Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOLR23-0659 APPROVED PLANS.pdf
SOLR23-0659 STREAMLINED PV CITY OF PALM DESERT IT'DEPARTMENT BUPAL'I'LOING BDESERTSAFETT Photovoltai c System-30KW and Under 0 L F E RT RESIDENCE OLFERT, DANIEL DEPARTMENT OF BUILDING SSAFETY Re au irements-Attached 45720 ABRONIA TRAIL PROVEDA N.aeao D APPaovEoF.N.ama 0 The atlach.d C'tv of Palm Desert 30kW a d Untler Photo Io is °II h—h PHOTOVOLTAIC SYSTEM PALM DESERT,CA 92260 m n r in m Ii n W h h �i f r r PETS° °P�Na TaEaEPr°NTNE1.TFI .P�ETE° E°` 5M05ieEKEP 45720 ABRONIA TRAIL (310)903 0148 `°"°"°°"`°"°`--°"°`°"°'°u"" .�,".,. ..E�°M....,�,° PALM DESERT, CA 92260 LICENSE#1028741 SE HOLDER Digitally PHOTOVOLTAIC SYSTEM SPECIFICATIONS : C-10LICEPATRICCK MOORENATURE: signed by Anthonette SYSTEM SIZE - 5.925kW DC 15.424kW CEC AC Anthonette Castro Castro MODULE TYPE & AMOUNT - (15) CANADIAN SOLAR HIKU CS3N-395MS BLK Date: INVERTER - (15) ENPHASE IQ8PLUS-72-2-US [240V] MICROINVERTERS* 2023.05. 1 5 *INVERTERS USED IN THIS DESIGN ARE COMPLIANT WITH CEC 690.12(RAPID SHUTDOWN). SEE MANUFACTURER DATA SHEET. 10:56:49-07'00' INTERCONNECTION METHOD - LOAD BREAKER GOVERNING CODES ALL MATERIALS,EQUIPMENT,INSTALLATION AND Chicory St 9. LAG SCREWS SHALL PENETRATE A MINIMUM 2" INTO 6. ALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE WORK SHALL COMPLY WITH THE FOLLOWING GENERAL SOLID SAWN STRUCTURAL MEMBERS AND SHALL NOT BONDED AND ELECTRICALLY CONTINUOUS. (CEC 250.90, APPLICABLE CODES: EXCEED MANUFACTURER RECOMMENDATIONS FOR 250.96) •2022 CBC 0 1. UTILITY SHALL BE NOTIFIED BEFORE ACTIVATION OF FASTENERS INTO ENGINEERED STRUCTURAL MEMBERS. 7. WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND •2022 CRC PV SYSTEM. 10. AN ACCESS POINT SHALL BE PROVIDED THAT DOES NOT CONDUITS ARE NOT SPECIFIED, CONTRACTOR SHALL •2022 CEC 2. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL PLACE THE GROUND LADDER OVER OPENINGS SUCH AS SIZE THEM ACCORDING TO APPLICABLE CODES. •2022 CMC BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY WINDOWS OR DOORS ARE LOCATED AT STRONG POINTS 8. REMOVAL OF A UTILITY-INTERACTIVE INVERTER OR •2022 CPC RECOGNIZED TESTING LABORATORY ACCREDITED BY OF BUILDING CONSTRUCTION AND IN LOCATIONS OTHER EQUIPMENT SHALL NOT DISCONNECT THE •2022 CFC THE UNITED STATES OCCUPATIONAL SAFETY HEALTH WHERE THE ACCESS POINT DOES NOT CONFLICT WITH BUILDING CONNECTION BETWEEN THE GROUNDING •2022 BUILDING ENERGY EFFICIENCY STANDARDS ADMINISTRATION. OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, ELECTRODE CONDUCTOR AND THE PV SOURCE AND/OR •2022 CALIFORNIA ENERGY CODE TITLE 24 • 45720 ABRONIA TRAIL 3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS WIRES,OR SIGNS.(CRC R331.4.2) OUTPUT CIRCUIT GROUNDED CONDUCTOR. •2022 CALIFORNIA HEALTH AND SAFETY CODE PRIOR TO INITIATING CONSTRUCTION. 11. WHERE DC CONDUCTORS ARE RUN INSIDE BUILDING, 9. FOR GROUNDED SYSTEMS, THE PHOTOVOLTAIC •CEC ARTICLE 690 PALM DESERT, CA 92260 4. CONTRACTOR SHALL REVIEW ALL MANUFACTURER THEY SHALL BE CONTAINTED IN A METAL RACEWAY; SOURCE AND OUTPUT CIRCUITS SHALL BE PROVIDED •CFC ARTICLE 605.11 INSTALLATION DOCUMENTS PRIOR TO INITIATING THEY SHALL NOT BE INSTALLED WITHIN 10" OF THE WITH A GROUND-FAULT PROTECTION DEVICE OR •IEEE STANDARD 929 CONSTRUCTION. ROOF DECKING OR SHEATHING EXCEPT WHERE SYSTEM THAT DETECTS A GROUND FAULT, INDICATES •UL STANDARD 1741 Parosella St Parosella St 5. ALL EQUIPMENT AND ASSOCIATED CONNECTIONS OF COVERED BY THE PV MODULES AND EQUIPMENT. (CEC THAT FAULT HAS OCCURRED, AND AUTOMATICALLY •OSHA 29 CFR 1910.269 INVERTERS, MODULES, PV SOURCE CIRCUITS, 690.31(E)(1)) DISCONNECTS ALL CONDUCTORS OR CAUSES THE •WHERE APPLICABLE,RULES OF THE PUBLIC D BATTERY CONNECTIONS, ETC. AND ALL ASSOCIATED 12. PLUMBING AND MECHANICAL VENTS THROUGH THE INVERTER TO AUTOMATICALLY CEASE SUPPLYING UTILITIES COMMISSION REGARDING SAFETY AND o WIRING AND INTERCONNECTIONS SHALL BE INSTALLED ROOF SHALL NOT BE COVERED BY SOLAR MODULES - POWER TO OUTPUT CIRCUITS.(CEC 690.35(C)) RELIABILITY - ONLY BY QUALIFIED PERSONNEL(CEC 690.4(E)). NO BUILDING, PLUMBING, OR MECHANICAL VENTS TO BE 10. FOR UNGROUNDED SYSTEMS, THE INVERTER IS •THE AUTHORITY HAVING JURISDICTION 6. THE CONTRACTOR OR OWNER MUST PROVIDE ROOF COVERED, OBSTRUCTED OR ROUTED AROUND SOLAR EQUIPPED WITH GROUND FAULT PROTECTION AND A GFI •MANUFACTURERS'LISTINGS AND INSTALLATION ACCESS (LADDER TO ROOF) FOR THE ALL REQUIRED MODULES. FUSE PORT FOR GROUND FAULT INDICATION. INSTRUCTIONS VICINITY MAP INSPECTIONS. LADDERS MUST BE OSHA APPROVED, 13. ALL FIELD-INSTALLED JUNCTION, PULL, AND OUTLET 11. PV MODULE FRAMES SHALL BE BONDED TO RACKING SHEET INDEX: MINIMUM TYPE I WITH A 250 LB RATING, IN GOOD BOXES LOCATED BEHIND MODULES SHALL BE RAIL OR BARE COPPER GEC/EGC PER THE MODULE PV-1 -COVER PAGE CONDITION AND DESIGNED FOR ITS INTENDED USE. ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MANUFACTURER'S LISTED INSTRUCTION SHEET. PV-2-PROPERTY PLAN 7 7. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE MODULE SECURED BY REMOVABLE FASTENERS. 12. PV MODULE RACKING RAIL SHALL BE BONDED TO BARE PV-3-SITE PLAN • REQUIRED TO BE RETROFITTED ONTO THE EXISTING COPPER G.E.0 VIA WEEB LUG, ILSCO GBL 4DBT LAY IN PV-4-MOUNT DETAILS e l DWELLING AS PER THE 2022 CRC. THESE SMOKE ELECTRICAL LUG,OR EQUIVALENT LISTED LUG. PV-4.1 -MOUNT DIAGRAM ALARMS ARE REQUIRED TO BE IN ALL BEDROOMS, 13. THE PHOTOVOLTAIC INVERTER WILL BE LISTED AS UL PV 5 FRAMING SECTION OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON 1. WIRING MATERIALS SHALL COMPLY WITH MAXIMUM 1741 COMPLIANT. PV-6-1-LINE DIAGRAM&CALCULATIONS CONTINUOUS CURRENT OUTPUT AT 25°C AND MAXIMUM -� EACH FLOOR OF THE HOUSE. CARBON MONOXIDE 14. RACKING AND BONDING SYSTEM TO BE UL2703 RATED. PV-7-LABELS u _ .-z ALARMS ARE REQUIRED TO BE RETROFITTED OUTSIDE VOLTAGE AT 600V;WIRE SHALL BE WET RATED AT 90°C. 15. ANY REQUIRED GROUNDING ELECTRODE CONDUCTOR PV-8-ELECTRICAL PHOTOS •- � 1 - E i „ EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR 2 EXPOSED PHOTOVOLTAIC SYSTEM CONDUCTORS ON WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS PV-9-PLACARD ti OF THE HOUSE. THESE ALARMS MAY BE SOLELY THE ROOF WILL BE USE-2 OR PV TYPE WIRE. AT BUSBARS WITHIN LISTED EQUIPMENT.