Loading...
HomeMy WebLinkAbout250C MB JOHNSONApril 30, 1985 off, 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA 92260 TELEPHONE (619) 346-0611 ARCHITECTURAL REVIEW COMMISSION ACTION CASE NO: 250 C APPLICANT (AND ADDRESS): M.B. JOHNSON, 74-140 El Paseo, Suite 3, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for an office warehouse facility. LOCATION: St Charles Place ZONE: SI (service industrial) Upon reviewing the submitted plans and the presentations by the staff and by the applicant, the architectureal review commission minute motioned this case. Date of Action: April 23, 1985 Vote: Carried 3-0 (An appeal of the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision.) STAFF COMMENTS: Please read the attached minutes. L I1. MINUTES PALM DESERT ARCHITECTURAL REVIEW COMMISSION TUESDAY - APRIL 23, 1985 2:00 P.M. COMMUNITY SERVICES CONFERENCE ROOM 73-510 FRED WARING DRIVE The meeting was called to order at 2:00 p.m. after a one hour study session. Members Present: Ron Gregory, Chairman Al Cook Charlie Martin Members Absent: Bernie Leung Rick Holden '� REVISIC� Staff Present: Ray Diaz Steve Smith Stan Sawa Donna Gomez Commission agreed to continue the minutes of the April 9, 1985 meeting and approve at the next meeting. Moved by Commissioner Martin, seconded by Commission Cook to approve the following cases by minute motion. Carried 3-0 A. CASE NO: 250 C APPLICANT (AND ADDRESS): M.B. JOHNSON, 74-140 El Paseo, Suite 3, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for an office warehouse facility. LOCATION: St. Charles Place ZONE: SI (service industrial) 2. CASE NO: 994 SA APPLICANT (AND ADDRESS): CALIFORNIA FEDERAL, 5670 Wilshire Blvd., Los Angeles, CA NATURE OF PROJECT/APPROVAL SOUGHT: Approval of sign program. LOCATION: Palm Desert Town Center east side of El Paseo. ZONE: PC (3) S.P. Subject to the following conditions: 1. That the drive up teller directional sign be reduced in size to comply with the code limits pertaining to directional signs (ie; 3 square feet maximum). 2. Commission approved a change to the color of the tile to be used on the roof and fascia. 3. CASE NO: 234 C APPLICANT (AND ADDRESS): GENE SALLY FOR PD III, INC., P.O. Box 8147, La Jolla, CA 92038; JOHN OUTCAULT, 74-133 El Paseo #11, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for a 19,000 square foot commercial building. LOCATION: Northwest intersection of Highway III and Painters Path. ZONE: C-1 AGENDA ITEM NO. III-A-1 DATE: April 23, 1985 ARCHITECTURAL COMMISSION CASE NO: 250 C APPLICANT (AND ADDRESS): M.B. JOHNSON, 74-140 El Paseo, Suite 3, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of plans for an office warehouse facility. LOCATION: St. Charles Place. ZONE: SI (service industrial) DISCUSSION: February 20, 1985 commission granted preliminary plan approval subject to the usual conditions. The final plans have now been submitted and would appear to be acceptable. RECOMMENDATION: That the commission review the final working drawings for Case 250 C, M.B. JOHNSON and determine acceptability. G$th'op 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA 92260 TELEPHONE (619) 346-0611 February 20, 1985 ARCHITECTURAL REVIEW COMMISSION ACTION CASE NO: 250 C APPLICANT (AND ADDRESS): M.B. JOHNSON, 74-140 El Paseo, Suite #3, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary approval. LOCATION: St. Charles Place ZONE: S.I. Upon reviewing the submitted plans and the presentation by the staff and by the applicant; -the architectural review commission minute motioned this case. Date of Action: February 12, 1985 Vote: Carried 3-0 (An appeal of the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision.) STAFF COMMENTS: Please read the attached minutes. MINUTES ARCHITECTURAL COMMISSION FEBRUARY 12, 1985 3. CASE NO: 250 C APPLICANT (AND ADDRESS): M.B. JOHNSON, 74-140 El Paseo, Suite #3, Palm Desert, CA 92260. NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary approval. LOCATION: St. Charles Place. ZONE: S.I. Subject to the following conditions: 1. Final construction drawings, including a final landscaping, grading, lighting, amenitites, trash storage, walkway layout, irrigation plans and sign program shall be submitted to the architectural review commission. No final inspection or occupancy permit shall be given by the deparment of environmental services to this project until the aforementioned approved plans and construction shall have been completed. 