Loading...
HomeMy WebLinkAbout126C SOUTHERN CALIFORNIA EDISONlbbkIM6. 00 rn $K X °�' • ,p LA L _ � p o :b .; 0� � � r` E�isr, �°.�ilrrr ✓� 1 ! ,4 G � Sr�.e- Srs. (k, Z ly x ro n '`3 w� x a 3� ;o `� O `` .� � /' l rr �'�r . Yam""•' -!1" �r r.._.... „ < 1 LA za �, l�, .� ` � � (�L/fA/�'L o SN,e•� �: iv G S.�A� .riP /,�K � AADD l me •� GA� E)(/sr' 9 i•, a p l(Jpm L 1! 1 q GA -(G39 } C5t:a: o =Rmf--71-7� =- 45-275 PRICKLY PEAR LANE, PALM DESERT, CALIFORNIA 92260 TELEPHONE (714) 346-0611 EPORT OF DESIGN REVIEW BOARD ACTION CASE NO: 126 C APPLICANT: Southern California Edison Co. (Attn: K. Martin, 74-100 Highway 111, Palm Desert, CA 92260) NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of landscaping, grading, and screening plans for electrical distribution substation. LOCATION: 250 feet south of Highway 111 and 120 feet east of Shadow Hills ZONE: P (Public/Institutional District) DESIGN REVIEW BOARD ACTION: Upon reviewing the submitted plans and the presentations by the Staff and fy the applicant, the Design Revie,d Board approves this project . Xl0W0(XkX=0(X)VXN(Xl6)6XX"X Date of Action: 2-12-80 Vote: 5-0 (An appeal of the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision.) STAFF COMMENTS: See attached Minutes. d MINUTES DESIGN REVIEW BOARD TUESDAY - FEBRUARY 12, 1980 CITY HALL COUNCIL CHAMBERS I. The meeting was called to order at 2:30 p.m. after a two and one-half hour study session. MEMBERS PRESENT: Vern Barton Al Cook Rick Holden Phyllis Jackson Charles Martin MEMBERS ABSENT: Eric Johnson Bernie Leung STAFF PRESENT: Stan Sawa Murrel Crump (present during a portion of the meeting) It was moved by Barton, seconded by Martin, that the minutes of January 29, 1980, be approved as written. Carried 3-0-2 (Barton, Jackson, Martin, with Cook and Holden abstaining). II. Minute motion approving cases found acceptable at the study session: None. III. CASES Case No. 126 C - SOUTHERN CALIFORNIA EDISON COMPANY - approval of final landscaping, grading, and screening plans for electrical distribution substation located 250 feet south of Highway 111 and 120 feet east of Shadow Hills Road; Kermit Martin was present. The Board reviewed the submitted plans and felt they were acceptable, inclu- ding the provision of an eight foot high slump stone wall for security purposes. On a motion by Holden, seconded by Martin, the Board granted final approval of the submitted plans. Carried 5-0 (Barton, Cook, Holden, Jackson, Martin). Case No. 127 C - FAR WEST SERVICES, INC. and WILLIAM BLUROCK & PARTNERS, ARCHITECT - final approval of building plans for restaurant in restaurant park located at the northwest corner of Highway 111 and 44th Avenue; Matt Sommers of Blurock & Partners was present. The Board reviewed the plans submitted by the applicant. The changes required from the previous review were discussed and deemed acceptable. The exterior colors, as revised, were discussed. The applicant was advised to submit a revised material sample board showing exact materials to be used on the exterior of the building. It was noted that there should be no roof lighting or lighting of the roof utilized. Additionally, the applicant was advised that any accent lighting used around the building is to be reviewed and approved by the Design Review Board. The applicant then presented a revised site plan which showed a modified walkway from the parking lot to the restaurant, a raised planter and three decorative lights which he wished to use around the building. The Board felt that the revised site plan was acceptable. Staff pointed out that, to date, only a preliminary final landscaping plan had been received. Additionally, there were some architectural details and subcontractor details which had not yet been submitted. It was pointed out to the applicant that until the final landscaping plan and all other architectural details are received by Staff, no plans would be approved for submission to Building and Safety. On a motion by Barton, seconded by Holden, the Board granted approval of the final working drawings subject to no lighting of the roof being provided and submission of all other final working drawings showing details. Carried 5-0 (Barton, Cook, Holden, Jackson, Martin). r NDA ITEM NO. III, A-1 DATE February 12, 1980 DESIGN REVIEW BOARD CASE NO. 