HomeMy WebLinkAbout208C CACTUS FLOWER SHOESf� C
C�t:(]�zf OO 1p:E�nnm®�C�73o�c
POST OFFICE BOX 1977, PALM DESERT, CALIFORNIA 92261
TELEPHONE (619) 346-0611
December 16, 1983
ARCHITECTURAL REVIEW COMMISSION ACTION
CASE NO: 208 C
APPLICANT (AND ADDRESS): CACTUS FLOWER SHOES, 73-880 El Paseo, Palm Desert,
CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of the awning with signage.
LOCATION: North side of El Paseo, east of Bank of America
ZONE: C-1, S.P.
Upon reviewing the submitted plans and the presentations by the staff and by the
applicant, the architectural review commission approved the awning and signage as
submitted.
Date of Action: December 13, 1983
Vote: 5-0
(An appeal of the above action may be made in writing to the city clerk of the City of
Palm Desert within fifteen (15) days of the date of the decision.)
STAFF COMMENTS: Please read the attached minutes.
.0 . N
I.
II.
MINUTES
PALM DESERT ARCHITECTURAL REVIEW COMMISSION
TUESDAY - DECEMBER 13, 1983
2:00 P.M. ADMINISTRATION CONFERENCE ROOM
73-510 FRED WARING DRIVE
The meeting was called to order at 2:05 after an hour and a half study session.
Members Present:
Staff Present:
Al Cook
Ron Gregory
Rick Holden
Bernie Leung
Charlie Martin
Ramon A. Diaz
Steve Smith
Patricia Armitage
Upon motion by Commissioner Cook, seconded by Commissioner Holden, the minutes
of the November 22, 1983 meeting were approved as written.
Motion carried 3-0-2 (Commissioners Leung and Gregory abstained).
Upon motion by Commissioner Holden, seconded by Commissioner Cook, the
following cases were approved by minute motion:
1. CASE NO: 243 MF
APPLICANT (AND ADDRESS): ONE QUAIL PLACE, P.O. Box 6000-333,
Palm Desert, CA 92261.
NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for a
384 unit residential development.
LOCATION: North side of Fred Waring Drive, south of Parkview.
ZONE: AHD PR-22 S.P.
The final plans for this case were approved subject to the following three
conditions:
No Eucalyptus trees to be planted within 20 feet of buildings.
2. No carrot woods or Italian alders to be used.
Chairman Gregory requested that it be noted that the plan appears to be
over -planted.
0 CASE NO: 208 C
APPLICANT (AND ADDRESS): CACTUS FLOWER SHOES, 73-880 El Paseo,
Palm Desert, CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of the awning with
signage.
LOCATION: North side of El Paseo, east of Bank of America
ZONE: C-1, S.P.
The awning and signage were approved as submitted.
-1-
ARCHITECTURAL REVIEW COMMISSION MINUTES
DECEMBER 13, 1983
3. CASE NO: 240 MF
APPLICANT (AND ADDRESS): BILL ROSSWORN, 73-941 Highway 111,
Suite 5, Palm Desert, CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for a
triplex.
LOCATION: North side of Santa Rosa Way, 2nd lot east of San Pascual
Avenue.
ZONE: R-2
The final plans were approved as submitted.
The motion on all of the cases listed above carried unanimously 5-0
Ill. CASES:
A. Final Drawings:
1. CASE NO: 207 C
APPLICANT (AND ADDRESS): PALMS TO PINES DRAPERY AND
CANVAS, Pinyon Pine, Box 69, Mountain Center, CA 92361 and
ROMMITTIS, 73-640 El Paseo, Palm Desert, CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Request to install a
retractable canvas awning with signage.
LOCATION: Corner of El Paseo and Larkspur Lane.
ZONE: C-1, S.P.
Mr. Smith indicated that this was an application to install a retractable
canvas awning with signage for Rommittis Restaurant.
The commissioners were concerned with the location of the awning and
recommended that it be set a foot or two north of the south fascia in order
to hide the exposed end.
Mrs. Brenda Prenten of Rommittis was present and distributed pictures of
the location where the awning would be placed.
Commissioner Holden did not approve of the colors used on the awning, if
the commission does not allow red, green and white signs the same should
hold for the awning.
Upon motion by Commissioner Cook, seconded by Commissioner Holden, the
awning and valance sign were approved, subject to the awning being moved
twelve to eighteen inches north of the south fascia.
Motion carried 4-1, Commissioner Holden voting nay.
2. CASE NO: 893 SA
APPLICANT (AND ADDRESS): SUNSHINE DO IT YOURSELF CENTER, 82-
025 Highway 111, Indio, CA 92201.
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of two business
identification signs.
