEMATIC DESIGN April 6, 2021 Lennar Inland Empire 980 Montecito Drive Suite 302 Corona, CA 92879 951.817.3500 A1.1.3ADOBE RANCH ELEV. PLAN 1-204812OCTOBER 28, 2022 COLOR BOARD COLOR SCHEMES INDICATE TYPICAL COLOR AND MATERIAL APPLICATION ALL PAINT TO BE SHERWIN WILLIAMS OR EQUAL (STUCCO TO BE OMEGA - SAND FINISH) ALL MASONARY TO BE KONI PRODUCT OR EQUAL ALL ROOFING TO BE BORAL ROOFING PRODUCT OR EQUAL (DUE TO VARIATIONS IN COLOR PRINTERS, SEE PAINT CHIPS FOR ACTUAL COLORS) BLACK FOX (SW7020)GRIFFIN (SW7026)BLACK BEAN (SW6006) BLACK MAGIC (SW6991)BLACK MAGIC (SW6991)BLACK MAGIC (SW6991) ACCENTS|TRIM|EAVE ACCENTS|TRIM|EAVE ACCENTS|TRIM|EAVE WROUGHT IRON WROUGHT IRON WROUGHT IRON DEEP MAROON (SW0072)GRANITE PEAK (SW6250)FRENCH ROAST (SW6069) BUNGLEHOUSE BLUE (SW0048) DRIED THYME (SW6186)GARRET GRAY (SW6075) LIBRARY PEWTER (SW0038)SEALSKIN (SW7675)BITTER CHOCOLATE (SW6013) ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERSENTRY DOOR|SHUTTERS 2 (DUETS ONLY) ENTRY DOOR|SHUTTERS 2 (DUETS ONLY) ENTRY DOOR|SHUTTERS 2 (DUETS ONLY) GARAGE DOOR GARAGE DOOR GARAGE DOOR COLOR SCHEME 1 SPANISH COLOR SCHEME 2 SPANISH COLOR SCHEME 3 SPANISH GARNET BLEND LOW ‘S’ PROFILE - 1VICS 3182 CAL MISSION BLEND LOW ‘S’ PROFILE - 1VICS 6464 RED CASTLE LOW ‘S’ PROFILE - 1VICS 7970 ROOFING ROOFING ROOFING SW7008 = 1/2A 872 BASE 10 OMEGA 20/30 SAND SW7011 = 1/2A 713 BASE 10 OMEGA 20/30 SAND STUCCO BODY 1 STUCCO BODY 1 STUCCO BODY 1 SW6154 = 1/2 15 BASE 2 OMEGA 20/30 SAND 12 5 Architecture + Planning 888.456.5849 ktgy.com UNIVERSITY PARK - DUETS PALM DESERT, CA # 2020-0836 SCHEMATIC DESIGN April 6, 2021 Lennar Inland Empire 980 Montecito Drive Suite 302 Corona, CA 92879 951.817.3500 A1.1.3ADOBE RANCH ELEV. PLAN 1-204812OCTOBER 28, 2022 COLOR BOARD COLOR SCHEMES INDICATE TYPICAL COLOR AND MATERIAL APPLICATION ALL PAINT TO BE SHERWIN WILLIAMS OR EQUAL (STUCCO TO BE OMEGA - SAND FINISH) ALL MASONARY TO BE KONI PRODUCT OR EQUAL ALL ROOFING TO BE BORAL ROOFING PRODUCT OR EQUAL (DUE TO VARIATIONS IN COLOR PRINTERS, SEE PAINT CHIPS FOR ACTUAL COLORS) DOMINO (SW6989) GARRET GRAY (SW6075)IRON ORE (SW 7069) STUCCO BODY 1 STUCCO BODY 1STUCCO BODY 2 STUCCO BODY 2 TRIMS|EAVES TRIMS|EAVES| GARAGE DOOR 2 (DUET ONLY) TRIMS|EAVES| GARAGE DOOR 2 (DUET ONLY) UNUSUAL GRAY (SW7059)TURKISH COFFEE (SW6076)WILLOW TREE (SW 7741) BLACK BEAN (SW6006) NAVAL (SW6244)GRIZZLE GRAY (SW 7068) UNUSUAL GRAY (SW7059)CYBERSPACE (SW7076)ROYCROFT PEWTER (SW 2848) ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERSENTRY DOOR 2 | GARAGE DOOR 2 (DUET ONLY) ENTRY DOOR 2 (DUET ONLY)ENTRY DOOR 2 (DUET ONLY) GARAGE DOOR GARAGE DOOR GARAGE DOOR COLOR SCHEME 4 DESERT PRAIRIE COLOR SCHEME 5 DESERT PRAIRIE COLOR SCHEME 6 DESERT PRAIRIE CHARCOAL BROWN BLEND FLAT SHAKE - 1FBCJ 1132 BRONZE PEARL BLEND FLAT SHAKE - 1FBCJ 0300 CHARCOAL BLEND FLAT SHAKE - 1FBCJ 1430 KONI - CASTLE STONE COUNTRY KONI - CAST24 NUAGE KONI - CASTLE STONE GREY ROOFING ROOFING ROOFING STONE STONE STONE STUCCO BODY 1 STUCCO BODY 2 SW6000 = D217 BASE 10 OMEGA 20/30 SAND SW7060 = 956 OMEGA 20/30 SAND SW7009 = 1/4 12 BASE 10 OMEGA 20/30 SAND SW7038 = A 897 OMEGA 20/30 SAND SW7656 = 3/8A 69 BASE 10 OMEGA 20/30 SAND SW7046 = 935 OMEGA 20/30 SAND 12 5 Architecture + Planning 888.456.5849 ktgy.com UNIVERSITY PARK - DUETS PALM DESERT, CA # 2020-0836 SCHEMATIC DESIGN April 6, 2021 Lennar Inland Empire 980 Montecito Drive Suite 302 Corona, CA 92879 951.817.3500 A1.1.3ADOBE RANCH ELEV. PLAN 1-204812OCTOBER 28, 2022 COLOR BOARD COLOR SCHEMES INDICATE TYPICAL COLOR AND MATERIAL APPLICATION ALL PAINT TO BE SHERWIN WILLIAMS OR EQUAL (STUCCO TO BE OMEGA - SAND FINISH) ALL MASONARY TO BE KONI PRODUCT OR EQUAL ALL ROOFING TO BE BORAL ROOFING PRODUCT OR EQUAL (DUE TO VARIATIONS IN COLOR PRINTERS, SEE PAINT CHIPS FOR ACTUAL COLORS) SMOKEHOUSE (SW7040)SUITABLE BROWN (SW7054) MEADOW TRAIL (SW7737) STUCCO BODY 1 STUCCO BODY 1 STUCCO BODY 1 BLACK FOX (SW7020)STILL WATER (SW6223)TERRA BRUN (SW6048) DOWNING SLATE (SW2819)RETREAT (SW6207)HOT COCOA (SW6047) URBANE BRONZE (SW7048)COCOON (SW6173)THUNDER GRAY (SW7645) ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERS ENTRY DOOR|SHUTTERSENTRY DOOR|SHUTTERS 2 (DUETS ONLY) ENTRY DOOR|SHUTTERS 2 (DUETS ONLY) ENTRY DOOR|SHUTTERS 2 (DUETS ONLY) GARAGE DOOR GARAGE DOOR GARAGE DOOR COLOR SCHEME 7 ADOBE RANCH COLOR SCHEME 8 ADOBE RANCH COLOR SCHEME 9 ADOBE RANCH CLIFFSIDE LOW ‘S’ TILE - 1VICS 3940 CASA GRANDE LOW ‘S’ TILE - 1VICS 6169 APPLE BARK LOW ‘S’ TILE - 1VICS 0431 KONI - CANYON STONE RANCH KONI - CANYON STONE MONTANA KONI - CANYON STONE SANTA FE ROOFING ROOFING ROOFING STONE STONE STONE TRIM/POSTS/SIDING/RAILING/CORBELS/RAFTERS/GARAGE DOOR 2 (DUETS ONLY) TRIM/POSTS/SIDING/RAILING/CORBELS/RAFTERSTRIM/POSTS/SIDING/RAILING/CORBELS/RAFTERS/GARAGE DOOR 2 (DUETS ONLY) SW7037 = 1 1/4 - 437 OMEGA 20/30 SAND SW6155 = 434 BASE 2 OMEGA 20/30 SAND SW6070 = A 296 BASE 1 OMEGA 20/30 SAND ARCHITECTURAL REVIEW COMMISSION NOTICE OF ACTION September 2, 2021 Lennar Homes 980 Montecito Drive, Suite 302 Corona, CA 92879 Subject: Consideration to approve a request for architectural elevations and a landscape plan for 196 units; 64 duplex units, 84 cluster units, 48-single-family homes, and a recreation building. The Architectural Review Commission of the City of Palm Desert considered your request and took the following action at its meeting of August 24, 2021: By Minute Motion, the Architectural Review Commission approved Case No. MISC 21-0019 subject to the following: 1) Applicant will provide accurate color samples for the revised color schemes to Planning Staff. The motion carried with a 6-0 vote with Commissioner Vuksic ABSENT. Any appeal of the above action may be made in writing to the City Clerk of the City of Palm Desert within 15 days of the date of the decision. If you have any questions, please contact Associate Planner Kevin Swartz at (760) 346-0611, Extension 485 or kswartz@cityofpalmdesert.org. Sincerely, ROSIE LUA, SECRETARY ARCHITECTURAL REVIEW COMMISSION cc: File MINUTES ARCHITECTURAL REVIEW COMMISSION AUGUST 24, 2021 3 LOCATION: 73100 El Paseo, Suites 1 & 2 ZONE: D Associate Planner, Nick Melloni, presented the item. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Upon a motion by Commissioner Mireles, seconded by Commissioner McAuliffe, and a 6-0 vote of the Architectural Review Commission, Case No. MISC 21-0024, was approved subject to the following: 1) Final engineering drawings shall include an accurate rendering showing the level of visibility of the steel staircase structure through the decorative breeze block wall on the north side of the building. (AYES: Lambell, Latkovic, McAuliffe, McIntosh, Mireles, and Van Vliet; NOES: None; ABSENT: Vuksic). 3. CASE NO: SARC 21-0009 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a request for a sign program for six (6) exterior wall signs and one (1) blade sign for Leeds and Son Fine Jewelers. APPLICANT AND ADDRESS: Best Signs, Inc., Palm Springs, CA 92264 LOCATION: 73670 El Paseo ZONE: D Associate Planner, Nick Melloni, presented the item. Mr. Melloni stated this item was previously brought before the ARC for review in February 2021 for a façade modification which was approved by the Commission. The item is being brought back to the ARC for approval of a master sign program. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Upon a motion by Commissioner Latkovic, seconded by Commissioner Mireles, and a 5-1 vote of the Architectural Review Commission, Case No. SARC 21-0009, was approved as presented, subject to the following: 1) Exceptions for inclusion of the Blade Sign in the master sign program, as well as the exceeded signage area limit on the north elevation are approved; and 2) Flag Banner sign is not approved for inclusion in the master sign program. (AYES: Lambell, Latkovic, McAuliffe, McIntosh, Mireles; NOES: Van Vliet; ABSENT: Vuksic). 4. CASE NO: MISC 21-0019 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a request for architectural elevations and a landscape plan for 196 units; 64 duplex units, 84 cluster units, 48 single-family homes, and a recreation building. APPLICANT AND ADDRESS: Lennar Homes, Corona, CA 92879 LOCATION: University Park TTM 36342 ZONE: PR-18 MINUTES ARCHITECTURAL REVIEW COMMISSION AUGUST 24, 2021 4 Associate Planner, Kevin Swartz, presented the item. Mr. Swartz turned the presentation over to the applicant, Lennar, whose team provided a detailed presentation on revisions to the project. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Upon a motion by Commissioner Latkovic, seconded by Commissioner Mireles, and a 6-0 vote of the Architectural Review Commission, Case No. MISC 21-0019, was approved subject to the following: 1) Applicant will provide accurate color samples for the revised color schemes to Planning Staff. (AYES: Lambell, Latkovic, McAuliffe, McIntosh, Mireles, and Van Vliet; NOES: None; ABSENT: Vuksic). B. PRELIMINARY PLANS None C. MISCELLANEOUS ITEMS None VI. COMMENTS Associate Planner, Kevin Swartz, provided an update for the Chandi Project on San Pablo and Fred Waring. Mr. Swartz advised the applicant submitted their construction drawings which has gone through its first round of review and was returned to the applicant. The applicant is currently working on revisions for their second submittal. Mr. Swartz provided an update for Avenida Palm Desert. Avenida Palm Desert, recently submitted renderings for the screening of the roof top equipment. It is anticipated the applicant will present their request to the ARC in September. Mr. Swartz provided an update for Sinclair Gas Station. Sinclair has indicated they would like to keep the current landscape modifications as is. Mr. Swartz stated he will take photos of the modifications and present them to the Commission at a future ARC meeting for consideration. Associate Planner, Nick Melloni, provided an update for the Abronia Trail 4-plex. Mr. Melloni reported the applicant appealed the ARC’s denial and is scheduled to go before City Council on August 26, 2021. The staff report provided to City Council is available for Commissioners to review. Mr. Melloni explained City Council can either deny their request or approve it, which would allow the project to move forward to the Planning Commission. Principal Planner, Rosie Lua, provided the Commission with an update regarding recent City staff promotions, transfers, and changes. At the request of Commissioner McAuliffe, a final staff organization chart will be provided to Commissioners. CITY OF PALM DESERT DEVELOPMENT SERVICES DEPARTMENT ARCHITECTURAL REVIEW COMMISSION MEMORANDUM To: Honorable Chair and Members of the Commission From: Nick Melloni, Senior Planner Date: November 8, 2022 Case No: MISC 22-0013 – Amendment #1 Subject: Consideration to approve a revision to the Design Review approval for Mechanic’s Bank, a new 3,830 square-foot building located within the Jensen’s Shopping Center at 73611 Highway 111, and review of Architectural Review Commission conditions of approval. BACKGROUND On August 23, 2022, the Applicant, McAuliffe & Co. Architects received approval by the Architectural Review Commission (ARC) for Case No. MISC22-0013 for the development of a new multi-tenant commercial building located at 73611 Highway 111, for the Merchant’s Bank. The project was approved in a 4-0-1 vote (Commissioner McAuliffe Absent) with the following comments: 1) Add landscape in the area between the proposed block wall and public sidewalk on the north and east portions of the property; and 2) Applicant will return to the ARC for review of a more developed illustration of rake detail including how detail terminates into the surrounding element prior to building permit issuance and specific details for proposed wood fascia siding. In accordance with the ARC conditions set forth on August 23, 2022, the applicant has prepared responses and illustrations to the comments. A summary of the responses is included below. In addition, the applicant is requesting the ARC consider a revision to the exterior façade that replaces the tile roof material with standing seam metal roof material. PROJECT SUMMARY A. Property Description: The project site is a vacant pad located at 73611 Highway 111, within the Jensen’s Shopping Center at the southwest corner of Highway 111 and Larkspur Lane. The pad is located on a 0.41- acre parcel which is improved with parking and vehicular drive aisles. The frontage of the parcel is fully improved with curb, gutter, and sidewalk. The parcel was previously developed as a gas MISC 22-0013 - Mechanics Bank Page 2 of 4 November 8, 2022 station which was demolished in 2018. The buildings within the shopping center were originally constructed in the late 1960’s and underwent a façade improvement in 2019. B. Zoning and General Plan Designation: Zone: Downtown Core Overlay (D-O) General Plan: Downtown / Town Center C. Adjacent Zoning and Land Use: North: Downtown Edge (DE) – Commercial buildings South: D-O – Commercial shopping center (Jensen’s Shopping Center) East: Downtown (D) – Multi-tenant commercial building (Fountain Plaza) West: D-O – Commercial shopping center (Jensen’s Shopping Center) Project Description The overall project is to construct a 3,830 square-foot building to be occupied by Mechanics Bank. The building will be occupied by a single tenant at this time, however, the space is designed to accommodate up to two tenant spaces and may be subdivided in the future. The ARC approved the project subject to conditions on August 23, 2022. The applicant has responded to the following conditions of the ARC as follows: 1) Add landscape in the area between the proposed block wall and public sidewalk on the north and east portions of the property; Original Final The applicant has amended the landscape plan to include additional landscape plantings between the block wall and sidewalk along Highway 111, reference Sheets L1.0 (color and black and white). These plantings include red tipped yucca, smooth agave, aloe vera, thunder cloud and Mediterranean fan palm. A comparison of the original plan and the proposed plan is shown above. Staff finds the condition is satisfied by the additional plantings. MISC 22-0013 - Mechanics Bank Page 3 of 4 November 8, 2022 2) Applicant will return to the ARC for review of a more developed illustration of rake detail including how detail terminates into the surrounding element prior to building permit issuance and specific details for proposed wood fascia siding. Original