126 C (CUP 09-79) APPLICANT (AND ADDRESS) Southern California Edison Co. (Attn: K. Martin, 74-100 Highway 111, Palm Desert, CA 92260) NATURE OF PROJECT/APPROVAL SOUGHT Final approval of landscaping, grading, and screening plans for electrical distribution substation LOCATION 250 feet south of Highway 111 and 120 feet east of Shadow Hills Road. ZONE P (Public/Institutional District) This Design Review item, along with a Conditional Use Permit, was approved by the Planning Commission at the meeting of December 4, 1979. The appli- cant has submitted final drawings incorporating the changes required. The submitted plans do incorporate the landscaping changes recommended by the Board. The applicant indicates that the slump stone wall along the west and a portion of the south property line will be eight feet tall as well as the chain link fencing. The specific height of the wall was not previously mentioned. Therefore, the Board should review this aspect of the project. STAFF ANALYSIS: The Board should review the submitted plans to determine compliance with preliminary approval. MINUTES PALM DESERT PLANNING COMMISSION DECEMBER 4, 1979 Page -3- VI. PUBLIC HEARINGS (Continued) Chairman Snyder asked if the applicant cared to make a presentation. KERMIT MARTIN, Area Manager for So. Calif. Edison, 74-000 Highway 111, added that an additional improvement would be that the service line to the station would be placed underground. He stated that the conditions were agreeable. Chairman Snyder asked Mr. Martin if he was sub -contracting the landscaping maintenance. Mr. Martin replied that they were. Commissioner Miller asked if the residents on the west side would be bothered by the noise. Mr. Martin introduced Mr. Spix, who did the noise study. JOHN SPIX, Engineer, Whittier, Ca., gave a lengthy explanation on the noise levels. He further stated that the station would tiave two transformers and would not increase the noise. Chairman Snyder asked Mr. Spix if the company would ever consider sound proofing the station as the need continues to grow. Mr. Spix replied that the need had not come up at this point. Commissioner Berkey indicated that a Special Condition could be added in regards to the noise level. Mr. Spix assured him that it would not increase. Mr. Williams pointed out that their report indicated a one decibel increase at night would occur. Commissioner Kryder stated that he did not feel it was necessary to add a Special Condition regarding the noise level if it was stated that it would not change. Commissioner Miller asked Mr. Spix if he was aware of how much the noise bothered the Silver Spur Ranch residents. Mr. Spix stated some people are sensitive to the sound and assured him it would not be any greater than it is presently.at the location under consideration. Mr. Martin also stated that if there was a problem the company would resolve it. Chairman Snyder concluded the discussion by stating that it was the Commission's responsibility to make sure no problems would exist. He felt sure that if there was a problem the utility company would take care of it. He then opened the Public Hearing asking if anyone present wished to speak in FAVOR or OPPOSITION to the case. There being none, the Public Hearing was closed. Upon motion made by Commissioner Berkey, seconded by Commissioner Kryder, case nos. CUP 09-79 and 126 C was approved by adoption of Planning Commission Resolution No. 553, with amendment and subject to conditions. Carried unanimously (4-0). Mr. Williams at this time got an assurance from the Commission that the wording of Special Condition No. 4 was acceptable. E. o. TT 15630, DUAINE K. BRICKER, Applicant. Request for appr a 17 lot Tentative Tract Map for condo- minium purposes to allow ling units and one common lot on approximately 1.3 acres within - Multi -family Residential District) zone, located between is Road and Deep Canyon Road. MINUTES PALM DESERT PLANNING COMMISSION DECEMBER 4, 1979 Page -2- I. PUBLIC HEARINGS (continued) Mr. Williams presented this case stating that because of expected tech ical information not received as yet, he would suggest a continuance to th meeting of December 19, 1979. Upon otion made by Commissioner Berkey, seconded by Commissioner Kryder, ca VAR 07-79 was continued to December 19, 1979. Carried unanimously (4-0). C.