HomeMy WebLinkAbout04 TRAFFIC IMPACT STUDY 1989-07-21Traffic impact Study
for the Proposed
DSL Commercial Center
Palm Desert, California
Prepared for
DSL Servica Company
3501 Jamboree Road
North Tower, Suite 5000
Newport Beach, California 92658
July 21, 1989
Prepared by:
ASL Consulting Engineers
2540 Red Hill Avenue, Suite C
Santa Ana, California 92705
(714) 250-5525
Architect:
McClellan Cruz Gaylord & Associates
Traffic Analysis:
ASL Consulting Engineers
2540 Red Hill Avenue
Santa Ana, California 92705
Garold B. Adams, Project Manager
Douglas Smith, Project Engineer, Author
Andrew Muth, Analyst
Peter Rim, Analyst
Reviewing Agency:
City of Palm Desert
Seyed Safavian, City Traffic Engineer
Ray Di&z, City Planner
This report was prepared by ASL Consulting Engineers under the
direct supervision of:
Date: 7 2( 71
Doul . Smith, R.C.E., T.E.
ASL Consulting Engineers
Date:
Garold B. Adams, R.C.E, T.E.
Associate
TABLE OF CONTENTS
Page
TABLE OF CONTENTS .................................... i
LIST OF EXHIBITS ..................................... ii
LIST OF TABLES ....................................... iii
1. INTRODUCTION .................................. 1
1.1 Project Location .............................. 1
1.2 Project Description ............................ 1
2. EXISTING CONDITIONS .............................. 1
2.1 Existing Roadway Network ....................... 1
2.2 Existing Traffic Volumes ....................... 6
2.3 Current General Plan ........................... 6
3. TRAFFIC FORECAST ................................. 8
3.1 Related Projects ............................... 8
3.2 Traffic Volume Growth Rate ..................... 8
3.3 Trip Generation ................................ 8
3.4 Trip Distribution .............................. 9
3.5 Trip Assignment ................................ 9
4. TRAFFIC IMPACTS ............................... 10
4.1 Roadway Capacities ............................. 10
4.2 Impacts to Off -Site Network ....................10
4.3 Intersection Capacity, Service Levels
and Signal Warrants ........................... 16
4.4 On -Site Circulation and Access ................. 17
5. MITIGATION MEASURES .............................. 17
5.1 Recommended Improvements ....................... 17
6. CONCLUSION ....................................... 18
APPENDIX............................................. 19
i
Figure
LIST OF FIGURES
Page
Vicinity Map
2
Project Location Map
3
Site Map
4
Existing Traffic Volumes
7
Project Trip Distribution
11
Site Trip Distribution
12
Project Trip Generation
13
Project Turning Movement Volumes
14
Traffic Volumes at Buildout
15
ii
LIST OF TABLES
Table
Page
2-1 Existing Traffic Volumes 6
3-1 Project Trip Generation 9
4-1 Roadway Volumes and Relative Increases 10
4-2 Intersection Level of Service Summary 16
iii
1. INTRODUCTION
ASL Consulting Engineers has been retained by DSL Service Company
to conduct a traffic impact study for the proposed development of
a Commercial Center at Fred Waring Drive and Highway Ill in the
City of Palm Desert, California. This report documents the study
effort and was prepared for submittal to the City of Palm Desert.
Report methodology and evaluation criteria is based on input from
the City of Palm Desert Traffic Engineering Department and fol-
lows generally accepted procedures for traffic impact analysis.
Traffic forecasts, impacts and associated mitigation are provided
for 1992, the projected build out year of this project.
1.1 Proiect Location
The project site is located in the'northeast quadrant of the
intersection of Fred Waring Drive and Highway ill. Figure 1
shows the vicinity map and the project location is shown on
Figure 2.
1.2 Proiect Description
The project under study is a proposed commercial development on
20 acres of land. The commercial center will includes a depart-
ment store (75,000 square feet) and nine smaller commercial
buildings ranging in size from 5,850 to 25,000 square feet and
20,000 square feet of office space. This property is currently
vacant. Site access will be provided by driveways on Fred
Waring Drive, Highway ill and Park View Drive. The aforemen-
tioned information is shown on the site map in Figure 3.
The majority of vehicular traffic entering and exiting the pro-
posed commercial center is expected to be via automobile, howev-
er, bus turnouts will be provided adjacent to the site along
Highway 111. There will be 1,045 on -site parking spaces provided
for patrons and employees of the commercial center.
2. EXISTING CONDITIONS
2.1 Existing Roadway Network
State Route Ill - State Route Ill is a north -south highway pro-
viding access to the Riverside County desert communities from
Interstate 10 to Imperial County. It is a fully improved roadway
adjacent to the project site. Highway 111 has six travel lanes
with raised median and 110 feet of right-of-way. The estimated
Average Daily Traffic (ADT) is 37,000 vehicle per day (VPD). The
subject property has previously dedicated 5 feet of right-of-way
on SR 111.
-1-
0
DINAH SHORE DRIVE
^f
w
0
GERALD FC
wI
PA•L,V O FRAP;,. SINA.TRA
n
�O� p
CATHEDRAL -
CIiY A CGUNTRY
m
O
w
RANCHO
MIRAGE
P A L' i A
DESERT ,
Qf
w
z
0
L PROJECT
SITE
z
z�
aM 74
N a �o
a�
ASL CONSULTING ENGINEERS
Arcadia * Santa Ana • Palm Springs
Rancho Cucamonga • Camarillo
<1DRIVE
T
w
w
a �
J N
O
� o
0 0
a_ o
WARING DRIVE
I
111
INDIAN
WELLS
FIGURE 1
VICINITY MAP
A9\
FRANK SINATRA
COUNTRY
YON DR.
•
PALM
DESERT
w
a_
o
w
>
¢
w
CLUB I DRIVE
�
}
i
w
'
Z
O
J
FALLS DR
CL
r
s^
v
ARK VIEW DR
FRED
WARING ?','✓_
OWN
CENTER
i
DR
s
PROJECT
SITE
z
z441
NDI,=`
�
Q
r
rVEL_S
74
4
QC
ASL CONSULTING ENGINEERS
Arcadia • Santa Ana • Palm Springs
Rancho Cucamonga 9 Camarillo
FIGURE 2
PROJECT LOCATION
MAP
AVml4rlry
LILUI
U.n
//v
rN,tl
VX
��k I
II xl loll II ...... ...... I YIIAII ;
XI'),IN5)AllxnYJJ nl IInll J 5FI/I Vm III IY II IIIOXI
XIXbd /
I� ILIXIUJ d
..w.......�......r_.............. r�.. _
- .........._..... .....:. :mow.: . .RIMY I
SUMMARY
IANI)AREA fillip". IIFS,F)UI
IVIIaIN(; ARIA )1),•YU.1
,ANAW(i l'MOV11111I uw l,AI,
I'ANAINIiYAlllll'Mr l\II1111 ,x' /11Y.1
ASL Consulting Engineers '
Arcadia • Santa Ana N Palm Springs
Rancho Cucamonga X Carnarlllo
FIGURE 3-
SITE MAP
I,
.'ll•rllx ,. rrl
A I'Nllll l' I Ilex
USE SCRVICE 181,%VANY
DSL COMMERCIAL CENTER
I IIpL..q III A I u d W.n1^II I Isla• IW... 14 ant, I .rLbnrrl r
The intersections along Highway 111 at Bob Hope Drive, Magnesia
Falls Drive, Park View Drive, Fred Waring Drive and Town Center
Drive are signalized.
Bob Hope Drive - Bob Hope Drive is a north -south major thorough-
fare extending from the I-10 Freeway south to Highway 111. This
four lane roadway is fully improved in the vicinity of the
project site. Bob Hope Drive has 100 feet of right-of-way and
raised median. The estimated ADT is 5,200 vpd.
Fred Waring Drive - Fred Waring Drive is an east -west fully
improved arterial street extending from Highway ill to Indio
Boulevard to the east. It is a four lane facility with raised
median. In the vicinity of the project site Fred Waring Drive is
86 feet wide with 110 feet of right-of-way. Currently, it car-
ries approximately 9,500 vpd.
The intersection of Fred Waring Drive and Monterey Avenue is
signalized.
Park View Drive - Park View Drive is an east -west partially
improved secondary roadway extending from Highway 111 easterly to
Monterey Avenue. It is a four lane roadway without raised medi-
an. Park View Drive is 64 feet wide with an 68 foot right-of-
way. The estimated ADT is 2,400 vpd. Half of the street width
lies within the City of Rancho Mirage. Rancho Mirage plans to
improve the street in the future and extend it through to Monter-
ey.
The intersection of Park View Drive and Monterey Avenue is sig-
nalized.
Magnesia Falls Drive - Magnesia Falls Drive is an east -west
secondary roadway providing access to residences east of Highway
111 and extending westerly to a dead end west of Joshua Road.
The lane configuration of this fully improved roadway varies from
two to four lanes in the proximity of the project site. The
right-of-way width also varies. Magnesia Falls Drive carries an
estimated ADT of 3,200 vpd.
Town Center Drive -Town Center Drive is a north -south scenic
secondary road providing access between Fred Waring Drive and SR
Ill and serving the Palm Desert Town Center. The existing road-
way is 82 feet wide or 100 feet of right-of-way.
Monterey Avenue - Monterey Avenue is a north -south roadway that
extends from Ramon Road southerly to Highway Ill. A partial
diamond interchange exists at the I-10 Freeway. Monterey Avenue
becomes SR 74, south of Highway ill. In the project site
vicinity most of the roadway is an 86 foot wide arterial street
with 110 feet of right-of-way. Monterey Avenue is fully improved
south of Fred Waring Drive and partially improved between Fred Waring
Drive and Park View Drive. The estimated ADT is 13,200 vpd.
-5-
2.2 Existing Traffic Volumes
Existing Average Daily Traffic (ADT) volumes and turning movement
volumes were obtained from counts performed by Traffic Counts,
Inc. in April and May 1989. These volumes have been incorporated
into the traffic analysis and can be found in the Appendix.
Existing volumes were multiplied by 26% to account for the sea-
sonal variation in the desert communities. This factor was
determined using data obtained from the Department of Transporta-
tion on Highway ill seasonal variations. For the purpose of this
report, ADT refers to Average Daily Peak Season Traffic Analysis
and mitigation is being provided for that condition and is very
conservative. Figure 4 shows existing non -adjusted turning
movement volumes. Table 2-1 shows existing ADT's and peak hour
volumes. The seasonal variation and growth rate used to adjust
existing volumes is presented in the following sections.
TABLE 2-1
EXISTING TRAFFIC VOLUMES
FOR ROADWAY SEGMENTS
Peak Season
Peak
Location
1989 ADT
Peak Hour Volume ADT
Hour
Highway 111
37,000
3,113 46,600
3,700
Fred Waring to Park View
Fred Waring Drive
9,500
777 11,570
960
Hwy 111 to Monterey
Park View Drive 2,400a 189 3,000 240
Hwy 111 to Monterey
Town Center Drive 6,850a 548 8,600 690
Hwy 111 to Fred Waring
a Approximate value based on the assumption that the pp unp peak hour volume is 8% of the ADT.
2.3 Current General Plan
The existing site was previously proposed for a hotel with some
commercial land uses, zoned PC4 and S.P. Parcel No. 1 on the
north half of the site will require a Zone Change and General
Plan Amendment from tourist (hotel) land use to commercial for
the proposed project.
cm
N�
T
Mn
(AM) PM
ASL CONSULTING ENGINEERS
Uj
Q
W
Uj
W
E—
Z
O
M
DR J��—I r22tsi)
39(ss)
21(15)�fr
39(40)1 n ..
Nov �
YNN N1�^
n N ^ ��520(4J5))
WARING DR J �1 1 39 71
117(123)
4 5(53a5M 1 r
m
C mo 0
m N fp
FIGURE 4
Arcadia • Santa Ana • Palm Springs
Rancho Cucamonga • Camarillo EXISTING TRAFFIC VOLUMES
3. TRAFFIC FORECAST
3.1 Related Proiects
City staff provided a description of proposed projects within the
study area which are expected to impact the roadway system.
A large development is currently being proposed on the south side
of Highway ill adjacent to Fred Waring Drive. The proposed use
would consist of a major commercial/retail/office space complex.
The other related project that impacts the site is the recently
completed reconstruction of Highway ill from north of Bob Hope
Drive to Town Center Drive. The California Department of Trans-
portation widened this roadway to three lanes in each direction,
constructed a raised median and performed signal modifications.
3.2 Traffic Volume Growth Rate
Average daily traffic volumes on roads in the Palm Desert area
have been growing steadily. A conservative growth rate of 7% per
year has been assumed based on yearly ADT increases on Highway
111 south of Bob Hope Drive. The yearly ADT data was obtained
from California Department of Transportation (CALTRANS) records.
It will be assumed that this growth will continue to 1992 and
that it reflects traffic generation from all development occur-
ring during this period within the study area.
3.3 Trip Generation
The proposed commercial center will include 168,900 s.f. of
retail shopping space, 17,000 s.f. restaurant space, 20,000 s.f.
office space and 12,000 s.f. savings and loan space. It was
assumed that the characteristics of this commercial development
approximate the characteristics of a shopping center for trip
generation purposes.
Trip generation for the project was estimated using Shopping
Center (Code 820) from ITE Trip Generation, 4th edition. Based
on the total building area of 217,900 s.f., the project is ex-
pected to generate 13,141 trips per day. Table 3-1 shows pro-
jected trip rates for the proposed commercial center.
cm
TABLE 3-1
PROJECT TRIP GENERATION RATESa
(217,900 Square Feet Gross Leasable Area)
Rate
Trios
Average Weekday Vehicle
58.93
13,141
Trip Ends (AWVTE)
Peak
Peak Hour A.M.
Enter
0.92
204
Hour of
Exit
0.40
90
Adjacent
Total
1.32
294
Street
Traffic
Peak Hour P.M.
Enter
2.11
420
Exit
2.38
531
Total
4.49
1,001
aITE Trip
Generation, 4th Edition
The above trip generation data is very conservative because pass -
by trips were not used in the analysis. A Pass -by Trip is a trip
that comes directly from the traffic stream passing the facility
on the adjacent street system and does not require a diversion
from another roadway. ITE Tri'p Generation, 4th edition, indi-
cates that shopping centers of similar size would require a 25
percent trip reduction based on pass -by trips.
3.4 Trip Distribution
Trip distribution for 1992 was estimated based on relative dis-
tances to nearby points of interest such as Palm Springs Airport,
the I-10 Freeway, College of the Desert and surrounding popula-
tion centers. It is estimated that 50% of the traffic will
originate from the I-10 Freeway/Rancho Mirage area to the north
and 50% will originate from the Palm Desert/Indian Wells area.
Figure 5 shows the regional trip distribution for the project
study.
3.5 Trip Assignment
Project trips were assigned to the local roadway network based on
the distribution described above. Site trip distribution for
1992 is shown on Figure 6. Figure 7 shows the corresponding
project trip generation. Figure 8 shows project turning movement
volumes due to the trip generation.
':m
4. TRAFFIC IMPACTS
4.1 Roadway Capacities
Roadway capacities for future conditions were determined by
classification according to the Palm Desert Circulation Element.
4.2 Impacts to Off -Site Network
Daily project traffic due to the proposed development is shown
relative to estimated traffic at build out in Table 4-1. It can
be seen that traffic increases between 14 and 34% are experi-
enced.
Figure 9 shows 1992 traffic volumes at project buildout.
TABLE 4-1
ROADWAY VOLUMES AND RELATIVE INCREASES
1989 1992 w/out 1992 with %
Location ADT Project Project Increase
Highway 111 37,000 45,330 51,900 + 14%
Fred Waring to Park View
Fred Waring Drive 9,500 11,640 15,580 + 34%
Hwy 111 to Monterey
Park View Drive 2,400 2,940 3,530 + 20%
Hwy 111 to Monterey
-10-
FRANK SINATRA 15%, 1970 TO I-10
COUNTRY
TO PALM SPRINGS
25%, 3285
9�X
PALM
DESERT
X%, ADT
10%, 1314
CLUB
w
Uj
Uj
DR. :: z
O
0%, 5260
FALLS DR
DRIVE
Uj
a
a
J
0
w
w
O
o_
Y
O
O
U
CENTER 157., 1970
DR
13'5%, 4600
31
INDIAN
WELLS
ASL CONSULTING ENGINEERS FIGURE 5
Arcadia • Santa Ana * Palm Springs PROJECT TRIP
Rancho Cucamonga • Camarillo DISTRIBUTION
I Qw
10% b, 111W11L
. . . . . . . . . . 4�
w
............. ............. . ...... ....
2 5 -- - --- --------
25% -J4-25%
wl�174v J;F
A 6*4WA� pPIOJF&T '3.101wo
iwill )-rP.FDwAko-4A pklljt, rl"UIRU') 1,04� :?W,
rp.Nipw 1,04.0
ASL Consulting Engineers
Arcadia - Santa Ana - Palm Springs
Rancho Cucamonga - Camarillo
FIGURE 6
SITE TRIP DISTRIBUTION
0
(20)42/(1
(20)4
m
4
/• ILuMU'IbI�v,L
r ua�a>
33
'y /
Ylyl
VV I
l
iii •�
ENTER \
(204)420
I1: IMV,II
1uuo,I.
EXIT
UO)
.,:. .. .......
61033)-0— 61(133)
A GoMMERGIAI.
jN,Ylll 7-FODWOkA' jAL NI heSEtC(, eA.
ASL Consulting Engineers
Arcadia • Sanla Ana • Palm Springs
Rancho Cucamonga • Camarillo
�UMNWR'(
NVIL , AMA
Nlp /¢n'I IU
Ixen4l rrsWgED
PNVCIIG /poJlp5p
FIGURE 7
'K%J(20)42
)63
/ (32)63
10)21
,. tN�wler.
��' or�•�v�CL.
PROJECT TRIP GENERATION
218,7a+ rF
3.IU/IOA�
I,o.(q fi{NA�i
I,oAo %f^Lp�
W
a_
O
2
m
O �� w m
�nN 5 >
FP ^
LLI
sSrI62J PGr\ �
J pw
0
,t N
J L26(5) PARK VIEW DR J
\, 67(12) J
'o.. 13(2),
J
N
M
FRED WARING DR 105(52)
13(2) J
93(16)—
N 9r3J G��
" L 7(1) \ �\
l� r46(8)
S)
N= »i
EL PASEO RD
(AM) PM
ASL CONSULTING ENGINEERS FIGURE 8
Arcadia • Santa Ana • Palm Springs PROJECT TURNING MOVEMENT
Rancho Cucamonga • Camarillo VOLUMES
f
Noz
fz
W
0_
O
2
m
M
Q�
5
n
�
A
N
L41(47)
g(14)
r16 22
r2�T
2r�OF��PG�
i t 9(2a)J
,
d,
34(45)1
mm�
n ^o s
bNN
n
r,
(_94C9(74)
r3t031)
PARK 'AEW DR
�370(329)
PASEC RD
J+L
)5(67) J
21(15)
tts(13=)
625(4r7)
1E
(AM) PM
ASL CONSULTING ENGINEERS FIRGURE 9
Arcadia • Santa Ana a Palm Springs TRAFFIC VOLUMES AT
Rancho Cucamonga • Camarillo BUILD OUT
4.3 Intersection Capacity and Levels of Service
To determine.the adequacy of existing and future intersection
capacity with regard to the proposed project, capacity analyses
were conducted using the 1985 Highway Capacity Manual, Report
209. For signalized intersections, this methodology utilizes
delay as the basis of level -of -service (LOS). Level -of -service
is described from "A" to "F" where LOS "A" is related to the
least delay and greatest reserve capacity and LOS "F" is much
delay and no reserve capacity. Normally, LOS "C" is considered
acceptable for rural conditions while LOS 'IF" is unacceptable.
For urban conditions such as Palm Desert, LOS "D" is considered
acceptable. City Staff has advised ASL that a level -of -service
"C" will be required for peak hours as a matter of City standard.
Table 4-2 shows levels of service for the various intersections.
Intersection
I Hope Drive/SR 111
Magnesia Falls/SR 111
I kview Drive/SR 111
Fred Waring Drive/SR 111
n Center Drive/SR 111
I kview/Monterey
Fred Waring Drive/Monterey
�.,C) Level of Service
TABLE 4-2
INTERSECTION LEVEL OF SERVICE SUMMARY
1989 1992 w/o Project 1992 w/ Project
AM PM AM PM AM PM
(0.300)C
(0.498)C
(0.704)C
(0.657)B
(0.344)13
(0.277)B
(0.633)C
(0.535)C
(0.770)D
(0.702)D
(0.520)8
(0.495)B
(0.813)D
(0.760)D
(0.513)C
(0.617)C
(0.859)C
(0.806)C
(0.424)3
(0.340)B
(0.694)D
(0.573)C
(0.964)E
(0.903)E
(0.640)B
(0.615)B
(0.996)E
(0.921)E
(0.399)C
(0.733)C
(0.874)C
(0.855)C
(0.611)C
(0.553)C
(0.714)D
(0.624)C
(0.973)E
(0.956)E
(0.657)C
(0.702)C
(1.004)E
(0.974)E
V/C Increase
AM PM
0.044
0.015
0.187
0.02
0.009
0.017
0.008
0.116
0.048
0.213
0.051
0.053
0.087
0.053
-16-
As can be seen from Table 4-2, only two intersections suffer from
inadequate levels of service "D" or under. They are Town Center
Drive/SR 111 and Fred Waring Dr./Monterey Avenue. Town Center
Drive/SR 111 will experience LOS "E" in 1992 without construction
of the project, its LOS remains "E" after project buildout with a
5% increase in V/C ratio. Fred Waring Drive/Monterey Avenue
experiences similar LOS and increase in V/C ratio. Both these
locations are not significantly impacted by the project according
to our analysis. Mitigation measures have been recommended at
Fred Waring Drive and Monterey Avenue to alleviate some conges-
tion.
Site entrances were also analyzed for operational LOS. The main
entrance at SR 111 experiences LOS "F" under peak conditions when
left unsignalized. Under signalized conditions, LOS "A" and "B"
were obtained during A.M. and P.M. peak. The State Traffic
Manual notes warrants for justification of a traffic signal based
on Estimated Daily Traffic Volumes. Review of those warrants
indicates a signal is needed at this location. The analysis can
be found in the Appendix.
4.4 On -Site Circulation and Access
The preliminary site plan dated 6/28/89 has been reviewed for
on -site circulation and access consideration. The following
improvements should be made to mitigate potential impact.
1. The main entrance on SR 111 should have two lanes exiting the
site and be supplied with a northbound right turn lane and a
southbound median left turn lane into the site.
2. The secondary entrance on Parkview Drive: should be clearly
marked as a service entrance.
3. All other entrances should be signed with stop signs (R1).
5. MITIGATION MEASURES
5.1 Recommended Improvements
The following improvements are recommended to mitigate negative
impacts of the proposed development at full build out.
1. Contribute to a "fair share" fun to improve the half width of
Parkview Drive to its ultimate width between SR 111 and
Monterey Avenue. This project contributes a 20% increase in
traffic on Parkview Drive.
2. Signalize the main entrance of the site on SR 111 and provide
a median left turn bay and a right turn deceleration lane
(both 10' wide). This signal should be fully actuated and
interconnected with other signals on SR 111 in the State
system.
-17-
3. Make the following improvements to the intersection of Fred
Waring Drive and Monterey Avenue.
a. Add a 14 foot wide thru/right turn lane to the eastbound approach.
b. Increase the westbound thru/right lane to 14 feet in width
c. Increase the southbound thru lane to 12 feet and add a 14 foot
wide right turn lane on that approach
The subject project should contribute to a fund for these
improvements based on the 34% increase in traffic experienced
by this intersection.
S. Conclusion
This report has analyzed the impacts of the proposed commercial
center on the surrounding transportation system. Mitigation
measures have been recommended to alleviate significant
operational deficiencies occurring due to the project specific
traffic. Based on very conservative assumptions, the.subject
project will increase traffic on the system by 14 to 34%. The
recommended improvements will mitigate project specific negative
impacts.
-18-
Appendix
-19-
signalized Intersections
The most dramatic change in the 1985 HCM is in procedures for
signalized intersections, which differ substantially from those
of the 1965 HCM and go considerably beyond those published in
Circular 212 in 1980. Signalized intersections are the most
complex points in any traffic system, and procedures reflect this
complexity. The 1985 HCM treats a broader range of variables in
greater depth than any previous analysis technique for signalized
intersections. This summary can only scratch the surface of the
subject and point out some of the highlights of the new methodol-
ogy.
A. Basic Approach
The methodology adopted for the 1985 HCM is based upon critical
movement analysis. Critical movement analysis focuses on the
identification and analysis of those movements in particular
lanes or groups of lanes which control the requirements for green
time allocation. Once critical movements are identified and
provided for, all other movements will operate as well or better.
Critical movement analysis is not new. Bruce Greenshields
studied and calibrated critical movement relationships as early
as the late 1940's. He did not, however, apply critical movement
analysis to capacity computations - he used the same approach to
time signals.
It is important to note that capacity analysis computations for
signalized intersections are reciprocal to signal timing
computations. In the former case, the signal timing is known,
and the LOS for known traffic and roadway conditions is computed.
In the latter, known traffic and roadway conditions are manipu-
lated to find a signal timing which will provide for a given LOS.
If the same methodology is not used for both types of computa-
tions, the results of signal timing and capacity analyses will be
inconsistent and difficult to explain. The 1985 HCM is struc-
tured to allow both types of computations.
1705.001
B. Levels of Service
Very early in the process of developing the 1985 HCM, delay was
adopted as the measure for intersection LOS.
As the analysis procedures developed, it became clear that use of
delay, while theoretically satisfying, led to considerable
computational difficulties and to basic changes in the meaning
and interpretation of level of service. The 1985 HCM defines
level of service for signalized intersections as follows:
LOS
A
5.0
seconds
LOS
B
15.0
seconds
LOS
C
25.0
seconds
LOS
D
40.0
seconds
LOS
E
60.0
seconds
LOS
F
60.0
seconds
These criteria refer to average stopped delay per vehicle during
a 15-minute analysis period.
Delay is a very complex measure which depends upon a number of
factors. Research has indicated that delay depends primarily on
the following four factors, listed in order of decreasing
importance:
1) quality of signal progression
2) cycle length
3) green times
4) v/c ratios
LOS F no longer automatically indicates oversaturation. It
merely depicts delay over 60 seconds per vehicle. This level of
delay can and does occur at v/c ratios as low as 0.80-0.85, where
signal progression and timing are inefficient. Thus, for
intersections, level of service F DOES NOT always signify a
breakdown or a case in which demand exceeds capacity.
Because of these characteristics, the 1985 HCM emphasizes that
capacity and level of service analyses of signalized inter-
sections are somewhat independent of one another. Analysis of
both v/c ratios and delay levels is required to get a full
picture of intersection operations.
1705.001
C. Operational Analysis
This procedure evaluates a broad range of factors affecting
operations, falling generally into three categories: geometrics,
signal control, and traffic.
Geometric factors include the number and use of lanes, lane
widths, grades, location of bus stops, and similar factors.
Control variables involve the type, phasing, and timing of the
traffic signal. Traffic factors include the usual composition
variables, parking activity, pedestrian crossing flows, and
vehicular flows by movement.
The 1985 HCM requires more detailed data than previous analysis
techniques. Some of the additional information now required
includes:
1. Pedestrian flows in all crosswalks.
2. Number of parking movements per hour into and out of
parking spaces within 250 ft. of the intersection.
3. Arrival type for each approach. Five arrival types are
defined and are used to evaluate the quality of
progression. Dense platoons arriving at the beginning
of the RED phase is the worst case; dense platoons
arriving at the beginning of the GREEN phase is the
best case.
4. Percent grade on all approaches.
Because of the large number of input variables needed to conduct
an operational analysis, the manual provides a tabulation of
default values for many of these which may not be readily
available from data. Key values, however, such as the arrival
type, must be evaluated in the field or projected.