- 2 -
(619)9)
December 1, 1983
Awning Specification Sheet
CLIENT: Cactus Flower Shoes
ADDRESS: 73-880 E1 Paseo, Palm Desert, Ca. 92260
BUSINESS OWNER: Velma Hagar
PROPERTY OWNER: R.V. Corporation, (D.B. Carmel)
Ms. Hagar has requested our company design, specify, procure
and install an awning on the front of her store. Attached is a
line drawing showing the existing building features and the
proposed awning in skeletal fashion.
Frame Construction: Awning will be made of 1"O.D., 18 ga. gal-
vanized tubing.
Awning Fabric: Fabric used on awning is of the Warema collection,
specifically designed for use on exterior awning systems. Fabric
has a five year prorated warranty.
Color -Awning: Light Gray (Suntec-Warema 6400)
Trim -Color: A light pink trim webbing will follow the valance
design with width of one half to three quarters of an inch
Lettering: CACTUS FLOWER SHOES will be centered on the width of
the awning. The lettering will be in a 'hand script' style.
(see attached sheet) On the right of the lettering will be a
logo of a cactus in bloom, planted in a wooden Dutch shoe.
Lettering heigth will be 12 inches. Logo will be approx. 14-16
inches tall. Lettering color will be pink. Logo will be primar-
ily green and pink.
Attachment to Building: Awning will attach to building with a
series of "Jiffy" style clips and appropriate wood screws.
Projection Beyond Existing Structure: The awning will project
a minimal amount beyond the existing protruding beam. This
projection is to provide clearance of the beams and provide
the most visually appealing curvature of the awning. The total
projection beyond the existing beam is estimated to be 2-3 inches.
If there is any questions concerning this request, a staff
member will be available to answer any questions and discuss
any modifications or changes.
Respectfully ours,
6Mark A. Beatty'
WINDOW ENERGY DESIGN CONCEPTS
oil
--' �' �-,
I: �zi 11
k
CiTY PALM DESERT
Q'IlTMENTOF
SERVICES
)R VEII) Lsl": El C.C. RES. No.
1-1 P.C. RES. NO.
STAFF LETTFR
fiala R-B. ACTION FORM
varo
��
UAUTUS.FLOWER SHOES
73880 E1 Paseo, Palm Desef, Ca,
PORTALS Companyken 11-19-83
VELMA HAGAR
Owner
73-880 El Paseo I Mini Mall
Palm Desert, CA 92260 1346-6223
Approx. Scale 3/8" = 1'
DRAWING OF EXISTING STRUCTUAL
DETAILS OF BUILDING
Portals 345-1663
Window Energy Design Concepts
CITY OF FALM DESERT
REAMER'S RECERY 7 713
RECEIVED OF:
DATE /�2-1 -93 AMOUNT i
I
RER
BY:
I ACCOUNT \NO. II AMOUNT I
CHECKS ACCEPTED SUBJECT TO BANK CLEARANCE
AGENDA ITEM NO: III -A 7
DATE: December 13, 1983
ARCHITECTURAL COMMISSION
CASE NO: 208 C
APPLICANT (AND ADDRESS): CACTUS FLOWER SHOES, 73-880 El Paseo, Palm Desert,
CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of the awning with signage.
LOCATION: North side of El Paseo, east of Bank of America
ZONE: C-1, S.P.
BACKGROUND:
The applicant is proposing to install an awning with valance over the existing fascia and
exposed wood beams. The awning is to be light gray in color with a light pink trim along
the valance. The awning will protrude a minimal amount beyond the existing beams.
The signage "Cactus Flower Shoes", is to be centered on the awning in pink script (12"
high letters). On the right of the sign will be a logo 14-16" in height of a cactus in bloom,
planted in a wooden dutch shoe, green and pink in color.
The business has approximately 16 feet of frontage adjacent to El Paseo with an existing 4
square foot sign. The signage proposed is well below that which would be permitted.
Considering that the awning will cover the hanging redwood sign it will likely be removed.
RECOMMENDATION:
That the commission review the proposal to install an awning with sign at 73-880 El
Paseo for Cactus Flower Shoes, Case No. 208 C to determine acceptability.
/pa
•:fy •w ._ �J yam.. hy, -'.
n
WDecember1, ` 1983 N 7 ?.Awning Specification Sheet
CLIENT.:- --'Cactus Flower Shoes
ADDRESS: 73-880 El Paseo, Palm Desert, Ca. 92260
PUSINESS OWNER: Velma Hagar
PROPERTY OWNER: R.V. Corporation, (D.B. Carmel)
Ms. Hagar has requested our company design, specify, procure
and install an awning on the front of her store.; -:.Attached is a
-line•drawing.showing the existing building features,,and the
Proposed -awning in skeletal fashion.
yi Frame Construction:. Awning willbemade of 1"
vanized. tubing. O.D., 18 ga. gal -
Awning -Fabric: Fabric used.on awning is of the Warema collection,
,_specifically designed for use. on exterior awning systems. Fabric
has'ai!five year prorated warranty..
