Loading...
HomeMy WebLinkAbout183C SENIORS' ASSOCIATIONm Ifolur Cmff :!Pm.T75't5� POST OFFICE BOX 1977, PALM DESERT, CALIFORNIA 92261 TELEPHONE (619) 346-0611 September 29, 1983 ARCHITECTURAL REVIEW COMMISSION ACTION CASE NO: 183 C APPLICANT (AND ADDRESS): PALM DESERT SENIORS' ASSOCIATION, INC., MR. HANK CLARK, 73-241 Highway 111, Palm Desert, CA 92260 and JOHN OUTCAULT, ARCHITECT, 74-133 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for the first phase of the senior center. LOCATION: Northwest corner of Catalina and San Pascual. ZONE: R-1, 10,000 Upon reviewing the submitted plans and the presentations by the staff and by the applicant, the architectural review commission approved the final plans for the first phase of the senior center. Date of Action: September 27, 1983 Vote: 5-0 ( An appeal of the above action may be made in writing to the city clerk of the City of Palm Desert within fifteen (15) days of the date of the decision.) STAFF COMMENTS: Please read the attached minutes. F t0 MINUTES PALM DESERT ARCHITECTURAL REVIEW COMMISSION TUESDAY - SEPTEMBER 27, 1983 2:00 P.M. CITY HALL COUNCIL CHAMBER I. The meeting was called to order at 2:00 P.M. after a one hour study session. Members Present: Al Cook Ron Gregory Rick Holden Bernie Leung Charlie Martin Staff Present: Ramon A. Diaz Steve Smith Patricia Armitage On a motion by Commissioner Holden, seconded by Commissioner Cook, the minutes of the September 13, 1983 meeting were approved as written. Motion carried 4-0-1 (Commissioner Martin abstained). H. Commissioner Martin moved and Commissioner Cook seconded to approve the following cases by minute motion: 1. CASE NO: 183 C APPLICANT (AND ADDRESS): PALM DESERT SENIORS' ASSOCIATION, INC., MR. HANK CLARK, 73-241 Highway I11, Palm Desert, CA 92260 and JOHN OUTCAULT, ARCHITECT, 74-133 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for the first phase of the senior center. LOCATION: Northwest corner of Catalina and San Pascual. ZONE: R-1, 10,000 2. CASE NO: 246 MF APPLICANT (AND ADDRESS): HUGH THORSON, 45-278 Deep Canyon, Apt. 106 A, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Approval of a shade structure over parking areas for an apartment complex. LOCATION: North of Sagebrush between Deep Canyon and Shadow Hills Road. ZONE: R-3 3. CASE NO: 864 SA APPLICANT (AND ADDRESS): PALM DESERT TOWN CENTER ASSOCIATES, 3666 Kearny Villa Road, San Diego, CA 92123. NATURE OF PROJECT/APPROVAL SOUGHT: Approval of signage for Riccardo's Caffe. LOCATION: Northeast side of mall building. ZONE: PC (3), S.P. -1- Ad ARCHITECTURAL REVIEW COMMISSION MINUTES SEPTEMBER 27, 1983 4. CASE NO: 863 SA APPLICANT (AND ADDRESS): PALM DESERT TOWN CENTER ASSOCIATES, 3666 Kearny Villa Road, San Diego, CA 92123. NATURE OF PROJECT/APPROVAL SOUGHT: Approval of signage for "PIZZA PALAZZO". LOCATION: Northeast side of the mall building. ZONE: PC (3) S.P. 5. CASE NO: 865 SA APPLICANT (AND ADDRESS): PALM DESERT TOWN CENTER ASSOCIATES, 3666 Kearny Villa Road, San Diego, CA 92123. NATURE OF PROJECT/APPROVAL SOUGHT: Approval of signage for "YELLOW BRICK ROAD". LOCATION: Northeast side of the mall building. ZONE: PC (3), S.P. 6. CASE NO: 856 SA APPLICANT AND ADDRESS: CINEMA 7 THEATRES, 72-860 Highway 111, P.O. Box 3075, Palm Desert, CA 92267 and COMET NEON, 611 Rock Springs Road, Escondido, CA 92025. NATURE OF PROJECT/APPROVAL SOUGHT: Request for approval of the entertainment theatre marquis. LOCATION: Palm Desert Town Center ZONE: PC(3), S.P. The minute motion to approve all of the cases listed above, carried unanimously 5-0. III. CASES: A. Final Drawings: 1. CASE NO: 69 C AMENDMENT APPLICANT (AND ADDRESS): JACK KLOTZ, THE PALM TREE RESTAURANT, 73-520 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Request to install a canopy from the entry to the street. LOCATION: 73-520 El Paseo ZONE: C-1, S.P. Mr. Smith indicated that the commission was concerned with the possible liability of having the posts so close to the curb.They had recommended at the study session that they be set back 18" to 24" from the curb. -2- 1W AGENDA ITEM NO: III-A-2 DATE: September 27, 1983 ARCHITECTURAL COMMISSION CASE NO: 183 C APPLICANT (AND ADDRESS): PALM DESERT SENIORS' ASSOCIATION, INC., MR. HANK CLARK, 73-241 Highway 111, Palm Desert, CA 92260 and JOHN OUTCAULT, ARCHITECT, 74-133 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for the first phase of the senior center. LOCATION: Northwest corner of Catalina and San Pascual. ZONE: R-1, 10,000 DISCUSSION: The commission reviewed and approved the preliminary plans for the senior center at its June 14, 1983 meeting. There were no special conditions imposed at the time of preliminary approval. The final plans are in substantial conformity with those plans given preliminary approval. RECOMMENDATION: That the commission review the final working drawings for Case No. 183 C, the Palm Desert Seniors' Association to determine acceptability. /pa or , c AGENDA ITEM NO: III-B-2 DATE: June 14, 1983 ARCHITECTURAL COMMISSION CASE NO: 183 C APPLICANT (AND ADDRESS): PALM DESERT SENIORS' ASSOCIATION, INC., Mr. Hank Clark, 73-241 Highway 111, Palm Desert, CA 92260 and JOHN OUTCAULT, ARCHITECT, 74-133 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary approval of plans for the first phase of the senior center. LOCATION: Northwest corner of Catalina and San Pascual. ZONE: R-1, 10,000 BACKGROUND: The city owns approximately 3.07 acres at the northwest corner of San Pascual and Catalina and said land is to be leased to the Palm Desert Seniors' Association, Inc. at a nominal fee. The Palm Desert Seniors' Association filed an application for a conditional use permit and a precise plan and a hearing was held by the planning commission on June 7, 1983, at which time both applications were approved. SITE PLAN: The plan for the first phase calls for construction of an "L" shaped 9400 square foot building oriented to the San Pascual -Catalina Way intersection. The parking area for 49 cars is located adjacent to both streets with an access from each street. The site plan indicates areas of future expansion and future parking as well as a bowling green at the northwest corner of the site. ELEVATIONS: A single story 17' high structure is proposed. The roof is to be clay tile. Walls will be almond pink cement plaster. Large overhangs provide solar protection. The overhangs are supported by slumpblock masonry columns. The wood fascia is to be oxford brown. This color will be carried over to the entry cover. The elevations proposed are acceptable to staff. LANDSCAPING: The landscape plan calls for a grassed area at the intersection. Adjacent to the parking lots it is proposed to plant a five gallon fancy natal plum to provide a 3-5 foot hedge. Ground cover in front of the hedge and elsewhere on the site is to be gazania. Major trees to be planted include carob, evergreen pear and Washingtonia Filifera. The commission should review the landscape plan to determine acceptability. RECOMMENDATION: That Case No. 183 C for preliminary approval of plans for a senior citizen facility at the northwest corner of San Pascual and Catalina be approved subject to the following: 1. Construction plans shall be submitted for approval to the city fire marshal prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 2. Final construction drawings, including a final landscaping, grading, lighting, amenities, trash storage, walkway layout, irrigation plans and sign program shall be submitted to the architectural commission. No final inspection or occupancy permit shall be given by the department of environmental services to this project until the aforementioned approved plans and construction shall have been completed. /pa r SAN PASCUAL FUTURE PARK ING 0 I I SCALE: I°=40' AVENUE PARKING SERVICE ` FUTURE FIRST PHASE T.'