E. Planning Analysis
The 1985 HCM does provide a planning analysis technique for
intersections which is considerably less complex than the
operational analysis procedure. There are no adjustment factors,
and details of signal timing need not be known. Because of the
simplicity of the procedure, however, it yields only a gross
estimate of whether or not demand will exceed capacity. It does
not yield delay or level of service evaluations, and should only
be applied to general analyses of future intersections.
1705.001
Unsignalized Intersections
A methodology is provided to analyze the capacity and operations
at two-way STOP- or YIELD -controlled approaches. Information on
the capacity of four-way STOP -controlled intersections is also
provided.
The basic methodology was developed in Germany in the early
197O's, and was originally translated by the Organization for
Economic Development. The procedure has not been extensively
validated in the United States, and no U.S. data base was avail-
able for calibrations.
The method is based upon a strict priority order of gap utiliza-
tion at STOP- or YIELD -controlled approaches:
1.
Right
turns
from the minor
street.
2.
Left
turns
from the major
street.
3. Through movements from the minor street.
4. Left turns from the minor street.
Right turns from the minor street merge into gaps in the right-
hand lane of the major street. The movement is relatively sim-
ple, and does not impede other vehicles seeking to use the same
gaps.
Left turns from the major street seek gaps in the opposing major
street flow. While waiting for such a gap, they are generally
positioned in the middle of the intersection, preventing lower
priority movements from using any available gaps until their
maneuver is completed.
Through vehicles from the minor street must cross through the
entire major street flow. The through vehicle impedes an oppos-
ing left -turning vehicle from the minor street, which follows a
conflicting path.
The left turning vehicle from the minor street faces the most
complex movement. Gaps must be sought in the entire major street
flow, and conflicts with opposing through vehicles must be avoid-
ed.
The priority of gap utilization is important. Large volumes of
left -turning vehicles from the major street, for example, could
use so many of the available gaps that lower priority movements
become congested, facing a capacity deficiency.
Computations are done in order of movement priority. Thus, right
1705.001
turns from the minor street are analyzed first, followed by major
street left turns, minor street through movements, and minor
street left turns. This allows an evaluation of the impact of
higher -priority movements on lower priority movements.
Capacities for each movement are estimated in three steps:
1. Potential capacity is estimated. Potential capacity
assumes that each movement has use of an exclusive
lane, and is able to use all available gaps in the
major traffic stream.
2. Movement capacity is estimated. Movement capacity
accounts for the impact of impedance.of high -priority
movements on low priority movements.
3. Shared -Lane capacity is estimated. Shared -lane capaci-
ty accounts for the sharing of lanes by various minor
street movements.
Potential capacity is the result of two factors; the traffic
volume through which gaps must be found (conflicting volume), and
the critical gap size. Critical gap is the median gap size (in
seconds) which would be accepted by a vehicle in a particular
movement. Conflicting volume varies depending upon the movement,
with the minor street right turn facing the fewest conflicts and
these minor street left turns facing the most. The critical gap
required increases as the complexity of the movement increases,
as the speed of major street traffic increases, and as the width
of the major street increases. STOP -controlled approaches also
involve slightly higher critical gaps than YIELD -controlled
approaches, as all vehicles are starting from a standing condi-
tion.
Note that conflicting volumes are computed in mixed vph while
potential capacity is expressed in passenger car equivalents.
Volumes are converted to pcph using a table of pce's reflecting
the impact of grade and traffic composition.
Potential capacity is converted to movement capacity using a
series of impedance factors. Each impeding movement will reduce
potential capacity, and each is represented by an impedance
factor.
Shared -lane capacity is computed from the movement capacities of
the various movements sharing a lane.
1705.001
Level of service is related to "reserve capacity," cr, which is
computed as the shared -lane capacity minus the lane volume.
Levels of service are related to reserve capacity as follows:
LOS A 400 pcph
LOS B 300 pcph
LOS C 200 pcph
LOS D 100 pcph
LOS E 0 pcph
Levels of service are presumed to be loosely correlated to delay.
The procedure, however, does not allow for a precise quantifica-
tion and cannot be compared with the results of a signalized
analysis.
The .results of an unsignalized intersection analysis are somewhat
less definitive than for other procedures in the manual. The HCM
recommends that delay studies be included as part of the normal
field data collection efforts to augment computational analysis
for unsignalized intersections. This will allow more precise
quantification of operational quality.
Source: An Executive Overview, 1985 Highway Capacity Manual,
ITE, 1986
1705.001
m
fro Cl)
G rn
G
W Ii
m �I v t c\ v A 01 -�1 Ul Cn Ul 01 m W Ul O1 Ul W, W A W N r Y Y Y r N r
ZC.,
3 rn -G
y D ';;
UlW UlO o0U7O Or W kDO)Cn UINU YO AONO�INY co NAA W A W AYONi co W Ul U7 -j m Y ON .1
0 y
�rrl
z1
G
J
G
T T
3
,O co
v Ol O) `l v UI Ol --j -! O v m to _I \o w -1 A U7 W W N r r r N r r 11
zzt rn
O rn
r it
NIo NUI m Ib Ul O to Ui ii.l O N Ln W WUI UI UI UI\o 01A W 10m W NUI AANY YN W W NNN 01N W W OIgw II
O y
03
a
D
i
n
o
�
-
a) am
cl
�
_�uco
.,
:a . rn
n
w
c-, -1
r
h
n iI
- N I.I
YY1--� r YYYr Y r rrYYY Y YYr
C �1
�'
C
- N
W U7AAin A NY W NN W Aw NN UI W Y-J 10 �I Ln N) W N Y W YY Y NI A
YA
I O jI
�1 N --I r Ul m O O Io m (al to O O 01 U7 07 m Y tD Ul r 01 Y Ln O W Ul O1 10 I co VI Ul N N U7 O O Ul �I Y
H
a
cn
c
n
�
a
n
oO000OO00000000000O0000 o0.oOoorrrr�
YF"
z
I-`YF`rr0000OO.o
Y YY O O O OID to lO W0] W W r V 1-1 C101011T Cl)Ul U UI AAAA W W W w NN NNYr YY NJ NNN
.�
Z
A W r O A W..Y O w A W Y CD W r CD W 1-1 0 lri W I-, CD w W Y O A W Y O A W 'Y O A W Y O A W Y O A W Y O
y
Tl
UlO U1O[nO UIO U1OCn OillO U1O V1'O (.n OCnO to OUlO U7O UlO U7O UIO U7 O.illO(nO U1ONOU1OUI O.
TI
1 I I 1 1 1-1 1 1 I11 I I I 1 1 1 I I I I t I 1 I I I I I I I I I I 1 I I I I I 1 I I I I i I
oa
YYYrYI--rYYY00000000O00000000000000OOocm) oO0000000rYr
"ll
k,
!1
N Y Y r Y 0 0 0 0 \o 'A to \0 N O O7 00 -1 v v J O1 01 O1 O1 UI.UI Ul Ul A A A W W W W N N N N Y Y Y r N N'N
I
O A W Y O A W r O A W Y 0 A W Y O A W Y O A W r O A W r O A W Y O A W F O. w Y 0 A W r O A W Y
ocnocnocnounocnocnocnocnocnocnocnocnocnourloinocnocnocnoulocnOcnocnoulocn�j
3
3
W 1
1
ti
a
N PI)W W N N W W A A A W W U1 A -1 mA m0% m l r1 10 W 10 `1 10' W Ib to m O� 'I W t -11 coOJ I v O co .l to ij
Z e�
.r 3
h
O li
N O N W O 1D m A W IV A 3a to W to N A Q Ul N co 01 m m O1 Ul 01 Ul N to Y O Ul \0 co N to 1- m A 01 N A Ul O
-4
(n
ti
rn I'll
3
I
hW i
�1
II
czrTI
(7N
l'- Y Y Y Y r j
cz
r-n 70a
G01 II
1- 1-- N Y N Y r N Ul lD NAAA W W AIn Un m i11 Im �o �I O Y O l010 co O OJY%o O tD%D Olo to W im *m C:)-I
Z
1 j (n-0
GOJ 11
NY r co O NA �! O1 rl 10r ill W Ul to AA ONl O rA t0 W ON Y00 to A UlM w W a%N O W YA W l v,o Mil
70
v a
ti
G-GY
z
OD
a �
h �
it
n y
Ul W
Y N N Y Y r Y Y N Y N Y Y Y Y Y r Y r Y Y r Y
C
NO II
N W AAAAA UIw W 010003 W O1 110O NN O W A mU1 CIO W wcA O)�IO NO V wlo-4 Ln Ql oI Un co m!
Z Z,
.
O W
AY W r1D 01A Ul Ul W W A V-,l to ✓o t W co W Ul W NUINU W QIA A Ol A10 W co UIONPI) N O•JW 1D co W I
h
TRAFFIC COUNT SUMMARY - HOURLY TOTALS
CITY
:
PALM DESERT
STREET NAME:
FRED WARING DR
LOCATION
:
E/O HIGHWAY 1.11.
TIME
EAST
BOUND
12.00 AM
>
48
1.00
---._.....
__=..____>
34
2:00
........ _.... .... _..._.. -- --
=_ _-=--->
20
3.00
- — —
a:00
----- --
>
15
5:00
............... - - -
6.00
109
7,00
>
186
8:00
--
-- -
__
>
220
9.00---
10: 00
- -- - ----
11.00
----
__:-_,-:_:-_ ---__>
289
12:00 PM
-._..__--.._....._._..----._..
1: 06
-- ------
__--_ -_=>
297
2.00
- ----- -
_..._.... __-_--_>
338
3,00
-- -- -
-==-__�>
365
4.00
- ------
WEST
BOUND
40
13 ---
30
6
15
50
154
298
301
381
399
-_ > 348 382
5:00 __........ ..... ...... --- - -
_--__-_> 383 394
6: 00 - - - - — — - - -----
____--==-_ > 241 302
7.00 ----
_:_:_:::::_____-
>
. 238
8.00
...... ..... . ......
_._
__>
159
9.00
--
—
____=_____-_—
->
142
10:00
- -
_.....
_.._....
>
121
11:00
- --
_----
-_-:_— —__>
77
214
----16 2 -- ---
2 2 3----
73
62
- ..._.._....- --- - - - - - -- -
4,479 5,049
PREPARED FOR: ASL CONSULTING ENGINEERS
DATE: 11 APR 1989.
DAY : THURSDAY
TYPE: DIRECTIONAL
TOTAL %' OF
COUNT TOTAL
88- 1e
47 0%
50 10
14 0�
30
83
263
484
521
530
. ........... ............ ..........---
533
577
----._....... ................
672
632
-- -719 --
764
730
-----.......... .....
7..7 --
543
----- 452
321
------3 6 5 ---
194
139
9,528
60
6%
60
7%
70
80
TRAFFIC
COUNT SUNNARY
— PEAK AND VOLUME
PERCENTAGES
CITY : PALM
DESERT
DATE:
11 APR 1989
STREET NAME: FRED
WARING DR
DAY :
THURSDAY
LOC,1TION E/O
HIGHWAY Ill
TYPE:
DIRECTIONAL
PEAK HOUR,
TINE
COUNT
o OF
TOT,1)L
EAST 60UNO
AN
6,30
TO
9.30
245
3
%
N.ID —Oil Y
1,45
TO
2:45
340
4
%
PM
4,30
TO
5:30
403
4
%
WEST BOUND
AN
7:30
TO
8:30
342
4
%
M10-014Y
1,45
TO
2,45
376
4
%
PH -
2:45
TO
3:45
410
4
%
HOURLY TOTAL
VOLUME
AN
7:30
TO
6:30
545
6
%
MIO—DAY
12:00
TO
1,00
672
7
PH
4: 45
TO
5, 45
808
8
PERCENTAGE 6Y DIRECTION OF TOTAL COUNT
EAST BOUND 4,479 47 %
WEST BOUND 5,049 53 %
9,52.8 100
TIME TABLE
,ei# — 6, 00 AN TO 10, 00 AM
MrD-0,4Y — 10,00 AN TO 2,00 PN
Ply — 2,00 PN TO 6 00 PH
PR^EPAREO FOR: ASL CONSULTING ENGINEERS
TRAFFIC COUNT
SUMMARY - HOURLY
TOTALS
CITY :
PALM DESERT
DATE: 1.1 APR 1989
STREET NAME:
HIGHWAY 111
DAY :'TUESDAY
LOCATION :
BET FRED WARING
DR/PARK VIEW
TYPE: DIRECTIONAL
TINE
NORTH
SOUTH
TOTAL .9
OF
BOUND
BOUNO
COZINT TOTAL
12;00 AN
106
132
238
1%
1:00
---- ^
__._..._= == _-_>
89
67
156
0%
2,00 ...
-........... _ ---- ... -
--- ---......_._..._-.
_
====:==_= ---- -�__>
42
54
96
0%
3.00
===_-- >
25
32
57
0%
4.00
-.-.. -_:.
__.- ......... _.
>
39
32
71
0%
5.00--
___ _--->
148
87
235
1%
6: 00
-------- --
- --
-- ----
=- - -__>
430
349
779
2 %
--- -_-=>
874
607
11481
4
8.00
------ =
--- -- - -- --
-.:
___-->
951
942
1,893
5%
9.00 --
_ -
-- --
-_-__ ->
995
1,038
2,033
6%
10. 00
--..._..___........ - - --
>
1,142
1,242
2,384
6%
11: 00
-- ---
--------
-- --- --
-
-=-___=>
1,345
1,369
2, 714
7%
12.00 PM ..........
......... -.... --- =-._
...... ----- --------- -- ..... ._..__ -
>
1,417
1,648
3,065
8%
1.00
_...............
_
_-->
1,417
1,603
3,020
8%
2.00
----- ---
--------
----------------------------
_-_ _ >
1,630
1,233
2,863
8%
3.00 -------
- -
- ---............ --
-_ ___---=>
1,669
1,444
3,113
8%
4:00 ---
-- -
-___�_>
1,491
1,470
2,961
8%
5.00
=-=---- =-=�_>
1,294
1,221
2,515
7 0
6.00
--5%
-_ -->
1,048
950
1,998---
7.00 _....
.... -- -
--- ---- - -
----- .._........_.... ----
___==-___===>
797
786
1,583
4%
8:00
- --- -- --.._
---- ........_._
->
603
577
1,180
3%
9:00
-..- - - - --
------
- --
_�_--->
607
461
1,068
3%
10: 00 --
_
-- -- -
--- - -
--->
360
370
730
2 %
11.00 -
------ -
---- -->
226
263
489
10
18,745
17,977
36,722
PREPARED FOR:
ASL CONSULTING
ENGINEERS
a
Ij
t* Z
nCri(j
i
'�
Il) Y i�
N ual W W W W N N N N N N N N N N N N N Y Y Y -
C -b
2
tO 01 In N p 0 01 N A Ol W A �" N (Jl A J N Y :.n Vl Y m m tli A W Y Y Y Y Y N N �- N N Ili N W
'j
}� y
a rn
3a. Ql ;1
o un J A t0 w \O Y co m A J w J MD uO J Y J N WAY m N O N O O O to OD A (n :a J co m t0 Y w to m O un W mrn
y
d
Z
4
'
moo'
c
_0
p 1I
03
Jp
W W W W W W W W Ili PI) NPI) NPI) NN Y Y Y 1— (
r` c
m'ti
Ln
A A A A Y O Y O J N m J un Y N.A <0 w N m Y Y m m W Y Y Y Y Y Y Y Y Y Y Y Y Y ,V N W A W t
"1
-1 1
Y I
Y W O in to unAAA m O m Y to ml Oo1 OD W JY\oN QI�oNJ W IO o% OOA CO YJCDM un W M W YA unN i
Z
S m
q
T L
Cn
70 q O
m { I,i
n
Ym
Z
qY
�_ I
0
Z7
Y'
Ui
Ol J mm m M Ln U'I a A (n W A A A A A W W N N Y Y
l
f W II.
AO'.o 0101 O mNN�lON J A m tO �� W Y oINN W to QiANN YYY Y Y YYN Y W W W W AA Ul o1J
a
Z
1 J I.
O m J to m co W Ul N N A Ln Q m Y m 10 W \o 0 to .A W W A J m io w up m W m A to m m Ul m m (1 m un w Y to OD O I�
I\
C)
r-(
Z
� _
1
a
m
z
a
q
1
YY Y J-Y1'..Y Y o0000000u7 o 0000000000000000000000000 oYYYY Z
;V
..
Y Y Y Y 000010 u0 lO IO m co co OD J JJ J 01 m oN o\ Ul un un un- AA.a W W W wNNNNY Y Y Y fV N NN
Z
A W Y O � w Y 0 A W Y 0 A W Y O A W Y O. A W Y O � W Y O A W Y O A W Y O A w Y 0 A W Y 0 A W Y 0
,71
Ln co unOLnOunOunOunOunOunOunO unOU7Ou-iOunOunOunOU O unOunOunOunOunOunOUlOunO
m
1 I 1 1 1 1 1( 1 I I( 1 I I((( 1 1(( 1(( 1 I i l(( I(( I(((((( I( 1
�u
YrYYYYYYY000000000o0000o00000000000a000000000YYY
rtl
m
Cl)
NY Y Y'r- 0000 �o io to to co m m m J J JJ m T m m un un un Ul.s AAA W W w'W NNN NI--'Y Y YN NN
g
O A W Y O A W Y O A W Y O A W Y O A W Y O A W Y O A W Y O. W Y O" W Y O A W Y O. W Y O A W Y
O U O un O Ul O Ul O un O Ul O W O Ul O un O un O.un O un O u.77 O (J7 O In O Ul O Ln O Ln O un O un O Ul O Ul O un O un
Y
N
.
C;o Z
I�
Q -S
Ln
YY Ni--+Y Y Y Y Y Y NY NNNN W N W W W ww W AAAAAAAw W W w W W W W W W
Z�b
y fl
cn i
W J A J J J m ro cn cD A m w A Ol m Y m Y W A m 0� Ul N Y A Lnm o 0 Y Y w Ut o w J N m A cn M A m w �;
Z y
.� a s
�D. u
AY M un Y IL) mNY W.NY Aun W 1-W 1-(nOD CDJ'.O N'.O IO O M A Ln W lO N W JJIO YU U COA O1�AA O10 .
O Z
a �y
ti
m
o
cz, 4
'ZD mY
Y Y Y Y Y YYY N N YN N N N N W W W W W W W W W W W w W NJ W AA W unS w W i
e=
rr, m q
I�
C0\
0\ A un m W in N CDun of Y to A m Y A N A o\ A to 0 01 un A A d \o . i- un O W M CO J '.O Y CDLO N un m m m CO m A
r; Z
ti 3> ;a
Z
{
y
� Y
Z co
a m
w (v
O1A t
(`�ti
Jun
YF-'YYYNYN W NN W NN W W A W AAAAUlun0101mm-iJJJ J J J m J0l01JmJJ\0JJo1
Nm
lD NY M un JY wY W JOm co O o�YlDY un m Co mom W N IOA AO\ olmmJ00 m Ol00 un un Oun W J
II
Z a
N �
Out Y wAAON0 �W Omw A Lnun un YN uo J un J W W A(n m of mu0 un to In AmN Ulm Oho A J NIV CO W 1
M1
ti
ill
3
Z
C
4
O
a
n
y
TRAFFIC
COUNT SUNNARY - PEAK AND VOLUME
PERCENTAGES
CITY : PALM
DESERT
0,4TE:
11 APR 1989
17R£ET NAME: HIGHWAY
111
DAY :
TUESDAY
LOCATION. : BET
FRED WARING RR./PARK
VIEW
TYPE:
OIRECTION.,4L
PEAK HOUR
TINE
COUNT
s OF
TOTAL
NORTH BOUND
14f+1
9: 45
TO
10,45
1,041
3
%
/110 -oil Y
1:45
TO
2:45
1,49,9
4
%
- PH
2:45
TO
3:45
1,726
5
%
601ITH BOUND
AN
9:45
TO
10:45
1,197
3
%
- NI0-0,4Y
12:45
TO
1,4.5
1,779
5
%
PH
3:45
TO
4:45
1,479
4
%
HOURLY TOTAL
VOLUME -
AN
9,00
TO
10,00
2,033
6
%
NI0-014}'
12,45
TO
1:45
3,222
9
%
PH
2:45
TO
3:45
3,156
9
%
PERCENTAGE BY DIRECTI^N OF TOTAL COUNT
NORTH BOUND
18,745
51
%
SOUTH BOl/ND
17,977
49
%
36,722
100
%
TINE T,48Lc
AN - 6:00 AN TO 10:00 AN
NID-DAY - 10,,00 AN TO 2,00 PH
PM - 2:00 PM TO 6:00 PH
PREP,-9RED FOR. ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY PALM DESERT,
NORTH -SOUTH STREET : HIGHWAY 111
EAST -WEST STREET PARK VIEW DR
TYPE INTERSECTION TURNING MOVEMENTS
N
0 R T
H
8
0 U N
D
TIME RIGHT THRU
LEFT
�7:15 AM
1
209
0
-7:30
0
226
0
7:45
1
271
0
9:00
0.
285
0
TOTAL
2
991
0
9:15 AM
0
305
0
8.30
0
298
0
9:45
0
278
0
9:00
1
273
0
TOTAL
1
11.54
_ 0
4.15 PM
1
283
1
4.30
1
296.
0
4:45
2
301
1
5.00
1
316
2
-OTAL
5
1196
4
-5:15 PM
1
320
1
5.30
1
309
0
5:45
0
301
1
-5:00
2
292
1
OTAL
4
1222
3
-R TOT
12
4563
7
r
S 0
U T
H
B O
U N
D
RIGHT
THRU
LEFT
0
.216
29
0
252
26
0
245
28
1
248.
'29
1
961
112
2
261
32
1
268
- 30
0
270
29
0
253
27
1
281
9
2
283
11
3
290
10
10
306
14
16
1160
44
13
311
10
10
302
9
5
290
11
4
294
13
32 1197 43
52 4370 317
DATE 04 APR 1989
DAY TUESDAY
E
A S
T
B O
U N
D
RIGHT
THRU
LEFT
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
1
1
0
2
1
1
2
0
0
2
1
0
3
1
1
5
3
2.
12
1
1
3
0
1
2
0
1
2
1
1
2
6
7
23
W E S T
S O U N D
RIGHT THRU LEFT
10
0 0
8
0 0
11
0 1
15
0 0
44
0 1
21
0 0
18
0 2
15
0 1
16
0 0
70
0 3
19
1 1
15
0 0
20
1 2
21
2 0
75
4 3
17
1 0
15
0 1
18
1 0
14
0 1
64 --
2 2
253 6 9
PREPARED FOR :ASI- CONSULTING ENGTMEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET : HIGHWAY'111
EAST -WEST STREET : PARK VIEW DR
TYPE : INTERSECTION TURNING MOVEMENTS
IME
9OO AM
915
830
945
r OTAL
N 0
R T
H
B 0
U N
0
RIGHT
THRU
LEFT
0
285
0
0
305
0
0
298
0
0
278
0
0 1166 0
P E A K H 0 U R R E P O R T
S O
U T
H
B 0
U N
0
RIGHT
THRU
LEFT
1
248
29
2
261
32
1
268
30
0
270
29
4 1047 120
04TE : 04 APR 1989
DAY : TU_SDAY
E A S T
B 0 U N 0
RIGHT THRU LEFT
0 0 0
0 0 0
0 0 1
1 0 0
1 0 1
W E S T
B 0 U N 0
RIGHT THRU LEFT
15
0 0
21
0 0
18
0 2
15
0 1
69
0 3
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY ; PALM DESERT
NORTH -SOUTH STREET : HIGHWAY 111
EAST -WEST STREET : PARK VIEW DR
TYPE : INTERSECTION TURNING NOVENENTS
N 0
R T
H
B O
U N
D
INE
RIGHT
THRU
LEFT
4:45
PN 2
301
1
5,00
1
316
2
5:15
1
320
1
5:30
1
309
0
OTAL
5 1246
4
P E A K H 0 U R R E P O R T
S O U T H
8 0 U N D
RIGHT THRU LEFT
3
290
10
10
306
14
13
311.
10
10
302
9
36 1209 43
DATE 04 APR 1989
DAY : TUESDAY
E A S T
8 0 U N 0
RIGHT THRU LEFT
1 0 3
1 1 5
1 1 3
0 1 2
3 3 13
W E S T
B O U N D
RIGHT THRU LEF7
20
1 2
21
2 0
17
1 0
15
0 1
73
4 3
PREPARED FOR: ASL CONSULTING ENGINEERS
i I '
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET : BOB HOPE DR
EAST -WEST STREET : HIGHWAY 111
TYPE : INTERSECTION TURNING MOVEMENTS
N 0
R T
H
B O
U N
D
TIME
RIGHT
THRU
LEFT
7:15
AM 30
151
1
--7.-30
36
168
0
7,45
35
21.6
0
'B:OO
49
209
0
TOTAL
1.50
744
1
8:15
AN 54
184
0
8.30
57
179
1
•' 6.45
49
163
1
9.00
52.
159
1
TOTAL
212
685
3
4:15
PM 73
243
21
4.30
78
252
11
4:45
72
266
5
5.00
79
2.69
6
DTAL
302
1030
43
5,15
PH 76
273
7
5.30
68
265
6
r5:45
70
270
2
---6:00
63
248
f
OTAL 277 1056 16
R TOT 941 3515 T63
S O
U T
H
8 0
U N
0
RIGHT
THRU
LEFT
0
146
4
0
155
5
0
'157
6
1
163
5
1 621
1 175
0 165
1 151
1 156
CAEN M-1fi
2 203
3 2.11
2 219
2 226
�M*116
1 255
2 263
2 245
2 221
7 `984
20 3111
20
4
5
4
5
18
19
23
24
27
29
26
25
27
107
238
DATE 05 APR 1989
DAY : WEDNESDAY
E A S T
B O U N D
RIGHT THRU LEFT
0 0 0
0 0 2
1- 1 1
2 0 1
3 1. 4
W E S T
8 0 U N D
RIGHT THRU LEF7
4 1 55
5 0 43
6 1 39
4 - 0 36
19 2 173
1
1
0
5
1
60
1
1
1:
6
0
63
0
1
1
4
1
54
1
1
1
5
0
52
3
4
3
20 -
_2
229
0
0
0
5
2
59
0
1
0
7
1
63
1
1
1
5
1
68
1
1
0
4
0
65
2
3
1
21
4
255
1
1
1
10
2
63
1
2
1
8
2
61
1
2
1
7
1
53
2
1
2
8
0
58
- 5
6
----5
3 3-----5
- 235
13
14
13
93
13
892
PPFPdPFn FnP •AQI rnhiSlll TTAIf_ FAIGTh1r7PPC
TRAFFIC COUNT SUNNARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET BOB HOPE DR
EAST -WEST STREET HIGHWAY 111
TYPE ; INTERSECTION TURNING NOVENENTS
N 0
R T
H
8 0
U N
D
INE
RIGHT
THRU
LEFT
7:95
AN 35
216
0
8:0O
49
209
0
8:15
54
184
0
8:5O
57
179
1
)OTAL
195
7-88
1
P E A K H 0 U R R E P O R T
S O U T H
8 0 U N D
RIGHT THRU LEFT
0 157 6
1 163 5
1 175 4
0 165 5
2 660 20
DATE 05 APR 1989
DAY WEDNESDAY
E A S T
B O U N D
RIGHT THRU LEFT
1 1 1
2 0 1
1 1 0
1 1 1
5 3 3
W E S T
R O U N D
RIGHT THRU LEF7
6
1
39
4
0
36
5
1
60
6
0
63
21 2 198
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET BOB HOPE DR
EAST -NEST STREET : HIGHWAY 111
TYPE : INTERSECTION TURNING NOVENENTS
, IrME
50O PN
515
530
545
I O TAL
N 0
R T
H
8 0
U N
D
RIGHT
THRU
LEFT
79
269
6
76
273
7
68
265
6
70
270
2
293 1077 21
P E A K H 0 U R R E P O R T
5 0 U T H
8 0 U N D
RIGHT THRU LEFT
2 226
27
1 255
29
2 263
2.6
2 245
25
�E : `Sill
DATE : 05 APR 1989
DAY WEDNESDAY
E A S T
8 0 U N D
RIGHT THRU LEFT
1 1 0
1 2 1
1 2 1
4 6 3
W E S T
B O U N D
RIGHT THRU LEFT
4
0
65
10
2
63
8
2
61
7
1
53
29 5 242
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -.SOUTH STREET : HIGHWAY 111
EAST -WEST STREET : FRED WARING DR
TYPE : INTERSECTION TURNING MOVEMENTS
N 0
R T
H
8 0
U N.
