HomeMy WebLinkAbout2022-11-15 ARC Special Meeting Agenda Packet
City of Palm Desert Page 1
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT, CALIFORNIA
SPECIAL MEETING
AGENDA
(HYBRID MEETING)
City Hall, Development Services Conference Room
73-510 Fred Waring Drive
Palm Desert, CA 92260
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference. There
will be in-person public access to the meeting location.
OPTIONS FOR PARTICIPATING IN THIS MEETING:
• Attend the meeting in the Development Services Conference Room at Palm Desert City Hall,
73510 Fred Waring Drive, Palm Desert, CA 92260.
• To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/83648797515,
Zoom Webinar ID: 836 4879 7515.
• To participate by telephone call (213) 338-8477 or (669) 219-2599, Zoom Webinar ID: 836
4879 7515. To provide a public comment please press *9 to raise your hand.
• Written public comment may also be submitted to planning@cityofpalmdesert.org. Emails
received by 9:30 a.m. prior to the meeting will be distributed to the Commission. Any
correspondence received during or after the meeting will be distributed to the Commission as
soon as practicable and retained for the official record. Emails will not be read aloud except
as an ADA accommodation.
1. CALL TO ORDER
2. ROLL CALL
3. NON-AGENDA PUBLIC COMMENT: This time has been set aside for the public to address
the Architectural Review Commission on issues that are not on the agenda for up to three
minutes. Because the Brown Act does not allow the Commission to act on items not listed on
the agenda, members may briefly respond or refer the matter to staff for a report and
recommendation at a future meeting.
Tuesday
November 15, 2022
12:00 p.m.
Special Meeting
Architectural Review Commission Special Meeting Agenda November 15, 2022
City of Palm Desert Page 2
4. ACTION CALENDAR
A. FINAL DRAWINGS
1. CASE NO: MISC22-0013 Amendment No.1 (Continued from November 8, 2022)
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a revision
to the Design Review approval for Mechanic’s Bank, a new 3,830 square-foot building
located within the Jensen’s Shopping Center at 73611 Highway 111, and review of
Architectural Review Commission conditions of approval.
APPLICANT AND ADDRESS: McAuliffe & Co. Architects, Palm Desert, CA 92260
LOCATION: 73611 Highway 111
ZONE: Downtown Core Overlay (D-O)
RECOMMENDATION:
1. The ARC determines the requirements of the findings have been met based on
staff’s analysis and approves the request as presented.
2. Modifications required, if any, by the ARC be added to the motion as conditions of
approval.
B. MISCELLANEOUS
None
5. INFORMATIONAL REPORTS & COMMENTS
A. ARCHITECTURAL REVIEW COMMISSIONERS
B. CITY STAFF
• Construction Drawings Subcommittees
6. ADJOURNMENT: The next Regular Meeting will be held on November 22, 2022, at 12:30
p.m.
Architectural Review Commission Special Meeting Agenda November 15, 2022
City of Palm Desert Page 3
AFFIDAVIT OF POSTING
I hereby certify under penalty of perjury under the laws of the State of California that the
foregoing agenda for the Architectural Review Commission Special Meeting was posted on
the City Hall bulletin board and City website not less than 24 hours prior to the meeting.
Melinda Gonzalez
Recording Secretary
PUBLIC NOTICES
Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the designated
office for inspection of records in connection with this meeting is the Development Services
Department, City Hall, 73-510 Fred Waring Drive, Palm Desert. Staff reports for all agenda
items and documents provided to a majority of the legislative bodies are available for public
inspection at City Hall and on the City’s website at www.cityofpalmdesert.org.
Americans with Disabilities Act: It is the intention of the City of Palm Desert to comply with
the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at
this meeting, or in meetings on a regular basis, you will need special assistance beyond what
is normally provided, the city will attempt to accommodate you in every reasonable manner.
Please contact the Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the
meeting to inform us of your needs and to determine if accommodation is feasible.
CITY OF PALM DESERT
DEVELOPMENT SERVICES DEPARTMENT
ARCHITECTURAL REVIEW COMMISSION MEMORANDUM
To: Honorable Chair and Members of the Commission
From: Nick Melloni, Senior Planner
Date: November 15, 2022
Case No: MISC 22-0013 – Amendment #1 (Continued from November 8, 2022)
Subject: Consideration to approve a revision to the Design Review approval for Mechanic’s
Bank, a new 3,830 square-foot building located within the Jensen’s Shopping
Center at 73611 Highway 111, and review of Architectural Review Commission
conditions of approval.
BACKGROUND
On August 23, 2022, the Applicant, McAuliffe & Co. Architects received approval by the
Architectural Review Commission (ARC) for Case No. MISC22-0013 for the development of a
new multi-tenant commercial building located at 73611 Highway 111, for the Merchant’s Bank.
The project was approved in a 4-0-1 vote (Commissioner McAuliffe Absent) with the following
comments:
1) Add landscape in the area between the proposed block wall and public sidewalk on the
north and east portions of the property; and
2) Applicant will return to the ARC for review of a more developed illustration of rake detail
including how detail terminates into the surrounding element prior to building permit
issuance and specific details for proposed wood fascia siding.
On November 8, 2022, the item was brought forth to the ARC, however due to a lack of quorum,
the item could not be heard and was scheduled for a future special meeting.
In accordance with the ARC conditions set forth on August 23, 2022, the applicant has prepared
responses and illustrations to the comments. A summary of the responses is included below.
Additionally, the applicant is requesting the ARC consider a revision to the exterior façade that
replaces the tile roof material with standing seam metal roof material.
MISC 22-0013 - Mechanics Bank
Page 2 of 4
November 15, 2022
PROJECT SUMMARY
A. Property Description:
The project site is a vacant pad located at 73611 Highway 111, within the Jensen’s Shopping
Center at the southwest corner of Highway 111 and Larkspur Lane. The pad is located on a
0.41-acre parcel which is improved with parking and vehicular drive aisles. The frontage of the
parcel is fully improved with curb, gutter, and sidewalk. The parcel was previously developed as
a gas station which was demolished in 2018. The buildings within the shopping center were
originally constructed in the late 1960’s and underwent a façade improvement in 2019.
B. Zoning and General Plan Designation:
Zone: Downtown Core Overlay (D-O)
General Plan: Downtown / Town Center
C. Adjacent Zoning and Land Use:
North: Downtown Edge (DE) – Commercial buildings
South: D-O – Commercial shopping center (Jensen’s Shopping Center)
East: Downtown (D) – Multi-tenant commercial building (Fountain Plaza)
West: D-O – Commercial shopping center (Jensen’s Shopping Center)
Project Description
The overall project is to construct a 3,830 square-foot building to be occupied by Mechanics
Bank. The building will be occupied by a single tenant at this time, however, the space is
designed to accommodate up to two tenant spaces and may be subdivided in the future. The
ARC approved the project subject to conditions on August 23, 2022.
The applicant has responded to the following conditions of the ARC as follows:
1) Add landscape in the area between the proposed block wall and public sidewalk on the
north and east portions of the property;
Original Final
The applicant has amended the landscape plan to include additional landscape plantings
between the block wall and sidewalk along Highway 111, reference Sheets L1.0 (color
MISC 22-0013 - Mechanics Bank
Page 3 of 4
November 15, 2022
and black and white). These plantings include red tipped yucca, smooth agave, aloe vera,
thunder cloud and Mediterranean fan palm. A comparison of the original plan and the
proposed plan is shown above. Staff finds the condition is satisfied by the additional
plantings.
2) Applicant will return to the ARC for review of a more developed illustration of rake detail
including how detail terminates into the surrounding element prior to building permit
issuance and specific details for proposed wood fascia siding.
Original Final
The applicant has provided three details for the roof rake detail on Sheet A-501, which
includes a section detail of the rake at the building corner, a section of where the rake
adjoins the wall (tower element), and a perspective view.
In addition to the updates in accordance with the conditions of approval, the applicant has
proposed a revision to the roof material of the building. The change is from a concrete roof tile to
a standing seam metal. Staff finds the change improves the architecture as the low roof pitch and
contemporary building forms are better suited to the new material.
Original Amendment
MISC 22-0013 - Mechanics Bank
Page 4 of 4
November 15, 2022
Site Plan and Parking
No changes are proposed to the approved site plan. The building is proposed on an existing
rough graded building pad located at the northeast corner of the existing parking lot. The building
will be designed with frontages oriented towards the western parking lot, Highway 111, and
Larkspur Lane. The site plan is referenced below.
Figure 2 – Proposed Site Plan
ZONING ORDINANCE SUMMARY
ARC approval is required for all design review applications per PDMC Section 25.68.020 (A).
The proposal is a revision to the design review and therefore require ARC approval. The change
is not substantial as only the material of the roof is changing.
STAFF RECOMMENDATION
Staff recommends the ARC determines that the requirements of the findings have been met
based on the analysis and approves the request as presented.
If major design comments arise during the discussion, Staff recommends the ARC clearly outline
the requested changes and incorporate the comments as conditions of approval.
Attachment:
1. Project Exhibits from the Applicant
2. Notice of Action dated September 12, 2022
The Project is the development of a new free-standing commercial shell building and site improvements
within the Jensen's Plaza multi-tenant, multi-building shopping center. The design of the building will
have updated form complimentary to the architecture of the center.
Improvements include new foundation/slab, building envelope, exterior finishes, roofing, and utility
infrastructure. The Work of this project will develop the building to a cold-grey shell condition. The
building will be equipped with fire sprinkers.
Site improvements include new parking, side walks, curb and gutter improvements, site drainange, and
construction of a multi-bin trash enclosure. Parking is shared with the shopping center.
Additional improvements include landscaping, irrigation, and landscape lighting. The landscape palette is
desert compatible and is drawn from the establish materials used currently at the shopping center.
The building will be approximately 3,800 SF and will be initially occupied by Mechanics Bank. Tenant
Improvements for the Bank are NOT part of this Poject and will be under separate permit by others.
The building is designed to accommodate two distinct tenants should future subdivision of the building
be entertained by the Building Owner.