� II EXPANSION BUILDING ' I i FUTUREI COURTYARD `I BLDG. I �• i I I - I I ' ' FUTURE BUILDING I IFBLDG. -_1 L_-_--!_j I i -- BOWLING GREEN Sit 15� BUS \OAIDING I i - Q 3 BARKING_- Z i - J - Q V -- I I I I I FUTURE i PARKING I 1 I I I I i,..MIi��i►�,�':9 - EL YQ)MRE ***DESIGN REVIEW BOARD*** DEPARTMENT OF ENVIRONMENTAL SERVICES PLANNING DIV1 ION .P411w&/l 9FS' ,R.T Ge1J102S a55�SG. City Gi D CS Ems", 0. EnI, 14, q2'z(v 0 3410 OloA3 0 Telephone REQUEST: (Describe specific nature of approval requested) "DC-9160 2SV(eW APP120VA4.. — ?WZ- LrMINS+ze!, PROPERTY DESCRIPTION: Avi2tzo5e. 3,o-13 AC-IZES AT NO2TH- WE$ i CO�Z"E2 pr- C'ATd�LI N A ANO SA" PASCUAU AV C PA(,M IVf_f f Iz s ASSESSOR IS PARCEL NO. EXISTING ZONING Property Owner Authorization yNE UNDERSIGNED STATES THAT THEY ARE THE OWNER (S) OF THE PROPERTY DESCRIBED HEREIN AND HEREBY GIVE AUTHOR- IZATION FOR THE FILING OF THIS APPLICATION. 3 IGNATURE DATE AGREEMENT ABSOLVING THE CITY OF PALM D RT OF ALL LIABILITIES RELATIVE TO ANY DEED RESTRICTIONS. - I DO BY MY SIGNATURE ON TH) AGREEMENT, ABSOLVE THE CITY OF PALM DESERT OF ALL LIABILITIES REGARDING ANY DEED RES- TRICTIONS THAT MAY BE APPLICABLE TO THE PROPERTY DESCRIBED HEREIN, 0 6 SI NATURE OAT Applicants Signature (FORSTAFFUSE ONLY) ENVIRONMENTAL STATUS ❑ MINISTERIAL ACT E.A. No. [] CATEGORICAL EXEMPTION ❑ NEGATIVE DECLARATION ❑ OTHER T :�C-N(0PZ ASSC• (NC. SIGNATURE srzc(-II7tt-t 3- -7-E3 DATE ACCEPTED BY CASE No. REFERENCE CASE NO. .. V. CITY OF PALM DESERT APPLICATION FORM DESIGN REVIEW BOARD PROCESS Design Review of: EWIO2 C(T1zrQS CEQ S2 TYPE OF PROJECT JO OU 1-OAUL.T0 Ail" T r-012. Ow l B ('- APPLICANT)i Agreement of compliance to be signed by those applying for review. I hereby acknowledge that I have read and agree, to comply with all the following requirements, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. The development of this project shall conform substantially to all development plans submitted in behalf of this case, and as revised according to the Design Review Board process. Any minor change requires approval by the Director of Envi- ronmental Services. Any substantial change requires ap- proval by the Design Review Board. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. Landscaping (with irrigation system) shall be installed prior to final inspection and receiving certificate of occupancy. .Curb, gutter, curb cuts, and tie-in paving shall be provided along the full frontage of the lot by means of installation prior to final inspection or other provisions as approved by the City Engineer. Construction shall conform to City Stan- dards and all requirements of the City Engineer. a 3-7-8 3 / (Signature) (Date) Department of Environmental Services Form 1 aoo(:D (Do 0 (A H v 1 v' m T a �0 D� �z > mp < nA D a l s�C D Z ?C Cl� LA T ail Y C) r N z o z r�, ,- ut �► -� �� �3 � m Fp >� L 3 -{ m -fpl- uy IT) (r� L � 0 rl UI � z -4 Is Z /♦IiryYry��,, f::5 Ll t-1 "`JJJ L) f,! T < h t U >rl -_= U z SA N PAS C J A L S 7. - 0 o 4"- 04N-'w4 cn y n m Z z K co p o C1� m ( — — LIQ DRAWING TITLE �CHEMATIG LAt tD S JOHN F. OUTCAULT — ARCHITECT A. I. A. A CORPORATION 74-133 EL PASEO, SUITE 11 Tele. 714-346-0630 PALM DESERT, CALIFORNIA 92260 CALIF. STATE LIC. NO. C2452-----_--------- REVISIONS STRUCTURAL ELECTRICAL REVDATE DESCRIPTION BY PROJECT PROPOSED JENIO c 1=f� 1 iff) _JCS PL:,L M D ES PLUMBING MECHANICAL DRAWN CHECKED SQUARE FOOTAGE Z �'o� Q��NiOW,7 ��-,-tomes �=_1CS W`1 dd 30ViOOJ 3uvnoS 03N33HO NMV8C, ' Ali r W W a J D N1 2 AVM d z i:dll lW1,11ITM V z w I m I W z J o J a D Z + _z J II m aI Y f 1 W u � � I -- I z d 1 -cl :3 p LL W ` C� z O m I W C9 oe 1 I D " a I I i O CL W U > O W 1 J � W 11 \co cx ce W C1 ~ a X v W Vf