D
TIME
RIGHT
THRU
LEFT
7.15
AM 2
148
1.
-17.30
2
156
1
7:45
3
163
2
8:00
2
176
1
TOTAL
9
643
5
8:15
AM 3
179
1
8.30
2
168
0
8:45
1
174
1
9:00
2
182
1
TOTAL
8
703
3
--4:15
PM 1
296
0
4.30
1
278
1
4:45
2
289
2
5:00
1
293
1
-OTAL
5
1156
4
5.15
PM 1
272
0
5:30
2
268
1
5:45
1
256
2
-6:00
1
249
2
OTAL
5
1045
5
-R TOT 27 3547 17
5 0 U T H
8 0 U N D
RIGHT THRU LEFT
1 120
30
1 126
33
0 138
38
0 . 149
42
2 533
143
1 156
41
0 163
38
0 170
36
0 158
40
0 252
29
1 249
36
0 265
45
0 270
39
1 1036
149
0 266
36
1 258
29
3 232
34
2 240
40
6 996 139
10 3212 586
DATE : 06 APR 1989
DRY : THURSDAY
E
A S
T
B O
U N
D
RIGHT
THRU
LEFT
1
1
1
2
1
1
3
2
2
2
1
0
8
5
4
1
0
1
1
1
1
1
1
2
2
2
1
5
4
5
2
1
1
2
0
1
1
1
2
2
1
1
7
3
5
0
1
1
0
1
2
1
1
2
0
1
1
21
16
20
W
E S
T
8 0
U N
0
RIGHT
THRU
LEF1
60
1
2
63
1
2
70
2
2
78
1
3
271 5 9
91
1 2
83
0 3
76
1 2
60
1 3
310 3 10
61
1 5
68
0 5
75
0 6
79
1 8
283 2 24
72
0
5
51
0
4
60
0
6
55
1
6
238 ---
--1 ---
21
1102
11
64
PREPARED FOR :ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET HIGHWAY 111
EAST -WEST STREET FRED WARING DR
TYPE ; INTERSECTION TURNING MOVEMENTS
INE
800 AM
815
630
845
OTAL
N. 0
R T
H
8 0
U N
0
RIGHT
THRU
LEFT
2
1.76
1
3
179
1
2
168
0
1
174
1
8 697 3
P E A K H 0 U R R E P 0 R T
S O
U T
H
B O
U N
D
RIGHT
THRU
LEFT
0
149
42
1
156
41
0
163
38
0
170
36
1 638 157
DATE : 06 APR, :i J89
DAY : TH0RSDA`(
E A S T
B O U N D
RIGHT THRU LEFT
2 1 0
1 0 1
1 1 1
1 1 2
5 3 4
W E S T
8 0 U N D
RIGHT THRU LEFT
78
1 3
91
1 2
83
0 3
76
1 2
328 3 10
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET HIGHWAY 11"L
EAST -WEST STREET FRED WARING DR
TYPE ; INTERSECTION TURNING MOVEMENTS
N 0
R T
H
8 0
U N.
0
IME
RIGHT
THRU
LEFT
4;30
PM 1
278
1
4,45
2
289
2
5;00
1
293
1
5;15
1
272
0
TOTAL
5
1132
4
PEAK' HO UR R EP O R T
S O U T H
8 0 U N D
RIGHT THRU LEFT
1
249
36
0
265
45
0
270
39
0
266
36
1 1050 156
DATE 06 APR 1989
DAY : THURSDAY
E A S T
8 0 U N D
RIGHT THRU LEFT
2
0 1
1
1 2
2
1 1
0
1 1
5
3 5
W E S T
8 0 U N D
RIGHT THRU LEF]
68 0 5
75 0 6
79 1 8
72 0 5
294 1 24
PREPARED FOR; ASL CONSULTING ENGINEERS
TRAFFIC. COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH-SnUTH STREET : SH III
EAST -WEST STREET : MAGNESIA FALLS
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
B n
U _N
D
TIME
RIGHT
THRU
LEFT
1:15
AM_ 63
243
8
11:30
22
171
3
'1:45
4.5
207
11
2.00
28
211
15
TOTAL
158
832
37
2:1.5
PM 42
263
9
12:30
4n
290
13
2.:45
4.5
299
6
1:00
35
218
In
'OTAL
162
1n70
38
4:15
PM 28
219
14
4:30
29
274
13
4:45
40
310
18
5:nn
43
221
In
OTAL
140
ln24
55
5:15
PM 31.
305
15
5:30
43
273
20
5:45
37
266
1.5
6:00
22
236
10
OTAL 133 1080 60
R TOT 593 4nn6 19n
S O U T H
F O U N D
RIGHT THRU LEFT
3 369
9
5 162
4
4 323
6
9 235
23
21 1n89 42
5
269
12
2
263
7
1
282
8
2
204
7
In 1018 34
5
239 4
2
214 7
0
289 3
n
297 2
7 1039 16
4
260 3
3
293 7
1
232 8
7
2:34 4
1.5 1019 22
53 416.5 114
DATE : 24 MAY 1989
DAY : WEDNESDAY
E A S T
B O U N D
RIGHT THRU LEFT
11
13
48
10
.5
21
9
6
19
11
2
27
41 26 11.5
7
2
31
12
6
46
14
.3
29
8
2
30
41 13 136
1
7
16
9
4
26
12
2
21
it
8
33
33
21
96
6
4
22
5
.5
23
12
11
24
7
4
1.5
30
24
84
145 84 4.31
W
E S T
B O
U N
n
RIGHT
THRU
LEFT
16
8
In
7
2
1
5
1
2
8
2
4
36
1.3
17
1.5
6
9
9
1
4
14
3
7
8
2
1
46
12
21
9
3
3
14
2
1
9
3
6
11
n
2
43
8
12
11
1
6
In
5
2
15
3
4
16
4
5
52
13
17
177
46
67
PRFPARF.D FOR :AST, CONSTTT,TTNG F_.NGTNF_.FRS
TRAFFIC. COUNT SUMMARY — 15 MINUTE COUNT
CITY : PALM DESERT
NORTH —SOUTH STREET : SH III
EAST —WEST STREET : MAGNESIA FALLS
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
H O
U N
D
DIME
RIGHT
THRU
LEFT
4:45
PM 40
.310
18
5:01)
43
221
10
5:1.5
31
305
1.5
5:30
4.3
273
20
TOTAL 1.57 lln9 63
P E A K H O U R R E P O R T
S O U T H
R_ n U N D
RIGHT THRU LEFT
0
289 3
0
297 2
4
260 3
3
293 7
7 1139 1.5
PATE : 24 MAY 1989_
DAY : WEDNESDAY
E
A S T
R O U N
D
RIGHT
THRU
LEFT
12
2
21
11
8
33
6
4
22
5
.5
23
34
19
99
W E S T
H O IT N D
RIGHT THRU LEF1
9
3
6
it
n
2
11
1
6
In
5
2
41
9
16
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC. COUNT SUMMARY - 15 MINUTE C017NT
CITY : PALM DESERT
NORTH -SOUTH STREET : SH III
FAST -WEST STREET : MAGNESIA FALLS
TYPE : INTERSECTION TURNING MOVEMENTS
.IME
2:3n P
2: 4_5
1:nn
1:15
TOTAL
N O
M
R T
H
B O
U N
D
RIGHT
THRU
LEFT
40
290
13
4.5
299
6
35
218
10
63
243
8
183 10.50 37
P E A K H O U R R E P O R T
S O U T H
F O U N D
RIGHT THRU LEFT
2
26.3
7
1
282
8
2
204
7
3
369
9
8 1118 31
DATE : 24 MAY 1989
DAY : WEDNESDAY
E
A S
T
B O U N
D
RIGHT
THRU
LEFT
12
6
46
14
3
29
8
2
30
11
13
48
4.5 24 153
W E S T
B O U N D
RIGHT THRU LEFT
9 1 4
14 3 7
8 2 1
16 8 10
47 14 22
PREPARED FOR: ASL CONSULTING, ENGINEERS
�J
'J
'T cn rs +s
'J
rn 'A to a
O
N N N
J
N �+ �-•
H
h
h
J
o�ll'wJ+~il
Aso n
C
ov'io n
Cam+
oso n
y
b
b
i I�
b
3
3
3
b
E r
H
rn 'J
y
+�
'W
a
r
r N H
'-n Cn 'J1 •T
• T
O
r r r r
'W 'S cor
': J l
r r I",
N a 'D
T
r
r r N
'D (11 ;wl
y Q7 2'i
rA
.P
'P
lA
O
N
N
N
Na
'a 'u
N
'T
I
Cn to V V
D
ul fs '.O 'D
r
'T 'P ':n '01
C" S
O1 •T '
•71 rn a W
V
N'D � a
N
•� N Ln 4A
r
W W NW
ti
H
N
+b
r r N N
'p
r NNN
'T
rr rr
'p
NNrN
R]
•. .. .. ..
4J
,A
'P 'D QJ W
c]
V N r OD
,A
•T V 'W Co
V
V N P. ,P
y
Y
z 'b OtLI
l�j�JH3
cn
r
r
r
r
'A
N
NW W W
V
NW Vla
r
N'w N'W
-P.W
WW.A
Q'QJ rn
()ZF< A
'D
to
V NOa
N
V W NC7
."').
'P =D N'A
N
'Jlrao
Ij
y H Cn
'D
N
N
N
V
N
.P C�.1 V a
'_.]
,A 'J1 V1 •m
r
ill 'Jl 'A +JI
'D
•S V V1 •77
W
r
'D rD H W
'p
a r •T iT
'D
'T V O] •q
fl
'x ilr N =>
h b Lq
2l
w
S
a
W a W ':wl
FN-'
V 'J1
'D
U1
V N •) •T
ill
r 'D ill .7
S
W O • o V
r
13) •00 W
r
n
H r r
n
r r N
n
r r r r
T
r N r r
W 'A V
V
'D 4A N N
r
'A 'JI N=D
r
'b in V F.
li �7
r
'li
r
.A
rrFr
rr r
'r
rrrr
V
V
'D 'T 'D r
N
'D '�� N
W
'W
r r 'D r
W
i..) 'W N 'P
2J rn
•ITT
'D V �A
N
N a W r
V
r 'D N 'J1
':71
W r 'D N
Q 'Z
h lz
rll
N W to0)
r
N W N FA
•0
N N r W
N
CJ 'W r 'W
V
V
N in ,A a
V
N •= .A r
.0
•T 'W 'D N
W
.A ':il 'D V
y
b b
k
64
A
r
r
r
r
V
•�
Nr N N
r
rNN 4A
N
N W N W
ii.1
';n':NIli N
ix
V 'D 'b 0)
a
'T ul 'D •T
rW
•01 V r 'D
1A
r 'b r ,A
J
r
`�
rF`rr
,A
rrr F�
,A
H H
,�
n K
•]�
':SI
•C) •b S
N
O r N V
V
i- 41 r
W
W lD w N
rn
O
•�
o
O 'D a !ll
p
•D N 'D O
':n
o r V V
'r
r 'D W N
rJ }J
.b r
rC 'D
r
I
�by
•,po
F'rl--`r
W
r r
N
r
V
rNrN
A.
':Jl
•T
,Cr Or
'D
•m
N fe 1•G
'D
cnm en r
r
rN•bO
TRAFFIC C017NT SUMMARY - 15 MINUTE COUNT
(7-TTY . : PALM DESERT
NORTH -SOUTH STREET : MONTEREY ANTE
_FAST -WEST .STREET : FRED WARING DR
TYPE : INTERSECTION TURNING MOVEMENTS
1:15
1:3n
11:4.5
'2:n0
OTAL
N O
AM
R T
H
B O
(T N
D
RIGHT THRU
LEFT
23
83
24
15
62
14
14
53
22
9
63
27
61 261 87
P E A K H O U R R R P O R T
S O
U T
H
B O
IT N
D
RIGHT
THRU
LEFT
40
80
44
36
52
33
31
7.5
58
35
RR
76
142 29.5 211
DATE: : 24 MAY 19R9
DAY : WEDNESDAY
E A S T
B O !1 N D
RIGHT THRU LEFT
11
142
37
17
129
19
1.5
111
33
18
133
34
61 .53.5 123
W E S T
R_ O U N D
RTGHT THRT_T LEFT
24 122 20
21 83 18
38 99 22
51 131 11
134 43.5 71
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC CnUNT SUMMARY - 15 MINUTE CnhNT
CITY : PALM DESERT
NORTH -SOUTH STREET : MONTEREY AVE
EAST -WEST STREET : FRED WARING DR
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
B O
U N
D
.'IME
RIGHT
THRU
LEFT
4:15
PM 18
96
2R
4:30
15
9n
21
4:45
13
59
22
5:00
14
.52
17
TOTAL
60
297
RR
P .E A K H O U R R E P O R T
S O
11 T
H
B O
U N
D
RIGHT
THRU
LEFT
6 n
8.5
50
52
56
4.5
33
51
49
27
46
51
172 238 195
PATE : 24 MAY 1989.
DAY : WEDNESDAY.
E A S T
B O U N D
RIGHT THRU LEFT
22
121
41
12
103
24
14
ln6
30
9
92
22
57 42'2 117
W E S T
R O U N D
RIGHT THRU LEFT
46 17n 14
29 129 E
2.5 112
16 1.09 12
116 .520 3�
PREPARED FOR: ASL CONSULTING ENGINEERS
TRAFFIC. COUNT S17MMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET : MONTEREY AVE
EAST-WP,ST STREET : PARK VIEW DR
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
B O
U N
D
TIME
RIGHT
THRU
LEFT
1:15
AM 9
146
8
11:.30
3
14.5
.5
11:4.5
.5
136
7
2:0n
7
171
in
TOTAL
24
598
3n
2:15
PM 1.5
210
5
.12:30
In
215
6
2:45
.5
11n
5
I:nn
6
106
7
"OTAL
36
641
23
4:15
PM 5
217
10
4:3n
3
171
4
4:45
6
181
7
5:nn
5
18n
8
,nTAL
19
749
29
5:15
PM 6
212
.5
5:30
10
166
8
5:45
3
1.56
7
6:00
5
124
4
nTAL
24
6.58
24
R TOT 103 2646 106
S O U T H
B O U N D
RIGHT THRU LEFT
37
120
43
16
148
12
11
149
10
2
1.52
1.5
66 .569 80
1
197
In
5
lnn
2n
2
105
in
11
212
22
19 614 62
12
174
5
9
164
16
11
179
8
In
14.5
11
42
662
40
6
144
17
5
1.56
24
7
141
26
8
122
28
26 563 9.5
153 24n8 277
DATE : 24 MAY 1989
DAY WEDNESDAY
E
A S
T
B O
U N
D
RIGHT
THRU
LEFT
6
4
4
7
7
.5
12
6
5
13
1
6
38
18
2n
5
5
1n
in
3
5
15
In
7
3
6
.5
33
24
27
8
.5
6
15
7
12
7
6
7
9
3
13
39
21.
38
15
6
9
16
2
.5
8
5
4
2
16
7
41
29
25
1.51 92 110
W
E .S
T
B O
U N
D
RIGHT
THRU
LEF7
7
9
E
8
9
2E
7
R
lE
2n
9
1[
42
3.5
.5 E
12
7
E
in
5
Y
11
In
2(
2n
5
if
53
27
6E
11
.5
E
13
4
4
8
2
18
6
i
5n
17
2�
13
6
c
8
2
C
7
.3
lE
In
2
4
38
13
2=
183 92 16i
PRFPARF7) FnR -ART. (Y1NRTIT.TTN(7 RNATNF.P.RR
TRAFFIC. COUNT SUMMARY — 15 MINUTE COUNT
CITY : PALM DESERT
NORTH —SOUTH STREET : MONTEREY AVE
EAST —WEST STREET : PARK VIEW DR
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
B O
r7 N
D
.IME
RIGHT
THRU
LEFT
1:45
AM 5
136
7
2:00
7
171
In
12:15
1.5
210
5
2:30
In
215
6
TOTAL
37
732
28
P E A K H O U R R E P O R T
S O U T H
R O U N D
RIGHT THRU LEFT
11
149
In
2
152
1.5
1
197
In
5
100
20
19 .598 5.5
DATE : 24 MAY 1989
DAY : WEDNESDAY
E A S T
B O U N D
RIGHT Tl4RU LEFT
12
6
.5
1.3
1
6
5
.5
1 n
in
3
.5
40
1.5
26
W E S T
B O U N D
RIGHT THRU LEFT
7
R
18
20
9
1C
12
7
6
In
5
3C
49
29
64
PREPARED FOR: ASL CONSULTING, ENGINEERS
TRAFFIC COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET : MONTEREY AVE
EAST -WEST STREET : PARK VIEW DR
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
B O
U N
D
,.IME
RIGHT
THRU
LEFT
4:15
PM 5
217
10
4:30
3
171
4
4:45
6
181
7
S:UU
5
180
8
TOTAL
19
749
29
P E A K Hn U R R F, P n R T
S O U T H
B O U N D
RIGHT THRU LEFT
12 174 5
9 164 16
11
179
8
10
145
11
42
662
40
DATE, : 24 MAY 19R9
DAY : WEDNESDAY
E A .S T
F O U N D
RIGHT THRU LEFT
8
5
6
1.5
7
12
7
6
7
9
3
1.3
39
21
38
W E S T
B O U N D
RIGHT THRU .LEFT
11
5
6
13
4
4
8
2
5
18
6
7
50
17
22
PREPARED FOR: ASL CONSULTING F,N(,TNEERS
ETC LZEZ PSZ
ZZP E9PZ 668
ZL SLS ESZ
SSE 9ZE PLT
PS £6 99
TPOT PZP OLT Lo.L H
99Z 89 OE rlvLu
ET
PTT
ZT
TT
SZT
6S
ZZ
6T
ST
89
ZT
9
00=9
ST
ZET
LT
OZ
TPT
L9
ST
6Z
PZ
P9
ET
8
56:5
PT
PST
TT
8T
6PT
LS
9T
EZ
8T
L9
SZ
OT
0£:9
8
OPT
ZZ
EZ
09T
OL
SZ
ZZ
6
69
ST
9
Wd ST:g
SP
TP9
89
Z6
6T9
PTZ
TOT
LL
SE
99Z
90T
E9
IYV.LO
8
S9T
LT
LT
L£T
£S
OZ
LT
8
-LS
Z£
OT
00:9
OT
PLT
8T
ZZ
PST
PS
TE
ST
ZT
PL
TZ
9T.
S'b-tl
£T
09T
PT
TZ
OST
8P
ZZ
6T
9
S9
TE
67
US:6
PT
ZST
6T
ZE
SLT
6S
SZ
EZ
ZT
09
ZZ
ST
Wd 9T:6
06
PLS
L9
PTT
8Z9
SOZ
98
T8
SP
S8Z
9PT
9E
7V.LO
TZ
SET
SZ
ZZ
S9T
ES
9Z
SZ
ST
SL
SZ
6
00:T'
6T
EST
£T
ZE
Z9T
E9
PT
8T
ZT
ZL
PP
L
Sv:Z
SZ
CPT
ZT
£Z
8PT
SS
9Z
LT
OT
TL
TE
9
0£=ZT
ZZ
OPT
LT
LE
EST
LE
LT
TZ
9
P9
9P
PT
Wd ST:Z'
SZT
ZLS
L8
PVT
TP9
PZZ
8TT
SL
ZZ
ZE'Z
POT
TV
7itL(l�
PE
OPT
ST
LE
LLT
99
ZE
ZZ
9
SL
TE
6
00:Z
LP
LST
SZ
SE
TST
Z9
6Z
ST
6
Z9
PZ
ZT
Sfl:T_
9Z
6PT
CZ
EZ
69T
ES
OE
9T
Z
TS
ZZ
ET
0£=TT
TZ
9ZT
TZ
9P
PVT
PP
LZ
ZZ
S
PP
LZ
L
WV ST:T
Gd37
OHH.L
LHDid
1.437
OHHS
.LHDIH
.LJSII
DHHd ILHDI21
Z337
OHH.L
LHDIH 3WI.L
ONO
09
aAl0
09
aN12
09
a
N a
09
L S 9
M
.L S v
3
H
z a
0 S
H
d H
0 N
S,LNHWHADW
0Nx Hll.L NOI.LJHSH3.LNI =
3dA.b
I I
I HS t
.L33HSs LSHM-.LS E'3
2 KVGSSNu8M
:
Ava
till
EaIN2D
NM01 : S3391S
HLU0S-H.LH0N
696T
XVW PZ :
3LH(7
.L'HZSHU
NgVd :
A.LIJ
.LN17OO 3dONIW ST - AUVWW17S M]OO :JIddVH.L
TRAFFIC COUNT S17MMARY - 15 MINUTE COUNT
CITY PALM DESERT
NORTH -SOUTH -STREET TnWN CENTER DR
EAST -WEST STREET SH III
TYPE INTERSECTION T17RNING MOVEMENTS
N O
R T
H
R O
U N
D
,'IME
RIGHT
THR17
LEFT
4:15
PM 18
22
6n
4:30
19
31
65
4.4.5
16
21
74
5:01)
In
32
.57
TOTAL
6.3
106
256
P E A K H O U R R E P O R T
S O
U T
H
B O
U N
D
RIGHT
THRU
LEFT
12
23
28
6
19
22
12
18
31
8
17
20
38 77 lnl
DATE : 24 MAY 1989
DAY : W_EDNESDAY
E
A S T
B
p U N
D
RIGHT
THRU
LEFT
59
178
32
48
150
21
54
1.54
22
53
137
17
214 619 92
W E S T
g D U _N D
RIGHT THRU LEFT
19
152
14
14
150
13
18
174
In
17
16.5
8
Z�19�m
PREPARED FOR: ASL CnNSULTING ENGINEERS
TRAFFIC. COUNT SUMMARY - 15 MINUTE COUNT
CITY : PALM DESERT
NORTH -SOUTH STREET : TOWN CENTER DR
FAST -WEST STREET : SH III
TYPE : INTERSECTION TURNING MOVEMENTS
N O
R T
H
R O
U N
D
_IME
RIGHT
THRU
LEFT
1:30
AM 13
22
51
1:4.5
12
24
62
12.:0n
9
31
75
2:15
14
46
64
,rOTAL 48 123 252
P E A K H O U R R E P O R T
S O
U T
H
B O
U N
D
RIGHT
THRir
LEFT
2
16
30
9
15
29
6
22
32
8
21
17
25 74 108
DATF• : 24 MAY 1989
DAY : WEDNESDAY
F. A S T
R O U N D
RIGHT THRU LEFT
53
169
23
62
151
38
65
177
37
37
1.53
37
217 650 135
W E S T
B O U N D
RIGHT THRU LFFT
23 149 26
25 157 47
18 140 34
17 140 22
83 586 129
PREPARED FOR: ASL l_ONSULTING ENGINEERS
9-8 TRAFFIC SIGNALS AND LIGHTING Traffic Manual
1249E6
Figure 9.1 D
TRAFFIC SIGNAL WARRANTS
(Based on Estimated Average Daily Traffic - See Note 2)
i
URBAN .........:!........... RURAL .......................
Minimum Requirements
EADT
1. Minimum Vehicular
Satisfied Not Satisfied
Vehicles per day on major
Vehicles per day on higher -
street (total of both •
volume minor -street approach
approaches)
(one direction only)
3� b...J�'�
Number of lanes for moving traffic on each approach
Major Street Minor Street
Urban Rural
Urban Rural
1 .......................... 1 ...........................
8,000 5,600
2,400 1,680
2 or more ................. 1 ...........................
9,600 6,726
2,400 1,680
2 or more ................. 2 or more ..................
,600 6,720v
200 2,240
1 .......................... 2 or more ..................
8,000 5.600
3,200 2,240
2. Interruption of Continuous Traffic
3-7 oc7"
5:5-
Vehicles per day on major
Vehicles per day on higher -
Satisfied Not Satisfied
street (total of both
volume minor -street approach
approaches)
(one direction only)
Number of lanes for moving traffic on each approach
Urban Rural
Urban Rural
Major Street Minor Street
1 ......................... 1 ..........................
12,000 8,400
1,200 _ 850
2 or more ................. 1 ..........................
14,400 10,080
1,200 850
2 or more ................. 2 or more ..................
4 40 7 10,080
1l 600� 1,120
1 .......................... 2 or more ..................
12,000 8,400
1,600 1,120
3. Combination
/
Satisfied Not Satisfied
2 Warrants
2 Warrants
No one warrant satisfied but following warrants fulfilled
80% or more ............ 4/.A
1 2
NOTE:
1. Heavier left turn movement from the major street may be included with minor street volume if a separate
signal phase is to be provided for the left -turn movement.
2. To be used only for NEW INTERSECTIONS or other locations where actual traffic volumes cannot
be counted.
TS-100
r
1983 HCM: SIG'NALI,ZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION..FRED WAKING
DR./HIGHWAY 111
HREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/9/S9
TIME ........... 92 AM
PEAL. W/O PRO.
COMMENT ....... VOL. BASED ON ANNUAL GROWTH RT. OF 7%
VOLUMES
-
GEOMETRY
--------------•----------
-
EB WB NB
SB : EB WLt
NB'
SB
LT 6 16 5
250 : L 10.0 L 10.0
L 10.0
L
10.0
TH - 3 561
508 T 12.0 T 12.0
T 12.0
T
1.2.0
RT 9 522 12
1 TR 12.0 T 12.0
T 12.0
T
12.0
RR 5 261 6
1,: 12.0 R 12.0
TR 12.0
T
12.0
12.0 12.0
12.0
R
10.0
--------------------------------------------------------------------------
` 12.0 12.0
12.0
12.0
ADJUSTMENT'FACTORS
GRADE HV
ADJ PKG BUSES PHF PEDS
PED. BUT.
ARR.
TYPE
(%) (%)
Y/N Nm Nb
Y/N min T
EB 0.00 2.00
Y 20 0 0.90 50
N 30.3
7.
WB 0.00 2.00
Y 20 0 0.90 50
N 30.3
3.
NB 0.00 2.00
Y 20 0 0.90 SO
N 27.2
SB 0.00 2.00
---------------------------------------------------------------------------
Y 20 0 0.90 50
N 27.0
._,
SIGNAL SETTINGS
CYCLE LENGTH
=
120.0
PH-1 PH-2
PH-3 PH-4 PH-1
PH-2 PH-3
PH-4
EB LT X
NB LT
X
i
TH X
TH
X
RT X
RT
X
PD X
PD
X
WB LT X
SB LT
X
TH X
TH
X
RT X
RT
X
PD X
PD
X
GREEN 42.0 0.0
0.0 0.0 GREEN 30.0
36.0
0.0
0.0
YELLOW 4.0 0.0
----------------------------------------------------------------------------
0.0 0.0 YELLOW
4.0 4.0
0.0
0.0
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP. DELAY
APP.