Final The applicant has provided three details for the roof rake detail on Sheet A-501, which includes a section detail of the rake at the building corner, a section of where the rake adjoins the wall (tower element), and a perspective view. In addition to the updates in accordance with the conditions of approval, the applicant has proposed a revision to the roof material of the building. The change is from a concrete roof tile to a standing seam metal. Staff finds the change improves the architecture as the low roof pitch and contemporary building forms are better suited to the new material. Original Amendment Site Plan and Parking No changes are proposed to the approved site plan. The building is proposed on an existing rough graded building pad located at the northeast corner of the existing parking lot. The building will be MISC 22-0013 - Mechanics Bank Page 4 of 4 November 8, 2022 designed with frontages oriented towards the western parking lot, Highway 111, and Larkspur Lane. The site plan is referenced below. Figure 2 – Proposed Site Plan ZONING ORDINANCE SUMMARY ARC approval is required for all design review applications per PDMC Section 25.68.020 (A). The proposal is a revision to the design review and therefore require ARC approval. The change is not substantial as only the material of the roof is changing. STAFF RECOMMENDATION Staff recommends the ARC determines that the requirements of the findings have been met based on the analysis and approves the request as presented. If major design comments arise during the discussion, Staff recommends the ARC clearly outline the requested changes and incorporate the comments as conditions of approval. Attachment: 1. Project Exhibits from the Applicant 2. Notice of Action dated September 12, 2022 The Project is the development of a new free-standing commercial shell building and site improvements within the Jensen's Plaza multi-tenant, multi-building shopping center. The design of the building will have updated form complimentary to the architecture of the center. Improvements include new foundation/slab, building envelope, exterior finishes, roofing, and utility infrastructure. The Work of this project will develop the building to a cold-grey shell condition. The building will be equipped with fire sprinkers. Site improvements include new parking, side walks, curb and gutter improvements, site drainange, and construction of a multi-bin trash enclosure. Parking is shared with the shopping center. Additional improvements include landscaping, irrigation, and landscape lighting. The landscape palette is desert compatible and is drawn from the establish materials used currently at the shopping center. The building will be approximately 3,800 SF and will be initially occupied by Mechanics Bank. Tenant Improvements for the Bank are NOT part of this Poject and will be under separate permit by others. The building is designed to accommodate two distinct tenants should future subdivision of the building be entertained by the Building Owner. PROJECT DESCRIPTION PROJECT DATA ASSESSORS PARCEL NUMBER: STREET ADDRESS: LEGAL DESCRIPTION: ZONING / LAND USE DESIGNATION: BUILDING SIZE NEW SHELL BUILDING: LOT SIZE: LOT COVERAGE: BUILDING DESCRIPTION: CONSTRUCTION TYPE: FIRE PROTECTION: 627-211-023 73611, Palm Desert, CA 92260 Parce 2 of PM 27511 Book: 183, Pages 96-97 Country of Riverside, CA ZONE 'D.O.' (Downtown Core Overlay) 3,830 GSF 0.41 Acres (17,860 SF) 3,830 SF / 17,860 SF = 21.4% New single story, free-standing commercial shell building. Type VB Fully Sprinklered OWNER ONE ELEVEN EL PASEO, LLC Bill Lang T: 310.373.2797 F: 310.373.4719 TENANT MECHANICS BANK . T: . ARCHITECT McAULIFFE & COMPANY, INC. Michael T. McAuliffe, AIA T: 760.773.0907 F: 760.773.0967 CIVIL ENGINEER THE ALTUM GROUP James Bazua, PE T: 760.346.4750 F: 760.851.8831 STRUCTURAL ENGINEER GREG J. COOK ENGINEERING Greg Cook, PE T: 530.544.7774 F: - MECH/PLUMB/ELEC/T-24 ENGINEER EQUITY SPEC CONSULTING ENG. Dave Celmer, PE T: 760.834.1537 F: 760.832.7333 LANDSCAPE ARCHITECT HERMANNN DESIGN GROUP Chris Hermann, ASLA T: 760.777.3130 F: 760.777.9032 GENERAL CONTRACTOR TBD TBD T: PROJECT TEAM PROJECT LOCATION PARCELS 1 & 2 PARCEL MAP 27511 73611, Palm Desert, CA 92260 1-10 FWY HWY 111 MONTERREY AVE.COOK ST.FRED WARING PORTOLA AVE.EL PASEO SAN PABLOLARKSPURAFF AC AB ARCH AWN BM BLKG BR BLDG CAB CRPT CLG CL CT C/O CLR CLO CW CONC CMU CONT CJ DTL DIA DIM DW DN DS DWG DF DRY EA ELEC EM EP Above Finish Floor Air Cond. Condensing Unit Anchor Bolts Architectural Awning Beam Blocking Broom Closet Building Cabinet Carpet Ceiling Center Line Ceramic Tile Clean Out Clear Closet Cold Water Concrete Concrete Masonry Units Continuous Control Joint Detail Diameter Dimension Dishwasher Down Downspout Drawing Drinking Fountain Dryer Each Electrical Electrical Meter Electrical Panel ELEV EMB EQUIP (E) EJ FOC FOF FOS FCU FDC FE FH FR FS FSH FSR FLR FD FAU GI GD GA GC GB36 GYP BD HC HDW HGT HM HORIZ HB HW INSUL INT JST K/S Elevation Embed Equipment Existing Expansion Joint Face of Concrete Face of Finish Face of Stud Fancoil Fire Dept. Connection Fire Extinguisher Fire Hydrant Fire Retardant Finish Surface Fire Sprinkler Head Fire Sprinkler Riser Floor Floor Drain Forced Air Unit Galvanized Iron Garbage Disposal Gauge or Gage General Contractor Grab Bar 24" Long Gypsum Board Handi Cap Hardware Height Hollow Metal Horizontal Hose Bibb Hot Water Insulation Interior Joist Kitchen Sink LS LAV LT WGT LIN MFR MAX MECH MC MICW MIN MIR NAP (N) NOM NIC NTS OBSC OC OPG OPP PTD PR P PTD PL P.O.C. PIV PTDF RAD HD R/O RE: REF (R) REQ'D Laundry Sink Lavatory Light Weight Lined Closet Manufacturer Maximum Mechanical Medicine Cabinet Microwave Minimum Mirror Napkin Receptacle New Nominal Not In Contract Not To Scale Obscure On Center Opening Opposite Painted Pair Pantry Paper Towel Dispenser Plate Point of Connection Post Indicator Valve Pressure Treated Douglas Fir Radius Range Hood Range/ Oven Reference Refrigerator Remove Required RAG R RH RD RM RO SCH SCD SHLF S+P SHW SIM SD SC SPEC SQ SF SS STD STL STR THK TC TP T & B TOB TOC TOP TOS TOW TB TD TRASH TR T T/SH Return Air Grill Riser Robe Hook Roof Drain Room Rough Opening Schedule Seat Cover Dispenser Shelf Shelf and Pole Shower Similar Soap Dispenser Solid Core Specifications Square Square Feet Stainless Steel Standard Steel Structural Thick Top of Curb Toilet Paper Top + Bottom Top of Beam Top of Concrete Top of Parapet Top of Sheathing Top of Wall Towel Bar Towel Dispenser Trash Enclosure Trash Receptacle Tread Tub/ Shower Combination ABBREVIATIONS A101 1Ref 1Ref 1Ref 1Ref SYMBOL LEGEND GRID STATION ASSEMBLY TAG DOOR ID TAG EXTERIOR ELEVATION MARKER 1 A101 SIM BUILDING SECTION MARKER ROOM I.D. Room name 101 NORTH ARROW 1REVISION TAG KEY NOTE 0 MATERIAL FINISH TAG WINDOW ID TAG A12 00A RA-01FIXTURE / EQUIPMENT TAG 101 A101 1SIM DETAIL MARKER 1 A101 SIM WALL SECTION MARKER INTERIOR ELEVATION MARKERA101 1Ref 1Ref 1Ref 1Ref WP-03 PT-03 STOREFRONT ASSEMBLY ID TAG000.A ARCHITECTURAL REVIEW COMMISSION NOTICE OF ACTION - APPROVAL 73611, PALM DESERT, CA 92260 07.20.2021 BUILDING PERMIT: TIMP 22-00__ [PERMIT DATE] APPROVALS ASSOCIATED PERMITS THE FOLLOWING ITEMS ARE ASSOCIATED WITH THIS PROJECT AND WILL BE UNDER SEPARATE PERMITS. THESE PERMITS SHALL BE ACQUIRED BY THE GENERAL CONTRACTOR PRIOR TO COMMENCEMENT OF RELATED WORK. GEOTECHNICAL INVESTIGATION Sladden Engineering Report No: 544-19173 22-06-382 Date:08.23.2022 ASSOCIATED REPORTS WATER: Coachella Valley Water District T: 760.398.2651 SEWER: Coachella Valley Water District T: 760.398.2651 GAS: Southern California Gas Company T: 800.427.2200 CABLE: Spectrum T: 866.874.2389 ELECTRICITY: Southern California Edison T: 800.684.8123 TELEPHONE: Verizon T: 800.837.4966 TRASH: Burrtec Waste & Recycling Services T: 760.340.2113 UNDERGROUND UTILITY ALERT: USA Dig Alert T: 800.227.2600 UTILITY PURVEYORS 1. 2. 3. IN ADDITION TO REGULAR INSPECTIONS, THE FOLLOWING ITEMS WILL ALSO REQUIRE SPECIAL INSPECTION IN ACCORDANCE WITH CBC SECTION 1702: STRUCTURAL CONCRETE OVER 2,500 PSI. FIELD WELDING. HIGH STRENGTH BOLTS. SPECIAL INSPECTIONS 4. 5. EXPANSION/EPOXY ANCHORS. DRYPACK OR NON-SHRINK GROUT. THE FOLLOWING ITEMS ARE DESIGN-BUILD AND SHALL BE DEFERRED SUBMITTALS: NFPA 13 FIRE SUPPRESSION SYSTEM Documents for deferred submittal items must be reviewed by the registered design professional in responsible in charge who will forward them to the Building Official with a notation indicating that they have been reviewed and are in general conformance with the design of the building. Deferred Submittal items shall not be intalled prior to Building Official approval. DEFERRED SUBMITTALS SPECIAL NOTES 1. 2. 3. 4. 5. Project improvements are to construct the building to a "Cold-Grey-Shell" condition. Site improvements are interconnected with existing site improvements of the Jensen's Shopping Center. Site access to the subject parcel are through existing access points of the Jensen's Shopping Center. Portions of the site have existing improvement that shall be retain, integrated with new improvements and protected during the course of construction. Existing subsurface drainage improvements to remain. Protect in place. CITY OF PALM DESERT CONSTRUCTION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. The City of Palm Desert CONSTRUCTION HOURS: OCTOBER 1ST THROUGH APRIL 30TH Monday-Friday 7:00 AM - 5:30 PM Saturday 8:00 AM - 5:00 PM Sunday NOT PERMITTED Government Holidays NOT PERMITTED All Contractors and subcontractors shall have a current City of Palm Desert business license prior to permit issuance per Palm Desert Municipal Code, Title 5. All Contractors and/or owner-builders must submit Certificate of Workers Compensation insurance coverage prior to the issuance of a building permit per California Labor Code section 1800. Contractor and/or Owner shall provide a trash bin to insure proper clean-up of all building materials per ordinance of the Palm Desert Municipal Code. Storage of building materials or debris shall be confined to the lot for which the permit is issued. Adjacent vacant properties may not be utilized for this purpose unless written permission of the Owner of the adjacent property is on file with the permitting authority. The public Right-of-Way shall be maintained in a clear condition at all times. Comply with the City of Palm Desert Municipal Code. Address numerals shall comply with Palm Desert Ordinance No.1265, Municipal Code Section 15.28 School Tax Fees must be paid prior to the issuance of your building permit. The Traffic Uniform Mitigation Fees (TUMF) must be paid at time of issuing the building permit. Block walls, trash enclosures, temporary power poles, pools, spas, site lighting, signage, etc. require separate permits. General contractors and/or owner-builders shall submit a completed sub-contractor's list to the Building & Safety Department prior to requesting a final inspection per Palm Desert Ordinance No. 60. Absolutely no sub-contractor's lists will be accepted unless all required information is provided on the appropriate City of Palm Desert form. Contractor to complete section 1 of the Construction Waste Management Plan prior to permit issuance, and complete section 2 at final inspection. Contractor to complete Self Certify VOC Checklist at final inspection. Contractor to complete Non-Residential Certification Checklist at final inspection. APPLICABLE MODEL CODES SERVICES AND DESIGN PROVIDED ARE BASED ON AND CONSISTENT WITH THE FOLLOWING CODES, REGULATIONS, AND ORDINANCES: 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION CURRENT EDITION CALIFORNIA BUILDING CODE CALIFORNIA ADMINISTRATIVE CODE CALIFORNIA PLUMBING CODE CALIFORNIA GREEN BUILDING STANDARDS CODE CALIFORNIA MECHANICAL CODE CALIFORNIA ENERGY CODE CALIFORNIA ELECTRIC CODE CALIFORNIA FIRE CODE CITY OF PALM DESERT MUNICIPAL CODE All construction of the Project shall comply with or exceed these standards. 1. 2. 3. 4. 5. 6. 7. 8. Construction Hours: Comply with Construction Hours as established by City of Palm Desert. Receipt/Storage of Materials: No material is to be delivered and placed in the street. Material is not to be stockpiled on adjacent property. Contractors will be required to place all materials in the Tenant's suite or secure the appropriate temporary storage location from the Property Manager. Trash and Debris: all trash and debris is to be picked up and the parking lot cleaned daily. Parking of Vehicles: During the course of work, all vehicles shall be parked at locations as designated by the Property Manager. This construction site conjoined with a multi-tenant complex. Tenants in other, adjacent suites will be conducting business during the course of construction. The contractor and the contractor's subcontractors shall not impede the operations of adjacent tenants. The General Contractor shall notify the Property Manager if utility service connections need to be temporarily interrupted during the course of the Work. The general contractor shall provide 48 hour written notice to the Property Manager in advance of any proposed interruption. Radios: Radios and stereo equipment may not be played at the worksite. PROPERTY MANAGEMENT REQUIREMENTS 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2021, McAuliffe & Company, Inc. All rights reserved. 