HomeMy WebLinkAbout2023-03-28 ARC Regular Meeting Agenda PacketCity of Palm Desert Page 1
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT, CALIFORNIA
AGENDA
(HYBRID MEETING)
City Hall, Development Services Conference Room
73-510 Fred Waring Drive
Palm Desert, CA 92260
Pursuant to Assembly Bill 2449, this meeting will be a hybrid meeting with in-person public
access to the meeting location.
OPTIONS FOR PARTICIPATING IN THIS MEETING:
•Attend the meeting in the Development Services Conference Room at Palm Desert City Hall,
73510 Fred Waring Drive, Palm Desert, CA 92260.
•To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/83648797515,
Zoom Webinar ID: 836 4879 7515.
•To participate by telephone call (213) 338-8477 or (669) 219-2599, Zoom Webinar ID: 836
4879 7515. To provide a public comment please press *9 to raise your hand.
•Written public comment may also be submitted to planning@palmdesert.gov. Emails received
by 9:30 a.m. prior to the meeting will be distributed to the Commission. Any correspondence
received during or after the meeting will be distributed to the Commission as soon as
practicable and retained for the official record. Emails will not be read aloud except as an
ADA accommodation.
1.CALL TO ORDER
2.ROLL CALL
3.NON-AGENDA PUBLIC COMMENT: This time has been set aside for the public to address
the Architectural Review Commission on issues that are not on the agenda for up to three
minutes. Because the Brown Act does not allow the Commission to act on items not listed on
the agenda, members may briefly respond or refer the matter to staff for a report and
recommendation at a future meeting.
4.CONSENT CALENDAR: All matters listed on the Consent Calendar are considered routine
and may be approved by one motion. The public may comment on any items on the Consent
Agenda within the three-minute time limit. Individual items may be removed by Commissioners
for a separate discussion.
Tuesday
March 28, 2023 12:30 p.m.
Regular Meeting
Page 1 of 75
Architectural Review Commission Agenda March 28, 2023
City of Palm Desert Page 2
A. APPROVAL OF MINUTES
RECOMMENDATION: Approve the Architectural Review Commission Regular Meeting
minutes of March 14, 2023.
B. CASE NO: SARC23-0001
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration of a design review to
replace two (2) existing monument signs for the Hilton Grand Vacation Club located at 1
Willow Ridge.
APPLICANT AND ADDRESS: Signarama, Palm Desert, CA 92211
LOCATION: 1 Willow Ridge
ZONE: Planned Residential – 5 units per acre (P.R.-5)
RECOMMENDATION:
1. The ARC determines that the requirements of the findings have been met based on
the analysis and approves the Sign Design Review.
CONSENT ITEMS HELD OVER: Items removed from the Consent Calendar for separate
discussion will be considered at this time.
5. ACTION CALENDAR
A. FINAL DRAWINGS
1. CASE NO: MISC22-0020 (Continued from October 11, 2022)
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a request
for a design review of a private sport court on a residential property located at 45710
Verba Santa Drive.
APPLICANT AND ADDRESS: Richard Leventhal, Palm Desert, CA 92260
LOCATION: 45710 Verba Santa Drive
ZONE: R-1, 20,000 (Single Family Residential)
RECOMMENDATION:
1. The ARC continue the design review of the subject sports court until the next
regularly scheduled ARC meeting on April 11, 2023, to allow a full review of the
applicant’s noise study to be completed by the City’s third-party consultant.
2. CASE NOS: PP/CUP/EA23-0001
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a Design
Review and a recommendation of approval to the Planning Commission for a Precise
Plan (PP) and Conditional Use Permit (CUP) to develop a 3,539 square-foot, single-
story building within the Palm Desert Civic Center Campus located at the northeast
Page 2 of 75
Architectural Review Commission Agenda March 28, 2023
City of Palm Desert Page 3
corner of San Pablo Avenue and Fred Waring Drive (Assessor’s Parcel Number 622-
250-014).
APPLICANT AND ADDRESS: Prest Vuksic Greenwood Architects, Palm Desert,
CA 92260
LOCATION: Northeast corner of San Pablo Avenue and Fred Waring Drive
(Assessor’s Parcel Number 622-250-014).
ZONE: Public Institution (P)
RECOMMENDATION:
1. Staff recommends the ARC determines that the requirements of the findings have
been met based on the analysis and approves the Design Review and provides a
recommendation of approval to the Planning Commission for the Precise Plan and
Conditional Use Permit.
6. NON-ACTION ITEMS
None
7. INFORMATIONAL REPORTS & COMMENTS
A. ARCHITECTURAL REVIEW COMMISSIONERS
B. CITY STAFF
C. ATTENDANCE REPORT
8. ADJOURNMENT: The next Regular Meeting will be held on April 11, 2023, at 12:30 p.m.
Page 3 of 75
Architectural Review Commission Agenda March 28, 2023
City of Palm Desert Page 4
AFFIDAVIT OF POSTING
I hereby certify under penalty of perjury under the laws of the State of California that the
foregoing agenda for the Architectural Review Commission was posted on the City Hall bulletin
board and City website not less than 72 hours prior to the meeting.
Melinda Gonzalez
Recording Secretary
PUBLIC NOTICES
Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the designated
office for inspection of records in connection with this meeting is the Development Services
Department, City Hall, 73-510 Fred Waring Drive, Palm Desert. Staff reports for all agenda
items and documents provided to a majority of the legislative bodies are available for public
inspection at City Hall and on the City’s website at www.palmdesert.gov.
Americans with Disabilities Act: It is the intention of the City of Palm Desert to comply with
the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at
this meeting, or in meetings on a regular basis, you will need special assistance beyond what
is normally provided, the city will attempt to accommodate you in every reasonable manner.
Please contact the Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the
meeting to inform us of your needs and to determine if accommodation is feasible.
Page 4 of 75
City of Palm Desert Page 1
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT, CALIFORNIA
MINUTES
(HYBRID MEETING)
Pursuant to Assembly Bill 2449, this meeting will be a hybrid meeting with in-person public
access to the meeting location.
1. CALL TO ORDER
A Regular Meeting of the Architectural Review Commission (ARC) was called to order by
Chair Vuksic on Tuesday, March 14, 2023, at 12:31 p.m. in the Development Services
Conference Room, City Hall, located at 73510 Fred Waring Drive, Palm Desert, California.
2. ROLL CALL
Present: Commissioners Dean Wallace Colvard, Nicholas Latkovic, Michael McAuliffe, Vice
Chair Jim McIntosh, Francisco Sanchez, and Chair John Vuksic.
Absent: None
City Staff
Present: Richard Cannone, Director of Development Services; Rosie Lua, Deputy Director
of Development Services; Nick Melloni, Principal Planner; and Melinda Gonzalez,
Recording Secretary, were present at Roll Call.
3. NON-AGENDA PUBLIC COMMENT
Chair Vuksic opened and closed the non-agenda public comment period. No public comments
were provided.
4. CONSENT CALENDAR
Associated staff reports, memos, attachments, and discussion on the following items can be
viewed by visiting the Architectural Review Commission Information Center website at,
https://www.palmdesert.gov/our-city/committees-and-commissions/commission-information.
Chair Vuksic opened and closed the public comment period for the Consent Calendar. No
public comments were provided.
MOTION BY COMMISSIONER MCAULIFFE, SECOND BY VICE CHAIR MCINTOSH,
CARRIED 6-0; to approve the consent calendar.
Tuesday
March 14, 2023
12:30 p.m.
Regular Meeting
Page 5 of 75
Architectural Review Commission Minutes March 14, 2023
City of Palm Desert Page 2
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
A. APPROVAL OF MINUTES
MOTION BY COMMISSIONER MCAULIFFE, SECOND BY VICE CHAIR MCINTOSH,
CARRIED 6-0; to approve the Architectural Review Commission Regular Meeting minutes
of February 28, 2023.
CONSENT ITEMS HELD OVER
None
5. ACTION CALENDAR
A. FINAL DRAWINGS
Associated staff reports, memos, attachments, and discussion on the following items can
be viewed by visiting the Architectural Review Commission Information Center website at,
https://www.palmdesert.gov/our-city/committees-and-commissions/commission-
information.
1. CASE NOS: SP/EA 22-0002, PP22-0009
NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a Design
Review and a recommendation of approval to the Planning Commission for a Specific
Plan Amendment (SP) and Precise Plan (PP) to develop a 114,700-square-foot
medical office park and site improvements on a 10.47-acre property located at the
southwest corner of Gerald Ford Drive and Technology Drive (Assessor’s Parcel
Numbers 694-580-026, and -027).
APPLICANT AND ADDRESS: Prest Vuksic Greenwood Architects, Palm Desert,
CA 92260
LOCATION: Southwest Corner of Gerald Ford Drive and Technology Drive, APNS:
694-580-026, and -027
ZONE: University Neighborhood Specific Plan (UNSP) - Neighborhood Center (NC)
Chair Vuksic announced his recusal due to a conflict of interest as he is a member of
the architectural firm retained for this project and left the conference room.
Principal Planner, Nick Melloni, narrated a PowerPoint presentation on the item and
responded to Commission inquiries. John Greenwood with Prest Vuksic Greenwood
Architects, Applicant, and their team were present and answered questions from the
Commission.
Vice Chair McIntosh opened and closed the public comment period. No public
comments were provided. Discussion on the item ensued with Commissioners
providing comments for the project.
Following discussion, MOTION BY COMMISSIONER MCAULIFFE, SECOND BY
COMMISSIONER LATKOVIC, CARRIED 5-0 (CHAIR VUKSIC ABSENT); to approve
Case Nos. SP/EA22-0002, PP22-0009 with the following conditions:
Page 6 of 75
Architectural Review Commission Minutes March 14, 2023
City of Palm Desert Page 3
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
1. Applicant shall provide a physical sample of scaled stone material and physical
color sample for spandrel glass and storefront frame.
2. Revised development drawings shall reflect rooftop locations for solar panels and
anticipated rooftop penetrations for future equipment and exhaust which are yet to
be determined.
3. Should there be design development changes to the elevator, drawings should be
updated to reflect changes.
4. Applicant shall provide a physical material sample of the rooftop screening.
At the conclusion of the item, Chair Vuksic returned to the conference room and rejoined
meeting.
6. NON-ACTION ITEMS
None
7. INFORMATIONAL REPORTS & COMMENTS
A. ARCHITECTURAL REVIEW COMMISSIONERS
Vice Chair McIntosh reported attending a subcommittee meeting with Commissioner
McAuliffe to review the construction documents for the Millennium Apartments project.
