HomeMy WebLinkAbout110C J SEGALLGtfqj�F o:ff IpDm' ,
45-275 PRICKLY PEAR LANE, PALM DESERT, CALIFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date: 2.421/7- A --
REPORT ON: Commercial addition
CASE NO.: 110 C
ZONE: C-1, S.P.
LOCATION: Northwest corner of Cabrillo and Highway 111
APPLICANT: J. SEGALL
NATURE OF APPROVAL SOUGHT: Final construction drawings
DESIGN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the staff and by the applicant, the DRB CONTINUED TO 3/6/79
this project, subject to revisions.
Date of Action
Motion Made By:
Seconded By:
Vote: Unanimous
Reasons for Negative Vote (s):
(An appeal of thove action may be made in writing to the City Clerk
e ab
of the City of PaZm Desert within fifteen (15) days of the date of the
decision.)
STAFF COMMENTS:
See enclosed Minutes.
A a
Minutes Page Two
Palm Desert Design Review Board
February 20, 1979
III. Case No. 148 MF (cont.
3. Plant material shall be used as indicated on the plans in the files
of the Department of Environmental Services.
4. A precise shrub plan for dwelling units shall be submitted for
Board Chairman's approval.
carried 4-0 (Johnson, Jackson, Urrutia, Williams).
Case No. 104 C - JOHN F. OUTCAULT, A.I.A. FOR J. WELLS - Final construction
drawings for commercial structure and related parking to be located north
of Highway 111, east of Las Palmas. Applicant was present.
The Board reviewed final plans for the project. The applicant submitted
a new set of plans addressing Staff concerns and these were found to be
generally acceptable.
On a motion by 'Jackson, seconded by Urrutia, the Board approved final
plans, subject to the following revision:
1. Replace Carolina Cherries with Pyracantha, on the west.
%arried 4-0 (Johnson, Jackson, Urrutia, Williams).
V Case No. 110 C - J. SEGALL - Final construction drawings for a commercial
addition to be located on the northwest corner of Cabrillo and Highway 111.
Applicant was present.
The Board reviewed various elements of the proposed construction; reviewing
materials of construction, the aesthetic aspects of the structure and
landscaping. Also discussed were structural requirements to support the
structure and satisfy wind load requirements.
On a motion by Urrutia, seconded by Johnson, Jackson having left the roan,
the Board moved to continue the item to allow the applicant to meet with
the Building Department to discuss structural requirements, and to review
the elevation of the structure and landscaping to screen it; carried 3-0-1
(AYES: Johnson, Urrutia, Williams ABSENT: Jackson).
Case No. 108 MF - AMERICAN WEST - Final construction drawings for a 5-unit
apartment complex to be located on the southwest corner of Driftwood and
Sunset. Applicant was present.
The Board discussed the final construction drawings and landscaping plans,
which were required to be submitted to the Board.
On a motion by Williams, seconded by Jackson, the Board approved the plans,
subject to the following revisions:
landscape Plan
1. Specify 5-gallon Oleanders, 10 foot O.C.
2. Specify future pool area to be in lawn.
3. Specify a/c pad locations, to be approved by Staff.
carried 4-0 (Jackson, Johnson, Urrutia, Williams).
Case No. 108 C - S AND J MANAOEENT - Preliminary plans for reconsideration of
commercial structure and related parking, to be located north of Highway 111,
west of DeAnza Way. Applicant not present.
The Board discussed the various aspects of the preliminary plans, evaluated
the plot plan, landscaping plan and building elevations. This item had been
continued to allow the applicant to restudy the plans.
On a motion by Urrutia, seconded by Jackson, the Board continued the item
to allow the applicant to consider the following revisions:
it
Agenda Item No. III - 3
DESIGN REVIEW BOARD DATE February 20, 1979
CASE NO.: 110 C
APPLICANT: J. Segall dba J & E Automotive
LOCATION: Northeast corner of Cabrillo and Highway 111
ZONING C-1. S.P_
Proposed Wood Shade structure addition.
