Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOLR23-0551 APPROVED PLANS.pdf
TPMS34.1662!TUSFBNMJOFE!QW 531.551X!Sftjefoujbm!BD!Npevmf ®® SunPower Maxeon Technology ® Built specifically for use with the SunPower Equinox system, the only fully integrated solar solution designed, engineered, and warranted by one company. Highest Power AC Density Available. The patented, solid-copper foundation Maxeon Gen 6 cell is over 5% larger than prior generations, delivering the highest efficiency * AC solar panel available. 5% larger 6.54 in 6.37 in \[166 mm\] \[161.7 mm\] Part of the SunPower ® Equinox Solar System Highest Lifetime Energy and Savings •Compatible with TM mySunPower monitoring Designed to deliver 60% more energy over 25 years in 1 real-world conditions like partial shade and high temperatures. • Seamless aesthetics 261& 251& 241& 231& Vq!up 221& 71& N.Tfsjft Npsf 211& Mjgfujnf :1& Fofshz 91& Dpowfoujpobm!Qbofm 81& 71& 1621263136 Zfbst!pg!Pqfsbujpo Factory-integrated Microinverter •Highest-power integrated Best Reliability, Best Warranty AC module in solar With more than 42.6 million and 15 GW modules deployed around •Engineered and calibrated the world, SunPower technology is proven to last. That’s why we by SunPower for SunPower stand behind our module and microinverter with the industry’s AC modules best 25-year Combined Power and Product Warranty. Datasheet TPMS34.1662!TUSFBNMJOFE!QW ® | | | | M-Series: M440 M435M430M425M420 SunPower Residential AC AC Electrical Data Module Inverter Model: Type H (Enphase IQ7HS)@240 VAC@208 VAC Max. Continuous Output Power (VA)384369 2 Nom. (L–L) Voltage/Range (V)240 / 211–264208 / 183–229 Max. Continuous Output Current (Arms)1.601.77 3 Max. Units per 20 A (L–L) Branch Circuit109 CEC Weighted Efficiency97.0%96.5% Nom. Frequency60 Hz Extended Frequency Range47–68 Hz AC Short Circuit Fault Current Over 3 Cycles4.82 A rms Overvoltage Class AC PortIII AC Port Backfeed Current18 mA Power Factor Setting1.0 Power Factor (adjustable)0.85 (inductive) / 0.85 (capacitive) DC Power DataWarranties, Certifications, and Compliance SPR-M440-SPR-M435-SPR-M430-SPR-M425-SPR-M420- • 25-year limited power warranty Warranties H-ACH-ACH-ACH-ACH-AC • 25-year limited product warranty 5 Nom. Power (Pnom) W440435430425420 • UL 1741 / IEEE-1547 • UL 1741 AC Module (Type 2 fire rated) Power Tolerance+5/-0% • UL 62109-1 / IEC 62109-2 • FCC Part 15 Class B Module Efficiency22.8%22.5%22.3%22.0%21.7% • ICES-0003 Class B Temp. Coef. (Power)-0.29%/° C • CAN/CSA-C22.2 NO. 107.1-01 4 • CA Rule 21 (UL 1741 SA) Shade ToleranceIntegrated module-level max. power point tracking (includes Volt/Var and Reactive Power Priority) 6 Certifications • UL Listed PV Rapid Shutdown Equipment Tested Operating Conditions and ComplianceEnables installation in accordance with: Operating Temp.-40° F to +185° F (-40° C to +85° C) • NEC 690.6 (AC module) Max. Ambient Temp.122° F (50° C) • NEC 690.12 Rapid Shutdown (inside and outside the array) Wind: 125 psf, 6000 Pa, 611 kg/m² back 7 Max. Test Load • NEC 690.15 AC Connectors, 690.33(A)–(E)(1) Snow: 187 psf, 9000 Pa, 917 kg/m² front Wind: 75 psf, 3600 Pa, 367 kg/m² back When used with AC module Q Cables and accessories Max. Design Load Snow: 125 psf, 6000 Pa, 611 kg/m² front 6 (UL 6703 and UL 2238) : • Rated for load break disconnect Impact Resistance1 inch (25 mm) diameter hail at 52 mph (23 m/s) PID Test1000 V: IEC 62804 Mechanical Data Solar Cells66 Maxeon Gen 6 Packaging Configuration Front GlassHigh-transmission tempered glass with anti-reflective coating Modules per pallet25 Environmental RatingOutdoor rated Packaging box dimensions1915 * 1072 * 1220 mm FrameClass 1 black anodized (highest AAMA rating) Pallet gross weight590 kg Weight48 lbs (21.8 kg) Pallets per container32 Recommended Max. 1.3 in. (33 mm) Net weight per container18,880 kg Module Spacing * Based on datasheet review of websites of top 20 manufacturers per Wood Mackenzie US PV Leaderboard Q3 2021. 