City of Palm Desert - Department of Building and Safety
73-510 Fred 1Naring Drive / Palm Desert, CA 92260-2578 /(760) 776-6420
Permit # RRAD21-p004
Plan Reviewer JASON FINLEY
Date af Applicatian 01/05/21
Praject Address: �4Q55 ASTER DR
The City of Palm Desert adopted the State af California 2019 Green Building Standards Cade as part af Ordinance 1351.
This Cade and Ordinance requires that builders/contractors recycle and/or salvage a minimum of 65%a af the non-
hazardous canstruction and demolition debris, or meet a local construction and demolitian waste management
ordinance, whichever is more stringent. This applies ta all additions ar alteratians af existing residential buildings where
the addition or alteration increases the building's conditianed area, volume, or size. It alsa applies to newly constructed
non-residential buildings, building additions af 1,000 square feet or greater, and/or building alterations with a permit
valuation of $20Q,000 ar above. Failure to comply with Ordinance 1351 may result in fines, penalties, and imprisanment.
Failure to provide documentation fram salvage, recycling and waste facilities may result in final inspection not being
issued.
Waste stream reduction alternative. Projects that generate a total combined weight af construction and demolition
waste dispased of in landfills, which do not exceed twa (2) pounds/square feet af the building area shall meet the
minimum 65 percent canstruction waste reduction requirement.
PLEASE INITIAL to represent that you understand these requirements.
I understand that I am required by Palm Desert Ordinance Na.1351 to recycle and/or salvage far reuse a minimum
of 65% af the non-hazardous construction and demolitian debris, or meet a local construction anc� ol' ion waste
management ordinance, whichever is more stringent. ��J (Iraitial�
I understand that failure to meet the requirements of Ordinance Na.1351 shall canstitute a misdemeanor, and shall
be punishable by imprisanment in the caunty jail for up ta 6 months, ar by fine af up ta $1000, pr t. I a ditian,
a stop order on the job ar a delay af final approval may occur. ��_, nitial}
At the completion of this project, or more frequently if required, all receipts ar other equivalent documentatian
from salvage, recycling and waste facilities will be provided ta the City af Palm Desert and 1 understand that I may
not be issued my final inspection unless all receipts and documentation are submitted to the City a a D�s_ert
Building and Safety Department. ���(Nnitia�l�
STEP 1: PROJECT IN�'ORMATIOIV — Ft1.L OUfi THE F01.1.OWIIVG INFt�RMATION
This Construction Waste Management Plan (CWP) must be completed, submitted for review, and approved to obtain
a building permit. Separate CWPs must be completed for demalitian and construction at the same site unless the
building department requires only one permit.
Applicant's rvame: Douglas J Ahuero
Contact Phone Number: �14 943-6406
Fax Number
Check One: �Owner �Architect OBuild ❑Owner/Builder ❑Other
Pro�ect Description: S�ngle ear garage
Estimated Completion Date: 09/21
STEP TWO: DETERMINE MATERIAI.S TO BE PR4DUCED AND W�IERE THEY WII.L BE REUSED,
RECYC�.ED 4R �►[SPCISED
Check the materials you anticipate generating and fill in the facilities that you plan ta use.
MATERIAI. CHECK IF REUSE, RECYCLING OR DISPOSAI. FACIUTY
APP�ICABLE
Appliances
Asphalt X ReCyCle
Cardboard/Paper
Concrete
Drywall
,____________________________________________________.. _______________________________________ _________________________________________________________________________________________________________________________________________________________..
Metals
Roafing (non-asphalt)
Wood/Green Waste
Other:
__Other:_______________________________ ________________________________ ______________________________________________________________________________________________________________________________________
Materials can anly be hauled by the cantractar (Na Subcantracting) ar by the City's franchise waste hauler,
Burrtec Waste & Recycling Services.
I will be self-hauling materials ta a Reuse, Recycling, ar Dispasa) Facility? YesO/Na❑
I will be contracting with Burrtec Waste & Recycling 5ervices to haul materials? Yes�No❑
The undersigned hereby agrees ta camply with the Constructian Waste Management Plan as submitted and is
the owner or authorized agent of this praject.