Principal Planner Melloni added upon review of the final construction drawings the
apartments were found to be in conformance with a revision for a recess detail however,
it was determined the final construction drawings for the clubhouse were not in substantial
conformance. Depending on the applicant’s revisions they will be scheduled for a second
subcommittee review or go before the ARC for approval of an amendment to the original
approval.
B. CITY STAFF
Principal Planner Melloni advised due to a conflict there is a need for another
commissioner to volunteer for the ARC subcommittee for West Coast Storage.
Commissioner McAuliffe volunteered to fill in for this committee.
Deputy Director Lua provided an update on DSRT Surf noting the applicant has until June
2023 to finalize their Final Map and obtain a grading permit.
Principal Planner Melloni provided an update on Spanish Walk Apartments noting they
recently obtained a rough grading permit and are currently in review for a precise grading
permit and building permit for the apartments and clubhouse.
Bravo Gardens is in review for a precise grading permit and building permit for the
apartments and clubhouse. The entitlements for this project, formerly “The Sands,” are
set to expire in April 2023 and the developer will be submitting a request for extension to
the Planning Commission.
C. ATTENDANCE REPORT
The attendance report was provided with the agenda materials. The Commission took no
action on this matter.
Page 7 of 75
Architectural Review Commission Minutes March 14, 2023
City of Palm Desert Page 4
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
8. ADJOURNMENT
The Architectural Review Commission adjourned at 1:37 p.m.
Respectfully submitted,
Melinda Gonzalez, Senior Administrative Assistant
Recording Secretary
ATTEST:
Rosie Lua, Deputy Director of Development Services
Secretary
APPROVED BY ARC: __/__/2023
Page 8 of 75
CITY OF PALM DESERT
DEVELOPMENT SERVICES DEPARTMENT
ARCHITECTURAL REVIEW COMMISSION MEMORANDUM
To: Honorable Chair and Members of the Commission
From: Nikki Gomez, Assistant Planner
Date: March 28, 2023
Subject: SARC23-0001 – Consideration of a design review to replace two (2) existing
monument signs for the Hilton Grand Vacation Club located at 1 Willow Ridge.
BACKGROUND
The Applicant, Signarama, is requesting approval of two (2) monument signs to replace the
existing monument signs at the southwest corner of Willow Ridge and Desert Willow Drive and
on the roundabout landscape area in front of the main building of the Hilton Grand Vacation Club.
This request is part of a sign packet submission which includes modifications to three (3) existing
directional monument signs and one (1) wall identification sign as part of the hotel rebranding
from Embarc Resort to Hilton Grand Vacation Club.
PROJECT SUMMARY
A. Property Description
The project site is an existing resort club located at 1 Willow Ridge that was previously Embarc
Resort. The project site was originally Intrawest Resort which consists of 310-unit residential
vacation ownership with a 7,850-square-foot amenity building (theater, change rooms, and lobby)
located on 44.4 acres of Final Subdivision Map of Tract No. 28450 approved by City Council on
May 22, 1997, by Resolution 97-40. Access to the resort is from Country Club Drive to Desert
Willow Drive, then to Willow Ridge. There are currently two monument signs for the existing
timeshare resort which feature an identical design characterized by unilluminated weathered steel
cabinets shaped to resemble a mountain silhouette.
B. Adjacent Land Use and Zoning Designation
Table 1 – Adjacent Land Use and Designations
Existing Uses General Plan Zoning
Project Site Resort/ Hilton
Grand Vacation
Club
Resort and
Entertainment
Planned Residential – 5 units
per acre (P.R.-5)
North Resort/ Hilton
Grand Vacation
Club
Resort and
Entertainment
Planned Residential – 5 units
per acre (P.R.-5)
Page 9 of 75
SARC 23-0001 – Willow Ridge Monument Signs
Page 2 of 5
March 28, 2023
South Desert Willow
Golf Course
Resort and
Entertainment
Planned Residential – 5 units
per acre (P.R.-5)
West Resort/ Hilton
Grand Vacation
Club
Resort and
Entertainment
Planned Residential – 5 units
per acre (P.R.-5)
East Resort/Vacant Lot Suburban Retail
Center
Desert Commercial Center
(PC-2)
C. Project Description
The applicant, Signarama, requests Architectural Review Commission (ARC) approval for two (2)
free standing monument signs which will replace the existing monument signage for Embarc. Sign
one, referenced as “A1” on the plans, is located at the southwest corner of Desert Willow Drive
and Willow Ridge. The second sign, “A2”, is located within a roundabout landscape area in front
of the main building of the Hilton Grand Vacation Club. The two proposed monument signs are
designed as rectangular cabinet signs to identify “Hilton Grand Vacation Club – Palm Desert”.
Both signs feature a rectangular body with a combination of metal cladding and stone veneer
base. Each sign is segmented in two halves with the top half designed using a fabricated
aluminum tube frame cabinet and reveal with aluminum faces and cladding (power coated to
simulate weathered steel) and bottom half designed using a tube base frame with stone veneer
(El Dorado stone) cladding. The letters are a white color finish with aluminum Flat Cut Out (FCO)
letters at 3/8” thickness mounted to the top half of the monument sign.
Table 1 identifies the changes in the overall size of the existing and proposed monument signs.
The sign identified as “A1” shows the existing monument sign as 3 feet, 6 inches in height by 12
feet, 6 inches in length. The proposed new monument is 4 feet in height by 10 feet in length. In
comparison to the existing sign, the proposed sign will increase in height by 6 inches and
decrease in length by 2 feet, 6 inches. The sign identified as “A2”, shows the existing sign as 1
foot, 9 inches in height by 6 feet, 5 inches in length, the proposed new monument sign is 3 feet
in height by 5 feet, 10 inches in length. The proposed sign will increase in height by 1 foot 3 inches
and decrease in length by 7 inches.
Table 1 – Monument Sign Existing and Proposed Size Comparison
Standard Existing
Monument Sign
A1
Proposed
Monument Sign
A1
Existing
Monument Sign
A2
Proposed
Monument Sign
A2
Sign
Height
3’-6” 4 feet 1’-9” 3 feet
Sign
Length
12’-6” 10 feet 6’-5” 5’-10”
The proposed monument signs will continue to serve as the main identification signs for the resort.
Both sign locations do not create a line-of-sight issue as all traffic flows along Willow Ridge and
does not obstruct visibility when entering or leaving the site. The proposed monument signs will
be placed on an existing landscaped area utilizing the existing exterior ground lighting for exterior
illumination.
Page 10 of 75
SARC 23-0001 – Willow Ridge Monument Signs
Page 3 of 5
March 28, 2023
Zoning Ordinance Summary
Pursuant to Section 25.68.050 of the Palm Desert Municipal Code (PDMC), all freestanding signs
(monument signs) require Architectural Review Commission (ARC) review and approval. The
standards for permanent identification signs are listed under Section 25.56.070 (C) and Section
25.56.080 (B)(2) of the Sign Ordinance. Compliance with the PDMC is summarized below.
Table 2 – Proposed Monument Sign Conformance Determination
Standard Monument Sign
A1
Monument Sign
A2
Ordinance Conformance
Determination
Sign Area 20 square feet 7.8 square feet 20 square feet Yes
Sign Height 4 feet 3 feet 6 feet Yes
Number per
Frontage
1 1 1 Yes
Illumination External External External only Yes
Additionally, all monument signs are required to be placed in a permanently landscaped area not
less than 24 square feet. The proposed monument signs will be surrounded with existing
landscape. The messaging on the sign is limited to the resort name with no phone numbers
included.
Per PDMC 25.56.030 (E), when approving or rejecting a sign permit application, the ARC shall
consider the design review criteria provided below and shall make the following findings:
1. That the sign is necessary for the applicant’s enjoyment of substantial trade and property
rights.
The monument signs are necessary to provide adequate and accurate identification to
customers and employees of the resort along Willow Ridge from Country Club Drive.
2. That the sign is consistent with the intent and purpose of this chapter and title.
The monument signs are consistent with the intent and purpose of the Sign Ordinance as the
monument signs are designed in harmony with the existing resort and complies with all
applicable development standards.
3. That the sign does not constitute a detriment to public health, safety, and welfare.
The design of the monument signs will not constitute a detriment to public health, safety, and
welfare as the design does not incorporate elements that are distracting or intrusive to
motorists or pedestrians. The placement of the monument signs are not anticipated to create
sight obstruction to motorists or pedestrians as they are setback away from line of sight areas,
adjacent streets, and drive aisles. The proposed monument signs will be installed on the same
location as the previous monument sign.
4. That the size, shape, color, height, and placement of the sign is compatible with and will have
a harmonious relationship with the building it identifies, the surrounding neighborhoods, and
other signs in the area.
Page 11 of 75
SARC 23-0001 – Willow Ridge Monument Signs
Page 4 of 5
March 28, 2023
The size and height of the proposed monuments signs complies with the development
standards established in the City’s Sign Ordinance. The shape of the proposed monument is
simplified to a rectangular shape to accommodate the resort name deviating from the existing
monument signs which are shaped to resemble a mountain silhouette. The color combination
is of simulated rusted cor-ten steel in Hickory Rust with stone veneer cladding in El dorado
stone to ensure the compatibility with the surrounding landscaping and the main building. The
location of the proposed monument signs are as follows; monument sign A1 located on the
existing landscape area at the entrance gate of the resort and monument sign A2 located on
the roundabout landscape area at the resort building entrance.
5. That both the location of the proposed sign and the design of its visual elements (lettering,
words, figures, colors, decorative motifs, spacing, and proportions) are legible under normal
viewing conditions prevailing where the sign is to be located.
The monument signs are oriented in a manner to be visible to pedestrians and motorists
traveling along Willow Ridge. The white colored letters are applied against the aluminum tube
frame of the monument sign providing enough contrast to be legible under typical viewing
conditions. The letters are also externally illuminated to allow for visibility during non-daylight
hours.
6. That the location, height, and design of the proposed sign does not obscure from view or
unduly detract from existing or adjacent signs and does not in any way compromise the health
or safety of any person(s).
The location, height, and design of the proposed monument signs does not obscure view or
unduly detract from existing signs in the vicinity and does not adversely affect the public health
safety or welfare. The height of the monument signs conforms to the Ordinance and are
placed in the same location as the previous monument signs.
7. That the location and design of the proposed sign and its size, shape, illumination, and color
are compatible with the visual characteristics of the surrounding area so as not to detract from
or cause depreciation of the value of adjacent developed properties.
The height and size of the monument signs comply with the requirements found in Table
25.56-2 of the Sign Ordinance. The Applicant is proposing a rust finish and stone veneer to
complement the landscape area and colors of the resort building structures.
8. That the location and design of a proposed sign in close proximity to a residential district does
not adversely affect the value or character of the adjacent residential uses.
