Loading...
HomeMy WebLinkAboutAPPROVED SOLR23-0506 PLAN.pdf Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements X The photovoltaic system size is 30kW AC CEC rating or less. X The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. X The photovoltaic system is utility interactive. 1XI Permit application and declaration is completed and attached. 2. Planning Department Requirements ❑ Existing MPU Amps Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. X Maximum height of"tilted"panels shall not exceed eighteen (18)inches. IN All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. Ex The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. 1X Modules shall be flush with one another and gaps between panels shall be minimized. Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements X No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter • For central inverter systems: No more than two inverters are utilized. Not Using Central Inverters • The PV system is connected to the load side of the utility distribution equipment. X A Solar PV Standard Plan and supporting documentation is completed and attached. 4. Structural Requirements XI A completed Structural Criteria and supporting documentation is attached Wind and Seismic(if required). 5. Fire Safety Requirements Im Clear access pathways provided. X Fire classification photovoltaic system is provided. All required marking and labels are provided. A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature: /t• G/a Date: 4-12-2023 Project Address: 3 IN Appaloosa WaY Updated June 2021 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW Date. kwRoof Mounted I C AID ROVED VALPLANS STHISBECOMES NULL&L ID IF SHALL T B INSPECTION ED TORECORDED WITRMIT I O 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT OR 14 . 0 AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND ITY ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE OR UNTIL COMPLETED. THE APPLICANT HAS AGREED TO THE TERMS OF THE P ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. 35 QCell o0 NOT COPY rzeanOOUCE 02aeauCe T DEPARTMENT OF 3T111 LAND SAFETY nUTHOrz znnOx FaOm THE Mickell Digitally signed by aloosa a ANGELIQUE ANGELIQUE HODGEs HQDGES Date: 2023.04.13 Palm e s e r 14:31 :24-07'00' DWG# 1 Cover Sheet W#,%w"or DWG# 2 Site Plan Arnerfccn Friends of DWG# 3 Layout our 4rned Forces Reo oa Red RNerRd Mickell Residence DWG# 4 Electrical Diagram11 ED DWG# 5 CEC Calculations 318 Appaloosa Way 1A/�NKLEco gPoauasa wr R O O F C O!.5'R U C i O R 5 301M-14 DWG# 6 General Notes Palm Desert, CA 92211 RD Winkle Co w�'Po' sa°°le PO Box 470 SundanceCir DWG# 7 System Labels Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 cram M� a Modules: 760-272-0003 Product Spec Sheets 35 O PEAK DUO BILK ML-G10+ 400 CA License #688062 C46, C39 Inverter: 35 I Q8A-72-2-U S Signature of Licensed Preparer AC Dis.: Square D Roof: Shingle Racking: IronRidge D wing Number: 1 Date: 3/25/23 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY ite Plan APPROVED PHOTOVOLTAIC UNDER 30KW SDate: Solar Modules THISAPPROVAL BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WIT 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT I OR Property Line AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND C ITY ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE OR - UNTIL COMPLETED. THE APPLICANT HAS AGREED TO THE TERMS OF THE P ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. GO NOT COPY.REPROOOCE,oR REPLACE TRis sTAmP TROIOATIOI EROM THE DEPARTMENT OF BUILDING AND SAFETY 0 IL ff to 1 Malin Service Panel Ad Disconnect c� Aq Combiner J L:1 1 nNnII 1 0I �I 1 l Property Line Mickell Residence ED 318 Appaloosa Way WINKUS0. R O O F C O N 5'R U C T O R 5 Palm Desert, CA 92211 RD Winkle Co PO Box 470 Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 Modules: 760-272-0003 35 Q.PEAK DUO BILK ML-G10+ 400 CA License #688062 C46, C39 Inverter: 35 I Q8A-72-2-U S Signature of Licensed Preparer AC Dis.: Square D Roof: Shingle Racking: IronRidge D wing Number: 2 Date: 3/25/23 Layout 72'-0" Rafter Support Rail Solar Module IronRidge Flashvue L I I ii ill ill! ild ill 1� ill ii ll� �i [P==i i ii I ii ill i ill [P , EF Tj 11Hl T-111 [P lll:��=Vii i �i iEiEil-- I �l 11 Hill CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW Date: THIS APPROVAL BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WITHIN 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT FOR AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND CITY ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE JOB UNTIL COMPLETED. THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. DO NOT COPY,REPRODUCE,OR RE=T-1 lyl AIT-RUAT...FRO.T.E Solar Module Max spacing on solar roof attachments = 72" Mickell Residence ED Basic Wind Speed: Risk Category IV - 108 mph 318 Appaloosa Way WINKUCO R O O F C O N S T R U C T O R S Shingle IronRidge Rail Palm Desert, CA 92211 RD Winkle Co Under layment PO Box 470 IronRidge Flashvue Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 Modules: 760-272-0003 35 Q.PEAK DUO BILK ML-G10+ 400 CA License #688062 C46, C39 Inverter: 35 I Q8A-72-2-U S Signature of Licensed Preparer 5„ AC Dis.: Square D 2 X 4 Rafter 24 O.C. 16 X 32 Lag Screw with 22 minimum embedment Weather sealant in pilot hole Roof: Shingle Racking: IronRidge D wing Number: 3 Date: 3/25/23 CITY OF PALM DESERT DEPARTMENT OF BUILDING 8,SAFETY ectrica i a ram System Summary Starand For M1ickI( Date: OVED PHOTOVOLTAIC UNDER 30KW LineTHIS BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WITH N Service Main: 200 Amps Gen rd F31,4SUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE S.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT I OR Main OCPD Rating: 175 Amps Laun ¢,AF A VIOLATION OF ANY OF THE PROVISIONS OF STATE ITY dmu LAWS THIS SET OF APPROVED PLANS MUST BE KEPT THE E OF Service Voltage. 