5 6 D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/21MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2021, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES for for 22-001 G-100 TITLE SHEET 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 73611 Highway 111 Palm Desert, CA 92260 MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1" = 1'-0" 1 VICINITY MAP SHEET INDEX 01 GENERAL G-100 TITLE SHEET G-101 GENERAL NOTES, PROJECT NOTES, CODE ANALYSIS G-102 GREEN BUILDING MANDATORY MEASURES G-200 ACCESSIBILITY REQUIREMENTS G-201 SITE ACCESSIBILITY REQUIREMENTS G-300 TITLE 24 ENERGY + LIGHTING COMPLIANCE G-301 TITLE 24 ENERGY + LIGHTING COMPLIANCE 02 CIVIL GP-01 PRELIMINARY GRADING PLAN 03 ARCHITECTURAL A-001 SITE PLAN A-002 SITE DETAILS A-100 SLAB PLAN A-101 FLOOR PLAN A-102 SOFFIT/CEILING PLAN A-103 ROOF PLAN A-200 EXTERIOR ELEVATIONS A-201 EXTERIOR ELEVATIONS A-300 BUILDING SECTION A-301 BUILDING SECTION A-302 WALL SECTION A-303 WALL SECTION A-304 WALL SECTION A-305 WALL SECTION A-306 WALL SECTION A-500 DETAILS A-501 ROOF DETAILS A-600 SCHEDULES A-700 STANDARD DETAILS A-800 MATERIALS SAMPLES A-900 PERSPECTIVE VIEW A-901 PERSPECTIVE VIEW A-902 PERSPECTIVE VIEWS 04 STRUCTURAL S-1 STRUCTURAL DRAWINGS 05 MECHANCIAL M-1 MECHANCIAL 06 PLUMBING P-1 PLUMBING 07 ELECTRICAL E-1 ELECTRICAL 08 LANDSCAPE L1.0 PRELIMINARY LANDSCAPE PLAN L2.0 LANDSCAPE RENDERING FACPFACPGENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. The General Contractor shall furnish all materials, labor, equipment, transportation and services necessary for the satisfactory completion of the Work unless designated specifically otherwise. Work shown in these drawings designated Not In Contract (N.I.C.) is shown for informational purposes only and is NOT the responsibility of the General Contractor. All equipment, work, and materials shall comply with all current applicable model codes, local municipal codes, ordinances, and governing regulations, and the Contract Documents. The Contractor shall coordinate the installation of the various trade items within the space above all ceilings (including, but not limited to: structural members, mechanical ducts and insulation, conduits, raceways, sprinkler systems, light fixtures, ceiling systems, and any special structural supports required) and shall be responsible for maintaining the finish ceiling height indicated in the Drawings and the Finish Schedule. Ceiling heights dimensions are to the finish surface of the ceiling unless noted otherwise. Access panels shall be provided and installed wherever required by the Building Code or for the proper operation or maintenance of mechanical, electrical or other concealed equipment, whether or not indicated on the Drawings. The General Contractor shall coordinate the size, location, and type of access panel(s) with other Subcontractors' work and with the Architect prior to installation of any access panels. When it is necessary to interrupt any existing utility service(s) to make connections and/or corrections, a minimum of 48 hours advanced notice shall be given to the Owner. Interruptions in utility services shall be of the shortest possible duration for the Work at hand and shall be approved in advance by the Owner. In the event the utility service is interrupted without the required 48 hour advanced notice, then the General Contractor shall be financially liable for all damages suffered by the Owner due to unauthorized interruption. Reconnection shall be made immediately. The General Contractor shall protect all finish work and surfaces from damage during the course of construction and shall replace and/or repair all damaged surfaces caused by the General Contractor or Subcontractor personnel to the satisfaction of the Owner and the Architect. The General Contractor shall provide and install all stiffeners, bracings, back-plates, strapping, and supporting brackets required for the installation of all casework, toilet accessories and of all floor/wall/ceiling mounted or suspended mechanical and electrical equipment. Only new materials and equipment of recent manufacture, of the quality specified, and free from defects shall be permitted for the Work. Bracing, shoring, and temporary supports shall be provided as required to hold the Work securely in place and to sustain all loads including those that may occur during erection and until subsequent construction is adequate to replace the temporary bracing. The General Contractor shall be solely responsible for these temporary elements. The General Contractor shall exercise extreme caution throughout the construction period to protect any landscaping, utilities, structures or other facilities intended to remain. Damage, destruction, or removal of these items shall be repair/replaced/restored at the General Contractor's expense and to the satisfaction of the Owner. Final Clean-Up and Disposal: the General Contractor shall remove debris, rubbish and waste material from the Owner’s property and common areas to a lawful disposal area and pay all hauling and dumping costs. The General Contractor shall conform to pertinent Federal, State, and Local laws, regulations and orders upon completion of Work. All construction areas shall be left vacuum-clean and free from debris. Clean all dust, dirt, stains, hand marks, paint spots, droppings and other blemishes. The General Contractor shall exercise extreme caution during the construction period to protect the existing building facility including the exterior and interior finishes, furniture and equipment. The General Contractor to provide approved temporary sanitary facilities (I.E. chemical toilets) on the construction site prior to commencement of the Work. The General Contractor shall have sole control over and charge of and responsibility for construction means, methods, techniques, sequences or procedures, and for safety precautions and programs in connection with the Work. The Architect shall not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Architect shall have authority to reject Work that does not conform to the Contract Documents. If concealed or unknown physical conditions are encountered at the site that differ materially from those indicated in the Contract Documents or from those conditions ordinarily found to exist, these conditions shall be brought to the attention of the Architect and the Owner prior to continuing with the Work. Structures in the course of construction, alteration or demolition shall comply with Chapter 14 of the 2019 California Fire Code and NFPA 241. 01. BUILDING OCCUPANCY & CONSTRUCTION TYPE Occupancy - CBC Chapter 3 BUILDING OCCUPANCY: Group B Construction Type – CBC Table 601 Type V-B Fire-Resistance Rating Requirements for Building Elements (Hours) – CBC Table 601 Primary Structural Frame:0 HR Bearing Walls – Exterior:0 HR Bearing Walls – Interior:0 HR Nonbearing Walls & Partitions Exterior:0 HR Nonbearing Walls & Partitions Interior:0 HR Floor Construction & Secondary Members:0 HR Roof Construction & Secondary Members:0 HR 02. FIRE SUPPRESSION REQUIREMENTS Fire Suppression System Requirement – CBC Section 903, Table 903.2.11.6, Section 410.6 Building to be protected with a NFPA 13 fire suppression sprinkler system. 03. BUILDING SITING See BUILDING SITING Diagram this sheet. 04. CONSTRUCTION TYPE & ALLOWABLE SIZE Allowable Building Height – CBC Table 504.3 Occupancy Class: B, (S), Construction: Type VB Height: 60 FT Allowable 21 FT Proposed Allowable Building Floor Area – CBC Table 506.2 Occupancy Class: B (S1), Construction: Type VBSF: 36,000 SF Allowable 3,830 SF Proposed SF 05. SPECIAL OCCUPANCY REQUIREMENTS Not Applicable. 06. FIRE & SMOKE PROTECTIVE ELEMENTS Maximum Area of Exterior Wall Openings Based on Fire Separation Distance and Degree of Opening Protection - CBC Table 705.8 North, East, and South have >30ft Fire Separation Distance: No Limit West Fire Separation Distance 25 to <30 ft (UP, S): No Limit 07. ADDITIONAL FIRE PROTECTION SYSTEMS Portable Fire Extinguishers - CBC Section 906 Portable fire extinguisher(s) shall be provided per requirements of Section 906 as part of Tenant Improvements (by Others). Fire Alarm & Detection Systems – CBC Section 907.2.1 Fire alarm & detection system to be provided. 08. INTERIOR FINISH MATERIALS Interior Wall & Ceiling Finish Requirements by Occupancy – CBC Table 803.13 Occupancy Group B: Exit Enclosures & Exit Passageways: B Corridors:C Rooms & Enclosed Spaces:C CBC 803.1 Interior Wall and Ceiling Finishes Class A:Flame spread index 0-25; smoke developed index 0-450 Class B:Flame spread index 26-75; smoke developed index 0-450 Class C:Flame spread index 76-200; smoke developed index 0-450 Interior Floor Finish – CBC Section 804 Minimum critical radiant flux: Class II materials required. *** NO Interior finishes as part of this Project. Interior finishes shall be part of Tenant Improvements (by Others; NIC). 09. EGRESS SYSTEMS Occupant Load – CBC Section 1004 & Table 1004.1.1 Refer to Exiting information on EXITING PLAN for Existing Occupant Load Calculations + aggregate exit loading (shell building ONLY). Means of Egress – CBC Chapter 10 Exiting Diagram for compliance with Means of Egress requirements shall be for the shell builing ONLY. (Tenant Improvements by Others; NIC). 10. SPECIAL USE REQUIREMENTS Not Applicable. 11. SITE & BUILDING ACCESSIBILITY REQUIREMENTS Site & Building Accessibility – CBC Chapter 11B See Site Plan and Site Details for accessibility improvements. 12. MISCELLANEOUS PROVISIONS Plumbing Fixtures – CPC Table 4-1, A Plumbing fixtures shall be provided under Tenant Improvements (by Others; NIC). CODE ANALYSIS KEY NOTES ID CLASSIFICATION REMARKS A FOUNDATIONS Foundations, slabs on grade, substructure improvements. B EXTERIOR ENVELOPE Buiding structure, exterior enclosure, exterior openings, roofing. C INTERIORS Partitions, interior openings, stairs, interior finishes. D SERVICES Conveying, plumbing, HVAC, fire protection, Electrical services. E EQUIPMENT & FURNISHINGS Equipment, appliances, cabinetry, accessories. F SPECIAL CONSTRUCTION Special facilities, construction. G SITEWORK Site walls, hardscape, paving, site features, site furnishings. X DEMOLITION Existing item, assembly, component, finish to be removed. FINISH CALLOUTS ID FINISH REMARKS MT MATERIAL Material designation, finish information, MFR color PT PAINT Paint color AS ASSEMBLY Assembly/Component (Doors, Windows, Fixtures, etc) KEY NOTE TYPE LEGEND CLASSIFICATION KEY NOTE NUMBER KEY NOTE TAGA01 EXIT DISCHARGE 05 49 E-101 ROOM/SPACE OCCUPANT LOAD EXIT PATH OF TRAVEL W. ACCUMULATED OCCUPANT LOAD EXIT ID EXIT DISCHARGE AND DIRECTION TO PUBLIC WAY SYMBOL LEGEND ROOM ID + OCCUPANCY INFO ROOM NAME ROOM NO. ROOM SF OCC. LOAD FACT. OCC. LOAD OLF: OCC:33 Name 101 150 SF 20 MECHANICS BANK BUILDING OLF: OCC: 3359 SF 23 TENANT SPACE 100 150 TENANT RESTROOM 101 TENANT RESTROOM 102 OLF: OCC: 33 SF 1 FIRE RISER 103 300OLF: OCC: 65 SF 1 UTILITY 104 300 (FUTURE)(FUTURE) 121211 11 E-100 0101 E-101 1. 2. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. These Project Notes are not all-inclusive and DO NOT relieve the Contractor(s) on this Project of their responsibility to review all relevant codes. The Contractor shall ask questions, call to the attention of the Architect and Owner any and all discrepancies, omissions and errors in these documents. INSPECTIONS The Contractor shall be responsible to make application for, secure and pay for all permits and fees required by the various permitting agencies and utility purveyors. The Contractor shall be responsible to schedule all inspections. Normal inspections by the building, engineering, fire and other permitting agency departments shall be conducted as required by those respective agencies. All re-inspection fees shall be paid by the contractor. CONSTRUCTION DOCUMENTS Contract Drawings and Specifications are mutually inclusive and what is required by one is required by the other. There is no precedence intended or implied between Drawings and Specifications and, in the event of a conflict, the Architect shall be their interpreter. Any work installed prior to and/or in conflict with such interpretation shall be corrected by the Contractor at the Contractor's expense and at no additional cost to the Owner. In no case shall dimensions be scaled from Drawings. The Contractor shall verify all conditions and dimensions in the field before proceeding with subsequent work. Any discrepancies between conditions indicated and actual field conditions shall be brought the attention of the Architect for clarification prior to proceeding. Any work installed prior to and/or in conflict with such clarification shall be corrected by the Contractor at the Contractor's expense and at no additional cost to the Owner. All dimensions are to face of stud or centerline of walls, columns and beams unless otherwise noted. Floor elevations are to top of concrete slab unless otherwise noted. All symbols and abbreviations used on the Drawings are considered to be construction standards. Any questions regarding the exact meaning of a symbol or abbreviation shall be brought to the attention of the Architect for clarification. Details marked "TYPICAL" shall apply in reasonably inferable similar conditions unless indicated otherwise. Notes contained within these documents which use the words "PROVIDE" or "INSTALL" shall be interpreted to mean "THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL" unless noted otherwise. The Specifications and ALL Consultant Drawings are supplemental to the Architectural Drawings. It shall be the Contractor's responsibility to coordinate with the Architectural Drawings before the installation of any of the Consultant's work and to bring any discrepancies or conflicts to the attention of the Architect in writing for clarification. Improperly installed work shall be corrected by the General Contractor at the General Contractor's expense and at no expense to the Architect, the Architect's Consultants, or the Owner. The General Contractor and the General Contractor's Subcontractors are responsible for reviewing, bidding, coordinating and performing their work based on the ENTIRE set of Contract Documents. Improperly installed work or contract requirements identified by these Documents excluded by the Contractor without prior written approval of the Architect shall be corrected by the General Contractor at the General Contractor's expense and at no expense to the Architect, his Consultants, or the Owner. It is the General Contractors responsibility for distribution of the ENTIRE set of Contract Documents to all of the General Contractors forces and Subcontractors. Any Work installed in conflict with the Contract Documents shall be corrected by the Contractor at the Contractor's expense and at no additional expense to the Owner, the Architect, or the Architect's Consultants. Drawings of existing conditions have been compiled from existing data supplied by the Owner to the Architect. The Architect makes no warranty either expressed or implied for the accuracy or completeness of the existing information recorded. The General Contractor shall field verify ALL existing conditions. The General Contractor shall notify in writing any discrepancies for clarification prior to proceeding with work. PROJECT NOTES20' - 2" CLR.6' - 2"∙ CLR. 28' - 6 3/4" CLR.71' - 10 3/4" CLR.F.S.D.