LOS
EB L 0.021
0.350 19.4 C
17.8
C
TR 0.009
0.350 16.4 C
WB L 0.039
0.350 19.5 C
27.9
D
T 0.003
0.350 16.4 C
R 0.782
0.350 28.6 D
NB L 0.016
0.250 25.8 D
25.0
D
TR 0.517
0.300 22.7 C
SB L 0.784
0.250 39.4 D
2.7.3
,D
T Ci.430
0.300 21.9 C
R 0.000
---------------------------------------------------------------------------
0.300 19.0 C
INTERSECTION: Delav
= 26.4 (secJveh) V/C =
0.694 LOS
= D
1985 HCM: SIGNALIZED""INTERSECTIONS
SUMMARY REPORT
INTERSECTION..FRED WARING DR./HIGHWAY Ill
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/5/S9
TIME.......... EX. ADJ. AM PEAK
COMMENT....... EX. VOL. WERE MOLT. BY A SEASONAL VAR. FACTOR OF 1.3
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB
NB
SB ;
ER
WL-t
NB
SB
LT
5 iv
4
204 ; L
10.0 L
10.0
L 10.0
L
10.0
TH
2 2
458
415 : T
12.0 T
12.0
T 12.0
T
12.0
RT
7 426
10
1 : TR
12.0 T
12.0
T 12.0
T
12.0
RR
7 213
10
1 :
12.0 R
12.0
TR 12.0
T
12.0
12.0
12.0
12.0
R
10.0
--------------------------------------------------------------------------
12.0
12.0
12.0
12.0
ADJUSTMENT
FACTORS
GRADE
HV
ADO PKG BUSES
PHF
PEDS
PED. BUT.
ARR.
TYPE
(%)
(%)
Y/N Nm
Nb
Y/N min T
EB
0.00
2.00
Y 20
i) 0.90
50
N 30.3
v,
WE)
0.00
2. 00
Y 20
0 0.90
5(_)
N 710.3
_
NB
O. i )i)
2.00
Y 20
0 0. 90
50
N 27. B
_
SB
0.00
2.00
Y 20
0 0.90
50
N 27.8
_
--------------------------------------------------------------------------
SIGNAL
SETTINGS
CYCLE LENGTH
120.0
PH-1
PH-2
PH-3
PH-4
PH-1
PH-2 PH-3
PH-4
EB
LT
X
NB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
WB
LT
X
SB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
GREEN
42.0
0.0
0.0
0.0 GREEN 30.0
36.0
0.0
0.0
YELLOW
--------------------------------------------------------------------------
4.0
0.0
0.0
0.0 YELLOW
4.0 4.0
0.0
i).0
LEVEL
OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
EB
L
0.016
0.350
19.4
C
18.5
C
TR
0.002
0.350
16.4
C.
WB
L
0.032
0.350
19.5
C
22.9
C
T
0.002
0. 350
16.4
C
R
0. 637
O. 350
23.2
C
NB
L
0.013
0.250
25.7
D
25.8
D
TR
0.417
0.'00
21.8
C
5B
L
0. 640
Q. 250
33.2
D
25.0
C
T
0.351
0.300
21.7
C
R
0. 000
0. 300
19.0
C
--------------------------------------------------------------------------
INTETSECTION;
Delav
= 25.0
(sec/veh)
V/C =
0.607 LOS
= D
985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
tifir##K'd. #•##.{;.fiF####•:Y• r•.{f..Y: # X•##Y###34•#k##3Fi£-####YeY<•i!#sY•#i?•Y'.
Y#G k#Y.if•ii•'x#ii#±aX3E#tif#..y .14..n.•7#-}°####
INTERSECTION..B01 HOPE
DR. /HT.BHWAY
III
;;REA TYPE. , ... C.BT'>
ANALYST ,....... M.S
DA rr............ 6/9/89
TIME .......... EXISTINO
AM PEA6;
COMMENT....... EX. VOL.
WERE MULT.
BY A
SEASONAL_
VAR.
FACTOR OF
1.3
---------------------------------------------------------------------------
VOLUMES
GEOMETRY
ER WB NH
SB
EB
WR
NB
SB
LT 4 257 1
26 LTR
12.0
L
10.0
L
10.0
L
10.0
' H 4 - 342
287
12.0
L
10.0
T
12,0
T
12.0
=`T 7 27 254
1.2.0
T
11.0
T
10.0
T
12.0
RR 4 14 127
2
12.0
R
12.0
T
10.0
Ti
12.0
12.0
12,0
R
12.0
12.0
12.0
12.0
12.0
12.0
GRADE
HV
i%)
K)
ER
0.00
2.00
WB
0.00
2.00
NB
0.00
2.00
SB
0.00
2.00
EB L-r
TH
RT
PD
wB L'T
TH
RT
PD
GREEN
YELLOW
X
42.0
4.0
LANE GRP.
EB
LTR
WB
L
T
R
NB
L
T
R
SR
L
TR
INTERSECTION:,
PH-2
ADJUSTMENT FACTORS
ADO
PKG
BUSES
PHF
PEDS
Y/N
Nm
Nb
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
0,0
C), CI
V/C
0.034
0. --
0.006
0.038
0.008
i, 202
-.L
0.296
0.204
0.175
SIGNAL SETTINGS
PH-3 PH-4
PED. BUT. 'ARR. TYPE
Y/N min T
! 32
N. 32.8
N 19.3 3
N 19.- L
-------------------------
CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4
NB LT
X
rH
X
RT
X
PD
X
SB L'T'
X
- :r!
X
RT
X
PD
X
0.0
0.0 GREEN
1,2.0
54.0 0.0 0.0
0.b
0.0 YELLOW
4,0
4.0 0.0 0.0
--------------------------------------------------------
LEVEL OF SERVICE
G/C
DELAY LOS
APP.
DELAY APP. LOS
0.350
1.6.6 C
16.6 C
,,,350
21.9 C
21.6 C
0.350
16.4 C
0.350
16.6 C
0.100
37.0 D
13.1 L{
0.450
12.9 B
0.450
13.6 R
0.100
.37c8D
14.6 B
0.450
12.7 B
--------------------------------------------------
Delav = 15.7 tser_/veh7 V/C = 0,300 LOS L
1995 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..BOB HOPE DR./HIGHWAY
111
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/9/89
TIME ........... 92 AM PEAK: W/0 PRO.
COMMENT....... PROJECTED VOL. BASED
-----------------------------------------------=----------------------------
ON AN
ANNUAL
GROWTH RATE OF
7%
VOLUMES
GEOMETRY
EB WB NB SB :
EB
WB
NB
SB
LT 5 315 1 32 . LTR
12.0
L
10.0 L
io.0
L
10.0
TH 5 4 419 352 :
12.0
L
10.0 T
12.0
T
12.0
RT 9 33 311 4 :
12.0
T
11.0 T
10.0
T
12.0
RR 5 17 155 2
12.0
R
12.0 T
10.0
TR
12.0
12.0
12.0 R
12.0
12.0
12.0
12.0
12.0
12.0
GRADE
HV
EB
0.00
2.00
WB
0.00
2.00
NB
0.00
2.00
SB
------------------
0.00
2.00
PH-1
EB LT
X
TH
x
RT
x
PD
x
WS LT
x
TH
x
RT
x
PD
x
GREEN
41.0
YELLOW
----------------
4.0
LANE GRP.
EB
LTR
WB
L
T
R
NB
L
T
R
SB
L
--------------
TR
INTERSECTION:
PH-2
0.0
0.0
V/C
0.042
0.419
0.009
0.049
0.007
0.247
0.364
0.232
0.215
ADJUSTMENT FACTORS
ADO PKG BUSES PHF PEDS
Y/N Nm Nb
Y 20 0 0.90 50
Y 20 0 0.90 50
Y 20 0 0.90 50
Y 20 0 0.90 50
----------------------------
SIGNAL SETTINGS
PH-3 PH-4
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0 0.0 GREEN
0.0 0.0 YELLOW
----------------------------
LEVEL OF SERVICE
G/C DELAY LOS
0.342 17.0 C
0.342 23.3 C
0.342 16.8 C
0.342 17.1 C
0.106 36.3 D
0.450 13.2 B
0.450 14.2 B
0.109 37.3 D
0.450 13.0 B
----------------------------
PED. BUT. ARR. TYPE
Y/N min T
N 30.- -
N 30._ 3
N 27.2 71
N 27.8 31
-------------------------
CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4
X
x
x
x
x
x
x
x
13.0 54.0
4.0 4.0
APP. DELAY
17.0
22.9
13.5
14.8
Delav = 16.3 (sec/veh) V/C = 0.369
0.0 0.0
0.0 0.0
-------------
APP. LOS
C
C
B
B
-------------
LOS = 0
1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT
��•�, � x•��#-��-��;-���� ax�r��� rEx t!•��a�•� u�#�rFx K;*+;� w�=� � u �# r Fx *R;� w x ���+��+��� �.i�>a���t!-�#
INTERSEC:TION..BOB HOPE DR./HIGHWAY III
AREA TYPE ..... CBD
ANALYST....... N.S.
DATE .......... 6/9/99
TIME.......... 92 AN PEAK W/ PRO.
COMMENT- .... ,: VOL. BASED ON ' 92 VOL.., AND TURN T NG MOVf.=MFNTS
VOLUMES . GEOMETRY
EB
WB
NB
LT
5
347
1
TH
5
4
435
RT
9
33
32:
RR
---------------------
l
1/
155
EB
WB
NB
SB
EB LT
TH
RT
RD
WR L
TH
RT
PD
GREEN
YELLOW
GRADE
0.00
0.00
0.00
0.00
PH-1
x
x
x
41.0
4,0
HV
2.00
2.00
2.00
2.00
PH-2
SB :
EB
WB
32 :
LTR 12.0 L
10.
195
.
1210 L
1.0.
4 s
12.0 T
II.
2 ,
12.0 R
12.
12.0
1.2.
12.0
12.
----------------------------
ADJUS'TMENT FACTORS
ADO
PKG
BUSES PHF
REDS
Y/N
Nm
Nb
Y
20
0 0.90
50
Y
20
0 0.90
50
Y
20
0 0.90
50
----------------------------
SIGNAL SETTINGS
PH-3
PH-4
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0 0.0 0.0 GREEN
0,0 0.0 0.0 YELLOW
LEVEL
OF SERVICE
LANE GRP.
V/C
G/c
DELAY
LOS
EB
LTR
0.042
0,342
17.0
C
WB
L
0.461
0.742
23.7
C.
T
0.008
% 342
16.8
c
R
0.049
0.342
17.1
C
NB
L
0.007
0.108
36.3
D
T
0.237
0.450
13.3
B
R
0.392
0.450
14.5
B
SB
L
0.2.32
0.108
37..3
D
TR
0.241
0.450
13.2
B
NB
SB
0 L
10.0
L 10.0
0 'T
12.0
T 12.0
0 T
10.0
T 12.0
0 i
10.0
TR 12.0
0 F;
12..1
12.0
0
12.0
1.2.0
RED,. BUT. ARR. TYPE
Y/N min T
N 30.3 _
N 30..3
N 27.0 _
N '27.0 _
-------------------------
CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4
X
x
x
x
v
n
x
x
x
13.0 54.0 0.0 0.1:)
4, 0 4.0 ().0 0, c"
---------------------------
APR. DELAY APR. LOS
17 0 C
23.4 1.
13.6 B
14.8 B
INTERSECTION: Delav = 16.5 r=.Ea/veh) V/C = 0,399 LOS = C
1995 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION-BO'B HOPE
DR./HIGHWAY
III
AREA TYPE .... .CBD
ANALYST ...... .M.:=.
DATE .......... 6/9✓89
TIME.......... EXISTING
PM PEAK
COMMENT....... EX. VOL.
=--------------------------------------------------------------------------
WERE MULT.
BY A
SEASONAL VAR.
FACTOR OF
1.3
VOLUMES
GEOMETRY
ER WR NH
S`3 :
ER
WD
NB
SE+
LT 4 315 27
139 : LTR
12.0
L 10.0
L
10.0
L
10.0
TH 8 7 467.
432 :
12.0
L 10.0
T
12.0
T
12.0
RT 5 38 381
9 :
12.0
T 11.0
T
10.0
T
12.0
RR 5 16 191
9 :
12.0
R 12.0
T
10.0
TR
12.0
12.0
12.0
R
12.0
12.0
12.0
12.0
12.0
12.0
ADJUSTMENT FACTORS
GRADE
HV
ADJ
PKG
RUSES
PHF PEDS
PED. BUT. ARR.
TYPE
(%)
("/.)
Y/N
Nm
Nb
Y/N
min T
EB
0.00
2.00
Y
20
0
0.90
50
N
32.9
3
Wg
0.00
2.00
Y
20
0
0.90
50
N
32.8
.'_
NB
0.00
2.00
Y
20
0
0.90
50
N
19.3
_
S$
0.00
2.00
Y
20
0
0.90
50
N
19.3
3
SIGNAL SETTINGS
CYCLE LENGTH =
120.0
PH-1
PH-2
PH-._.
PH=4
PH-1
PH-2 PH-3
PH-4
E$
LT
X)
NB LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
WR
LT
X
SH LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
GREEN
34.0
0.0
0-0
0.0
GREEN
24.0
50.0 0.0
0.0
YELLOW
4.0
0.0
0.0
0.0
YELLOW
4.0'
4.o 0.0
0.0
---------------------------------------------------------------------------
LEVEL OF
SERVICE
LANE GRP.
EP
LTR
WP
L
T
R
N.6
L
T
R
S9
L
--------------
TR
INTERSECTION:
V/C G/C DELAY LOS APP. DELAY
0.038 0.283 20.1 C 20.1
0.494 0.293 27.7 D 27,1
0.016
0.283
20.0
C
0.081
0.223
20.4
C
0.106
0.200
29.8
D 16,1
0.298
0.417
15.1
C
0.478
0.417
17.0
C
0.545
0.200
34.4
D 19.4
0.283
0.417
15.0
Li
------------------------------------------
Delav = 19.6
(sec/veh)
V/C = 0.498
APP. LOS
r_
D
C
C
LOS = C
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION..BOB HOPE_ DR./HIGHWAY
III
AREA TYPE ..... CSD
ANALYST....... M.S.
DATE .......... 6/9/89
TIME ........... 92 PM
PEAK. W/O PRO.
COMMENT....... PROJECTED VOL. ARE BASED
ON AN
ANNUAL GROWTH
RATE
OF 7%
------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB
SB
EB
WB
NB
SB
LT 5 396 .3
170 LTR
12.0
L
10.0 L
10.0
L
10.0
TH 10 9 572
528
12.0
L
10.0 T
12.O
'f
7.,0
RT 6 47 467
11
12.0
T
11.0 T
10.0
T
12.0
RR 3 24 230
6 .
12.0
R
1=.0 T
10.0
TR
12.0
12.0
12.0 R
12.0
12.0
---------------------------------------------------------------------------
12.0
12,0
12.0
12.0
GRADE
HV
Q)
Q)
EB
0.00
2.00
WB
0.00
2.00
NB
0.00
2.00
SB
0.00
2.00
EB LT
TH
RT
PD
WB LT
TH
RT
PD
GREEN
YELLOW
LANE GRP.
EB LTR
WB L
T
R
NB L
T
R
SD L
TR
--------------
INTERSECTION:
PH-2
ADJUSTMENT FACTORS
ADJ
PKG
BUSES
PHF
PEDS
Y/N
Nm
Nb
Y
20
ti
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
----------------------------
SIGNAL SETTINGS
PH-:=
PH-4
NB
LT
TH
RT
PD
SB
LT
TH
RT
PD
0.0
0.0
0.0 GREEN
0.0
0.0
0.0 YELLOW
--------------------------------
LEVEL_
OF SERVICE_
V/C
G/C
DELAY
LOS
0.063
0.292
19.9
C
0.597
0.292
28.7
D
0.022
0.292
19.6
C
0.082
0.292
1919
C
0.183
0.142
34.5
D
0.325
0.467
13.0
B
0.531
0.467
15.4
C
0.941
0.142
72.6
F
0..312
0.467
12.9
B
PED. BUT. ARR. TYPE
Y/N min T
N 0.0 -
N 0.0
N 0.0
N 0.0 3
------------ 7------------
CYCL.E LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4
x
x
x
x
x
x
x
17.0 5&0
4,0 4.0
APP, DELAY
19.8
28.0
14.4
26.4
Delev = 21.6 (sec/veh) V/C = 0,617
0.0 0.0
0.0 0.0
APP. LOS
C
D
B
D
-------------
LOS = C
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSF_CTION..BOB HOPE DR./HIGHWAY
111
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/9/89
TIME ........... 92 PM
PEAK W/ PRO.
COMMENT ....... VOL. BASED ON '92 VOL.
--------------------------------------------------------------------------
AND
TURNING
MOVEMENTS
VOLUMES
GEOMETRY
ER WB NB
SB :
EB
WB
NB
SR
LT 5 453' 33
170 : LTR
12.0
L
10.0 L
10.0
L
10.0
TH 10 9 667
616
12.0
L
10.0 T
12.0
T
12.0
FT 6 47 538
11 :
12.0
T
11.0 T
10.0
T
12 0
RR _ 24 .230
6
12.0 'R
12.0 T
10.0
TR
12.0
12.0
12.0R
120
120
- -
-
12.0
12.0
.12.0
12.0
EB
WB
NB
S13
EB LT
TH
FIT
PD
WD LT
TH
FIT
PD
GREEN
YELLOW
GRADE
(%)
0.00
0.00
0.00
0.00
LANE GRP
EB
LTR
WB
L
T
R
NB
L
T
R
SB
L
-------------
TR
INTERSECTION:
ADJUSTMENT FACTORS
HV
ADJ
PKG
BUSES PHF PEDS
(%)
Y/N
Nm
Nb
2.00
Y
20
0 0.90 50
2.00
Y
20
0 0.90 50
2.00
Y
20
0 0.90 50
2.00
Y
20
0 0.90 50
------------------------------------
SIGNAL SETTINGS
PH-2
PH-3
PH-4
NB LT
TH
RT
PD
SB LT
TH
FIT
F'D
0.0
0.,0
0.0 GREEN
0.0
0.0
0.0 YELLOW
-----------------------------------
LEVEL OF SERVICE
V/C
G/C
DELAY LOS
6.063
0.292
19.6 C
0.701
0,292
30.8 D
0.022
0.292
19.6 C
0.082
0.292
19.9 C
01183
0.142
34.5 D
0.380
0.467
13.4 B
0.691
0.467
18.7 C
0.941
0.142
72.6 F
0.763
0,467
13.3 B
PED. BUT. ARR. TYPE
Y/N min T
N 0.0
N 0.0
N 0.0 3 -
N 0.0 3
-------------------------
CYCLE LENGTH = 1.:0.0
PH-1 PH-2 PH-3 PH-4
x
X
X
X
X
X
x
X
17.0 56.0 0.0 0.0
4.0 4.0 0.0 0.0
APP. DELAY APP. LOS
19.8 C
30.1 D
15.6 G
25.1. D
Delav = 21.9 (sec/veh) V/C = 0,733
LOS = C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION"^MAGN5RIA
FALLS/HIGHWAY 111
AREA TYPE """""CBD
ANALYST ."""^.,M"S"
DATE """^".."""6/12/R9
TIME "",".""".^EXISTING
AM PEAK
COMMENT ^""'","EX. VOL.
WERE MULT" BY A SEASONAL FACTOR
VAR, OF 1.3
-_____-_~--____-_____---__________-______________-________________--_____'
VOLUMES
: GEOMETRY
EB WB NB
SB : EB WB
N!:(
SP
LT 199 29 40
40 : L 10.0 L 12"0
L \O^0 L
10"(
TH 31 18 1365
1453 : TR 12,0 TR 15"0
T 12"0 T
12"(
RT 59 61 242
10 : 12.0 12"0
T 12,0 T
12"(
RR 23 24 91
4 : 12"0 '12"0
TR 15,0 TR
15"(
: 12^0 12^0
12^0
12.(
: 12"0 12"0
12.0
12"(
__________________________________________________________________________
ADJUSTMENT FACTORS
GRADE HV ADJ
PKG BUSES PHF PEDS
PED" BUT, ARR.
TYPE
(%) (%) Y/N
Nm Nb
Y/N min T
EB 0^00 2"00
Y 20 0 0"90 50
M 30,8
3
WB 0^00 2,00
Y 20 0 0"90 50
N 30"8
7
NB .0100 2.00
Y 20 0 0,90 50
N 18.3
3
SB 0"00 2.00
Y 20 o 0"90 50
N 12,3
3
--------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
120.(
PH-1 PH-2
PH-3 PH-4 PH-1
PH-2 PH-3
PH-'
EB LT X
NB LT
X
TH X
TH
X
RT X
RT
X
PD X
PD
X
WB LT X
SR LT
X
TH X
TH
X
RT X
RT
X
PD X
PD
X
GREEN 35.0 0,0
()^0 0.0 GREEN 13,0
60"0 0,0
0,'
YELLOW 4"0 0"0
0^0 0.0 YELLOW
4.0 4"0 0,0
().'
----------------------------------------------
-----------------------------
LEVEL OF SERVICE
LANE GRP" V/C
G/C DELAY LOS
APP. DELAY APP.
LOS
EB L 0"639
0"292 30"9 D
29"0
D
TR 0^218
0"292 20"8 C
WB L 0"089
0^292 23"5 C
28"6
D
TR 0"167
0"292 20.5 C
NB L 0"347
0.108 38"2 D
19,5
C
TR 0.818
().500 17,9 C
GB L 0"290
()"108 37"7 D
17"3
C
TR 0"774
0.500 16"8 C
-------------------------------------
INTERSECTION: Delay
____________________________________
'
= 19"2 (sec/veh) V/C =
0,704 LOq = C
1995 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
•iF###########################•Y.-##%•##.Y'.•#dF•#irirf.-#/c#####-3(•#-
INTERSECTION..MAGNESIA FALL'S/HIGHWAY 111:
AREA TYPE ..... CBD
ANALYST ....... M.S.
DATE .......... 6YI2199
TIME ........... 92 AM PEAK W/O PRO.
COMMENT ....... VOL. BASED ON AN.ANNUAL GROWTH RATE OF 7%
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB
WB NB
SB :
EB
WB
NB
SB
LT
244
36 59
49 :
L 10.0 L
12.0 L
10.0
L
10.,
TH
38
22 1672
1779 :
TR 12.0 TR
15.0 T
12.0
T
12.-
RT
73
75. 297
12
12.0
12.0 T
12.0
T
12.,
RR
26
26 149
6
12.0
12.0 TR
15.0
TR
14.,
12.0
12.0
12.0
12.
12.0
12.,0
12.0
12.
---------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV
ADJ PKG
BUSES PHF PEDS PED. BUT.
ARR.
TYP
(%)
(%)
Y/N Nm
Nb
Y/N
min T
ED
0.00
2.00
Y 20
0 0.90
50 N
0.0
_
WB
0.00
2.00
Y 20
0 0.90 i
50 N
0.0
._
NB
0.00
2.00
Y 20
0 0.90
50 N
0.0
31
A
0.00
2.00
Y 20
0 0.90
50 N
0..0
v
--------------------------------------------------------------------------
.SIGNAL SETTINGS"
CYCLE LENGTH =
120.
PH-1
PH-2
PH-3
PH-4
PH-1
PH-2
PH-3
PH-
EB
LT
X
NG LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
WB
LT
X
SB .LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
GREEN
30.0 0.0
0.0
0.0 GREEN
11.0
67.0
0.0
0.
YELLOW
4.0 0.0
0.0
0.0 YELLOW
4.0
4.0
0.0
0.
LEVEL OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP. LOS
ED
L
0.948
0.250
62..=
F
51.7
E
TR
0.325
0.250
23.9
C
WB
L
0.135
0.250
26.6
D
29..5
D
TR
0.254
0.250
23.4
C
NS
L
0.505
0.092
42.1
E
17.9
C
TR
0.877
0..558
17.1
C
SB
L
0.419
0.092
40.4
E
17.0
C
TR
0.856
0.558
16.4
C
--------------------------------------------------------------------
INTERSECTION:
Delay = 20.4
(sec/veh)
V/C
= 0.839 LOS
= C
1985 HCM: SIE*|AL7ZA [N.|EHSECTl9N�,
SUMMARY REPORT
INTERSECTION —MAGNESIA FALLS/H[ISHNAY 11l
AREA TYPE ,""""C89
ANALYST ",^^^""M.S,
DATE ... ,""""^.h/12/B9 ^
TINE ,.""^"^,,,.92 AM PEAKW/ PRO.
COMMENT ....... VOL. BASED ON '92 VOL" AND TURNING M(|VISMF ^S
____~~^____-`.^___`.^^____`_~_-__.._^-_~~~~__--_~.____-~^^^_____,'-^____-~~�
VOLUMES
GEOMETRY
E8 pi8
Ng
SEA :
EB
W8
NB
S8
1,1
244 36
59
49 :
L 10.0 L-
12.0 L
11).() L
A!)"o
lH
38 22
1700
1871 :
TR 12.0 TR
15^0 |
12"0 |
12'0
Hr
73 75
297
12 ;
12,0
12"0 1
12"9 |
11,3
RR
26 26
149
6 :
12"0
12"0 1w
15^0 TR
14.0
:
l?.o
`__-_~__--
�
-
:
\
19.0
1/,o
`
;V,JDSTMEN[ FMC|i/W6
6pAVE
HV
ADJ PKG
0nSES PHF P�OS
Bur-PFV� �7' �kR.
)Y/F
(%)
\%)
Y/N Nm
Nb
Y/N
min |
E8
0.0x0
2"00
; 2o
()0"9V
50 u
v,0
J
W8
0"00
2,041
y 20
0 0"90
50 W
0.0
3
Nb
$,00
2"0o
Y Z»
0 0.1?»
5V I'll
SB
-------------------------------
0,00 .2.00
Y 20
V0.98
-,^'____~~______~~____-_._____-____--.____-'_.
50 N
0.0
3
SIGNHL
�
SETTINGS
CYCLE
LE#G|H
12U^o
PH-1.
pH-2
PH-3
PH-4
PH-1 PH-2
PH-3
PH-4
ES
|T X
NB LT
�
FHX
TH,
�
RT X
RT
X
PD X
PD
�
WB
LT X
SD LT
X
rH . X.
TH
;
RT X
�
RI
X
PD x
pn
X
GREEN 30^0
0.0.
0"0
0"0 GREEN
11"n h7^0
0.0
(),0
YELLOW, 4^0
---------------------------------------------------
0"0
o"v
0"0 YELLOW
4,0 4,0
0,3
010
\EyEL OR ` SERVICE
^-__~_______-~^__
LANE GRP^
V/C
G;C
DELAY LDS
APP, XL4'
HPp.
LOS
E(1
i
V,948
0.250,
6/.3 F
52.4
E
/R
0.325
V^2no
23.Y C
u:
L
0.135
y.25'`
7^.6 A
7+.�
o
`
lR
0.254
o.250
?A.� (�
ux
L
0.5�/5
0,092'
4/,y F
21"A
^
TR
01890
0"558
Sx
L
0.419
0.092
`� 40"4 E
1A,B
C
__--___-____-.~-__-____--__-^--`~-__-____~-__~^__.`___~~_--_-___'-__.`__~~_
`fR
V"902
0"558
�� 18"3 C
iN|ERSECUtON:
DelOv = 21.3
!sec/veh) V/C
= 0.974
L|/S = C
�
'
19B5 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTIDN.,NAGNESIA
FALLS/HIGHWAY ill
AREA TYPE.....CBD
ANALYST....... M.S.
DATE .......... 6/12/89
TIME.......... EXISTING
PM PEAL;
COMMENT....... EX. VOL.
WERE NULT. BY A SEASONAL VAR,
FACTOR OF I.3
---------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB WB NB
SB EB WB
ND
SB
LT 129 21 82
20 L 10.0 L 12.0
L 10.0 L
10.
TH 25 12 1442
1431 : TR 12.0 TR 15.0
T 12.0 T
12.,
RT 44 53+ 204
9 12.0 12.0
T 12.0 T
12.
RR 22 26 102
5 v 12.0 12.0
TR 15.0 TR
15.
12.0 12.0
12.0
12.
12.0 12.0
12.0
12.
-----------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE H'V ADS
PKG RUSES P-IF PEDS
FED. BUT. ARR.