The monument signs are compatible with the design of the existing building and meet the
requirements established in Table 25.56-2 for commercial signage, therefore, they will not
adversely impact the character of adjacent commercial use. Additionally, the monument signs
are located within the interior streets of the resort, not visible from the major arterial Country
Club Drive. The monument signs do not directly face existing residential uses.
9. That any neon tubing used in conjunction with any sign is incorporated as an integral part of
the sign design with careful attention to color, intensity of light, and the use of colors that are
not overly bright.
Page 12 of 75
SARC 23-0001 – Willow Ridge Monument Signs
Page 5 of 5
March 28, 2023
Neon tubing is not proposed as part of the monument sign. The monument signs will be
externally illuminated conditioned the external light sources shall be shielded from view and
directed to illuminate the sign face only.
10. That the quantity of information displayed in the sign does not cause visual clutter.
The signage text is limited to the name of the resort “Hilton Grand Vacation Club – Palm
Desert”.
Staff Recommendation.
Staff recommends the ARC determines that the requirements of the findings have been met
based on the analysis and approves the Sign Design Review.
Additionally, any modifications required by the ARC be added to the motion as conditions of
approval.
Attachment: 1. Project Exhibits
Page 13 of 75
1 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
PALM DESERT
1 Willow Ridge
Palm Desert, CA
presented by
Page 14 of 75
2 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
SIGN ORDINANCE SUMMARY
Page 15 of 75
3 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
N
W
S
E SITE SCALE: SEE LEGEND
D1
E2
E1
C
A1
F
B
A2
Page 16 of 75
4 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
EXISTING CONDITIONS
PROPOSED SIGN 'A1' - NEW SIGN
12'-6" VERIFY
3'-6" VERIFYGC TO STU
NEAR TOP
REMOVE & DISPOSE OF EXISTING
"MOUNTAIN" SCULPTURE.
INSTALL NEW S/F MONUMENT SIGN.
A1
Page 17 of 75
5 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
EXISTING CONDITIONS
PROPOSED - SIGN 'A2' - NEW SIGN
6'-5"5" LETTERSREMOVE & DISPOSE OF EXISTING
"MOUNTAIN" SCULPTURE.
INSTALL NEW S/F MONUMENT SIGN.
A2
Page 18 of 75
6 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
PROPOSED
EXISTING CONDITIONS
EXISTING CONDITIONS
4'-0"1'-4"NO ACTION REQUIRED
C
18"20"REMOVE & DISPOSE OF
EXISTING SIGN. INSTALL
NEW S/F PANEL.
B
Page 19 of 75
7 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
PROPOSED- S/F NEW ROCK
PROPOSED- S/F NEW ROCKEXISTING CONDITIONS
E1
44"± 48 ½" VERIFYREMOVE & DISPOSE
OF EXISTING ROCK.
EXISTING CONDITIONS
44"± 48 ½" VERIFYREMOVE & DISPOSE
OF EXISTING ROCK.
E2
Page 20 of 75
8 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
PROPOSEDEXISTING CONDITIONS
F
REMOVE & DISPOSE OF
EXISTING SIGN SIGN PANEL
INSTALL NEW 18½"14½"
Page 21 of 75
9 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
NIGHT VIEW
END VIEW
S/F MOUNUMENT
GENERAL SPECIFICATIONS
FABRICATED ALUMINUM TUBE FRAME CABINET AND REVEAL WITH
ALUMINUM FACES AND CLADDING - ALL TO BE POWDER COATED TO
SIMULATE RUSTED COR-TEN STEEL. (QPC HICKORY RUST SHOWN).
BASE IS FABRICATED SQ TUBE BASE FRAME W/ CONCRETE BACKER
BOARD AND STONE VENEER CLADDING. EXACT STONE SPEC IS
ELDORADO STONE.
ALL COPY AND RULE LINE TO BE ⅜" THK. ALUMINUM FCO LETTERS
PAINTED MAP WHITE AND FLUSH MOUNTED TO CABINET.
SIGN IS ILLUMINATED WITH .EXISTING GROUND LIGHTING
THE STONE USED IN PALM DESERT IS ELDORADO STONE. SUPPLIERS IN
THE VALLEY SHOULD BE ABLE TO COLOUR MATCH THE EXISTING STONE
ON THE SALES CENTER.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 1/2" = 1' - 0"
20 SQFT
GRADE4'-0" (48") OAH3"2'-0" (24")1'-8⅞" (20⅞")10'-0" (120")
9'-8" (116") REVEAL
10'-0" (124") BASE
GRADE
1'-4"(16")
1'-2"(14")
REVEAL
SUPPORT POLE AND CONCRETE FOUNDATION
TO BE DETERMINED BY ENGINEERING BASED ON
LOCAL CODE AND WINDLOAD REQUIREMENTS.
* RULE LINE THICKENED FOR FABRICATION
A18⅜" 'P' ¾" 3½"3 1/2” I.D. PIPE SUPPORT
(4” O.D.)
2’-0” DIA. X 2’-0” DEEP
CONCRETE PIER 2'-0"3"2’-0” DIA. X 2’-0” DEEP
CONCRETE PIER
Page 22 of 75
10 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
Page 23 of 75
11 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
3 1/2” I.D. PIPE SUPPORT
(4” O.D.)
2’-0” DIA. X 2’-0” DEEP
CONCRETE PIER
NIGHT VIEW
END VIEW
S/F MOUNUMENT
GENERAL SPECIFICATIONS
FABRICATED ALUMINUM TUBE FRAME CABINET with REVEAL WITH
ALUMINUM FACES AND CLADDING - ALL TO BE POWDER COATED TO
SIMULATE RUSTED COR-TEN STEEL. (QPC HICKORY RUST SHOWN).
BASE IS FABRICATED SQ TUBE BASE FRAME W/ CONCRETE BACKER
BOARD AND STONE VENEER CLADDING. EXACT STONE SPEC IS
ELDORADO STONE.
ALL COPY AND RULE LINE TO BE ⅜" THK. ALUMINUM FCO LETTERS
PAINTED MAP WHITE AND FLUSH MOUNTED TO CABINET.
SIGN IS ILLUMINATED WITH .EXISTING GROUND LIGHTING
THE STONE USED IN PALM DESERT IS ELDORADO STONE. SUPPLIERS IN
THE VALLEY SHOULD BE ABLE TO COLOUR MATCH THE EXISTING STONE
ON THE SALES CENTER.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 1/2" = 1' - 0"
7.8 SQFT
GRADE
5'-10" (70")
5'-7 ⁄ " (67 ⁄ ") REVEAL
5'-10" (70") BASE
GRADE
1'-4"(16")
1'-2"(14")
REVEAL
SUPPORT POLE AND CONCRETE FOUNDATION
TO BE DETERMINED BY ENGINEERING BASED ON
LOCAL CODE AND WINDLOAD REQUIREMENTS.
* RULE LINE THICKENED FOR FABRICATION
A23'-0" (36") OAH2"16"18"5 ⁄ " 'P' ⁄ " 2¼"3 1/2” I.D. PIPE SUPPORT
(4” O.D.)
2’-0” DIA. X 2’-0” DEEP
CONCRETE PIER 1'-6"3"Page 24 of 75
12 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
Page 25 of 75
13 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
C S/F WALL SIGN
GENERAL SPECIFICATIONS
1-1/2" DEEP .080" ALUMINUM PAN PANEL WITH 1" x 1"
ALUM. ANGLE MOUNTING CLIPS. PANEL TO BE POWDER
COATED TO SIMULATE COR-TEN RUSTED STEEL (QPC -
HICKORY RUST - SHOWN)
COPY TO BE 7725-20 MATTE WHITE OPAQUE VINYL.
PANEL ATTACHES FLUSH TO WALL USING NON-CORROSIVE
HARDWARE SUITABLE FOR WALL CONDITION.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 1-1/2" = 1' - 0"
3.65 SQFT21"25"2"2" ⅛" ⅞"23⅝"
16½"
1½"
END VIEW
Page 26 of 75
14 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
44"
E1 S/F SANDBLASTED ROCK
GENERAL SPECIFICATIONS
REMOVE & DISPOSE OF EXISTING SANDBLASTED ROCK.
MANUFACTURE and INSTALL ONE (1) NEW S/F SANDBLASTED ROCK, SAME SIZE
AS EXISTING.
PALM DESERT: COPY & GRAPHICS TO BE SANDBLASTED AND FILLED WITH BLACK PAINT.
DESERT WILLOW GOLF RESORT: COPY & GRAPHICS TO BE SANDBLASTED AND FILLED WITH
BLACK PAINT & BLUE COLORS [EXACT COLOR TBD]. ARTWORK IS PLACEHOLDER ONLY-
CLIENT TO PROVIDE ARTWORK PRIOR TO MFG.
EXISTING GROUND LIGHTING TO REMAIN.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 1" = 1' - 0"
14.8 SQFT± 48½" (VERIFY)3"1¼" ¼" 4 ¾" PHOTO @ EXISTING SIGNAGE5⅝"1⅜"2⅞"2⅞"Page 27 of 75
15 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
44"± 48½" (VERIFY)3"1¼" ¼" 4¾" E2 S/F SANDBLASTED ROCK
GENERAL SPECIFICATIONS
REMOVE & DISPOSE OF EXISTING SANDBLASTED ROCK.
MANUFACTURE and INSTALL ONE (1) NEW S/F SANDBLASTED ROCK, SAME SIZE
AS EXISTING.
PALM DESERT: COPY & GRAPHICS TO BE SANDBLASTED AND FILLED WITH BLACK PAINT.
DESERT WILLOW GOLF RESORT: COPY & GRAPHICS TO BE SANDBLASTED AND FILLED WITH
BLACK PAINT & BLUE COLORS [EXACT COLOR TBD]. ARTWORK IS PLACEHOLDER ONLY-
CLIENT TO PROVIDE ARTWORK PRIOR TO MFG.
EXISTING GROUND LIGHTING TO REMAIN.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 1" = 1' - 0"
14.8 SQFT4 ⁄ "2⅞"2⅞"1⅜"Page 28 of 75
16 16
Address
Approval / Date
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
Address
Sheet
HILTON GRAND VACATIONS CLUB
0630037Ar9
M WILSON
J HUDDLESTON
06/03/2022
1 WILLOW RIDGE
PALM DESERT, CA
R1:HG:6/17/22:REVISE D1-E
PER RED TAG
R2:EC:6/27/22: (A1) DELETE
OPT2. (A2) DELETE OPT1.
(D1/D2) NEW SCOPE. (E) ADD
OPT2.