>30 42' - 2 3/4" CLR.F.S.D. >30121' - 11" CLR. (N.T.S)F.S.D. 25 TO < 30 29' - 7 3/4" CLR.F.S.D. >3073' - 10 3/4" CLR.FF=227.50 3,830 GSF MECHANICS BANK BUILDING VACANT PARCEL APN: 627-211-023 ZONE: D.O. HIGHWAY 111 LARKSPUR LANE123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:28 PM22-001 G-101 GENERAL NOTES, PROJECT NOTES, CODE ANALYSIS 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 EXIT SCHEDULE EXIT IDOCCUPANTS SERVED WIDTH FACTOR WIDTH REQUIRED WIDTH PROVIDEDREMARKS E-100120.22.39 in72.00 in DOOR TO BE EQUIPPED WITH A LATCH AND EMERGENCY EXIT HARDWARE E-101110.22.19 in36.00 in DOOR TO BE EQUIPPED WITH A LATCH AND EMERGENCY EXIT HARDWARE 1/8" = 1'-0" 1EXITING PLAN 1/16" = 1'-0" 2SITE DIAGRAM FACPSITE PLAN - GENERAL NOTES 1. 2. 3. 4. 5. PROTECT EXSTING IMPROVEMENTS NOT RECEIVING WORK. PARKING IS SHARED WITH THE JENSEN'S PLAZA SHOPPING CENTER. (8) ADDITIONAL PARKING SPACES ARE ADDED TO EXISTING PARKING BY THE IMPROVEMENTS OF THIS PROJECT. PROTECT EXISTING LANDSCAPING, IRRIGATION, AND LANDSCAPE LIGHTING IN PLANTER AREAS ADJACENT TO AREA OF WORK. ON SITE STORM WATER IS MANANGED BY EXISTING, SUB-SURFACE DETENTION STRUCTURES SHARED WITH THE JENSEN'S PLAZA SHOPPING CENTER. THESE IMPROVEMENTS ARE ALREADY EXISTING. FF=227.50 3,830 GSF MECHANICS BANK BUILDING 89° 12' 43" 126.93' N W0° 11' 09"140.01'NW89° 14' 06" 110.34' SE R= L=26.02' 20.00'0° 11' 09"120.28'SEVACANT PARCEL APN: 627-211-023 ZONE: D.O. MULTI-BUILDING RETAIL APN: 627-211-022-3 ZONE: D.O. UTILITY EASEMENT20' - 0"20 20 22 22 28 25 25 24 24 26 26 30 30 01 02 03 04 HC 05 06 07 08 09 10 11 12 13 15 36 36 37 37 38 38 33 33 33 33 35 34 34 34 3434 34 34 34 35 35 39 39 39 39 39 38 HIGHWAY 111 LARKSPUR LANE32 29 29 29 25 G01 G02 G04 G04 +230.75 TW +230.75 TW +234.00 FS 40 41 G03 A-002 2 A-002 5 A-0026A-0024 A-002 3 31 30 3032 14 38 38 38 01 A-600 9 PARKING TABULATION PER CITY OF PALM DERSERT MUNICIPAL CODE D.O. ZONE PARKING REQUIREMENT TABLE 25.18-2 3 PARKING SPACES / 1,000 SF OF BUILDING = 0.003 SP/SF 3,830 SF x 0.003 SP/SF = 12 PARKING SPACES REQUIRED SPACES PROVIDED:15 STANDARD + 1 VAN ADA ACCESSIBLE PER CBC TABLE 11B-208.2 MINIMUM NUMBER OF ACCESSIBLE SPACES TOTAL SPACES: 1 TO 25 = 1 ACCESSIBLE SPACE REQUIRED SPACES PROVIDED:1 VAN ACCESSIBLE SPACE PROVIDED 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:29 PM22-001 A-001 SITE PLAN 10.28.2022 JG MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1" = 10'-0" 1SITE PLAN SHEET NOTES ID DESCRIPTION 01 ALIGN 20 PROPERTY LINE 22 EASEMENT 24 STREET 25 CONCRETE CURB & GUTTER 26 PUBLIC SIDEWALK 28 CENTERLINE OF STREET 29 CONCRETE SIDEWALK 30 ADA PATH-OF-TRAVEL 31 ADA PATH-OF-TRAVEL STRIPING 32 ADA CURB RAMP 33 E. ASPHALT PARKING LOT 34 EXISTING PARKING SPACE 35 NEW PARKING SPACE 36 E. CONCRETE RIBBON GUTTER 37 E. STORM WATER INLET GRATE; CONNECTED TO E. SUB-SURFACE STORM WATER DETENTION STRUCTURE 38 PLANTER AREA; SEE LANDSCAPE 39 EXISTING PLANTER AREA 40 PROPOSED BACKFLOW PREVENTER 41 PROPOSED FDC + PIV KEYNOTES ID SPEC DESCRIPTION G - BUILDING SITEWORK G01 ACCESSIBLE TRASH ENCLOSURE PER ARCHITECT'S PLANS AND PER CITY OF PALM DESERT ORDINANCE NO. 1161. G02 METAL TRASH ENCLOSURE GATE + HSS STEEL GATE POSTS; PAINT G03 TRASH ENCLOSURE CONCRETE APRON G04 CEMENT PLASTER CLAD CMU RETAINING WALL; PAINT PT-04G02 G03 G01 6' - 0"∙05 PT-01PT-02MT-02MT-02G01 05 1 A-002 2' - 8"∙2 C.7 C.4' - 8"6' - 0"05G03 MT-02PT-02MT-02PT-01 G02PT-04 TRASH ENCLOSURE - GENERAL NOTES 1. 2. 3. TRASH ENCLOSURE TO COMPLY WITH CITY OF PALM DESERT SOLID / RECYCLING / ORGANICS TRASH ENCLOSURE REQUIREMENTS. ENCLOSURE TO COMPLY WITH ADA ACCESSIBILITY REQUIREMENTS. WASTE BINS/RECEPTACLES SHALL BE FULLY SCREENED FROM VIEW BY THE ENCLOSURE.6' - 0"6"12x8x16 CMU 8x8x16 CMU CEM. PLASTER FINISH; PAINT PRE-CAST CAP; PAINT F.G. CONC. SLAB PAINT ALL EXP. SURFACES CONC. FTG.(7) C.(2) C.6' - 7"∙CLR.5' - 1"3' - 9" CLR.7.13%8"8' - 9" ∙2' - 0"8' - 9"∙8"∙ G03 G01 G03 30 32 1 A-002 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:37 PM22-001 A-002 SITE DETAILS 10.28.2022 Author Checker MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1/4" = 1'-0" 3TRASH - NORTH 1/4" = 1'-0" 5TRASH - SOUTH 1/4" = 1'-0" 4TRASH - EAST 1/4" = 1'-0" 6TRASH - WEST 8PERSPECTIVE VIEW 7 PERSPECTIVE VIEW 9PERSPECTIVE VIEW FINISHES SCHEDULE ID SPEC DESCRIPTION MATERIALS MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 30 ADA PATH-OF-TRAVEL 32 ADA CURB RAMP KEYNOTES ID SPEC DESCRIPTION G - BUILDING SITEWORK G01 ACCESSIBLE TRASH ENCLOSURE PER ARCHITECT'S PLANS AND PER CITY OF PALM DESERT ORDINANCE NO. 1161. G02 METAL TRASH ENCLOSURE GATE + HSS STEEL GATE POSTS; PAINT G03 TRASH ENCLOSURE CONCRETE APRON 1/2" = 1'-0" 1 SECTION 1/4" = 1'-0" 2 TRASH ENCLOSURE FACPFLOOR PLAN - GENERAL NOTES 1. 2. 3. 4. TENANT IMPROVEMENTS ARE NOT A PART OF THIS PROJECT; THEY ARE TO BE PERFORMED BY OTHERS UNDER SEPARATE PERMIT. RESTROOMS ARE PART OF TENANT IMPROVEMENTS; N..I.C. SHELL BUILDING TO BE PROTECTED BY AUTOMATIC FIRE SPRINKLER SYSTEM. BUILDING IMPROVEMENTS TO BE DEVELOPED TO A COLD GREY SHELL CONDITION. 1 A-300 1 A-301A-200 3 A-201 1 A-2012 A-2002 MECHANICS BANK BUILDING 1 12 3 3 4 4 5 6 7 7 AA BB C D EE 29' - 8"29' - 4"33' - 0"2' - 0"30' - 0"15' - 0"47' - 0"92' - 0" 23' - 0"6' - 8"29' - 4"10' - 8"21' - 0"1' - 4" 92' - 0"2' - 0"16' - 0"29' - 0"47' - 0"21' - 4"6' - 8"2' - 0"6' - 0"12' - 0"8' - 8"14' - 0"6' - 4"1' - 0"5' - 0" 8' - 4"12' - 8"2' - 0"6' - 8"6' - 6"5' - 6"11' - 10"5' - 6"2' - 0"6' - 8"2' - 0"16' - 8"4' - 4" 1' - 0"28' - 8"2' - 0"6' - 8"18' - 0"2' - 8"8' - 4"15' - 0"2' - 0"4' - 8"3' - 0" 3' - 4"3' - 0"6' - 4"8"2' - 4"1' - 6"1' - 6"6' - 7"TENANT SPACE 100 TENANT RESTROOM 101 TENANT RESTROOM 102 FIRE RISER 103 UTILITY 104 26 B80OVHD E01 D60 D61 D80D90 26 (FUTURE)(FUTURE) 11 11 11 11 13 13 13 13 13 WP-01 100.1 100.2 104.1103.1 3 A-300 2 A-301 3 A-301 2' - 0"2' - 6"5' - 7"2' - 0"2' - 7"3' - 0"1' - 7"5' - 9"9"WP-01 WP-01 WP-01 WP-01 WP-01WP-01 WP-01 WP-01 WP-01WP-01WP-01 WP-01 WP-01 WP-01 WP-02 WP-02 WP-01WP-01 WP-03WP-03 WP-04 WP-04 WP-05 WP-05 WP-05 WP-05WP-05 WP-05 WP-05 WP-05 WP-05WP-05 WP-05WP-05 WP-05WP-05 WP-01 WP-07WP-07 WP-07 WP-06 1' - 8"1' - 0"3' - 0"1' - 6"6' - 0"3' - 6"3' - 0"6' - 3"9' - 0"9' - 0"1' - 4"3' - 0"1' - 4"3' - 0"A-600 9 100.B 100.C 100.D 100.E 100.F 100.G 100.H 100.J 100.K100.L 100.A WP-06 WP-06 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:38 PM22-001 A-101 FLOOR PLAN 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 1FLOOR PLAN SHEET NOTES ID DESCRIPTION 11 ROOF OVERHANG ABOVE 13 SOFFIT ABOVE 26 PUBLIC SIDEWALK KEYNOTES ID SPEC DESCRIPTION B - SHELL B80 ROOF ACCES HATCH D - SERVICES D60 FIRE ALARM CONTROL PANEL D61 FIRE RISER D80 ELECTRICAL SWITCH GEAR + METER SECTION D90 TELEPHONE/DATA EQUIPMENT E - EQUIPMENT E01 WALL-MOUNTED ROOF ACCESS LADDER ASSEMBLY SCHEDULE ID SPEC DESCRIPTION WALL/PARTITION ASSEMBLY WP-01 072100 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT EXT: 7/8" EXT. CEMENT PLASTER CORE: 2x6 WOOD STUDS - 16" O.C. W. 1/2" PLYWOOD, R-21 INSUL. INT: OPEN WP-02 061000 072100 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT EXT: 7/8" EXT. CEMENT PLASTER CORE: 2x6 WOOD STUDS - 16" O.C., 1/2 PLY, R-21 INSUL. INT: 5/8" GYP. BD. WP-03 061000 061600 072100 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT EXT: H.P. ENG. STONE VENEER, 3/4" SCRATCH + BROWN COAT CORE: 2x6 WOOD STUDS - 16" O.C. ,1/2 PLYWD, R-21 BATT INSUL. INT: OPEN WP-04 061000 061600 072100 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT EXT: H.P. ENG. STONE VENEER, 3/4" SCRATCH + BROWN COAT CORE: 2x6 WOOD STUDS - 16" O.C. ,1/2 PLYWD, R-21 BATT INSUL. INT: 5/8" GYP. BD. WP-05 061000 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT INT: OPEN CORE: 2x6 WOOD STUDS - 16" O.C. OPP: OPEN WP-06 061000 072100 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT INT: OPEN CORE: 2x6 WOOD STUDS - 16" O.C., 1/2" PLYWD. OPP: OPEN WP-07 061000 092900 STRUCTURAL WALL NON-RATED, FULL HEIGHT INT: 5/8" GYP. BD. CORE: 2x6 WOOD STUDS - 16" O.C., 1/2" PLYWD. R-21 INSUL. OPP: 5/8" GYP. BD ROOF PLAN - GENERAL NOTES 1. 2. 3. ALL ROOF-MOUNTED MECHANICAL EQUIPMENT SHALL BE FULLY SCREENED BY ROOF PARAPETS. ROOF ACCESS PROVIDED BY INTERNAL ROOF-ACCESS LADDER AND ROOF ACCESS HATCH. ROOF TILE PROFILE TO MATCH PROFILE OF JENSEN'S CENTER ROOF TILES. 1 A-300 1 A-301 27' - 0" T.O.P. 1 12 4 4 5 6 7 7 AA BB C D EE 1/4" / 12"1/4" / 12"1/4" / 12"2 1/2" / 12"2 1/2" / 12" 2 1/2" / 12"2 1/2" / 12"D40 66 63 MT-07 MT-04 PT-01 MT-07 MT-07MT-05 MT-05 MT-04PT-01 MT-04PT-02 MT-04PT-02 D40 B80 69 D20 69 69 69 D20 D20 69 D20 B82 61 61 61 6163 62 62 62 62 66 66 66 69 73 73 73 73 74 74 6 A-501 6 A-501 5 A-501 5 A-501 23' - 2 1/2" T.O.P. 16' - 6 3/4" T.O.D. 23' - 2 1/2" T.O.P. 15' - 7 17/32" T.O.D. 16' - 2 23/32" T.O.D. 15' - 9 1/4" T.O.D. 16' - 2 3/4" T.O.D. 15' - 7 3/4" T.O.D. 20' - 11 7/8" T.O.D. 20' - 11 7/8" T.O.D. 20' - 8 7/8" T.O.D. OVHG. 4' - 0"∙OVHG.4' - 0"TOWER 33' - 0" OVHG. 3' - 0 3/8"OVHG.4' - 0 3/8"3 A-300 2 A-301 3 A-301 TOWER29' - 0"TOWER32' - 0"TOWER 23' - 0" 20' - 0"5' - 0"16' - 4"8' - 0"PARAPET LOC.2' - 0"PARAPET LOC.5' - 6"PARAPET LOCATION 14' - 8" PARAPET LOCATION 21' - 0" 2 A-501 1 A-501 2 A-501 1 A-501 ROOF AREA 'A' CRITERIA SERVES THE LARGEST DRAINAGE CALCULATIONS. APPLY ROOF AREA 'A' CRITERIA TO ROOF AREA 'B', 'C', AND 'D'. PALM DESERT RAINFALL INTENSITY:2"/HR ROOF AREA 'A' DRAINAGE SYSTEM: GUTTER W. DOWNSPOUT LEADER PROJECT ROOF AREA SERVED:939 SF VERTICAL PIPE CALCUATION - CPC TABLE 1103.1 3" DIA. PIPE @ 2"/HR RAINFALL ALLOWABLE: 4,400 SF 3"x4" RECTANGULAR VERT. LEADER PROVIDED ; 4,400 SF ALLOWABLE > 939 SF SERVED: 'OK' HORIZONTAL PIPE CALCUATION - CPC TABLE 1103.2 3" DIA. PIPE (1/4"/FT SLOPE) @ 2"/HR RAINFALL ALLOWABLE: 2,320 SF 3" DIA. HORIZONTAL OUTLET LEADER PROVIDED; 2,320 SF ALLOWABLE > 939 SF SERVED: 'OK' ROOF AREA 'B' PROJECT ROOF AREA SERVED:631 SF ROOF AREA 'C' PROJECT ROOF AREA SERVED:713 SF ROOF AREA 'D' PROJECT ROOF AREA SERVED:519 SF ROOF DRAINAGE CALCULATIONSROOF DRAINAGE CALCULATIONS ROOF AREA 'A' ROOF AREA 'D' ROOF AREA 'B' ROOF AREA 'C' 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:47 PM22-001 A-103 ROOF PLAN 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 2ROOF PLAN INTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION MATERIALS MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM MFR: FIBERTITE COLOR: OFF WHITE PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 SHEET NOTES ID DESCRIPTION 61 EAVE 62 RAKE 63 HIP 66 PARAPET 69 CRICKET 73 ELEVATED ROOF FRAMING ENCLOSURE 74 36 x 48 THRU-PARAPET ACCESS KEYNOTES ID SPEC DESCRIPTION B - SHELL B80 ROOF ACCES HATCH B82 8" H. MECHANICAL EQUIPMENT CURB D - SERVICES D20 COMBINATION ROOF DRAIN + OVER FLOW DRAIN D40 HVAC R.T.U. SLOPED ROOFS TO SHEET FLOW. SLOPED ROOFS TO SHEET FLOW. EXTERIOR ELEVATION - GENERAL NOTES 1. 2. 3. ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED. BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY. SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER SEPARATE REVIEW. F.F. 0" 12347 T.O.D. 15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" 80 D40 MT-02 MT-04 PT-04MT-04PT-04 BEYOND MT-01PT-01 CT-04PT-05 CT-02MT-03 PT-03 MT-05 CT-04PT-05 CT-02 MT-02PT-02 MT-02 PT-04 MT-06 PT-04 MT-04PT-04 BEYOND CT-03 CT-03 MT-01PT-01 0505 PT-01 PT-01 20' - 0"F.F.0" AB C D E T.O.D.15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H) 29' - 0" MT-02PT-02 CT-02 MT-01 PT-01 CT-04 PT-05 CT-02 MT-05 MT-04 PT-04 MT-02PT-04 MT-06PT-04 MT-02PT-02 MT-04PT-04 80 CT-03 05 06 PT-01 20' - 0"123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:45:54 PM22-001 A-200 EXTERIOR ELEVATIONS 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 3BLDG NORTH ELEVATION 3/16" = 1'-0" 2BLDG EAST ELEVATION EXTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION COMPONENT CT-02 081113 ALUMINUM-FRAME STOREFRONT MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-03 081113 CHANNEL SCREED DESCRIPTION: 1" W. REVEAL MATL: ALUMINUM FINISH: PAINT CT-04 107313 CUSTOM LOUVERED METAL AWNING PRODUCT: ALUMINUM SHUTTERS FINISH: PAINT MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT MT-03 093000 FEATURE WALL CLADDING HIGH-PRESSURE ENGINEERED STONE VENEER MFR: NEOLITH COLLECTION: IRON COLLECTION MODEL: IRON CORTEN MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-03 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7549 "STUDIO TAUPE" 284-C5 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 PT-05 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 6993 "BLACK OF NIGHT" 251-C5 SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS KEYNOTES ID SPEC DESCRIPTION D - SERVICES D40 HVAC R.T.U. F.F.0" 1234 5 6 7 T.O.D. 15' - 6" T.O.P. (L) 23' - 0" T.O.P. (M) 27' - 0" T.O.P. (H)29' - 0" MT-01PT-01CT-02MT-03 MT-04PT-04MT-02PT-02 CT-02 CT-02 CT-04PT-05 MT-02PT-03MT-02PT-03MT-02 PT-03 MT-02 PT-02 MT-05MT-04PT-04 MT-02 PT-04 MT-06 PT-04 D40BEYOND CT-03 06 05 PT-01 100.M F.F. 0" ABCDE T.O.D. 15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" MT-05MT-02PT-02 MT-04 PT-04CT-04 PT-05 MT-01 PT-01 CT-02 CT-01MT-02PT-03 MT-02PT-04 MT-06PT-04 80 CT-03 05 06 PT-01 EXTERIOR ELEVATION - GENERAL NOTES 1. 2. 3. ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED. BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY. SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER SEPARATE REVIEW. 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:01 PM22-001 A-201 EXTERIOR ELEVATIONS 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 INTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION COMPONENT CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-02 081113 ALUMINUM-FRAME STOREFRONT MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-03 081113 CHANNEL SCREED DESCRIPTION: 1" W. REVEAL MATL: ALUMINUM FINISH: PAINT CT-04 107313 CUSTOM LOUVERED METAL AWNING PRODUCT: ALUMINUM SHUTTERS FINISH: PAINT MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT MT-03 093000 FEATURE WALL CLADDING HIGH-PRESSURE ENGINEERED STONE VENEER MFR: NEOLITH COLLECTION: IRON COLLECTION MODEL: IRON CORTEN MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE MT-06 062013 5/4x12 TREATED WOOD FASCIA TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE FIN: PAINT PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-03 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7549 "STUDIO TAUPE" 284-C5 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 PT-05 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 6993 "BLACK OF NIGHT" 251-C5 3/16" = 1'-0" 1BLDG SOUTH ELEVATION 3/16" = 1'-0" 2BLDG WEST ELEVATION SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS KEYNOTES ID SPEC DESCRIPTION D - SERVICES D40 HVAC R.T.U. EXTERIOR ELEVATION - GENERAL NOTES 1. 2. 3. ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED. BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY. SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER SEPARATE REVIEW. F.F. 0" 12347 T.O.D. 15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" 80 D40 MT-02 MT-04 PT-04MT-04PT-04 BEYOND MT-01PT-01 CT-04PT-05 CT-02MT-03 PT-03 MT-05 CT-04PT-05 CT-02 MT-02PT-02 MT-02 PT-04 MT-06 PT-04 MT-04PT-04 BEYOND CT-03 CT-03 MT-01PT-01 0505 PT-01 PT-01 20' - 0"F.F.0" AB C D E T.O.D.15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H) 29' - 0" MT-02PT-02 CT-02 MT-01 PT-01 CT-04 PT-05 CT-02 MT-05 MT-04 PT-04 MT-02PT-04 MT-06PT-04 MT-02PT-02 MT-04PT-04 80 CT-03 05 06 PT-01 20' - 0"123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:59:41 PM22-001 A-200 EXTERIOR ELEVATIONS 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 3BLDG NORTH ELEVATION 3/16" = 1'-0" 2BLDG EAST ELEVATION EXTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION COMPONENT CT-02 081113 ALUMINUM-FRAME STOREFRONT MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-03 081113 CHANNEL SCREED DESCRIPTION: 1" W. REVEAL MATL: ALUMINUM FINISH: PAINT CT-04 107313 CUSTOM LOUVERED METAL AWNING PRODUCT: ALUMINUM SHUTTERS FINISH: PAINT MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT MT-03 093000 FEATURE WALL CLADDING HIGH-PRESSURE ENGINEERED STONE VENEER MFR: NEOLITH COLLECTION: IRON COLLECTION MODEL: IRON CORTEN MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-03 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7549 "STUDIO TAUPE" 284-C5 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 PT-05 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 6993 "BLACK OF NIGHT" 251-C5 SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS KEYNOTES ID SPEC DESCRIPTION D - SERVICES D40 HVAC R.T.U. F.F.0" 1234 5 6 7 T.O.D. 15' - 6" T.O.P. (L) 23' - 0" T.O.P. (M) 27' - 0" T.O.P. (H)29' - 0" MT-01PT-01CT-02MT-03 MT-04PT-04MT-02PT-02 CT-02 CT-02 CT-04PT-05 MT-02PT-03MT-02PT-03MT-02 PT-03 MT-02 PT-02 MT-05MT-04PT-04 MT-02 PT-04 MT-06 PT-04 D40BEYOND CT-03 06 05 PT-01 100.M F.F. 0" ABCDE T.O.D. 15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" MT-05MT-02PT-02 MT-04 PT-04CT-04 PT-05 MT-01 PT-01 CT-02 CT-01MT-02PT-03 MT-02PT-04 MT-06PT-04 80 CT-03 05 06 PT-01 EXTERIOR ELEVATION - GENERAL NOTES 1. 2. 3. ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED. BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY. SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER SEPARATE REVIEW. 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:59:47 PM22-001 A-201 EXTERIOR ELEVATIONS 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 INTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION COMPONENT CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-02 081113 ALUMINUM-FRAME STOREFRONT MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-03 081113 CHANNEL SCREED DESCRIPTION: 1" W. REVEAL MATL: ALUMINUM FINISH: PAINT CT-04 107313 CUSTOM LOUVERED METAL AWNING PRODUCT: ALUMINUM SHUTTERS FINISH: PAINT MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT MT-03 093000 FEATURE WALL CLADDING HIGH-PRESSURE ENGINEERED STONE VENEER MFR: NEOLITH COLLECTION: IRON COLLECTION MODEL: IRON CORTEN MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE MT-06 062013 5/4x12 TREATED WOOD FASCIA TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE FIN: PAINT PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-03 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7549 "STUDIO TAUPE" 284-C5 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 PT-05 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 6993 "BLACK OF NIGHT" 251-C5 3/16" = 1'-0" 1BLDG SOUTH ELEVATION 3/16" = 1'-0" 2BLDG WEST ELEVATION SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS KEYNOTES ID SPEC DESCRIPTION D - SERVICES D40 HVAC R.T.U. WALL SECTION - GENERAL NOTES 1. 2. 3. ALL ROOF-MOUNTED MECHANICAL EQUIPMENT SHALL BE FULLY SCREENED BY ROOF PARAPETS. ALL ROOF DRAINS AND DRAIN LEADERS ARE CONCEALED. ROOF ACCESS IS PROVIDED BY INTERNAL LADDER AND ROOF HATCH. F.F.0" 123 4 5 6 7 T.O.D.15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H) 29' - 0" D40 66 73 B82 73 66 6666 74BEYOND 74 BEYOND TENANT SPACE 100 0506 MT-07 BEYOND MT-07BEYOND MT-07BEYOND A-302 1A-302 4 A-302 3 A-302 2 3' - 0 3/8" F.F. 0" 13 4 7 T.O.D.15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H) 29' - 0" A-303 4 A-303 3 A-303 2 A-303 1 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:03 PM22-001 A-300 BUILDING SECTION 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 1EAST-WEST SECTIONS EXTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION MATERIALS MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM MFR: FIBERTITE COLOR: OFF WHITE SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 66 PARAPET 73 ELEVATED ROOF FRAMING ENCLOSURE 74 36 x 48 THRU-PARAPET ACCESS KEYNOTES ID SPEC DESCRIPTION B - SHELL B82 8" H. MECHANICAL EQUIPMENT CURB D - SERVICES D40 HVAC R.T.U. 3/16" = 1'-0" 3EAST-WEST SECTIONS F.F. 0" AB D E T.O.D. 15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" D40 B82 66 74 66 UTILITY 104 TENANT SPACE 100 TENANT RESTROOM 101 BEYOND B80 D20 66 BEYOND 0506 MT-04 PT-01MT-01 PT-01 MT-07 BEYONDBEYOND BEYOND A-305 3 A-305 1A-305 2 4' - 0 3/8" 5' - 6" F.F.0" Level 2 10' - 0" AB D E T.O.D.15' - 6" T.O.P. (L)23' - 0" T.O.P. (M)27' - 0" T.O.P. (H)29' - 0" T.O.W.3' - 3" A-304 1 A-304 2 A-304 3 F.F. 0" Level 210' - 0" AB C E T.O.D. 15' - 6" T.O.P. (L) 23' - 0" T.O.P. (M) 27' - 0" T.O.P. (H)29' - 0" T.O.W. 3' - 3" A-306 3 A-306 2 A-306 1 WALL SECTION - GENERAL NOTES 1. 2. PROTECT EXSTING IMPROVEMENTS NOT RECEIVING WORK. 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:04 PM22-001 A-301 BUILDING SECTION 10.28.2022 Author Checker MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3/16" = 1'-0" 1NORTH-SOUTH SECTIONS 3/16" = 1'-0" 2NORTH-SOUTH SECTIONS 3/16" = 1'-0" 3NORTH-SOUTH SECTIONS KEYNOTES ID SPEC DESCRIPTION B - SHELL B80 ROOF ACCES HATCH B82 8" H. MECHANICAL EQUIPMENT CURB D - SERVICES D20 COMBINATION ROOF DRAIN + OVER FLOW DRAIN D40 HVAC R.T.U. SHEET NOTES ID DESCRIPTION 05 FINISH GRADE 06 FINISH SURFACE 66 PARAPET 74 36 x 48 THRU-PARAPET ACCESS FINISHES SCHEDULE ID SPEC DESCRIPTION MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-04 076200 BRAKE METAL COPING MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM MFR: FIBERTITE COLOR: OFF WHITE PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 CEMENT PLASTER FACE BEYOND LOW FLOATING CLIP VARIES3/4" OVHG.5/4x12 TREATED FASCIA BOARD; PAINT FINISH. 5/4x12 TREATED RAKE TRIM BOARD; PAINT FINISH. 1/2" PLYWOOD SHEATHING 2x SOFFIT FRAMING AT 24" O.C.; SEE STRUCTURAL 2x BACKING BOX RAKE TRIM; MATCH METAL ROOF FINISH LOW-RAKE SUPPORT ANGLE CONT. CLEAT STANDING SEAM METAL ROOF PANELS FIELD CUT & BEND UP 2" PANEL LEG AS REQ'D WHEN ENDING OFF MODULE PARAPET RAKE CLEAT (2) LAYERS 15# ROOFING FELT 5/8" PLYWOOD ROOF SHEATING 2x ROOF FRAMING AT 24" O.C.; SEE STRUCTURAL 7/8" EXT. CEMENT PLASTER OVER 3.4 #/SY EXP. MTL. LATH; PAINTLAP CEMENT PLASTER FACE BEYOND6 1/2"∙6 1/2"∙ NOTE: PROVIDE FASTENER TYPES, SIZES, AND QUANTITIES PER ROOF MANUFACTURER'S REQUIREMENTS BOX RAKE TRIM 2x NAILER 3 1/2"∙2"1 1/8" COPING PROFILE 1-PLY MEMBRANE ROOFING; EXTEND OVER TOP OF PARAPET G.I.S.M. 22 GA. COPING; PAINT COPING CLEAT 7/8" EXT. CEM. PLASTER OVER BUILDING PAPER & SELF FURRING LATH PARAPET ASSEMBLY 1-PLY MEMBRANE ROOFING; EXTEND OVER TOP OF PARAPET G.I.S.M. 22 GA. COPING; PAINT COPING CLEAT 2"1 1/8" COPING CLEATG.I.S.M. 22 GA. COPING; PAINT 4"2-PIECE COPING PROFILE 7/8" EXT. CEM. PLASTER OVER BUILDING PAPER & SELF FURRING LATH PARAPET ASSEMBLY 7/8" EXT. CEMENT PLASTER OVER BLDG. PAPER & SELF-FURRING LATH LOW FLOATING CLIP 5/4x12 TREATED RAKE TRIM BOARD; (FOREGROUND) 1/2" PLYWOOD SHEATHING 2x4x16 GA. ANGLE STANDING SEAM METAL ROOF PANELS FIELD CUT & BEND UP 2" PANEL LEG AS REQ'D WHEN ENDING OFF MODULE PARAPET RAKE TRIM (2) LAYERS 15# ROOFING FELT 5/8" PLYWOOD ROOF SHEATING 2x ROOF FRAMING AT 24" O.C.; SEE STRUCTURAL NOTE: PROVIDE FASTENER TYPES, SIZES, AND QUANTITIES PER ROOF MANUFACTURER'S REQUIREMENTS 2x NAILER FLEXIBLE MEMBRANE PARAPET RAKE CLEAT COUNTER FLASHING LOW-RAKE SUPPORT ANGLE WALL ASSEMBLY CEMENT PLASTER FACE (FOREGROUND) 3 1/2"∙ 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:10 PM22-001 A-501 ROOF DETAILS 10.28.2022 JG MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 3" = 1'-0" 1 ROOF RAKE DETAIL - OPEN 3" = 1'-0" 6PARAPET COPING DETAIL 3" = 1'-0" 5 PARAPET COPING DETAIL 3" = 1'-0" 2ROOF RAKE DETAIL - WALL 3RAKE PERSPECTIVE 4RAKE PERSPECTIVE BOX RAKE TRIM 5/4x12 FASCIA BD. 5/4x12 RAKE TRIM BD. STANDING SEAM MTL ROOF 5/4x12 FASCIA BD. METAL EAVE TRIM W. DRIP STANDING SEAM MTL ROOF 5/4x12 FASCIA BD. METAL EAVE TRIM W. DRIP BOX RAKE TRIM PARAPET RAKE TRIM & COUNTER FLASHING PT-02 PT-04 PT-05 PT-01 PT-03 MT-01 MT-02 MT-03 MT-04 CT-02 CT-04 MT-05 MT-07 CT-01 MT-06 CT-03 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:11 PM22-001 A-800 MATERIALS SAMPLES 10.28.2022 Author Checker MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 EXTERIOR FINISHES SCHEDULE ID SPEC DESCRIPTION COMPONENT CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-02 081113 ALUMINUM-FRAME STOREFRONT MATL: ALUMINUM FRAME FINISH: FACTORY COLOR: DARK BRONZE ANODIZED GLAZING: 1" INSULATED, FULLY TEMPERED CT-03 081113 CHANNEL SCREED DESCRIPTION: 1" W. REVEAL MATL: ALUMINUM FINISH: PAINT CT-04 107313 CUSTOM LOUVERED METAL AWNING PRODUCT: ALUMINUM SHUTTERS FINISH: PAINT MATERIALS MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: SMOOTH FINISH: PAINT MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER TEXTURE: LIGHT SAND FINISH: PAINT MT-03 093000 FEATURE WALL CLADDING HIGH-PRESSURE ENGINEERED STONE VENEER MFR: NEOLITH COLLECTION: IRON COLLECTION MODEL: IRON CORTEN MT-04 076200 BRAKE METAL COPING MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM MFR: MBCI SERIES: SUPERLOK STANDING SEAM FINISH: SIGNATURE 200 SERIES COLOR: BURNISHED SLATE MT-06 062013 5/4x12 TREATED WOOD FASCIA TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE FIN: PAINT MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM MFR: FIBERTITE COLOR: OFF WHITE PAINTS PT-01 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7567 "NATURAL TAN" 284-C1 PT-02 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7530 "BARCELONA BEIGE" 285-C4 PT-03 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7549 "STUDIO TAUPE" 284-C5 PT-04 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 7026 "GRIFFIN" 241-C6 PT-05 099123 MFR: SHERWIN-WILLIAMS COLOR: SW 6993 "BLACK OF NIGHT" 251-C5 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:18 PM22-001 A-900 PERSPECTIVE VIEW 10.28.2022 UB MM MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1PERSPECTIVE - NE 2PERSPECTIVE NW 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:25 PM22-001 A-901 PERSPECTIVE VIEW 10.28.2022 Author Checker MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1PERSPECTIVE - SW 2PERSPECTIVE - SE 123 4 SHEET TITLE: These documents are Instruments of Service and are the sole property of McAuliffe & Company, Inc. All designs and other information on these documents are for use on the specified project only. These documents shall not be altered in any way, shall not be disclosed or assigned to any third party, and shall not create any third party rights. Without express written permisison of McAuliffe & Company, Inc., these Instruments of Service shall not be used or relied on by any other persons or entities, or for any purpose following substantial completion of the Project. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. 5 6 for D C B E A DRAWING DATE: REVISIONS: INSTRUMENTS OF SERVICE CONSTRUCTION SET ISSUE DATES: BID SET PERMIT SET PLANCHECK SET DESIGN DEVELOPMENT SET PLANNING SUBMITTAL SET MICHAEL T. McAULIFFE, AIA C-27929 McA PROJECT NO: CHECKED BY: DRAWN BY: D C B E A SHEET NUMBER: T: 760.773.0907 F: 760.773.0967 mail@archmca.com 45125 Panorama Drive Palm Desert, California 92260 REN. C-27929 04/30/23MICHAELT.McA U L I FFENo.LIC ENSEDARCHIT ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification, interpretation, or addition to these documents by anyone not under the Architect's direct control or supervision. All modifications to these documents shall be in writing and shall be approved by the Architect in advance of the Work. Any use or reuse of these documents, in whole or in part, by the Owner, agents of the Owner, or any other party without the review and written approval of the Architect is strictly forbidden. McAuliffe & Company, Inc. shall be held harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of any and all unauthorized use or reuse of these documents. Copyright 2022, McAuliffe & Company, Inc. All rights reserved. UNAUTHORIZED CHANGES & USES 11/1/2022 3:46:32 PM22-001 A-902 PERSPECTIVE VIEWS 10.28.2022 Author Checker MECHANICS BANK BUILDING One Eleven El Paseo, LLC 73611 Highway 111 Palm Desert, CA 92260 149 Palos Verdes Blvd. Suite E Redondo Beach, CA 90277 1AERIAL - NE 2AERIAL - SE 3AERIAL - SW 4AERIAL - NE FF=227.503,830 GSFMECHANICS BANK BUILDING0° 11' 09"140.01'NW89° 14' 06"110.34'SER=L=26.02'20.00'0° 11' 09"120.28'SEVACANT PARCELAPN: 627-211-023ZONE: D.O.MULTI-BUILDING RETAILAPN: 627-211-022-3ZONE: D.O.01020304HC050607080989° 12' 43"NWW101112131514AAAABBBBBBBBBCCCCCCCCCCCCABCPRELIMINARYDESIGNL1.0FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/24DESIGNGROUP77-899 WOLF RD. FF=227.503,830 GSFMECHANICS BANK BUILDING0° 11' 09"140.01'NW89° 14' 06"110.34'SER=L=26.02'20.00'0° 11' 09"120.28'SEVACANT PARCELAPN: 627-211-023ZONE: D.O.MULTI-BUILDING RETAILAPN: 627-211-022-3ZONE: D.O.01020304HC050607080989° 12' 43"NWW101112131514AAAABBBBBBBBBCCCCCCCCCCCCABCPRELIMINARYDESIGNL1.0FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/24DESIGNGROUP77-899 WOLF RD. ARCHITECTURAL REVIEW COMMISSION NOTICE OF ACTION September 12, 2022 Michael McAuliffe, AIA (McAuliffe & Company, Inc.) 45125 Panorama Drive Palm Desert, CA 92260 Subject: Consideration of a recommendation to the Planning Commission for approval to construct Mechanics Bank, a new 3,830 square-foot commercial building located in the Jensen’s Shopping Center at 73611 Highway 111. The Architectural Review Commission of the City of Palm Desert considered your request and took the following action at its meeting of August 23, 2022: By Minute Motion, the Architectural Review Commission approved Case No. MISC22- 0013 subject to the following: 1) Add landscape