� Ca s No. PM 15723, ERNEST W. HAHN, INC. Applicant (Rep sented by: Southwest Engineering). Request r approval of a Parcel Map to divide two existing parcels in four parcels on approximately 100 acres, within the P (3), S.P. (Regional Planned Commercial, Scenic Presery ion Overlay), R-3 (9) (Multi -family Resi- dential, Max. 1 u./9000 sq.ft.) and PR-6, S.P. (Planned Residential, Max. d.u./ac., Scenic Preservation Overlay) zones, generally loc ted between Monterey Avenue and the Palm Valley Stormwate Channel, north of Highway 111. Mr. Williams presented this case de ning each of the proposed parcels and future developments and suggested that he fire station site be established at 150' x 250' in size. The applicant did not make a presentation t Mr. Bill Lyle of Hahn Co., was available to answer any questions from the Commis 'on. Chairman Snyder opened the Public Hearing asking \fayOPone present wished to speak in FAVOR or POSITION to this case. being none, the Public Hearing was closed. Upon motion made by Commissioner Kryder, seconded by Co issioner Miller, case PM 15723 was approved by adoption of Planning Com 'ssion Resolution No. 552, amended to include the suggested fire station site size as recommended. Carried unanimously (4-0). D. Case Nos. CUP 09-79 an 126 C SOUTHERN CALIFORNIA EDISON CO., Applicant. Request for approval of a Conditionl Use Permit and Design Review case to allow the construction and operation of an expanded electrical distribution substation in conjuntion with existing substation facilities on approx- imately .86 acres within the P (Public/Institutional District) zone, located 250 feet south of Highway 111 and 120 feet east of Shadow Hills Road. Mr. Williams presented this case indicating that this request was to provide for the growing needs of this area. He also stated that the proposed expansion would include installation of a Temporary Transformer. Mr. Williams pointed out that because of the location of the substation, lands- caping would also be added. The Design Review Board recommended approval with a few requested changes in landscaping material and a requirement to see the drainage and grading plans before installation. Commissioner Berkey asked Mr. Williams what kind of requirements there were in terms of maintenance of the landscaping. Mr. Williams stated that the landscaping maintenance was now done by a contracting service. Commissioner Berkey suggested that it may be stipulated in the Special Conditions. It was discussed and agreed to add Special Condition No. 4, to read: "The proposed landscaping shall be installed and well maintained in perpetuity." 0 ti 45-275 PRICKLY PEAR LANE, PALM DESERT, CALIFORNIA 92260 TELEPHONE (714) 346-0611 REPORT OF PLANNING COMMISSION ACTION DATE December 6, 1979 APPLICANT Southern California Edison Co. 74-000 Highway ill Palm Desert, CA 92260 CASE No.: CUP 09-79 and 126 C The Planning Commission of the City of Palm Desert has considered your request and taken the following action at its meeting of December 4, 1979 CONTINUED TO DENIED X APPROVED BY PLANNING COMMISSION RESOLUTION NO. 553 PLACED ON THE AGENDA OF THE CITY COUNCIL OF FOR CONCURRENCE WITH THE PLANNING COMMISSION DECISION. PLACED ON THE AGENDA OF THE CITY COUNCIL OF FOR PUBLIC HEARING. Any appeal of the above action may be made in writing to the Director of Environmental Services, City of Palm Desert, within fifteen (15) days of the date of the decision. cc: Applicant r v r v n PAUL A. WILLI.21S, SECRETARY PALM DESERT PI-VNNING C=%!ISSSION , fi PLANNING COMMISSION RESOLUTION NO 553 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF PALM DESERT, CALIFORNIA, ANNOUNCING FINDINGS AND GRANTING A CONDITIONAL USE PERMIT AND PRELIMINARY DESIGN REVIEW TO ALLOW THE CONSTRUCTION AND OPERATION OF AN EXPANDED ELEC- TRICAL DISTRIBUTION SUBSTATION IN CONJUNCTION WITH EXIST- ING SUBSTATION FACILITIES, LOCATED 250 FEET SOUTH OF HIGHWAY 111 AND 120 FEET EAST OF SHADOW HILLS ROAD. CASE NO(S) CUP 09-79 AND 126 C WHEREAS, the Planning Commission of the City of Palm Desert, California, did hold a duly noticed Public Hearing on December 4, 1979, to consider an application from SOUTHERN CALIFORNIA EDISON CO. for approval of a Conditional Use Permit and preliminary Design Review