PROJECT DESCRIPTION
PROJECT DATA
ASSESSORS PARCEL NUMBER:
STREET ADDRESS:
LEGAL DESCRIPTION:
ZONING / LAND USE DESIGNATION:
BUILDING SIZE
NEW SHELL BUILDING:
LOT SIZE:
LOT COVERAGE:
BUILDING DESCRIPTION:
CONSTRUCTION TYPE:
FIRE PROTECTION:
627-211-023
73611, Palm Desert, CA 92260
Parce 2 of PM 27511
Book: 183, Pages 96-97
Country of Riverside, CA
ZONE 'D.O.' (Downtown Core Overlay)
3,830 GSF
0.41 Acres (17,860 SF)
3,830 SF / 17,860 SF = 21.4%
New single story, free-standing commercial shell building.
Type VB
Fully Sprinklered
OWNER
ONE ELEVEN EL PASEO, LLC
Bill Lang
T: 310.373.2797
F: 310.373.4719
TENANT
MECHANICS BANK
.
T: .
ARCHITECT
McAULIFFE & COMPANY, INC.
Michael T. McAuliffe, AIA
T: 760.773.0907
F: 760.773.0967
CIVIL ENGINEER
THE ALTUM GROUP
James Bazua, PE
T: 760.346.4750
F: 760.851.8831
STRUCTURAL ENGINEER
GREG J. COOK ENGINEERING
Greg Cook, PE
T: 530.544.7774
F: -
MECH/PLUMB/ELEC/T-24 ENGINEER
EQUITY SPEC CONSULTING ENG.
Dave Celmer, PE
T: 760.834.1537
F: 760.832.7333
LANDSCAPE ARCHITECT
HERMANNN DESIGN GROUP
Chris Hermann, ASLA
T: 760.777.3130
F: 760.777.9032
GENERAL CONTRACTOR
TBD
TBD
T:
PROJECT TEAM
PROJECT LOCATION
PARCELS 1 & 2 PARCEL MAP 27511
73611, Palm Desert, CA 92260
1-10 FWY
HWY 111 MONTERREY AVE.COOK ST.FRED WARING PORTOLA AVE.EL PASEO SAN PABLOLARKSPURAFF
AC
AB
ARCH
AWN
BM
BLKG
BR
BLDG
CAB
CRPT
CLG
CL
CT
C/O
CLR
CLO
CW
CONC
CMU
CONT
CJ
DTL
DIA
DIM
DW
DN
DS
DWG
DF
DRY
EA
ELEC
EM
EP
Above Finish Floor
Air Cond. Condensing Unit
Anchor Bolts
Architectural
Awning
Beam
Blocking
Broom Closet
Building
Cabinet
Carpet
Ceiling
Center Line
Ceramic Tile
Clean Out
Clear
Closet
Cold Water
Concrete
Concrete Masonry Units
Continuous
Control Joint
Detail
Diameter
Dimension
Dishwasher
Down
Downspout
Drawing
Drinking Fountain
Dryer
Each
Electrical
Electrical Meter
Electrical Panel
ELEV
EMB
EQUIP
(E)
EJ
FOC
FOF
FOS
FCU
FDC
FE
FH
FR
FS
FSH
FSR
FLR
FD
FAU
GI
GD
GA
GC
GB36
GYP BD
HC
HDW
HGT
HM
HORIZ
HB
HW
INSUL
INT
JST
K/S
Elevation
Embed
Equipment
Existing
Expansion Joint
Face of Concrete
Face of Finish
Face of Stud
Fancoil
Fire Dept. Connection
Fire Extinguisher
Fire Hydrant
Fire Retardant
Finish Surface
Fire Sprinkler Head
Fire Sprinkler Riser
Floor
Floor Drain
Forced Air Unit
Galvanized Iron
Garbage Disposal
Gauge or Gage
General Contractor
Grab Bar 24" Long
Gypsum Board
Handi Cap
Hardware
Height
Hollow Metal
Horizontal
Hose Bibb
Hot Water
Insulation
Interior
Joist
Kitchen Sink
LS
LAV
LT WGT
LIN
MFR
MAX
MECH
MC
MICW
MIN
MIR
NAP
(N)
NOM
NIC
NTS
OBSC
OC
OPG
OPP
PTD
PR
P
PTD
PL
P.O.C.
PIV
PTDF
RAD
HD
R/O
RE:
REF
(R)
REQ'D
Laundry Sink
Lavatory
Light Weight
Lined Closet
Manufacturer
Maximum
Mechanical
Medicine Cabinet
Microwave
Minimum
Mirror
Napkin Receptacle
New
Nominal
Not In Contract
Not To Scale
Obscure
On Center
Opening
Opposite
Painted
Pair
Pantry
Paper Towel Dispenser
Plate
Point of Connection
Post Indicator Valve
Pressure Treated Douglas Fir
Radius
Range Hood
Range/ Oven
Reference
Refrigerator
Remove
Required
RAG
R
RH
RD
RM
RO
SCH
SCD
SHLF
S+P
SHW
SIM
SD
SC
SPEC
SQ
SF
SS
STD
STL
STR
THK
TC
TP
T & B
TOB
TOC
TOP
TOS
TOW
TB
TD
TRASH
TR
T
T/SH
Return Air Grill
Riser
Robe Hook
Roof Drain
Room
Rough Opening
Schedule
Seat Cover Dispenser
Shelf
Shelf and Pole
Shower
Similar
Soap Dispenser
Solid Core
Specifications
Square
Square Feet
Stainless Steel
Standard
Steel
Structural
Thick
Top of Curb
Toilet Paper
Top + Bottom
Top of Beam
Top of Concrete
Top of Parapet
Top of Sheathing
Top of Wall
Towel Bar
Towel Dispenser
Trash Enclosure
Trash Receptacle
Tread
Tub/ Shower Combination
ABBREVIATIONS
A101
1Ref
1Ref
1Ref
1Ref SYMBOL LEGEND
GRID STATION
ASSEMBLY TAG
DOOR ID TAG
EXTERIOR ELEVATION MARKER
1
A101
SIM
BUILDING SECTION MARKER
ROOM I.D.
Room name
101
NORTH ARROW
1REVISION TAG
KEY NOTE
0
MATERIAL FINISH TAG
WINDOW ID TAG
A12
00A
RA-01FIXTURE / EQUIPMENT TAG
101
A101
1SIM
DETAIL MARKER
1
A101
SIM
WALL SECTION MARKER
INTERIOR ELEVATION MARKERA101
1Ref
1Ref
1Ref
1Ref
WP-03
PT-03
STOREFRONT ASSEMBLY ID TAG000.A
ARCHITECTURAL REVIEW COMMISSION
NOTICE OF ACTION - APPROVAL
73611, PALM DESERT, CA 92260
07.20.2021
BUILDING PERMIT:
TIMP 22-00__
[PERMIT DATE]
APPROVALS
ASSOCIATED PERMITS
THE FOLLOWING ITEMS ARE ASSOCIATED WITH THIS PROJECT
AND WILL BE UNDER SEPARATE PERMITS. THESE PERMITS SHALL
BE ACQUIRED BY THE GENERAL CONTRACTOR PRIOR TO
COMMENCEMENT OF RELATED WORK.
GEOTECHNICAL INVESTIGATION
Sladden Engineering
Report No: 544-19173
22-06-382
Date:08.23.2022
ASSOCIATED REPORTS
WATER:
Coachella Valley Water District
T: 760.398.2651
SEWER:
Coachella Valley Water District
T: 760.398.2651
GAS:
Southern California Gas Company
T: 800.427.2200
CABLE:
Spectrum
T: 866.874.2389
ELECTRICITY:
Southern California Edison
T: 800.684.8123
TELEPHONE:
Verizon
T: 800.837.4966
TRASH:
Burrtec Waste & Recycling Services
T: 760.340.2113
UNDERGROUND UTILITY ALERT:
USA Dig Alert
T: 800.227.2600
UTILITY PURVEYORS
1.
2.
3.
IN ADDITION TO REGULAR INSPECTIONS, THE FOLLOWING ITEMS WILL ALSO REQUIRE
SPECIAL INSPECTION IN ACCORDANCE WITH CBC SECTION 1702:
STRUCTURAL CONCRETE OVER 2,500 PSI.
FIELD WELDING.
HIGH STRENGTH BOLTS.
SPECIAL INSPECTIONS
4.
5.
EXPANSION/EPOXY ANCHORS.
DRYPACK OR NON-SHRINK GROUT.
THE FOLLOWING ITEMS ARE DESIGN-BUILD AND SHALL BE DEFERRED SUBMITTALS:
NFPA 13 FIRE SUPPRESSION SYSTEM
Documents for deferred submittal items must be reviewed by the registered design professional in
responsible in charge who will forward them to the Building Official with a notation indicating that they have
been reviewed and are in general conformance with the design of the building. Deferred Submittal items
shall not be intalled prior to Building Official approval.
DEFERRED SUBMITTALS
SPECIAL NOTES
1.
2.
3.
4.
5.
Project improvements are to construct the building to a "Cold-Grey-Shell" condition.
Site improvements are interconnected with existing site improvements of the Jensen's Shopping
Center.
Site access to the subject parcel are through existing access points of the Jensen's Shopping Center.
Portions of the site have existing improvement that shall be retain, integrated with new improvements
and protected during the course of construction.
Existing subsurface drainage improvements to remain. Protect in place.
CITY OF PALM DESERT CONSTRUCTION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
The City of Palm Desert CONSTRUCTION HOURS:
OCTOBER 1ST THROUGH APRIL 30TH
Monday-Friday 7:00 AM - 5:30 PM
Saturday 8:00 AM - 5:00 PM
Sunday NOT PERMITTED
Government Holidays NOT PERMITTED
All Contractors and subcontractors shall have a current City of Palm Desert business license prior to
permit issuance per Palm Desert Municipal Code, Title 5.
All Contractors and/or owner-builders must submit Certificate of Workers Compensation insurance
coverage prior to the issuance of a building permit per California Labor Code section 1800.
Contractor and/or Owner shall provide a trash bin to insure proper clean-up of all
building materials per ordinance of the Palm Desert Municipal Code. Storage of building materials or
debris shall be confined to the lot for which the permit is issued. Adjacent vacant properties may not be
utilized for this purpose unless written permission of the Owner of the adjacent property is on file with
the permitting authority. The public Right-of-Way shall be maintained in a clear condition at all times.