�"" 2/24/21
Applicant Signature: Date:
�ww • . ■ �•� • -w ■�•w • -r • ■ M' 'r
� • w r �• r • w • �• w- • -r
M � • � ^ • • • • " MI r
i • • � ' � � � • •
�
STEP THREE: ARRANGE FOR HAULING OF MATERIALS AND ACCUMULATE WEIGHT
TICKETS/DOCU M ENTATION
REMEMBER, HAULING OF MATERIALS CAN ONLY BE DONE BY:
Contractor — can only haul debris if using their own employees and equipment.
Demolition Contractor — can haul debris only if doing the demolition work and using own employees and equipment.
City's Franchise Waste Hauler — must be used if the above does not apply. Contact Burrtec Waste & Recycling Services
at (760) 340-2113
WEIGHT TICKETS will be given every time a load is hauled to a facility. Tickets
must list date, type of material, and tonnage of material. Tickets must be
saved
and turned in with the final report as documentation. Burrtec can also provide
a cumulative report upon completion of the project (see sample on the right).
, ��M , m,
er�rtu�u�;;�,�;���r,��r i��c � ��y �,,;��1, °���� f��,Jr�
�«�� %,,; �f, „1„ �,,,, ��,,;; f, „7,,,, �, ,,,,,,,»,
� p4 �, �.� �
FINAL REPORT PERMIT # RRAD21-0004
Please complete this section, have it approved by the Building and Safety Department no later than 30
days after completion of the construction project.
This section must be completed and signed, and all original receipts or other supporting documentation
must be attached in order to receive final project approval.
I.IST WEIGHT TICKETS FROM SAI.VAGE AND RECYC�ING FACII.ITIES
DATE MATERIAL FACILITY TONNAGE CITY USE ONLY
(A) TOTA� TONNAGE SALVAGED/RECYCLED
CONTINUE ON NEXT PAGE
N.IST wEM+�H��' TI�I��1�5 FRQnJI REFuusE FACII�I�'�E5
Ci�,il� Ihr1AT�RI�L FA�IIL�iY i+CDININAfi� �Ii'"Y �MS� �C1�IL:Y
REFI�SE
� ....................................................................................................................................................................................................... _.................................................................................................................................................................................. .................................................................................................
(�� �r��r,�� �an�n���� ���us�
��-r��nn��� �om�n��►�� ��v���r��
r�r�� r�r�r���� s�Lv�,�i��/��cvc��� ����ann i��i�vi�u� �a��i (��
�.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.�.� �.�.�.� �.�.�.� �.�.�.�.� �.�.�.�.wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww .�.�.�.�.� �.�.�.�.� �.�.�.�.��.�.�.�.�
r��aLr�r�r�a��� ����us� �u��
ra�A� c����is H��.u��� �a+��
�����r��,��� �� �i���is �iv���r�a t�� / ��+��
� All c�rigir��l i��c�ipts �r �quiw�4�m�t d�r��uirt��n��ti�art ff+�m s�lv�g+�, r�+�y�lin��, �nd disp+���l ��i�� h�i��by �tt�ck���d.
� This pr�j'�c� has r��ycl�d at 4�ast 55°r'� ��f m�c�n-l��aza�d�us canstru���ic�n �r�dl d�rnc��iutic�n dl�bru�.
���Vica�rnt �igrr���tur�;
I�at�:
, �+�• r « ■ ■�w� • "r� ■■�w� • "r� r " ■ 1�` -ur
Alf �ri��inal c������ts, �v�i�ll��t �ag� ,����d e9�c�rm�n�atbc�� f�r s�lv���, ��c�cflin�� �r�� dispca��l m�ust ka� suibrm�tt��d;
❑ �dr� cr�rnpl�ti�m�� �� pirca�ec�
: . • �-, a.� w
� C�t�n+�r
