HomeMy WebLinkAbout217C WARREN HICKEY (HALE'S)�i`:-
�.. _
- �. �.�
_._ . .
:�
�, ..
f�.�ti Perry. �`?-
s
1; %n 1 ti.4 �
CITY
EmvpZCn�4dl Nl f•_ ' s v �i'= s
e ❑ C.C. RES- M-
Sorr"om ❑ P.C. kES. Pi9._
STAFF LETTER
k_0. AMON FORM '.
w DoW
of THIS APPROVAL -
ix
lit
A
(U$alr off 1pmz� =C:N=®nyav
73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA 92260
TELEPHONE (619) 346-0611
FEBRUARY 28, 1984
ARCHITECTURAL REVIEW COMMISSION ACTION
CASE NO: 217 C
APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo, Palm Desert, CA
92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas awning on
business front.
LOCATION: 73-920 El Paseo.
ZONE: C-1, S.P.
Upon reviewing the submitted plans and the presentations by the staff and by the
applicant, the architectural review commission moved to approve the canvas awning on
the condition that there be a skirt on each end.
Date of Action: February 28, 1984
Vote: 4-0
(An appeal of the above action may be made in writing to the city clerk of the City of
Palm Desert within fifteen (15) days of the date of the decision.)
STAFF COMMENTS: Minutes attached.
P
PALM DESERT ARCHITECTURAL REVIEW COMMISSION
FEBRUARY 28, 1984
A monument sign was suggested, but staff explained that this may create
problems with traffic.
Mr. Beiser indicated that because the sign was on their own building, he
thought the sign would be acceptable.
Motion by Commissioner Cook, second by Chairman Gregory to approve
the additional signage at Cinema 7. Vote was 2-2. (Commissioners
Holden and Leung voting against it.)
Commissioner Cook withdrew his motion and Chairman Gregory his
second.
Mr. Smith recommended that a decision on the case be deferred to the
next meeting when all members of the commission are present.
Motion by Commissioner Cook, second by Chairman Gregory to defer
action on this case to the meeting of March 13, 1984. Carried
unanimously 4-0.
4. CASE NO: 217 C
APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo,
Palm Desert, CA 92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas
awning on business front.
LOCATION: 73-920 El Paseo.
ZONE: C-1, S.P.
Mr. Smith explained tha�,xhe, applicant wishes to install a 31 inch high
awning across the front of Nit building housing Hale's Men's Wear and
Richard Dunskin Galleries. The,* 'wning would extend the full width
between the brick columns. The color"Wodd,be rust with brown vertical
trim and sand colored lettering.
Motion by Commissioner Cook, second by'I^or�hmissioner Holden to
approve the canvas awning on the condition that there be a skirt on each
end. Motion carried unanimously 4-0.
5• CASE NO: 204 C
APPLICANT (AND ADDRESS): RUSSELL AND KOENEN TRUST, P.O.
Box 2056, Palm Desert, CA 92261.
NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans
for a 7830 square foot multi -tenant industrial building.
LOCATION: East side of Beacon Hill in Palm Desert Business Park.
ZONE: S.I.
Mr. Smith highlighted the salient facts from the staff report and
indicated that the only concern staff has at the present time involves the
roof -mounted equipment. There is some confusion as to where the
evaporative coolers and air conditioners are to be located.
Commissioner Cook indicated that the air conditioners and evaporative
coolers should be placed as they are on the architectural plans.
-4-
AGENDA ITEM NO: III-A-8
DATE: FEBRUARY 28, 1984
ARCHITECTURAL COMMISSION
CASE NO: 217 C
APPLICANT (AND ADDRESS): WARREN HICKEY, 73-920 El Paseo, Palm Desert, CA
92260.
NATURE OF PROJECT/APPROVAL SOUGHT: Request to install canvas awning on
business front.
LOCATION: 73-920 El Paseo.
ZONE: C-1, S.P.