R3:HG:6/29/22:ADD OPTIONS
FOR D1/D2
r4:JH:9/1/22: REVISE (A1/A2)
DELETE D1/D2; DELETE (E)
OPT.1 - ADD (E2).
r5:EC:9/12/22: (A1/A2) REV
BASE TO STONE.
r6:BV:9/14/22: (A1/A2) ADD
STONE NOTE
r7:EC:9/14/22: (A1/A2) REV
OAH & ADD STONE SPEC.
UPDATE LOGO ON ALL SIGNS.
r8:TQ:11/15/22: (A1/A2)
ADDED CONCRETE PIER AND
PIPE SUPPORT DETAILS
r9:BV:12/7/22: (A1A2
STAMPED ENGINEERING
F S/F DIRECTIONAL SIGN w/ VINYL COPY
GENERAL SPECIFICATIONS
REMOVE AND DISPOSE OF EXISTING PANEL.
MANUFACTURE and INSTALL ONE (1) .125" THK. ALUMINUM
PANEL POWDER COATED TO SIMULATE COR-TEN RUSTED
STEEL .(QPC- HICKORY RUST SHOWN)
ALL COPY TO BE 7725-20 WHITE OPAQUE VINYL.
ONE [1] REQUIRED - MANUFACTURE & INSTALL
SCALE: 2" = 1' - 0"
1.86 SQFT
14½" 18 ½" 1⅛" 1⅛" 1⅛" ½" ⅛" Page 29 of 75
CITY OF PALM DESERT
DEVELOPMENT SERVICES DEPARTMENT
ARCHITECTURAL REVIEW COMMISSION MEMORANDUM
To: Honorable Chair and Members of the Commission
From: Audrey Nickerson, Associate Planner II
Date: March 28, 2023
Subject: MISC22-0020 – 45710 Verba Santa Drive – Leventhal Private Sport Court
Project Summary
The applicant, Rick Leventhal, is requesting design review approval for a private sport court
located in the rear yard of a single-family residence located at 45710 Verba Santa Drive. The
sport court will be used for pickleball and is 20’-0” wide by 44’-0” long. No lighting is proposed for
the court area. The court area includes landscape screening adjoining the neighboring properties
with 15-gallon Ficus trees. Sport courts are subject to review and approval by the Architectural
Review Commission (ARC) pursuant to Palm Desert Municipal Code (PDMC) Section 25.40.070.
Background
In early 2022, the sport court was constructed without City approval and remains the subject of
an open Code Compliance case. A decision by the ARC is required to resolve the code
compliance case and make a final determination of the use. Staff has mailed a courtesy notice of
the ARC meeting to property owners within 300 feet of the project site.
On October 11, 2022, planning staff presented the project to the ARC for design review. The ARC
voted to continue the item with a 6-0 vote providing the following comments:
1) Applicant must conduct sound analysis to record actual noise decibels to determine if the
sports court is within the Palm Desert Municipal Code (PDMC) allowable noise
requirements; and,
2) Staff to provide Commissioners further clarification of PDMC Noise Requirements,
specifically on the “average” decibel of noise.
On March 13, 2023, the Applicant submitted a Noise Impact Assessment to the City, which is
currently under review by the City’s third-party consultant.
Staff Recommendation
Staff recommends the ARC continue the design review of the subject sports court until the next
regularly scheduled ARC meeting on April 11, 2023, to allow a full review of the applicant’s noise
study to be completed by the City’s third-party consultant.
Attachment: Courtesy Notice dated March 22, 2023
Page 30 of 75
CITY OF PALM DESERT
CASE NO. MISC 22-0020
NOTICE IS HEREBY GIVEN that the Development Services Department has received a request
for a private sport court in the rear yard of a single-family residence located at 45710 Verba Santa
Drive. The Palm Desert Municipal Code (PDMC) allows private sport courts on residential
properties subject to approval by the Palm Desert Architectural Review Commission (ARC)
pursuant to PDMC 25.40.070.
This notice is being sent to you as a courtesy of the hearing, based on your property’s proximity to
the proposed sport court. The proposed sport court is scheduled for consideration by the City’s
Architectural Review Commission on Tuesday, March 28, 2023, at 12:30 p.m. via Zoom meeting or
in-person in the Development Services Conference Room at Palm Desert City Hall, 73510 Fred
Waring, Palm Desert, CA 92260. The agenda for this meeting is available on the City of Palm
Desert website at:
https://www.cityofpalmdesert.org/our-city/committees-and-commissions/commission-information
Should you have any questions, comments or would like to participate in the meeting, please
contact Ms. Audrey Nickerson, Associate Planner II, by March 27, 2023, at (760) 776-6444,
between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday.
March 22, 2023 Nick Melloni
Principal Planner
Page 31 of 75
CITY OF PALM DESERT
DEVELOPMENT SERVICES DEPARTMENT
ARCHITECTURAL REVIEW COMMISSION MEMORANDUM
To: Honorable Chair and Members of the Commission
From: Nick Melloni, Principal Planner
Date: March 28, 2023
Case No(s): PP/CUP/EA23-0001
Subject: Consideration to approve a Design Review and a recommendation of
approval to the Planning Commission for a Precise Plan (PP) and
Conditional Use Permit (CUP) to develop a 3,539 square-foot, single-story
building within the Palm Desert Civic Center Campus located at the
northeast corner of San Pablo Avenue and Fred Waring Drive (Assessor’s
Parcel Number 622-250-014).
EXECUTIVE SUMMARY
The proposal is a request by PVG Architects (Applicant), on behalf of the City of Palm
Desert, for consideration of a Precise Plan (PP), Conditional Use Permit (CUP) and
Environmental Assessment (EA) to develop a new 3,539 square-foot building at the
Palm Desert Civic Center (Civic Center). The Architectural Review Commission (ARC)
will consider the architecture and landscape design of the proposed project and provide
a recommendation to the Planning Commission for final consideration.
The project, generally known as Discover Palm Desert consists of a building located on a
0.5-acre area directly to the south of the existing skate park and east of San Pablo
Avenue within Civic Center. The new building will operate as the “visitor center” for the
City of Palm Desert. The new visitor center location will provide informational services
regarding local events, attractions, and businesses. Additionally, the new building will
have multi-use space for hosting community meetings and venues. It may also
accommodate a café and bike repair station onsite as well.
Staff recommends the Architectural Review Commission (ARC) make findings to
approve a Design Review for PP/CUP/EA 23-0001 and recommend approval of the
project to the Palm Desert Planning Commission.
Page 32 of 75
PP/EA23-0001 Discover Palm Desert
Page 2 of 9
March 28, 2023
BACKGROUND
The City of Palm Desert has historically operated a visitor center at various locations
throughout the City of Palm Desert. Since 1998, the visitor center has operated at
various lease locations including Highway 111, El Paseo and San Pablo, and in 2015
moved to its current location at Palm Desert City Hall. The new visitor center location will
provide informational services regarding local events, attractions, and businesses.
On January 10, 2019, the Palm Desert City Council held a study session to discuss
options for the operations of the visitor center and decided to explore the construction of
a building in a new location. The Council provided direction that the visitor center provide
multi-function use and a connection to the Palm Desert Link. In May 2019, the City
began work with PVG Architects to design a new stand-alone building for the visitor
center (Visitor Center) at the Civic Center under an existing on-call professional design
services contract (Contract No. C38040E) which ultimately expired in July 2020.
On October 28, 2021, the City Council approved a new professional services agreement
(Contract No. C42290) with PVG Architects to continue work related to the design of the
Visitor Center at the Civic Center.
On May 26, 2022, the City Council held a study session to view drafts of the Discover
Palm Desert architecture and were supportive of the proposed architecture and site
design.
PROJECT SUMMARY
A. Property Description:
The project site is a vacant 21,151-square-foot (0.49-acres) area within the 58.65-
acre Palm Desert Civic Center. The site is adjacent to the existing skate park and
electrical vehicle (EV) charging stations. The site is developed with existing Civic
Center parking areas to the east and south and San Pablo Avenue to the west. The
perimeter of the site is landscaped with rows of southern live oak trees.
B. Zoning, General Plan and Adjacent Uses:
Table 1 – Adjacent Land Use and Designations
Existing Uses General Plan Zoning
Project Site Vacant Public
Facility/Institutional
Public Institution (P)
North Civic Center –
Skate Park
Public
Facility/Institutional
Public Institution (P)
South Civic Center – City
Hall
Public
Facility/Institutional
Public Institution (P)
East Civic Center –
Park
Public
Facility/Institutional
Public Institution (P)
West Golf Driving
Range
City
Center/Downtown
Downtown Edge (DE) / Public
(P)
Page 33 of 75
PP/EA23-0001 Discover Palm Desert
Page 3 of 9
March 28, 2023
Project Description
The following entitlement applications have been submitted for the project:
• Precise Plan 22-0009: To develop a 3,539-square-foot building consisting of the
visitor center operations and flexible use space including:
a. Site Landscaping.
b. Outdoor courtyard areas.
c. Connections to the Palm Desert Link pedestrian and bike paths (PD Link).
• Conditional Use Permit: To allow the proposed use consisting of a general
institution use for public gathering, office, recreation-oriented services including a
café and retail.
• Environmental Assessment: An environmental analysis was prepared pursuant to
the California Environmental Quality Act (CEQA) to support a categorical
exemption for a Class 32 exemption (Infill Development).
Per the statement of use prepared for the project conditional use permit, the visitor
center will operate Monday through Friday between the hours of 8:00 a.m. and 5:00
p.m., with the potential to operate on Saturday and Sunday, and will be staffed by two (2)
city employees. In addition to the visitor center operations, there is additional “flex space”
which can be used for staging of special events, an operations hub for City events such
as Concerts in the park, and space for community meetings. The ARC’s review of the
project will focus on the building and landscape architecture.
Site Plan and Access
The site plan (see Figure 1 on next page) shows the placement of the building. There
existing perimeter landscaping will remain in place and new sidewalk connections will be
constructed to provide pedestrian connections to the Palm Desert Link (PD Link) located
along San Pablo Avenue. As depicted, the areas immediately adjacent to the building will
provide outdoor flex space areas serving as courtyards with potential public art spaces or
may be used for City events. The site also shows areas for two optional accessory
buildings which would provide for future kiosks such a bike repair amenity or pop-up café
kiosk on the west and east side of the building.
Potential locations for future public art are shown on Sheet A101 of the project plan set.
The final placement of those art pieces and future art will be subject to review by the
Public Art Division and Cultural Arts Committee.
The site plan shows new carport spaces located adjacent to the existing skate park to
provide future solar in accordance with state requirements.