240 Volts Tota GeneralLightin CANT HAS AGREED TO THE TERMS OF THE P First OOV Y CHECKLIST.ANY DEVIATION FROM THE PV System Size. 14.0 kW Rem iningat35% CHECKLIST WILL REQUIRE PLAN R IEW. 1 Tota General Li htin Load h� .27.2 # of Branch Circuits: 4 Branch Circuits "°"'"E Garb ge Disposal 600 Inverter BackFeed Breaker: 70 AmpsOven Dish PV System Azimuth: 1800, 2700 Range 54000 #6 Bare Copper Ground under array where exposed. Inside junction box it will be permanently bonded to#8 AWG Stranded PV System Tilt: 181 Main Service Panel oo Dryer 2 Total Fixed Appliances 1 s25200 Ground which will run through EMT conduit with conductors. Junction Box is fed from top of the busbar. Solar Inverter breaker will 2 Air Conditioners 14aoo be located at the 3 Total Other Loads 14WO THWN-2 Existing Main Service Panel opposite end of the i I I I I I I I I I i 8-#10 AWG 200 amp busbar busbar per NEC 4 Total Service Load VA(Sum of line 1,2,&3) 38727.2 1 -#8 AWG EGC 175 amp main breaker 705.12(B)(3)(2) 5 Total Service Load Amps(Line 4/240) 161.36 3/4"EMT Inverter output x 1.25=63.44 amps 200 x 120% =240 amps Utility-Supplied Permanent placard shall be 175+63.44=238.44 amps 240 VAC placed at main service 20 AMP KWH Meter breaker stating"MAIN 2 pole breaker 20 AMP 175 AMP To BEEN SERVIDOWNSIZED TO CE BREAKER S 2 pole breaker 20 AMP 20 AMP 2 pole Utility 175 AMPS. NO UPSIZING 2 pole breaker 2 pole breaker breaker IS PERMITTED." 70 AMP I Racking Integrated 2 pole - Grounding System breaker - Bonds Solar Panel 3 I Frames to Support Rail - —Typical —a Neutral-to-ground ❑2 EOn$Aase 100 Amp AC Disconnect I Connection point Microlnverters AC Combiner If Existing Earth THWN-2 Existing Ground is not 3-#6 AWG Earth _ accessible,an 1 -#4 AWG EGC Ground irreversible splice 1" EMT will be made to the Grounding Electrode Conductor PV MODULE RATINGS @ STC p 1 hase Microlnverters Mickell Residence ❑ Note: En MODULE MANUFACTURER= QCell meet CEC 690.12 Rapid MODULE MODEL= Shutdown Requirements 318 Appaloosa WayR 0 0 F 1 0 N S T R U C T O R S 1CLE�0 Q.PEAK DUO BILK ML-G10+400 OPEN-CIRCUIT VOLTAGE=45.30 V Palm Desert, CA 92211 RD Winkle Co OPERATING VOLTAGE= 37.13 V Legend MAX SYSTEM VOLTAGE= 1000 V AC DISCONNECT RATINGS [I PO Box 470 OPERATING CURRENT= 10.77 A INVERTER RATINGS MANUFACTURER= SQUARE D DC Positive --------- Size: 14.0 kw DC 12.612 kw AC Thousand Palms, CA 92276 SHORT-CIRCUIT CURRENT= 11.14 A ❑2 DC Negative --------- T MODEL= DU323RB Bare C MAX SERIES FUSE(OCPD)=20 A ENPHASE IQ8A-72-2-US Copper 760-272-0003 AC Line MAXIMUM POWER(@25°C)= 400 W MAX DC VOLT RATING= 60 V DISCONNECT AMP RATING= 100 A Modules: 2 MAX POWER= 366 W DISCONNECT VOLT RATING= 240 V AC Neu Ground _ _ _ 35 Q.PEAK DUO BLK ML-G10+ 400 CA License #688062 C46, C39 NOMINAL AC VOLTAGE= 240 V Support Rail MAX AC CURRENT= 1.45A Inverter: 35 MA-72-2-US Signature of Licensed Preparer MAX OCPD RATING= 20 A FREQUENCY = 60 HZ Roof: f: h i ng l D Roof: Shingle Racking: IronRidge D wing Number: 4 Date: 3/25/23 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY ectrica a c u a i o n s APPROVED PHOTOVOLTAIC UNDER 30KW Date: THIS APPROVAL BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WITH N 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT OR AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND ITv ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE OF UNTIL COMPLETED. DC Voltage QCell Q.PEAK DUO BLK ML-G10+ 400 THE APPLICANT HAS AGREED TO THE TERMS OF THE P PV Module Voc = 45.30 VDC STC ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE PV Module Vpm = 37.13 VDC STC System Description CHECKLIST WILL REQUIRE PLAN REVIEW. Maximum number of PV Modules per string = 1 o0N0iCOavaeaaDu�CE.02PARTMENTOFBUImINGANDTPR1ORAUTX0R1ZAT10xFROMTXE SAFETY Nominal Maximum Power Voltage = 37.13 x 1 = 37.13 V Enclosed documents describe requirements for a new Photovoltaic (PV) sxktem. PV Correction factor per CEC 690.7 (A) for -5 degree C = 1.12 x (PV module Voc AT 25 degree C) = 50.74 V equipment location shall be coordinated with owner's representative. Maximum Open Circuit Voltage = 1 x 50.74 = 50.74 V All wires to transition boxes shall be routed within metallic cable tray system. Length, PV Source Circuit gauge and type of wire is indicated on "Electrical Diagram" drawing. PV module Isc = 11.14 A PV module Imp = 10.77 A Output from grid-tied inverters may be combined in an AC combiner panel then # of modules in parallel per source circuit = 1 interconnected with the grid power (in concordance with CEC 690.59). If used, the AC Max Isc = 1 x 11.14 A x 1.25 = 13.93 A combiner will be shown on the "Electrical Diagram" drawing. Inverter Output Circuit: Enphase IQ8A-72-2-US The complete PV system described here shall be installed and commissioned such Inverter Max Continuous Current = 1.45 A that it operates automatically as follows: 1. When grid power is present, solar power runs loads onsite during the day. Inverter output circuit over current protection = 20 A breaker 2. When grid power fails, the PV system shall automatically disconnect from the 125% of inverter max continuous output circuit = 125% x 1.45 x 10 = 18.13 A grid. Output circuit continuous current = 18.13 A < 20 A 3. The PV system shall automatically resume supplying power to the grid when the proper voltage and frequency (As mandated by the IEEE standards) is restored Inverter output circuit over current protection = 20 A breaker and there is sufficient sunlight. 