Comply with the City of Palm Desert Municipal Code.
Address numerals shall comply with Palm Desert Ordinance No.1265, Municipal Code Section 15.28
School Tax Fees must be paid prior to the issuance of your building permit.
The Traffic Uniform Mitigation Fees (TUMF) must be paid at time of issuing the building permit.
Block walls, trash enclosures, temporary power poles, pools, spas, site lighting, signage, etc. require
separate permits.
General contractors and/or owner-builders shall submit a completed sub-contractor's list to the Building
& Safety Department prior to requesting a final inspection per Palm Desert Ordinance No. 60. Absolutely
no sub-contractor's lists will be accepted unless all required information is provided on the appropriate
City of Palm Desert form.
Contractor to complete section 1 of the Construction Waste Management Plan prior to permit issuance,
and complete section 2 at final inspection.
Contractor to complete Self Certify VOC Checklist at final inspection.
Contractor to complete Non-Residential Certification Checklist at final inspection.
APPLICABLE MODEL CODES
SERVICES AND DESIGN PROVIDED ARE BASED ON AND CONSISTENT WITH THE
FOLLOWING CODES, REGULATIONS, AND ORDINANCES:
2019 EDITION
2019 EDITION
2019 EDITION
2019 EDITION
2019 EDITION
2019 EDITION
2019 EDITION
2019 EDITION
CURRENT EDITION
CALIFORNIA BUILDING CODE
CALIFORNIA ADMINISTRATIVE CODE
CALIFORNIA PLUMBING CODE
CALIFORNIA GREEN BUILDING STANDARDS CODE
CALIFORNIA MECHANICAL CODE
CALIFORNIA ENERGY CODE
CALIFORNIA ELECTRIC CODE
CALIFORNIA FIRE CODE
CITY OF PALM DESERT MUNICIPAL CODE
All construction of the Project shall comply with or exceed these standards.
1.
2.
3.
4.
5.
6.
7.
8.
Construction Hours: Comply with Construction Hours as established by City of Palm Desert.
Receipt/Storage of Materials: No material is to be delivered and placed in the street. Material is not to
be stockpiled on adjacent property. Contractors will be required to place all materials in the Tenant's
suite or secure the appropriate temporary storage location from the Property Manager.
Trash and Debris: all trash and debris is to be picked up and the parking lot cleaned daily.
Parking of Vehicles: During the course of work, all vehicles shall be parked at locations as designated by
the Property Manager.
This construction site conjoined with a multi-tenant complex. Tenants in other, adjacent suites will be
conducting business during the course of construction. The contractor and the contractor's
subcontractors shall not impede the operations of adjacent tenants.
The General Contractor shall notify the Property Manager if utility service connections need to be
temporarily interrupted during the course of the Work. The general contractor shall provide 48 hour
written notice to the Property Manager in advance of any proposed interruption.
Radios: Radios and stereo equipment may not be played at the worksite.
PROPERTY MANAGEMENT REQUIREMENTS
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2021, McAuliffe & Company, Inc.
All rights reserved.
5 6
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/21MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2021, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
for
for
22-001
G-100
TITLE SHEET
10.28.2022
UB
MM
MECHANICS BANK BUILDING
One Eleven El Paseo, LLC
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
73611 Highway 111
Palm Desert, CA 92260
MECHANICS BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1" = 1'-0" 1 VICINITY MAP
SHEET INDEX
01 GENERAL
G-100 TITLE SHEET
G-101 GENERAL NOTES, PROJECT NOTES, CODE ANALYSIS
G-102 GREEN BUILDING MANDATORY MEASURES
G-200 ACCESSIBILITY REQUIREMENTS
G-201 SITE ACCESSIBILITY REQUIREMENTS
G-300 TITLE 24 ENERGY + LIGHTING COMPLIANCE
G-301 TITLE 24 ENERGY + LIGHTING COMPLIANCE
02 CIVIL
GP-01 PRELIMINARY GRADING PLAN
03 ARCHITECTURAL
A-001 SITE PLAN
A-002 SITE DETAILS
A-100 SLAB PLAN
A-101 FLOOR PLAN
A-102 SOFFIT/CEILING PLAN
A-103 ROOF PLAN
A-200 EXTERIOR ELEVATIONS
A-201 EXTERIOR ELEVATIONS
A-300 BUILDING SECTION
A-301 BUILDING SECTION
A-302 WALL SECTION
A-303 WALL SECTION
A-304 WALL SECTION
A-305 WALL SECTION
A-306 WALL SECTION
A-500 DETAILS
A-501 ROOF DETAILS
A-600 SCHEDULES
A-700 STANDARD DETAILS
A-800 MATERIALS SAMPLES
A-900 PERSPECTIVE VIEW
A-901 PERSPECTIVE VIEW
A-902 PERSPECTIVE VIEWS
04 STRUCTURAL
S-1 STRUCTURAL DRAWINGS
05 MECHANCIAL
M-1 MECHANCIAL
06 PLUMBING
P-1 PLUMBING
07 ELECTRICAL
E-1 ELECTRICAL
08 LANDSCAPE
L1.0 PRELIMINARY LANDSCAPE PLAN
L2.0 LANDSCAPE RENDERING
FACPFACPGENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
The General Contractor shall furnish all materials, labor, equipment, transportation and services
necessary for the satisfactory completion of the Work unless designated specifically otherwise. Work
shown in these drawings designated Not In Contract (N.I.C.) is shown for informational purposes only
and is NOT the responsibility of the General Contractor. All equipment, work, and materials shall
comply with all current applicable model codes, local municipal codes, ordinances, and governing
regulations, and the Contract Documents.
The Contractor shall coordinate the installation of the various trade items within the space above all
ceilings (including, but not limited to: structural members, mechanical ducts and insulation, conduits,
raceways, sprinkler systems, light fixtures, ceiling systems, and any special structural supports required)
and shall be responsible for maintaining the finish ceiling height indicated in the Drawings and the Finish
Schedule. Ceiling heights dimensions are to the finish surface of the ceiling unless noted otherwise.
Access panels shall be provided and installed wherever required by the Building Code or for the proper
operation or maintenance of mechanical, electrical or other concealed equipment, whether or not
indicated on the Drawings. The General Contractor shall coordinate the size, location, and type of
access panel(s) with other Subcontractors' work and with the Architect prior to installation of any access
panels.
When it is necessary to interrupt any existing utility service(s) to make connections and/or corrections, a
minimum of 48 hours advanced notice shall be given to the Owner. Interruptions in utility services shall
be of the shortest possible duration for the Work at hand and shall be approved in advance by the
Owner.
In the event the utility service is interrupted without the required 48 hour advanced notice, then the
General Contractor shall be financially liable for all damages suffered by the Owner due to unauthorized
interruption. Reconnection shall be made immediately.
The General Contractor shall protect all finish work and surfaces from damage during the course of
construction and shall replace and/or repair all damaged surfaces caused by the General Contractor or
Subcontractor personnel to the satisfaction of the Owner and the Architect.
The General Contractor shall provide and install all stiffeners, bracings, back-plates, strapping, and
supporting brackets required for the installation of all casework, toilet accessories and of all
floor/wall/ceiling mounted or suspended mechanical and electrical equipment.
Only new materials and equipment of recent manufacture, of the quality specified, and free from defects
shall be permitted for the Work.
Bracing, shoring, and temporary supports shall be provided as required to hold the Work securely in
place and to sustain all loads including those that may occur during erection and until subsequent
construction is adequate to replace the temporary bracing. The General Contractor shall be solely
responsible for these temporary elements.
The General Contractor shall exercise extreme caution throughout the construction period to protect
any landscaping, utilities, structures or other facilities intended to remain. Damage, destruction, or
removal of these items shall be repair/replaced/restored at the General Contractor's expense and to the
satisfaction of the Owner.
Final Clean-Up and Disposal: the General Contractor shall remove debris, rubbish and waste material
from the Owner’s property and common areas to a lawful disposal area and pay all hauling and dumping
costs. The General Contractor shall conform to pertinent Federal, State, and Local laws, regulations and
orders upon completion of Work. All construction areas shall be left vacuum-clean and free from debris.
Clean all dust, dirt, stains, hand marks, paint spots, droppings and other blemishes.
The General Contractor shall exercise extreme caution during the construction period to protect the
existing building facility including the exterior and interior finishes, furniture and equipment.
The General Contractor to provide approved temporary sanitary facilities (I.E. chemical toilets) on the
construction site prior to commencement of the Work.
The General Contractor shall have sole control over and charge of and responsibility for construction
means, methods, techniques, sequences or procedures, and for safety precautions and programs in
connection with the Work.
The Architect shall not be responsible for the Contractor's failure to carry out the Work in accordance
with the Contract Documents.
The Architect shall have authority to reject Work that does not conform to the Contract Documents.
If concealed or unknown physical conditions are encountered at the site that differ materially from those
indicated in the Contract Documents or from those conditions ordinarily found to exist, these conditions
shall be brought to the attention of the Architect and the Owner prior to continuing with the Work.
Structures in the course of construction, alteration or demolition shall comply with Chapter 14 of the
2019 California Fire Code and NFPA 241.
01. BUILDING OCCUPANCY & CONSTRUCTION TYPE
Occupancy - CBC Chapter 3
BUILDING OCCUPANCY: Group B
Construction Type – CBC Table 601
Type V-B
Fire-Resistance Rating Requirements for Building Elements (Hours) – CBC Table 601
Primary Structural Frame:0 HR
Bearing Walls – Exterior:0 HR
Bearing Walls – Interior:0 HR
Nonbearing Walls & Partitions Exterior:0 HR
Nonbearing Walls & Partitions Interior:0 HR
Floor Construction & Secondary Members:0 HR
Roof Construction & Secondary Members:0 HR
02. FIRE SUPPRESSION REQUIREMENTS
Fire Suppression System Requirement – CBC Section 903, Table 903.2.11.6, Section
410.6
Building to be protected with a NFPA 13 fire suppression sprinkler system.
03. BUILDING SITING
See BUILDING SITING Diagram this sheet.