case to allow the construction and operation of an expanded electrical distribution substation in conjunction with existing substation facilities on approximately .86 acres within the P (Public/Institutional District) zone, located 250 feet south of Highway 111 and 120 feet east of Shadow Hills Road, more particularly described as: APN 625-161-013 WHEREAS, said application has complied with the requirements of the "City of Palm Desert Environmental Quality Procedure Resolution No. 78-32," in that the Director of Environmental Services has determined that the project would not have a significant impact on the environment, and a Negative Declaration has been prepared. WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said Commission did find the following facts and reasons to exist to justify the granting of said Conditional Use Permit: 1. The proposed location of the conditional use and the conditions under which it will be operated and main- tained will not be detrimental to the public health, safety, or general welfare, or be materially injurious to the properties or improvements in the vicinity. 2. The proposed location of the conditional use is in accord with the objectives of the Zoning Ordinance and the purpose of the district in which the site is lo- cated. 3. The proposed conditional use complies with the goals, objectives, and policies of the City's adopted General Plan. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Palm Desert, California, as follows: 1. That the above recitations are true and correct and constitute the findings of the Commission in this case; 2. That the Conditional Use Permit (CUP 09-79) and Preliminary Design RUview (126 C) is hereby granted to the attached conditions. PASSED, APPROVED, and ADOPTED at a regular meeting of the Palm Desert Planning Commission, held on this 4th day of December, 1979, by the following vote, to wit: AYES: Berkey, Kryder, Miller, Snyder NOES: None ABSENT: None ABSTAIN: None WALTER SNYDER, Chairman ATTEST: nAlll A Ln,, TAUC C--r...+­. PLANNING COMMISSION RESOLUTION NO. 553 Page -2- 4 CONDITIONS OF APPROVAL CASE NO. CUP 09-79 Standard Conditions: 1. The development of the property shall conform substantially with Exhibit A (Case No. CUP 09-79) on file with the Department of Environ- mental Services, as modified by the following conditions. 2. Prior to the issuance of a building permit for construction of any uses contemplated by this approval, the applicant shall first complete all the procedural requirements of the City which include, but are not limited to, Design Review, and building permit procedures. 3. Construction of the total development may be done in phases. 4. Construction of a portion of said project shall commence within one year from the date of final approval otherwise said approval shall become null, void and of no effect whatsoever. 5. Prior to the issuance of any City permits for the commencement of construction on said project, the applicant shall agree in writing to these Conditions of Approval. 6. The development of the property described herein shall be subject to the restrictions and limitations set forth herein which are in additions to all municipal ordinances and State and Federal Statutes now in force, or which hereafter may be in force. 7. All requirements of the City Fire Marshal shall be met as part of the development of this project. 8. Construction plans shall be submitted for approval to the City Fire Marshal prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 9. Prior to issuance of a building permit for construction of any use contemplated by this approval, the applicant shall first obtain permits and/or clearance from the following agencies: Palm Desert Design Review Board Process City Fire Marshal Evidence of said permit or clearance from the above agencies shall be presented to the Department of Building and Safety at the time of issuance of a building permit for the use contemplated herewith. Special Conditions 1. Delete Cedrus Atlantica and replace with Pinus Eldarica. 2. Delete Albizzia Julibrissin and replace with Fraxinus Undei, Fraxinus Modesto, or Rhus Lancea (15 gallon size may be used). 