125% of inverter max continuous output circuit = 125% x 1.45 x 9 = 16.31 A Output circuit continuous current = 16.31 A < 20 A Inverter output circuit over current protection = 20 A breaker 125% of inverter max continuous output circuit = 125% x 1.45 x 7 = 12.69 A Output circuit continuous current = 12.69 A < 20 A Inverter output wiring to dedicated inverter circuit breaker = (1 sets) #10 THWN-2, 90 degrees C rated Conductors will be more than 7/8" above the roof surface. Temperature correction factor for 40 degree C = 0.91 Correction factor for 8 current-carrying conductors = 0.7 Corrected ampacity = 40 A x 0.91 x 0.7 = 25.48 A > 20 A Voltage Drop for branch circuit of 10 microinverters: M I Cke I I Residence , One way distance from array to AC combiner is 100 feet. Conductor length = 100 x 2 = 200 feet 318 Appaloosa Wa CO Resistance on conductors = (1.29/1000) x 200 = .258 Ohms pp y R O O F C O N S T R U C T O R S Voltage drop = (10 x 1.45) x .258 = 3.74 volts Voltage drop % = (3.74/240) x 100 = 1.56% Palm Desert, CA 92211 RD Winkle Co PO Box 470 Combined Inverter Output Circuits Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 Interconnection circuit breaker for AC Combiner output = 70 A Modules: 760-272-0003 125% of inverter max continuous output circuit = 125% x 1.45 x 35 = 63.44 A 35 Q.PEAK DUO BLK ML-G10+ 400 CA License #688062 C46, C39 Output circuit continuous current = 63.44 A < 70 A Inverter: 35 I Q8A-72-2-U S Signature of Licensed Preparer AC Combiner output wiring to point of interconnection at Main Service Panel AC Dis.: Square D = (1 sets) #4 THWN-2, 90 degrees C rated / Temperature correction factor for 40 degrees C ambient = 0.91 Roof: Shingle /J f Corrected ampacity = 95 A x 0.91 = 86.45 A > 70 A Racking: IronRidge D wing Number: 55 Date: 3/25/23 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY enera O e s APPROVED PHOTOVOLTAIC UNDER 30KW Date: THIS APPROVAL BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WITH N 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT OR AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND ITv ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE OF UNTIL COMPLETED. THE APPLICANT HAS AGREED TO THE TERMS OF THE P ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. 1. All Electrical work shall be in accordance with the 2022 Editions of the California Building Code, California Electrical Code(CEC),California Plumbing Code, California Mechanical Code,California Fire Code and the California Energy Code district regulations. DEPARTMENT OF BUILDING AND SAFETY 2. Applications for which no permit is issued within 180 days following the date of application shall automatically expire. 3. Every permit issued shall become invalid unless work authorized is commenced within 180 days, a successful inspection is not obtained within 180 days,or if work is suspended or abandon for a period of 180 days. 4. All equipment shall be listed and labeled per recognized electrical testing laboratory and installed per the listing requirements and the manufacturer's instructions. 5. All inverters shall be UL 1741 compliant and shall be inspected by local utility before commissioning,testing, and operation of the system. 6. All outdoor equipment shall be minimum NEMA 3R, including outdoor transition boxes,combiner boxes, and switches. 7. All equipment shall be properly grounded per the requirements of CEC ART. 250, 690. 8. All circuits shall have overcurrent protection as required by CEC ART.690.9(A). 9. Due to the fact that PV modules are energized whenever they are exposed to light, PV contractors shall enable the array during installation and service by short circuiting,opening circuiting, or covering the array with an opaque covering. 10. Photovoltaic system shall back feed the distribution system on site per the requirements of CEC ART.705.All back feed breakers shall be identified as such. 11. Fall arrest protection per OSHA requirements shall be provided for all roof work. 12. All conductors and termination shall be rated for 75 degree C minimum. 13. CEC ART. 705.10 A permanent plaque or directory denoting the location of all electric power source disconnecting means on or in the premises shall be provided at each service equipment location and at the location(s) of the system disconnect(s)for all electric power production sources capable of being interconnected.The marking shall comply with CEC ART. 110.21(B). 14. CEC ART. 690.13 (B)each DC disconnect shall be labeled with: "PV System Disconnect." Label shall be 1"x 4" minimum with UV resistant lettering per local municipal code. 15. CEC ART. 690.53 A placard, UV resistant,and lettering per local municipal code,shall be provided beside the do disconnect location with the following text: Maximum voltage=XXX VOLTS, Maximum Short circuit current=XXX AMPS 16. CEC ART. 690.13 (B) Each AC disconnect shall be labeled with: "PV System Disconnect." Label shall be 1"x 4" minimum with UV resistant lettering per local municipal code. 17. CEC ART. 690.13 (B) Each disconnect where both line and load sides may be energized in the open positions shall also be labeled with: "Warning! - Electrical shock hazard- Do not touch terminals on both line and load side may be energized in the open position". Label shall be 1"x 4" minimum with UV resistant lettering per local municipal code. 18. DC disconnect at the inverter shall be readily accessible after the installation is complete per CEC ART.690.13 (A). 19. Contractor to provide ground fault protection for photovoltaic arrays per CEC ART. 690.41(B) 20. Contractor to provide Arc fault protection for all photovoltaic systems operating at 80 volts DC or greater per CEC ART. 690.11. 21. Where more than one nominal voltage system exists,the different Systems shall be identified by phase and system per CEC ART. 215.12 (C). 22. Provide an accessible disconnect device that is lockable in open position and is located within 10'-0" of the meter per local electrical utility regulations. 23. Photovoltaic source currents must be rated at both 125%of the parallel module and at a continuous load of another 125%for a total of 156%of the load. 24. Installation of PV panel arrays should resist sliding and pop-up resulting from seismic events and should comply with CBC section 1613A and ASCE standard 7-16,Chapter 13. 25. Design indicates use of copper wire for DC circuits, use of aluminum wires is not allowed. 26. It is recommend to install the PV array such that general shading of the PV modules between 9:00 am-3:00 pm solar is minimized and localized shading due to plumbing or air vents is minimized. 