(CEC 250.64(C)) BATTERY OPERATED IF THE PHOTOVOLTAIC PROJECT 3. PHOTOVOLTAIC SYSTEM CONDUCTORS SHALL BE 16. WHEN BACKFED BREAKER IS THE METHOD OF UTILITY 9F45 BIR R_ I DOES NOT INVOLVE THE REMOVAL OF INTERIOR WALL INTERCONNECTION, THE BREAKERS SHALL NOT READ - P� DER 60 IDENTIFIED AND GROUPED. THE MEANS OF skyline ; AND CEILING FINISHES INSIDE THE HOME; OTHERWISE, "LINE AND LOAD". IFg y IDENTIFICATION SHALL BE PERMITTED BY SEPARATE s m a r t e n e THE ALARMS MUST BE HARD WIRED AND COLOR-CODING, MARKING TAPE, TAGGING OR OTHER 17. WHEN APPLYING THE 120% RULE OF CEC 705.12(D)(2), a- INTERCONNECTED.(CRC R314,R315) APPROVED MEANS THE SOLAR BREAKER TO BE POSITIONED AT THE SKYLINE SMART ENERGY " - 8. SMOKE AND CARBON MONOXIDE ALARMS ARE 4. ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL OPPOSITE END OF THE BUS FROM THE MAIN BREAKER. CALIFORNIA 4 _ REQUIRED PER CRC SECTIONS R314 AND 315 TO BE BE RAIN-TIGHT AND APPROVED FOR USE IN WET 18. THE WORKING CLEARANCE AROUND THE EXISTING •a VERIFIED AND INSPECTED BY THE INSPECTOR IN THE ELECTRICAL EQUIPMENT AS WELL AS THE NEW COVER PAGE .'.� ,j �-• •• LOCATIONS.(CEC 314.15) - FIELD. 5. WHERE CONDUCTORS ARE INSTALLED UNDERGROUND, ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN REV#1: A 9. CONTRACTOR SHALL VERIFY THAT THE ROOF JOB#:4628 REV SECTION 300.5 OF THE CEC MUST BE FOLLOWED TO ACCORDANCE WITH CEC 110.26( ) P` ,- STRUCTURE WILL WITHSTAND THE ADDITIONAL LOADS. DATE:4/13/2023 #2: V ENSURE PROPER PROTECTION.ERIAL MAP DRAWN BY:SG REV#3: '° ° A SOLR23-0659 STREAMLINED PV 721 4„ OLFERT, DANIEL PROPERTY LINE N 45720 ABRONIA TRAIL PALM DESERT,CA 92260 - - - - - - - - - - - - - - - �� (310)903-0148 FENCE 1 0 LICENSE#1028741 Im I � C-10LICENSE HOLDER SIGNATURE: I r PATRICK MOORE I 1z Im 1 POOL I I 40'-5" I I I II I SINGLE FAMILY HOME 1 LEGEND: I 1 I PROPERTY LINE: - - I DRIVEWAY: J 21'-5" - 1 Q 88 3 I � FENCE: I APN: 625195010 QI 0 i LOT: 0.175 ACRES I ZO I 1108'-3" I 0 0 I m 1 Q I C I IN Lo I � I I II wl z 1 J 1 Of wl I 0 I 0 DRIVEWAY I � I 1 SCALE: 1/12" = 1'-0" PATIO skyline s m a r t e n e r g y n29'-10" 4' 16'-6" �� SKYLINE SMART ENERGY 4„ - - - - - - - - - - � CALIFORNIA PROPERTY LINE PROPERTY PLAN 53'-8" JOB#:4628 PAROSELLA ST. DATE:4/13/2023 PV-2 DRAWN BY:SG SOLR23-0659 STREAMLINED PV ROOF DETAIL CIRCUIT DETAIL OLFERT, DANIEL ROOF TYPE:ROLLED COMP. ENPHASE CIRCUITS N 45720 ABRONIA TRAIL PALM DESERT,CA 92260 ROOF SECTION 1:AZIMUTH:90° CIRCUIT#1:8 MODULES (310)903-0148 O C1 PITCH:3' (EXISTING) 125/100 EXTERIOR MODULE COUNT: 15 LICENSE#1028741 �2 CIRCUIT#2:7 MODULES MAIN SERVICE PANEL & POINT OF C-10LICENSEHOLDERSIGNATURE: PATRICK MOORE INTERCONNECTION. 0 R°FESSIONq M c�oo0�R1 SMy�yF4c AC NEW 30A UNFUSED AC .............. ....... ............ .... . . . C C56136 rn o ; DISCONNECT EXP. 12/31/24 I SYSTEM LEGEND 9TFOFIV ��F°� NEW IQ COMBINER PANEL PV SYSTEM SIZE: C A I NEW 5.925kW DC 5.424kW CEC AC 04/25/2023 0I EXISTING EXTERIOR MAIN SERVICE PANEL& aPOINT OF INTERCONNECTION.TIED TO UTILITY METER 222010-590260. NEW PV SYSTEM AC DISCONNECT(RSD). LOCATED OI I a WITHIN 10'OF MSP. C NEW DEDICATED PV SYSTEM COMBINER PANEL. O PV MODULE ELECTRICAL SPECIFICATIONS Q 15 NEW CANADIAN SOLAR HIKU CS3N-395MS BLK CANADIAN SOLAR HIKU Z MODULES 1 MODULE TYPE CS311-395MS BLK I C 1 C1 15 NEW ENPHASE IQ8PLUS-72-2-US[240V] 0 I C1 MICROINVERTERS,MOUNTED ON THE BACK OF 395W EACH MODULE. POWER MAX(PMAX) I OPEN CIRCUIT VOLTAGE(Von) 44.3V m I C 1 Cif NEW PV CONDUIT RUN.*SEE E1.0 CONDUIT SCHEDULE SHORT CIRCUIT CURRENT(ISM) 11.44A Q I =EXTERIOR RUN =ATTIC RUN O }�MAX POWER-POINT VOLTAGE(VMP) 37V NEW JUNCTION BOX.(MOUNTED TO PV MODULE) � � C 1 C 1 �1 'T' MAX POWER-POINT CURRENT(IMP) 10.68A Ln SERIES FUSE RATING 20A MODULE MECHANICAL SPECIFICATIONS C2 DESIGN WIND SPEED 110 MPH DESIGN SNOW LOAD 20 PSF #OF STORIES 1 ROOF PITCH 3° TOTAL ARRAY AREA(SQ.FT) 328.65 C2 C2 TOTAL ROOF AREA(SQ.FT) 2345 3 U" F I R E C 0 D E PATHWAY ARRAY SQ.FT/TOTAL ROOF SQ.FT 14.01% C2 Ci2 MODULE ^n C2 SCALE: 1/8" = 1'-0" ROLLED COMP. (JL skyline s m a r t e n e r g y SKYLINE SMART ENERGY CALIFORNIA a. ROCK-IT MOUNTS AND SITE PLAN STRUCTURAL ATTACHMENT RAFTER:2"X 10" CANADIAN SOLAR HIKU CS3N-395MS BLK ARE CLASS JOB#:4628 "A"FIRE RATED AND U.L. 1703, DATE:4/13/2023 PV-3 NTS ELEVATION DETAIL C.S.F.M. 14-011 COMPLIANT. DRAWN BY:SG WIND UPLIFT AT ATTACHMENT POINTS IS PROVIDED WITH THE ENGINEERING LETTER. OLFERT, DANIEL SUPPORT LOCATIONS HAVE BEEN OPTIMIZED TO WITHSTAND UPLIFT 45720 ABRONIA TRAIL PALM DESERT,CA 92260 (310)903-0148 LICENSE#1028741 C-10LICENSE HOLDER SIGNATURE: PATRICK MOORE 2 3 4 5 6 7 8 9 10 t1 12 13 14 5 t6 NOTES A ALL DIMENSIONS ARE mm UNLESS OTHERWISE SPECIFIED. 50±0,20 2X A DIMENSIONS AND TOLERANCE SHOWN ARE AFTER PLATING AND/OR EI 27 30 2 7,7 5±0,200 PART IS TO BE FREE OF BURRS AND SHARP EDGES, ANY MATERIAL DEVIATION FROM SPECIFIED MATERIAL MUST BE APP OVED BY EVEREST/K2, PARTS SHALL NOT HAVE OILS, RESIDUES, OR OTHER SUBSTANCES 011 THEIR + -+- MOUNTING LEGEND SURFACE. 2X B 14,75±0,20 -+- + B 2 Q� ESSIO 41 16,7 45,3 SMy'.e c 2X c F y --------- ------------------ c� m 2 79 25±0 00 J �EX/P.112/31/24 B 4 X D 4 O C I C A�- 222,25±0,500 R13,87±0,300 04/25/2023 101.6 E + HIDDEN LINES OMITTED TER SIMPLICITY 015.00±1 100,6±0,041 F + -+- r 2X + + 209±2 G a L +- O0 EXPOSED SURFACE + +H 2X CD MOUNT DETAILS- 4- 30±1 3X A A tFN SCALE: NOT TO SCALE 18,37±0,200 188,87±0,200 QUOTATION PORPUSFS ONLY, NOT FAR MANUFACTURING V 1 2 3 4 5 6 7 8 9 10 11 t2 t3 14 15 16 s s m a r t e n e r g y SKYLINE SMART ENERGY CALIFORNIA MOUNTING DETAILS JOB#:4628 DATE:4/13/2023 PV.4 DRAWN BY:SG ROOF SECTIONS : 171-911 OLFERT, DANIEL (I)SLOPE-3- 45720 ABRONIA TRAIL AZIMUTH-90' PALM DESERT,CA 92260 MATERIAL-ROLLED COMP. 19, (310)903-0148 RAFTER-2"X 10",24"O.C. LICENSE#1028741 C-10LICENSE HOLDER SIGNATURE: PATRICK MOORE MOUNTING LEGEND 0 o - FRAMING = CROSS RAIL = - MOUNTING FEET = 48' 1 68'-4" 19'-2" 6' 3' • 21-5" 10'-5" • �- 4' 14'-10" MOUNT DIAGRAM skyline -- s m a r t e n e r g y SKYLINE SMART ENERGY 121-911 CALIFORNIA 15'-9" MOUNTING DIAGRAM MOUNT DIAGRAM FRAMING MUST BE VERIFIED BY INSTALL CREW