Page 34 of 75
PP/EA23-0001 Discover Palm Desert
Page 4 of 9
March 28, 2023
Figure 1 – Proposed Site Plan (Sheet A102)
Vehicular access to the site is provided by two (2) existing driveways and drive aisles
along San Pablo Avenue. No modifications are proposed to existing parking areas
except for the addition of two accessible parking spaces near the proposed structure.
Architecture and Screening
The project architecture is characterized as desert contemporary with elements of
midcentury modern design including long horizontal forms, low-pitch roof, long
overhangs, and large floor-to-ceiling windows. The exterior material palette consists of
venetian plaster, metal veneers, laser-cut back-lit metal panels, standing seam metal
roof, and perforated corrugated metal (fencing). Wood veneer will be placed on the
underside of the roof structure.
Page 35 of 75
PP/EA23-0001 Discover Palm Desert
Page 5 of 9
March 28, 2023
Figure 2 – Proposed Building Elevations – Sheet A312
The future optional kiosks may be constructed from re-purposed shipping containers.
Table 2 below outlines the area breakdown for uses of the structure.
Table 2 – Floor Area Breakdown
Floor Area Use Square Feet
Storage/Support 647.30
Visitor Center 504.10
Electrical/Mechanical 231.90
Restrooms 446.50
Visitor Center Support 512.30
Gallery 1,197.30
Total Square-footage 3,539.40
Landscaping
Landscape for the site consists of a mix of desert appropriate live plantings which
includes shrubs located along the site perimeter and curb-adjacent street trees. Two of
the existing southern live oaks located on the east side of the structure will be removed
in conjunction with project development. The remaining seven (7) oaks will be preserved
in place. All shrubs and plants will be a minimum 5-gallon size at the time of planting.
Page 36 of 75
PP/EA23-0001 Discover Palm Desert
Page 6 of 9
March 28, 2023
Figure 3 – Proposed Landscaping
Site Lighting
Exterior site lighting will consist of a combination of pole-mounted lot lighting and
decorative landscape lighting. Exterior building and pole lighting fixtures are proposed to
be directed downward and fully shielded to prevent and reduce glare and light trespass.
Landscaping lighting will be low intensity and decorative in nature and consist of ground-
mounted up lighting.
ANALYSIS
Development Standards
The project site is zoned Public Institution (P). The proposed use is a general institution
with event space with ancillary commercial use and requires the approval of a conditional
use permit. New development requires the approval of a precise plan by the Palm Desert
Planning Commission in accordance with Palm Desert Municipal Code Section (PDMC)
25.72.030. Development in the P zone is subject to development standards provided
under Table 25.22-2 within Section 25.22.040 of the PDMC. The table below
summarizes the project’s conformance analysis for the new additions:
Table 3 – Project Development Standard Conformance
STANDARD P PROJECT CONFORMS
Lot Area (minimum) None N/A N/A
Yard Requirements None 7’-3” (West Setback) Yes
Building height, max 35’-0” 27’-6” Yes
Parking 14 Spaces Approx. 1,100 spaces Yes
Page 37 of 75
PP/EA23-0001 Discover Palm Desert
Page 7 of 9
March 28, 2023
Parking
The project is required to provide parking at a minimum ratio of four (4) parking spaces
per 1,000 square-feet of building area in accordance with PDMC Section 25.46.040. The
project will not add any additional parking spaces but will reconfigure existing spaces to
provide two accessible parking spaces. The building will have access to the
approximately 1,100 spaces available at the Civic Center. The portions of the parking
area adjacent to the visitor center are not typically occupied during regular City Hall
operational hours of 8:00 a.m. to 5:00 p.m.
ZONING ORDINANCE SUMMARY
ARC approval of a design review is required for all Precise Plan applications per PDMC
Section 25.68.020 (A). Findings for ARC decisions are listed under PDMC Section
25.68.040 – Findings of the ARC. Findings in support of the project are listed below:
To approve a design review application, the ARC shall find the following:
A. That the proposed development conforms to any legally adopted development
standards.
The proposed development conforms with applicable development standards for
the Public Institution zoning designation. The project conforms with other
applicable standards including, building height, and parking as provided in the
above analysis section. As summarized, the project conforms with all applicable
development standards. The proposed rooftop units are screened by a continuous
screen wall or within the building in accordance with PDMC 25.40.090.
B. That the design and location of the proposed development and its relationship to
neighboring existing or proposed developments and traffic is such that it will not
impair the desirability of investment or occupation in the neighborhood; and that it
will not unreasonably interfere with the use and enjoyment of neighboring existing
or proposed developments and that it will not create traffic hazards or congestion.
The proposed project and design will provide a civic amenity available to all
residents and visitors of Palm Desert and was commissioned by the Palm Desert
City Council. The site has been designed to retain storm run-off onsite to prevent
off-site flooding.
C. That the design and location of the proposed development is in keeping with the
character of the surrounding neighborhood and is not detrimental to the
harmonious, orderly, and attractive development contemplated by this title and the
General Plan of the City.
The project design proposes durable exterior materials and a design adapted to
Page 38 of 75
PP/EA23-0001 Discover Palm Desert
Page 8 of 9
March 28, 2023
the desert climate by providing extensive passive shading opportunities. The
proposal complies with applicable development standards and is intended to
provide an attractive amenity for residents and visitors of the City of Palm Desert.
The proposal implements design goals and policies of the General Plan including:
Land Use Policy 2.7 – The project will provide an additional, comfortable, and
inviting public gathering space.
Land Use Policy 4.10 – The project provides a civic building with distinctive
architectural characteristics.
D. That the design and location of the proposed development would provide a
desirable environment for its occupants, as well as for its neighbors, and that it is
aesthetically of good composition, materials, textures, and colors.
The proposed design utilizes durable finishes and features a quality contemporary
style characterized by modern forms, smooth stucco exterior finishes, and desert
compatible colors. The buildings provide for a quality visual aesthetic along San
Pablo Avenue as well as appropriate connections to take advantage of the non-
motorized transportation options along the corridor. The project also includes
extensive onsite landscaping along perimeter frontages.
E. That the proposed use conforms to all the requirements of the zone in which it is
located and all other applicable requirements.
The proposed development conforms with proposed development standards for
the Public Institution District. A summary of the conformance with these
development standards, including yard measurement, building height, open
space, and parking is provided on the conformance analysis table on page 6 of
this staff report. As summarized, the project conforms with all applicable
development standards. The proposed utilities are screened or within the building
in accordance with PDMC 25.40.090.
F. That the overall development of the land shall be designed to ensure the
protection of the public health, safety, and general welfare.
The preliminary grading plan has been reviewed to ensure the design of the
project incorporates the proper improvements including adequately sized retention
basin for onsite drainage. In addition, the overall building design ensures the
protection of the public health, safety, and general welfare.
Page 39 of 75
PP/EA23-0001 Discover Palm Desert
Page 9 of 9
March 28, 2023
STAFF RECOMMENDATION
Staff recommends the ARC determines that the requirements of the findings have been
met based on the analysis and approves the Design Review and provides a
recommendation of approval to the Planning Commission for the Precise Plan and
Conditional Use Permit.
Furthermore, should major design comments arise during the discussion the ARC should
clearly outline the requested changes and continue the case.
Attachment: 1. Project Exhibits from the Applicant
2. Statement of Operations
Page 40 of 75
PREST | VUKSIC | GREENWOOD
A R C H I T E C T S I N T E R I O R S
D I S C O V E R P A L M D E S E R T
V I S I T O R C E N T E R
PALM DESERT, CA
Page 41 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A001
PROJECT
INFORMATION / SHEET
INDEX
MARCH 14, 2023Proj. No. 221094PROJECT INFORMATION
OWNER
CITY OF PALM DESERT
73-510 FRED WARING DR.
PALM DESERT, CA 92260
APPLICANT
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
LEGAL DESCRIPTION
APN 622-250-014-2
LOCATION
BEING A DIVISION OF A PORTION OF THE WEST HALF
OF THE SOUTHWEST QUADRANT OF SECTION 17,
T5S, R6E, S.B.B.M.
ZONING
PUBLIC
NO YARDS/SETBACKS REQUIRED.
HEIGHT LIMIT = 35'
PARKING DATA
PARKING REQUIRED:
STANDARD @ 4 PER 1,000
ACCESSIBLE
LOADING
PARKING PROVIDED:
ACCESSIBLE
LOADING
ALL PARKING IS EXISTING AND TO BE PART OF
SHARED PARKING AGREEMENT
BUILDING DATA
OCCUPANCY:
TYPE OF CONSTRUCTION:
SPRINKLED
NO. OF STORIES
GREATEST HEIGHT
B
TYPE VB
YES
1
28'-0"
CONSULTANTS
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
760.779.5393
JOHN VUKSIC
ARCHITECT
CIVIL ENGINEER
LANDSCAPE ARCHITECT
SHEET
NO.SHEET NAME
ARCHITECTURE
A000 COVER SHEET
A001 PROJECT INFORMATION / SHEET INDEX
A002 VINICITY / ADA ACCESS
CIVIL
1 PRELIMINARY GRADING PLAN
LANDSCAPE
L5.00 CONCEPTUAL LANDSCAPE PLAN
ARCHITECTURE
A100 OVERALL SITE PLAN
A101 ART IN PUBLIC PLACES EXHIBIT
A102 ENLARGED SITE PLAN
A110 SITE CROSS SECTIONS
A200 FLOOR PLAN
A201 OCCUPANCY, EXITING & LIFE SAFETY
A300 EXTERIOR ELEVATIONS
A301 EXTERIOR ELEVATIONS
A302 EXTERIOR ELEVATIONS
A310 COLOR ELEVATIONS
A311 COLOR ELEVATIONS
A312 COLOR ELEVATIONS NO ARTWORK
A313 COLOR ELEVATIONS NO ARTWORK
A320 3D VIEWS
A321 3D VIEWS
A322 3D VIEWS NO ARTWORK
A323 3D VIEWS NO ARTWORK
A400 ROOF PLAN
A500 PHOTO SIM
A501 PHOTO SIM
A502 PHOTO SIM NO ARTWORK
A503 PHOTO SIM NO ARTWORK
A504 RENDERINGS
A505 RENDERINGS NO ARTWORK
A600 MATERIAL BOARD
ELECTRICAL
E100 ELECTRICAL
E200 ELECTRICAL
E300 ELECTRICAL
SITE
VICINITY MAP
FRED WARING DRIVESAN PABLO AVEMAGNESIA FALLS DRIVE
PORTOLA AVESQUARE FOOTAGE
NAME S.F.