Color -Awning: Light. Gray (Suntec-Warema 6400)
Trim -Color: A light pink trim webbing will follow the valance
design with width of one half to three quarters of an inch
Lettering: CACTUS FLOWER SHOES will be centered on the width of
the awning: The lettering will be in a 'hand script' style.
(see attached sheet) On the right of the lettering will be a
logo of a cactus in bloom, planted in a wooden Dutch shoe.
Lettering heigth will be 12 inches. Logo will be approx. 14-16
inches tall. Lettering color will be pink. Logo will be primar-
ily green and pink.
Attachment to Building: Awning will attach to building with a
series of "Jiffy" style clips and appropriate wood screws.
Pro,iection Beyo% Existing Structure: The awning will project
a minimal amount beyond the existing protruding beam. This
projection is to provide clearance of the beams and provide
the most visually appealing curvature of the awning. The total
projection beyond the existing beam is estimated to be 2-3 inches.
If there is any questions concerning this request, a staff
member will be available to answer any questions and discuss
any modifications or changes.
Respectfully yours,
.rk A. Beatt�f� .
�� WINDOW ENERGY DESIGN CONCEPTS
Window Energy Design Concepts
CACTUS -FLOWER SHOES
73880 E1 Paseo, Palm Desert, Ca.
Taken 11-19-83
PORTALS Company
VELMA HAGAR
Owner
73-660 El Paseo /Mini Mall
A
Palm Desert, CA 92260 1346.6223
D" 1' 11 3, 'r
Approx. Scale 3/8" = 1'
DRAWING OF EXISTING STRUCTUAL
DETAILS OF BUILDING
12'.
1rtal16191345-7 3
Iq
Window Energy Design Concepts
73 680
G
OPEN
r2/g3
CITY F PALM BESER POIRRO 1�
4a 273 PI l i k l y I" I I Lane, Fito G}e"f C&2=60
Applicont (Pima" print)
Mailing Address releonone
Gty State ZIP -Coda
REQUEST' (D"Wtbe speclflc nature of approval requested I.
ASSESSOR'S PARCEL NO.
EXISTING ZONING
Property Omer AutnarRation The undersigned states tflat trey are ties owter (a) of no property described nersin and hereby give outhw-
imtlon for the nnng at role apw+edtlas .
Signature Date
Agrownem absolving tree Clty of Palm Desert (if all Ileblutles native to any dead restrictions.
DO 9Y MY SIGNATURE ON TNIS AGREEMENT, Absolve the City at Palm Dessit of all Itabltitles regarding any deed reenatfons
that may be applicable to ire property desarlbed Ilereki.
Applicants Signature
FOR STAFF USE ONLY) Etivirontttental Status
❑ Ministerial Ale
❑ Categorical EsemM tw
❑ Negative Declaration
❑ Omer
Signature Date
Signature Date
Accepted by,
E.A. No. XH
ad
Reference Ca" No.
�v
J
CITY OF PALM DESERT
APPLICATION FORM
DESIGN REVIEW BOARD PROCESS
Design Review Of: CASE NO.
(Type of Project
(Applicant)
Agreement of compliance to be signed by those applying for review.
I hereby acknowledge that I have read and agree, to comply with
all the following requirements, and understand that the Depart-
ment of Building and Safety will not issue a building permit or
allow occupancy on the use permitted until this signed confirma-
tion has been received by the Department of Environmental Services.
The development of this project shall conform substantially to all
development plans 'submitted in behalf of this case, and as revised
according to the Design Review Board process. Any minor change
requires approval by the Director of Environmental Services. Any
substantial change requires approval by the Design Review Board.
All requirements of any law, ordinance, or regulation of the State,
City, and any other applicable government entity shall be complied
with as part of the development process.
This approval is applicable, subject to the development of this
project, commencing within one year from approval date and being
promptly completed.
Landscaping (with irrigation system) shall be installed prior to
final inspection and receiving certificate of occupancy.
Curb, gutter, curb cuts, and tie-in paving shall be provided along
the full frontage of the lot by means of installation prior to
final inspection or other provisions as approved by the City
Engineer. Construction shall conform to City Standards and all
requirements of the City Engineer.
All new and existing electrical distribution lines, telephone,
cable antenna television, and similar service wires or cables,
which are adjacent to and provide service to the property being
developed shall be installed underground as a part of development
from the nearest existing pole not on the property being developed
as required by Municipal Code.
Signature Date
Department of Environmental Services Form la