4. APPLICANT: PLAZA TAXCO NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awnings. LOCATION: Northwest corner of El Paseo and Sage Lane. 5. CASE NO: CUP 84-10 APPLICANT (AND ADDRESS): ROCKWELL'S, P.O. Box 3546, Palm Desert, CA 92261. NATURE OF PROJECT/APPROVAL SOUGHT: Approval of sign and awning. LOCATION: Southeast corner of El Paseo and Lupine. ZONE: C-1 III. CASES: A. Final Drawings: 1. CASE NO: 231 C APPLICANT (AND ADDRESS): MR. do MRS. ROBERT PICKING, P.O. Box 3234, Palm Desert, CA 92260; MR. DANIEL BEEN, 1500 S. Palm Canyon Drive, Suite 1, Palm Springs, CA 92262. NATURE OF PROJECT/APPROVAL SOUGHT: Final approval for a 4,000 square foot commercial building. LOCATION: El Paseo, 180 feet west of Sage. ZONE: C-1 Commission pointed out that the parking lot layout did not meet requirements. Commissioner Gregory indicated that he wished to see revised landscape plans. Moved by Commissioner Holden, seconded by Commissioner Cook to approve the following case subject to conditions. 1. Parking lot layout to be revised and submitted to staff. 2. Resubmit revised landscape plans to commission prior to issuance of building permit. -210010 - 1hE,as�E,�ptsl I kill E1m),Eiwl RECEIVED OF: DATE AMOUNT FOR \ 1 BY ACCOUNT NO. 11 AMOUNT CHECKS ACCEPTED SUBJECT TO BANK CLEARANCE I Cff " OF PALE BE81 T 43 2'4f Q PTIck2y ftieP flaw®, ( a2m Dosmr4, C,& S=aC D�SIGH REVIEW BOAR Y'IL ";AUD®UJ IFU RN: 19m��P$UU9®Q0$ a� �QVPfdPQ�Q9QQ0®GU�IDI) BmPf��>d ° &9�ffi000fl�QD� QIGMCBG®QG ° M. B. JOHNSON Apdkant (plsass print) 74-140 El Paseo, Suite #3 (619)346-0109 Melling Adtlna rrlspn-f °-- no ry REQUEST: (Decrtbs spedfle nature of appaval requested ). ARCHITECTURAL REVIEW PROPERTY DESCRIPTION: TRACT 13915, LOT 24 ASSESSOR'S PARCEL NO. EXISTING ZONING S.I.S.P. ine undersigned states mat lzatlon for the ftlinq of this 1 00 6y My SIGNATURE ON THIS Applicant's Signature 7R STAFF USE ONLY) Environmental Status - - ❑ Ministerial Act E.A. IVa. ❑ Categorical Eaempnon ❑ Nsgativs Oetlararlon ❑ Other are tie owner W of the property give autn, nrmfve to any deed lestrletlons. — -- Abimtw tM City of Palm Desert of all liabilities mgarding *try deed restrfatlon NW may be amimOle a the property described MrNry. . Date AcWted byr 0nh 31E IIV(01� �2 �53 Reference Cose No CITY OF PALM DESERT APPLICATION FORM DESIGN REVIEW BOARD PROCESS Design Review Of: CASE NO. ype of Pro,7ect M. B. JOHNSON t pp icant 74-140 El Paseo, Suite #3 Palm Desert, CA 92260 Agreement of compliance to be signed by those applying for review. - I hereby acknowledge that I have read and agree, to comply with all the following requirements, and understand that the Depart- ment of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirma- tion has been received by the Department of Environmental Services. The development -of -ttTts-project-shall conform substantially to all development plans submitted in behalf of this case, and as revised according to the Design Review Board process. Any minor change requires approval by the Director of Environmental Services.. Any substantial change requires approval by the Design Review Board. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed: Landscaping (with irrigation system) shall be installed prior to final inspection and receiving certificate of occupancy. Curb, gutter, curb cuts, and tie-in paving shall be provided along the full frontage of the lot by means of installation prior to final inspection or other provisions as approved by the City Engineer. Construction shall conform to City Standards and all requirements of the City Engineer. All new and existing electrical distribution lines, telephone, cable antenna television, and similar service wires or cables, which are adjacent to and provide service to the property being developed shall be installed underground as a part of development from the nearest existing pole not on the property being developed as required by Municipal Code. a1� � S� Signature Date Department of Environmental Services Form la �_i CITY OF PALM DESERT DEI=AFeTLIENT OF ENVIRONMENTAL SEWMES APPROVED BY- 0 C.C.RES. NO. P.C..P.ES.NO. STAFF LETTER ® D.R.@. ACTION FORM BY DOS CONSTRUCTION SHALL COMMENCE WITHIN ONE YEAR OF THIS APPF'm.'F,'_. y 44 I 6— rrlcvn ivsr" P%f . /B 1 /%9� Kiyotoki Associates Architects and Land Planners �17748 Skypark Blvd. Suite165 Irvine,Calif. 92714 714 261-7110 Takahashi Associates Landscape Architecture • Planning 153 E. Whittier Blvd., #B, La Habra, CA 90631 l 14/F J7.i\4 Ira AA /- I I i _- _—� III -,��� �i\•\ �� 4j Am Ira AA /- I I i _- _—� III -,��� �i\•\ �� 4j Am 'I'1114�I11����!�ilLr4�� II II . m M1 OV, 490 1 OYM".=/ A AV I AdIIIIIIIIIIIIIIIIIIIF A j �b 12 I_ M -I ,Q00-bl ,00 4 N O C6 g W N 8 N I 0 ti 0,4,— .ftme �No ^L+ W T r ~ Noma C N C� a Q- i N J c L T O � �