in the area between the proposed block wall and public sidewalk on the north and east portions of the property; and 2) Applicant will return to the ARC for review of a more developed illustration of rake detail including how detail terminates into the surrounding element prior to building permit issuance and specific details for proposed wood fascia siding. The motion carried with a 4-0-1 vote. (AYES: Colvard, Latkovic, McIntosh, and Vuksic; NOES: None; ABSENT: None; ABSTAIN: McAuliffe). To view video or audio for the discussion on this item, including comments provided by the Commission, please visit the Architectural Review Commission Information Center website at, https://www.cityofpalmdesert.org/our-city/committees-and-commissions/commission- information. If you have any questions, please contact Senior Planner, Nick Melloni, at (760) 776-6479 or nmelloni@cityofpalmdesert.org. Sincerely, ROSIE LUA, SECRETARY ARCHITECTURAL REVIEW COMMISSION cc: File CITY OF PALM DESERT DEVELOPMENT SERVICES DEPARTMENT ARCHITECTURAL REVIEW COMMISSION MEMORANDUM To: Honorable Chair and Members of the Commission From: Nick Melloni, Senior Planner Date: November 8, 2022 Case No: PP/CUP20-0003 – Landscape Plans Subject: Final Review of Landscape Plans for Chandi Mixed Use BACKGROUND On May 27, 2021, the City Council adopted Resolution 2021-28 approving the Chandi Mixed-Use Development, a three-story, mixed-use development containing 60 residential dwelling units and 16,500 square-feet of ground floor commercial space located on the southeast corner of Fred Waring Drive and San Pablo Avenue. The applicant has prepared final landscape construction drawings for the project in accordance with condition of approval #17 of the Council Resolution: PLANNING COMMISSION: 17. The applicant shall revise the landscape plan to include pedestrian-friendly plants on all sides of the property, add additional landscape screening to the southeast portion of the lot, and consider using non-deciduous landscaping. The City’s Architectural Review Commission (ARC) shall review the landscape plan at the time that the ARC reviews the construction drawings. The landscape plan is being presented to the ARC to satisfy this condition of approval. The applicant has incorporated additional landscape shrub plantings along the street frontages of the project. These plantings will be in curb-adjacent landscape planters and building adjacent planters to line both sides of the sidewalk. The preliminary approved plans are attached for reference. The final landscape construction plans will be provided at the meeting. The Architectural Review Commission will not take action on this item as it is informational to demonstrate the landscape plan is in conformance with the preliminary approval. Attachments: 1. Preliminary approved architectural plans. 2. ARC Notice of Action dated November 16, 2020 3. Resolution No. 2021-28 BIKE STOR. RETAIL / COMMERCIAL ART PLAZA SAN PABLO AVENUE SANTA ROSA WAYFRED WARING DR.6 8 18 9 10 7 ART PLAZA 10 RETAIL / COMMERCIAL TRASH RM. 10%8%17% TOC 184.98 187.33 183.8 +/-186.5 STEP AS NEED - TO WORK WITH SLOPING SIDEWALK 4.8%186.3+/-183.8BIKE STOR. MECH. RETAIL / COMMERCIAL 3,172 sf +/-185.5 STEP AS NEED - TO WORK WITH SLOPING SIDEWALK LEASING PARKING LEVEL 1 ELEC. RM. FIRE CMD LINE OF BUILDING ON LEVEL 3 STORAGESTORAGEDN8.33% SLOPE 3R @ 6" 1.5' HT @ 18' L 3R @ 5"DN 2R @ 6" DN UP UP UP DN UP DNUP F.H. UP STAIR 2 22 R @ 6.54" = 12' STAIR 4 STAIR 3 UP (1) LOADING GAS METERS EVCSVANVANEV EVEVCSEVCLEAN AIR/VANPOOL/EVCLEAN AIR/VANPOOL/EVCLEAN AIR/VANPOOL/EVEVSTAIR 1 22 R @ 6.545" = 12' 42 R @ 6.85"= 24'0"10M-2P10M-2P10M-2P 10M-2P10M-2P10M-2PSINK DW REF CHASE ELEV 1 ELEV 2 RECYCLE 4YD TRASH 4YD FUTURE COMPOST BINS CBOARD 4YD BOOSTER PUMP 185.04 2% DN DN CLCL MPOE GOLF/ MOTORCYCLE (10) LINE OF 2ND FLOOR BUILDING PAD ABOVE OPEN AIR SPACE MAIL RM. 1ST LEVEL PARKING: 68 SPACES 10 GOLF/MOTOR CYCLE SPACES VANEVEV1ST FLOORPLANTING L1.0 FAX (760) 777-9132 PH. (760) 777-9131 PALM DESERT, CA SUITE 102 H ERMANN LIC# 2754 92211 EXP. 04/30/22 DESIGN G ROUP 77-899 WOLF RD. OPEN TO BELOW CAFE DECK 6917DN194.3STOR.8MEZZANINE MEZZANINE DECK FLEX AMENITY STORAGE2ND FLOORPLANTING L1.1 FAX (760) 777-9132 PH. (760) 777-9131 PALM DESERT, CA SUITE 102 H ERMANN LIC# 2754 92211 EXP. 04/30/22 DESIGN G ROUP 77-899 WOLF RD. XSXSXSTRASH RM.DECKFITNESSM.W.POOL EQ.REFSINK DW RANGE REFSINKDWRANGE REFSINKDWRANGEREFSINKDW SINKDWRANGEREFSINKDWRANGE SINKDWREFRANGESINKDWREFRANGEREF SINKDWRANGEREFSINK DW RANGEREFSINK DWRANGEREFSINKDW RANGEREF SINKDW3RD FLOORPLANTING L1.2 FAX (760) 777-9132 PH. (760) 777-9131 PALM DESERT, CA SUITE 102 H ERMANN LIC# 2754 92211 EXP. 04/30/22 DESIGN G ROUP 77-899 WOLF RD. BIKESTOR.RETAIL / COMMERCIALARTPLAZASAN PABLO AVENUESANTA ROSA WAY FRED WARING DR.68189107ARTPLAZA10RETAIL / COMMERCIALTRASH RM.10%8%17%TOC 184.98187.33183.8+/-186.5STEP AS NEED - TOWORK WITH SLOPINGSIDEWALK4.8% 186.3+/- 183.8 BIKE STOR.MECH.RETAIL / COMMERCIAL3,172 sf+/-185.5STEP AS NEED - TOWORK WITH SLOPINGSIDEWALKLEASINGPARKING LEVEL 1ELEC. RM.FIRECMDLINE OFBUILDING ONLEVEL 3STORAGE STORAGE DN8.33% SLOPE3R @ 6"1.5' HT @ 18' L3R @ 5"DN2R @ 6"DNUPUPUPDNUPDNUPF.H.UPSTAIR 222 R @ 6.54"= 12'STAIR 4STAIR 3UP(1) LOADINGGAS METERSEVCS VAN VANEV EV EVCS EV CLEAN AIR/ VANPOOL/EV CLEAN AIR/ VANPOOL/EV CLEAN AIR/ VANPOOL/EV EVSTAIR 122 R @ 6.545"= 12'42 R @ 6.85"= 24'0"10M-2P10M-2P 10M-2P10M-2P10M-2P10M-2PSINKDWREFCHASEELEV1ELEV 2RECYCLE4YDTRASH4YDFUTURE COMPOST BINSCBOARD4YDBOOSTERPUMP185.042%DNDNCLCL MPOEGOLF/MOTORCYCLE(10)LINE OF 2ND FLOORBUILDING PAD ABOVEOPEN AIR SPACEMAIL RM.1ST LEVEL PARKING:68 SPACES10 GOLF/MOTOR CYCLE SPACESVAN EV EV L2.0FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/22DESIGNGROUP77-899 WOLF RD.1ST FLOORPLANT MATERIALTREES & ACCENTS BIKESTOR.RETAIL / COMMERCIALARTPLAZASAN PABLO AVENUESANTA ROSA WAY FRED WARING DR.68189107ARTPLAZA10RETAIL / COMMERCIALTRASH RM.10%8%17%TOC 184.98187.33183.8+/-186.5STEP AS NEED - TOWORK WITH SLOPINGSIDEWALK4.8% 186.3+/- 183.8 BIKE STOR.MECH.RETAIL / COMMERCIAL3,172 sf+/-185.5STEP AS NEED - TOWORK WITH SLOPINGSIDEWALKLEASINGPARKING LEVEL 1ELEC. RM.FIRECMDLINE OFBUILDING ONLEVEL 3STORAGE STORAGE DN8.33% SLOPE3R @ 6"1.5' HT @ 18' L3R @ 5"DN2R @ 6"DNUPUPUPDNUPDNUPF.H.UPSTAIR 222 R @ 6.54"= 12'STAIR 4STAIR 3UP(1) LOADINGGAS METERSEVCS VAN VANEV EV EVCS EV CLEAN AIR/ VANPOOL/EV CLEAN AIR/ VANPOOL/EV CLEAN AIR/ VANPOOL/EV EVSTAIR 122 R @ 6.545"= 12'42 R @ 6.85"= 24'0"10M-2P10M-2P 10M-2P10M-2P10M-2P10M-2PSINKDWREFCHASEELEV1ELEV 2RECYCLE4YDTRASH4YDFUTURE COMPOST BINSCBOARD4YDBOOSTERPUMP185.042%DNDNCLCL MPOEGOLF/MOTORCYCLE(10)LINE OF 2ND FLOORBUILDING PAD ABOVEOPEN AIR SPACEMAIL RM.1ST LEVEL PARKING:68 SPACES10 GOLF/MOTOR CYCLE SPACESVAN EV EV L2.1FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/22DESIGNGROUP77-899 WOLF RD.1ST FLOORPLANT MATERIALSHRUBS OPEN TO BELOWCAFE DECK17DN 194.3 STOR.MEZZANINEDECKFLEXAMENITYL2.2FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/22DESIGNGROUP77-899 WOLF RD.2ND FLOORPLANT MATERIALACCENTS up up up TRASH RM.DECK FITNESS M.W. POOL EQ. REFSINKDW RANGEREF SINKDWRANGEREFSINK DW RANGEREFSINK DW SINKDWRANGEREFSINK DW RANGESINK DWREF RANGESINKDWREF RANGEREF SINKDWRANGE REFSINKDWRANGE REF SINKDWRANGE REF SINKDWRANGEREF SINKDWL2.2FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/22DESIGNGROUP77-899 WOLF RD.3RD FLOORPLANT MATERIALTREES & SHRUBS BIKE STOR. RETAIL / COMMERCIAL ART PLAZA SAN PABLO AVENUE 6 8 18 9 10 7 ART PLAZA 10 RETAIL / COMMERCIAL TRASH RM. 10%8%17% TOC 184.98 187.33 183.8 +/-186.5 STEP AS NEED - TO WORK WITH SLOPING SIDEWALK BIKE STOR. MECH. RETAIL / COMMERCIAL 3,172 sf +/-185.5 STEP AS NEED - TO WORK WITH SLOPING SIDEWALK LEASING PARKING LEVEL 1 ELEC. RM. FIRE CMD LINE OF BUILDING ON LEVEL 3 DN8.33% SLOPE 3R @ 6" 1.5' HT @ 18' L DN 2R @ 6" DN UP UP UP DN UP DNUP F.H. UP STAIR 2 22 R @ 6.54" = 12' STAIR 4 STAIR 3 UP (1) LOADING GAS METERS VAN STAIR 1 42 R @ 6.85" = 24'0" 10M-2P 10M-2PSINK DW REF CHASE ELEV 1 ELEV 2 RECYCLE 4YD TRASH 4YD FUTURE COMPOST BINS CBOARD 4YD BOOSTER PUMP 185.04 2% DN DN CL MPOE GOLF/ MOTORCYCLE (10) LINE OF 2ND FLOOR BUILDING PAD ABOVE OPEN AIR SPACE MAIL RM. 1ST LEVEL PARKING: 68 SPACES 10 GOLF/MOTOR CYCLE SPACES 1ST FLOOR PLANTING L1.0 FAX (760) 777-9132 PH. (760) 777-9131 PALM DESERT, CA SUITE 102 HERMANN LIC# 2754 92211 EXP. 04/30/22 DESIGNGROUP 77-899 WOLF RD. 1 RESOLUTION NO. 2021-28 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM DESERT, CALIFORNIA, CONSIDERING APPROVAL OF A PRECISE PLAN, CONDITIONAL USE PERMIT, AND TENTATIVE PARCEL MAP 38023 TO CONSTRUCT A THREE-STORY MIXED -USE BUILDING CONSISTING OF RETAIL AND OFFICE USES ON THE GROUND FLOOR, AND 60 TOTAL RESIDENTIAL APARTMENT UNITS ON THE SECOND AND THIRD FLOORS LOCATED ON THE SOUTHEAST CORNER OF SAN PABLO AVENUE AND FRED WARING DRIVE; AND ADOPTION OF A NOTICE OF EXEMPTION IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) CASE NOS: PP/CUP 20-0003 and TPM 38023 WHEREAS, the City Council of the City of Palm Desert, California, did on the 27th day of May 2021, hold a duly noticed public hearing to consider the request by Chandi Group USA, for approval of the above -noted project request; and WHEREAS, the Planning Commission of the City of Palm Desert, California, did on the 15'h day of December 2020, hold a duly noticed public hearing to consider the request by Chandi Group USA, for a recommendation to the City Council for approval of the above -noted project request; and WHEREAS, according to the CEQA, the City must determine whether a proposed activity is a project subject to CEQA. If the project is subject to CEQA, staff must conduct a preliminary assessment of the project to determine whether the project is exempt from CEQA review. If a project is not exempt, further environmental review is necessary. The application has complied with the requirements of the "City of Palm Desert Procedure for Implementation of the California Environmental Quality Act," Resolution No. 2019-41, and the Deputy Director of Development Services has determined that the proposed project is an Article 19 Class 32: Infill Development Projects Categorical Exemption for purposes of CEQA and no further review is necessary; and WHEREAS, at the said public hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, the City Council did find the following facts and reasons to exist to justify approval of said request: 1. The proposed project is located in the Downtown Edge (DE) zoning district, which allows "mixed -use developments" as permitted uses, subject to the approval of a Precise Plan application (PP) and Conditional Use Permit (CUP). 2. The proposed project conforms to the DE zone and One Eleven Development Code design guidelines since the project provides a mixture of residential densities and uses. It is also intended to provide for the integration of urban designs by encouraging front -facing buildings closer to the street that creates a building line on the ground floor to create a more walkable neighborhood. 3. The proposed project conforms to the Downtown (D) designation within the General Plan by creating a walkable neighborhood building. The purpose of the D RESOLUTION NO. 2021-28 designation is to provide high -intensity mixed -use development anchored by civic, cultural, entertainment, retail, and dining activity that features a variety of building sizes and housing choices. Ground floor uses include retail, restaurant, service, and office uses, while upper floors accommodate residential and office uses. 4. The project complies with all development standards including setbacks, building height, density parking, lot coverage, and land use compatibility. 5. The building as designed offers an upscale architectural design. 6. One of the City's overall goals identified in the Strategic Plan is to focus on creating a city center/downtown that provides high -intensity mixed -use developments anchored by civic, cultural, entertainment, retail, and dining activity along walkable streetscapes. FINDINGS FOR APPROVAL: 1. That the density of the proposed subdivision is consistent with applicable general and specific plans. The land use designation is D within the General Plan, which allows a density of up to 40 units per acre. The proposed project of 60 market -rate apartment units on 1.54 acres is consistent with the density within the General Plan. The purpose of the D designation is to provide high -intensity mixed -use development anchored by civic, cultural, entertainment, retail, and dining activity that features a variety of building sizes and housing choices. Ground floor uses include retail, restaurant, service, and office uses, while upper floors accommodate residential and office uses. Buildings are encouraged near or at the sidewalk to shape the commercial streetscapes, support outdoor dining, and for easy view of storefronts. Buildings are typically mixed -use up to three stories with taller buildings up to five stories focused at key intersections and/or public open space. The proposed mixed -use development with commercial uses on the ground floor and a mixture of residential apartment units (one to three bedrooms) meets the intent of the General Plan designations. The project is also consistent with the City's overall vision for San Pablo Avenue, and with the City's Strategic Plan. Land Use - Priority 4: "Create a mixed -use city core integrating shopping, dining, lodging, and housing." Tourism and Marketing — Priority 1: "Improve access to Palm Desert and its attractions to enhance the ease of lifestyle." Transportation — Priority 1: "Create walkable neighborhoods and areas within Palm Desert that would include residential, retail, services and employment centers, and parks, recreation, and open space to reduce the use of low occupancy vehicles." 2 RESOLUTION NO. 2021-28 1 1 1 Land uses within the surrounding area are compatible with the proposed use, and maintain the same General Plan designations. Furthermore, the project does not physically divide an existing community and does not conflict with any applicable land use plan, policy, or regulation outlined in the General Plan. 2. That the design or improvement of the proposed subdivision is consistent with applicable general and specific plans. The Land Development (Planning/Engineering) Division, Economic Development Department, Fire Department, and Public Works Department have reviewed the design and improvements of the proposed subdivision for consistency with the General Plan and emergency services. The street and utility improvements, circulation patterns, and drainage improvements meet all requirements of the General Plan. All existing perimeter streets are in conformance with the General Plan. All external project streets that serve the project conform to City standards. There are no specific plans for the property. 