BACKGROUND:
The applicant wishes to install a 31 inch high awning across the front of the building which
presently houses Hale's Men's Wear and Richard Dunskin Galleries. The awning is to
extend the full width between the brick columns.
The awning is to be brick color (rust) and will have brown vertical trim. Sand colored
lettering (6" - 8" high) is proposed for each of the businesses. The size of the signs will
continue to conform to code limits. The awning is anchored with Y: inch pipe at the
bottom to prevent movement due to wind.
RECOMMENDATION:
That the commission review plans for an awning at 73-970 El Paseo, Case No. 217 C and
determine acceptability.
74 / 4� 11
AhdWi�P �
t
LJ
73 9' E(L
'B12.IC{L c�Vz.� T� cet.I12d5
M nnOV�
, sy�
9
C�07t\/7 OF PALH BESEE 4
,43 27w Alef, 0y fur Lauose Peom DiwisP4, C &92260
\iftw DESIGN REVIEW BOARE
�;, 2v �! 1g3VL-2�73
Moiling Address _ elepnone
REOUEST� ( Describe specific nature of approval requested I.
c
PROPERTY DESCRIPTION:
O O
ASSESSOR'S PARCEL NO.
EXISTING ZONING
C
1 e /—� Jti
Property Owner Authorizatlon The unasreigned states that they are the osmer is) of the property described herein and hereby give author -
motion for the tlling of this application.
ement absolving the Clty, of Palm Dees" of ail I,abllihas mianw to any deed restrictions.
I DO SY MY SIGNATURE ON THIS AGREEME •Abwtw the City of Palm Desert of all liabilities regarding any deed restrictions
/titat/rdy be applicable to the property described herein.
Applicants Signature
Signature
:OR STAFF USE ONLY) Environmental Status
❑ Ministerial Act E.A. No.
❑ Categorical Exemption
❑ Negative Declaration
❑ Other
/i2/
Det
Date
Accepted by:
(CASES UV�a v iJ1
Reference Case No
cw,w..a.na
de
CITY OF PALM DESERT
APPLICATION FORM
DESIGN REVIEW BOARD PROCESS
Design Review Of: CASE NO.
(Type of Project)
(Applicant)
Agreement of compliance to be signed by those applying for review.
I hereby acknowledge that I have read and agree, to comply with
all the following requirements, and understand that the Depart-
ment of Building and Safety will not issue a building permit or
allow occupancy on the use permitted until this signed confirma-
tion has been received by the Department of Environmental Services.
The development of this project shall conform substantially to all
development plans submitted in behalf of this case, and as revised
according to the Design Review Board process. Any minor change
requires approval by the Director of Environmental Services. Any
substantial change requires approval by the Design Review Board.
All requirements of any law, ordinance, or regulation of the State,
City, and any other applicable government entity shall be complied
with as part of the development process.
This approval is applicable, subject to the development of this
project, commencing within one year from approval date and being
promptly completed.
Landscaping (with irrigation system) shall be installed prior to
final inspection and receiving certificate of occupancy.
Curb, gutter, curb cuts, and tie-in paving shall be provided along
the full frontage of the lot by means of installation prior to
final inspection or other provisions as approved by the City
Engineer. Construction shall conform to City Standards and all
requirements of the City Engineer.
All new and existing electrical distribution lines, telephone,
cable antenna television, and similar service wires or cables,
which are adjacent to and provide service to the property being
developed shall be installed underground as a part of development
from the nearest existing pole not on the property being developed
as required by Municipal Code.
Signature Date
Department of Environmental Services Form la
j
PALM DESERT PROPERTY OWNERS ASSOCIATION
73-833 EL PASEO
PALM DESERT, CALIFORNIA 92260
TELEPHONE 346-2804
A Non -Profit Corporation
15 February .1984
Hale's
73-920 E1 Paseo
Palm Desert, Ca. 92260
Gentlemen:
This -is to- inform you that your -plans ---for an -awning to be
added to your store front have been approved by the
Architectural Committee.
'Very
/truly yours,
Kay 5helt
Office Manager