AT TIME OF PANEL INSTALLATION. IF JOB#:4628 ACTUAL FRAMING DIFFERS FROM FRAMING SHOWN ON THE DRAWINGS,CONTACT DATE:4/13/2023 THE ENGINEERING TEAM FOR GUIDANCE REGARDING AN APPROPRIATE SOLUTION DRAWN BY:SG P Y\, -4.1 SCALE: 1/8" = 1'-0" OLFERT, DANIEL 45720 ABRONIA TRAIL PALM DESERT,CA 92260 (310)903-0148 LICENSE#1028741 C-10 LICENSE HOLDER SIGNATURE: PATRICK MOORE ROOF SECTION 1 FROM PV 3.0 FRAME MEMBER TYPE: RAFTER DETAILS: 2" X 10" RAFTER SPACED AT 24" O.C. FRAMING NOTES ROOF LENGTH 1 7'-9" NO EAVE DUE TO FLAT ROOF 2411 SPACING BETWEEN ROOF SUPPORTS skyline s m a r t e n e r g y SKYLINE SMART ENERGY CALIFORNIA FRAME ELEVATION FRAME SECTION JOB : 4 DATE:4/13/3/2023 DRAWN BY:SG PV-5 SCALE: NOT TO SCALE SOLR23-0659 STREAMLINED PV CONDUCTOR AND CONDUIT SCHEDULE OLFERT, DANIEL TAG WIRE TYPE WIRE SIZE #OF CONDUCTORS CONDUIT TYPE MIN.CONDUIT SIZE 45720 ABRONIA TRAIL 1 Q-CABLE #10 4-L1 L2 FREE AIR N/A PALM DESERT,CA 92260 (310)903-0148 1 BARE COPPER #6 1-BARE FREE AIR N/A LICENSE#1028741 2 THWN-2 #10 4-L1 L2 EMT 3/4" 2 THWN-2 EGC #8 1-GND EMT 3/4" C-10 LICENSE HOLDER SIGNATURE: PATRICK MOORE 3 THWN-2 #10 3-L1 L2 N EMT 3/4" 3 THWN-2 EGC #8 1-GND EMT 3/4" i THE ENPHASE IQ8PLUS-72-2-US [240AMICRO-INVERTERS HAVE INTEGRATED GROUND AND DOUBLE INSULATION,SO NO GEC OR PV SYSTEM SIZE: EGC IS REQUIRED.THE DC CIRCUIT IS ISOLATED NEW 5.925kW DC I 5.424kW CEC AC AND INSULATED FROM GROUND AND MEETS THE REQUIREMENTS OF NEC 690.35 MODULE TYPE&AMOUNT-(15) CANADIAN SOLAR HIKU CS3N-395MS BLK INVERTER-(15) ENPHASE IQ8PLUS-72-2-US[240V] OVERHEAD FEED [COPPER#21 METER#: NOTES: [11 WIRES IN FREE AIR [11(MIN)3/4"EMT 222010-590260 1. MODULES ARE BONDED TO RAIL USING UL 2703 RATED BONDING SYSTEM- (4)#10 AWG PV WIRE (4)#10 AWG THWN-2 WIRE (E)125A RATED INTEGRATED BONDING MID-CLAMPS+ DIRECT-BURIAL LAY-IN-LUGS; SEE (1)#6 BARE COPPER EGC (1)#8 AWG THWN-2 EGC CENTERFED ATTACHED FOR SPECIFICATIONS IF APPLICABLE 2. PV DC SYSTEM IS UNGROUNDED (N)240V/60A PV ENPHASE MAIN SERVICE 3. PV ARRAY WILL HAVE A GROUNDING ELECTRODE SYSTEM IN COMPLIANCE PV LOAD CENTER,AC (N)SQUARE D DU221 RB PANEL WITH NEC 250.58 AND 690.47(A) COMBINER WITH OR EQUIVALENT 4. PV SOURCE,OUTPUT,AND INVERTER INPUT CIRCUIT WIRING METHODS CIRCUIT 1:8 MODULES-CANADIAN SOLAR INTEGRATED MONITORING. AC DISCONNECT (E)LOADS SHALL COMPLY WITH NEC 690.1(G) HIKU CS3N-395MS BLK WIRE SIZED AT#14(NM) 240V/30A NEMA 3R UTILITY SERVICE 5. BACKFED PV BREAKER WILL BE INSTALLED AT OPPOSITE END OF THE BUS NON-FUSIBLE, 120/240V BAR FROM THE MAIN BREAKER.A PERMANENT WARNING LABEL TO BE NEMA 3R RATED SINGLE PHASE INSTALLED PER SYSTEM SIGNAGE,PAGE VISIBLE-LOCKABLE (E)LOADS 6. BARE COPPER IS TRANSITIONED TO THWN-2 VIA IRREVERSIBLE CRIMP; ENVOY-IQ 1 0 0 0 7 8 LABELED.� � MONITOR WHEN PRESENT,THE GEC TO BE CONTINUOUS LOCATED WITHIN 10'OF 7. INVERTER(S)TO BE COMPLIANT WITH UL 1741 SUPPLEMENT A 3 MSP. 8. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM 2P-15AI20A (E)LOADS EXISTING)100 CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS MAIN REQUIRED BY FIELD CONDITIONS 30A (N)PV OCPD DISCONNECT 9. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM 2P-30A CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UPSIZING AS REQUIRED BY FIELD CONDITIONS. 2P-20A c Nc 10. A METER HEIGHT AT CENTER OF METER SHALL BE 48 INCHES-75 INCHES. V V PP_POA MAINTAIN 3 FT. PERUMETER LEVEL AND CLEAR SPACE IN FRONT OF CIRCUIT 2:7 MODULES-CANADIAN SOLAR HIKU METER. FACILITY GROUND CS3N-395MS BLK RODS SEPARATED BY A 11. PV METER SHOCKET AND AC DISCONNECT WILL BE PROVIDED WITHIN 10" TO 72"FROM EXISTING SERVICE METER AND WILL BE INSTALLED BETWEEN MINIMUM OF 6'. 48"TO 75"ABOVE THE FLOOR OR GRADE LEVEL. GROUND RODS TO BE 12. EXTERNALLY OPERATED KNIFE BLADE TYPE AC DISCONNECT SWITCH 1 o o o 6 7 NEMA3R RATED JUNCTION INSTALLED IF NO LIFER WHICH IS LOCKABLE IN THE OPEN POSTION,VISIBLE DESIGNATIONS WHICH COMPLY W/ IS PRESENT IS ACCESSIBLE TO RIVERSIDE UTILITIES DEPARTMENT EMPLOYEES AT ALL BOX:SHALL NEC COMPLY GROUNDING WIRE WILL TIMES AND NON FUSED. BE MINIMUM#4 AWG (E)GROUND ROD+ (E)WATER PIPE BOND INSTALLER NOTES: CONNECTION TO THE INTERIOR METAL QUAD 2 50AMP EXISTING BREAKERS TO ENPHASE BEATER IPINGSH LL MAKE ROOM FOR PV BREAKEROM FOR IQ8PLUS-72-2-US[240V] FROM THE POINT OF WTHIN 5' MICRO-INVERTER FROM EP OUR PV BREAKER. ENTECE skyline PV MODULE ELECTRICAL SPECIFICATIONS INVERTER ELECTRICAL SPECIFICATIONS SYSTEM OVER-CURRENT PROTECTION DEVICE(OCPD) BUSBAR CALCULATIONS PV BREAKER-120%RULE 5 m a r t e n e r g y AN SOLAR HIKU ENPHASE CALCULATIONS CANADIAN MODULE TYPE CS3AN INVERTER TYPE IQ8PLUS-72-2-US[240V] ENPHASE SKYLINE SMART ENERGY MAIN BUS RATING 125 POWER MAX(PM ) 395W MAX INPUT DC VOLTAGE 60V INVERTER TYPE IQ8PLUS-72-2-US CALIFORNIA [240V] MAIN DISCONNECT RATING 100 OPEN CIRCUIT VOLTAGE(Voc) 44.3V MAX DC SHORT CIRCUIT CURRENT 15A #OF INVERTERS 15 1-LINE DIAGRAM&CALCULATIONS SHORT CIRCUIT CURRENT(ISM) 11.44A MAXIMUM OUTPUT POWER 29OW MAX CONTINUOUS OUTPUT CURRENT 121 PV BREAKER RATING 30 MAX POWER-POINT VOLTAGE(VMp) 37V MAXIMUM CONT.OUTPUT CURRENT 1.21A JOB#:4628 �� (#OF INVERTERS)x(MAX CONT.OUTPUT CURRENT)X125%<= (MAIN BUS RATING x 1.2)-MAIN DISCONNECT RATING-OCPD RATING DATE:4/13/2023 MAX POWER-POINT CURRENT(Imp) 10.68A CEC EFFICIENCY 97% OCPD RATING 125A x 1.2 DRAWN BY:SG SERIES FUSE RATING 20A MAX UNITS PER 20A CIRCUIT 13 (15 x 1.21A x 1.25)=22.69A<=30A,OK ( )-100A-30A,OK SOLR23-0659 STREAMLINED PV • MAXIMUM VOLTAGE: 480V DC PHOTOVOLTAIC OLFERT, DANIEL 7SOLAR IC SHOCK HAZARD I WARNING ! MAXI MUM CIRCUIT CURRENT: 15ADC 45720 ABRONIA TRAIL THE LINE AND LOAD SIDES MAY 0 ELECTRIC SHOCK HAZARD 0 AC DISCONNECT PALM DESERT,CA 92260 ED IN THE OPEN POSITION. 0 TERMINALS ON BOTH LINE AND LOAD SIDES MAX RATED OUTPUT CURRENT OF IS ALWAYS PRESENT WHEN MAY BE ENERGIZED IN THE OPEN POSITION. THE CHARGE CONTROLLER OPERATING CURRENT: 18.15A AC (310)903-0148 TURN RAPID SHUTDOWN r ---- S ARE EXPLOSED TO SUNLIGHT (IF INST DC-TO-DC CONVERTER OPERATING VOLTAGE: 240 V AC SWICH TO THE"OFF" LABEL 2 LABEL 3 LICENSE#1028741 LABEL 4 LABEL 5 POSITION TO SHUTDOWN AT EACH DISCONNECTING MEANS FOR AT EACH DISCONNECTING MEANS FOR AT EACH DC DISCONNECTING MEANS AT POINT OF INTERCONNECTION,MARKED C-10 LICENSE HOLDER SIGNATURE: PV SYSTEM AND REDUCE PHOTOVOLTAIC EQUIPMENT PHOTOVOLTAIC EQUIPMENT [NEC 690.531 AT DISCONNECTING MEANS . ] [NEC .15] PATRICK MOORE SHOCK HAZARD IN ARRAY [NEC 69015 69013 AND 690 [NEC 690.54] LABEL vr AT RAPID SHUTDOWN SYSTEM I WARNING ! I CAUTION ! PHOTOVOLTAIC [NEC 690.56(C)(1)(A)]. 