04. CONSTRUCTION TYPE & ALLOWABLE SIZE
Allowable Building Height – CBC Table 504.3
Occupancy Class: B, (S), Construction: Type VB Height: 60 FT Allowable
21 FT Proposed
Allowable Building Floor Area – CBC Table 506.2
Occupancy Class: B (S1), Construction: Type VBSF: 36,000 SF Allowable
3,830 SF Proposed SF
05. SPECIAL OCCUPANCY REQUIREMENTS
Not Applicable.
06. FIRE & SMOKE PROTECTIVE ELEMENTS
Maximum Area of Exterior Wall Openings Based on Fire Separation Distance and
Degree of Opening Protection - CBC Table 705.8
North, East, and South have >30ft Fire Separation Distance: No Limit
West Fire Separation Distance 25 to <30 ft (UP, S): No Limit
07. ADDITIONAL FIRE PROTECTION SYSTEMS
Portable Fire Extinguishers - CBC Section 906
Portable fire extinguisher(s) shall be provided per requirements of Section 906 as
part of Tenant Improvements (by Others).
Fire Alarm & Detection Systems – CBC Section 907.2.1
Fire alarm & detection system to be provided.
08. INTERIOR FINISH MATERIALS
Interior Wall & Ceiling Finish Requirements by Occupancy – CBC Table 803.13
Occupancy Group B:
Exit Enclosures & Exit Passageways: B
Corridors:C
Rooms & Enclosed Spaces:C
CBC 803.1 Interior Wall and Ceiling Finishes
Class A:Flame spread index 0-25; smoke developed index 0-450
Class B:Flame spread index 26-75; smoke developed index 0-450
Class C:Flame spread index 76-200; smoke developed index 0-450
Interior Floor Finish – CBC Section 804
Minimum critical radiant flux: Class II materials required.
*** NO Interior finishes as part of this Project. Interior finishes shall be part of
Tenant Improvements (by Others; NIC).
09. EGRESS SYSTEMS
Occupant Load – CBC Section 1004 & Table 1004.1.1
Refer to Exiting information on EXITING PLAN for Existing Occupant Load
Calculations + aggregate exit loading (shell building ONLY).
Means of Egress – CBC Chapter 10
Exiting Diagram for compliance with Means of Egress requirements shall be for the
shell builing ONLY. (Tenant Improvements by Others; NIC).
10. SPECIAL USE REQUIREMENTS
Not Applicable.
11. SITE & BUILDING ACCESSIBILITY REQUIREMENTS
Site & Building Accessibility – CBC Chapter 11B
See Site Plan and Site Details for accessibility improvements.
12. MISCELLANEOUS PROVISIONS
Plumbing Fixtures – CPC Table 4-1, A
Plumbing fixtures shall be provided under Tenant Improvements (by Others; NIC).
CODE ANALYSIS
KEY NOTES
ID CLASSIFICATION REMARKS
A FOUNDATIONS Foundations, slabs on grade, substructure improvements.
B EXTERIOR ENVELOPE Buiding structure, exterior enclosure, exterior openings, roofing.
C INTERIORS Partitions, interior openings, stairs, interior finishes.
D SERVICES Conveying, plumbing, HVAC, fire protection, Electrical services.
E EQUIPMENT & FURNISHINGS Equipment, appliances, cabinetry, accessories.
F SPECIAL CONSTRUCTION Special facilities, construction.
G SITEWORK Site walls, hardscape, paving, site features, site furnishings.
X DEMOLITION Existing item, assembly, component, finish to be removed.
FINISH CALLOUTS
ID FINISH REMARKS
MT MATERIAL Material designation, finish information, MFR color
PT PAINT Paint color
AS ASSEMBLY Assembly/Component (Doors, Windows, Fixtures, etc)
KEY NOTE TYPE LEGEND
CLASSIFICATION
KEY NOTE NUMBER
KEY NOTE TAGA01
EXIT DISCHARGE
05
49
E-101
ROOM/SPACE OCCUPANT LOAD
EXIT PATH OF TRAVEL W.
ACCUMULATED OCCUPANT LOAD
EXIT ID
EXIT DISCHARGE AND DIRECTION
TO PUBLIC WAY
SYMBOL LEGEND
ROOM ID + OCCUPANCY INFO
ROOM NAME
ROOM NO.
ROOM SF
OCC. LOAD FACT.
OCC. LOAD
OLF:
OCC:33
Name
101
150 SF
20
MECHANICS BANK BUILDING
OLF:
OCC:
3359 SF
23
TENANT SPACE
100
150
TENANT
RESTROOM
101
TENANT
RESTROOM
102
OLF:
OCC:
33 SF
1
FIRE RISER
103
300OLF:
OCC:
65 SF
1
UTILITY
104
300
(FUTURE)(FUTURE)
121211
11
E-100
0101
E-101
1.
2.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
These Project Notes are not all-inclusive and DO NOT relieve the Contractor(s) on this Project of their
responsibility to review all relevant codes. The Contractor shall ask questions, call to the attention of the
Architect and Owner any and all discrepancies, omissions and errors in these documents.
INSPECTIONS
The Contractor shall be responsible to make application for, secure and pay for all permits and fees
required by the various permitting agencies and utility purveyors.
The Contractor shall be responsible to schedule all inspections. Normal inspections by the building,
engineering, fire and other permitting agency departments shall be conducted as required by those
respective agencies. All re-inspection fees shall be paid by the contractor.
CONSTRUCTION DOCUMENTS
Contract Drawings and Specifications are mutually inclusive and what is required by one is required by
the other. There is no precedence intended or implied between Drawings and Specifications and, in the
event of a conflict, the Architect shall be their interpreter. Any work installed prior to and/or in conflict
with such interpretation shall be corrected by the Contractor at the Contractor's expense and at no
additional cost to the Owner.
In no case shall dimensions be scaled from Drawings. The Contractor shall verify all conditions and
dimensions in the field before proceeding with subsequent work. Any discrepancies between conditions
indicated and actual field conditions shall be brought the attention of the Architect for clarification prior
to proceeding. Any work installed prior to and/or in conflict with such clarification shall be corrected by
the Contractor at the Contractor's expense and at no additional cost to the Owner.
All dimensions are to face of stud or centerline of walls, columns and beams unless otherwise noted.
Floor elevations are to top of concrete slab unless otherwise noted.
All symbols and abbreviations used on the Drawings are considered to be construction standards. Any
questions regarding the exact meaning of a symbol or abbreviation shall be brought to the attention of
the Architect for clarification.
Details marked "TYPICAL" shall apply in reasonably inferable similar conditions unless indicated
otherwise.
Notes contained within these documents which use the words "PROVIDE" or "INSTALL" shall be
interpreted to mean "THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL" unless noted
otherwise.
The Specifications and ALL Consultant Drawings are supplemental to the Architectural Drawings. It shall
be the Contractor's responsibility to coordinate with the Architectural Drawings before the installation
of any of the Consultant's work and to bring any discrepancies or conflicts to the attention of the
Architect in writing for clarification. Improperly installed work shall be corrected by the General
Contractor at the General Contractor's expense and at no expense to the Architect, the Architect's
Consultants, or the Owner.
The General Contractor and the General Contractor's Subcontractors are responsible for reviewing,
bidding, coordinating and performing their work based on the ENTIRE set of Contract Documents.
Improperly installed work or contract requirements identified by these Documents excluded by the
Contractor without prior written approval of the Architect shall be corrected by the General Contractor
at the General Contractor's expense and at no expense to the Architect, his Consultants, or the Owner.
It is the General Contractors responsibility for distribution of the ENTIRE set of Contract Documents to
all of the General Contractors forces and Subcontractors.
Any Work installed in conflict with the Contract Documents shall be corrected by the Contractor at the
Contractor's expense and at no additional expense to the Owner, the Architect, or the Architect's
Consultants.
Drawings of existing conditions have been compiled from existing data supplied by the Owner to the
Architect. The Architect makes no warranty either expressed or implied for the accuracy or
completeness of the existing information recorded. The General Contractor shall field verify ALL
existing conditions. The General Contractor shall notify in writing any discrepancies for clarification
prior to proceeding with work.
PROJECT NOTES20' - 2" CLR.6' - 2"∙ CLR.
28' - 6 3/4" CLR.71' - 10 3/4" CLR.F.S.D.>30
42' - 2 3/4" CLR.F.S.D. >30121' - 11" CLR. (N.T.S)F.S.D. 25 TO < 30
29' - 7 3/4" CLR.F.S.D. >3073' - 10 3/4" CLR.FF=227.50
3,830 GSF
MECHANICS BANK BUILDING
VACANT PARCEL
APN: 627-211-023
ZONE: D.O.
HIGHWAY 111
LARKSPUR LANE123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:28 PM22-001
G-101
GENERAL NOTES, PROJECT NOTES,
CODE ANALYSIS
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
EXIT SCHEDULE
EXIT IDOCCUPANTS
SERVED
WIDTH
FACTOR
WIDTH
REQUIRED
WIDTH
PROVIDEDREMARKS
E-100120.22.39 in72.00 in
DOOR TO BE EQUIPPED WITH A
LATCH AND EMERGENCY EXIT
HARDWARE
E-101110.22.19 in36.00 in
DOOR TO BE EQUIPPED WITH A
LATCH AND EMERGENCY EXIT
HARDWARE
1/8" = 1'-0" 1EXITING PLAN
1/16" = 1'-0" 2SITE DIAGRAM
FACPSITE PLAN - GENERAL NOTES
1.
2.
3.
4.
5.
PROTECT EXSTING IMPROVEMENTS NOT RECEIVING WORK.
PARKING IS SHARED WITH THE JENSEN'S PLAZA SHOPPING CENTER.
(8) ADDITIONAL PARKING SPACES ARE ADDED TO EXISTING
PARKING BY THE IMPROVEMENTS OF THIS PROJECT.
PROTECT EXISTING LANDSCAPING, IRRIGATION, AND LANDSCAPE
LIGHTING IN PLANTER AREAS ADJACENT TO AREA OF WORK.
ON SITE STORM WATER IS MANANGED BY EXISTING, SUB-SURFACE
DETENTION STRUCTURES SHARED WITH THE JENSEN'S PLAZA
SHOPPING CENTER. THESE IMPROVEMENTS ARE ALREADY
EXISTING.
