Loading...
HomeMy WebLinkAboutEncroachment Permit (486)CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT Permit Number: ENCR20-0135 THE PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED AT (760) 776-6450 AT LEAST 24 HOURS PRIOR TO %(*,11,1*$1<:25.127,),&$7,216+$//,1&/8'(/2&$7,21'$7($1'67$577,0(,) NOTIFICATION IS NOT GIVEN, ANY WORK PERFORMED IS SUBJECT TO IMMEDIATE REMOVAL. PERMIT NO: ENCR20-0135 ISSUED: 11/10/2020 EXPIRES: 12/31/2020 FINALED: EXTENSION: Failure to complete the work specified here within the time allotment shall subject permit holder to a $92.00 processing fee. APPLICANT: DESERT SUNSHINE TREE & PALM SERVICE CONTRACTOR: DESERT SUNSHINE TREE & PALM SERVICE FIELD CONTACT AND PHONE NO: PLACIDO MARTINEZ (760) 485-3124 LOCATION: 626030043 75800 AVONDALE DR CROSS STREETS: ELDORADO COUNTRY CLUB / FRANK SINATRA PERMISSION IS HEREBY GRANTED FOR: TRIM OLEANDERS (TREES). ELDORADO / FRANK SINATRA / COUNTRY CLUB AVONDALE COUNTRY CLUB PERAMETER If this work requires lane closure, it must be installed per the WATCH Handbook or a CIty approved traffic control plan. Traffic control hours shall be between 8:30 AM ±PM in certain locations; check with your inspector. This permit is issued to the applicant and contractor stated above. The contractor or applicant must notify the City of the name and field contact information for all sub-contractors hired to perform any work under this permit. The permit holder is required to comply with all applicable City ordinances, City standards, the terms and conditions of the permit, and all applicable rules and regulations of the City of Palm Desert. Utility companies should not shut down their utility facilities in the area of work prior to contacting or notifying affected residents and businesses. NOTE: Prior to performing any excavation in or near a signalized intersection, and/or between two signalized intersections, the contractor must notify the City at 760-776-6364. A copy of this permit is to be kept at the site of the work and must be shown on demand to any authorized representative of the Director of Public Works. This permit is issued by authority of the City of Palm Desert Director of Public Works. CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT STANDARD SPECIFICATIONS BASIS OF SPECIFICATIONS ‡The Standard Specifications of the City are contained in the Standard Specifications for Public Works Construction, (latest edition) including supplements as written and promulgated by the Joint Cooperative Committee of the Southern California Chapter of the American Public Works Association and the Southern &DOLIRUQLD'LVWULFWRIWKH$VVRFLDWHG*HQHUDO&RQWUDFWRUVRI&DOLIRUQLD&RSLHVRIWKHVH6WDQGDUG6SHFLILFDWLRQV are available from the publisher: Building News, Incorporated, 990 Park Center Drive, Suite E, Vista, California 92081; or by phone at (888) 264-2665. ‡The Standard Specifications set forth above will control the general provisions, construction materials and construction methods except as amended in the following Specifications: GENERAL SPECIFICATIONS ‡Any and all damage caused by the work must be repaired and/or replaced by the permit holder at their cost, and to the satisfaction of the City. This includes (but is not limited to) hardscape, landscape, signal equipment, FRQFUHWHDVSKDOWHWFRQSXEOLFRUSULYDWHLPSURYHPHQWV%HIRUHGRLQJDQ\UHSDLURUUHSODFHPHQWWKH&LW\ must be made aware of the deficiency and review the desired resolution. ‡The City may order the permit holder to stop the work, or any part of the work due to extreme weather or any other unfavorable conditions (including the failure of the permit holder to carry out orders given by the City Inspector) for such time as is deemed necessary to correct the conditions. ‡3DUNLQJDQGGULYLQJRQVLGHZDONVLVSURKLELWHG6LGHZDONVDUHWRUHPDLQIUHHDQGFOHDUIRUSHGHVWULDQV ‡7KHPLQLPXPRIDFODVVYHVWLVUHTXLUHGIRUGD\WLPHZRUN7KHPLQLPXPRIDFODVVYHVWZLWKVOHHYHVDQG pants are required for night work. ‡Trench plates must be recessed to match the adjoining finished surface. REQUIRED NOTIFICATIONS ‡City at (760) 776-6364 prior to performing any excavation in or near a signalized intersection, or between two signalized intersections. USA does not cover signalsAny damage to signal equipment, loops, etc. must be replaced and or repaired within 48 hours. ‡Sheriff Department at (760) 836-1600 for lane reductions or street closures. ‡Fire: Station. 