3. Grading and drainage plans shall be submitted to the Design Review Board with final development drawings. The proposed landscaping shall be installed and well maintained in perspectivity. L AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. ate pp scant s Signature PLANNING COMMISSION RESOLUTION NO. 553 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF PALM DESERT, CALIFORNIA, ANNOUNCING FINDINGS AND GRANTING A CONDITIONAL USE PERMIT AND PRELIMINARY DESIGN REVIEW TO ALLOW THE CONSTRUCTION AND OPERATION OF AN EXPANDED ELEC- TRICAL DISTRIBUTION SUBSTATION IN CONJUNCTION WITH EXIST- ING SUBSTATION-FAC-I-LITUS;--LOCATED 250 FEET SOUTH OF HIGHWAY I AND 120`FEET EAST OF SHA HILLS ROAD. CASE NO Z CUP 09-79 AND 126 C WHEREAS, the Planning Commission of the City of Palm Desert, California, did hold a duly noticed Public Hearing on December 4, 1979, to consider an application from SOUTHERN CALIFORNIA EDISON CO. for approval of a Conditional Use Permit and preliminary Design Review case to allow the construction and operation of an expanded electrical distribution substation in conjunction with existing substation facilities on approximately .86 acres within the P (Public/Institutional District) zone, located 250 feet south of Highway 111 and 120 feet east of Shadow Hills Road, more particularly described as: APN 625-161-013 WHEREAS, said application has complied with the requirements of the "City of Palm Desert Environmental Quality Procedure Resolution No. 78-32," in that the Director of Environmental Services has determined that the project would not have a significant impact on the environment, and a Negative Declaration has been prepared. WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said Commission did find the following facts and reasons to exist tc justify the granting of said Conditional Use Permit: 1. The proposed location of the conditional use and the conditions under which it will be operated and main- tained will not be detrimental to the public health, safety, or general welfare, or be materially injurious to the properties or improvements in the vicinity. 2. The proposed location of the conditional use is in accord with the objectives of the Zoning Ordinance and the purpose of the district in which the site is lo- cated. 3. The proposed conditional use complies with the goals, objectives, and policies of the City's adopted General Plan. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Palm Desert, Californid, as follows: 1. That the above recitations are true and correct and constitute the findings of the Commission in this case; 2. That the Conditional Use Permit (CUP 09-79) and Preliminary Design RUview (126 C) is hereby granted to the attached conditions. PASSED, 'APPROVED, and ADOPTED at a regular meeting of the Palm Desert Planning Commission, held on this 4th day of December, 1979, by the following vote, to wit: AYES: Berkey, Kryder, Miller, Snyder NOES: None ABtiENT: None ABSTAIN: Nunn WALiLR SNYhtR, C+ia;ru!.ir. 'PPHOVAI. i. The development of the property ;hall conform substantially with Exhibit A (Case No. CUP 09-79) on file with the Department of Environ- mental Services, as modified by the following conditions. 2. Prior to the issuance of a building permit for construction of any uses contemplated by this approval, the applicant shall first complete all the procedural requirements of the City which include, but are not limited to, Design Review, and building permit procedures. 3. Construction of the total development may be done in phases. A. Construction of a portion of said project shall commence within one year from the date of final approval otherwise said approval shall become null, void and of no effect whatsoever. 5. Prior to the issuance of any City permits for the commencement of construction on said project, the applicant shall agree in writing to these Conditions of Approval. 6. The development of the property described herein shall be subject to the restrictions and limitations set forth herein which are in additions to all municipal ordinances and State and Federal Statutes now in force, or which hereafter may be in force. 7. All requirements of the City Fire Marshal shall be met as part of the development of this project. 