STAFF RECOMMENDATION:
Approve, subject to:
1. Wood being stained dark brown
2. Landscaping in terms of at least 15-gallon shade trees being
installed in the grass area to the south of the proposed addition
3. Proposed grill works shall be wood, similar to the rest of structure
4. Applicant shall file material samples for approval by Staff
GLb /'Z/ -92-4
N�N2/011�VJ,1-?/.753Q W-7b'(j
I// AMH 961-*Z-
2?ntLow oiny 3
�
S
—"NaL" ;r,
•�JO'7/� �JJ/1S/X�
M�/A dot
OS J
N
1No
0771 -9 _
N.�dO
.8 _
a1. a7.�M--Jdd
s..-+og 9d> a� �; „b�) o, a.cv�d -40H0N f/
M 9H1S iNdln�A?I� `�)' SGIS
Z' J r 4Nl1�17f3
jj�,.Z k-_
.� djlls >
'73.�1s Xvg �
,NJNJ /�
„- INCH
Box SrE� L
❑;
E�rcTtNgr �
�
�. �:' f
I
.Ftfrl•
S f
SIDE-
4"CwAiC-N7 glge
R NCHA UR PLTE
�
p,� �Y "t 1.
y
l
CtENT
LAGG BOLTS
ARc- "/EL D • To
//2-” P/PL
.L
Fre �Nr
S ciN SHAPE
/ S o`XSFeET
O PE nl
- GAILi-
WORK
-j4
R
R
Y
S
.- - Jc�, AUTOMO-ri V E
74-/9( HWY /I/
PRLM DFSEp.-r, 0 ")L1A0/2NlH
FEB. 121 / y79
f-guPPoriT
' 2 r�6 rkvN
A, rI NCH
BOX STE4'i-
❑x
E�(Ic71N��1 h
S/D6 S � � eMrNr Sll�B
i'
ANCtrOR PLATE
ARC-WE[.D'To
l �lJ
�-- 3Y�
Fk�NT
SCi/V Sf/ADE
S �XSF--Er
�y kAG go rs
N
S
/UV VIENv
L XIS%'/ldG
to i .,......"
- Q
I
N
I
0
I R III A
IF
5 S
Jam+ AUTOMOri vE
74-/9L HWY /I/
PALM DESERrt, Crlc lt0/?NlN
FE$.12, / y79
`����������0 q� OOp ***DESIGN REVIEW BOARD***
DEPARTMENT OF ENVIRONMENTAL SERVICES
PLANNING DIVISION
Jerold Segall
Applicant (Pleose mint)
74-196 Highway 111 346-8329
Mailing Address Telephone
Palm Desert, CA 92260
REQUEST: (Describe specific nature of approval requested)
I request approval of a sun shade erected over the hoist area.
The top of the shade is covered by wooden slats 1" thick, 2 inches
wide and 16 feet long. The slats are place about 1 1/2" apart.
PROPERTY DESCRIPTION:
W.WWARWO •u• • -.. _._�_•
ASSESSOR IS PARCEL N0.625025002
EXISTING ZONING commercial
Property Owner Authorization THE UNDERSIGNED STATES THAT THEY ARE THE OWNER(S) OF THE PROPERTY DESCRIBED HEREIN AND HEREBY GIVE AUTHOR-
IZATION FOR THE FILING OF THIS APPLICATION.
FPhruary 12, 1979
DATE
AGREEMENT ABSOLVING THE CITY OFF LM DESERT OF ALL LIABILITIES RELATIVE TO ANY DEED RESTRICTIONS.
I DO BY MY SIGNATUR ON IS AGREEMENT, ABSOLVE THE CITY OF PALM DESERT OF ALL LIABILITIES REGARDING ANY DEED RES-
TRICTIONS THAT MAY BE APPLICABLE TO THE PROPERTY DESCFHSED HEREIN,
Februarys 1979
SIGNATURE Ail DATE
Applicants Signature
SIGNATURE
(FOR STAFF USE ONLY) ENVIRONMENTAL STATUS
❑ MINISTERIAL ACT E.A. No.
❑ CATEGORICAL EXEMPTION
❑ NEGATIVE DECLARATION
❑ OTHER
E No
REFERENCE CASE NO
February 12, 1279
DATE
mo (
The Design Review Board process is the method by which the City of Palm Desert
reviews detailed design and construction plans prior to the issuance of a building
permit.
FENCES,POOLS B
DEPARTMENT DESIGN PLANNING
APPLICATIQN OF ENVIRON- REVIEW (—\ COMMISSION
MENTAL BOARD L� (APPROVES OR
SERVICES (ADVISORY)
DENIES PROJECT)
STAFF
INTERIOR REMODELS, MINOR ELECTRICAL, MECHANICAL, OR PLUMBING PERMITS
PROCESSING SCHEDULE:
DEPARTMENT o
BUILDING ANDNSTRUCI
SAFETY N
SINGLE-FAMILY HOMES and similar projects require 2-4 working days before they may
be submitted to the Building and Safety Division for plan check.
