Loading...
HomeMy WebLinkAboutApp & Checklist PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1. Submittal Requirements - Completed permit application form. This permit application form can be downloaded at: https://www.cityofpaI mdesert.org/ou r-city/depa rtments/palm-desert-permit-center/building-safety-permits - Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our-city/depa rtments/palm-desert-permit-center/building-safety-perm its/so lar- information - Provide a standardized or simplified photovoltaic plan that demonstrates: ✓ Title or Cover Sheet noting the 2019 California Electrical Code. ✓ Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. ✓ A simplified Electrical Plan: 1. Locations of main service or utility disconnect 2. Total number of modules, number of modules per string and the total number of strings 3. Make and model of inverter(s) and/or combiner box if used 4. Single-line diagram of system 5. Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit - Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1. The type of roof covering and the number of roof coverings installed 2. Type of roof framing, size of members and spacing 3. Weight of panels, support locations and method of attachment 4. Framing plan and details for any work necessary to strengthen the existing roof structure 5. Site-specific structural calculations 6. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system Updated June 2021 Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements X The photovoltaic system size is 30kW AC CEC rating or less. The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. X The photovoltaic system is utility interactive. X Permit application and declaration is completed and attached. 2. Planning Department Requirements X Existing MPU Amps Doubling,e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. X Maximum height of"tilted"panels shall not exceed eighteen (18)inches. X All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. X Modules shall be flush with one another and gaps between panels shall be minimized. X Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements X No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter X For central inverter systems: No more than two inverters are utilized. X The PV system is connected to the load side of the utility distribution equipment. A Solar PV Standard Plan and supporting documentation is completed and attached. 4. Structural Requirements A completed Structural Criteria and supporting documentation is attached Wind and Seismic(if required). 5. Fire Safety Requirements X Clear access pathways provided. X Fire classification photovoltaic system is provided. X All required marking and labels are provided. A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature: �� G�eurt.� Date:05/04/2023 Project Address:45720 Abronia Trail,Palm D ert.Califo nia 92260 Updated June 2021 CITY OF PALM DESERT DEPARTMENT OF DEVELOPMENT SERVICES Building &Safety Division •73510 Fred Waring Drive, Palm Desert, California 92260 Phone(760) 776-6435• Fax(760)776-6392• permitcenter@cityofpaImdesert.org BUILDING PERMIT APPLICATION Project Address: 45720 Abronia Trail, Palm Desert, California 92260 Total Value of Work$: 8117.25 Project Description (Describe the Specific Nature of Approval Requested): REROOF CRRC: HVAC SEER: WATER HEATER ENERGY: OTHER:To install a 5.925kW PV array roof mounted 15 panel system Contractor Business Name: Skyline Smart Energy Phone: 8552561507 Mailing Address: 10642 Downey Ave Unit 205 Fax: City: Downey State: CA Zip: 90241 Email: capermitting@skylinesmartenergy.com License No. 1028741 Property Owner Name: Daniel Olfert Phone: 8552561507 Mailing Address: 45720 Abronia Trail Fax: City: Palm Desert, State: CA Zip: 92260 Email: janellenixoncasting@gmail.com Architect/Designer Name: Phone: Mailing Address: Fax: City: State: Zip: Email: License No. Engineer Name: Phone: Mailing Address: Fax: City: State: Zip: Email: License No. Applicant Name: Phone: Mailing Address: Fax: City: State: Zip: Email: Applicant/Representative Signature: By signing this application, I certify that the information provided is accurate. I understand that the City might not approve what I am applying for and/or might require conditions of approval. Print Name: Amanda Young Signature: .4t-rt.G72� G,�eu41q_ Date: 05/04/2023 *THE REVERSE SIDE MUST BE COMPLETED FOR RESIDENTIAL REMODELS AND TENANT IMPROVEMENTS CITY OF PALM DESERT BUILDING PERMIT APPLICATION Structure Information: Roof Type (circle one): Occupancy Group (circle one): Shingles❑ Built Up❑ Concrete❑ Foam❑ Metal❑ R2❑ R3❑ A.2❑ U❑ R3-U❑ A2❑ Tile type:Comp Shingle B❑ M❑ MIXED Construction Type (circle one): Fire Sprinklers: YES ❑ NO 0 IA El IB❑IIA❑ IIB❑ IIIA❑ IIIB❑ IV HT❑ VA❑VB❑ All applicable information must be completed below Commercial Remodel Sq. Ft. Addition Sq. Ft. Residential Remodel Sq. Ft. Addition Sq. Ft. Assembly Area Accessory Cover Office Garage Area Retail Living Area Warehouse/Storage No. of Bedrooms Total Building No. of Baths Accessory Cover No. of Dwelling Units Multi-family, some Residential, and Commercial Projects plans must be submitted to the Fire Department. Fire requires one (1) complete set of plans. Please call Fire at(760) 346-1870 for further information. THE FOLLOWING ITEMS ARE BEING SUBMITTED: (Please check all that you have provided) ❑2 COMPLETE SETS OF PLANS, including the following supporting documents if applicable: ❑Structural Calculations ❑Title 24—Energy Calculations ❑Truss Calculations ❑Soils report ❑CF-R Forms ❑Manufacturer's Specifications ❑ Electrical El Mechanical ❑Plumbing ❑HOA Letter of Approval(required by Planning Dept.) ❑Assessor: Please submit the following for new construction, square footage addition to an existing structure, photovoltaic and swimming pool permits ✓ Commercial projects-1 title page, 1 site plan, 1 elevation, 1 floor plan ✓ Residential projects-1 site plan, 1 dimensioned floor plan,at least 1 elevation plan FEES Plan Check Hourly: $168.00 (Plan Review Fees may be adjusted after Plan Review) Inspection Hourly: $159.00 Archive Fee: 8.5xl 1 up to 11x17 $.07 per page Plans $.80 per page Do not base your permit fees off of the fees stated above. For Reference Only. OFFICE USE ONLY Permit No. Plan Location: APN: Received By: 2