0 DUAL POWER SOURCES. 0 0 PHOTOVOLTAIC SYSTEM 0 0 BI-DIRECTIONAL METER 0 0 DC DISCONNECT 0 RAPID SHUTDOWN � SECOND SOURCE IS PV SYSTEM CIRCUIT IS BACKFED • LABEL 7 LABEL 8 LABEL 9 LABEL 10 SWITCH AT POINT OF INTERCONNECTION;LABEL,SUCH AS LABEL 7 OR LABEL 8 MUST IDENTIFY AT UTILITY METER AT EACH DC DISCONNECTING MEANS SOLARPHOTOVOLTAIC SYSTEM [NEC 690.56(B)] [NEC 690.13(B)] [NEC 705.12(B)(4)] LABEL 6 #03-359 LOCAL CODES AT RAPID SHUTDOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. I WARNING ! PHOTOVOLTAIC UTILITY 0 POWER SOURCE OUTPUT QWARNING Q ALL SIGNAGE MUST BE PERMANENTLY ATTACHED AND BE POWER16a •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p 0 OF 3/8"AND PERMANENTLY AFFIXED. OO 1.5 ALERTING WORDS TO BE COLOR g CODED. "DANGER"WILL HAVE RED OO p p p ® BACKGROUND;"WARNING"WILL HAVE ORANGE UTILITY AC BACKGROUND;"CAUTION"WILL HAVE YELLOW 11 DC BACKGROUND.[ANSI Z535] PRODUCTION DISCONNECT STRING DISCONNECT AC © 14 METER (IF USED) (IF USED) INVERTER (IF USED) DISCONNECT 11 O LABELS ARE NOT DRAWN TO SCALE JUNCTION (IF USED) o© skyline .v= s mar t e n e r g y BOX O3 FOR MICRO 0 p (IF USED) 10 13 INVERTERS ONLY SKYLINE SMART ENERGY #xx-xxx-xxx 0® (NO KNIFE SWITCH CALIFORNIA 0 p DISCONNECT) ELECTRICAL LABELS JOB#:4628 O DATE:4/13/2023 PV-7 DRAWN BY:SG OLFERT, DANIEL 1 ABRONIA TRAIL DESERT,PALM ' 92260 1 9 1 4: LICENSE#1028741 C-10 LICENSE HOLDER SIGNATURE: 1 T : c w d � oar fro _ M L. '1 i A Mayskyline SKYL NE SMART t ypCALIFORNIA PHOTOSELECTRICAL •: •ATE:4/13/2023 • DRAWN • SOLR2 -0659 STREAMLINED PV OLFERT, DANIEL 45720 ABRONIA TRAIL N PALM DESERT,CA 92260 (310)903-0148 LICENSE#1028741 C-10 LICENSE HOLDER SIGNATURE: 0 PATRICK MOORE 0 O 0 0 0 SCALE: NOT TO SCALE skyline s m a r t e n e r g y SKYLINE SMART ENERGY CALIFORNIA STICKER MAP JOB#:4628 DATE:4/13/2023 s M FOR INSTALLER USE ONLY DRAWN BY:SG SOLR23-0659 STREAMLINED PV CAUTION z i. � POWER TO THIS BUILDING IS SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN 45720 ABRONIA TRAIL PALM DESERT,CA 92260 SOLAR PHOTOVOLTAIC �>Z ARRAY ON ROOFTOP IQ COMBINER PANEL SERVICE POINT RAPID SHUTDOWN DISCONNECT PV SOLAR SYSTEM(S) ARE EQUIPPED LOCATION(AC DISCONNECT) WITH RAPID SHUTDOWN DEVICE(S) SOLR23-0659 STREAMLINED PV ENGINEERING DRAWING(mm) CS3N-40OMS/I-V CURVES ton A r C a n a d i a n S o l a r Rear View Frame Cross Section 12 12 A-A 11 1a ,6 I 35 9 9 ing I 8 8 H.a I 8.14a9 7 7 Ln 6 6 Hole I M 5 5 4- 3- 3 2 2 Mounting Hole o vo, v 5 10 15 20 25 30 35 40 45 50 55 60 5 10 1$20 25 30 35 40 45 50 55 60 I -I ■ ,000 Whn' 5-C ■ _I_ ■ 800 WIm' 25°C ■ il ■ 600 W/m' 45'C ■ HiKuBlack Mono PERC m • 200 WM,' 65'C ■ 9 200 W/rrr' 5 1 BLACK FRAME ON BLACK BAC KSH E ET ELECTRICAL DATA I STC* MECHANICAL DATA F223 Frame CS3N 380MS 385MS 390MS 395MS 40OMS 405MS 41OMS Specification Data 380 W - 410 W Nominal Max.Power(Pmax) 380 W 385 W 390 W 395 W 400 W 405 W 410 W Cell Type Mono-crystalline C S 3 N-38 0 38 5 390 395 400 40 5 410 M S Opt.Operating Voltage(Vmp)36.4 V 36.6 V 36.8 V 37.0 V 37.2 V 37A V 37.6 V Cell Arrangement 132[2 X(11 X 6)] Opt.Operating Current(Imp) 10.44 A10.52 A10.60 AlO.68 A10.76 A10.83 A10.92 A Dimensions 1940 X 1048 X 35 mm Open Circuit Voltage(Voc) 43.7 V 43.9 V 44.1 V 44.3 V 44.5 V 44.7 V 44.9 V (76.4 X 41.3 X 1.38 in) MORE POWER Weight 23.4kg(51.6lbs) Short Circuit Current Qsc) 11.26 A11.32 A11.38 A11.44 A11.50 A11.56 A11.62 A Industry Leading Product Warranty on Materials Front Cover 3.2 mm tempered glass 25 � * Module Efficiency 18.7% 18.9% 19.2% 19.4% 19.7% 19.9% 20.2% Module power up to 410 W Years and Workmanship Frame Anodized aluminium alloy 410 W Module efficiency up to 20.2 /o Operating Temperature 40°C-+85°C j-Box IP68,3 bypass diodes 0 Max.System Voltage 1000V(UL) Cable 12 AWG(UL) 25 Linear Power Performance Warranty* Module Fire Performance TYPE 2(UL 61730 1000V) Portrait:400 mm(15.7 in)(+)/280 Years Cable Length mm(11.0 in)(-)(supply additional Lower LCOE&BOS cost Max.Series Fuse Rating 20 A (Including Connector) cable jumper:2 lines/pallet);land- V,year power degradation no more than 2% Application Classification Class A T4 or _12 0 mm(49.2 in)* Y P 9 Connector T4 or MC4 series Subsequent annual power degradation no more than 0.55% Power Tolerance 0_+10 W Per Pallet 30 pieces f Comprehensive LID/ LeTIDmitigation * *Under Standard Test Conditions(STC)of irradiance of1000W/m',spectrumAM1.5 and cell temperatureof Subject to the terms and conditions contained in the applicable Canadian Solar Limited Per Container(40'HQ)720 pIECeS technology,up to 50%lower degradation Warranty Statement.Also this 25-year limited product warranty is available only for 25°C. *For detailed information,please contact your localCanadian Solar sales anc products installed and operating on residential rooftops in certain regions. technical representatives. ...............................................................................__......................._..._...._.»... ELECTRICAL DATA I NMOT* MANAGEMENT SYSTEM CERTIFICATES* C53N 380MS 385MS 39OMS 395MS 40OMS 405MS 41OMS + Better shading tolerance SO 9001:2015/Quality management system - TEMPERATURE CHARACTERISTICS ISO 14001:2015/Standards for environmental management systern Nominal Max.Power(Pmax) 284 W 288 W 291 W 295 W 299 W 303 W 306 W ISO 45001:2018/International standards for occupational health&safety Opt.Operating Voltage(Vmp)34.0 V 34.2 V 34.4 V 34.6 V 34.7 V 34.9 V 35.1 V Specification Data PRODUCT CERTIFICATES* Opt.Operating Current(Imp)8.35 A 8.42 A 8.48 A 8.54 A 8.60 A 8.66 A 8.73 A Temperature Coefficient(Pmax) -0.34%/°C MORE RELIABLE IEC 61215/IEC 61730/CE Temperature Coefficient(Voc) -0.26%I*C Open Circuit Voltage(Voc) 41.2 V 41.4 V 41.6 V 41.8 V 41.9 V 42.1 V 42.3 V FSEC(US Florida)/UL 61730/IEC 61701/IEC 62716 Temperature Coefficient(ISc) 0.05%/°C Short Circuit Current(Isc) 9.08 A 9.13 A 9.18 A 9.23 A 9.28 A_9.33 A 9.37 A SP *Under Nominal Module Operating Temperature(NMOT),irradiance of 900 Win-spectrum AM 1.5.ambient Nominal Module Operating Temperature 42 t 3°C Minimizes micro-crack impacts .vE C C E c ' us temperature 20'C,wind speed t m/s. *The specific certificates applicable to different module types and markets will vary, and therefore not all of the certifications listed herein will simultaneously apply to the PARTNER SECTION Heavy snow load up to 8100 Pa, products you order or use.Please contact your local Canadian Solar sales representative =••••.......................................».