3. That the site is physically suitable for the type of development. The 1.54 acres are suitable for the development proposed. No environmental or traffic concerns were identified that would indicate that development in this area would be unsuitable. in addition, existing commercial and residential developments have successfully constructed similar types of development in the immediate vicinity. No obstacles to the development of surrounding subdivisions were experienced and, due to the proximity and similarity of the proposed development, it is reasonable to conclude that the site is physically suitable for it. The property is suitable for the proposed development as conditioned. 4. That the site is physically suitable for the proposed density of development. As proposed, the site layout and density are consistent with the General Plan. The property allows for 40 DU/acre, and the project density of 60 units on 1.54 acres complies. The project density is necessary to carry out the vision of creating an urban development within the DE zone. 5. That the design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and unavoidably injury to fish or wildlife or their habitat. For purposes of CEQA, the project will not have a significant negative impact on the environment, and is categorically exempt, under Class 32: Infill Development Projects. The design of the project will not cause substantial environmental damage or injure fish or wildlife or their habitat since the surrounding area has been developed. In addition, the project will pay into the Coachella Valley Multi -Species Habitat Conservation fund for the development of raw land. 3 RESOLUTION NO. 2021-28 6. That the design of the subdivision or the type of improvements is not likely to cause serious public health problems. The design and layout of the mixed -use development complies with all grading requirements and the project will be developed in accordance with the Uniform California Building Code. Pedestrian access is provided to adjoining land uses along San Pablo Avenue where other residents would be able to walk to the retail uses, which decreases the need for vehicular traffic between adjoining properties. 7. That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. The proposed project will construct an underground retention drainage. The parcel map identifies the use of this area and will record an easement for drainage purposes. In addition, the applicant is responsible for the maintenance of the retention basin outlined in the conditions of approval. Surrounding perimeter City streets are built out to the General Plan designation. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF PALM DESERT, CALIFORNIA, AS FOLLOWS: 1. That the above recitations are true and correct and constitute the findings of the City Council in this case. 2. That the City Council approval of the Precise Plan, Conditional Use Permit, and Tentative Parcel Map 38023 as proposed. PASSED, APPROVED, AND ADOPTED by the City Council of the City of Palm Desert, California, at its regular meeting held on the 27th day of May 2021, by the following vote, to wit: AYES: HARNIK, JONATHAN, NESTANDE, QUINTANILLA, and KELLY NOES: NONE ABSENT: NONE ABSTAIN: NONE ATTEST: M. oLORIA ANCHEZ, ACTING CITY CLERK CITY OF PXLM DESERT, CALIFORNIA Ri<ctiZ0-1417 1 ega KATHLELLY, )MAY 4 RESOLUTION NO. 2021-28 CONDITIONS OF APPROVAL CASE NOS: PP/CUP 20-0003 and TPM 38023 LAND DEVELOPMENT (PLANNING/ENGINNERING) DIVISION: 1. The development of the property shall conform substantially with exhibits on file with the Land Development Division, as modified by the following conditions. 2. The applicant shall record Parcel Map 38023 within two (2) years of project approval. 3. All construction documentation shall be coordinated for consistency, including, but not limited to, architectural, structural, mechanical, electrical, plumbing, landscape and irrigation, grading, and street improvement plans. All such plans shall be consistent with the approved entitlement plans on file with the Land Development Division. 4. Construction of said project shall commence as outlined with the Disposition and Development Agreement from the date of final approval unless an extension of time is granted; otherwise, said approval shall become null, void, and of no effect whatsoever. 5. The development of the property described herein shall be subject to the restrictions and limitations set forth herein which are in addition to the approved project and all Palm Desert Municipal ordinances and state and federal statutes now in force, or which hereafter may be in force. 6. Prior to issuance of a building permit for construction of any use or structure contemplated by this approval, the applicant shall first obtain permits and/or clearance from the following agencies: Building & Safety Division Public Works Department Fire Department Coachella Valley Water District (CVWD) The applicant shall present evidence of said permit or clearance from the above agencies to the Department of Building & Safety at the time of issuance of a building permit for the use contemplated herewith. 7. The Applicant shall agree to defend, indemnify, and hold harmless the City of Palm Desert or its agents, officers, and employees from any claim, action, or proceeding against the City of Palm Desert or its agents, officers or employees, to attack, set aside, void, or annul, any approval of the City of Palm Desert, whether by its City Council, Planning Commission, or other authorized board or officer of the City. 8. If the presence of cultural resources is identified in the cultural resources inventory, an approved Native Cultural Resource Monitor shall be on -site during ground -disturbing activities. 9. Should human remains be discovered during the construction of the proposed project, the project coordinator would be subject to either the State Law regarding the discovery and disturbance of human remains or the Tribal burial protocol. In either circumstance, all destructive activity in the immediate vicinity shall halt, and the County Coroner shall be contacted pursuant to State Health and Sa-ety Code 7050.5. If the remains are determined RESOLUTION NO. 2021-28 to be of Native American origin, the Native American Heritage Commission (NAHC) shall be contacted. The NAHC will make a determination of the Most Likely Descendant (MLD). The City and developer will work with the designated MLD to determine the final disposition of the remains. 10. All sidewalk plans shall be reviewed and approved by the Department of Public Works. 11. Developer shall enter into a recordable Disposition and Development Agreement to memorialize these, and other conditions stated within the Disposition and Development Agreement placed on the project. 12. The project shall have a density of 60 dwelling units on the 1.54 acres. 13. The project land uses shall conform to the DE zone. Restaurant uses are permitted throughout the mixed -use project as a part of the CUP approval. 14. Lighting plans shall be submitted in accordance with Palm Desert Municipal Code PDMC) Section 24.16 for any landscape, architectural, street, or other lighting types within the project area. 15. The property shall be maintained in accordance with landscape maintenance requirements contained in the PDMC. 16. The applicant or any successor in interest shall comply with all applicable local, state, and federal laws and regulations. PLANNING COMMISSION: 17. The applicant shall revise the landscape plan to include pedestrian -friendly plants on all sides of the property, add additional landscape screening to the southeast portion of the lot, and consider using non -deciduous landscaping. The City's Architectural Review Commission (ARC) shall review the landscape plan at the time that the ARC reviews the construction drawings. PUBLIC WORKS DEPARTMENT: Prior to recordation of the Parcel Map and any permits: 18. The parcel map shall be submitted to the City Engineer for review and approval. 19. Easements for drainage, pedestrian, and public utility purposes shall be provided as needed on the final parcel map. 20. Utilities shall be relocated and easements abandoned as needed so as not to conflict with the proposed infrastructure. 21. The applicant shall pay the appropriate signalization fee in accordance with City of Palm Desert Resolution Nos. 79-17 and 79-55 and drainage fee in accordance with Section 26.49 of the PDMC and Palm Desert Ordinance Number 653. 22 Park fees in accordance with PDMC Section 26.48.060 shall be paid prior to the recordation of the tract map. 6 RESOLUTION NO. 2021-28 1 1 1 23. The applicant shall submit Covenants, Conditions, & Restrictions (CC&Rs) concurrently with the final map for review and approval. Once approved by the City, the CC&Rs shall be recorded with the County Recorder's Office. 24. Horizontal control requirements shall apply to this map, including state plane coordinates, which shall conform to City of Palm Desert specifications. Prior to the issuance of a grading permit: 25. The applicant shall submit a grading plan to the Public Works Department for review and approval. Any changes to the approved civil or landscape plans must be reviewed for approval prior to work commencing. 26. The applicant shall submit a PM10 application for approval. The applicant shall comply with all provisions of PDMC Section 24.12 regarding Fugitive Dust Control. 27. The applicant shall abide by all provisions of City of Palm Desert Ordinance 843, Section 24.20 Stormwater Management and Discharge Ordinance. 28. The applicant shall abide by PDMC Section 27.12.56, and retain stormwater on -site to the 100-year, 24-hour storm. 29. The applicant shall submit a final Water Quality Management Plan (WQMP) for review and approval. The WQMP shall identify the Best Management Practices (BMPs) that will be used on the site to control predictable pollutant runoff. Prior to the issuance of the grading permit, the Operation and Maintenance Section of the approved final WQMP shall be recorded with County's Recorder Office and a conformed copy shall be provided to the Public Works Department. 30. Provide the City Engineer with evidence that a Notice of Intent (NOI) has been filed with the State Water Resources Control Board. Such evidence shall consist of a copy of the NOI stamped by the State Water Resources Control Board or the Regional Water Quality Control Board, or a letter from either agency stating that the NOI has been filed. 31. The applicant shall enter into an agreement and post security, in a form and amount acceptable to the City Engineer, guaranteeing the construction of all off -site improvements. Plans shall be submitted for review and approval prior to construction. Improvements shall include, but are not limited to: A. The installation of a driveway on Fred Waring Drive. B. The installation of a driveway on Santa Rosa Way. C. The modification of an existing curb ramp on the corner of San Pablo Drive and Santa Rosa Way. D. The installation of an ADA compliant sidewalk on Santa Rosa Way. E. The installation of a full -capture trash device in the catch basin on San Pablo Avenue. 7 RESOLUTION NO. 2021-28 BUILDING AND SAFETY DIVISION: 32. This project shall comply with the latest adopted edition of the following codes: A. 2019 California Building Code and its appendices and standards B. 2019 California Plumbing Code and its appendices and standards C. 2019 California Mechanical Code and its appendices and standards D. 2019 California Electrical Code E. 2019 California Energy Code F. 2019 California Green Building Standards Code G. 2019 California Administrative Code H. 2019 California Fire Code and its appendices and standards 33. Provide building height and area analysis to determine compliance with CBC Section 503. Justify any area increases to height and area as permitted per CBC Sections 504 and506. 34. Provide a complete set of scaled or fully dimension elevations to determine the number of stories for the proposed project. CBC Section 503 (Definition of "Grade Plan" "Story" and Story above gradeplane"). 35. Provide an area analysis on the first sheet of the plans to justify the allowable floor areas for a mixed occupancy building. The sum of the ratios of the actual area for each occupancy divided by the allowable area for each occupancy must not exceed 1.00. For buildings with fire walls, use the floor area of each separate "building" to justify the area. CBC Section 508.4.2 and 706.1. 36. Submit an exit plan that labels and clearly shows compliance with all required egress features such as, but not limited to, common path of travel, the required number of exits and separation, occupant load, required width, continuity, travel distance, elevators, etc. CBC 1001.1. 37. An approved automatic fire sprinkler system shall be installed as required per the City of Palm Desert Code Adoption Ordinance 1351. 38. A disabled access overlay of the precise grading plan is required to be submitted to the Department of Building and Safety for plan review of the site accessibility requirements as per 2016 CBC Chapters 11A & B (as applicable) and Chapter 10. 39. All exits must provide an accessible path of travel to the public way. (CBC 1027.5 & 11B- 206). 40. Detectable warnings shall be provided where required per CBC 11B-705.1.2.5 and 11B- 705.1.2.2. The designer is also required to meet all ADA requirements. Where an ADA requirement is more restrictive than the State of California, the ADA requirement shall supersede the State requirement. 41. Provide an accessible path of travel to the trash enclosure. The trash enclosure is required to be accessible. Please obtain a detail from the Building and Safety Division. 8 RESOLUTION NO. 2021-28 42. Public pools and spas must be first approved by the Riverside County Department of Environmental Health and then submitted to the Building and Safety Division. Pools and Spas for public use are required to be accessible. 43. All contractors and subcontractors shall have a current City of Palm Desert Business License prior to permit issuance per Palm desert Municipal Code, Title 5. 