Loading...
HomeMy WebLinkAbout217C WARREN HICKEY (HALE'S)�i`:- �.. _ - �. �.� _._ . . :� �, .. f�.�ti Perry. �`?- s 1; %n 1 ti.4 � CITY EmvpZCn�4dl Nl f•_ ' s v �i'= s e ❑ C.C. RES- M- Sorr"om ❑ P.C. kES. Pi9._ STAFF LETTER k_0. AMON FORM '. w DoW of THIS APPROVAL - ix lit A (U$alr off 1pmz� =C:N=®nyav 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA 92260 TELEPHONE (619) 346-0611 FEBRUARY 28, 1984 ARCHITECTURAL REVIEW COMMISSION ACTION CASE NO: 217 C APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas awning on business front. LOCATION: 73-920 El Paseo. ZONE: C-1, S.P. Upon reviewing the submitted plans and the presentations by the staff and by the applicant, the architectural review commission moved to approve the canvas awning on the condition that there be a skirt on each end. Date of Action: February 28, 1984 Vote: 4-0 (An appeal of the above action may be made in writing to the city clerk of the City of Palm Desert within fifteen (15) days of the date of the decision.) STAFF COMMENTS: Minutes attached. P PALM DESERT ARCHITECTURAL REVIEW COMMISSION FEBRUARY 28, 1984 A monument sign was suggested, but staff explained that this may create problems with traffic. Mr. Beiser indicated that because the sign was on their own building, he thought the sign would be acceptable. Motion by Commissioner Cook, second by Chairman Gregory to approve the additional signage at Cinema 7. Vote was 2-2. (Commissioners Holden and Leung voting against it.) Commissioner Cook withdrew his motion and Chairman Gregory his second. Mr. Smith recommended that a decision on the case be deferred to the next meeting when all members of the commission are present. Motion by Commissioner Cook, second by Chairman Gregory to defer action on this case to the meeting of March 13, 1984. Carried unanimously 4-0. 4. CASE NO: 217 C APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas awning on business front. LOCATION: 73-920 El Paseo. ZONE: C-1, S.P. Mr. Smith explained tha�,xhe, applicant wishes to install a 31 inch high awning across the front of Nit building housing Hale's Men's Wear and Richard Dunskin Galleries. The,* 'wning would extend the full width between the brick columns. The color"Wodd,be rust with brown vertical trim and sand colored lettering. Motion by Commissioner Cook, second by'I^or�hmissioner Holden to approve the canvas awning on the condition that there be a skirt on each end. Motion carried unanimously 4-0. 5• CASE NO: 204 C APPLICANT (AND ADDRESS): RUSSELL AND KOENEN TRUST, P.O. Box 2056, Palm Desert, CA 92261. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for a 7830 square foot multi -tenant industrial building. LOCATION: East side of Beacon Hill in Palm Desert Business Park. ZONE: S.I. Mr. Smith highlighted the salient facts from the staff report and indicated that the only concern staff has at the present time involves the roof -mounted equipment. There is some confusion as to where the evaporative coolers and air conditioners are to be located. Commissioner Cook indicated that the air conditioners and evaporative coolers should be placed as they are on the architectural plans. -4- AGENDA ITEM NO: III-A-8 DATE: FEBRUARY 28, 1984 ARCHITECTURAL COMMISSION CASE NO: 217 C APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas awning on business front. LOCATION: 73-920 El Paseo. ZONE: C-1, S.P. BACKGROUND: The applicant wishes to install a 31 inch high awning across the front of the building which presently houses Hale's Men's Wear and Richard Dunskin Galleries. The awning is to extend the full width between the brick columns. The awning is to be brick color (rust) and will have brown vertical trim. Sand colored lettering (6" - 8" high) is proposed for each of the businesses. The size of the signs will continue to conform to code limits. The awning is anchored with Y: inch pipe at the bottom to prevent movement due to wind. RECOMMENDATION: That the commission review plans for an awning at 73-970 El Paseo, Case No. 217 C and determine acceptability. 74 / 4� 11 AhdWi�P � t LJ 73 9' E(L 'B12.IC{L c�Vz.� T� cet.I12d5 M nnOV� , sy� 9 C�07t\/7 OF PALH BESEE 4 ,43 27w Alef, 0y fur Lauose Peom DiwisP4, C &92260 \iftw DESIGN REVIEW BOARE �;, 2v �! 1g3VL-2�73 Moiling Address _ elepnone REOUEST� ( Describe specific nature of approval requested I. c PROPERTY DESCRIPTION: O O ASSESSOR'S PARCEL NO. EXISTING ZONING C 1 e /—� Jti Property Owner Authorizatlon The unasreigned states that they are the osmer is) of the property described herein and hereby give author - motion for the tlling of this application. ement absolving the Clty, of Palm Dees" of ail I,abllihas mianw to any deed restrictions. I DO SY MY SIGNATURE ON THIS AGREEME •Abwtw the City of Palm Desert of all liabilities regarding any deed restrictions /titat/rdy be applicable to the property described herein. Applicants Signature Signature :OR STAFF USE ONLY) Environmental Status ❑ Ministerial Act E.A. No. ❑ Categorical Exemption ❑ Negative Declaration ❑ Other /i2/ Det Date Accepted by: (CASES UV�a v iJ1 Reference Case No cw,w..a.na de CITY OF PALM DESERT APPLICATION FORM DESIGN REVIEW BOARD PROCESS Design Review Of: CASE NO. (Type of Project) (Applicant) Agreement of compliance to be signed by those applying for review. I hereby acknowledge that I have read and agree, to comply with all the following requirements, and understand that the Depart- ment of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirma- tion has been received by the Department of Environmental Services. The development of this project shall conform substantially to all development plans submitted in behalf of this case, and as revised according to the Design Review Board process. Any minor change requires approval by the Director of Environmental Services. Any substantial change requires approval by the Design Review Board. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. Landscaping (with irrigation system) shall be installed prior to final inspection and receiving certificate of occupancy. Curb, gutter, curb cuts, and tie-in paving shall be provided along the full frontage of the lot by means of installation prior to final inspection or other provisions as approved by the City Engineer. Construction shall conform to City Standards and all requirements of the City Engineer. All new and existing electrical distribution lines, telephone, cable antenna television, and similar service wires or cables, which are adjacent to and provide service to the property being developed shall be installed underground as a part of development from the nearest existing pole not on the property being developed as required by Municipal Code. Signature Date Department of Environmental Services Form la j PALM DESERT PROPERTY OWNERS ASSOCIATION 73-833 EL PASEO PALM DESERT, CALIFORNIA 92260 TELEPHONE 346-2804 A Non -Profit Corporation 15 February .1984 Hale's 73-920 E1 Paseo Palm Desert, Ca. 92260 Gentlemen: This -is to- inform you that your -plans ---for an -awning to be added to your store front have been approved by the Architectural Committee. 'Very /truly yours, Kay 5helt Office Manager