TYP
Q) (%) Y/N
Nm Nt
Y/N min T
EB 0.00 2.00
Y 20 0 0,90 50
N 32.3
-
WB 0.00 2.00
Y 20 0 0.90 Sit
N =2.3
_
NB 0.00 2.00
Y 20 0 0.90 50
N 20.0
-
SB 0.00 2.00
Y 20 0 0.90 50
N 20.0
_
-------------------------------------------------------------------------
.SIGNAL SETTINGS
CYCLE LENGTH =
120.
PH-1 PH-2
PH-3 PH-4 PH-1
PH-2 PH-3
PH-
EB LT X
NB LT
X
TH X
TH
X
RT X
RT
X
PD X
PD
X
WB LT X
SB LT
X
TH X
TH
X
RT X
RT
X
PD X
PD
X
GREEN 22.0 0.0
0.0 0.0 GREEN 15.0
71.0 0.0
0.
YELLOW 4.0 O,ii
O,ir 0.C> YELLOW
4,0 4.0
0.
----------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP. DELAY AP-P.
LOS
EB L 0.615
O.183 37.6 D
35.2
D
TR 0.244
0.183 27.2 D
WB L 0.096
0.183 31.0 D
33.5
D
TR 0.190
0.193 26.8 D
NB L 0.514
0.125 39.4 D
12.8
B
TR 0.700
0.592 11.5 B
SB L 0.125
0.125 35.5 D
11.3
B
TR 0.665
0.592 11.0 B
-------------------------------------------------------------------------
INTERSECTION: Delay
= 14.0 (sec/veh) V/C =
0.637 LOS = B
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..MAGNESIA FALLA/HIGHWAY 111
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/12/89
TIME...........92 PM PEAK W/0 PRO.
COMMENT ....... VOL. RASED ON ANNUAL GROWTH RATE OF 7%
--------------------------------------------------------------------------
VOLUMES
EB
WB NB
SS
LT
159
25 100
24
TH
30
14 1759
1913
RT
54
65 249
11
RR
27
33 125
6
EB
WB
NB
SB
EB LT
I.H
RT
PD
WB LT
TH
RT
PD
GREEN
YELLOW
GRADE
(l)
0.00
0.00
0.00
0.00
00
HV
2.00
2.00
2.00
)0
2.00
19:d:1
0.0
0.0
GEOMETRY
EN
W.B
NB
SB
L 10.0
L 12.0 L
10.0
L. 10.(
TR 12.0
TR 15.0 T
12.0
T 12.(
12.0
12.0 T
12.0
T 12.(
12.0
12.0 TR
15.0
TR 15.(
12.0
12.0
12.f)
12.t
12.0
---------------------------------------------
12.0
12.0
12.(
ADJUSTMENT FACTORS
ADO
PKG
RUSES
PHF
PEDS
Y/N
Nm
N6
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
------------------
SIGNAL SETTINGS
PH PH-4
0.0 0.0
0.0 0.0
NB LT
TH
RT
PD
SB LT
TH
RT
PD
GREEN
YELLOW
FED. BUT. ARR. TYPE
Y/N min T
N 0.0 _
N 0.0 _
N 0.0 _
N 0.0 _
-------------------------
CYCLE LENGTH = 120.(
PH-1 PH-2 PH PH
X
x
X
X
n
X
X
17.0 67.0
4.0 4.0
LEVEL OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
API"'. DELAY
EB
L
0.710
0.200
40.2
E
36.7
TR
0.269
0.200
26.3
D
-WB
L
0.108
0.200
29.8
D
32.5
TR
0.205
0.200
25.9
D
NB
L
0.554
0.142
39.9
D
19.4
T '
0.905
0.558
18.4
C
SB
L
0.133
0.142
34.3
D
16.8
TR
0.063
0.558
16.6
C:
-------------------------------------------------------------
INTERSECTION:
Delay = 19.5
(sec/veh)
V/C
= 0.806
0.0 0.(
O, C) C). )
-------------
APP. LOS
D
D
C
C
-------------
LOS = C
' _.
r.-.7• .7 = .1.•� (4dr.l3aS! i; :;_ = .aeT�C!
------------_--------...---.....
_..----
0 810Z
69010
m86'0
-11.
8'6:':
00WO
Hi.ay•('}
"I tf
CI
A is "(,)17
ch's l "!)
Oft t "i.7
I N �
Sol
f'-i` Awlso,:
801 A, `;7 I_i'I
010
s
!i";7
(,)-Ca wv,
.- ---- -- .-..-------------..------.--
(t ;? Tilt.) ! III,{. WO
WO
O'f7
-..----- _.._._..-----.
)"Y ' MIA1171):
(7
/9 C?'C1 Nal 80 41I1
010
0
'::I t'r:
_.
lid,
.r
'.phi
it IIh
ris
L. ):w,t •
I. Fla
17--1"iad
L--I Id 17--1.W
:`H:-A
i —H,-3
11.-Hd
O'`i;'. '[
-. hil_`1P.3.1 I
Low `: '_q'da 11_Iti-'1',lN:'J'L
`;
_..--_----
-.------_--.-----
a ---
---`----.-........--
07)
N Oq 0 (7 0
CIE A•
(,Ifl"Z
1010 81-1.
...
fa'ia
N (I!a fJr.'(.1 f)
' Ca?: 1..
(JC)',
i.af}"('? tl =? '
) 1;'TW
MIA, ql'.!
Ilya! MIA
(K)
C":i
_bd,`:.1.
" �}'i:: "JOB
"l.j:c. d Sold AHA `.-."+aSh?!;:{.
sm Pau
(1H
3UW89
:l
' -------•^_.--------------------------------------
0AI l
Wzj
;)":-;:
a 1, U'��1
;:;i :'. ;. ii •:'; I:.
-
[:'. �1'
:,. � _.. �_. 'f._7 '
('r"�'.t
f}`,•.4
,! i;7"� C (?".:L
tl
617Z
Y9 V Iti
.f r.
'c,zh,
IJ'f74
! 43 ",Ai (}'Cot I
" jar".
mi 1,
.r,. W.4 f .I'i I ,
!\}i'1 ::'!l.11.l :i('i
n
�i1h1! 1 !I
�i , •-
(r-ison
Inn
. " . !l ii:d71::Y
..il,.!, I
:fin AW30
4:)1Y ?6...........
;4 r 1
1; .,'.1
.... ..:,.,,, I,,,5 star.
I.!: f.}9iQi.7 Y.m/siri,
.:
-
:985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION -PARK VIEW DR./HIGHWAY III
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/9/89
TIME.......... EXISTING AN Pr_K''.
COMMENT....... EX. VOL. WERE MULT. BY A SEASONAL VARIATION FACTOR OF 1.3
----------------------------------------------------------------------------
VOLUMES
ED
WB NB
LT
1
4 0
TH
0
0 506
RI
I
90 0
RR
1
45 U
Azwoo
ED
0.00
Ws
0.00
NB
0.00
SB
----------
0.00
PH-1
ED
LT
X
TH
X
RT
X
PD
X
WB
LT
X
TH
X
RT
X
PD
X
GREEN
18.0
YELLOW
4.0
LANE GRP.
EB
LT
R
WB
L
T
R
NB
L
TR
SB
L
--------------
INTERSECTION:
HV
Q)
2,00
2.00
2.00
2.00
PH-2
0.0
0. 0
V/C
0.006
0.00I
0.020
0.000
0.324
0.000
0.259
0.565
0.235
GEOMETRY
SB :
ED
WEI
NB
156 : LT
10.0 L
10.0 L
10.0
456 : R
10.0 T
12.0 T
12.0
_ .
12.0 R
11.0 T
12.0
3
12.0
12.0 TR
12.0
12.0
12.0
12.0
12.0 '
12.0
12.0
----------------------------
ADJUSTMENT FACTORS
ADO PKG BUSES PHF PEDS
Y/N Nm N6
Y 20 0 0.90 50
Y 20 0 0.90 5f i
Y 20 0 0.90 50
Y 20 0 0.90 50
----------------------------
SIGNAL SETTINGS
PH-3 PH-4
NO LT
TH
RT
PD
SB LT
TH
RT
PI)
0.0 0.0 GREEN
0.0 0.0 YELLOW
-----------------------------
LEVEL OF SERVICE
G/C DELAY LOS
0.150 28.0 D
0.150 20.0 D
0.150 33.0 D
0.150 0.0 A
0.150 29.0 D
0.217 0.0 A
0.533 9. 8 B
0.217 33.7 D
0.533 9.7 B
----------------------------
L
T
T
TR
SB
10.0
12.0
12.0
12.C-
12.0
12.0
FED. BUT. ARR. TYPE
YIN min T
N 0.0
N 0.0 _
N 0.0
N 0.0 _
-------------------------
CYCLE LENGTH = 120.(
PH-1 PH-2 PH-3 PH-L
X
X
X
X
X
X
X
X
26.0 64.0
4.0 4.0
0.0 0.(
0. 0 0. (
APP. DELAY APP. LOS
28.0 D
30.1
9.8
15.3
Delav = 13.5 (sec/veh) V/C = 0.344 LOS = B
D
B
C
1985 HCN: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#Yt#!.''i:'It,{'##########Y'-i•iF•Y.'#Y'#Y!•-k5%'MS:F iive'•Y'ir-Y.'Y.'�F'=Y.'YF#'X•it•IE###########iF'Yi'lE'i ie•YFF<#'ai"k##iF#Y# r• n'S('
INTERSECTION..PARK VIEW DR./HIGHWAY III
AREA TYPE ..... CBD
ANALYST....... N.S.
DATE ...... .... 6/12/99
TIME ........... 92 AN PEAK W/O PRO. I
COMMENT ....... VOL. .BASED ON AN ANNUAL GROWTH HATE OF 7.
EB
LT
TH it
RT 110
RR 55
GRADE
VOLUMES
WB
NP
SB
1
0
191 LT
i 1
620
559 . R
1
i)
6 :
1
0
_
Q)
EB
0.00
WB
0.00
NB
0.00
SB
--------------
0.00
PH-1
EB
LT
X
TH
X
RT
X
PD
X
WB
LT
X
TH
X
RT
X
PD
X
GREEN
14.0
YELLOW
4.0
LANE GRP
EB
LT
R
WB
L
T
R
IN
L
TR
SB
L
TR
-------------
INTERSECTION:
GEOMETRY
EB
WB
NB
10.0 L
10.0 L
1.0.0
10.0 T
12.0 T
12.0
12.0 R
12.0 T
12.0
12. 0
12. 0 TI;
12. o
12.0
12.0
12.0
12.0
12.0
12.0
------------------------------------
ADJUSTMENT FACTORS
HV ADJ PKG BUSES PHF PEDS
(%) Y/N Nm NC
2.00 Y 20 0 0.90 50
2.00 Y 20 0 0.90 30
2.00 Y 20 0 0.90 50
2.00 Y 20 0 0.90 50
-----------------------------------
SIGNAL SETTINGS
PH-2 PH-3 PH-4
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0 0.0 0.0 GREEN
0.0 0.0 0.0 YELLOW
-----------------------------------------
LEVEL OF SERVICE
V/C G/C DELAY LOS
0.032 0.117 30.4 D
0.532 0.117 :5.3 D
0.008 0.117 35.6 D
0.000 0.117 25.9 D
0.001 0.117 30.2 D
0.000 0.192 33.1 D
0.286 0.592 7.9 B
0.791 0.192 44.3 E
0.260 0.592 7.6 B
S Ft
L 10.
T 12.;
T 12.E
TR 12.
12.'
PED. BUT. ARR. TYP
Y/N min T
N 0.0 3
N 0.0 _
N 0.0 71
N 0.0 _
------------------------
CYCLE LENGTH = 120.
PH-1 PH-2 PH-3 PH-
X
X
X
X
X
X
X
X
23.0 71.0
4.0 4.0
APP. DELAY
34.9
35.1
7.8
16.._
----------------------------------------
Delay = 13.3 (sec/veh> V/C = 0.424
0.0 0.
0. 0 0.
APP. LOS
D
D
B
C
------------
LOS = B
,t =. 'Ru
Ti9"C3 = ;..i .'(1. S'-h ••f J��i 'i."S.ktC = ^t'
-
- S—,,. "0
(i `i'!-;:'
/. t i `U
Fir)!) "l)
-f
1`qq
1 T `<:?
Sul
6:i" AM""IvitCl
a h? r-i!"1
lH :SdCI "
J:
`.)!(
cl.iCt
-;rdt1 1
C)°rk
(:)'t
l?°F
MCI 1,1-A
kF-.3B :D 0 0
O'C2
0,0
(a'trT
Pd:IcltaE)
X
I.
X
1 i.1.
X
H.1
X
1.-1 iS
X
F1
Nt*t
1. �}
X
HA
X
H1
I. I PIN
I -I
1
,:3 C:--I-ita
I—HH
tr--fai_I
.;='—H:-{ ,::":—HtA
T—Fl:a
T = Fil,[)rJ=1"1 _f
1".)A.G'
S5iN1 l.J Q-t-Ito NOIs
N t.?',
?.:?6 `<) t.)
f}?: A,
<:?<.)'i':
OO 1)
c)r0
nt n'-
Ot. n :.?
apt: A
z`2.
t.)(?`O
ki71
'6HRI "A111
-ill-i:-1 Fi(Izjd
-11-i,-1 91= il;:%I
d i'(It-:
r`.ii
,-!CI rR:i'...I
Ci'(.
o
O1:T
l
i)' , G
1. r? ":t• t
I. fa ", :'!
1.. i? ° t.; l ?:f
tr 1 �
'xa9
U
0
lid.
C
I rk"Ot
{?"t:?I:
n`(.?[ 1`I
Tt:'
?
T
I"I
:, :1-dAtLt_itl
S_ wf,l ICE
SIKHW.: lAUW :]NIN-dFil (IN:f '_10A Z6, NO ('I: SHH "IOA ° ° ° ° ° . ANRt•it^ 03
68/ZT19...°" .3.twl
C113:1......zld ,.I W3, kl
l'tT ,kP/t+iH`JI:H/'Wl 113M A,i:Itkl"'NO(,.l_CS35i_:r.).NI
1lalar:l3yy h'r.:IH.,IG!{-1S
..Lct;f;liif I. t-12 ( ''7 '_•,
1985 HCM: SIGNALIZED INTERSECTION=.
SUMMARY REPORT
INTERSECTION..PARK VIEW DR./HIGHWAY
111
AREA TYPE ..... CBD
ANALYST....... N.S.
DATE .......... 6/1.2/89
TIME.......... EXISTING
PM PL'At:
COMMENT....... EX. VOL.
WERE MULT.
BY A
SEASONAL FACTOR OF
1.3
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
ED WB NB
SB :
ED
WH
NB
SB
LT 4 4 5
56 : LT
10.0
L 10.0 L
10.0
L
io&
TH 4 5 542
5.39 . R
10.0
T 12.0 T
12.0
T
12.0
RT 17 95 7
47
12.0
R 12.0 T
12.0
T
12.0
RR 2 47 4
23
12.0
12.0 TR
12.0
TR
12.(
GRADE
HV
ED
0.00
2.00
WB
0.00
2.00
NB
0.00
2.00
SB
0.00
2.00
ADJ PKG
Y/N Nm
12.0 12.0
12.0 12.0
---------------------
ADJUSTMENT FACTORS
BUSES PHF PEDS
Nb
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
i(
0.90
50
SIGNAL SETTINGS
PH-1 PH-2 PH-3 PH-4
ED LT
X
TH
X
RT
X
PD
X,
WB LT
X
TH
X
RT
X
PD
X
GREEN
22.0 0.0 0.0
YELLOW
----------------------------
4. 0 C). i) 0. 0
LANE GRP
ED LT
R
WB L
T
R
NB L
TR
SB L
TR
V/C
0.035
0.093
0.019
0.019
0.276
0.026
0.263
0.293
0.273
G/C'
0.183
0.18=
0.193
0.183
0.183
0.150
).567
0.150
0.567
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0 GREEN
0.0 YELLOW
LEVEL OF SERVICE
DELAY
LOS
2'6.0
D
26.3
D
30.5
D
5 2
s:. 9
D
27.4
D
--.1
D
8.6
B
34.7
D
9.6
B
12.0 12.(
12.0 12.(
----------------
PED.
BUT. ARR. TYPE
Y/N
min T
N
30.8 _
N
30.8 _
N
21.- -
N
21._
-------------------------
CYCLE LENGTH = 120.(
PH-1 PH-2 PH-•3 PH-z
X
X
X
X
X
X
X
X
18.0 68.0
4.0 4.0
APP. DELAY
26.2
27.5
8.3
10.8
INTERSECTION: Delay = 10.9 Csec/veh) J/C = 0.277
0.0 0.(
0. 0 0. (
--------------
APP. LOS
D
D
B
B
-------------
LOS = B
19% HCM: SIeNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..PAi=K VIEW DR./HIGHWAY III
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/12/99
TIME ........... 92 PM PEAK W/O PRO.
COMMENT ....... VOL. BASED ON AN ANNUAL GROWTH
RATE OF
7%
- VOLUMES
GEOMETRY
ED WB NB SD e ED
WB
NB
SR
LT 5 ,.. 6 69 LT 10.0 L
10.0
L
io.0
L.
10.
TH 5 6 664 662 R 10.0 T
12.0
T
12.0
T
12. E
RT 21 116 9 58 a 12.0 R
12.0
T
12.0
T
12.
RR 3 58 5 26 12.0
12.0
TR
12.0
T'R
12.
12.0
12.0
12.0
12.
12. _)
-
12. V
12.0
-
12. ,
GRADE
ED
0.00
WB
0.00
NB
0.00
SD
0.00
PH-1
ED LT
x
TH
x
RT
x
PD
x
WB LT
x
TH
x
RT
x
PD
x
GREEN
13.0
YELLOW
--------------
4.0
LANE GRP
ED
LT
R
WB
L
T
R
NB
L
TR
SIX
L
TR
-------------
INTERSECTION:
HV
2.00
2.00
2.00
2,00
PH-2
0.0
0.0
V/C
0.055
0.138
0.028
0.028
0.408
0.043
0.294
0.499
� i. 298
ADJUSTMENT FACTORS
ADJ
PKG
BUSES
PHF
PEDS
Y/N
Nm
NC
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
----------------------------
20
0
0.90
50
SIGNAL SETTINGS
PH-3 PH-4
FED. BUT. ARR. TYP:
`//N min T
N 30.8 =
N 30.8 71
N 21._ _
N 21._ v
------------------------
CYCLE LENGTH = 120.
PH-1 PH-2 PH-3 PH-
NB LT
:x
TH
x
RT
x
PD
x
SB LT
x
TH
x
RT
x
PD
x
0.0
0.0 GREEN
13.0
77.0
O.C)
0.0 YELLOW
4.0
4.0
----------------------------------------
LEVEL OF SERVICE
G/C
DELAY LOS
APP. DELAY
0.150
28.2 D
23.5
0.150
28.6 D
0.150
33.1 D
30.6
01150
20.1 D
0.150
30.7 D
0.106
36.4 D
6.3
0.642
6.1 B
0.100
40.5 E
9.0
0.642
-----------------------------"---------
6.2 B
Delay = 9.1 (sec/veh) V/C = 0..=40
0.0 0.
0. 0 C),
------------
APP. LOS
D
D
------------
B
LOS = B
g
0"uT
8"?S'
BOT'0
208`0
-.1
r.1s
3
t'9
Ztf9"0
ViTS'','0
H.1..
r7
8't1
(].
'' t"`?'
BOT'o
2t0°0
-I
ON
<5
T "172
091"O
ta6t4 °0
H
0.
1 "8Z
w4T'0
SZ0, 7
.I.
.3
ti'k•'t•
tI
:'">'7:
ilC�t`t;
t:rtla"Cr
„1`1
Hd
S'U'l
".GrIH t,ti lit} "Adw
$0'1
4t)"I-}i!
O/El
'JiA
"J;tlu :311d-1
MAWS
1 AWS .30 1363
1
-----.....-----------
0 0
--
0_0 O'l- (a'I-
MY I' }_ih c'a°c.r
0"0
c.a`ta
0 - v
mOl i:-i r.
0 tt
-t, ^t:(: ::t
P111359 0"0
WO
0"0
0-81
h3a_}HO
X
(1
L; J
IM
J. "I
Bs
y
L''1 Fttt!
X
u173
X
L1c3
.'
L-I
FIN
X
L-I `I-
v-1'3d
:-t ld c'-H•:d i-Hd
w_H d
2-'Hd
1-Hd
T-Hd
--------------------------------------------------------------------------
' -
2'tz N
09
06'0 0
t.a_
A t:ulz
00"0
utJ
2
8100 N
09
06'0 0
Oz
J. Oulz
0010
04
2
8102 N
09
06'0 O
Oz
h _ _ t" 0 1
0010
" O-B
L UIW Nth
SIN
WN NIA
t l
M
-.WiH "1li`T `tl}_Id
£i(T:1d
:+lcl s Isri"
O:ad PUH
dH
Dull 'T
a>II..ous
}.N31. isi vuld
-------------------------------------------------------------------------
:rM
Welt
OW
O L
"
we1.T.
I OW A
OWL
8 (i'i7.L
Us
6
1vt i:,'.
,I':i
t 'll
1. O'll. .}_
wz.t
1. 0'0'1
''tf " Wt'
tpe
9 0
H1.
Sa'o!1
ta't)L `I
n'cat
_.t ea'iat 19
W
9
9 6
J-"
_._. _ ;9N}i^.t tril U. SINp Il}:, {.!. {•,U.t i.1 ct:it:{I daft""'---
. ..1 t;.d :M .yr._d Wd 16 .......
ILI A Mt hl,W "HU MW
�. 3 ## # :d:'%!'st:'..:K#'max # ,..p..,t..a;..yl.X..X..�..u..y. ... ;�>p:�..�..;1.?i •D; �•##Fst..X..� :�.}.y..,y.#'.". #'—E.v.x.'F .�c.af ## ##?E� 3i 3F # �7F # :t.??. �F ieit' #•Yr# i,'..ai•".; # 3F�Y�
IN0113 3` IAMNI 0=1'<I-1UNDIS =I. H r:i86T
1955 HCM" SIGNALIZED INTERSECTIONS
SUMMARY REPORT
�#�z-t��• r•�•�•tt #�#���u•#�•r.•���x�*at•�#x• r-�u�# r•#�•���c x-�� *�#��-�•��w�� �a���x•� u#�•�•t����� tt•��
INTERSECTI'ON..FRED WARING DR./HIGHWAY III
AREA TYPE ..... C$D
ANALYST....... M.S.
DATE .......... 6/9/89
TINE ........... 92 AM PEAK W/ PRO.
COMMENT ....... VOL. BASED ON '92 VOL. AND TURNING MOVEMENTS
---------------------------------------
LT
TH
RT,
RR
VOLUMES
GEOMETRY
E9
WB
NE(
SP s
EB
WE+
NB
6
24
5
250
L 10.0
L
1.0.0
L
10.0
3
612
530
T 12.0
T
12.0
T
12.0
9
523
19
5
TR 12.0
T
12.0
T
1.2.0
5
261
6
1
12.0
R
12.0
TR
12.0
12.0
12.0
12.0
12.0
12.0
12.0
GRADE
HV
tAlB
O.00
.2.00
NE+
0.00
2.00
88
0.00
2.00
EB LT
TH
RT
PD
WB LT
TH
RT
PD
GREEN .
YELLOW
LANE GRP.
L
TR
L
T
R
L
TR
L_
T
R
INTERSECTION:
PH-2
0.0
0. 0
V/C
0. 021
0.009
0. 060
c, . 003
0.797
i,. 016
0.5b5
0.778
0 445
0.015
ADJUSTMENT FACTORS
ADS
PKG
RUSES
PHt=
PEDS
Y/N
Nm
Nb
Y
20
r)
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
SIGNAL_ SETTINGS
PH-3 PH-4
0.0. 0.0
0.0 0.0
NB LT
TH
RT
PD
SH LT
TH
RT
PD
GREEN
YELLOW
SD
L 10.0
T 12. :)
T 12.0
T 12.0
R 10.!
12.0
PET. BUT. APR- TYPE
Y/N ruin T
N 30,3 v
N 730. _ _
N27.8
N 27..3 v,
-------------------------
CYC.L.E I...ENGTH = 119.0
PH-1 PH-2 F'H-3 PH-4
x
x
x
x
x
x
x
x
30.0 .36.0
4.0 4.0
LEVEL OF SERVICE
G/C.
DELAY
LOS
APP, DELAY
0.345
19.6
C
19.0
0.345
16.6
C
0,345
19.8
C
29.6
0.345
16.5
C
0.:+45
29.6
D
0. 252
25. 4
D
25.0
0,303
22.9
C
0.252
30.6
D
26.7
0..307,
21.7
C
0.303
le.8
C:
Delav = 2R.2 ts(-c/vc-h) V/C = 0.714
0.0 0.0
0.0 0,0
---------------
APP. LOS
C
D
t;,
15
--------------
LOS = D
985 HCM, SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#�: ��•���###����R# �� x ���� �� R#����#
tt �##tc����a
�i�ia
cer.--#�-x �;:: � e � ��� �� � #max v.-�� ���-���*
INTERSECTION..FRED WARING DR./HIGHWAY
III
AREA TYPE ..... GBD
ANALYST.,,,.., M.S.
DATE .......... 6/5/89
TIME.,.,..,.,. EX. ADJ. PM PEAKS
COMMENT.,...,. EX. VOL. WERE MULT.
BY A
SEASONAL
VAR.
FACTOR OF
1.3
-----------------------------------------
VOLUMES
GEOMETRY
EB WB NB SB :
EB
WB
NB
SB
LT 7 31 5 203 : L
1010
L
10.0
L
10.0
L
10.0
TH 2 1 740 663 : T
12.O
T
12.0
T
12.0
T
12,0
RT 7 382 7 1 : TR
12.0
T
12.0
T
12.0
T
12,0
RR 4 250 4 1
12. 0
R
12.0
fR
12. i
T
12.0
12..0
12.0
12.0
R
10.0
12.0
12.0
12.0
12.0
------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS FED. BUT, ARR. TYPE_
(%) K) Y/N Nm Nb Y/N miry T
_=B 0.00 2.00 Y 20 0 0.90 50 N 30.3 ..
WD 0.00 2, 00 Y 20 0 0190 50 N
30.3
NB 0,00 2.00 Y 20 0 0.90 50 N 27,8
SB 0.00 2.00 Y 20 0 0.90 50 N 27,8
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = .122.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH PH-4
EB LT X NB LT X
1H X TH X
RT X RT X
ND X, PD X
WB LT X SB LT X
TH X TH X
RT X RT X
PD X. PD X
GREEN 27.0 0.0 0.0 0.0 GREEN 41.0 42.0 0.0 0.0
YELLOW 4.0 0.0 0.0 0.0 YELLOW 4.0 4.0 0.0 0.0
---------------------------------------------------------------------•-----
LEVEL OF SERVICE
LANE GRP, V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.0.32 0,221 28.3 D 26.4 D
TR 0.011 0.221 24.0 C
WB L 0.114 0.221 28.9 D 30.4 D
T 0.002 0.221 23.9 C
R 0.624 0,221 30.8 D
NB L % 012 0,336 20.5 C 23.6 C
TR 0,590 0.344 21.6 C
SB L 0,.774 01336 24.V c 21..6 C'
f Q, 504 0.344 26.7 C
R 0.000 0.344 16.9 C
----------------------•-----_----- ---------_---------
INTERSECTTON: Delav = 2'.3.2 (sec/veh) V/C - 0,��55 LOS u
fI =
S01 `:rLS"0
= O/A (49A/DaS) L"t)Z = AL'IaQ
:NOI103S831NI
8 B"ZT
SZ1710
-------------------
000"0
:J
O b19T
9Zb'O
009.0
1:
21TZ
Q Z"6%2
O9Z°0
TBL"0
1
SS
0 F'LT
9Z17-o
SB9'O
81
17'61
Q 8'9Z
(59Z"O
6TO'0
-I
SN
(1 219Z
SZZ"0
6T2"0
13 212E
91 zlo
{Fsoc) o
1
Q
219Z
U °BZ
9ZZ"O
L`�T'0
'1
SM
O t'-�Z
94Z"0
2Ts)°0
81
a
13"9Z
Q 9'LZ
SZZ"O
9%O'0
-1
S3
SO-1
°ddv
Ad-13G 'ddH
SO-1 AH730
3/9
O/A'
'd89 3NH7
33I683S r10 13A31
0"0
010
- -----------------------------------------------------
0'17 0'b
M0113A 010
O"O
010
0'b M0-113A
0"0
0"0
0"1S' C;°0:=
N3389 0"o
O,o ,
O"O
()°LZ N33a9
X
(lr_1
X G l
X
18
x .CS
x
Hi
X Hi.
x
11 SS
X 1-1
am
X
Qcf -
x Gli
x
18
X _LS
X
HI
X H1
x
11 SN
X 1"1
83
V-lid
2 - i i
Z-Hd T-Hd
tr-Hd
s-Hd
Z-Hd
T-HH
HION3"'1 3"13A3
fi9tJI1135 `IHN9IS
R "LZ N
0!4
- --------------------------------------
06'0 o
oz A
0o "z
00 "0
SS
2
B"LZ N
09
06'O 0
(3Z A
00"Z
00.0
SN
u2 N
0g
06'0 0
OZ A
t)0"Z
00't]
am
2
2"02. N
OS
06'0 0
OZ A
00"Z
00°0
E17
L U-Mil N/A
qN
WN N/A
(%1
(7)
3dA.1.