MULTI -FAMILY, COMMERCIAL, and other projects that must be reviewed by the D.R.B.
and Planning Commission usually require 10-20 days.
In order to facilitate processing, the applicant or a designated representative
should attend the review hearings to answer questions which may arise regarding
the project.
STAFF USE ONLY:
Date Received
Date of
ACTOR ;Neoting
ACTION
APPLICANT NOTIFIED
Staff
DRB
P.C.
Department of Environmental Services Form 1
CITY OF PALM DESERT
APPLICATION FORM
DESIGN REVIEW BOARD PROCESS
Design Review of:
Sun shade
TYPE OF PROJECT
Jerold Segall
APPLICANT
CASE NO.
Agreement of compliance to be signed by those applying for review.
I hereby acknowledge that I have read and agree, to comply
with all the following requirements, and understand that
the Department of Building and Safety will not issue a
building permit or allow occupancy on the use permitted
until this signed confirmation has been received by the
Department of Environmental Services.
The development of this project shall conform substantially
to all development plans submitted in behalf of this case,
and as revised according to the Design Review Board process.
Any minor change requires approval by the Director of Envi-
ronmental Services. Any substantial change requires ap-
proval by the Design Review Board.
All requirements of any law, ordinance, or regulation of
the State, City, and any other applicable government entity
shall be complied with as part of the development process.
This approval is applicable, subject to the development of
this project, commencing within one year from approval date
and being promptly completed.
Landscaping (with irrigation system) shall be installed
prior to final inspection and receiving certificate of
occupancy.
Curb, gutter, curb cuts, and tie-in paving shall be provided
along the full frontage of the lot by means of installation
prior to final inspection or other provisions as approved by
the City Engineer. Construction shall conform to City Stan-
dards and all requirements of the City Engineer.
�7Tii1F�Wf
(Signature)
Department of Environmental Services Form 1
CASE NO.
DESIGN REVIEW BOARD CHECKLIST
INITIAL PLAN REVIEW
NOTE: Planning Division Staff are required to
reject applications if any applicable
exhibits are not received and checked.
I. Completed Application Form (one (1) copy)
II. Address labels for project sponsors
(two (2) copies, gummed labels & typed list)
Not required for a single-family dwelling
application, or staff approved signs.
III. Detailed Plot Plan
A. Design Review Board and Commission
Review/Approval A.
- Three (3) full size (one (1) of which is
to be colored)
- One (1) reduced copy (8z11xll", or 13")
B. Staff Approval B.
- Three (3) full size
IV. Information Sheet and/or Plan Block
V. Site Analysis & Preliminary Drainage and
Grading Plan (Three (3) copies, may be com-
bined, where appropriate, with plot plan)
VI. Architectural Elevations (all sides of the
building(s))
A. Design Review Board and Commission Review/
Approval
- Three (3) full size (one (1) of which
is to be color keyed)
- One (1) reduced copy (8J"xll" or 13")
B. Staff Approval B
- Three (3) full size
A.
DRB Checklist
Page Two
** VII. Sign Program (elevation(s) and details, if
applicable)
- Three (3) copies to scale
VIII. Color and Material Exhibits
- Color and Materials written description
(one (1) copy)
- Color and Materials sample board
(max. 8"x1311, 3/8" thick)
IX. Floor and Roof Plans
- Three (3) copies to scale
* X. Landscape Plan (3 copies, 1 colored)
- Plant List, (1 copy)
* XI. Exterior Lighting Plan (3 copies)
XII. Filing Fee
A. Commission Review/Approval ($50.00) A.
B. Staff approval, single-family
dwellings ($15.00) B. �]
C. Sign Program Only ($15.00 DRB or C. l�
$10.00 Staff)
* Items X and XI may be combined.
** Sign Program only - submit items IIIB, VI, VII,
VIII, and Sign Fee.
Initial Plan Exhibits
Received and Checked by: /
Ping. Div. Staff .Date
FINAL CONSTRUCTION DRAWINGS
I. Three (3) copies of drawings to be submitted for plan check.
Drawings must reflect all Conditions of Approval.
Final Construction
Drawings Received by: /
Ping. Div. Staff Date