27. PV system installer will be responsible for furnishing and installation of all related equipment,cables, additional conduits, boxes wireways and other accessories necessary for complete and operational photovoltaic system. 28. PV system contractor shall coordinate all the work with the engineer,the construction manager and all other contractors to insure that PV system is installed as specified in these drawings. 29. Drawings in general are diagrammatic and indicate general arrangement of the equipment and work included.The intention of the drawings is to indicate size,capacity, approximate location and general relationship, but not exact detail or physical placement. 30. Field verify exact AC rating required of the main switchboard from local utility company. 31. Notify serving utility before activation of pv system. 32. Working clearances around existing electrical equipment as well as the new electrical equipment will be maintained in accordance with CEC 110.26. 33. Per section R314 and R315 of CRC 2019, it is required that Smoke alarm and Carbon Monoxide Detectors are retrofitted into existing dwelling for a permit with repairs or additions exceeding$1000. Residence 34. Wiring methods will be according to CEC ART. 690.31.All raceways and cables,fittings specifically intended and identified for use on photovoltaic systems. Direct current and MICkeII R R � � alternating currents shall be separated by barriers to meet code requirements. 35. Circuits over 150 volts to ground in one and two family dwellings, live parts in photovoltaic source circuits and photovoltaic output circuits over 150 volts to ground shall not be accessible to other than qualified persons while energized. 318 Appaloosa Way W�NKLLECO R O O F C O N S T R U C T O R S 36. Point of connection CEC ART. 705.12(B) Inverter Output Connection in a panelboard shall be positioned at the opposite(load) end from the input feeder location or main circuit location.A permanent label shall be applied to the distribution equipment with the following or equivalent markings. "WARNING INVERTER OUTPUT CONNECTION DO Palm Desert, CA 9221 1 RD Winkle Co NOT RELOCATE THIS OVERCURRENT DEVICE" PO Box 470 37. Conduit wiring systems, and raceways for photovoltaic circuits shall be located as close as possible to the ridge or hip or valley and from the hip or valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilation opportunities. Conduit runs between sub arrays and to DC combiner boxes shall be installed in a manner that minimizes Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 the total amount of conduit on the roof by taking the shortest path from the array to the DC combiner box. The DC combiner boxes shall be located such that conduit runs are 760-272-0003 minimized in the pathways between arrays. DC wiring shall be installed in metallic conduit or raceways when located within enclosed spaces in a building. Conduit shall run along Modules: the bottom of load bearing members. 35 Q.PEAK DUO BLK ML-G10+ 400 CA License #688062 C46, C39 38. Electric utility company servicing building shall be notified prior to operation of the PV system. Inverter: 35 MA-72-2-US Signature of Licensed Preparer AC Dis.: Square D Roof: Shingle Racking: IronRidge D wing Number: 6 Date: 3/25/23 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY stem a e s APPROVED PHOTOVOLTAIC UNDER 30KW Date: THIS APPROVAL BECOMES NULL&VOID IF AN INSPECTION IS NOT RECORDED WITH N 180 DAYS OF ISSUANCE.ALL WORK SHALL BE DONE IN ACCORDANCE WITH HE APPROVED PLANS.THIS APPROVAL SHALL NOT BE CONSTRUED TO BE A PERMIT I OR AN APPROVAL OF ANY VIOLATION OF ANY OF THE PROVISIONS OF STATE AND C ITY ORDINANCES OR LAWS.THIS SET OF APPROVED PLANS MUST BE KEPT ON THE OB UNTIL COMPLETED. THE APPLICANT HAS AGREED TO THE TERMS OF THE P ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. DO NOT COPY,REPRODUCE,OR REPLACE TRis STIASP wOROUT PRIOR AUTROIOATIOI EROM THE DEPARTMENT OF BUILDING AND SAFETY Typical WARNING • • SHOCKELECTRIC HAZARD CO .. . Meter .• . . . . . . SMIDIEASLS • Typical MAY BE ENERGIZED IN THE OPEN POSITION. IF A GROUND FAULT IS INDICATED Typical • •CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED PHOTOVOLTAIC SYSTEM ON DISCONNECTAC - OFF If Required Main Service Panel SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN AC Combiner AC Disconnect CAUTION : TURN RAPID SHUTDOWN PARELE SWITCH TO THE Typical "OFF"POSITION TO POWER TO THIS BUILDING IS SHUTDOWN PV SYSTEM AND REDUCE ALSO SUPPLIED FROM THE HOCKHAZAR WARNING SHOCK HAZARD FOLLOWING SOURCES WITH IN ARRAY DISCONNECTS LOCATED AS DUAL POWER SUPPLY Note: Materials used for all marking shall be SHOWN: • - GRID AND reflective, weather resistant and suitable for the SOLAR Typical PHOTOVOLTAIC yp • . environment. All letters shall be a minimum height ON ROOF Typical of 3/8", capitalized and white on a red background. WARNING PHOTOVOLTAIC POWER SOURCE .• NOT RELOCATE THIS OVERCURRENT DEVICE Typical at F"SYSTEMDISCONNECT Backfed M i c ke I I Residence FOR UTILITY OPERATION SERVICE POINT AND NOTE:Adirecto placard showingthe UTILITY METERING directory locations of Main Service Disconnect, Photovoltaic Disconnect(s)and Solar 318 Appaloosa Way WINKUS0. Array(s)will be installed. ROOF CONSTRUCTOR 5 Palm Desert, CA 92211 RD Winkle Co WARNING:PHOTOVOLTAIC PO Box 470 SOURCEPOWER Size: 14.0 kw DC, 12.612 kw AC Thousand Palms, CA 92276 On Ext. and Int. Conduit Every Modules: 760-272-0003 10 Feet and within 1' of turns Typical 35 Q.PEAK DUO BLK ML-G10+ 400 CA License #688062 C46, C39 and within 1' above/or below penetrations and all Inverter: 35 MA-72-2-US Signature of Licensed Preparer Disconnects, Combiners and ]unction Boxes. AC DiS.: Square D Roof: Shingle Racking: IronRidge D wing Number: 7 Date: 3/25/23 STREAMLINED 30KW UNDER SOLR23-0506 powered by V i�U0 TOP BRAND PV ' EUROPE Warranty 2021 0 CELLS Product a Performance Yield Security BREAKING THE 20%EFFICIENCY BARRIER nnn/III Illlllnlllllll IIII Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.9%. THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY _ Q CELLS is the first solar module manufacturer to pass the most comprehen- sive quality programme in the industry:The new"Quality Controlled PW of v� the independent certification institute TUV Rheinland. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields,whatever the weather with excellent low-light and temperature behavior. _ ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID Technology,Anti PID ` Technology',Hot-Spot Protect and Traceable Quality Tra.QTM^ EXTREME WEATHER RATING High-tech aluminum alloy frame,certified for high snow(5400 Pa)and wind loads(4000 Pa). A RELIABLE INVESTMENT Q�p7 Inclusive 25-year product warranty and 25-year 1 linear performance warranty2. APT test conditions according to IEC/TS 62804-1:2015,method A(-1500V,96h) 2 See data sheet on rear for further information. THE IDEAL SOLUTION FOR: Rooftop arrays residential buildings Engineered in Germany Q CELLS STREAMLINED 30KW UNDER SOLR23-0506 MECHANICAL SPECIFICATION Format 74.Oin x 41.1in x 1.26in(including frame) (1879mm x 1045mm x 32mm) 4:0"(1879mm) 42.8"(1088 mm) 15.6-(395.5 mm) Weight 48.51bs(22.Okg) Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with za9.2(z6omm) anti-reflection technology 1 1 4 x Grounding ppiMa 9 0.18-(4.5 mm) R.- Back Cover Composite film 39.2(996 mm) Frame Black anodized aluminum ® al.l"11096 mm) Cell 6 x 22 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98in x 1.26-2.36in x 0.59-0.71in (53-101mm x 32-60mm x 15-18mm),IP67,with bypass diodes ebB1� =a92••(zsomm) Cable 4mm2 Solar cable;(+)>49.2in(1250mm),(-)>_49.2in(1250mm) 8a Dre10ege holes 4 x Mounting slots(DETAIL A) _ Connector Staubli MC4;IP68 1 +I 1.26•'(32 mm) DETAILA 0.63"(16 mm) 0.96••(24.5mm)TyI0.33"(8.6 mm) ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-0 W) Power at MPP' PMPP [W] 385 390 395 400 405 Short Circuit Current' ISC [A] 11.04 11.07 11.10 11.14 11.17 E E Open Circuit Voltage' Voc IV] 45.19 45.23 45.27 45.30 45.34 5 Current at MPP IMPP [A] 10.59 10.65 10.71 10.77 10.83 Voltage at MPP VMPP IV] 36.36 36.62 36.88 37.13 37.39 Efficiency' 11 [%] >_19.6 >_19.9 >_20.1 >_20.4 >_20.6 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 Power at MPP PMPP [W] 288.8 292.6 296.3 300.1 303.8 E Short Circuit Current ISC [A] 8.90 8.92 8.95 8.97 9.00 'c Open Circuit Voltage Voc IV] 42.62 42.65 42.69 42.72 42.76 2 Current at MPP IMPP [A] 8.35 8.41 8.46 8.51 8.57 Voltage at MPP VMPP IV] 34.59 34.81 35.03 35.25 35.46 1Measurement tolerances PMPP±3%;Ise;Voc±5%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98%of nominal power during '� I ,I w �a .,��a�rd mrr��r r.�,aMler a w e first year.Thereafter max.0.5% w I I I I I degradation per year.At least 93.5% u too - ----I---- - of nominal power up to 10 years.At z least 86%of nominal power up to w a of 90 90 ___ wo 25 years. _T____I_ T____I_ rcZ o cAll data within measurement toleranc- aas.Full warranties in accordance with 90 0 zoo aoo 900 90o low0 the warranty terms of the Q CELLS IRRADIANCE[W/m'] u so sales organisation of your respective 6 26 country. o sMpoenncee ror1ha 10 WcomPe sas 30 YEARS Typical module performance under low irradiance conditions in rntntne M1BM1ast prpeuUlm cspttlry In 203a(es eC 9eptem6ar 2014) iD comparison to STC conditions(25°C,1000W/m2) m TEMPERATURE COEFFICIENTS o Temperature Coefficient of Isc a [%/K] +0.04 Temperature Coefficient of Voc (i [%/K] -0.27 Temperature Coefficient of PMPP y [%/K] -0.34 Nominal Module Operating Temperature NMOT [OF] 109±5.4(43±3OC) Y in 0 PROPERTIES FOR SYSTEM DESIGN ° a w Maximum System Voltage VSYS IV] 1000(IEC)/1000(UL) PV module classification Class II a N Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 m Max.Design Load,Push/Pull; [IbS/ft2] 75(3600 Pa)/55(2660 Pa) Permitted Module Temperature -40 oF up to+185oF a Max.Test Load,Push/PUIl3 [IbS/ft2] 113(5400 Pa)/84(4000 Pa) on Continuous Duty (-40°Cupto+85eC) it 3See Installation Manual M QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 61730,CE-compliant, 5� a0 iiC e Quality Controlled C-730:21 inland, ® �d� fib°" �6b°" O-O L..••.I o IEC 61215:2016,IEC 61730:2016, U.S.Patent No.9,893,215(solar cells), Tw6namlane Horizontal 76.4in 43.3in 48.Oin 1656lbs 24 24 32 QCPV Certification ongoing. C US packaging 1940mm 1100mm 1220mm 751 kg pallets pallets modules cem6ae UL61730 ID 111t1330377 D n Note:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Hanwha 0 CELLS America Inc. 400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiryQus.q-cells.com I WEB www.q-cells.us STREAMLINED 30KW UNDER SOLR23-0506 0M ENPHASE. ENIHASE HVIA I all A a�O IQ8 Series Microinverters Easy to install Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- Lightweight and compact with defined microinverters with split-phase power conversion capability to convert DC plug-n-play connectors power to AC power efficiently.The brain of the semiconductor-based microinverter power Line Communication is our proprietary application-specific integrated circuit(ASIC)which enables the (PLC)between components microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times Faster installation with simple to changing loads and grid events,alleviating constraints on battery sizing for home two-wire cabling energy systems. High productivity and reliability • Produce power even when the Enphasegrid is down* 25 • More than one million cumulative hours of testing year limited L warranty -A • Class II double-insulated Part of the Enphase Energy System,I08 Series IQ8 Series Microinverters redefine reliability enclosure Microinverters integrate with the Enphase IQ Battery, standards with more than one million cumulative Optimized for the latest high- Enphase IQ Gateway,and the Enphase App monitoring hours of power-on testing,enabling an industry- powered PV modules and analysis software. leading limited warranty of up to 25 years. Microgrid-forming • Complies with the latest advanced grid support** 6W:::C CERTIFIED Remote automatic