33 at (760) 346-0508 ‡SunLine Transit Agency at (760) 343-3456 when stops, access, pickups, or routes are affected. ‡Burrtec Waste & Recycling Services at (760) 340-2113 when stops, access, pickups, or routes are affected. ‡Utility companies should not shut down their utility facilities in the area of work prior to notifying affected residents and businesses. TEMPORARY TRAFFIC CONTROL ‡New or like-new traffic control devices as approved by the Public Works inspector are required and shall be installed in accordance with the latest edition of the WATCH (Work Area Traffic Control Handbook) manual, &DOWUDQV7UDIILF&RQWURO6WDQGDUG3ODQV7WR7DQGWKH087&' ‡Traffic control hours shall be between 8:30 AM ±PM in certain locations; check with your inspector. ‡$OOXQQHFHVVDU\WUDIILFFRQWUROGHYLFHVPXVWEHUHPRYHGDVVRRQDVFRQGLWLRQVDOORZ$Q\GDPDJHGRU unacceptable traffic control devices must be replaced immediately. ‡7UDIILFFRQWUROVKDOOQRWEHOHIWXQDWWHQGHGRUJLYHWKHDSSHDUDQFHRIEHLQJXQDWWHQGHG7KHFRQWUDFWRUVKDOOQRW leave the site until the traffic control is removed. ‡2QHODQHRIWUDIILFLQHDFKGLUHFWLRQPXVWEHPDLQWDLQHGDWDOOWLPHVGXULQJFRQVWUXFWLRQ:KHUHDUDLVHGPHGLDQ island exists, the open lane must be located on the appropriate side of the street. ‡If major intersections are involved with the proposed work, a detailed traffic control plan must be submitted, and approved by the Public Works Department prior to beginning any work. STRIPING AND MARKERS Any traffic striping, pavement markings or pavement markers removed or damaged shall be replaced per City of Palm Desert standards and requirements. INLETS All inlets that will or may be affected by the work of the permit holder will be protected from debris and fluids other than UDLQ7KHSHUPLWKROGHUPXVWPDLQWDLQWKHLQOHWVDQGNHHSWKHPFOHDQWKURXJKRXWWKHGXUDWLRQDQGDWWKHHQGRIWKH SURMHFW DUST AND TRACK-OUT The permit holder shall control all dirt areas disturbed and stockpiled during and after workdays by applying water or a VRLOVWDELOL]HU7UDFNRXWGHYLFHVVKDOOEHLQVWDOOHGDQGPDLQWDLQHGWRDYRLGGLUWLQWKHVWUHHW PRIVATE PROPERTY If private property is used during this work, written permission from the property owner must be provided to the inspector. MONUMENTATION Prior to being removed or disturbed, all existing survey monuments shall be completely tied out by a licensed land surveyor or appropriately licensed civil engineer (R.C.E. #33965 or lower number) so they may be readily and properly UHSODFHG$FRPSOHWHVHWRIQRWHVVKRZLQJWKHWLHVWRWKHVHPRQXPHQWVVKDOOEHVXEPLWWHGWRWKH&LW\(QJLQHHUSULRU WREHJLQQLQJFRQVWUXFWLRQRQWKLVSURMHFW7KHSHUPLWKROGHULVUHVSRQVLEOHIRUDOOFRVWVLQYROYHGZLWKWKHDERYH COMPACTION TESTS Compaction tests will be required on sub grade (for curb, curb and gutter, sidewalk, driveway approach, street, and trench); rock base grade (for street or trench); and asphalt concrete. CONCRETE $OOFRQFUHWHVKDOOEHDPLQLPXPVDFN&$OOFRQFUHWHVWUXFWXUHVUHPRYHGRUGDPDJHGE\WKHZRUNXQGHU WKLVSHUPLWVKDOOEHUHSODFHGSHUWKHVWDQGDUGVRIWKH&LW\RI3DOP'HVHUW:KHUHFRQFUHWHLVUHPRYHGRUGDPDJHGLW shall be replaced to the nearest joint in each direction. PERMANENT ASPHALT CONCRETE ‡Asphalt concrete used for permanent resurfacing shall be PG 70-10 and follow Standard Specifications for Public Works Construction 203 and 302. All AC pavement installations will be subject to a rideability test and shall not have any humps or depressions and must be installed to the same line and grade as the adjoining pavement. Transverse joints must be checked with a minimum12-foot straight edge. Any pavement that fails or is installed in an unacceptable manner is subject to removal and correction. ‡Permanent AC pavement must be installed within 15 days of the installation of underground work. When trench paving operations are being performed, the length of trench area allowed to be open or cold planed to receive a final lift of AC pavement will not exceed the length of trench that can be final-paved the same day. ‡The final lift of AC must be installed with a self-propelled vibratory screed-type machine. ‡AC joints must be sealed by the end of each paving operation. TEMPORARY ASPHALT CONCRETE Streets: 7HPSRUDU\$&VKDOOEH´thick and compacted with a steel wheeled roller or a vibratory plate to obtain a smooth, dense matte and must be installed to the same line and grade as adjoining AC pavement and must be maintained free of potholes and without a rough riding surface. Sidewalks: Temporary AC shall be ´thick and follow the requirements mentioned above for streets. CONSTRUCTION WORK HOURS October 1 through April 30 May 1 through September 30 Mon.-Fri. 7 AM to 5:30 PM *5:30 AM to 7 PM * Saturday 8 AM to 5 PM *8 AM to 5 PM * *Actual work hours must be coordinated with the inspector or his/her representative. NIGHT, AFTER-HOURS, SUNDAY, AND GOVERNMENT CODE HOLIDAY WORK A letter to the City Manager through the Public Works Director must be submitted for review and DSSURYDODWOHDVWRQHZHHNSULRUWRWKHDFWXDOVWDUWGDWH7KHOHWWHUVKDOOLQFOXGHWKHGDWHVVWDUWDQG end times, and the reason the work cannot be performed during normal construction hours. FAILURE TO OBSERVE THESE WORK HOURS WILL RESULT IN A CITATION BEING ISSUED TO THE OFFENDERS BY THE POLICE DEPARTMENT