STORAGE / SUPPORT 647.3 SF
VISITOR CENTER 504.1 SF
ELECTRICAL / MECH.231.9 SF
RESTROOMS 446.5 SF
VISITOR CENTER SUPPORT 512.3 SF
GALLERY 1,197.3 SF
Grand total 3,539.5 SF
THE ALTUM GROUP
44-600 VILLAGE COURT, STE 100
PALM DESERT, CA 92260
760.346.4750
DOUG FRANKLIN
MSA CONSULTING, INC.
34200 BOB HOPE DRIVE
RANCHO MIRAGE, CA 92270
760.320.9811
RON GREGORY
PROPERTY DATA
Project Area: Project site is within an existing 58.65 acre
park and civil center. Project site is an empty flat area of
approximately 21,151 SF in size. The Percent of Total
Project Devotion is based on this area and not the 58.65
acre site as that includes existing structures, walkways,
parking, driveways, landscaping, etc.
SITE AREA:
BUILDING COVERAGE:
FAR:
LANDSCAPE COVERAGE:
21,151 SF
13.13%
1.6
44.87%
14 SPACES
1 VAN
1 SPACE
APPROX. 1,100 SPACES
2 (INCLUDE 1 VAN)
1 SPACE
PROJECT DESCRIPTION / USE
The project is a new 3,539 square foot single story building
with outdoor seating and event spaces for visitors. Hours of
operation are between 7am and 7pm; however, special
events will occur between the hours of 5am and midnight
on occasion. The facility will accommodate 100 walk-in
visitors/day and have a maximum of 4 employees. Special
events will accommodate additional visitors and volunteers.
Page 42 of 75
SAN PABLO AVENUE FRED WARING DRIVECIVIC CENTER PARK
SKATE PARK CIVIC
CENTER
(E) ACCESSIBLE PATH
TO PUBLIC ROW
A100
1
PROPOSED
NEW BUILDING
NEW ADA
PARKING
PROPOSED NEW CARPORT W/
SOLAR AS REQ'D BY CBC, MUST BE
LOCATED WITHIN 250' OF BLDG.
543'-6"755'-11"7'-3"313'-1"PROPERTY LINEPROPERTY LINE
PROPERTY LINE
PROPERTY LINEACCESSIBLE PATH
500'-0"1,433'-6"436'-7"677'-0"63'-0"759'-4"
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1" = 50'-0"
A002
VINICITY / ADA
ACCESS
MARCH 14, 2023Proj. No. 2210940'20'40'80'160'
Page 43 of 75
AA
AAENGINEERING | PLANNING | SURVEY | ENVIRONMENTAL44-600 Village Court, Suite 100Palm Desert, CA 92260t.760.346.4750 f. 760.340.0089TheAltumGroup.comPage 44 of 75
Page 45 of 75
EEEEEEVVEEEEWMBFP16+0017+0018+0019+0020+00PARKINGNOSAN PABLO AVENUE
(E) SKATE PARK
PROPERTY LINEPROPERTY LINEPROPERTY LINE
(E) PARKING
(E) PARKING
PD LINK BIKE PATH
PD LINK PED PATH
(E) SIDEWALK
(E) RESTROOMS
PUBLIC ART SCUPLTURE LOCATION.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE.
PUBIC ART IMAGE WALL. ARTWORK TO
BE COMMISSIONED BY THE PALM
DESERT CULTURAL ARTS COMMITTEE.
SEE COLOR ELEVATIONS AND
RENDERINGS.
PUBLIC ART HANGING SCUPLTURE
LOCATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT
CULTURAL ARTS COMMITTEE.
DISCOVER PUBLIC ART SIGNAGE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE.
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/16" = 1'-0"
A101
ART IN PUBLIC
PLACES EXHIBIT
MARCH 14, 2023Proj. No. 2210941/16" = 1'-0"1 ART IN PUBLIC PLACES LOCATIONS
Page 46 of 75
EEEEVVEPROPERTY LINEPROPERTY LINE
BREEZEWAY /
OUTDOOR
FLEX SPACE
OUTDOOR FLEX
SPACE
S A N P A B L O /
C V L I N K
(E)
SKATE PARK
OUTDOOR
COMMUNITY SPACE
VISITOR
CENTER
INDOOR
FLEX
SPACE
P D C I V I C C E N T E R
P A R K & P A R K I NG
OPTIONAL FUTURE
COFFEE KIOSK OR
'POP-UP' SEASONAL
VENDOR.
SEPARATE
SUBMITTAL/PERMIT.
ELEC.
/ FR.
PUBLIC
ART
MECH/MAINT.
YARD
OPTIONAL FUTURE
PD LINK AMENITY,
CYCLE REPAIR.
SEPARATE
SUBMITTAL/PERMIT.
PA
PA
PD LINK PED PATH
(E) SIDEWALK
PA
PA
PLANTER
PA
PUBLIC
ART
(E) PARKING
1
A110
1
A110
2
A110
2
A110
OPTIONAL
RAIN HARVESTING
RESERVOIR
RAMP RAMP
RAMPPA
PA
PA
PA
TYP.105
107
107
107
107
108
106
108
107
102
110
TYP.105
TYP.105
107 107
104
104
TYP.102
TYP.102
TYP.102
TYP.102
TYP.101
TYP.101
109
109
103STEPS DOWN6" RI
SERS4'-0"4'-0"4'-0"4'-0"EXISTING RAMP TO BE
RECONSTRUCTED AS
REQUIRED TO MEET
ADA REQUIREMENTS
EASEMENT6'-0"111
21'-8"B IK E R A C K BI
KE RACKPA
RETENTION BASIN
(SEE CIVIL)
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A102
ENLARGED SITE PLAN
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
101 EXISTING CURB
102 NEW HARDSCAPE
103 NATURAL ROCK BENCH
104 PUBLIC ART LOCATION. ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS COMMITTEE.
105 SHADE STRUCTURE
106 SWINGS
107 EXISTING TREE TO REMAIN
108 EXISTING TREE TO BE REMOVED
109 EXISTING SKATE PARK FENCE (APPROX. 5-6' TALL) WITH
LASER CUT PRIVACY SCREEN
110 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
111 30"H PLANTER WALL
Page 47 of 75
PLPD LINK
(BIKE)
PD LINK
(PED)
SAN PABLO
PARKING
CIVIC CENTER PARK
PARKING
FF 182.25
PE 181.627'-6"16'-6"FS 179.68
FS 181.93
2'-6"FIRST FLOOR
0"PLPARKINGSKATE PARK
FF 182.25
PE 181.6
FS 181.6827'-6"(E) FENCETO MATCH15'-6"OPEN BREEZEWAY
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A110
SITE CROSS
SECTIONS
MARCH 14, 2023Proj. No. 2210941/8" = 1'-0"1 SITE CROSS SECTION A
0'4'8'16'32'
1/8" = 1'-0"2 SITE CROSS SECTION B
Page 48 of 75
11
A
A
66
106
STORAGE 1
105
COPY /
SUPPORT RM.27'-0"37'-0"12'-0"200
INDOOR FLEX
SPACE
112
BREEZEWAY /
OUTDOOR
FLEX SPACE76'-0"OPEN TO ABOVE
55
22
B
B
418'-0"8'-0"11'-0"H
H
OPEN TO ABOVE
100
VISITOR
CENTER
101
RECEPTION
102
OFFICE103
KITCHEN /
BREAK /
GREEN ROOM
12'-0"E
E
D
D
7'-0"20'-0"18'-0"30'-6"22'-6"23'-0"
C
C
20'-0"
27'-0"18'-0"30'-6"22'-6"23'-0"
14'-0"13'-0"3'-0"
121'-0"
48'-0"
G
G
8
5'-0"4'-0"2'-0"4'-0"2'-0"6'-0"2'-0"8'-0"2'-0"10'-0"1'-6"6"2'-0"26'-0"2'-0"49'-0"45'-6"8'-0"20'-0"8'-0"2'-0"9'-0"24'-0"11'-6"11'-0"3'-0"
10'-0"18'-0"
109
MEN'S
107
DF
108
WOMEN'S
111
MECH/STOR.
110
ELECT.
LINE OF ROOF ABOVE,
TYP.
OPTIONAL FUTURE
CONTAINER FOR
VENDOR, SEPARATE
SUBMITTAL/PERMIT.
SHADE STRUCTURE
OPTIONAL FUTURE
CONTAINER FOR
VENDOR, SEPARATE
SUBMITTAL/PERMIT.
JAN.
LINE OF ROOF
ABOVE, TYP.
IT
A300
1
F
F
7
A301 2
A301
1
A3022
A3002
1
SWINGS
6'-3"
7 4 °4'-0"4'-0"ACCESS TO
MECH.
3
SHADE STRUCTURE
SHADE STRUCTURE
5'-0"Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A200
FLOOR PLAN
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
SQUARE FOOTAGE
NAME S.F.
STORAGE / SUPPORT 647.3 SF
VISITOR CENTER 504.1 SF
ELECTRICAL / MECH.231.9 SF
RESTROOMS 446.5 SF
VISITOR CENTER SUPPORT 512.3 SF
GALLERY 1,197.3 SF
Grand total 3,539.5 SF
Page 49 of 75
520.7 SF
STORAGE 1
106
OL 200 / 2.6 OCC.
67.4 SF
105
COPY /
SUPPORT RM.
OL 50 / 1.3 OCC.
1,147.5 SF
INDOOR FLEX SPACE
200
OL 30 / 38.5 OCC.
BREEZEWAY /
OUTDOOR
FLEX SPACE
472.1 SF
100
VISITOR
CENTER
OL 30 / 15.7 OCC.
148.5 SF
RECEPTION
101
OL 150 / 1 OCC.
121.5 SF
OFFICE
102
OL 150 / 1 OCC.
157.9 SF
103
KITCHEN /
BREAK /
GREEN ROOM
OL 50 / 3 OCC.
MEN'S
WOMEN'S
MECH/STOR.ELECT.
JAN.
IT
OCC. TYPE(S)
EXITING SUMMARY
TOTAL OCC. LOAD NO. OF EXITS REQ'D NO. OF EXITS PROV'D
A (GALLERY)39 1 2 EXITS
2 EXITSA/B (VISTOR)25 1
prov'd occ.
req'd
EXIT
#200-1
60"X
7.8"
2
1
max. allowed total
TOTAL EXIT ACCESS
75' 48'
prov'd occ.
req'd
EXIT
#100-1
60" X
5"
max. allowed total
TOTAL EXIT ACCESS
75' 56'
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A201
OCCUPANCY, EXITING
& LIFE SAFETY
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
Page 50 of 75
FIRST FLOOR
0"
301 300 300
28'-0"3'-6"2'-2"8"9'-2"27'-6"
16'-6"15'-6"
303B304303B 303A
310
TYP.
320
TYP.
313
TYP.317
318
TYP.
313
TYP.