FF=227.50
3,830 GSF
MECHANICS BANK BUILDING
89° 12' 43"
126.93'
N W0° 11' 09"140.01'NW89° 14' 06"
110.34'
SE
R=
L=26.02'
20.00'0° 11' 09"120.28'SEVACANT PARCEL
APN: 627-211-023
ZONE: D.O.
MULTI-BUILDING RETAIL
APN: 627-211-022-3
ZONE: D.O. UTILITY EASEMENT20' - 0"20
20
22
22
28
25
25
24
24
26
26
30
30
01
02
03
04
HC
05
06
07
08
09
10
11
12
13
15
36
36
37
37
38
38
33
33
33
33
35
34
34
34
3434
34 34 34
35
35
39
39
39
39
39
38
HIGHWAY 111
LARKSPUR LANE32
29
29
29
25
G01
G02
G04
G04
+230.75 TW
+230.75 TW
+234.00 FS
40
41
G03
A-002
2
A-002
5
A-0026A-0024
A-002
3
31
30
3032
14
38
38
38
01
A-600
9
PARKING TABULATION
PER CITY OF PALM DERSERT MUNICIPAL CODE D.O. ZONE PARKING REQUIREMENT
TABLE 25.18-2
3 PARKING SPACES / 1,000 SF OF BUILDING = 0.003 SP/SF
3,830 SF x 0.003 SP/SF = 12 PARKING SPACES REQUIRED
SPACES PROVIDED:15 STANDARD + 1 VAN ADA ACCESSIBLE
PER CBC TABLE 11B-208.2 MINIMUM NUMBER OF ACCESSIBLE SPACES
TOTAL SPACES: 1 TO 25 = 1 ACCESSIBLE SPACE REQUIRED
SPACES PROVIDED:1 VAN ACCESSIBLE SPACE PROVIDED
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:29 PM22-001
A-001
SITE PLAN
10.28.2022
JG
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1" = 10'-0" 1SITE PLAN
SHEET NOTES
ID DESCRIPTION
01 ALIGN
20 PROPERTY LINE
22 EASEMENT
24 STREET
25 CONCRETE CURB & GUTTER
26 PUBLIC SIDEWALK
28 CENTERLINE OF STREET
29 CONCRETE SIDEWALK
30 ADA PATH-OF-TRAVEL
31 ADA PATH-OF-TRAVEL STRIPING
32 ADA CURB RAMP
33 E. ASPHALT PARKING LOT
34 EXISTING PARKING SPACE
35 NEW PARKING SPACE
36 E. CONCRETE RIBBON GUTTER
37 E. STORM WATER INLET GRATE; CONNECTED TO E. SUB-SURFACE STORM
WATER DETENTION STRUCTURE
38 PLANTER AREA; SEE LANDSCAPE
39 EXISTING PLANTER AREA
40 PROPOSED BACKFLOW PREVENTER
41 PROPOSED FDC + PIV
KEYNOTES
ID SPEC DESCRIPTION
G - BUILDING SITEWORK
G01 ACCESSIBLE TRASH ENCLOSURE PER ARCHITECT'S PLANS AND
PER CITY OF PALM DESERT ORDINANCE NO. 1161.
G02 METAL TRASH ENCLOSURE GATE + HSS STEEL GATE POSTS;
PAINT
G03 TRASH ENCLOSURE CONCRETE APRON
G04 CEMENT PLASTER CLAD CMU RETAINING WALL; PAINT
PT-04G02
G03
G01
6' - 0"∙05
PT-01PT-02MT-02MT-02G01
05
1
A-002
2' - 8"∙2 C.7 C.4' - 8"6' - 0"05G03
MT-02PT-02MT-02PT-01
G02PT-04
TRASH ENCLOSURE - GENERAL NOTES
1.
2.
3.
TRASH ENCLOSURE TO COMPLY WITH CITY OF PALM DESERT
SOLID / RECYCLING / ORGANICS TRASH ENCLOSURE
REQUIREMENTS.
ENCLOSURE TO COMPLY WITH ADA ACCESSIBILITY
REQUIREMENTS.
WASTE BINS/RECEPTACLES SHALL BE FULLY SCREENED FROM VIEW
BY THE ENCLOSURE.6' - 0"6"12x8x16 CMU
8x8x16 CMU
CEM. PLASTER
FINISH; PAINT
PRE-CAST CAP;
PAINT
F.G.
CONC. SLAB
PAINT ALL EXP.
SURFACES
CONC. FTG.(7) C.(2) C.6' - 7"∙CLR.5' - 1"3' - 9" CLR.7.13%8"8' - 9" ∙2' - 0"8' - 9"∙8"∙
G03
G01
G03
30
32
1
A-002
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:37 PM22-001
A-002
SITE DETAILS
10.28.2022
Author
Checker
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1/4" = 1'-0" 3TRASH - NORTH
1/4" = 1'-0" 5TRASH - SOUTH
1/4" = 1'-0" 4TRASH - EAST
1/4" = 1'-0" 6TRASH - WEST
8PERSPECTIVE VIEW
7 PERSPECTIVE VIEW
9PERSPECTIVE VIEW
FINISHES SCHEDULE
ID SPEC DESCRIPTION
MATERIALS
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
30 ADA PATH-OF-TRAVEL
32 ADA CURB RAMP
KEYNOTES
ID SPEC DESCRIPTION
G - BUILDING SITEWORK
G01 ACCESSIBLE TRASH ENCLOSURE PER ARCHITECT'S PLANS AND
PER CITY OF PALM DESERT ORDINANCE NO. 1161.
G02 METAL TRASH ENCLOSURE GATE + HSS STEEL GATE POSTS;
PAINT
G03 TRASH ENCLOSURE CONCRETE APRON
1/2" = 1'-0" 1 SECTION
1/4" = 1'-0" 2 TRASH ENCLOSURE
FACPFLOOR PLAN - GENERAL NOTES
1.
2.
3.
4.
TENANT IMPROVEMENTS ARE NOT A PART OF THIS PROJECT;
THEY ARE TO BE PERFORMED BY OTHERS UNDER SEPARATE
PERMIT.
RESTROOMS ARE PART OF TENANT IMPROVEMENTS; N..I.C.
SHELL BUILDING TO BE PROTECTED BY AUTOMATIC FIRE
SPRINKLER SYSTEM.
BUILDING IMPROVEMENTS TO BE DEVELOPED TO A COLD GREY
SHELL CONDITION.
1
A-300
1
A-301A-200
3
A-201
1
A-2012 A-2002
MECHANICS BANK BUILDING
1
12
3
3
4
4 5 6
7
7
AA
BB
C
D
EE
29' - 8"29' - 4"33' - 0"2' - 0"30' - 0"15' - 0"47' - 0"92' - 0"
23' - 0"6' - 8"29' - 4"10' - 8"21' - 0"1' - 4"
92' - 0"2' - 0"16' - 0"29' - 0"47' - 0"21' - 4"6' - 8"2' - 0"6' - 0"12' - 0"8' - 8"14' - 0"6' - 4"1' - 0"5' - 0"
8' - 4"12' - 8"2' - 0"6' - 8"6' - 6"5' - 6"11' - 10"5' - 6"2' - 0"6' - 8"2' - 0"16' - 8"4' - 4"
1' - 0"28' - 8"2' - 0"6' - 8"18' - 0"2' - 8"8' - 4"15' - 0"2' - 0"4' - 8"3' - 0"
3' - 4"3' - 0"6' - 4"8"2' - 4"1' - 6"1' - 6"6' - 7"TENANT SPACE
100
TENANT
RESTROOM
101
TENANT
RESTROOM
102
FIRE RISER
103
UTILITY
104
26
B80OVHD
E01
D60
D61
D80D90
26
(FUTURE)(FUTURE)
11
11
11
11
13
13
13
13
13
WP-01
100.1
100.2
104.1103.1
3
A-300
2
A-301
3
A-301
2' - 0"2' - 6"5' - 7"2' - 0"2' - 7"3' - 0"1' - 7"5' - 9"9"WP-01
WP-01
WP-01
WP-01
WP-01WP-01
WP-01
WP-01
WP-01WP-01WP-01
WP-01
WP-01
WP-01
WP-02
WP-02
WP-01WP-01
WP-03WP-03
WP-04
WP-04
WP-05
WP-05
WP-05
WP-05WP-05
WP-05
WP-05
WP-05
WP-05WP-05
WP-05WP-05
WP-05WP-05
WP-01
WP-07WP-07
WP-07
WP-06
1' - 8"1' - 0"3' - 0"1' - 6"6' - 0"3' - 6"3' - 0"6' - 3"9' - 0"9' - 0"1' - 4"3' - 0"1' - 4"3' - 0"A-600
9
100.B
100.C
100.D
100.E
100.F
100.G
100.H
100.J
100.K100.L
100.A
WP-06
WP-06
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:38 PM22-001
A-101
FLOOR PLAN
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 1FLOOR PLAN
SHEET NOTES
ID DESCRIPTION
11 ROOF OVERHANG ABOVE
13 SOFFIT ABOVE
26 PUBLIC SIDEWALK
KEYNOTES
ID SPEC DESCRIPTION
B - SHELL
B80 ROOF ACCES HATCH
D - SERVICES
D60 FIRE ALARM CONTROL PANEL
D61 FIRE RISER
D80 ELECTRICAL SWITCH GEAR + METER SECTION
D90 TELEPHONE/DATA EQUIPMENT
E - EQUIPMENT
E01 WALL-MOUNTED ROOF ACCESS LADDER
ASSEMBLY SCHEDULE
ID SPEC DESCRIPTION
WALL/PARTITION ASSEMBLY
WP-01 072100
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
EXT: 7/8" EXT. CEMENT PLASTER
CORE: 2x6 WOOD STUDS - 16" O.C. W. 1/2" PLYWOOD, R-21 INSUL.
INT: OPEN
WP-02
061000
072100
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
EXT: 7/8" EXT. CEMENT PLASTER
CORE: 2x6 WOOD STUDS - 16" O.C., 1/2 PLY, R-21 INSUL.
INT: 5/8" GYP. BD.