updates for Ill SAFETY __A the latest grid requirements Connect PV modules quickly and easily to I08 Series I08 Series Microinverters are UL Listed as Configurable to support a wide Microinverters using the included Q-DCC-2 adapter PV Rapid Shut Down Equipment and conform with cable with plug-n-play MC4 connectors. various regulations,when installed according to range of grid profiles manufacturer's instructions. Meets CA Rule 21(UL 1741-SA) requirements ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters,and other *Only when installed with IQ System Controller 2,meets names are trademarks of Enphase Energy,Inc.Data subject to change. UL 1741.IQ8H-208V operates only in grid-tied mode. **IQ8 Series Microinverters supports split phase,240V. I08SE-DS-0001-01-EN-US-2022-03-17 IQ8H-208 supports split phase,208V only. STREAMLINED 30KW UNDER SOLR23-0506 IQ8 Series Microinverters INPUT DATA IDCI ,: .1 , ,: , ,: 1 , 1: Commonly used module pairings' w 235-350 235-440 260-460 295-500 320-540+ 295-500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 33-45 36-45 38-45 38-45 Operating range v 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC current'[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT 1' Q .1 ,: ,: 1:' ,: 1 ,: 1: Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal(L-L)voltage/range4 v 240/211-264 208/183-250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50-68 AC short circuit fault current over 2 4.4 3 cycles Arms Max units per 20 A(L-L)branch circuits 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency % 97 97 97 97.5 97 97 Night-time power consumption mw 60 MECHANICAL DATA Ambient temperature range -400C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type MC4 Dimensions(HxWxD) 212 mm MY)x 175 mm(6.9")x 30.2 mm(1.2") Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor 1 CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)The I08H-208 variant will be operating in grid-tied mode only at 208V AC.(2)No enforced DC/AC ratio.See the compatibility calculator at https://Iink.enphase.com/module-compatibility(3)Maximum continuous input DC current is 10.6A(4)Nominal voltage range can be extended beyond nominal if required by the utility.(5) Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8SE-DS-0001-01-EN-US-2022-03-17 STREAMLINED 30KW UNDER SOLR23-0506 IRONRIDGE Roof Mount System al a r - A Built for solar's toughest roofs. Anchored by the strongest rails in solar, the IronRidge Roof Mount System provides the durability and versatility to handle virtually any residential or commercial rooftop. The unique curved profile of the XRS Rail increases its strength while also giving it an attractive look, making it very customer-friendly. In addition, IronRidge Rails are certified for integrated grounding, which eliminates separate module grounding components and procedures, making it very installer-friendly. Strongest Rails PE Certified Longer spans between attachments, ® Pre-stamped engineering letters fewer roof penetrations. available in most states. Simple Assembly Design Software OVersatile and adjustable components ® Online tool generates a complete bill simI lify any array design. of materials in minutes. Integrated Grounding 20 Year Warranty ® LIL 2703 system eliminates separate Twice the protection offered by module grounding components. competitors. STREAMLINED 30KW UNDER SOLR23-0506 Standrard Rails (XRS) Light Rails (XRL) Rail Splices Curved rails increase spanning Lightweight rails reduce cost for Internal splices seamlessly connect capabilities and aesthetics. lighter load conditions. rails, allowing easy L-foot installation. • Available in clear and black anod. Available in clear and black anod. Different versions for XRS and XRL • Multiple sizes between 12'and 18' Multiple sizes between 12'and 18' Includes self-tapping screws • Made of corrosion resistant alum. Made of corrosion resistant alum. Available with grounding straps Attachments Flashings Adjustable L-Feet Tilt Leg Kits rr FlashFootT"^ is an all-in-one mounting Slotted L-feet provide adaptable Fixed and adjustable tilt legs allow product for composition shingle roofs. attachment to standoffs and flashings. adjustment in all three axes. • Integrated L-Foot and hardware Available in clear and black anod. Attaches directly to XRS and XRL • Certified compliant with IBC & IRC Works with XRS and XRL rails Ships with all required hardware • PE certified with IronRidge Rails Compatible with third-party parts Multiple sizes for 5-45 deg. tilts Clamps &Accessories — End Clamps Mid Clamps 8 End Caps Wire Clips Secure modules to the end Fasten modules in the Provide a finished look for Organize both DC and AC of the rails. middle of the rails. rails. wiring along the rails. • Clear and black anod. Clear and black anod. Keeps out debris Attaches to both rails • Sizes from 1.22"to 2.3" T-bolt or hex nut designs Black polycarbonate Supports ten 5mm wires • Optional bottom clamps Grounding clamp offered UV protected LIV protected Online SoftwarE Available with Integrated Grounding The IronRidge Design Assistant IronRidge offers LIL 2703 certified -- -_ helps you go from rough layout to components that automatically bond fully engineered system. For free. modules and rails to ground. Go to ironridge.com/rm Go to ironridge.com/ig 0 :00 522&_ STREAMLINED 30KW UNDER SOLR23-0506 � IRONRIDGE Class A Fire Rating Background All roofing products are tested and Fire Testing Procesi classified for their ability to resist fire. Test Setup Recently, these fire resistance standards Solar Modules y Solar modules are given a Type were expanded to include solar equipment classification based on their as part of the roof system. Specifically, this materials and construction. requires the modules, mounting hardware Mounting System and roof covering to be tested together as Mounting is tested as part of a system that includes type-tested a system to ensure they achieve the same modules and fire-rated roof covering. fire