317305
314
OPEN
BREEZEWAY
305
313
309315
319 303B322305
TYP.
317 323324
325
302B
316
300
FIRST FLOOR
0"
303B 304 303A
300
TYP.
320 318
TYP.
313
TYP.
306
314 305319TYP.317
TYP.
3175'-2"8"9'-2"27'-6"9'-10"309
315 326
TYP.
320300
16'-6"
302B
316
301
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A300
EXTERIOR
ELEVATIONS
MARCH 14, 2023Proj. No. 2210941/8" = 1'-0"1 WEST ELEVATION (SAN PABLO)
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
304 WOOD VENEER. MFR:TBD COLOR: RUSTIC OAK
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
306 GLASS PIVOT DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
310 SIGNAGE. SEPARATE PERMIT.
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
314 STEEL TUBE TRANSOM BEAM, SEE STRUCTURAL. CLAD TO
MATCH WINDOW FRAMES, PRIMED AND PAINTED ON
EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
316 FUTURE ART INSTALLATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
317 SHADE STRUCTURE
318 RAISED PLANTER
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
322 METAL FASCIA. COLOR: ACCENT PINK
323 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
324 NATURAL ROCK BENCH
325 RAIN CHAIN
326 SWINGS
1/8" = 1'-0"2 SOUTH ELEVATION
0'4'8'16'32'
Page 51 of 75
FIRST FLOOR
0"
303B TYP.300 TYP.302B
TYP.
300
TYP.300
303A 312 311307 315
TYP.
320
OPEN
BREEZEWAY
18'-6"
28'-0"27'-6"
TYP.
305
TYP.
317
TYP.317
TYP.
320
305
326313 303B
328 319
330
316 302A
302B
FIRST FLOOR
0"
303B301
303A
303B
321 301
303B303A
315 312
TYP.317 319
305 315
TYP.313
317 300 325
TYP.
320
27'-6"
18'-6"
28'-0"
16'-6"9'-10"12'-0"309302B 321
316
EXISTING SKATE PARK FENCE WITH LASER CUT PRIVACY SCREEN TO MATCH NEW
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A301
EXTERIOR
ELEVATIONS
MARCH 14, 2023Proj. No. 2210941/8" = 1'-0"1 EAST ELEVATION
0'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302A BACKLIT LASER CUT METAL PANEL. MFR: MOZ DESIGNS,
COLOR: RUST POWDER, PATTERN: VINES
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
307 OVERHEAD SECTIONAL GARAGE DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
311 HOLLOW METAL DOOR, PAINTED TO MATCH ADJACENT
PLASTER
312 HOLLOW METAL LOUVERED MECHANICAL DOOR, PAINTED
TO MATCH ADJACENT PLASTER
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
316 FUTURE ART INSTALLATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
317 SHADE STRUCTURE
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
321 OVERFLOW DRAIN
325 RAIN CHAIN
326 SWINGS
328 STEEL TUBE COLUMN, SEE STRUCTURAL. CLAD TO MATCH
WINDOW FRAMES, PRIMED AND PAINTED ON EXTERIOR TO
MATCH WINDOW FRAMES.
330 6' FENCE
1/8" = 1'-0"2 NORTH ELEVATION
Page 52 of 75
FIRST FLOOR
0"
303B 300 300 304 303B
306 314
305322
322
TYP.317
TYP.317 TYP.320TYP.313 300 3181'-4"2'-2"8"9'-2"12'-0"27'-6"
319
16'-6"
325
FIRST FLOOR
0"
302B303B
301 309 310
319 322 303A
15'-6"3'-6"2'-2"8"9'-2"313 329 305 306 320 315 326310
305 304
309 302B
BY OTHERS
FUTURE ART
300
303B
1'-4"2'-2"8"9'-2"313
314
OPEN
BREEZEWAY
TYP.
320 323
305
305
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A302
EXTERIOR
ELEVATIONS
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
304 WOOD VENEER. MFR:TBD COLOR: RUSTIC OAK
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
306 GLASS PIVOT DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
310 SIGNAGE. SEPARATE PERMIT.
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
314 STEEL TUBE TRANSOM BEAM, SEE STRUCTURAL. CLAD TO
MATCH WINDOW FRAMES, PRIMED AND PAINTED ON
EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
317 SHADE STRUCTURE
318 RAISED PLANTER
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
322 METAL FASCIA. COLOR: ACCENT PINK
323 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
325 RAIN CHAIN
326 SWINGS
329 SHIPPING CONTAINER WALL. COLOR:
1/8" = 1'-0"1 NORTH BREEZEWAY ELEVATION
1/8" = 1'-0"2 SOUTH BREEZEWAY ELEVATION
1/8" = 1'-0"3 WEST BREEZEWAY ELEVATION
Page 53 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A310
COLOR ELEVATIONS
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
WEST ELEVATION (SAN PABLO)
SOUTH ELEVATION
Page 54 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A311
COLOR ELEVATIONS
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
NORTH ELEVATION
EAST ELEVATION
Page 55 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A312
COLOR ELEVATIONS
NO ARTWORK
MARCH 14, 2023Proj. No. 221094WEST ELEVATION (SAN PABLO)
SOUTH ELEVATION
Page 56 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A313
COLOR ELEVATIONS
NO ARTWORK
MARCH 14, 2023Proj. No. 221094NORTH ELEVATION
EAST ELEVATION
Page 57 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A320
3D VIEWS
MARCH 14, 2023Proj. No. 2210941 VIEW FROM SAN PABLO LOOKING NORTH
2 VIEW FROM SAN PABLO LOOKING SOUTH
Page 58 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A321
3D VIEWS
MARCH 14, 2023Proj. No. 2210941 VIEW FROM CIVIC CENTER
2 VIEW FROM CIVIC CENTER PARK
Page 59 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A322
3D VIEWS
NO ARTWORK
MARCH 14, 2023Proj. No. 2210941 VIEW FROM SAN PABLO LOOKING NORTH
2 VIEW FROM SAN PABLO LOOKING SOUTH
Page 60 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A323
3D VIEWS
NO ARTWORK
MARCH 14, 2023Proj. No. 2210941 VIEW FROM CIVIC CENTER
2 VIEW FROM CIVIC CENTER PARK
Page 61 of 75
11
A
A
66
55
22
B
B
44
H
H
E
E
D
D
C
C
G
G
88
A300
1
F
F
7
7
A301 2
A301
1
A3022
A3002
1
OPEN TO BELOW
OPEN TO BELOW
T.O. EAVE 18'-6"
T.O. EAVE 28'-0"
T.O. EAVE 16'-6"
T.O. EAVE 27'-6"
T.O.P. 15'-6"
9'-10"SLOPE 1/4" / 1'-0"3
600
603
601
604
605
TYP.
602
600
V
A
LL
E
Y
V
A
LL
E
Y
600
603
603
603
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A400
ROOF PLAN
MARCH 14, 2023Proj. No. 2210940'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
602 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
604 DRAIN TO THRU PIPE DRAIN TO RAIN CHAIN. RAIN CHAIN TO
TERMINATE AT PLANTER BMP.
605 DRAIN TO ROOF DRAIN AND OVERFLOW. CONNECT ROOF
DRAIN TO UNDERGROUND DRAINAGE SYSTEM AND
DAYLIGHT OVERFLOW TO GRADE
Page 62 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A500
PHOTO SIM
MARCH 14, 2023Proj. No. 221094Page 63 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A501
PHOTO SIM
MARCH 14, 2023Proj. No. 221094Page 64 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A502
PHOTO SIM
NO ARTWORK
MARCH 14, 2023Proj. No. 221094Page 65 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A503
PHOTO SIM
NO ARTWORK
MARCH 14, 2023Proj. No. 221094Page 66 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A504
RENDERINGS
MARCH 14, 2023Proj. No. 221094VIEW FROM SAN PABLO VIEW FROM PD LINK LOOKING NORTH VIEW FROM EV PARKING LOOKING NORTH
VIEW FROM WEST PLAZA VIEW FROM BREEZEWAY VIEW FROM EAST PLAZA
Page 67 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A505
RENDERINGS
NO ARTWORK
MARCH 14, 2023Proj. No. 221094VIEW FROM SAN PABLO VIEW FROM PD LINK LOOKING NORTH VIEW FROM EV PARKING LOOKING NORTH
VIEW FROM WEST PLAZA VIEW FROM BREEZEWAY VIEW FROM EAST PLAZA
Page 68 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A600
MATERIAL BOARD
MARCH 14, 2023Proj. No. 221094P1 M3M5
M1
M4M2 M3
ARTWORK, TYP.