"'JSH
inn °a3d
Said
AHd S3S11a
E)Ad CQH
OH
3CIti8q
88010t1d 1N3WiSt1PUH
----'----------------------------------
i)•OT
8
0"•'T
0'ZT
0°ZT
0'7-1
1
O"ZT 41
O"ZT
8 0"ZT
e T
O
OOb 9
88
O ZT
1
0"ZT 1
O"ZT
l 0"ZT
81 e T
6
89fr 6
18
0'7T
[.
O'Z1 L
0'ZT
1 O'ZT
1 a 928
906
T 2
H1
i)"OT
1
0"OT 1
O"OT
1 O"OT
1. - 617Z
9
82 6
11
88
HN
SM
83
a as
8N
am 83
A813W03n
53Ni1'l06
%L 30 01V8 H_I:M089 1Hf1NNH NH NO Q3SH8 "10A " "' ° ' ° •.LN'3WW0._1
'08d O/M AV3d Wd +Z6. """' •""' °'3WI1
68/S/9."""."."'.BIV(T
S,"W"° '°1SAIHNH
0')aq°,""'°3dAJ_ H38H
ITT AHMHO W ' 80 ONI8HM 031Jd "NO NO I103S-'_f3_LN I
�r'X##.#-Yr iFid#;E3#4k###i:'iiv•#o`F#'[Dk#Yrfi####•R###7F####i4A##############9l'R'######•iF######### '
! SOd38 A.avwwf1S
�:NC17:_I..]3583_LNI Q=72.1:1HNOYS ''WOh1 986:
1955 HCM:-SIGNALIZED INTERSECTIONS
SUMMARY REPGR-1
INTERSECTION..FRE:D WARING DR./HIGHWAY
111
AREA TYPE ..... CB.D
ANALYST....... M.S.
DATE .......... 6/5/89
TIME ........... 92 PM PEAK: W/
PRO.
COMMENT ....... VOL. BASED ON
---------------------------------------
'92 VOL.. AND
TURNING MOVEMENTS
VOLUMES
----------------------------------
GEOMETRY
EB WB NB SO
EH
WB
NH
SH
LT 9 84 6 257 :
I_ 10.0
L 10.0 L-
10.0 L
10,0
TH 3 1 1011 969
T 1.2,0
r 12.0 T
12.0 T
l2 V
?iT 9 475 22 1
-I R 12.0
T 12.0 T
12.0 T
12.0
RR 5 400 5 1
12.0
R 12.0 TR
12.0 l
_
2,i;
12.0
12.0
12.0 R
10.i�
12.0
12.0
12,0
12.0
BRADE
(Y.)
EH
0.00
WB
0.00
NB
0.00
SB
--------------
0.00
PH-1
EB
LT
x
rH
x
RT
x
PD
x
WB
LT
x
TH
x
RT
x
PD
x
GREEN
27.0
YELLOW
4.0
LANE GRP.
EB
L
T R
WB
L
T
R
NB
L
I' R
SH
L
T
R
INTL.RSECTION:
-------------------------------------
ADJUSTMENT FACTO%
HV
ADO
PK:G
BUSES
PHF
PEDS
(%)
YIN
Nm
Nh
2.00
Y
20
0
0.90
50
2.00
Y
20
0
0.90
50
2.00
Y
20
0
0.90
50
2.00
Y
20
0
0.90
50
SIGNAL SETTINGS
PH-2
PH-3
PH-4
NB
LT
TH -
Rr
PD
SB
LI'
TH
RT
PD
0.0
O.0
0.0 GREEN
0.0
----------------------------------
0.0
i>.0 YELLOW
LEVEL
OF SERVICE
VIC
BIC
DEL-.HY
LOS
0.036
0.225
27.6
D
01013
0.225
23.3
Cl
0.303
0.225
29.6
D
0.002
0.225
23.3
C
0,351
0.225
25.6
D
0.019
0.250
25.al
D
0.662
0.425
18.4
C
Q.806
0.250
40.9
L
0.579
0.425
17.3
C
0.000
--------------------------------
0.425
12.8
B
PED.
BUT.
YIN
min T
N
30.
N
30.1
N
27.8
N
27.8
ARR, TYPE
y�
CYCLE LENGTH = 120,V
PH-1
PH-2
PH-3 PH-4
x
x
x
x
x
Y.
x
x
>G,0
b1.0
0.0 0.0
4.0
4,0
0,0 Q.0
APP. DEL..HY Ai-P. LOS
:5.8 D
27.7 D
20.1 C
21.9 L
Delav = 21.4 (sec/veh) VIC = 0.624 LOS = C
-995 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HIGHWAY III/TOWN CENTER DR.
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/12/89
TIME.......... EXISTING AM PEAK
COMMENT....... EX. VOL. WERE MULT. BY A SEASONAL VAR. FACTOR OF 1.3
----------------------------------------------------------•-----------------
VOLUMES
GEOMETRY
EB WB
NB
SB :
EB
WB
NB
SB
LT
176 166
323
140 : L
12.0 L
14.0
L 13.0
L
10.0
TH
845 762
160
96 : L
12.0 T
12.0
TR 13.0
TR
10.0
RT
282 108
62
33 : T
12.0 T
12.0
12.0
R
11..0
RR
141 54
31
16 : T
12.0 T
12.0
1.2.0
1.2.0
. 1-R
15.0 R
15.0
12.0
12.0
12.C=
12.0
1.2.0
12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE
HV ADO PKG
BUSES PHF
PEDS
PED. BUT.
ARR.
TYPE
('/.> (%:)
Y/N Nm
Nb
Y/N min T
ED
0.00 2.00
Y 20
0 0.90
50
N 18.8
3
WB
0.00 2.00
Y 20
0 0.90
50
N 18.8
NB
0.00 2.00
Y 20
0 0.90
50
N 32.3
3
SB
0.00 2.00
Y 20
0 0.90
50
N 32.3
,-
----------------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH
=
120.0
PH-1
PH-2
PH-3
PH-4
PH-1
PH-2 ' PH-3
PH-4
EB
LT X
NB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
WB
LT- X
SB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
GREEN
27.0
35.0
0.0
0.0 GREEN 46.0
0.0
0.0
0.0
YELLOW
4.0
4.0
0.0
0.0 YELLOW
4.0 0.0
0.0
0.0
---------------------------------------------------------------------------
LE'VEL.
OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
EB
L
0.309
0.225
29.5
D
32.6
D
TR
0.919
0.292
33.1
D
WB
L
0.509
0.225
31.9
D
25.7
D
T
0.664
0.292
24.9
C
R
0.176
0.292
20.5
C
NB
0
0.811
0.383
32.6
D
27.2
>
TR
0.432
0.383
18.0
C
SB
L
0.450
0.383
21.6
C
19.0
c
TR
0.197
0.383
16.0 i
C
R
0.035
0.383
14.9
S
---------------------------------------------------------------------------
INTERSECTION:
Delav = 28.2
(sec/veh)
V/C =
0.770 Lr1S
= 1?
_995 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HIGHWAY 111/TOWN CENTER DR.
AREA TYPE ..... CBD
ANALYST ....... M.S.
DATE .......... 6/12/89
TIME ........... 92 AM PEAK W/O PROJ
COMMENT ....... VOL. BASED ON AN ANNUAL GROWTH RATE OF 7%
EB
LT 215
TH 1035
RT 346
RR 173,
EB
WB
NB
SB
EB LT
TH
RT
PD
WB LT
TH
RT
PD
GREEN
YELLOW
VOLUMES
WB NB
205 401
933 196
132 76
116 36
GRADE
HV
0.00
2.00
0.00
2.00
0.00
2.00
0.00
2.00
'
GEOMETRY
SB
EB
WB
No
172
L 12.0 L
14.0
L._
13.0
118
L 12.0 T
12.0
1"R
1.'3.0
40
T 12.0 T
12.0
12.0
20
T 12.0 T
12.0
12.0
TR 15.0 R
15.0
12.0
12.0
12.0
12.0
-----------------------------------------------
ADJUSTMENT FACTORS
ADJ PKG
FUSES PHF
PEDS
PED,
BUT.
Y/N Nm
Nh
Y/N
min T
Y 20
0 0.90
50
N
19.8
Y 20
0 0.90
50
N
18.8
Y 20
0 0.90
50
N
32.3
Y 20
0 0.90
50
N
32.3
SIGNAL SETTINGS
PH-1
PH-2
PH-3 PH-4
x
N8 LT
x
TH
x
RT
x
PD
x
SB LT
x
TH
x
R
x
PD
27.0
35.0
0.0 Ct,O GREEN
4.0
4.0
0.0 0.0 YELLOW
LANE GRP
EB
L
TR
WB
L
T
R
NB
L
TR
SB
L
TR
R
-------------
INTERSECTION:
LEVEL
OF SERVICE
V/C
G/C
DELAY
LOS
0.378
0.225
30.1
D
1.127
0.292
94.8
F
0. 62 1
0.225
34.1
D
0.813
0.292
27.7
D
0.052
0.292
19.7
C
1.042
0.383
74.5
F
0.533
0.383
19.3
C
0.613
0.383
25.2
D
0.242
0.383
16.3
C
0.042
-------------------------------
0.::83
15.0
B
SB
L 10.0
TR 10.0
R 11.0
12.0
12.0
12.0
ARR. TYPE
CYCLE LENGTH = 120.0
PH-1 PH--2 PH-3 PH-4
x
x
x
x
x
x
x,
x
46.0 Ct ij, i7 0. 0
4. 0 Ct, 0 0. 0 0. 0
-----------------------------
APP. DELAY APP. LOS
76.9 F
29.7 D
54.1 E
2.1.1 C
Delav = 52.4 (sec/veh) V/C = 0.964 LOS =
_985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#�#�•x ��•�#�#x�-�!• ��* x ��•t�a��•it#�*t�#its*##*x•�•��#�at•��*�:�*�#•�*�r#� ���•�•� � xis*�•� x•� �����x
INTERSECTION..HIGHWAY ill/TOWN CENTER DR.
AREA TYPE ..... CRD
ANALYST....... M.S.
DATE .......... 6/12/89
TIME ........... 92 AM PEAT. W/PROJ.
COMMENT.......
VOLUMES
GEOMETRY
ED WR
NB
SR :
ER
WR
NB
SR
LT
215 205
401
172 : L
12.0 L
14.0
L 13.0
L
10.0
TH
1065 990
196
118 : L
12.0 T
12.0
TR 13.0
TR
10.0
RT
346 132
76
40 : T
12.0 T
12.0
12.0
R
11.0
RR
173 116
36
20 : T
12.0 T
12.0
12.0
12.0
. TR".
15.0 R
15.0
12.0
12.0
12.0
12.0
12.0
12.0
-----=--------------------------------------------------------------------
ADJUSTMENT
FACTORS
GRADE
HV
ADJ PKG RUSES PHF
PEDS
PED. BUT.
ARR.
TYPE
(%)
(%)
YIN Nm
Nb
YIN min T
ER
0.00
2.00
Y 20
0 0.90
50
N 19.8
31
WR
0.00
2.00
Y 20
0 0.90
50
N 18.8
.7
NB
0.00
2.00
Y 20
0 0.90
50
N 32.3
_
SR
0.00
2.00
Y 20
0 0.90
50
N 32.3
1-1
--------------------------------------------------------------------------
SIGNAL
SETTINGS
CYCLE LENGTH =
120-0
PH-1
PH-2
PH-3
PH-4
PH-1
PH-2 PH-3
PH-4
ER
LT x
NB
LT
x
TH
x
TH
x
RT
x
RT
x
PD
x
PD
x
WR
LT x
SR
LT
x
TH
x
TH
x
RT
x
RT
x
PD
x
PD
x
GREEN
27.0
35.0
0.0
0.0 GREEN 46.0
0.0
0.0
0.0
YELLOW
4.0
4.0
0.0
0.0 YELLOW
4.0 0.0
0.0
0.0
--------------------------------------------
LEVEL
7-----------------------------
OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
ER
L
0.378
0.225
30.1
D
87.9
F
7R
1.154
0.292
97.5
F
WR
L
0.621
0.225
34.1
D
30.1
D
T
0.862
0.292
29.5
D
R
0.052
0.292
19.7
C
NB
L
1.042
0.383
74.5
F
54.1
E
TR
0. Sir
0.383
19.71
C
SR
L
0.613
0.383
25.2
D
21.1
C
TR
0.242
0.383
16.3
C
R
0.042
0.383
15.0
R
-----------------------------------------------------------------------------
INTERSECTION:
Delav
= 57.2
(sec/veh)
V/C =
0.973 1.013
= E
1985 HCM: SIGNALIZED INTERSECTION'S
SUMMARY REPORT
INTERSECTION..HIGHWAY
Ill/TOWN CENTER
DH.
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE. ......... 6/12/89
TIME.......... EXISTING
PM PEAK
COMMENT....... EX. VOL.
WERE MULT.
BY A
SEASONAL
VAR,
FACTOR OF 1.3
---------------------------------------------------------------------•-----
VOLUMES
GEOMETRY
ER WB NB
SB :
EB
WB
NH
SB
LT 120 59 333
131 . L..
12.0
L
14.0
L 13.0 L
10,0
TH 805 833 13G
100 . L.
12.0
T
12.0
TR 1110 TR
10.0
RT 278 88 02
49 . T
12.0
T
12.0
12.O R
11.,o
RR 141 54 31
16 . T
12.0
T
12.0
12.0
12.0
TR
15.0
R
15.0
1'.2. 0
12. C)
-----------------------------------------------------------------------------
12.0
12.0
12.0
12.0
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PF_D. BUT. ARR, TYPE
(%) Q) YIN Nm Nb YIN min T
EB 0.00 2.00 Y 20 0 0.90 50 N 18.8
WB 0.00 2.00 1f 1 Y 20 0 0.90 50 N 18.6
NB 0.00 2.00 y 20 0 0.90 50 N 3.2..3 _
SB 0.00 2.00 Y 20 0 0.90 50 N 32.3 71
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 120.Q
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X
TH X TH X
RT X RT X
PD X PD X
WB LT X SB LT X
TH X TH X
RT X RT X
PD X PD X
GREEN 27.0 35.0 0.0 0.0 GREEN 46.0 0.0 010 0.0
YELLOW 4.0 4.0 0.0 0.0 v "L.LOW 4.0 0.0 C). C) C7,C)
---------------------------------------------------------------------------------------
LEVEL OF SERVIRF
LANE GRP. V/C 6/0 DELAY rii'P. DELA�. APP. LOS
EB L 0.211 0.225 28.8 D 30.=; D
TR 0.878 0.292 30.5 :0
WB L 0.179 0.225 28.6 D 25.8 D
T 0.725 0.292 25.8 D
R 0.111 0.292 20.1 C
NB L 0.856 0.383 36.6 D 29.8 D
TR 0.436 0.383 18.1. C
SB L 0.419 0.323 21.2 C 19.5 C
TR 0.213 0.383 16.1 C
R 0.070 0.383 15.1 C
INTERSECTION: Delay = 27.6 (sec/veh) V/C = 0,70: LOS = D
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#* x• ��•�• ��* x ��#�*x�• aF*�•���z-�x�##�#*�n*���*��t� u•* ��ttrE t�� r*�•>E��• � x •><���c•�r�t•iF�#�•u.•�#�•*�
INTERSECTION..HIGHWAY III/TOWN CENTER DR.
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/12/89
TIME ........... 92 PM PEAK W/O PROD
COMMENT ....... VOL. BASED ON AN ANNUAL GROWTH RATE OF 7%
VOLUMES GEOMETRY
EB WB NB SB EH WB NB SB
LT 147 72 408 161 : L 12.0 L 14.0 L 1.3.0 L lo.0
TH 986 1020 169 127, L 12.0 T 12.0 TR 13.0 TR 10.0
RT 341 108 100 60 T 12.0 T 12.0 12.0 R 11.0
RR 141 54 31 16 T 12.0 T 12.0 12.0 12.0
TR 15.0 R 15.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADO PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 2.00 Y 20 0 0.90 50 N 18.6 3
WB 0.00 2.00 Y 20 0 0.90 50 N 18.8 3
NB 0.00 2.00 Y 20 0 0.90 50 N 32.3 3
SB 0.00 2.00 Y 20 0 0.90 50 N 32..3
---_-----------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 120,0 '
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH--4
EB LT X NB LT X i
TH X TH X
RT X RT X
PD X PD X
WB LT X SB LT X
TH X TH X
RT X RT X
PD X PD X
GREEN 27.0 35.0 0:0 o.O GREEN 46.0 0.0 0.0 0.0
YELLOW 4.0 4.0 0.0 0.0 YELLOW 4.0 0.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. 'DELAY APP. LOS
EB L 0.258 0.225 29.1 D 72.8 F
TR 1.111 0.292 78.0 F
WB L 0.218 0.225 28.9 D 30.2 D
T 0.888 0.292 30.7 D
R 0.176 0.292 20.5 C
NB L 1.124 0.383 110.9 F 77.2 F
TR 0.551 0.383 19.6 C
GB L 0,577 0.383 24.2 C 20.1 C:
TR 0.264 0.383 16.4 C
R 0.093 0.383 15.3 C
---------------------------------------------------------------------------
INTERSECTION: Delav = 54.4 (sec/veh) V/C = 0.903 LOS = E
1985 H::M: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..HIGHWAY ill/TOWN CENTER DR.
AREA TYPE ..... CPD
ANALYST....... M.S.
DATE .......... 6/12/09
TIME ........... ?2 PM PEAK W/PROO.
COMMENT.......
VOLUMES
GEOMETRY
£B
WB NB
SB
:
ED
W.B
NB
SB
LT
147
72 409
161 :
L
12.0 L
14.0 L
1.3.0
L t0.0
TH
1165
1138 169
120
: L
12.0 T
12.0 TR
13.0
TR lon')
RT
341
103 100
60 :
T
12.0 T
12,0
12.0
R 1.1.0
RR
141
54 :=1
16
: T
12.0 T
12.0
12.0
12.0
(R
15.0 R
15.0
12.0
:L2.0
--------------------------------------------------------------------------------
12.0
12.0
12.0
12.0
EB
WB
NB
SB
EB LT
TH
RT
PD
WB LT
TH
RT
PD
GREEN
YELLOW
GRADE
0.00
0.00
0.00
0.00
22.0
4.0
LANE GRP.
EB
L
TR
WB
L
T
R
NS
L
TR
SB
L
TR
R
HV
1%)
2.00
2.00
2.00
2.00
ADJUSTMENT FACTORS
ADO
PKG
BUSES
PHF
PEDS
Y/N
Nm
Nb
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
Y
20
0
0.90
50
----------------------------
SIGNAL SETTINGS
PH-3
PH-4
x
X
x
40.0
4.0
PED, BUT. ARR. TYPE
Y/N min T
N 12.8
N 18.8 _
N 32.3 •-
N 32.3
-------------------------
CYCLE LENGTH = 120.0
PH -I PH-2 PH-3 PH-4
x
x
X
x
x
x
x
x
46.0 0.0 0.0 0.0
4.0 0.0 0.0 0.0
APP. DELAY
72.9
27.4
77.2
20.1
------------------------------------------------------------
INTERSECTION: Delav = 53.6 (sec/veh) V/C = 0,956
V/C
0.317
1.114
0.269
0.867
0.154
1.124
0.551
0.577
() . 264
0. 09.3
NB
LT
TH
RT
PD
SB
LT
TH
RT
PD
0.0
0.0 GREEN
0.0
0.0 YELLOW
-----------------------
LEVEL OF SERVICE
G/C
DELAY
LOS
0.183
32.4
D
0.333
77.0
F
O..t G3
32.1
D
0.333
27.5
D
0.333
18.2
C
0.383
110.9
F
0.383
19.6
C
11.383 GjJ
24.2
"
0.383
16.4
C
0.383
15.3
C
APP. LOS
F
D
F
C
-------------
LOS = E
1965 HCM:
SIGNALI_`/.ED INTERSECTIONS
SUMMARY REPORT
#####•##ie######s###vt.
###ti.T:
Y•#;( s.;.#s•#'Si###Y.#####b:•###r.
#####'r.
###############if###ii•#
INTERSECTION..PARK
VIF_W
DR./MONTERY
AVE.
AREA TYPE
..... CBD
ANALYST .......
M.S.
DATE ..........
6/1.3/39
TIME..........
EXISTING
AM PEAT;
COMMENT.......
EX. VOL.
WERE MULT.
BY A SEASONAL VAR.
FACTOR OF
1.3
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB
WB NB
SD :
ER
WB
NB
SB
LT 34
83 36
72 : L
12.0 L.
12.0
L
12.0
L
12.0
TH 20
38 952
777 : T
12.0 TR
12.0
T
12.0
T
12.0
RT 52
64 48
25 . R
15.0
12.0
T
12.0
T
15.0
RR 26
32 24
13 .
12.0
1.2.0
R
10.0
R
10.0
12.0
12.0
12.0
12.0
12.0
J.2.0
12.0
12.0
EB
WB
NB
SB
EB LT
TH
RT
PD
WB LT
TH
RT
PD
GREEN
YELLOW
GRADE
0. 00
0.00
0.00
0. 00
PH-1
X
X
x
X
X
X
X
X
22.0
4.0
LANE GRP.
ER
L
T
R
WB
L
TR
NB
L
T
R
SB
L
T
R
--------------
INTERSECTION:
-------------------------------------
ADJUSTMENT FACTORS
HV
ADJ
PKG
BUSES
PHF
PEDS
(%)
Y/N
Nm
NC
2.00
Y
20
0
0.90
10
2.00
Y
20
0
.).9i:)
30
2. 00
Y
20
0
0. 90
50
2.00
Y
20
0
0.90
50
-----------------------------------
SIGNAL SETTINGS
PH-2
PH-3
PH-4
NB LT
TH
RT
PD
SB LT
TH
RT
PD
0.0
0.0
0.0
GREEN
0.0
0.0
0.0
YELLOW
--------------------------------
LF_VEL OF SERVICE
V/C
G/C
DELAY
LOS
0.167
0. 183
31.4
D
0.076
0.183
26.2
D
0.135
0.183
26.5
D
0.376
0.183
33.1
D
0.357
0.183
28.0
D
0.210
0.125
35.9
D
0.585
0.592
10.2
B
0.045 )45
0.592
6.6
B
0.420
0.125
37.8
D
0.455
0.592
9.9
B
0.024
0.592
6.6
B
PEP. PUT. ARR. TYPE
Y/N min T
N 0.0 _
N 0.0 7.
N )i.i)
N 0.0 _
CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4
X
X
X
x
X
X
X
X
15.0 71.0
4.0 4.0
APP. DELAY
28. 5
30. B
11.0
11.2
Delay = 13.1 (sec/veh) V/C = 0.520
010 0.0
0.0 0.0
-------------
APP. LOS
D
D
B
B
-------------
LOS = B
1985 HC•M: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
•�'�'###Ti#"Yr'X'#•¢.'#ii•'i.#'Nv.'St•I{•#'#•h•�"`i."�"�"k R'it •� Y###'il"i#Yk #-R'##N.'-#######�. #•kii•'Yi'9•#�-'�rt'#'`r. §: YA-##Tt#"f.•##3•R")i'#
INTERSECTION..PARK: VIEW DR./NONTERY AVE.
AREA TYPE..... CBI)
ANALYST....... M.S.
DATE .......... 6/13/89
TINE ........... 92 AN PEAK W/O PRO.
COMMENT ....... VOL. BASED ON AN ANNUAL GROWTH
RATE OF
7
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EA WB NB SB EB
WB
NB
SB
LT 41 102 45 88 L 1.2.0 L
12.0
L
12.0
L
12.0
TH 24 46 1166 952 : T 12.0 TR
12.0
T
12.0
T
12.0
RT 64 78 59 30 : R 15.0
12.0
T
12.0
T
15.0
RR 32 39 29 15 12.0
12.0
h
10.0
R
10.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.Q
------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) ('/.) YIN Nm N6 YIN min T
EB 0.00 2.00 Y 20 0 0.90 50 N 0.0 71
Wn 0.00 2.00 Y 20 0 0.90 50 N 0.0
NB 0.00 2.00 Y 20 0 0.90 50 N 0.0 _
SD 0.00 2.00 Y 20 0 0.90 50 N 0.0 -
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT x NB LT x
TH x TH x
RT x RT x
PD x PD x
W.B LT x SB LT x
TH x TH x
RT x RT x
PD x PD x
GREEN 22.0 0.0 0.0 0.0 GREEN 15.0 71.0 0.0 0.0
YELLOW 4.0 0.0 0.0 0.0 YELLOW 4.0 4.0 C).0 C).0
------------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.213 0.193 31.7 D 26.7 D
T 0.091 0.193 26.3 D
R 0.164 0.183 26.7 D
WB L 0.477 0.18.3 34.5 ll 32.0 D
TR 0.438 0.183 28.9 D
NB L 0.263 0.125 36.3 D 12.7 B
T 0.717 0.592 12.0 B
R 0.058 0.592 6.7 B
SB L 0.51.3 0.125 39.2 D 12.2 B
T 0.557 0.392 9.9 B
R 0.028 0.592 6.6 B
----------------------------------------•-----------------------------------
INTERSECTION: Delav = 14.4 (sec/veh) V/C = 0.640 LOS = B
t 4i l`i 111:I-1] OHNMI (ZFt)
:iumm `f'y 1!f;Pilw-!
�. A ,i. x.,x..�. i%## K#- Y# fr.}g.p
#. #..�.#ii+ta##u.pc.#..�.y_,.�..k.:t
ti#..�. ##Y•# ## #Nr. #..e..�..R..�. #..x#..h.
ik ?£#� x1:K :::� k :: w- li'tF #. '...�..�.
{:. #.;-}c
1NTERSECUON„WAFi1::: VIEW
DR.7Mi,)NIERY
AVE.
aREP rYPE.....G8O
ANALYST .......
M.S.
TIME..........
' 92 AM PEAK
W/ PRO..
COMMENT. „ . , ..
Vol. BASED
ON 92
VOL. AND FIRNING MOV'F'MP
N! -1
---------------------
VOL_UMES
---
e
9EOME
RY
Es WB
018
SR
E13 WO
m8
SB
LT 53 102
45 IvS
s I...
12.0 L 12.0
L 1it. 0 I....