8. Construction plans shall be submitted for approval to the City Fire Marshal prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 9. Prior to issuance of a building permit for construction of any use contemplated by this approval, the applicant shall first obtain permits and/or clearance from the following agencies: Palm Desert Design Review Board Process City Fire Marshal Evidence of said permit or clearance from the above agencies shall be presented to the Department of Building and Safety at the time of issuance of a building permit for the use contemplated herewith. Special Conditions I. Delete Cedrus Atlantica and replace with Pinus Eldarica. 2. Delete Albizzia Julibrissin and replace with Fraxinus Undei, Fraxinus Modesto, or Rhus Lancea (15 gallon size may be used). 3. Grading and drainage plans shall be submitted to the Design Review Board with final development drawings. 4. The proposed landscaping shall be installed and well maintained in perspectivity. AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has boon received by the Department of Environmental Services. —(A pp leant s Signature CITY OF PALM DESERT STAFF REPORT To: Planning Commission Report on: Conditional Use Permit and Preliminary Design Review Applicant: Southern California Edison Co., 74-000 Highway 111, Palm Desert, CA 92260 Case No(s): CUP 09-79 and 126 C Date: December 4, 1979 I II REQUEST: ,Request for approval of a Conditional Use Permit and Design Review case to allow the construction and operation of an expanded electrical distribution substation in conjunction with existing substation facilities on approximately .86 acres within the P (Public/Institutional District) zone, located 250 feet south of Highway 111 and 120 feet east of Shadovr Hills Road. LOCATIONAL MAP: �E O r1.•_i: ■ 1...11..E uu��u► aarkr_onimn• A. ADJACENT ZONING: North: C-1, S.P. South: R-3 East: PC(4), S.P. West: R-3 B. GENERAL PLAN LAND USE DESIGNATION: Medium Density Residential C. ENVIRONMENTAL ASSESSMENT: pup ®9,79 :r . .1 The Director of Environmental Services has determined that the proposed project will not have a significant adverse impact on the environment and a Negative Declaration has been prepared. STAFF REPORT December 4, 1979 III. DISCUSSION: Page -2- The subject request concerns an existing electrical substation site which is not covered by a City -approved Conditional Use Permit. The applicant indi- cates (in the attached letter) that the purpose of the requested expansion is to keep pace with present and future service demands. The proposed expansion of the facility would involve a temporary transformer installation as the first activity undertaken. Improvements to the site would include additional land- scaping and fencing. The Design Review Board considered the site and landscape design at their November 27, 1979 meeting. With the exception of landscape material substi- tution, they are recommending approval of the Design Review case. IV. STAFF RECOMMENDATION: 7T consideration of the use requested and the recommendation of the Design Review Board, with the justification provided in the draft Resolution: Approve CUP 09-79 and related Design Review Case,No. 126 C, by adopting Planning Commission Resolution No. 553 , subject to conditions. Southern California Edison Company gcE P. o. 8OX Boo 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 November 2, 1979 Honorable Members of the Planning Commission City of Palm Desert 45-275 Prickley Pear Lane Palm Desert, California 92260 Subject: Palm Village Substation Additional Facilities Gentlemen: This letter is submitted to your honorable body in connection with the Southern California Edison Company's application for a Conditional Use Permit to construct, operate and maintain a low profile electric substation in conjunction with existing substation facilities to meet the growing electrical demand of the area. The substation facilities will be located south of Highway 111 approxi- mately 200 feet east of Shadow Hill Drive. The Southern California Edison Company is a regulated public utility subject to the jurisdiction of the California Public Utilities Commission pursuant to the California Constitution and the Public Utilities Code of this state. As a regulated public utility, Edison has a legal obligation to furnish adequate, efficient and reliable service to all members of the public within the City of Palm Desert and throughout its service territory. This charter is based