------ _.»»..»»»....„.»»... ».. ...»...».; * * to confirm the specific certificates available for your Product and applicable in the regions enhanced wind load up to 6000 Pa* in which the products will be used. CSI SOLAR(USA)CO., LTD. is committed to providing high quality t i solar photovoltaic modules,solar energy and battery storage , *The specifications and key features contained in this datasheet may deviate slightly from our actual • solutions to customers.The company was recognized as the products due to the on-going innovation and product enhancement.CSI Solar Co.,Ltd.reserves the right to No.1 module supplier for quality and performa nce/p rice ratio make necessary adjustment to the information described herein at any time without further notice. 1 in the IHS Module Customer Insight Survey.Over the past Please be kindly advised that PV modules should be handled and installed by qualified people who have 1 professional skills and please carefully read the safety and installation instructions before using our PV , 20 years,it has successfully delivered over 63 GW of modules. *For detailed information,please refer to Installation Manual. premium quality solar modules across the world. ?..................._».._..........._..___.._......._...._............_....._.._.................._? ............................................................................................-.......-......................................................................................................................................................... CSISOLAR(USA)CO.,LTD. ._......._.._.».. _. ...................................... ._ .... .... ._ ................._..................................... .......»............................................. 1350 Treat Blvd.Suite 500,Walnut Creek,CA 94598, USA I www.csisolar.com/na I service.ca@csisolar.com CSI SOLAR(USA)CO.,LTD. Jan. 2022 1 All rights reserved I PV Module Product Datasheet v2.9C25_F23J2_NA SOLR23-0659 STREAMLINED PV OM ENPHASE IQ8 Series Microinverters INPUT DATA(DC) IQ8-60-2-US IQBPLUS-72-2-US IQ8M-72-2-US 108A-72-2-US •: .: ,: Commonly used module pairings2 w 235—350 235—440 260—460 295—500 320—540+ 295—500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range v 27—37 29—45 33—45 36—45 38—45 38—45 Operating range v 25—48 25—58 Min/max start voltage v 30/48 30/58 Max input DC voltage v 50 60 Max DC current3[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal(L-L)voltage/range4 v 240/211—264 208/183—250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 IQ8 Series Microinverters Extended frequency range Hz 50—68 Easy to install AC short circuit fault current over 2 4.4 Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- • Lightweight and compact with 3 CyC12S Arms defined microinverters with split-phase power conversion capability to convert DC plug-n-play connectors Max units per 20 A(L-L)branch circuit5 16 13 11 11 10 9 power to AC power efficiently.The brain of the semiconductor-based microinverter • Power Line Communication Total harmonic distortion <5% is our proprietary application-specific integrated circuit(ASIC)which enables the (PLC)between components Overvoltage class AC port III microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times Faster installation with simple AC port backfeed current mA 30 to changing loads and grid events, alleviating constraints on battery sizing for home two-wire cabling Power factor setting 1.0 energy systems. Grid-tied power factor(adjustable) 0.85 leading—0.85 lagging High productivity and reliability Peak efficiency % 97.5 97.6 97.6 97.6 97.6 97.4 • Produce power even when the CEC weighted efficiency % 97 97 97 97.5 97 97 Enphasegrid is down . ..-.� Night-time power consumption mW 60 Z-5 • More than one million cumulative MECHANICAL DATA hours of testing Ambient temperature range -40°C to+60°C(-40°F to+140°F) •Class II double-insulated Relative humidity range 4%to 100%(condensing) Part of the Enphase Energy System,IQ8 Series IQ8 Series Microinverters redefine reliability enclosure Microinverters integrate with the Enphase IQ Battery, standards with more than one million cumulative Optimized for the latest high DC Connector type MC4 • high- Enphase IQ Gateway,and the Enphase App monitoring hours of power-on testing,enabling an industry- powered PV mOdU12S Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") and analysis software. leading limited warranty of up to 25 years. Weight 1.08 kg(2.38 Ibs) Microgrid-forming Cooling Natural convection—no fans •Complies with the latest Approved for wet locations Yes advanced grid support" Pollution degree PD3 CERTIFIED • Remote automatic updates for Enclosure Class II double-insulated,corrosion resistant polymeric enclosure the latest grid requirements Environ.category/UV exposure rating NEMA Type 6/outdoor Connect PV modules quickly and easily to IQ8 Series IQ8 Series Microinverters are UL Listed as •Configurable to support a wide Microinverters using the included Q-DCC-2 adapter PV Rapid Shut Down Equipment and conform with cable with plug-n-play MC4 connectors. various regulations,when installed according to range of grid profiles CA Rule 21 (UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 manufacturer's instructions. • Meets CA Rule 21 (LIL 1741-SA) Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section requirements 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)The IQ8H-208 variant will be operating in grid-tied mode only at 208V AC.