WP-03
061000
061600
072100
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
EXT: H.P. ENG. STONE VENEER, 3/4" SCRATCH + BROWN COAT
CORE: 2x6 WOOD STUDS - 16" O.C. ,1/2 PLYWD, R-21 BATT INSUL.
INT: OPEN
WP-04
061000
061600
072100
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
EXT: H.P. ENG. STONE VENEER, 3/4" SCRATCH + BROWN COAT
CORE: 2x6 WOOD STUDS - 16" O.C. ,1/2 PLYWD, R-21 BATT INSUL.
INT: 5/8" GYP. BD.
WP-05 061000
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
INT: OPEN
CORE: 2x6 WOOD STUDS - 16" O.C.
OPP: OPEN
WP-06
061000
072100
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
INT: OPEN
CORE: 2x6 WOOD STUDS - 16" O.C., 1/2" PLYWD.
OPP: OPEN
WP-07 061000
092900
STRUCTURAL WALL
NON-RATED, FULL HEIGHT
INT: 5/8" GYP. BD.
CORE: 2x6 WOOD STUDS - 16" O.C., 1/2" PLYWD. R-21 INSUL.
OPP: 5/8" GYP. BD
ROOF PLAN - GENERAL NOTES
1.
2.
3.
ALL ROOF-MOUNTED MECHANICAL EQUIPMENT SHALL BE FULLY
SCREENED BY ROOF PARAPETS.
ROOF ACCESS PROVIDED BY INTERNAL ROOF-ACCESS LADDER
AND ROOF ACCESS HATCH.
ROOF TILE PROFILE TO MATCH PROFILE OF JENSEN'S CENTER ROOF
TILES.
1
A-300
1
A-301
27' - 0" T.O.P.
1
12
4
4 5 6
7
7
AA
BB
C
D
EE
1/4" / 12"1/4" / 12"1/4" / 12"2 1/2" / 12"2 1/2" / 12"
2 1/2" / 12"2 1/2" / 12"D40
66
63
MT-07
MT-04 PT-01
MT-07
MT-07MT-05
MT-05
MT-04PT-01
MT-04PT-02
MT-04PT-02
D40
B80
69
D20
69
69
69
D20
D20
69
D20
B82
61
61
61
6163
62
62
62
62
66
66
66
69
73
73
73
73
74 74
6
A-501
6
A-501
5
A-501
5
A-501
23' - 2 1/2" T.O.P.
16' - 6 3/4" T.O.D.
23' - 2 1/2" T.O.P.
15' - 7 17/32" T.O.D.
16' - 2 23/32" T.O.D.
15' - 9 1/4" T.O.D.
16' - 2 3/4" T.O.D.
15' - 7 3/4" T.O.D.
20' - 11 7/8" T.O.D.
20' - 11 7/8" T.O.D.
20' - 8 7/8" T.O.D.
OVHG.
4' - 0"∙OVHG.4' - 0"TOWER
33' - 0"
OVHG.
3' - 0 3/8"OVHG.4' - 0 3/8"3
A-300
2
A-301
3
A-301
TOWER29' - 0"TOWER32' - 0"TOWER
23' - 0"
20' - 0"5' - 0"16' - 4"8' - 0"PARAPET LOC.2' - 0"PARAPET LOC.5' - 6"PARAPET LOCATION
14' - 8"
PARAPET LOCATION
21' - 0"
2
A-501
1
A-501
2
A-501
1
A-501
ROOF AREA 'A' CRITERIA SERVES THE LARGEST DRAINAGE CALCULATIONS.
APPLY ROOF AREA 'A' CRITERIA TO ROOF AREA 'B', 'C', AND 'D'.
PALM DESERT RAINFALL INTENSITY:2"/HR
ROOF AREA 'A'
DRAINAGE SYSTEM: GUTTER W. DOWNSPOUT LEADER
PROJECT ROOF AREA SERVED:939 SF
VERTICAL PIPE CALCUATION - CPC TABLE 1103.1
3" DIA. PIPE @ 2"/HR RAINFALL ALLOWABLE: 4,400 SF
3"x4" RECTANGULAR VERT. LEADER PROVIDED ; 4,400 SF ALLOWABLE > 939 SF SERVED: 'OK'
HORIZONTAL PIPE CALCUATION - CPC TABLE 1103.2
3" DIA. PIPE (1/4"/FT SLOPE) @ 2"/HR RAINFALL ALLOWABLE: 2,320 SF
3" DIA. HORIZONTAL OUTLET LEADER PROVIDED; 2,320 SF ALLOWABLE > 939 SF SERVED: 'OK'
ROOF AREA 'B'
PROJECT ROOF AREA SERVED:631 SF
ROOF AREA 'C'
PROJECT ROOF AREA SERVED:713 SF
ROOF AREA 'D'
PROJECT ROOF AREA SERVED:519 SF
ROOF DRAINAGE CALCULATIONSROOF DRAINAGE CALCULATIONS
ROOF AREA
'A'
ROOF AREA
'D'
ROOF AREA
'B'
ROOF AREA
'C'
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:47 PM22-001
A-103
ROOF PLAN
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 2ROOF PLAN
INTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
MATERIALS
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM
MFR: FIBERTITE
COLOR: OFF WHITE
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
SHEET NOTES
ID DESCRIPTION
61 EAVE
62 RAKE
63 HIP
66 PARAPET
69 CRICKET
73 ELEVATED ROOF FRAMING ENCLOSURE
74 36 x 48 THRU-PARAPET ACCESS
KEYNOTES
ID SPEC DESCRIPTION
B - SHELL
B80 ROOF ACCES HATCH
B82 8" H. MECHANICAL EQUIPMENT CURB
D - SERVICES
D20 COMBINATION ROOF DRAIN + OVER FLOW DRAIN
D40 HVAC R.T.U.
SLOPED ROOFS TO SHEET FLOW.
SLOPED ROOFS TO SHEET FLOW.
EXTERIOR ELEVATION - GENERAL NOTES
1.
2.
3.
ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED.
BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY.
SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER
SEPARATE REVIEW.
F.F.
0"
12347
T.O.D.
15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
80
D40
MT-02
MT-04 PT-04MT-04PT-04 BEYOND
MT-01PT-01
CT-04PT-05
CT-02MT-03 PT-03
MT-05
CT-04PT-05
CT-02
MT-02PT-02
MT-02 PT-04
MT-06 PT-04
MT-04PT-04
BEYOND
CT-03
CT-03
MT-01PT-01
0505
PT-01
PT-01
20' - 0"F.F.0"
AB C D E
T.O.D.15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)
29' - 0"
MT-02PT-02 CT-02 MT-01 PT-01
CT-04 PT-05
CT-02
MT-05 MT-04 PT-04
MT-02PT-04
MT-06PT-04
MT-02PT-02
MT-04PT-04
80
CT-03
05 06
PT-01
20' - 0"123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:45:54 PM22-001
A-200
EXTERIOR ELEVATIONS
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 3BLDG NORTH ELEVATION
3/16" = 1'-0" 2BLDG EAST ELEVATION
EXTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
COMPONENT
CT-02 081113 ALUMINUM-FRAME STOREFRONT
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-03 081113 CHANNEL SCREED
DESCRIPTION: 1" W. REVEAL
MATL: ALUMINUM
FINISH: PAINT
CT-04 107313 CUSTOM LOUVERED METAL AWNING
PRODUCT: ALUMINUM SHUTTERS
FINISH: PAINT
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
MT-03 093000 FEATURE WALL CLADDING
HIGH-PRESSURE ENGINEERED STONE VENEER
MFR: NEOLITH
COLLECTION: IRON COLLECTION
MODEL: IRON CORTEN
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-03 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7549 "STUDIO TAUPE" 284-C5
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
PT-05 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 6993 "BLACK OF NIGHT" 251-C5
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS
KEYNOTES
ID SPEC DESCRIPTION
D - SERVICES
D40 HVAC R.T.U.
F.F.0"
1234 5 6 7
T.O.D.
15' - 6"
T.O.P. (L)
23' - 0"
T.O.P. (M)
27' - 0"
T.O.P. (H)29' - 0"
MT-01PT-01CT-02MT-03
MT-04PT-04MT-02PT-02
CT-02 CT-02
CT-04PT-05
MT-02PT-03MT-02PT-03MT-02 PT-03 MT-02 PT-02
MT-05MT-04PT-04
MT-02 PT-04
MT-06 PT-04
D40BEYOND
CT-03
06 05
PT-01
100.M
F.F.
0"
ABCDE
T.O.D.
15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
MT-05MT-02PT-02 MT-04 PT-04CT-04 PT-05 MT-01 PT-01
CT-02 CT-01MT-02PT-03
MT-02PT-04
MT-06PT-04
80
CT-03
05 06
PT-01
EXTERIOR ELEVATION - GENERAL NOTES
1.
2.
3.
ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED.
BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY.
SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER
SEPARATE REVIEW.
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:01 PM22-001
A-201
EXTERIOR ELEVATIONS
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
INTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
COMPONENT
CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-02 081113 ALUMINUM-FRAME STOREFRONT
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-03 081113 CHANNEL SCREED
DESCRIPTION: 1" W. REVEAL
MATL: ALUMINUM
FINISH: PAINT
CT-04 107313 CUSTOM LOUVERED METAL AWNING
PRODUCT: ALUMINUM SHUTTERS
FINISH: PAINT
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
MT-03 093000 FEATURE WALL CLADDING
HIGH-PRESSURE ENGINEERED STONE VENEER
MFR: NEOLITH
COLLECTION: IRON COLLECTION
MODEL: IRON CORTEN
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
MT-06 062013 5/4x12 TREATED WOOD FASCIA
TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE
FIN: PAINT
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-03 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7549 "STUDIO TAUPE" 284-C5
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
PT-05 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 6993 "BLACK OF NIGHT" 251-C5
3/16" = 1'-0" 1BLDG SOUTH ELEVATION
3/16" = 1'-0" 2BLDG WEST ELEVATION
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS
KEYNOTES
ID SPEC DESCRIPTION
D - SERVICES
D40 HVAC R.T.U.
EXTERIOR ELEVATION - GENERAL NOTES
1.
2.
3.
ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED.
BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY.
SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER
SEPARATE REVIEW.
F.F.
0"
12347
T.O.D.