upon the laws of the state and the franchise granted to the Southern California Edison Company by the City of Palm Desert. To fulfill this public service obligation, Edison must continually anticipate the needs of its present and future customers and expand its system, as required, to meet these growing needs. The expansion at the Palm Village Substation site was planned as a result of providing for the needs of the area with minimal impact upon the environment. The load growth in the area is placing an immediate demand upon Edison's system which will require us to install a 10 MVA transformer on the site to help maintain system reliability during the construction period of the permanent facilities. This 10 MVA transformer will be temporary in nature and will be removed by November 15, 1980, the planned operating date of the new facilities. -z- We are hereby requesting a favorable decision on our applica- tion for a Conditional Use Permit for the permanent facilities and approval for the placement of the temporary transformer at the Palm Village site. ' Sincerely, K. O. MARTIN LGPrutsos:rm DEPARTMENT OF FIRE PROTECTION IN COOPERATION WITH THE CAL FORMA DIVISION OF FORESTRY DAVID L. FLAKE COUNTY FIRE WARDEN November 27, 1979 Paul A. Williams Director of Environmental Services City of Palm Desert 45-275 Prickly Pear Lane Palm Desert, Ca. 92260 Re: Case No. CUP 09-79 Dear Mr. Williams, We have no fire protection requirements at this time. David J. Ortegel Fire Marshal DJO:dt P.O. BOX 248 210 WEST SAN JACINTO STREET PERRIS, CALIFORNIA 92370 TELEPHONE (714) 657-3183 p0UNi ESTABLISHED IN 1918 AS A PUBLIL. , _NCY �15i RiGt COACHELLA VALLEY COUNTY WATER DISTRICT POST OFFICE BOX 1058 • COACHELLA, CALIFORNIA 92236 • TELEPHONE (714) 398-2651 DIRECTORS OFFICERS RAYMOND R. RUMMONDS, PRESIDENT LOWELL O. WEEKS, GENERAL MANAGER - CHEF ENGINEER TELLIS CODEKAS, VIOL PRESIDENT BERNARDINE SUrTON, SECRETARY C. J. FROST DENNIS M. HACKETT, AUDITOR WILLIAM S. GARDNER REDWINE AND SHERRILL, ATTORNEYS STEVE D. BU(TON November 27, 1979 File: 0163.11 0421.1 0721.1 Department of Environmental Services City of Palm Desert P. 0. Box 1977 Palm Desert, California 92260 Re: Permit 09-79, Portion of SE 1 Section 21, T5S, RISE Gentlemen: This area is protected from stormwater flows by a system of channels and dikes. This area may be considered safe from stormwater flows except in rare instances. The District will furnish domestic water and sanitation service to said area in accordance with the currently prevailing regulations of this District. This area shall be annexed to Improvement District Nos. 54 & 80 of the Coachella Valley County Water District for sanitation service, Very trygy yours LoweN 0. Weeks General Manager -Chief Engineer cc: Riverside County Dept. of Health 46-209 Oasis Street Indio, California 92201 NDA ITEM NO. C, III-6 DATE November 27, 1979 DESIGN REVIEW BOARD CASE NO. 126 C (CUP 09-79) APPLICANT (AND ADDRESS) So. California Edison Co., Attn: K. Martin (74-100 Hwy 111, Palm Desert, Ca 92260) NATURE OF PROJECT/APPROVAL SOUGHT Preliminary plans to allow expansion and operation of an expanded electrical distribution substation in conjunction with existing substation facilities. LOCATION 250 feet south of Hwy 111 and 120 feet east of Shadow Hills Road. ZONE P (Public/Institutional District) A CUP has also been filed to allow expansion of the existing facilities. Some landscaping will be removed with new lands- caping provided. STAFF ANALYS The Board should review the submitted landscaping plan to determine acceptability for aesthetics and screening from adjacent properties. N i p-� lip CITY OF PALM DESERT DEPARTMENT OF ENVIRONMENTAL SERVICES EXHIBIT NO - ---------------------- CASE NO: �(CtAPCDC! - 5 3 sw s L V l r4 V_, - - " ; ;I 3- /K v 4c5oc 3 3 X V idl,) rn VAf _31 X)I_^4 icelicc-< 0 cAIL7r /,bLe.5 ce,.Icg — — — --------------------- -job _RT PALM DES 'TAL EX41B,T fla. - ------------ CASE toe NO. av j n ti5�d . Auedwo,o uosrp3 eiwo/peo weyjnog aaerwvw vaar xiyxvNi arn[x� ` M r plEta v� to wire I II AVM H 0 1 H m Pt[ l6YPIit lI1 L1 '1lj j OO MR9 ***DESIGN REVIEW BOARD*** DEPARTMENT OF ENVIRONMENTAL SERVICES PLANNING DIVISION Southern California Edison Company Applicant 1 please pint) P. O. Box 800 Attention: L. G. Prutsos (213) 572-4943 Mailing