44. All contractors and/or owner -builders must submit a valid Certificate of Worker's Compensation Insurance coverage prior to the issuance of a building permit per California Labor Code, Section 3700. 45. Address numerals shall comply with Palm Desert Ordinance No. 1351 (Palm Desert Municipal Code 15.28. Compliance with Ordinance 1351 regarding street address location, dimension, a stroke of line, distance from the street, height from grade, height from street, etc. shall be shown on all architectural building elevations in detail. Any possible obstructions, shadows, lighting, landscaping, backgrounds or other reasons that may render the building address unreadable shall be addressed during the plan review process. You may request a copy of Ordinance 1351 or Municipal Code Section 15.28 from the Department of Building and Safety counterstaff. 46. Please contact Tameca Williams, Management Specialists II, at the Building and Safety Division (760-776-6420) regarding the addressing of all buildings and/orsuites. FIRE DEPARTMENT: 47. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes, which are in force at the time of building plan submittal. 48. The proposed project may have a cumulative adverse impact on the Fire Department's ability to provide an acceptable level of service. These impacts include an increasing number of emergency and public service calls due to the increased presence of structures, traffic, and population. The project proponents/developers will be expected to provide for a proportional mitigation to these impacts via capital improvements and/or impact fees. 49. Fire Department emergency vehicle apparatus access road location and design shall be in accordance with the current California Fire Code, PDMC, and Riverside County Fire Department Standards. Plans must be submitted to the Fire Department for review and approval prior to building permit issuance. 50. Fire Department water systems(s) for fire protection shall be in accordance with the current California Fire Code, City of Palm Desert, and Riverside County Fire Department Standards. Plans must be submitted to the Fire Department for review and approval prior to building permit issuance. END OF CONDITIONS OF APPROVAL 9 CITY OF PALM DESERT DEVELOPMENT SERVICES DEPARTMENT ARCHITECTURAL REVIEW COMMISSION MEMORANDUM To: Honorable Chair and Members of the Commission From: Nick Melloni, Senior Planner Date: November 8, 2022 Case No: PP/CUP21-0004 – Construction Plans Subject: Final Review of Project Construction Plans for Vitalia Apartments BACKGROUND On August 25, 2021, the City Council adopted Resolution 2021-57 approving the Vitalia Apartments, a 269-unit affordable apartment development located on the southwest corner of Gerald Ford Drive and Planned Extension of Rembrandt Parkway. The notice of action and minutes are attached to this memorandum for reference as well as the final resolution of the project. The final construction drawings have been submitted for plan check with Building and Safety Division and are pending building permit issuance. The Architectural Review Commission is to review the architectural plans for substantial conforms with the preliminary exhibits approved for the above noted Vitalia Apartments. The preliminary approved plans are attached for reference. The final construction plans will be provided at the meeting. The Architectural Review Commission will not take action on this item as it is informational to demonstrate the plans are in conformance with the preliminary approval. Attachments: 1. Preliminary Approved Architectural Plans 2. ARC Minutes dated May 11, 2021 3. ARC Notice of Action dated May 20, 2021 -----ATTACHMENT WITH ADDITIONAL RENDERINGS A-1.0PROJECT INFORMATION420GENERAL PROJECT NOTES:1. ALL DOWNSPOUTS FOR ROOF ELEMENT DRAINAGE SHALL BE CONCEALED WITHIN THE BUILDINGS AND NOT EXPOSED (TYP.)2. THE DRIP EDGE DETAIL AT APARTMENT BALCONIES SHALL BE CAREFULLY CONSIDERED TO PREVENT DRAINAGE OVERRUN OVER THE BUILDINGS VERTICAL SURFACES (TYP.)3. THE FINAL LOCATION OF ALL FIRE RISERS AND UTILITY CONNECTIONS SHALL BE CONCEALED FROM DIRECT VIEW AND CONFORM TO FIRE DEPARTMENT REQUIREMENTS.CONCEAL ALL FIRE RISERS INDICATED TO BE LOCATED WITHIN THE STAIRWELLS (TYP.) GENERAL PLAN NOTES: 1. ALL DOWNSPOUTS FOR ROOF ELEMENT DRAINAGE SHALL BE CONCEALED WITHIN THE BUILDINGS AND NOT EXPOSED (TYP.) 2. THE DRIP EDGE DETAIL AT APARTMENT BALCONIES SHALL BE CAREFULLY CONSIDERED TO PREVENT DRAINAGE OVERRUN OVER THE BUILDINGS VERTICAL SURFACES (TYP.) 3. THE FINAL LOCATION OF ALL FIRE RISERS AND UTILITY CONNECTIONS SHALL BE CONCEALED FROM DIRECT VIEW AND CONFORM TO FIRE DEPARTMENT REQUIREMENTS. CONCEAL ALL FIRE RISERS INDICATED TO BE LOCATED WITHIN THE STAIRWELLS (TYP.) GENERAL PLAN NOTES: 1. ALL DOWNSPOUTS FOR ROOF ELEMENT DRAINAGE SHALL BE CONCEALED WITHIN THE BUILDINGS AND NOT EXPOSED (TYP.) 2. THE DRIP EDGE DETAIL AT APARTMENT BALCONIES SHALL BE CAREFULLY CONSIDERED TO PREVENT DRAINAGE OVERRUN OVER THE BUILDINGS VERTICAL SURFACES (TYP.) 3. THE FINAL LOCATION OF ALL FIRE RISERS AND UTILITY CONNECTIONS SHALL BE CONCEALED FROM DIRECT VIEW AND CONFORM TO FIRE DEPARTMENT REQUIREMENTS. CONCEAL ALL FIRE RISERS INDICATED TO BE LOCATED WITHIN THE STAIRWELLS (TYP.) GENERAL PLAN NOTES: 1. ALL DOWNSPOUTS FOR ROOF ELEMENT DRAINAGE SHALL BE CONCEALED WITHIN THE BUILDINGS AND NOT EXPOSED (TYP.) 2. THE DRIP EDGE DETAIL AT APARTMENT BALCONIES SHALL BE CAREFULLY CONSIDERED TO PREVENT DRAINAGE OVERRUN OVER THE BUILDINGS VERTICAL SURFACES (TYP.) 3. THE FINAL LOCATION OF ALL FIRE RISERS AND UTILITY CONNECTIONS SHALL BE CONCEALED FROM DIRECT VIEW AND CONFORM TO FIRE DEPARTMENT REQUIREMENTS. CONCEAL ALL FIRE RISERS INDICATED TO BE LOCATED WITHIN THE STAIRWELLS (TYP.) PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL PARKING STALL 10 1 10 1 CONCEPTUAL CARPORT DETAILS 1/8"=1'-0" 24'0 8'4'16' CARPORT TYPICAL CARPORT ACCESSIBLE CARPORT ELEVATION COLOR & MATERIAL BOARD A-2. Stucco - 16/20 finish Awnings - Aluminum Brushed finish Railing - Metal Screen Iron Ore (or similar) Storefront - Aluminum Iron Ore (or similar) (on Building 9 only) Windows - Vinyl Iron Ore (or similar) DAC EBSW 7647 Crushed Ice SW 9158 Coquina SW 7652 Mineral Deposit SW 9093 Nearly Brown SW 7543 Avenue Tan 1 2 3 4111 11111111111111 B G G GGAAAFFFFDDEAAC 43 512 F SW 6415 Hearts of Palm G SW 7669 Summit Gray GERALD FORD DRIVEREMBRANDT PARKWAYBUILDING 1BUILDING 4BUILDING 6BUILDING 7BUILDING 5BLDG. 8BUILDING 10BUILDING 9CLUBCHILDCAREFITNESSBUILDING 11BUILDING 12BUILDING 13BUILDING 14BUILDING 2BUILDING 3SHERIFF STATIONVACANT LANDVACANT LAND127455566981011711666RECREATION AREA - SEE ENLARGEMENT, SHEET L.2366BLDG. 1TYPE B2-STORYLANYARDBLDG. 4TYPE A3-STORYCOASTALBLDG. 2TYPE B2-STORYZICRONBLDG. 3TYPE B2-STORYSOCIALITEBLDG. 6TYPE A3-STORYLANYARDBLDG. 5TYPE A3-STORYSOCIALITEBLDG. 7TYPE B2-STORYCOASTALBLDG. 9CLUBHOUSE1-STORYSOCIALITEBLDG. 8TYPE A3-STORYZICRONBLDG. 10TYPE A3-STORYCOASTALBLDG. 11TYPE A3-STORYLANYARDBLDG. 14TYPE B2-STORYLANYARDBLDG. 13TYPE A3-STORYZICRONBLDG. 12TYPE A3-STORYSOCIALITEBLDG. 3TYPE B2-STORYCOQUINABLDG. 2TYPE B2-STORYTAN AVE.BLDG. 1TYPE B2-STORYN. BROWNBLDG. 4TYPE A3-STORYMIN. DEP.BLDG. 6TYPE A3-STORYN. BROWNBLDG. 8TYPE A3-STORYTAN AVE.BLDG. 7TYPE B2-STORYMIN. DEP.BLDG. 5TYPE A3-STORYCOQUINABLDG. 10TYPE A3-STORYMIN. DEP.BLDG. 11TYPE A3-STORYN. BROWNBLDG. 13TYPE A3-STORYTAN AVE.BLDG. 12TYPE A3-STORYCOQUINABLDG. 14TYPE B2-STORYN. BROWNBLDG. 9CLUBHOUSE1-STORYCOQUINA CITY OF PALM DESERT ARCHITECTURAL REVIEW COMMISSION MINUTES TUESDAY, MAY 11, 2021 – 12:30 P.M. ZOOM VIRTUAL MEETING I. CALL TO ORDER Chair Van Vliet called the meeting to order at 12:33 p.m. II. ROLL CALL Commissioners Current Meeting Year to Date Present Absent Present Absent Chris Van Vliet, Chair X 5 Karel Lambell, Vice Chair X 4 1 Allan Levin X 5 Michael McAuliffe X 5 Jim McIntosh X 4 1 John Vuksic X 4 1 Also Present: Eric Ceja, Deputy Director of Development Services Kevin Swartz, Associate Planner Nick Melloni, Associate Planner Christina Canales, Land Development Technician Melinda Gonzalez, Management Specialist I III. ORAL COMMUNICATIONS Deputy Director of Development Services, Eric Ceja, advised the Commission there were no comments or inquiries received by email or voicemail prior to the meeting. IV. APPROVAL OF MINUTES A. MINUTES of the Architectural Review Commission meeting of April 27, 2021. Rec: Approve as presented. MINUTES ARCHITECTURAL REVIEW COMMISSION MAY 11, 2021 2 Upon a motion by Commissioner Levin, seconded by Commissioner McAuliffe, and a 5-0 vote of the Architectural Review Commission, the minutes were approved with corrections. (AYES: Lambell, Levin, McAuliffe, McIntosh, and Van Vliet; NOES: None; ABSENT: Vuksic). V. CASES It should be noted, discussion on the following item can be viewed through audio or video by visiting the Architectural Review Commission Information Center website at, https://www.cityofpalmdesert.org/our-city/committees-and-commissions/architectural- review-commission-information-center. A. FINAL DRAWINGS None B. PRELIMINARY PLANS 1. CASE NO: PP 21-0004 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration of a recommendation to the Planning Commission for approval of PP 21-0004 for a 269 unit apartment project. APPLICANT AND ADDRESS: Pacific West Communities, Inc., Eagle, ID. LOCATION: APN 694-310-006, Southwest corner of Gerald Ford Drive and Rembrandt Parkway ZONE: PR-20 Associate Planner, Nick Melloni, presented the item. Mr. Melloni noted this item was brought before the Commission at the Architectural Review Commission meeting held April 27, 2021. He stated staff recommends approval of the project with comments from the Commission being added as conditions of approval. Mr. Melloni introduced the applicant who provided a detailed presentation on the revisions to the project. Discussion on the item ensued with Commissioners providing comments and concerns for the project. Upon a motion by Commissioner McAuliffe, seconded by Commissioner Levin, and a 3-2 vote of the Architectural Review Commission, Case No. PP 21-0004, was approved subject to the following: 1) The building entrance elements for all two and three-story buildings should be differentiated from the balcony elements; 2) The hours of operation for the dog park should be restricted to prevent adverse impacts to adjacent apartment units; 3) Colors A (SW 7138 “Lavender Wisp”) and E (SW 6479 “Drizzle”) of the color palette shall be revisited to better align with the desert color palette; 4) Applicant should be attentive as to how the color patterns are distributed throughout the project site; 5) All downspouts for roof element drainage shall be concealed within the building and not exposed; 6) The detail of the drip edge at the apartment MINUTES ARCHITECTURAL REVIEW COMMISSION MAY 11, 2021 3 balconies shall be carefully considered to prevent drainage overrun over the building’s vertical surfaces; 7) The final location of all fire risers and utility connections shall be coordinated so that it is concealed from direct view and conform to Fire Department requirements. Conceal all fire risers indicated to be located within the stairwells. (AYES: Levin, McAuliffe, Van Vliet; NOES: Lambell, McIntosh; ABSENT; Vuksic). C. MISCELLANEOUS ITEMS None VI. COMMENTS Associate Planner, Kevin Swartz, advised the Commission as of the current meeting and moving forward, minutes will be completed in action minute format, noting this change was approved by City Council in November 2020. VII. ADJOURNMENT With the Architectural Review Commission concurrence, Chair Van Vliet adjourned the meeting at 1:55 p.m. Eric Ceja, Secretary Melinda Gonzalez, Recording Secretary ARCHITECTURAL REVIEW COMMISSION NOTICE OF ACTION May 20, 2021 Pacific West Communities, Inc. 430 East State Street, Suite 100 Eagle, ID 83616 Subject: Consideration for approval to construct a 269-unit apartment project. The Architectural Review Commission of the City of Palm Desert considered your request and took the following action at its meeting of May 11, 2021: By Minute Motion, the Architectural Review Commission approved Case No. PP 21-0004 subject to the following: 1) The building entrance elements for all two and three- story buildings should be differentiated from the balcony elements; 2) The hours of operation for the dog park should be restricted to prevent adverse impacts to adjacent apartment units; 3) Colors A (SW 7138 “Lavender Wisp”) and E (SW 6479 “Drizzle”) of the color palette shall be revisited to better align with the desert color palette; 4) Applicant should be attentive as to how the color patterns are distributed throughout the project site; 5) All downspouts for roof element drainage shall be concealed within the building and not exposed; 6) The detail of the drip edge at the apartment balconies shall be carefully considered to prevent drainage overrun over the building’s vertical surfaces; 7) The final location of all fire risers and utility connections shall be coordinated so that it is concealed from direct view and conform to Fire Department requirements. Conceal all fire risers indicated to be located within the stairwells. The motion carried by a 3-2 vote, with Commissioner Vuksic ABSENT. Any appeal of the above action may be made in writing to the City Clerk of the City of Palm Desert within 15 days of the date of the decision. If you have any questions, please contact Associate Planner Nick Melloni at (760) 346-0611, Extension 479 or nmelloni@cityofpalmdesert.org. Sincerely, ERIC CEJA, SECRETARY ARCHITECTURAL REVIEW COMMISSION cc: File CITY OF PALM DESERTATTENDANCE REPORTAdvisory Body: Architectural Review CommissionPrepared By:YearMonthDate 11‐Jan 25‐Jan 8‐Feb 22‐Feb 8‐Mar 22‐Mar 12‐Apr 26‐Apr 10‐May 24‐May 14‐Jun 28‐Jun 12‐Jul 26‐Jul 9‐Aug 23‐Aug 13‐Sep 27‐Sep 11‐Oct 25‐Oct 8‐Nov 22‐Nov 13‐Dec 27‐DecColvard, Dean WallacePPPPP00Latkovic, NicholasPPPP‐PPPP PPP‐‐‐PPPPP00McAuliffe, MichaelPPPP‐PPPA PPP‐‐‐PAPPP22McIntosh, JamesPPPP‐PPAP PPA‐‐‐PPAPP33Sanchez, FranciscoPPPP00Vuksic, JohnPPPP‐PPPP PPP‐‐‐PPPPP00Vacancy00Palm Desert Municipal Code 2.34.010:Twice Monthly: Six unexcused absences from regular meetings in any twelve‐month period shall constitute an automatic resignation of members holding office on boards that meet twice monthly.Total Unexcused AbsencesJan Feb Mar Apr May Jun Jul Aug Sep2022 2022 2022 2022 2022Total AbsencesOct Nov DecM. Gonzalez2022 20222022 2022 2022 2022 2022