(2)No enforced DC/AC ratio.See ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters,and other *Only when installed with IQ System Controller 2,meets the compatibility calculator at https://Iink.enphase.com/module-compatibility(3)Maximum continuous input names are trademarks of Enphase Energy,Inc.Data subject to change. UL 1741.IQ8H-208V operates only in grid-tied mode. DC current is 10.6A(4)Nominal voltage range can be extended beyond nominal if required by the utility.(5) **IQ8 Series Microinverters supports split phase,240V. Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8SE-DS-0001-01-EN-US-2022-03-17 IQ8SE-DS-0001-01-EN-US-2022-03-17 IQ8H-208 supports split phase,208V only. SOLR23-0659 STREAMLINED PV Product data sheet DU221 RB Characteristics SWITCH NOT FUSIBLE GD 240V 30A 2P NEMA3R © 2009 SQUARE D. All rights reserved. Product availability: Stock-Normally stocked in distribution facility Price* : 177.00 USD c 0 U fl_ I � a) N U 4 � U a 0 U 7 a 0 n 0 0 w 0 0 T a3 Main Product or component type Single Throw Safety Switch ca Line Rated Current 30 A n Product certifications UL listed NEMA degree of protection NEMA 3R 0 Disconnector device type Non-fusible disconnect a Device composition None Device mounting Surface cn 0 Number of poles 2 0 Electrical connection Lugs o c Series name General duty c as `o Ordering and shipping details Category 00106-D&DU SW,NEMA3R, 30-200A Discount Schedule DE1A y ns GTIN 00785901490340 m Nbr.of units in pkg. 1 c Package weight(Lbs) 4.8600000000000003 c Returnability Y Country of origin MX 0 4u, c a� Contractual warranty E U Warranty period 18 months 00 0 t a`) E Cc U N Mar 22,2018 1 SOLR23-0659 STREAMLINED PV We support PV systems Formerly Everest Solar Systems • • • Rail Shelf T Allows for easier rail support T Aligns CrossRail T-Bolt channel Self-Tapping Screws T Self-sealing; no sealant required r T Self-tapping; no pilot holes required T 2 screws included per mount Splice Foot X & XL Patent Pending PRODUCT SHEET K2 EverSeal Part Number Description T Pre-installed butyl flexible flashing 4000113 Splice Foot Kit,Mill T 20+ years of proven water sealing technology 4000162 Splice Foot XL Kit,Mill T TAS 100(A) and Wind Driven Rain tested and approved T All-in-one mount and splice foot T K2 EverSeal technology �s. r > T 20+years of proven water sealing technology on asphalt T Self drilling lag screws = less tools needed Splice Foot XL T Optimized for CrossRail systems and components Patent Pending T No L-Foot needed PRODUCT R • . T T-Bolt hardware included SOLR23-0659 STREAMLINED PV RIGHT ANGLE ENGINEERING STRUCTURAL CERTIFICATION REPORT Roof-mounted Solar Panels April 11, 2023 To: Skyline Smart Energy Re: Daniel Olfert 10642 Downey Ave Unit 205 45720 Abronia Trail Downey, CA 90241 Palm Desert, CA 92260 Skyline Smart Energy proposes to install new roof-mounted solar panels at this residence and asked Right Angle Engineering to review the existing structure for suitability. This letter summarizes the methods that were used to survey, evaluate, and certify the existing roof framing and the attachment of the new solar panels to it. STRUCTURAL DESIGN Building Code: California Residential Code 2022 Design Standards: ASCE 7-16 Snow: Ground: pg= 0.0 psf Flat Roof: pf= 0.0 psf Sloped Roof: ps= 0.0 psf Wind: Ultimate Wind Speed = 115.0 mph Exposure = C Seismic: Risk Category = 2 Seismic Design Category=A Site Class = D STRUCTURE Field Technicians from Skyline Smart Energy visited the site and observed the existing structure Array Name Panel Quantity Roof Framing Material Pitch Array 1 15 3.25x5.25 Rafter 24" o.c. TPO membrane 3° ANCHORAGE The solar panel anchorage shall be installed according to the manufacturer's most current installation manual. Anchorage shall be staggered to distribute the load evenly to adjacent roof members. The solar panels should be mounted flush to the roof surface. Array Name Connection Type Fastener Max Anchorage Spacing Array 1 Splice Foot X (2)M5X60 into 3/8" plywood 72" Installation Instructions Solar panels and the equipment shall be installed per the manufacturer's installation specifications. Improper installation will void this certification. Deviations from the approved structural plans (including equipment substitutions) are not allowed without written approval from Right Angle Engineering. Prior to installation, the installer should: • Confirm that the existing structure matches the information provided in the structural survey, the approved installation plans and this certification. • Identify discrepancies between this certification and the approved installation plans. If found, then this certification shall govern. • Identify structural elements that are dangerous (cracked, broken, excessive sag, signs of overstress, rot,decay, fire, water). If found, installation shall cease until those elements are adequately abated and made to comply with the referenced building code. • Verify that both the existing structure and the solar addition has been permitted through the AHJ. 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV STRUCTURAL CERTIFICATION I certify the addition of solar panels on the roof of this structure does not cause the structure to become unsafe or make it generally less compliant with the life-safety requirements of the referenced building code. Based on the evaluation methods described below, for the loads that exist at this site, the existing framing will safely support the new solar panels if they are installed and attached correctly. Electrical design is not included in this certification. Array Name Certification Method Retrofits Array 1 Stress analysis California Residential code 324.4.1 None required Regards, Q�pFESS/ONgI C 56136 rn J .Z7 S�EXP. 12/31/24 4TF C I V O \� F p� 04/11/2023 Robert D. Smythe, P.E. Right Angle Engineering 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV Job Details Roof Snow Load -ASCE 7-16 Design Criteria Ground Snow Load (p ) Section 7.2 9 0.0 psf Design Wind Speed 115.Omph Exposure Factor(Ce) 0.9 Exposure Category C Table 7.3-1 Thermal Factor(Cd 1.1 Risk Category 2 Table 7.3-2 Importance Factor(/S) 1 Mean Roof Height 30 ft Table 1.5-2 Flat Roof Snow Load (pf) 0.0 psf Roof Type Gable Roof Equation 7.3-1 Slippery Surface Slope Factor (CS) 1 Building Type Enclosed Figure 7.4-1 Non-Slippery Surface Slope Factor(C ) 1 Figure 7.4-1 Roof Live Load Roof Snow Load 0.0 p sf Existing Roof Live Load 20 psf Equation 7.4-1 ASCE 7-16 Table 4.3-1 Reduced Snow Load (Slippery Surface) 0.0 psf Equation 7.4-1 1 Roof Dead Load TPO membrane 1.5 psf No Drywall 0.0 psf 5/8" Plywood Sheathing 2.0 psf Solar Panel Array 2.89 psf Roof Framing 3.14 psf Dead Load Without Panels 7.84 psf Insulation 1.2 psf Roof Dead Load is taken from the worst case scenario dead load from all arrays of the job in order to provide a more conservative evaluation. 