Address Telephone Rosemead, California 91770 City State Zip- Code REQUEST: (Describe specific nature of approval requested) The site will be used for the construction and operation of a low profile electric distribution substation in conjuction with existing substation facilities to meet the growing electrical demand of the area. PROPERTY DESCRIPTION: The property is presently fenced and utilized for electric distributing substations uses. I&I ASSESSOR IS PARCEL NO. 625-@16-013 EXISTING ZONING "P" Zone Property Owner Authorization THE UNDERSIGNED STATES THAT THEY ARE THE OWNER(S) OF THE PROPERTY DESCRIBED HEREIN AND HEREBY GIVE AUTHOR- IZATION FOR THE FILING OF THIS APPLICATION. SOUTHERN CALIF NIA EDI COMPANY 7 by SIGNATURE DATE AGREEMENT ABSOLVING THE CITY OF PALM DESERT OF ALL LIABILITIES RELATIVE TO ANY DEED RESTRICTIONS. I DO BY MY SIGNATURE ON THIS AGREEMENT, ABSOLVE THE CITY OF PALM DESERT OF ALL LIABILITIES REGARDING ANY DEED RES- TRICTIONS THAT MAY BE APPLICABLE TO THE PROPERTY DESCRIBED HEREIN. bbyUTHE CALIFORNIA E C ` 7 N COMPANY / y �' 6�r SIGNATURE DATE Applicants Signature SIGNATURE (FOR STAFF USE ONLY 1 ENVIRONMENTAL STATUS ❑ MINISTERIAL ACT E.A. No, ❑ CATEGORICAL EXEMPTION ❑ NEGATIVE DECLARATION 0 OTHER SON COMPANY ACCEPTED BY 11-6 -- 7 9 DATE CASE No. Wo (!!!,�y REFERENCE CASE N0. 0 1— / 1 The Design Review Board ,( reviews detailed design permit. CATION DEPARTMENT OF ENVIRON- MENTAL SERVICES STAFF process is the method by which the City of Palm Desert and construction plans prior to the issuance of a building DESIGN REVIEW BOARD (ADVISORY) PLANNING COMMISSION (APPROVES OR DENIES PROJECT) 0 DEPARTMENT BUILDING AND �CONSTRUCI SAFETY ION l INTERIOR REMODELS, MINOR ELECTRICAL, MECHANICAL, OR PLUMBING PERMITS ' PROCESSING SCHEDULE: SINGLE-FAMILY HOMES and similar projects require 2-4 working days before they may be submitted to the Building and Safety Division for plan check. MULTI -FAMILY, COMMERCIAL, and other projects that must be reviewed by the D.R.B. Cand Planning Commission usually require 10-20 days. In order to facilitate processing, the applicant or a designated representative should attend the review hearings to answer questions which may arise regarding the project. STAFF USE ONLY: i Date Received Date of ACTOR 'Meeting ACTION c APPLICANT NOTIFIED Staff ORB P.C. C.C. Department of Environmental Services Form 1 C. CITY OF PALM DESERT APPLICATION FORM DESIGN REVIEW BOARD PROCESS Design Review of: Addition of electric distributin facilities to an existing substation. TYPE OF PROJECT Southern California Edison Com an APPLICANT Agreement of compliance to be signed by those applying for review. I hereby acknowledge that I have read and agree, to comply with all the following requirements, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. The development of this project shall conform substantially C to all development plans submitted in behalf of this case, and as revised according to the Design Review Board process. Any minor change requires approval by the Director of Envi- ronmental Services. Any substantial change requires ap- proval by the Design Review Board. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. Landscaping (with irrigation system) shall be installed prior to final inspection and receiving certificate of occupancy. Curb, gutter, curb cuts, and tie-in paving shall be provided along the full frontage of the lot by means of installation prior to final inspection or other provisions as approved by the City Engineer. Construction shall conform to City Stan- dards and all requirements of the City Engineer. South,/e� n California diso� Company by (/J...�. A (/. &Ay (Signat re) -(Date) Department of Environmental Services Form 1 6 � I LO 10 F-� Z ui lu� V � n Z —S - I -a I Z. Ill C Ii 7 7,f LL Z 5 O O to LL 0 20 U O U 9. O � _ ❑ O LSD J F `_ �> w I—_ Z L)_ o u !�J o U GJ CL cl- 0 v O •� �O p1�Z._ -d Q) Lu 1_ } 0IL 11_ �➢OcxLd c1 �51L�t Z� ll.1hi I' I i II �I it i ,1 I;L v� O i 1 ' n�! `l Z' I O W I c U C ir. 6 N W =cj �7ZU2-11 py' O w U C :LL �O Z U W U) N O 0 z 0 w a 0 Y U z Z w 0 W O K a IL a a cn 41 Q C'l w a: w f- a 0 z tN z w cr 0 z O z 0 w CD a p Y U CD z LU 0 w O cr n. a a a U) N W a O W C w r a a i fn z O_ N W m O Z N 0 zIr 3 a 0 w U z W w w LL W x (n CD z 3 a 0 W U Z W W w W K