W1
M1
W1
WOOD VENEER. MFR:TBD COLOR: RUSTIC OAKPLASTER - VENETIAN COLOR: CONCRETE WARM GRAYMETAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132 STYLE: FLATP1 M1
STEEL, DOOR & WINDOW FRAMESCOLOR: BLACK ANODIZEDMETAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212 STYLE: FOG FLATBACKLIT LASER CUT METAL PANEL. MFR: MOZ DESIGNS, COLOR: RUST POWDER, PATTERN: VINESPERFORATED CORRUGATED METAL FENCE. MFR: MOZ DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN: CUSTOM PERFORATIONM2 M3 M4 M5 M6
M6
STANDING SEAM ROOFING MFR: ATASCOLOR: DARK BRONZE ANODIZEDPage 69 of 75
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A601
MATERIALS
MARCH 14, 2023Proj. No. 221094faux concreteweathered zinccopperdark bronzereclaimed wood palletsPage 70 of 75
E E
E
E
E
E
V
V
E
E
E
E
WM
BFP (E) SKATE PARK(E) PARKING(E) ACCESS DRIVEPD LINK BIKE PATHPD LINK PED PATH(E) SIDEWALK(E) RESTROOMSEXISTING ELECTRIC VEHICLE CHARGING111111117666666645553228557778688Sheet:Scale:INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260IIWWW.PVGARCHITECTS.COMPREST VUKSIC GREENWOODA R C H I T E C T S • I N T E R I O R SDISCOVER PALM DESERT VISITOR CENTER760 . 902 . 9048www.rayalightingdesign.com1494 UNION STREET, STE 802SAN DIEGO, CA 92101373 BOUQUET CANYON DRIVEPALM DESERT, CA 92211ELECTRICALMARCH 3, 2023
Proj. No. 221094E100 3/32" = 1'-0"LIGHTING FIXTURE NOTESUNGROUND ROUND LIGHTING FIXTURE INSTALLED IN ACONCRETE FOUNDATION TO ILLUMINATE THE CANOPY OFTHE TREES.INGROUND LINEAR LIGHTING FIXTURE WITH NARROW OPTICSTO ILLUMINATE THE VERTICAL BUILDING NAME.INGROUND LINEAR LIGHTING FIXTURE WITH WIDE OPTICS TOILLUMINATE THE VERTICAL BUILDING NAME.UNGROUND ROUND LIGHTING FIXTURE INSTALLED IN ACONCRETE FOUNDATION WITH MEDIUM OPTICS TOILLUMINATE PUBLIC ART.LED EXTERIOR RATES LED LINEAR LIGHTING MOUNTED ATTHE EDGE OF THE ROOF LINE OR ROUND ROOF OPENINGSWITH RGBW COLOR CHANGING LIGHT TO CELECRATESEASONAL OR SPECIAL OCCASIONS.ARCHITECTURAL PEDESTRIAN POST LIGHTING TO PROVIDEGENERAL ILLUMINATION IN THE PUBIC OPEN SPACES.ARCHITECTURAL PALM TREE LIGHTING FIXTURES TO MATCHTHOSE INSTALLED ON THE PALM TREES ON SAN PABLODRIVE.POLE MOUNTED PARKING LOT LED LIGHTING FIXTUREMOUNTED AT 18'0" ABOVE FINISHED GRADE.12345678GENERAL LIGHTING NOTES1.ALL LIGHTING FIXTURE WILL UTILIZE LED LIGHTING2.LIGHTING FIXTTURES WILL BE AIMED DIRECTRLY ATOPTJECTS OR BE GLARE FREE TO PERSERVE DARK SKYREQUIREMENTS.3.ALL LIGHTING WILL BE CONTROLLED BY A LIGHTINGCONTROL SYSTEM TO MEET CALIFORNIA TITLE 24REQUIREMENTSS I T E L I G H T I N G P L A NPage 71 of 75
(E) RESTROOMS1Sheet:Scale:INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260IIWWW.PVGARCHITECTS.COMPREST VUKSIC GREENWOODA R C H I T E C T S • I N T E R I O R SDISCOVER PALM DESERT VISITOR CENTER760 . 902 . 9048www.rayalightingdesign.com1494 UNION STREET, STE 802SAN DIEGO, CA 92101373 BOUQUET CANYON DRIVEPALM DESERT, CA 92211ELECTRICALMARCH 3, 2023
Proj. No. 221094E200 3/32" = 1'-0"S O L A R C A R P O R T P L A NGENERAL LIGHTING NOTES1.ALL LIGHTING FIXTURE WILL UTILIZE LED LIGHTING2.LIGHTING FIXTTURES WILL BE AIMED DIRECTRLY ATOPTJECTS OR BE GLARE FREE TO PERSERVE DARK SKYREQUIREMENTS.3.ALL LIGHTING WILL BE CONTROLLED BY A LIGHTINGCONTROL SYSTEM TO MEET CALIFORNIA TITLE 24REQUIREMENTSL I G H T I N G F I X T U R E I M A G E STYPE 1 & 4TYPE 2 & 3TYPE 5TYPE 6TYPE 6TYPE 7TYPE 8Page 72 of 75
E
E
E
E
E
E
V
V
E
E
E
WM
BFP (E) SKATE PARK(E) PARKINGPD LINK BIKE PATHPD LINK PED PATH(E) SIDEWALK(E) RESTROOMSEXISTING ELECTRIC VEHICLE CHARGING666666656883.14.1 3.2 1.8 1.12.75.78.2 5.9 2.93.5 6.7 9.1 6.4 3.5 2.9 3.2 2.8 1.91.52.6 5.0 6.8 6.5 4.6 3.54.56.6 5.8 3.3 2.3 3.4 6.2 7.0 4.3 2.8 3.1 3.8 3.2 2.2 2.0 3.2 6.0 7.33.7 7.6 8.7 5.8 3.5 3.35.48.97.73.9 2.6 3.87.48.5 5.1 3.6 5.3 7.8 6.0 3.4 2.9 4.3 7.6 9.01.43.47.17.9 4.94.0 6.0 5.3 3.0 2.1 2.84.55.0 3.6 3.45.78.7 6.7 4.0 3.95.56.8 6.33.6 4.0 3.01.72.1 2.3 2.0 2.3 3.6 4.94.43.7 5.2 8.41.2 1.2 1.3 1.8 2.3 2.5 3.0 5.3 8.80.9 1.1 1.4 1.8 2.5 3.8 5.20.6 0.9 1.3 2.1 2.9 3.4 3.3 2.7 1.90.4 0.6 0.91.73.45.5 5.43.9 2.9 2.21.40.8 0.5 0.4 0.30.3 0.5 0.9 2.1 4.9 8.8 8.4 5.95.13.8 2.11.10.7 0.5 0.40.3 0.3 0.5 0.9 1.9 4.2 7.37.57.2 8.7 6.6 3.2 1.5 1.0 0.8 0.70.3 0.4 0.7 1.2 1.7 2.5 3.74.56.1 8.6 6.7 3.3 1.7 1.5 1.6 1.40.3 0.5 1.0 2.0 2.41.71.8 2.4 3.44.53.8 2.4 1.9 2.6 3.7 3.40.3 0.51.12.51.5 1.11.3 1.6 1.9 1.8 1.6 2.1 4.27.46.60.4 0.4 0.5 0.8 1.40.8 0.9 1.0 1.0 1.1 1.9 4.2 7.6 6.9 3.30.7 0.7 0.7 0.7 0.60.7 0.8 1.4 2.6 4.0 3.7 2.11.5 1.4 1.2 1.3 1.5 1.40.9 1.4 1.8 1.7 1.23.5 3.2 2.3 2.0 3.1 2.81.31.41.2 0.97.3 6.6 3.9 2.6 2.8 2.82.0 2.2 1.86.5 9.8 8.8 4.9 2.9 2.2 1.6 1.1 0.84.0 5.0 3.5 1.77.1 8.2 7.0 5.0 4.1 3.3 2.2 1.5 1.1 0.9 0.82.9 6.1 8.45.52.39.4 8.2 6.0 5.9 7.2 6.2 3.6 2.3 1.81.5 1.10.82.55.16.94.52.07.410.5 8.5 6.17.110.1 8.5 4.9 3.6 3.7 3.1 1.9 1.2 0.9 0.81.6 2.6 3.1 2.3 1.27.3 8.1 6.8 6.2 7.3 8.4 7.0 4.8 5.2 7.3 6.1 3.2 1.9 1.5 1.4 1.2 1.01.3 1.4 1.17.8 9.3 7.3 6.17.49.2 7.6 5.1 4.05.78.87.54.0 2.8 3.0 2.9 2.1 1.4 1.18.9 10.0 7.0 6.1 8.4 10.57.54.1 3.0 3.9 5.3 4.8 3.4 3.8 6.0 6.2 3.7 2.0 1.6 1.45.87.47.2 6.0 6.37.7 7.72.0 2.1 2.4 2.4 2.5 4.2 7.9 8.44.72.8 2.8 3.0 2.3 1.34.58.3 8.5 6.1 5.9 8.1 8.6 5.91.25.15.43.7 3.25.16.64.52.04.48.3 8.0 5.35.58.7 9.0 5.13.1 6.2 8.65.72.3Sheet:Scale:INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260IIWWW.PVGARCHITECTS.COMPREST VUKSIC GREENWOODA R C H I T E C T S • I N T E R I O R SDISCOVER PALM DESERT VISITOR CENTER760 . 902 . 9048www.rayalightingdesign.com1494 UNION STREET, STE 802SAN DIEGO, CA 92101373 BOUQUET CANYON DRIVEPALM DESERT, CA 92211ELECTRICALMARCH 3, 2023
Proj. No. 221094E300 3/32" = 1'-0"S I T E P H O T O M E T R I C L I G H T I N G P L A NPage 73 of 75
Statement of Operations for Discover PD
Visitor Center Use
Normal Operations:
The City of Palm Desert has historically operated a “visitor center” in various locations throughout the
City including a location at the Palm Desert Civic Center campus. The visitor center supports the City’s
goals of Economic Development by promoting the City’s hotels, restaurants, businesses, attractions and
activities. They provide information directly to visitors as well as information on local events via
handouts, phone calls, email, and social media posts.
The Center operates Monday – Friday between the hours of 8:00 am and 5:00 pm and serves over 100
visitors per week. Saturday – Sunday operations are also possible between the hours of 8:00 am and
5:00 pm. The Center is staffed by two (2) city employees who perform the duties and services above.
The Visitor Service Center accommodates over 7,000 visitors annually during Monday-Friday operations.
In addition to the visitor service operations at the site, there is additional “flex space” for the center.
This space can be used for staging of special events, a green room for concerts in the park, and space for
community meetings. All of these functions currently existing at Palm Desert City Hall and would be
shifted to this new site.
Event Use
Waste Plan – all potential events which may utilize the building and/or site will require a use agreement
with the City of Palm Desert. As part of the use agreement event organizers will be required to contract
with Burrtec Waste Management industries for all event waste needs. Therefore, no additional waste
services are anticipated for the normal, or special event, operations at this site.
Event Planning – all potential events at the Civic Center campus require approval by the City, and/or our
contractor, Desert Recreational District (DRD). All existing events are staged at the Civic Center Campus
Amphitheater, Baseball Fields, or DRD and YMCA buildings. Some of these events, particularly, those
that are staged at the amphitheater will be relocated to the visitor services building.
Page 74 of 75
CITY OF PALM DESERTATTENDANCE REPORTAdvisory Body: Architectural Review CommissionPrepared By:Year2023 2022MonthDate 10-Jan 24-Jan 14-Feb 28-Feb 14-Mar 22-Mar 12-Apr 26-Apr 10-May 24-May 14-Jun 28-Jun 12-Jul 26-Jul 9-Aug 23-Aug 13-Sep 27-Sep 11-Oct 25-Oct 8-Nov 22-Nov 13-Dec 27-DecColvard, Dean WallacePP-PPPPPPPP A P -11Latkovic, NicholasPP-AP PPP P P PP- - - PPPPPP P P -11McAuliffe, MichaelPP-PP PPPA P PP- - - PAPPPP P P -22McIntosh, JamesPP-P P P PA P P PA- - - P PAPPA A P -55Sanchez, FranciscoPP-PPPPPPP P P -00Vuksic, JohnPA-PP PPP P P PP- - - PPPPPP P A -22Vacancy00Palm Desert Municipal Code 2.34.010:2023M. Gonzalez2022 2022Twice Monthly: Six unexcused absences from regular meetings in any twelve-month period shall constitute an automatic resignation of members holding office on boards that meet twice monthly.Total Unexcused AbsencesJanFebMarAprMayJunJulAugSep2022Total AbsencesOctNovDec2022202220222023202220222022Page 75 of 75