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV Array 1 0.04 kf�96 0.028 kip 028 kip 0.028 kip 01 0.016 k6 kiP/ft x — — 2 'i Array Details Beam Stresses Roof Pitch 3° Beam Span 16.0' Panel Portrait Orientation Panel Quantity 15 Spacing 24.0" #of Panels on 3 Rafter Roof Framing 3.25x5.25 Panel Distance „ Panel Area 263.74 ft2 Type Rafter From Eave 0.0 DF No.2 Wind Calculations -ASCE 7-16 Roof Attachments: Splice Foot X(2)M5X60 GC Zone 2 2 3 Shear Capacity 700.0 Ibs Figure 30.3-(2A-58) K2 Testing KZ 0.9 Pullout Capacity 700.0 Ibs Table 26.10-1 K2 Testing Kht 1 Lag Screw Embedment 2.0" Equation 26.8-1 Pullout Tributary Area 31.2 ft2 Kd 0.85 Shear Tributary Area 4630.1 ft2 Table 26.6-1 K Max Connection Spacing 72" Table 26.9-1 0 99 Wind Speed (Vuit) 115.0 mph Local Design Criteria Velocity Pressure 25.71 psf Equation 26.10-1 Design Pressure -40.25 psf Equation 29.4-7 yE 1.5 ya=0.45 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV Design Ratio Member ID P M. VY C SR D Status 1 0.001 0.256 0.067 0.257 0.043 0.011 Pass 2 0.0 0.013 0.019 0.013 0.043 0.014 Pass Member Design Capacity(LRFD) Member ID F b(ksi) F t(ksi) F v(ksi) F (ksi) F cp(ksi) E(ksi) EmlII(ksi) 1 2.324 1.292 0.311 2.566 0.939 1600.0 1041.216 2 2.324 1.292 0.311 2.566 0.939 1600.0 1041.216 Node Coordinates I X Coordinate Y Coordinate 1 0.000 0.000 2 16.000 0.839 3 -1.500 -0.079 Members ID Node A Section Node A Fixity Node B Fixity Length 1 1 2 1 FFFFFF FFFFFF 16.022 2 3 1 1 FFFFFF FFFFFF 1.502 Supports In Node ID Restraint Code 1 2 RFFRRR 2 1 FFFFFR Materials ID Young's Modulus Poisson's Ratio 1 1 NDS-Table 4A-DOUGLAS FIR-LARCH-No.2-2in&wider 1600.000 33.308 0.400 Sections ID Name Depth Width Shear Area Z Shear Area Y Torsion Radius 1 3.25 x 5.25 5.750 3.250 15.573 15.573 2.923 ID Centroid Y Centroid Z Area Y-Axis Mot Z-Axis Mot Torsion Constant 1 1.625 2.875 18.688 16.449 51.488 42.538 Point Loads ID Load Group Member Position% Y Magnitude 1 Solar-Snow 2 66.667% 0.000 2 Solar 2 66.667% -0.028 3 Solar-Snow 1 30.641% 0.000 4 Solar 1 30.641% -0.028 5 Solar-Snow 1 64.407% 0.000 6 Solar 1 64.407% -0.028 Member Distributed Loads ID Load Group Start Position End Position Member Y Magnitude 1 Dead Load 0.000% 100.000% 2 -0.016 2 Dead Load 0.000% 100.000% 1 -0.016 3 Roof Live Load 91.923% 100.000% 1 -0.040 4 Snow Load 91.923% 100.000% 1 0.000 Load Combinations Roof Live Load ID Dead Load Factor Snow Load Factor Solar Factor Solar-Snow Factor Factor 1 1.1AD 1.4 0 1.4 0 0 2 3.1.2D+1.6Lr 1.2 0 1.2 0 1.6 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV 3 3.1.2D+1.6S 1.2 1.6 1.2 1.6 0 4 4.service loads A 0 1 0 1 0 5 5.service loads B 0 0 0 0 1 Internal Member Forces and Moments Shear Force Y Shear Force Z Bending Moment Y Bending Moment Z Member Axial Force(Min/Max) Torsion(Min/Max) (Min/Max) (Min/Max) (Min/Max) (Min/Max) 1 -0.014/0.010 -0.259/0.191 0.000/0.000 0.000/0.000 0.000/0.000 -0.044/0.889 2 -0.004/0.000 -0.072/0.000 0.000/0.000 0.000/0.000 0.000/0.000 -0.044/0.000 Member Displacement Span Check Member Length Max Relative Displacement Span Method 1 1 16.022 0.011 L/16908 2 1.502 0.003 U6426 Member Stresses Axial Stress Torsion Stress Shear Stress Y Shear Stress Z Top Bending Moment Bottom Bending Member (Min/Max) (Min/Max) (Min/Max) (Min/Max) Z(Min/Max) Moment Z(Min/Max) 1 -0.001/0.001 0.000/0.000 -0.021/0.015 -0.000/-0.000 -0.030/0.596 -0.596/0.030 2 -0.000/0.000 0.000/0.000 -0.006/0.000 -0.000/-0.000 -0.030/0.000 0.000/0.030 581 E Technology Ave, C1500 Orem, UT 84097 925-787-3067 www.rightangleeng.com Page of SOLR23-0659 STREAMLINED PV PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1. Submittal Requirements - Completed permit application form. This permit application form can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits - Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpaI mdesert.org/ou r-city/depa rtments/pa Im-desert-permit-center/building-safety-perm its/solar- information - Provide a standardized or simplified photovoltaic plan that demonstrates: ✓ Title or Cover Sheet noting the 2019 California Electrical Code. ✓ Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. ✓ A simplified Electrical Plan: 1. Locations of main service or utility disconnect 2. Total number of modules, number of modules per string and the total number of strings 3. Make and model of inverter(s) and/or combiner box if used 4. Single-line diagram of system 5. Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit - Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1. The type of roof covering and the number of roof coverings installed 2. Type of roof framing, size of members and spacing 3. Weight of panels, support locations and method of attachment 4. Framing plan and details for any work necessary to strengthen the existing roof structure 5. Site-specific structural calculations 6. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system Updated June 2021 SOLR23-0659 STREAMLINED PV Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements X The photovoltaic system size is 30kW AC CEC rating or less. The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. X The photovoltaic system is utility interactive. X Permit application and declaration is completed and attached. 