rating as the original roof covering. Roof covering Roof covering products are given a Adoption of these new requirements will Fire Class Rating of A, B or C based begin in California in 2015 and extend to on their tested fire resistance. the rest of the country in 2016. Burning Brand Test IronRidge Certification 000 In August 2014, IronRidge was the first company to receive a Class A Fire Rating— the highest possible rating—from Intertek Group plc., a Nationally Recognized Testing A burning wooden block is placed on module as a fan blows at 12 mph. Laboratory. Flame cannot be seen on underside of roof within 90 minutes. IronRidge Roof Mount products were tested Spread of Flame Test on flat and sloped roofs in accordance with the new UL 1703 & UL 2703 test standards. The testing evaluated the system's ability to , resist flame spread, burning material and structural damage to the roof. Refer to the table below to determine the requirements for achieving a Class A Fire Flame at southern edge of roof is aimed up the roof as a fan blows at 12 Rating on your next project. mph.The flame cannot spread 6 feet or more in 10 minutes. Roof Slope Module A Fire Rating* Steep Slope I Flush - Type 1, 2, &3 I Class A I (z 9.5 degrees) Tilt I Type 1 &2 I Class A Low Slope Flush Fil Type 1, 2, &3 Class A (<9.5 degrees) Tilt Type 1, 2, &3 Class A �u 'Class A rated PV systems can be installed on Class A,B,and C roofs. STREAMLINED 30KW UNDER SOLR23-0506 Frequently Asked Questions What is a "module type"? What attachments and flashings are deemed compatible with Class A? The new UL1703 standard introduces the concept of a PV module type, based on 4 construction parameters Attachments and their respective flashings are not and 2 fire performance parameters. The purpose of constituents of the rating at this time.All code-compliant this classification is to certify mounting systems without flashing methods are acceptable from a fire rating needing to test it with every module. standpoint. What roofing materials are covered? What mounting height is acceptable? All fire rated roofing materials are covered within this UL fire testing was performed with a gap of 5", which is certification including composition shingle, clay and considered worst case in the standard. Therefore, the cement tile, metal, and membrane roofs. rating is applicable to any module to roof gap. What if I have a Class C roof, but the jurisdiction Am I required to install skirting to meet the fire now requires Class A or B? code? Generally, older roofs will typically be "grandfathered No, IronRidge achieved a Class Afire rating without any in", and will not require re-roofing. However, if 50% or additional racking components. more of the roofing material is replaced for the solar installation the code requirement will be enforced. What determines Fire Classification? Where is the new fire rating requirement code listed? Fire Classification refers to a fire-resistance rating system for roof covering materials based on their ability 2012 IBC: 1509.7.2 Fire classification. Rooftop to withstand fire exposure. mounted photovoltaic systems shall have the same fire classification as the roof assembly required by Section Class A- effective against severe fire exposure 1505. Class B-effective against moderate fire exposure Class C- effective against light fire exposure Where is a Class A Fire Rating required? What if the roof covering is not Class A rated? The general requirement for roofing systems in the IBC refers to a Class C fire rating. Class A or B is required for The IronRidge Class A rating will not diminish the fire areas such as Wildland Urban Interface areas (WUI) and rating of the roof, whether Class A, B, or C. for very high fire severity areas. Many of these areas are found throughout the western United States. California What tilts is the tilt mount system fire rated for? has the most Class A and B roof fire rating requirements, due to wild fire concerns. The tilt mount system is rated for 1 degrees and up and any roof to module gap, or mounting height. Are standard mid clamps covered? Mid clamps and end clamps are considered part of the PV"system", and are covered in the certification. More Resources — En aASSIFIED Fire Rating Certificate Engineering Certification Letters Os Visit our website to download the official UL We offer complete engineering resources 2703 certification document. and pre-stamped certification letters. Go to IronRidge.com Go to IronRidge.com 01-800-227-9523 for more information.Version 1.12 STREAMLINED 30KW UNDER SOLR23-0506 Intertek AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: IronRidge, Inc. Manufacturer: IronRidge, Inc. 1495 Zephyr Ave 1435 Baechtel Road Address: Hayward, CA 94544 Address: Willits, CA 95490 Country: USA Country: USA Contact: Yann Schwarz Contact: Jim Norsworthy Phone: (800) 227-9523 Phone: (800) 227-9523 FAX: (707) 459-1833 FAX: (707) 459-1833 Email: yschwarz@ironridge.com Email: jorsworthy@ironridge.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA �QrU�IA— Control Number: 4007559 Authorized by: for Thomas J. Patterson, Certification Manager ETL CLASSIFIED US T'�' m Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client.Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this Authorization to Mark.Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety.Use of Intertek's Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark.Any further use of the Intertek name for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road,Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Standard(s): UL Subject 2703 Outline of Investigation for Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules and Panels, Issue Number: 1, October 4, 2010 Product: XR Rails with Integrated Grounding. Brand Name: IronRidge Roof Mount Models: XR Rails ATM for Report 1 01 541 1 32LAX-002 Page 1 of 3 ATM Issued: 24-Apr-2015 ED 16.3.15(1-Jan-13)Mandatory STREAMLINED 30KW UNDER SOLR23-0506 Intertek AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: IronRidge, Inc. Manufacturer: IronRidge, Inc. 1495 Zephyr Ave 1495 Zephyr Ave Address: Hayward, CA 94544 Address: Hayward, CA 94544 Country: USA Country: USA Contact: Yann Schwarz Contact: Jim Norsworthy Or Dave Taggart Phone: (800) 227-9523 Phone: (707) 363-3025 FAX: (707) 459-1833 FAX: (510) 225-0975 Email: yschwarz@ironridge.com Email: jorsworthy@ironridge.com Party Authorized To Apply Mark: Same as Manufacturer (1-1 Report Issuing Office: Lake Forest, CA Control Number: 4008377 Authorized by: for Thomas J. Patterson, Certification Manager ETL CLASSIFIED US T'�' m Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client.Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this Authorization to Mark.Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety.Use of Intertek's Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark.Any further use of the Intertek name for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road,Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Standard(s): UL Subject 2703 Outline of Investigation for Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules and Panels, Issue Number: 1, October 4, 2010 Product: XR Rails with Integrated Grounding. Brand Name: IronRidge Roof Mount Models: XR Rails ATM for Report 1 01 541 1 32LAX-002 Page 2 of 3 ATM Issued: 24-Apr-2015 ED 16.3.15(1-Jan-13)Mandatory STREAMLINED 30KW UNDER SOLR23-0506 Intertek AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: IronRidge, Inc. Manufacturer: Precision Die & Stamping, Inc. 1495 Zephyr Ave 1704 W. 10th Street Address: Hayward, CA 94544 Address: Tempe, AZ 85281 Country: USA Country: USA Contact: Yann Schwarz Contact: Andy Frola Phone: (800) 227-9523 Phone: (480) 967-2038 FAX: (707) 459-1833 FAX: (480) 829-0838 Email: yschwarz@ironridge.com Email: andy@precisiondie.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CAj�� Control Number: 4008083 Authorized by: for Thomas J. Patterson, Certification Manager ETL CLASSIFIED US T'�' m Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client.Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party,other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this Authorization to Mark.Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety.Use of Intertek's Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark.Any further use of the Intertek name for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road,Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Standard(s): UL Subject 2703 Outline of Investigation for Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules and Panels, Issue Number: 1, October 4, 2010 Product: XR Rails with Integrated Grounding. Brand Name: IronRidge Roof Mount Models: XR Rails ATM for Report 1 01 541 1 32LAX-002 Page 3 of 3 ATM Issued: 24-Apr-2015 ED 16.3.15(1-Jan-13)Mandatory STREAMLINED 30KW UNDER SOLR23-0506 RON RI DGE FlashVue TM Moving Flashing Forward We set out to design a flashing that checked all the boxes: fully waterproof, fast and easy to install correctly, economical, and strong enough to handle every environmental condition. FlashVue does it all. The optimized flashing design features a large viewport, for easy alignment with the pilot hole. And the GripCap and GripCap+ sit snugly in place, so the lag can be driven single-handedly. Three-Tier Water Seal, Reimagined FlashVue's seal architecture utilizes three layers of protection.The viewport is elevated 0.30",and provides a"friction-fit"for the GripCap.The GripCap fully covers the viewport while a sealing washer adds another layer of protection.And an EPDM washer and lag bolt"seal the deal"in the stack. ,W:ai GripCap &GripCap+ _- � The 360 capable GripCap(2.74" — _ tall)and GripCap+(3.74"tall)can be placed in any orientation,and provide a f ^ "friction-fit"for easy installs. Push snug into the viewport,without worrying it will _ roll away or rotate while driving the lag. ♦ �1 �® rO \ � 6 0 Eta �s Large Viewport in Flashing Intertek /��� The large viewport makes it easy to Triple Certified to / align the flashing with the pilot hole,and Tri p >� drive the lag centered into the rafter.The Protect the Roof elevated rim not only provides a sturdy UL 2703,441 (27) ° dock for the GripCap or GripCap+,but TAS 100(A)-95 increases water-shedding capabilities. >TREAMLINED 30KW UNDER SOLR23-0506 See Your Pilot Holes Large Viewport in Flashing pilotFlashVue makes before.visible,like never . roofs.tedious guesswork on hot I IV Solve Roof Undulations Available:Also . . roofsWe know perfectly flat.GripCap+can help when undulations get in the way. GripCap GripCap+ 2" 1„ �- GripCdAx f°r Uneven Roof Surfaces >1" Trusted Strength & Certification Attachment Loading FlashVue has been tested and rated to support 1161 (Ibs) of uplift and 353 (Ibs) of lateral load. Structural Certification Designed and certified for compliance with the International Building Code &ASCE/SEI-7. ® Water Seal Ratings Passed both the UL 441 Section 27 "Rain Test" and TAS 100-95 "Wind Driven Rain Test" by Intertek. UL 2703 Listed System Conforms to UL 2703 mechanical and bonding requirements. See Flush Mount Manual for more info. 01-800-227-9523 for more information.Version 1%---1 STREAMLINED 30KW UNDER SOLR23-0506 /lam I RON RI DGE FlashVue 1 2 3 4 d ITEM NO DESCRIPTION QTY IN KIT 1 BOLT, LAG 5/16 X 4.25" 1 2 WASHER, EPDM BACKED 1 3 FM FLASHING, MILL OR BLACK 1 4 GRIP CAP, MILL OR BLACK 1 FLASHVUE PART NUMBER DESCRIPTION FV-01-M1 FLASHING, FLASHFOOT, MILL FV-01-B1 FLASHING, FLASHFOOT, BLACK 1) BOLT, LAG 5/16 x 4.25" 0.61 .26 5/16 THD 4.25 7/16" Head Property Value Material 300 Series Stainless Steel Finish Clear v1.0 ■ STREAMLINED 30KW UNDER SOLR23-0506 MOII 2) Washer, EPDM Backed .14 0.35 Property Value OcJ5.75 Material 300 Series Stainless Steel Finish I Clear 3) Grip Cap .40� .36� �— 1.00 i + 2.74 'A if Property Value Material Aluminum Finish Mill/Black 4) FM Flashing 8.0 32 12.0 O Property Value Material Aluminum Finish Mill/Black v1.0