312.0
1"H. 24 46
1.168 952
T
12.0 TF 12.0
T 12.0 1
12.0
RT 66 78
59
30 R
1.5.0 12.0
T 12.0 T
15.O
RR: 32 39
29
15
12.0 12.0
R 10.0 R
10.0
1210 1':„ .! t
12.0
1. 0
1.2.0 1. _.0
1:2.0
12.0
----------- -
ADJUSTMENT
FORS'
GRADE
HU AOJ
Pk:1_7
RI1;3ES PHF PRI) i
PRO. Bur. A1RF'.
FYF'E
1%)
(%) Y/N
Nm
Nb
Y/N min 1
E D 0.00
2.00 Y
20
0 G. 9t) bo
!•,I Q. 0
wo 0.00
2.00 v
20
0 0.90 50
1\1 0.0
so 0. 00
2,00 Y
20
0 O. 9U FAO
M 0: t)
i
-----.._..--------'
.
''
Pla-i
f-'Fl-•'
PH-4 PH.
...1 ;-'l-I-:' F1-I-.1i
!-'I-1-4. '
EH LT x
NU L- I
X
1H x
IF-!
^
RT .X
f21
x
F' D x
W:S !..'f x
SB L7
w
( FI x
IN
X
P( 1x
f-tT
x '
P> X
RO
GREEN 22.0
0.0
0.0
0.0 GF•:L-EcN 1.:5.0
11.0 U.0
On)
YELLOW 4,0
0.0
0.0
0.0 YELLOW 4.0
4.0 0.0
0.0
-----•-----' -
I....F_'VkL
OF SERVICE
LANE GRP.
V /C
G/C
DELAY LDS
APP. DELAY APP.
LDS
EB L'
O. 275
0.183
32.2 0
-...
D
1-
C)„ O91
0.183
26.3 1')
R
:). 1 ?5
U. 1ir1:_:
26.7 1)
WB L
0.481.
0.1.83
14.6 D
13.9
D
I R
0..4.38
0.183
2A.9 I)
1`143 L
0,263
0.125
06.3 D
1 2. ,
0
T
0.718
0.592
12.0 R
R
0.058
0.592
6. ? 0
T
0. 55?
0. 597!
9.
--------.__._.--..-..--:---'-_..--
i NTFRSFKF it IN:
-. _..-'-'-__..
Omlav
= 1!`
n .=.er. ✓mh) U111 _
()_"s, f I11!" = C:
1995 HCM; SIGNALIZED INTERSECTIONS
SUMMARY REPORT
###•###iE###•k#•#####;r##•i##############'r. ######•V.••it#### i...i^.:r.:t. os#####################
INTERSECTION..PARK VIEW DR./MONTERY AVE.
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/13/99
TIME.......... EXISTING PM PEAK
COMMENT ....... EX. VOL. WERE MULT. BY A SEASONAL VAR. FACTOR OF 1.3
--------------------------------------------------------------------------
VOLUMES
GEOMETRY
EB
WB
NB
SB :
EB
WB
NB
SEt
LT
49
29
39
52 2 L
12.0 L
12.0
L 12.0
L
12.0
TH
27
22
974
861 . T
12.0 TR
12.0
T 12.0
T
120
RT
51
65
25
55 . R
15.0
12.0
T 12.0
T
1`.0
RR
26
32
13
27 .
12.0
12.0
R 10.0
R
10.0
12.0
12.0
12.0
12.0
12.0
12.0
1210
12.0
--------------------------------------------------------------------------
ADJUSTMENT
FACTORS
GRADE
HV ADJ PKG BUSES
PHF
PEDS
PED. BUT.
ARR.
TYPE
(%)
(%) Y/N Nm
Nh
Y/N min T
EB
0.00
2.00
Y 20
0 0.90
Sit
N 0.0
WB
0.00
2.00
Y 20
0 0.90
50
N 0.0
3
NB
0.00
2.00
Y 20
0 0.90
50
N 0.0
_
SB
0.00
2.00
Y 20
0 0.90
50
N 0.0
--------------------------------------------------------------------------
SIGNAL
SETTINGS
CYCLE LENGTH
=
1.1.9.Ct
PH-1
PH-2
PH-:(
PH-4
PH-1 i'H-2
PH-3
PH-4
EB
LT
X
NB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
WB
LT
X
SB
LT
X
TH
X
TH
X
RT
X
RT
X
PD
X
PD
X
GREEN
21.0
0.0
0.0
0.0 GREEN 15.0
71.0
0.0
0.0
YELLOW
4.0
0.0
0.0
0.0 YELLOW
4.0 4.0
0.0
0.0
----------------
LEVEL
OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APP. DELAY
APP.
LOS
EB
L
0.236
0.176
32.1
D
29.3
D
T
0.106
0.176
26.6
D
R
0.134
0.176
26.7
D
WB
L.
0.139
0.176
31..5
D
29.0
D
TR
0.299
0.176
27.7
D
NB
L
0.22.0
0.126
35.6
D
10.9
B
T
0.594
0.597
10.0
B
R
0.02E
0.597
6.3
B
SB
L
0.301
0.126
36.2
D
10.4
B
T
0.500
0.597
9.1
B
R
0.053
0.597
6.5
B
---------------------------•--------------
INTERSECTION:
Delay - 12.2
(sec/veh)
V/C - -
r B
0.495 LOS -
1985,
HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION-PARK VIEW
DR. /MONTERY AVE..
AREA
TYPE ..... CRD
ANALYST ....... M.S
DATE
.......... 6/13/89
TIME
........... 9'2 PM PEAK
W/O PRO.
COMMENT ....... VOL. RASED
ON AN ANNUAL GROWTH 'RATE OF 7%
-------------------------------•-•---
VOLUMES
GEOMETRY
ER WR NB
SR : CR
64 L 12.0 L
WR
12.0
NR
L 12.0 L
S9
12.0
LT
TH
61 35 46 :
33 27 1193 1054 T 12.0 TR
12.0
T 12.0 T
12.0
RT
62 80 30
67 a R 15.0
12.0
T 12.0 T
15.0
RR
26 32 13
27 e 12.0
12.0
R 10.0 R
10.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ
PKG RUSES FHF PEDS
PED. BUT. ARR.
TYPE
( ) (%) Y/N
'Nm Nb
Y/N min T
ER
Ct.Oit 2.00 Y
200 �- .90
Sir
-
N 31.5
WR
0.00 2.00 Y
20 0 0.90
50
N 31.5
31
ND
0.00 2.00 Y
20 0 0.90
50
N 23.5
,3
SR
0.<r0 L.00 Y
26 - 0 0.90 �
5 0
N 23.5
-
---------------
SIGNAL SETTINGS
CYCLE LENGTH '=
120.0
PH-1 PH-2
PH-3 PH-4
PH-1
PH-2 PH-3
PH-4
ER
LT x
N11 LT
x
TH x
TH
x
RT x
RT
x
PD x
PD
x
WR
LT x
SR LT
x
TH x
TH
x
RT x
RT
x
PD x
PD
x
GREEN 19.0 0.0
0,0 0.0 GREEN
16.0
73.0 0.0
0.0
YELLOW 4.0 0.0
0.0 0.0 YELLOW
-------
4.0 4.0 0.0
0.0
-----•--------------------------
LEVEL OF SERVICE
LANE GRP. VYC
G/C DELAY LOS
APP. DELAY APP.
LOS
ER
L 0.354
0.158 34.7
D
31.=
D
T 0.144
0.158 28..1
D
R 0.216
0.136 28.5
D
WR
L 0.199
0.158 33.4
D
31.6
D
TR 0.459
0.158 30.7
D
NR
L 0.252.
0.133 35.6
D
12.0
B
T 0.713
0.608 11.3
R
R 0.032
0.608 6.1
R
SR
L 0.350
0.13+3 36.4
D
11.0
H
T 0.600
0.608, 9.1
R
i
R 0.074
0.608 6.2
R
------------------------------------------------------._
INTERSECTION: Delay = 13.2 (sec/veh)
V/C =
0.6'15 LOS = R
1985 HrM: SIGNALIZED IN[ERSECllgNS
SUMMARY REPORT
INTERSECTInNI.PARK VIEW
8K"/MON[GRY AVE.
AREA TyPE,."".CBu
HNALY51 .^^,,,"^M.S"
DATE ..........
±/1J/89
TIME ",,".,"i,"'92
PM PEAK
W/ PRO.
COMMENT .......
VOL. BASED
ON '92 VOL. 4ND Ti|RmlNS NOVEMFNiS
----------------------------~�___^--^-^.—___~^.-____^~~_____^.-'_____--_____-_
VOLUMES
. ,
: GF0ME/Rv
E9 we
mH
S8 : EB WB N8
�8
L[ 128 35
46 104
: L 12,0 | 111.0 |. 12.A
lH 33 27
12!0^ 1054
: T 12.0 TR 12,V
n
n[ 75 90
^o
/,Y : R 15.0 1/,n
o
RR 26 62
it
x/ : 12.0 To x A.o R
^
:12.0
: 12,U
~-___~-____.-_-^_~.-,_____.____~_____~'___-`___~^-_____^___--__`___-'`___-__
ADJUSTMENY FP[10%
GRADE
Hv PoJ
PkG 8iSES PHp , PEoS PFo~ w!|, AxR.
|vP�:
Q%/ YIN
Nm mh` ;/N min |
E8 o.,«)
2^0Ov
2V o v.90 50 m �1'�41
�,
Wru 0.0V
2.00 Y
20 v N 1,5
N8 V.')o
I.m} ;
11".'}N
S8 0"00
2^00 f
20 o^y
----_-_-___--'_--___^~~^-^_-_--__-~--~
------------------------------------
6IGNAL SIA||lMY" F-wci|,
lo
PH-1
PH^2
PH-3 PH-4 PA-} Pk-2 PH -A
pU~4
EB LT x
TH X
RT X
RF �
PD X
P0 :
WB Al� x
SO L? �
TH X
TH :
RT X
� ` RT �
PD X
PV :
GREEN 19"0
0.0
0"0 0,0 GREEN 16.0 73.; U.
YELLOW 4"0
0,0
0^0 0.0 YELLOW. 4'0 4'0 o'V
~--'-.~_^_____-`-_.~~.--`--__-__^-__-.
n.o
--------------------------------------
-.
|rvpL OF smo[CE
LAmE'�R^�.
Y��C
8/C (.�\��Y
-
E�
�
0,l44
28.l U
R
' V,/*4
0~159
W8 �
0.209
0.158
|�
V,459
0"159 �V^7 D
ND L
0.%52
/� 1��2
0"133 35^, .
B
/
v'7y)
0.609 11.4 H
R
V.V12
0-60p 0.1 8
SR i
o,569
x9.8 n
7
0,60O
0,608 9.7 n
R
U.0?4
0.609 6.2 H
-------------------
1NTERSECTION:
__^-___-__~_--~-_-^~__-.-�~___-__~-__--+-_~--_~^--=.____^
� V/C O 7o2 LDS � C
De1av � 15,4 (sec/veh! � `
'
i995 HCH; SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#.Y.-#-##Mi: #K #####it V.•#.•#3%•Y####i: ####di•Yr#i'i•#-k##3:#ii•k•tf#k•{(.#.y.#?c1ck#?=is•###•:?5
•te### # #•#v'.Yr#Rii9,e#Si
INTERSECT'ION-FRED WAR,ING DR/MON'T'ER'Y AVE.
AREA TYPE ..... CBD
ANALYST....... M.S.
DATE .......... 6/1.';yeg
TINE .......... EXISTING
AM PEA..
COMMENT....... En. VOL.
WERE MOLT. BY A SEASONN-
VAN'.,
FACTOR OF
1,3
VOLUMEfS
_ROMET
RY
EB Ws Ns
SB EO
WB
NB
f_B
LT ' 160 92 11::=
274 L 12.0 L_
12.i:7
L 1;,10
L
A0.0
TH 696 566 339
394 ..I. 12.0 T
12.0
T 12.0
T
12.0
R.T 79 174 79
105 T 11.0 T
1:2.0
GR 15.0
i'P
1`:,()
RR 38 e7 38
92 TR 1 o. 0 W
12.0
12.0
L'
EB
WB
NB
SB
EB LT
I..H
RT
RD
WB LT
CH
HT
RD
GREEN
YELLOW
12.0 12.0 12.0
`
ADJUSTMENT FACTORS
GRADE
HV
ADJ
PKG.
BUSES
PHF
REDS
K)
Q)
Y/N
Nm
Nb
0.00
2.00
Y
20
0
0, 90
50
0.00
2.00
Y
20
0
0.90
50
0.00
2.00
Y
• 20
0
0.90
50
O.od
2,00
Y
20
0
0.90
50
SIGNAL ?SETTINGS -
PH-1
PH-:'
PH-3'.
PH-4
X
X
X
x
X
n
X
x
21.0
29. 0
;.0
3.0
LANE GRP.
EB
L
YR
WB
L
1.R
NB
L
'IR
SB
L
T
--------------
INTERSECTION:
V/C
0.667
0.898
.7, 383
0. /22
0.6L4
0.799
0.796
NB
L T
1H
RI-
RD
SB
LT
T FI
F..j:
RD
0.0
0.0 GREEN
0, (i
0. 0 Yr.LL13W
LEVEL OF SERVICE
G/C
DELAY
LDS
0.175
39.4
D
0. 23
35. 4
D
0.175
33.7
D
Q, --
50.E _
D
O :2tiO
2211
:i)
0. 24� _,
27.3 _
D
0.250
39.9
0
0..242
31.4
D
RED. BUT . PpR= FyPP
Y/N Win T
N 29.8
N 29.8
N =1.0 _
N 3:L.t?
---------------------------
C:YCL_E LEN04H = 1 _0.0
PH-1 F" l-c PH-::i: PH-4
x
x
X
X
APP. DELAY
=6.1
27. t..
_4.4
-------------------------------------
Delav = 33.2 (sec_/veh) V/C = 0.911
` SUMMARY REPORT
`
lNTERSECTlON".FRED
WHRlN8
DR/MUNlERy
AVE"
AREA 7YPF.....
coo
ANALYST ""^^^^,M^S^
DATE ,","",""."6/13/E\q
TIME ""^".^.^,,.92
AM
PEAK W/O
PRO,
COMMENT".."^,^VUL.
BASED
ON AN ONNUAL GRUWTH PATE .OF 0,
~^..,~~-.~_.`-___---______-_~--.~~~^_-___--___-_--___-~-~_^-__________-_-^__-
' YOLUMES
6EOmG[Ry
EB W8
N8
90 :
EB W8 */8
S8
LT 196, 113
139
336
L 12.0 L 12.o L 12.V L
lZ,V
TH 868 693
415
470 :
T 12,0 l 12^0 l 12.O T
12^0
RT 17 213
97
226 :
T 11"0 T 12"0 TR 15"0 [R
15.0.
` RR 38 97
38
92 :
TR 10"0 TR 12.0 12m
12^0
:
12"0 12"0 12,0
12"0
12"0 12,0 12,0
12"0
---------------------------
7------------------------- --------------------
ADJUSTMENT FACTORS
' GRADE
HV
HD/ PKG
BUSES VHF PE0S PED" BUT. pRR.
rypE
(%)
(%)
Y/N Nm
mb Y/N mzn l
E9 0.00
2.00
Y 20
0 3"90 5') N 29.8
J
W8 0"00
2.00
Y 20
O 0.90 50 N 29"8
�
^
N8 0"00
2^00
Y 20
O 0.90 50 N 31"0
3
SB ' 0.00
____________'_--`�~^~_~.�_�____________._~..`~~�______________._---....�^^_~
2.08
Y 20
0 0"90 5o N 3l.0
�
SI
L SFTTIHSS CYCLE LENG|H
12Un-
` PH-1
PFI-2
PH-3
PH~4 pH-1
PH-4
ED LT x
N8 L[%
TH
r}| K
RT
x
A1
PD
X
F\U �
/ WB LT X`
S8 LT �
' nH
X
7A S
RT
x
RT &
PD
X
PU :
` GREEN 22.0
29.0
0"0
0^V GREEN 78.0 29^0 0,0
U"Y
YELLOW 7.0
_~~~^~._�_�__-_-_',__~--
3"0
0"0
0.0 YELLOW 3.(} 3"0 0`6
0.0
/
---
I
--
LEVEL OF SERVICE
- LANE GRP"
V/C
sic
DELAY LOS APP. DELAY PPP"
LQ6
` EB L
0.780
0.183
44"4 E 69"7
F
TR
1,093
0.242
74^5 F
' wB L
0.,449
0.183
33"9 D 3903
D
TR
0,951
0.242,
39"7 D
' N8 L
.0"434
0,233
30^4 D 30w7
D
. TR
0"781
0.242
30.8 D
S8 i
1.050
0.23ƒ
87"F 65,9
F
TR
1"012
0^242
'54"4 E
-------------------
- INTERgECTlPN:
Delay
___--_'~~-..~_~^-__--__________-_-_~�~_~~__._`______-^_
53^3 (sec/veh) V/C 0.996 LOS = E
�
`
1:
X.
1- 14'
i
PA
A lf-ttli: IN i
it
... .. ..
it
1
1 'b
4
IMPM 1
H V
PkII-11
d I r. c.
J.)!n Pr- D.. On I I
I y Pl_
o
29
90
Pit
pt I
E'N
2V 0
C;RF-.0 1.i
. .. .......
t,
yr-1 lvl�.4
0
L.EVEL OF
V/C
G/C
DFLAY
APP.
L01.4
242
Ell 13
1W
R
1 009
4
0 242
l
t.)56
or
F
66,
rk
1985 HCM, SIGNALIZED
INTERSECTIONS
SUMMARY REPOR1
INTERSECTION.,FRED WARING
DR/MONIERY
AVE.
AREA TYPE .....CPD
ANAL-YS I'....... N. S.
DATE .......... 6/1;>/89
'TIME :........... 9. AM
PEAK W/
PRU.
COMMENT ........... MITIGATION
MEASURES,...
VOLUMES
----------------------------------------
GEOMETRY
E1- WO NO
SB
ES WP
NP
SE+
LT 198 113 139
338
L 12.0 L 12.0
L 12.0 L
12.0
TH 984 745 415
470
T 12.0 T 12.0
T 12.0 -I'
12.0
RT 97 213 97
226 e
T 12.0 T 12.0
TR 15.0 T
12.0
RR 36 87 710
92
TR 14.0 TR 14.0
1.2.0 R
14.0
12.0 12,0
12.0
12.0
--------------------------------------------------------------------------
1.2.0 12.0
S.c.O
12.0
ADJUSTMENT FACTOH5
GRADE HV
ADO PPG
BUSES PHF FEDS
PED. BUT. ARR.
TYPE
(%) (%)
Y/N Nm
Nb
Y/N min T
EP 0.00 2,00
Y 20
0 0.90 50
N 2,9.8
-
WP 0.00 2.00
Y 20
0 0.40- 50
N _9, H
NB 0.00 2.00
Y 20
0 0.90 50
N 31,0
SP 0.00 2.00
Y 20
0 0.90 50
N 31,0
_�
SIGNAL
--- ---------•-------------------
SETTINGS
CYC(_E LF_NGfH =
1:d0.0
F'H-1 PH-
PH-3
PH-4 NH-1
PH--2 PH-3
PH--4
ES LI x
NS LT
x
1H x
TH
n
RI x
RT
x
PD x
H'17
x
WS LT x
SP LT
x
)H X
TH
x
R) x
RI
x
HD x
PI)
x
GREEN 22.0 29.0
0.0
0.0 GREEN 28.0 :29.0 0.0
0,0
YELLOW 3.0 3.0
-----------------------------------------------------------•------------------
0.0
O.0 YELLOW 3.0 3.0 0.C)
0.0
LEVEL- OF SERVICE
LANE GRP. V/C
G/C
DELAY LOS
APP. DELAY APP.
LOS
EP L 0.788
0.183
45.0 E
59.0
E
TR 1..057
0.242
61.7 F
!49 I.- 0. 449
0.183
33. 9 1.)
43. H
E
TR Cl. 990
U. i?42
45, .; E
NS L Q. 434
Q. 233
::,0. 4
TR 0.7H1
0.242
30.H 0
P L 1, C>,`s6
0. 2.33
E39. y F
49. y
E
I (), 7ti7
Q.242
28.6 ti
R 0.544
-- --------- -------'--------
0.242
2- . 1 1).
HfLFRSEt,TIONs Delav = 0-7
(s(-c-/veh) V/C =
0.9':28 LOS = E
7
'?S5 IIC1M: SIGNALIZED INTERSECTIONS
SUI'1PV-RY REPORT
LNTERSECTION.,FRED WARING DR/MONTERY AVE.
AREA TYPE ..... CB0
ANALYST ....... M.S.
DATE„, .......6/1 /99
TIME .......... EXISTING PM PEAK
_ COMMENT: ...... EX. VOL. WERE: MOLT. F3Y A SEASONAL.
VAR.
F,purOR
OF 1.ai
• vuLuriES e
GEOMETRY
E9 Wri Ns Sr.; EN
Wri
NB
SO
LT 152 51 114 254 o L 12.0 L..
12.0
I:.
1 .0 L-
1':?. t) .
TH 549 676 386 309 T 12.0 I"
12.0
T
12.0 1
12.0
RT 74 15,1 78 224 a .1. 11.0 T'
13.0
rw "
1,__ ,, FIR
1q; ()
RR "i' 75 46 137 IR 10.0 TR
12,0
12. ,
1'._. )
1'2. 0
1'__. 0 '
1 ... 0
120
1..2.()
12.0
v.C)
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF
PEDS
PED,
soy1 ORR.
1YPF:
(„) (/) Y/N Nm Nb
Y/N
min f
WB 0.00 2.,00 Y 20 0 0.90
50
N
29.8
ND 0.00 2.00 Y 20 0 0.90.
50
N
sl.o
' ^_SB 0.00 2.00 Y 26 0 0.90
50
N
31.0
EP LT
TH
RT
tAjB LT
TH
R-I'
GREEN
YELLOW
SIGNAL SETTINGS CYCLE LS iH = 120,
PH-1 " F'H-2 PH-3 PH-4 PH-1 PH--2 P:4-3 .-.H-4
X I . NB Ll-. X
x
21.0
_.0
LANE GRP
h_B L
TR
LOH I..
-1 I
T-19 L
TR
8k L
`TR
---------------
INTERSECTION:
X
TfI
x
x
RT
X
X
ISO
X
Sri
L'I
x
Y
III
X
X
1:'T
x -
X"
PD
x
29, 0
040
0.0 GREEN
31.0 27.0
0.0 on)
3.0
0.0
0.0 YE:LLOW,
310 310
0.0 0.0
LEVEL
OF SERVICE
V7•C
G/ C
DEL
LOS
APP. DEAY
DELAY
APP. LOS
(l
0.691
0.242
27.9
1)
0.866
0.242,
12.8
U
0.322 22
0.258
27.5
D
29. kt
D
9. 11 7'
0.258 8
35.0
D
3'L „ 8
D
0, 7f3
Va _t_5
29.9.
D
--------------
Delay
31.7
(sec_/veh)
V/C
= 0.760
LOS = U
9
= SCI-I Qb`O
= O/A (qOA/D3e) tr`Oy = Aeid0 , W01133SK31NI
---------------------------
---
3 T'ph 941.10
Z.T4)"u )J-L
(2
(F'"),i:
(1 4. `t:r'. �.i7Z `<.;
i..i'•i7'(.1 1 t-lri
f h 'qf" Z`(
066'1:) ra_1
agwo
tf
C."..,
A
Sul
'ck:Ib AW 1:-i(J r-dW
"Sol ,'WARO 0r0
01h c3os 3Nb-I
=1;71fi835 AD 1163'i
—.__ _-_--.-------.---_---.-
Yr.-c;
--._--•-------.__---.-----.-,
('<? C5•:' {)-;
_ _
ML1•"IAaA. O"i"` •O'O.
1)"1 c-)°s i`1c.11%
l7"iY
i}-( (7•<.:. •ia"r:,r':
Malmo 0.0 O'O
O':S. O-'Tz N.l1'JFI
Ali
k.
C3.)1
41 r-i
k
J `-i
x
All
17—.11ri
.`—I�i.-.i r.'.—Firms L—H._f
IT—Hri .. —N•d
r':—I'i r-1 T—Ho
H 1 ON 3-1 =+' ); t:.(1
f3F)t`J i I i. 9S-RINNE;LT 6 r
.
A)", 06 F'.; (:? t.1,?. A(rl.T
f t)ti"(1 as
CP` L _ N
v C."e, ;; C7 1.4 �, }
t:;(:j ..;r (1(5 "t.5 liP
8,4Z W
CK; t"7r,'0 } IN, A
OO'- - OO'O rim _.
8`7Z N
'(';; C7h'o O IOZ A
Of)` - OQ`(`r Ha
3d1..1
`-11:3H 'Isla (1'i1i1
S(731:f dHrai SASW.i EY:Yd C'Oki
Fi 300l*i
couiDo_I iNaFIS11[rO:H
---------------------
0,71
0,01 t1i
.. 26
c?'F.1
.{. C}':(.L 1
(: '.-... 1 t.)"r':-L_ .1. 642
C V 868 ZZ9 HI.•
r`�M?y 90f
- •
�i{'J
ii{`( _y • r:i~i
I'�I•d Om
- +,.,
„ r 1111%10"i:a I O' r„+ j c I AR
WO . - it:., 1 N i',Jww"'.
V' o Ulm mono
L-.Ir_I .',41a . . ` ' .. - " W 1 .1. '
.::ri Li(:
'
Oki C(......:+AAA '.Y38U
=„ H Amalld)11i,r-{Ci omiew
-i#�-.�iF#�%3f..Y�..y.#-v.ytx..�.x{.�...:�.#.�..�..;t..v.�..,r.a.Yr°c:a..�.�t:..�..;t.??i#'.F•�'.F#v{i;.�.?I.•#3F#?t••7.',{#-#=i?,�#:t.�..'kn##��?t##'.A:Q..t.A'.:K.•#.Y
_•
tcti'1d:av !, wwwns
'
•
SNOTI 3 SH INl
OWWN915 `trIH 9BI
f
U
�
�
985'YCM: SXGNALlXED
INTERSECTIDNS
SUMMARY REPOR!
INTERSFrTlON^.FRED
WAR[NG
DR)MONlFHY AVE,
��REH !YPE...^,CHI)
&13/86'
TIME .,,.."",,""'92
PM
PEAK W/ PRO.
...,,,,V0L~
BHSFy0N^/97 VOL. AN0 T||RN'ms
M0VIoMFWIS
_-__-______-_--~-__-__-__'.._,~~^_^^__~___~~~,.^,~___~_-�---___--__-_`~____`
vNUmES
^
1�!LDM
\RY
5Bu8
NO
S8 : 5k
SB
L| 199 X2
' 140
A24 } 14''o 1
1
|. V ,
t7.:
k| 91 185
96
774 : | 11'1) 1
,o
!},
8R 45 93
48
137 r if i0,n |F/
IZ.0
2'(A
A2.C)
,vn/
1/.0
1it. 0
12.v
ly,»
-^---------------
A2.Y
--------------------------
~__,,---____----------------
�
A0JU5TMFNf FoC(O8S
�
____
5RAOE,
nv
A().) PK� PAF
PRO
FoS
pFu, m|r. APR.