2. Planning Department Requirements X Existing MPU Amps Doubling,e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. X Maximum height of"tilted"panels shall not exceed eighteen (18)inches. X All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. X Modules shall be flush with one another and gaps between panels shall be minimized. X Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements X No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter X For central inverter systems: No more than two inverters are utilized. X The PV system is connected to the load side of the utility distribution equipment. A Solar PV Standard Plan and supporting documentation is completed and attached. 4. Structural Requirements A completed Structural Criteria and supporting documentation is attached Wind and Seismic(if required). 5. Fire Safety Requirements X Clear access pathways provided. X Fire classification photovoltaic system is provided. X All required marking and labels are provided. A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature: �� G�eurt.� Date:05/04/2023 Project Address:45720 Abronia Trail,Palm D ert.Califo nia 92260 Updated June 2021 SOLR23-0659 STREAMLINED PV -�-� CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems-30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. The definition of"qualifying residential rooftop solar systems" is all of the following: ■ A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. ■ A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ■ -A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) ■ A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. ■ Electrical main panel upgrade included with solar plan (Review required if doubling in size) 1. Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: • Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. • Fire Marshall approval is not required for small residential rooftop systems at this time. • Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2. Building Permit Application Form A permit application can be obtained in person or downloaded from the Department's website at: www.cityofpalmdesert.org 3. Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria's, standard plan review timetables apply. Please consult a licensed designed professional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 1 of 4 SOLR23-0659 STREAMLINED PV 4. Project Submittal All projects can be submitted in person at: City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert,California 92260 5. Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7)to ten (10)working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6. Plan Review and Permit Fees Plan Review Fee is $203. Permit Fees are approximately$266 depending on archiving materials. 7. Minimum Plan Set Requirements • Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11"X17" to Maximum of 24"X36"). Include a separate Site and Roof Layout Plan for the Riverside County Assessor's Office. • Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. • Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal's Office. You can find these clearances at: http://osfm.fire.ca.qov/traininq/pdf/photovoltaics/solarphotovoltaicquideline.pdf Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. • Product Specifications and Literature Provide all manufacturers' specifications on all inverters, solar panels, combiner and disconnect boxes and solar panel anchorage system to be used. • Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City's website. All submittals must be signed by a C-10 (Electrical Contractor) or C-46 (Solar Contractor)or licensed design professional. Electrical Plans should include the following: • Location of main service or utility disconnect. • Total number of modules, number of modules per string and the total number of strings. • Make and model of inverter(s)and/or combiner box if used. • Single line diagram of system. • Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 2 of 4 SOLR23-0659 STREAMLINED PV • If batteries are to be installed, include them in the diagram and show their locations and venting. • Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. • Labeling of equipment as required by CEC, Sections 690 and 705. • Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department's website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: • The type of roof covering and the number of roof coverings installed. • Type of roof framing, size of members and spacing. • Weight of panels, support locations and method of attachment. • Framing plan and details for any work necessary to strengthen the existing roof structure • Site-specific structural calculations. • Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system. • As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar Structural Technical Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four(24)hours in advance at: (760)776-6420 Monday through Friday(8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection.The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: • Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. • Array conductors and components are installed in a neat and workman-like manner. • PV array is properly grounded. • Electrical boxes are accessible and connections are suitable for environment. • Array is fastened and sealed according to attachment detail. • Conductor's ratings and sizes match plans. • Appropriate signs are properly constructed,installed and displayed. • Smoke detector and carbon monoxide alarms are required at final inspection. Page 3 of 4 SOLR23-0659 STREAMLINED PV QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: • Permit applicants can save time and money by following these tips. • Take time to review permit requirements of the local jurisdiction. • Permitting rules and processes differ among different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. • Contact the local electric utility early in the permitting process(solar PV installations). • Local electric utilities have a completely separate approval process from the local jurisdiction's permitting process.Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. • Make sure that the solar installation that is built matches the submitted plans. • The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections. Page 4 of 4