15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
80
D40
MT-02
MT-04 PT-04MT-04PT-04 BEYOND
MT-01PT-01
CT-04PT-05
CT-02MT-03 PT-03
MT-05
CT-04PT-05
CT-02
MT-02PT-02
MT-02 PT-04
MT-06 PT-04
MT-04PT-04
BEYOND
CT-03
CT-03
MT-01PT-01
0505
PT-01
PT-01
20' - 0"F.F.0"
AB C D E
T.O.D.15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)
29' - 0"
MT-02PT-02 CT-02 MT-01 PT-01
CT-04 PT-05
CT-02
MT-05 MT-04 PT-04
MT-02PT-04
MT-06PT-04
MT-02PT-02
MT-04PT-04
80
CT-03
05 06
PT-01
20' - 0"123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:59:41 PM22-001
A-200
EXTERIOR ELEVATIONS
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 3BLDG NORTH ELEVATION
3/16" = 1'-0" 2BLDG EAST ELEVATION
EXTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
COMPONENT
CT-02 081113 ALUMINUM-FRAME STOREFRONT
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-03 081113 CHANNEL SCREED
DESCRIPTION: 1" W. REVEAL
MATL: ALUMINUM
FINISH: PAINT
CT-04 107313 CUSTOM LOUVERED METAL AWNING
PRODUCT: ALUMINUM SHUTTERS
FINISH: PAINT
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
MT-03 093000 FEATURE WALL CLADDING
HIGH-PRESSURE ENGINEERED STONE VENEER
MFR: NEOLITH
COLLECTION: IRON COLLECTION
MODEL: IRON CORTEN
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-03 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7549 "STUDIO TAUPE" 284-C5
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
PT-05 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 6993 "BLACK OF NIGHT" 251-C5
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS
KEYNOTES
ID SPEC DESCRIPTION
D - SERVICES
D40 HVAC R.T.U.
F.F.0"
1234 5 6 7
T.O.D.
15' - 6"
T.O.P. (L)
23' - 0"
T.O.P. (M)
27' - 0"
T.O.P. (H)29' - 0"
MT-01PT-01CT-02MT-03
MT-04PT-04MT-02PT-02
CT-02 CT-02
CT-04PT-05
MT-02PT-03MT-02PT-03MT-02 PT-03 MT-02 PT-02
MT-05MT-04PT-04
MT-02 PT-04
MT-06 PT-04
D40BEYOND
CT-03
06 05
PT-01
100.M
F.F.
0"
ABCDE
T.O.D.
15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
MT-05MT-02PT-02 MT-04 PT-04CT-04 PT-05 MT-01 PT-01
CT-02 CT-01MT-02PT-03
MT-02PT-04
MT-06PT-04
80
CT-03
05 06
PT-01
EXTERIOR ELEVATION - GENERAL NOTES
1.
2.
3.
ALL NEW STORFRONT GLAZING SHALL BE FULLY TEMPERED.
BUILDING SIGNAGE IS SHOW FOR GENERAL PLACEMENT ONLY.
SIGNAGE DESIGN, SIZE, AND TYPE BY OTHERS AND UNDER
SEPARATE REVIEW.
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:59:47 PM22-001
A-201
EXTERIOR ELEVATIONS
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
INTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
COMPONENT
CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-02 081113 ALUMINUM-FRAME STOREFRONT
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-03 081113 CHANNEL SCREED
DESCRIPTION: 1" W. REVEAL
MATL: ALUMINUM
FINISH: PAINT
CT-04 107313 CUSTOM LOUVERED METAL AWNING
PRODUCT: ALUMINUM SHUTTERS
FINISH: PAINT
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
MT-03 093000 FEATURE WALL CLADDING
HIGH-PRESSURE ENGINEERED STONE VENEER
MFR: NEOLITH
COLLECTION: IRON COLLECTION
MODEL: IRON CORTEN
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
MT-06 062013 5/4x12 TREATED WOOD FASCIA
TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE
FIN: PAINT
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-03 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7549 "STUDIO TAUPE" 284-C5
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
PT-05 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 6993 "BLACK OF NIGHT" 251-C5
3/16" = 1'-0" 1BLDG SOUTH ELEVATION
3/16" = 1'-0" 2BLDG WEST ELEVATION
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
80 PROPOSED SIGNAGE LOCATION; SIGNAGE - BY OTHERS
KEYNOTES
ID SPEC DESCRIPTION
D - SERVICES
D40 HVAC R.T.U.
WALL SECTION - GENERAL NOTES
1.
2.
3.
ALL ROOF-MOUNTED MECHANICAL EQUIPMENT SHALL BE FULLY
SCREENED BY ROOF PARAPETS.
ALL ROOF DRAINS AND DRAIN LEADERS ARE CONCEALED.
ROOF ACCESS IS PROVIDED BY INTERNAL LADDER AND ROOF
HATCH.
F.F.0"
123 4 5 6 7
T.O.D.15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)
29' - 0"
D40
66
73
B82
73
66 6666
74BEYOND 74 BEYOND
TENANT SPACE
100
0506
MT-07 BEYOND
MT-07BEYOND
MT-07BEYOND
A-302
1A-302
4
A-302
3
A-302
2
3' - 0 3/8"
F.F.
0"
13 4 7
T.O.D.15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)
29' - 0"
A-303
4
A-303
3
A-303
2 A-303
1
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:03 PM22-001
A-300
BUILDING SECTION
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 1EAST-WEST SECTIONS
EXTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
MATERIALS
MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM
MFR: FIBERTITE
COLOR: OFF WHITE
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
66 PARAPET
73 ELEVATED ROOF FRAMING ENCLOSURE
74 36 x 48 THRU-PARAPET ACCESS
KEYNOTES
ID SPEC DESCRIPTION
B - SHELL
B82 8" H. MECHANICAL EQUIPMENT CURB
D - SERVICES
D40 HVAC R.T.U.
3/16" = 1'-0" 3EAST-WEST SECTIONS
F.F.
0"
AB D E
T.O.D.
15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
D40
B82
66
74
66
UTILITY
104
TENANT SPACE
100
TENANT
RESTROOM
101
BEYOND
B80
D20
66 BEYOND
0506
MT-04 PT-01MT-01 PT-01
MT-07
BEYONDBEYOND
BEYOND
A-305
3
A-305
1A-305
2
4' - 0 3/8"
5' - 6"
F.F.0"
Level 2
10' - 0"
AB D E
T.O.D.15' - 6"
T.O.P. (L)23' - 0"
T.O.P. (M)27' - 0"
T.O.P. (H)29' - 0"
T.O.W.3' - 3"
A-304
1 A-304
2
A-304
3
F.F.
0"
Level 210' - 0"
AB C E
T.O.D.
15' - 6"
T.O.P. (L)
23' - 0"
T.O.P. (M)
27' - 0"
T.O.P. (H)29' - 0"
T.O.W.
3' - 3"
A-306
3
A-306
2
A-306
1
WALL SECTION - GENERAL NOTES
1.
2.
PROTECT EXSTING IMPROVEMENTS NOT RECEIVING WORK.
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:04 PM22-001
A-301
BUILDING SECTION
10.28.2022
Author
Checker
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3/16" = 1'-0" 1NORTH-SOUTH SECTIONS
3/16" = 1'-0" 2NORTH-SOUTH SECTIONS
3/16" = 1'-0" 3NORTH-SOUTH SECTIONS
KEYNOTES
ID SPEC DESCRIPTION
B - SHELL
B80 ROOF ACCES HATCH
B82 8" H. MECHANICAL EQUIPMENT CURB
D - SERVICES
D20 COMBINATION ROOF DRAIN + OVER FLOW DRAIN
D40 HVAC R.T.U.
SHEET NOTES
ID DESCRIPTION
05 FINISH GRADE
06 FINISH SURFACE
66 PARAPET
74 36 x 48 THRU-PARAPET ACCESS
FINISHES SCHEDULE
ID SPEC DESCRIPTION
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-04 076200 BRAKE METAL COPING
MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM
MFR: FIBERTITE
COLOR: OFF WHITE
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
CEMENT PLASTER FACE BEYOND
LOW FLOATING CLIP
VARIES3/4" OVHG.5/4x12 TREATED
FASCIA BOARD;
PAINT FINISH.
5/4x12 TREATED RAKE
TRIM BOARD;
PAINT FINISH.
1/2" PLYWOOD
SHEATHING
2x SOFFIT FRAMING AT
24" O.C.;
SEE STRUCTURAL
2x BACKING
BOX RAKE TRIM; MATCH
METAL ROOF FINISH
LOW-RAKE SUPPORT
ANGLE
CONT. CLEAT
STANDING SEAM
METAL ROOF PANELS
FIELD CUT & BEND UP 2" PANEL LEG
AS REQ'D WHEN ENDING OFF MODULE
PARAPET RAKE CLEAT
(2) LAYERS 15# ROOFING
FELT
5/8" PLYWOOD ROOF
SHEATING
2x ROOF FRAMING AT 24" O.C.;
SEE STRUCTURAL
7/8" EXT. CEMENT PLASTER OVER
3.4 #/SY EXP. MTL. LATH; PAINTLAP
CEMENT PLASTER FACE BEYOND6 1/2"∙6 1/2"∙
NOTE:
PROVIDE FASTENER TYPES, SIZES,
AND QUANTITIES PER ROOF
MANUFACTURER'S REQUIREMENTS
BOX RAKE TRIM
2x NAILER
3 1/2"∙2"1 1/8"
COPING PROFILE
1-PLY MEMBRANE
ROOFING; EXTEND
OVER TOP OF
PARAPET
G.I.S.M. 22 GA.
COPING; PAINT
COPING CLEAT
7/8" EXT. CEM. PLASTER
OVER BUILDING PAPER
& SELF FURRING LATH
PARAPET ASSEMBLY
1-PLY MEMBRANE
ROOFING; EXTEND
OVER TOP OF
PARAPET
G.I.S.M. 22 GA.
COPING; PAINT
COPING CLEAT
2"1 1/8"
COPING CLEATG.I.S.M. 22 GA.