{YpE
'
Y/N mm
Y/m
min i
E8 V�oV
1.00
, �2.)V 0191}
t.A
�0 0,00
2.00
Y 90
5n
N 29~10
3
-8 \x)
2,00
Y 0"4o
`
SE, 0"00
2"00
Y 20 90
58
N 31,cl
--------------------
SIGNAL SETTINGS
CYCLE LENGTH
128.0
� PH-1
PH-2
PH-3 9H-4
PH-1
PH-12 PA-3
pH-4
EB LT x
NO
L1 x
�
TH
X
��
/H
x
~
Kl
«
|Rl
�
PD
:
f`D
W8 LT x
|rH
SYEA
i.TX
:
Is
:
PP
� �
�� `
P0
GREEN 21^0
31.0
0.0 l]"o GREEN
2910
2/,0 0,0
on,
-;,0
- _",y
o^// vV vp|`i0u
o
!"'v o,p
",o
-__--____-_______-___-'^^_^~^^_--_~'.'.`_~._--__+______--_-_~__~'-_..~_-_-__
`
/fvF| OF AFx;/cF
LANE nRP"
V/C
G/Cl DELAY
LDS pPP~
PR*v ApP,
/V*
o'R2`/
():1 4P./�
F
`��.4
[�
(�
0.893
0.256, 33,4
D
x
w8 L
0.258
0.175 A2;b
|)
f-
`rH
1,101
o,250
F
pu L
o,422
`76,5
0.242 29,/
v
30.A
U
TR
0,917
0,225 4V,1
t
S8 L
0.918
0.242 64.4
F
56,9
F
AR
0,936
0"225 42^6
E
---------------
---`~---------------------~-~^`~
INTERSECTION:
Delav
--------------------------
= 51,7 (sea/veh>
V/C = 0,974
L/}S = E
I9arm:SIGNALIZED I7mSE10a
SUMMARY REPORT
I r { /. //r z G it RY AVE.
AREA TYPE ..;mo
ANALYST ....... ± S.
Dr. .�.. w!&m
2r ..........•92 A PEAK w LUG
mAga....�mmGA2m'+mma..
VOLUMES
:
+mwv
ED m
No
2:
m
m
m
m
LT
199 62
!q
q; . c
12.0 c
12.0
E 12.0
E
12.0
m
765 933
q!
379: I
R.o 1
12.0
r l2 o
*
12.o
q
w 18
«6
27 : I
12.0 T
12,0
m !& o
!
12.0
m
#s ,a
ae
! : IN
,« o m
w.o
,
,wo
w.n
12.0
12.
,
w.o
o.o
Ile.. u
12.0
gJmmmleA
FORS
_.-----------
GRADE
+
7a SIG
BUSES PHF PEDS
7m BUT.
m&
TYPE
R,
a,
ww _
+
¥G min !
ED
600
&m
Y m
o 0.90
VO
N 29.8
s
m
0.00
2.00
Y 20
o 0.9u
m
N 29.8
3
m
mm
am
Y m
o mk
VO
N 31.0
s
2
Gm
am
Y 20'
o aq
VO
N 31.0
5
. SIGNAL
�Img
r LENGTH
\m w
mw
PH-2
m=
-
mm
mr
m=
m-
ED
G x
m Er
x
y
x
m
x
e
x
er
x
q
x
m
x
m
:! x
SB Lr
x
9
x
m
x
wr
x
e
X
PD
x
A
x
GREEN
21.0
2,0
Go
mo GREEN
:.o :ao
mo
w,
YELLOW
Go
to
Go
«o YELLOW
to &o
ad
0.0
LEv
c OP SERVICE
---------------
NE mR
yc
Dc
DELAY ms
APP. 7i.
APP.
LOs
Es
E
0.829
0.175
4Y.4 F
#,a
o
m
0.849
m ae
=no e
we
c
« =m
m!a
32,6 u
64,7
e
m
1.050
0,258
68.2 e
No
E
0.422
0.242
29.7 J
00.1
o
m
0.917
0.225
40.1 E
m
E
0.«e
Game
64.9 F
#s,
E
T
0.613
0.r,
27.9 0
R
0. 597
0.225
29.2 o
wrRSECsm:
_Iav
------------------------
= 46.3aec/vm, oc=0.9!
Em=E
_985 HCM: !-NSIGNAL12ED INTERSECTIONS P oe-1
IDENTIFYING INFORMATION-
----------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET ..............
3V
PEAK
HOUR FACTOR .................................
1'
AREA
POPULATION.......... .....................
150000
NAME
OF THE EAST/WEST STREET .....................
PARK VIEW DR.
NAME
OF THE NORTH/SOUTH STREET.........,..........
ENTRANCE 1
NAME
OF THE ANALYST......, ........................
Pr.
DATE
OF THE ANALYSIS (mm/dd/vv)..................
7-19-09
TIME
PERIOD ANALYZED .............................
AM
OTHER
INFORMATION:'
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES:'
EB WB NB SB
---- ---- ---- ----
LEFT 0 20 5 --
THRU 120 76 0 --
RIGHT 20 0 14 --
NUMBER OF LANES
----------------
EB WB NB SO
--------------------- -----
LANES 2 2 1' -'
_-" P:NT
FACTORS
F'aoe-2
PERCENT RIGHT'
TURN CURB RADIUS (ft)
ACCELERATION LANE
-
GRADE ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
0.00
90
20
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
1!
SOUTHBOUND
----- ---
---
-
VEHICLE COMPOSITION
% SU TRUCKS
%
COMBINATION
AND RV'S
VEHICLES % MOTORCYCLES
EASTBOUND
0
0
O
WESTBOUND
C)
0
0
NORTHBOUND
0
0
{�
SOUTHBOUND
---
--- ---
CRITICAL GAPS
TABULAR'VALUES
ADJUSTED
SIGHT D'IST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
----------------
NB
5. S l
5. 50
0 00
5. 0
MAJOR LEFTS
WB
5.50
5.50
0.00
J b J._ 50
MINOR LEFTS
ND
7.00
7.00
C1, c0
7.00
CAPACITY AND LEVEL —OF —SERVICE
---------------------------------------
POTEN— ACTUAL
FLOW— TIAL MOVEMENT
RATE CAPACITY CAPACITY
MOVEMENT v(0cph) c (pcph) c (pcph)
0 M
------------------------
MINOR STREET
NB LEFT 6 639 630
RIGHT 1. � 997 997
MAJOR STREET
WB LEFT 22 953 953
Pave—_,
SHARED RESERVE
CAPACITY CAPACITY
c (0cph) c = c — v LOS
SH R SH
> 6.30 > 625 > A
864 1 84:= >A
> 997 > 9BI 7 A
953 9'31 A
i
1 ,
1965 HCM: UNSIGNALIZED INTERSECTIONS Pace-1
•�•�##*�•w���n• �#�i!•�,•�����;��et�aea�a��t�•u��•�•�•�• w•w u•as•��;�*�;��•R�a•�x •�####•a*x••� r �•��a��•�•xt
IDENTIFYING INFORMATION
------------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET. .............30
PEAK`HOUR FACTOR .................... ........,, 1
AREA POPULATION .............. ....I.......... 150000
NAME OF THE EAST/WEST STREET.,,..,,. ENTRANCE
NAME OF THE NORTH/SOUTH,STREET.....,....,.......,. HWY III
NAME OF THE ANALYST,. PF;
DATE OF THE ANALYSIS (Am/dd/vv)................. 7-10-84
TIME PERIOD ANALYZED. AM
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE_: T--INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH'
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------------------------------
EB WIi NB SB
LEFT — 22 0 51
THRU -- 0 1030 1055'
RIGHT -- 22 51 C?
NUMBER OF LANES
EB WLi N:.0 SB
--------------------- -----
LANES -- 2 2 2
ADJUSTMENT
FACTORS
Pane-2
PERCENT RIGHT TURN CURB RADIUS (ft)
ACCELERATION LANE
GRADE ANGLE
FOR' RIGHT. TURNS
FOR RIGHT TURNS
EASTBOUND
----- ---
---
-
WESTBOUND
0.00 90
20
N
NORTHBOUND
0.00 90
20
N
SOUTHBOUND
0.00 90
20
N
VEHICLE COMPOSITION
----------------------- ----------------------------------------------
% SU TRUCKS %
COMBINATION'
AND RV'S
VEHICLES % MOTORCYCLES
EASTBOUND
---
--- ---
WESTBOUND
0
0
0
NORTHBOUND
0
0
.0
SORTHBOUND
0
0
0
-CRITICAL GAPS
---------------------------
7-----------------------------------------
TABULAR.VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL -GAP
MINOR RIGHTS
WB
5.50
5.50
0.00
5.50
MAJOR LEFTS
SB
5.50
5.50
0.00
5.50
MINOR LEFTS
WB
7.00
7.00
0.00
7.00
CAPACITY AND LEVEL —OF —SERVICE
Pane-3
POTEN— ACTUAL
FLOUT— TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c — v LOS
0 141 SH R SH
MINOR STREET
I+lB LEFT
24
RIGHT
24
MAJOR STREET
SP LEFT
56
75 65
598 598
3i>0 300
65
5913
_00
41 E
574 A
244 C
1?85 HCM: UNSIGNALIZED INTERSECTIONS
Arne-:
IDENTIFYING INFORMATION
-------------------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET ..............
.0
PEAK HOUR FACTOR .................................
I
AREA POPULATION ..................................
150000
-, NAME OF THE EAST/WEST STREET .....................
i
FRED WARING DR.
NAME OF THE NORTH/SOUTH STREET...................
ENTRANCE 3
NAME OF THE ANALYST...,....,.....> .................
PK,
DATE OF THE ANALYSIS tmm/dd/ya7..................
7-10-59
TIME PERIOD ANALYZED.. ........................
AM
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSF_CTION
MAJOR STREET DIRECTION.' EAST/WEST
- CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EP WS NH SH
---- ---- ---- ----
LEFT 10 0 -- 9
THRU 163 664 -- 0
RIGHT 1.) 32 -- 9
NUMBER OF LANES
---------------
ELi WD NB SP.
--------------------- -----
LANES 2 2 -- 1
^7USTMENT FACTORS Paae-2
---------------------------------------------------------------------
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS
------------ -----------------
EASTBOUND 0.00 90 20 N
'WESTBOUND 0.00 90 20 N
NORTHBOUND ----- --- --- -
SOUTHBOUND 0.00 90 20 N
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES 7 MOTORCYCLES
----------- ------------- -------------
EASTBOUND 0 0 O
WESTBOUND 0 0 0
'NORTHBOUND --- --- ---
SOUTHBOUND 0 0 0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Tabled 0-2)
VALUE_
ADJUSTMENT
CRITICAL. GAP
--------------
MINOR. RIGHTS
--------
-----------
------------
SB 5.50
5.50
0.00
5.50
MAJOR LEFTS
EB 5.50
5.50
0.00
5.50
MINOR LEFTS
GB 7.OLi
7.00
0.00
7.00
CAPACITY AND LEVEL -OF -SERVILE
POTEN- ACTUAL
FLOW TIAL MOVEMENT SHARED
RATE CAPACITY CAPACITY CAPACITY
MOVEMENT v(o+cph) c (pr_ph) c S,_cph) c (rcph)
D h, SH
MINOR STREET
SB LEFT 10 245 242
RIGHT 10 747 747
MAJOR STREET
EB LEFT 11 493 493
Pace
RESERVE
CAPAC I T'Y
c = c - v LOS
R SH
> 24•
365 > 346 `H
> 747 > 737 > A
482
1995 HCM: UNSIGNALIZED INTERSECTIONS
Page-!
IDENTIFYING INFORMATION
-----------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET ..............
30
PEAK HOUR FACTOR .................................
1
AREA POPULATION ...................................
150000
NAME OF THE EAST/WEST STREET., ....................
FRED WARING DR.
NAME OF THE NORTH/SOUTH STREET ...................
EMTRANCE 4
NAME OF THE ANALYST ................... i..........
Pk::
DATE OF THE ANALYSIS (mm/dd/yv)................7
7-10-89
TIME PERIOD ANALYZED .............................
AM
OTHER INFORMATION:
INTERSECTION, TYPE AND CONTROL
j
INTERSECTION TYPE: T-INTERSECTION
_
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE SOUTHPOUND: STOP SIGN
TRAFFIC VOLUMES
i
{ i
ED WP NB SB
LEFT 0 0 -- 9
THRU 172 696 -- 0
-�
RIGHT 0 20 -- 0
l�
NUMBER OF LANES
---------------------------------------------------------------------
ER WB NB SR
------- ------- ------- -------
LANES 2 2 -- 1
"19TMENT
----------------------------------------------------------------
FACTORS
Fang-2
PERCENT
RIGHT TURN CURB RADIUS (ft)
ACCELERATION LANE'
GRADE
ANGLE
FOR RIGHT TURNS
FOR FIGHT TURNS
EASTBOUND
0.00
_------
90
-----------------
20
----------- ------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
-----
---
---
-
SOUTHBOUND
0.00
90
20
,!
VEHICLE COMPOSITION
----------------------------------------------------------------------
X SU TRUCKS
%
COMBINATION
AND
RV'S
VEHICLES % MOTORCYCLES
EASTBOUND
-----------
------•-------
0
-------------
0
0
WESTBOUND
C)
0
Ci
NORTHBOUND
SOUTHBOUN➢
CRITICAL GAPS
MINOR RIGHTS
SB
MAJOR LEFTS
ER
MINOR LEFTS
SB
C)
0
0
TABULAR VALUES
ADJUSTED
SIGHT ➢IST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
5.50
5.50
0.00
5.50
5.50
5.50
0.00
5.50
7.00
7.00
0.00
7.,Oti
CAPACITY AND LEVEL —OF —SERVICE
MOVEMENT
MINOR STREW
SB LEFT
RIGHT
MAJOR STREET
EB LEFT
Pape-3
POTEN~
ACTUAL
FLOW— TIAL
MOVEMENT
SHARED'
RESERVE
RATE CAPACITY
CAPACITY
CAPACITY
CAPACITY
v(ocph) c (pcph)
c (pcph)
c 'pcph>
c = c ~ v LOS
o
_______ ________
M
_________
SH
____________
R SH
____________ ___
10 236
236
> 236
226 > C
.
> 236
226 >C
0 738
738
> 738
/ 73R > A
490 480 A
Lj
it
1985 HCN: I.NSIGNAL.IZ D INTERSECTIONS'
. ��#.�.���•��x#�t����#�x������•iF•��t�;.x��-�x-�+�•���ab��exuK�i;-�ttrtt��rrr,�x��s�tt-z-�9.�x#rc•re-s
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET .............. 30
PEAK HOUR FACTOR ................... ...... 1
AREA POPULATION....... ........... ... 150000
NAME OF THE EAST/WEST STREET ..................... PARK: VIEW DR.,
NAME OF THE NORTH/SOUTH STREET....... ............. ENTRANCE 1
NAME OF THE ANALYST..... .................. PK
DATE OF THE ANALYSIS (mm/dd/y'e) .................. —10-89
TIME PERIOD ANALYZED .......... ....'............ ... PM.
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
----------------------------------------------------------------------
INTERSECTION `!'YPEL T—INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND,: STOP SIGN
TRAFFIC VOLUMES
---------------
ED
LEFT 0
THRU 51
RIGHT 26
NUMBER OF LANES
-----------------
EH
LANES 2
WS
NB
42
26
SB
U
0
., 90
SB
NB'
1
SB
b
ADJUSTMENT FACTORS Pace-2
---------------------------------------------------------------------
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE -
GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS
--------- ------------------
EASTBOUND 0�00 90 20 N
WESTBOUND 0.00 90 20 N
�i 'NORTHBOUND 0.00 90 20 N
SOUTHBOUND ----- --- ---
VEHICLE COMPOSITION
----------------------------------------=-----------------------------
SU TRUCKS % COMBINATION
FIND RV'S --VEHICLES % MOTORCYCLES
-------------------------------
- EASTBOUND 0 0 0
WESTBOUND, 0 0 0
NORTHBOUND 0. 0 0 1
SOUTHBOUND --- --- ---
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
NB 5.50
5.50
0.00
5.50
MAJOR LEFTS
WB - J.JO
5.50
0.00
5.50
MINOR LEFTS
NB 7.00
7.00,
O:00
7.00
CAPACITY AND LEVEL -OF -SERVICE
-----------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT
RATE CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph)
o M
MINOR STREET
ND LEFT 29 666 647
RIGHT Be 999 995
MAJOR STREET
WP LEFT 46 996 996
P acl c-
SHAMED RESERVE
CAPACITY CAPACITY
c (ccph) c = c - v 1_05
SH R SH
647 b19 A
881 764 ;H
99S 910 A
996
950 A
1985 HCM: UNSIGNALIZE_ INTERSECTIONS P�ac-1
###•K.•###tF•i'r##?6##le##i.#####<k: #•####ii-##iF##ti#.#t'r##'f. #?E#######iFit##i'. ###i£#irii•tr. ik•k#"m.
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET .............. 30
PEAK: HOUR FACTOR ....................... ......... ].
AREA POPULATION .................................. 1500U00
NAME OF THE EAST/WEST STREET ..................... ENTRANCE 2
NAME OF THE NORTH/SOUTH STREET ................... HWY III
NAME OF THE ANALYST....,...,................... .,..— PK
,i
DATE OF THE ANALYSIS (mm/dd/yv).................. 7-10-89
TIME PERIOD ANALYZED-- ....................... PM
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
-----------------------------------
EB WD NB SD
LEFT -- 13a 0 105
' THRU -- c> 1507 1223
RIGHT - 133 105 r
NUMBER OF LANES
-- ---------------------------------------------
EB WB NB SB
-------------------- -----
LANES --
-
---------------------------------------------------------------------
FACTORS
Faoe-�
PERCENT
RIGHT TURN CURB RADIUS
(4t) ACCELERA'TION LANE
GRADE
ANGLE
FOR RIGHT TURNS FOR RIGHT TURNS
EASTBOUND
------
--
--- ---
---
-----------------
-
WESTBOUND
0.00
90
20
pl
NORTHBOUND
0.00
90
20
N
SORTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
----------------------------------------------------
------------------
I '
% SU TRUCES
%
COMBINATION
AND
RV'S
VEHICLES %
MOTORCYCLES
EASTBOUND
-----------
---
-------------
-------------
---
---
WESTBOUND
0
O
0
NORTHBOUND
C)
i
0
SOUTHBOUND
0
0
0
r
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
._ WB J. 56
5.50
0.00
5.50
MAJOR LEFTS
SB 5.50
5.50
0.,00
5.50
MINOR LEFTS
WB 7.00
7.00
0.00
7.0o
G
CAPACIT`/ AND LEVEL —OF
---------------------------------------------------------------------
-•SERVICE
Paoe—z•
POTEN—
ACTUAL
FLOW—
TIAL
MOVEMENT
SHARED RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY CAPACITY
MOVEMENT v(ocph)
c (pcph)
c (pcph)
c (pcph) c = c — v LOS
p
M
SH R SH
MINOR STREET
WD LEFT 146
75 1?
19
—127 F
RIGHT 146
422 422
422
276 C.
MAJOR STREET
SP LEFT 116
145 145
145
30 E
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET............,.. 30
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ................ .... FRED WARING DR.
NAME OF THE NORTH/SOUTH STREET ................... ENTRANCE L
NAME OF THE ANALYST .............................. PK
DATE OF THE ANALYSIS tmm/dd/vv?.................. 7-10-89
TIME PERIOD ANALYZED ............................. PM
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE SOUTHHOUND: STOP SIGN
TRAFFIC VOLUMES
EB WD NH SR
LEFT 21 0 -53
-
THRU 164 780 -- 0
RIGHT 0 63 -- S',
NUMBER OF LANES
Eft W8 NH SD
- --- LANES 2 2 -- 1
J
ADJUSTMENT FACTORS
----------------------------------------
Pape-2
PERCENT RIGHT TURN
CURB RADIUS
(ft) ACCELERATION
LANE
GRADE ANGLE
FOR RIGHT
TURNS FOR
RIGHT TURNS
- EASTBOUND 0.00 90
---------
20
-----------------
N
- WESTBOUND 0.00 90
20
N
NORTHBOUND ----- -•--
---
SOUTHBOUND , 0.00 90
20
N
VEHICLE COMPOSITION
------------------------------------------------•---------------------
SU TRUCKS %
COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
----------- -------------
EASTBOUND 0
0
-------------
Ci
- WESTBOUND 0
0
0
NORTHBOUND ---
---
---•
SOUTHBOUND 0
0
0
CRITICAL GAPS
------------------------------------------------------------------------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
----
-----------
------------
SB 5.50
5.50
0.00
5.50
MAJOR LEFTS
EB 5.50
5.50
0.00
5.50
MINOR LEFTS
GB 7.00
t
7.00'
0.00
7.00
CAPACITY AND LEVEL —OF —SERVICE
pane—._
---------------
POTEN— ACTUAL
FLOW— TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(ocph) c (pcph) c (pcph) c (pcph) c = c - v LDS
n M SH R SH
------------------------ ------------------------ ---
MINOR STREET
SB LEFT 58 191 185
RIGHT 58 684 684
MAJOR STREET
EB LEFT 23 405 405
105 > 126 > D
2?1 > 174 )D
684 > 626 > A
405 321 B
! 1985 HCM; UNSIGNALIZED INTERSECTIONS
Pace-1
'R'K'IE'I!'?E'{F'Y."YC'SE'#'X"IE'k"Y"V."FF'IF'iF'y: "T'1S"'Yf'X"pit"}"i:"Y.'};E"YCIi'Y^.,'IF1Y'#'A"YTii"YC'{EdF'YC'N"U."IF'K'IE'H'ifr'YCtY"IF'IF'IE'SF]Y"x"�{E'�'YC'YS'IX'%'%"IE'YC'IE'N'
IDENTIFYING INFORMATION
--------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET ..............
30
PEAK HOUR FACTOR.................... ..........
1
AREA POPULATION ..................................
150000
NAME OF THE"EAST/WEST STREET .....................
FRED WARING DR.
NAME OF THE NORTH/SOUTH STREET ...................
EMTRANCE 4
NAME OF THE ANALYST ..............................
PK
DATE OF THE ANALYSIS (mm/dd/vv)..................
7-10-89
TIME PERIOD ANALYZED .............................
PM
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE; T—INTERSECTION
MAJOR STREETbIRECTION: EAST/WEST
CONTROL TYPE SOUTHBOUND; STOP SIGN
TRAFFIC VOLUMES
ER WB NB SP
LEFT 0 0 -- 53
THRU 217 843 -- 0
RIGHT 0 42 -- i)
NUMBER OF LANES
------------------------- -------------------------------------------
EB WEs NH SB
LANES 2 2 -- 1
-----------------------------------------------------------------
F'aoe-c
PERCENT
RIGHT
TURN_ CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
-------
0.'00
----------
90
----------------
20
-----------------
N
WESTBOUND
0,.00
90
20
N
NORTHBOUND
-----
---
---
-
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
----------------------------------------------------------------------
SU TRUCKS
%
COMBINATION
AND
RV'S
VEHICLES % MOTORCYCLES
EASTBOUND
0
0
0
WESTBOUND
0
0
0 !
NORTHBOUND
---
_
--- ---
SOUTHBOUND
0.
0
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAF'.
MINOR
RIGHTS
SB 5. so
5.50
0. 00
5. 50
MAJOR
LEFTS
'EB 5,50
5.50
0,0f)
5.50
MINOR
LEFTS
SB 7.00
7.00
C),00
7.00
CAPACITY AND LEVEL —OF —SERVICE
------------------------------
pace—
POTEN— ACTUAL
FLOW— TIA_ MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT u(ncph) c (pcph) c (pcph) C. (ph) cpc = c — v LOS
o M SH R SH
------------------------------------------------ ---
MINOR STREET
SB LEFT 58
170 170
RIGHT 0
669 669
MAJOR STREET
EB LEFT V
385 395
170 111 :? D
170 111 D
669 > 669 A
38`
38= B
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
INTERSECTION- MAIN ENTRANCE/SR
111
AREA TYPE ..... CBD
ANALYST ....... PK
DATE .......... 7/11/89
TIME .......... 199'2 AM
PEAK W/PROJ
COMMENT....... MITIGATION
----=----------------------------------------------------------------------
MEASURES
_
VOLUMES
GEOMETRY
EB WB NB
SB EB WB
NB
SB
I LT 0 22 0
51 12.0 L 10.0
T
12.0
L
10.0
TH 0 0 1030
1055 : 12.0 R 12.0
T
12.0
T
12.0
RT 0 22 51
0 12.0 12.0
T
12.0
T
12.0
RR 0 0 0
0 12.0 12.0
R
10.0
T
12.0
12.0 12.0
12.0
12.-0
12.0 12.0
12.0
12.0
ADJUSTMENT FACTORS
--------------------
GRADE HV
ADJ FKG BUSES PHF PEDS
PED,
BUT.
ARR.
TYPE_
W (%)
Y/N Nm Nb
Y/N
min T
EB 0.00 2.00
N 0 0 0.90 0
N
30.8
-
WB 0.00 2.00
N Ci C> 0.90 0
N
30.6
3
NB 0.00 2.00
N 0 0 0.90 0
N
10.8
3
SB 0.00 2.00
---------------------------------------------------------------
N 0 0 0.90 - 0
N
10.8
SIGNAL SETTINGS
CYCLE
LENGTH =
60.0
PH-1 PH-2
PH-3 PH-4 PH-1 PH-2
PH-3
PH-4
EB LT
NB LT
TH
TH
X
RT
RT
X
PD
PD
X
WB LT X
SB LT
X
TH
TH
X
RT X
RT
PD X
--------------------------------------------------------------------------
PD
x
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP, DELAY
APP.
LOS
WD L 0.104
0.167 16.1 C
13.4
B
t 0.063
0.2B3. 10.1 B
NB T 0.392
0.667 3.0 A
3.6
A
R 0.383
0.117 16.5 C
SB L 0.."00
0.133 18.1 C
3.6
A
T 0.402
0.667 3.0 A
-------------------------------------------------------
INTEFiSECTION: Delav
= ,3.8.Ssec/veh) V/C =
0.: 6
LOS
- A
}
-,I
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
-
�#�+•�••�•�#��•�-�*�t���t�t•�*�r•��**��a�#r•��**�x•�•*+x-�c•x-*�c•##it##��t-x�*���*��ic-��•�r•����z•r•�**�
INTERSECTION -MAIN ENTRANCE/SR III
-`
AREA TYPE ..... CPD
fl
ANALYST ....... PK
DATE .......... 7/11/89
TIME .......... 1992 PM
PEAK W/PROJ
J
COMMENT....... MITIGATION
--------------------------------------------
MEASURES
VOLUMES
7---------------------------
GEOMETRY
EB WB NH
SR : ER
WB
N8
SD
LT C) 133 0
105 12.0 L
10.0
T 12.0
L
10.0
TH 0 0 1507
1223 12.0 R
12,0
T 12.0
T
12.0
'
RT 0 13.:. 105
0 : , 12.0
12.0
T 12.0
T
12.0
RR 0 0 0
0: 12.0
12.0
R 10.o
T
12.0
12.0
12.0
12.0
12.0
I�
---------------------------------------------------------------------
12.0
12.0
12.0
12.0
-
ADJUSTMENT FACTORS
-
GRADE HV
ADJ PKG BUSES PHF
PEDS
PED. BUT.
ARR.
TYPE
(%) W
Y/N Nm Nb
Y/N min T
EH O. ()0 2. 00
N 0 0 0.90
0
N' 25.6
3
W8 0.00 2.00
N 0 0 0.90
0
N 25,8
.3
N9WOO 2. 00
N 0,' C) 0. 90
0
N 8,0
31
SB 0.00 2.00
--------------------------------------------------------------------------
N 0 0 0.90
0
N 8.0
3
SIGNAL SETTINGS
CYCLE LENGTH
=
75.0
i
PH-1 PH-2
PH-3 PH-4
PH-1 PH-2 PH-3
PH-4
ER LT
NH
LT
_
TH
TH
X
RT
RT
X
PD
PD
X
WB LT X
SR
LT
X
TH
TH
X
i
RT X
RT
'PD X
--------------------------------------------------------------------------
PD
X
LEVEL OF SERVICE
LANE GRP. V/C
G/C DELAY
LOS
ARP, DELAY
APP.
LOS
WB L 0,782
0.133 36.5
D
26,8
D
R 0.478
0.227 17.0
C
'
NB T 0.636
0,600 6.6
t
.10.5
B
R 0,986
0.0g3 72,2
F
SB I_ 0,619
0. 133 27. 5
D
9.71
B
T 0,583
0.533 7.9
B
----------------------------
INTERSECTION: Delav = 11.3 (sec/veh)
V/C=•0.597 LOS
---
B
---
e
u