COPING; PAINT
4"2-PIECE COPING PROFILE
7/8" EXT. CEM. PLASTER
OVER BUILDING PAPER
& SELF FURRING LATH
PARAPET ASSEMBLY
7/8" EXT. CEMENT PLASTER OVER
BLDG. PAPER & SELF-FURRING LATH
LOW FLOATING CLIP
5/4x12 TREATED RAKE
TRIM BOARD;
(FOREGROUND)
1/2" PLYWOOD
SHEATHING
2x4x16 GA. ANGLE
STANDING SEAM
METAL ROOF PANELS
FIELD CUT & BEND UP 2" PANEL LEG
AS REQ'D WHEN ENDING OFF MODULE
PARAPET RAKE TRIM
(2) LAYERS 15# ROOFING
FELT
5/8" PLYWOOD ROOF
SHEATING
2x ROOF FRAMING AT 24" O.C.;
SEE STRUCTURAL
NOTE:
PROVIDE FASTENER TYPES, SIZES,
AND QUANTITIES PER ROOF
MANUFACTURER'S REQUIREMENTS
2x NAILER
FLEXIBLE MEMBRANE
PARAPET RAKE CLEAT
COUNTER FLASHING
LOW-RAKE SUPPORT
ANGLE
WALL ASSEMBLY
CEMENT PLASTER FACE
(FOREGROUND)
3 1/2"∙
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:10 PM22-001
A-501
ROOF DETAILS
10.28.2022
JG
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
3" = 1'-0" 1 ROOF RAKE DETAIL - OPEN
3" = 1'-0" 6PARAPET COPING DETAIL
3" = 1'-0" 5 PARAPET COPING DETAIL
3" = 1'-0" 2ROOF RAKE DETAIL - WALL
3RAKE PERSPECTIVE
4RAKE PERSPECTIVE
BOX RAKE TRIM
5/4x12 FASCIA BD.
5/4x12 RAKE TRIM BD.
STANDING SEAM MTL ROOF
5/4x12 FASCIA BD.
METAL EAVE TRIM W. DRIP
STANDING SEAM MTL ROOF
5/4x12 FASCIA BD.
METAL EAVE TRIM W. DRIP
BOX RAKE TRIM
PARAPET RAKE TRIM &
COUNTER FLASHING
PT-02
PT-04
PT-05
PT-01
PT-03
MT-01
MT-02
MT-03
MT-04
CT-02
CT-04
MT-05
MT-07
CT-01
MT-06
CT-03
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:11 PM22-001
A-800
MATERIALS SAMPLES
10.28.2022
Author
Checker
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
EXTERIOR FINISHES SCHEDULE
ID SPEC DESCRIPTION
COMPONENT
CT-01 081113 ALUMINUM-FRAME STOREFRONT ENTRANCE
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-02 081113 ALUMINUM-FRAME STOREFRONT
MATL: ALUMINUM FRAME
FINISH: FACTORY
COLOR: DARK BRONZE ANODIZED
GLAZING: 1" INSULATED, FULLY TEMPERED
CT-03 081113 CHANNEL SCREED
DESCRIPTION: 1" W. REVEAL
MATL: ALUMINUM
FINISH: PAINT
CT-04 107313 CUSTOM LOUVERED METAL AWNING
PRODUCT: ALUMINUM SHUTTERS
FINISH: PAINT
MATERIALS
MT-01 092400 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: SMOOTH
FINISH: PAINT
MT-02 092900 MATL: 7/8" EXTERIOR CEMENT PLASTER
TEXTURE: LIGHT SAND
FINISH: PAINT
MT-03 093000 FEATURE WALL CLADDING
HIGH-PRESSURE ENGINEERED STONE VENEER
MFR: NEOLITH
COLLECTION: IRON COLLECTION
MODEL: IRON CORTEN
MT-04 076200 BRAKE METAL COPING
MT-05 073216 STANDING SEAM METAL ROOFING SYSTEM
MFR: MBCI
SERIES: SUPERLOK STANDING SEAM
FINISH: SIGNATURE 200 SERIES
COLOR: BURNISHED SLATE
MT-06 062013 5/4x12 TREATED WOOD FASCIA
TREATMENT: WINDSOR-ONE PROTECTED 'TRU-CORE
FIN: PAINT
MT-07 075416 1-PLY MEMBRANE ROOFING SYSTEM
MFR: FIBERTITE
COLOR: OFF WHITE
PAINTS
PT-01 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7567 "NATURAL TAN" 284-C1
PT-02 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7530 "BARCELONA BEIGE" 285-C4
PT-03 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7549 "STUDIO TAUPE" 284-C5
PT-04 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 7026 "GRIFFIN" 241-C6
PT-05 099123 MFR: SHERWIN-WILLIAMS
COLOR: SW 6993 "BLACK OF NIGHT" 251-C5
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:18 PM22-001
A-900
PERSPECTIVE VIEW
10.28.2022
UB
MM
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1PERSPECTIVE - NE
2PERSPECTIVE NW
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:25 PM22-001
A-901
PERSPECTIVE VIEW
10.28.2022
Author
Checker
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1PERSPECTIVE - SW
2PERSPECTIVE - SE
123 4
SHEET TITLE:
These documents are Instruments of Service and are the sole property
of McAuliffe & Company, Inc. All designs and other information on
these documents are for use on the specified project only.
These documents shall not be altered in any way, shall not be disclosed
or assigned to any third party, and shall not create any third party rights.
Without express written permisison of McAuliffe & Company, Inc., these
Instruments of Service shall not be used or relied on by any other
persons or entities, or for any purpose following substantial completion
of the Project.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
5 6
for
D
C
B
E
A
DRAWING DATE:
REVISIONS:
INSTRUMENTS OF SERVICE
CONSTRUCTION SET
ISSUE DATES:
BID SET
PERMIT SET
PLANCHECK SET
DESIGN DEVELOPMENT SET
PLANNING SUBMITTAL SET
MICHAEL T. McAULIFFE, AIA C-27929
McA PROJECT NO:
CHECKED BY:
DRAWN BY:
D
C
B
E
A
SHEET NUMBER:
T: 760.773.0907 F: 760.773.0967
mail@archmca.com
45125 Panorama Drive
Palm Desert, California 92260
REN.
C-27929
04/30/23MICHAELT.McA
U
L
I
FFENo.LIC ENSEDARCHIT
ECTCATSFOET INROFIALAThe Architect shall have no responsibility for the modification, clarification,
interpretation, or addition to these documents by anyone not under the
Architect's direct control or supervision. All modifications to these
documents shall be in writing and shall be approved by the Architect in
advance of the Work.
Any use or reuse of these documents, in whole or in part, by the Owner,
agents of the Owner, or any other party without the review and written
approval of the Architect is strictly forbidden. McAuliffe & Company, Inc.
shall be held harmless from all claims, injuries, damages, losses,
expenses, and attorney's fees arising out of any and all unauthorized use
or reuse of these documents.
Copyright 2022, McAuliffe & Company, Inc.
All rights reserved.
UNAUTHORIZED CHANGES & USES
11/1/2022 3:46:32 PM22-001
A-902
PERSPECTIVE VIEWS
10.28.2022
Author
Checker
MECHANICS
BANK
BUILDING
One Eleven El Paseo,
LLC
73611 Highway 111
Palm Desert, CA 92260
149 Palos Verdes Blvd. Suite E
Redondo Beach, CA 90277
1AERIAL - NE
2AERIAL - SE
3AERIAL - SW
4AERIAL - NE
FF=227.503,830 GSFMECHANICS BANK BUILDING0° 11' 09"140.01'NW89° 14' 06"110.34'SER=L=26.02'20.00'0° 11' 09"120.28'SEVACANT PARCELAPN: 627-211-023ZONE: D.O.MULTI-BUILDING RETAILAPN: 627-211-022-3ZONE: D.O.01020304HC050607080989° 12' 43"NWW101112131514AAAABBBBBBBBBCCCCCCCCCCCCABCPRELIMINARYDESIGNL1.0FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/24DESIGNGROUP77-899 WOLF RD.
FF=227.503,830 GSFMECHANICS BANK BUILDING0° 11' 09"140.01'NW89° 14' 06"110.34'SER=L=26.02'20.00'0° 11' 09"120.28'SEVACANT PARCELAPN: 627-211-023ZONE: D.O.MULTI-BUILDING RETAILAPN: 627-211-022-3ZONE: D.O.01020304HC050607080989° 12' 43"NWW101112131514AAAABBBBBBBBBCCCCCCCCCCCCABCPRELIMINARYDESIGNL1.0FAX (760) 777-9132PH. (760) 777-9131PALM DESERT, CASUITE 102HERMANNLIC# 275492211EXP. 04/30/24DESIGNGROUP77-899 WOLF RD.
ARCHITECTURAL REVIEW COMMISSION
NOTICE OF ACTION
September 12, 2022
Michael McAuliffe, AIA (McAuliffe & Company, Inc.)
45125 Panorama Drive
Palm Desert, CA 92260
Subject: Consideration of a recommendation to the Planning Commission for approval to
construct Mechanics Bank, a new 3,830 square-foot commercial building located in the
Jensen’s Shopping Center at 73611 Highway 111.
The Architectural Review Commission of the City of Palm Desert considered your request and
took the following action at its meeting of August 23, 2022:
By Minute Motion, the Architectural Review Commission approved Case No. MISC22-
0013 subject to the following: 1) Add landscape in the area between the proposed block
wall and public sidewalk on the north and east portions of the property; and 2) Applicant
will return to the ARC for review of a more developed illustration of rake detail including
how detail terminates into the surrounding element prior to building permit issuance and
specific details for proposed wood fascia siding. The motion carried with a 4-0-1 vote.
(AYES: Colvard, Latkovic, McIntosh, and Vuksic; NOES: None; ABSENT: None;
ABSTAIN: McAuliffe).
To view video or audio for the discussion on this item, including comments provided by the
Commission, please visit the Architectural Review Commission Information Center website at,
https://www.cityofpalmdesert.org/our-city/committees-and-commissions/commission-
information.
If you have any questions, please contact Senior Planner, Nick Melloni, at (760) 776-6479 or
nmelloni@cityofpalmdesert.org.
Sincerely,
ROSIE LUA, SECRETARY
ARCHITECTURAL REVIEW COMMISSION
cc: File