1 Maxeon 435 W, 22.5% efficient, compared to a Conventional Panel on same-sized arrays (260 W, 16% efficient, approx. 1.6 m²), 7.9% more energy per watt (based on PVSyst pan files for avg. US climate), 0.5%/yr slower degradation rate (Jordan, et. al. “Robust PV Degradation Methodology and Application.”PVSC 2018). 2 Voltage range can be extended beyond nominal if required by the utility. 3 Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. 4 Factory set to IEEE 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. 5 Standard Test Conditions (1000 W/m² irradiance, AM 1.5, 25°C). All DC voltage is fully contained within the module. 6 UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors; when installed according to manufacturer’s instructions. 7 Please read the safety and installation instructions for more information regarding load ratings and mounting configurations. Please read the safety and installation instructions for details. See www.sunpower.com/company for more reference information. Specifications included in this datasheet are subject to change without notice. ©2021 SunPower Corporation. All rights reserved. SUNPOWER, the SUNPOWER logo, SUNPOWER EQUINOX 539973 Rev B / LTR_EN and MYSUNPOWER are trademarks or registered trademarks of SunPower Corporation in the U.S. MAXEON is a registered trademark of Maxeon Solar Technologies, Ltd. For more information visit www.maxeon.com/legal.Publication Date: October 2021 | 1-800-SUNPOWER sunpower.com TPMS34.1662!TUSFBNMJOFE!QW SINGLE-FAMILY DWELLING - LOAD CALCULATION NEC 2020 Edition: Following Example Annex D2(b) Customer Name:Jill Hamilton, 40931 Avenida Solana, Palm Desert, CA 92260 1.OTHER LOADS: a.General lighting & receptacle loads; 2,465sq.ft. x 3 VA =7,395VA b.Small appliance loads; 1,500VAx2circuits =3,000VA c.Laundry =1,500VA d.Special loads: Dishwashers=1,440VA Disposals=1,224VA Refrigerator=1,440VA Water heater ( if Gas =0)=0VA Oven- 220.55=9,600VA Cook Top=0VA Pool=5,707VA Garage & outside plugs=1,440VA Car charger=0VA Clothes Dryer=0VA Microwave=1,800VA (Subtotal)34,546 VA First 10,000VA x 100% =10,000VA Remaining24,546VA x 40%9,818VA (Total #1 = Net Load)19,818 VA 2.HEATING OR A/C LOAD: Heating units (3 or less) =VA x 65%0VA Heating units (4 or more) =VA x 40%VA A/C unit # 10823 =6,775VA x 100%6,775VA A/C unit # 07587 =5,615VA x 100%5,615VA (Total #2 = Net Load)12,390 VA Net Load(Total #1 + Total #2 = Subtotal Net Load)32,208 VA I= SERVICE: SERVICE:I = 32,208VA=134.2A 240V Service amperes required134.2A Service amperes provided200A SLD 4.3.23 TPMS34.1662!TUSFBNMJOFE!QW Qbhf!2!pg!3 TPMS34.1662!TUSFBNMJOFE!QW EJHJUBMMZ!TJHOFE ESS F I O O N R A P L ET H N D N E Z E E K A N R C L H G E U E T I A R N S P I E E G R E R No. S3878 Exp. 3-31-25 A S S I TL T RA N UR A CU T TR E O F OI FL A C Qbhf!3!pg!3 TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW p g V K zt S s h width bldg TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW p g V K zt S s h width bldg TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW UJMF!SFQMBDF!GPS!SBJMFE!SFTJEFOUJBM!GMBU-!T!BOE!X!UJMF!SPPGT MjhiuTqffe!Ujmf!Sfqmbdf!tztufn!gps!sbjmt T!ujmf!jotubmmfeGmbu!ujmf!jotubmmfeX!ujmf!jotubmmfe jotubmmbujpo!ujnft!cz!fmjnjobujoh!uif!offe!up!dvu!sppg!ujmft/!Bmtp-!uif!sfqmbdfe!sppg!! tfbnmfttmz!sfqmbdf!Gmbu-!T-!ps!X!ujmft-!boe!nbjoubjo!uif!xbufsqsppg!joufhsjuz!pg!uif!sppg/! !Fmjnjobuft!dvuujoh!pg!sppg!ujmft !Sfqmbdft!Gmbu-!T-!ps!X!tibqfe!ujmft !Vojwfstbm!po!cbuufofe!ps!! cbuufo.mftt!sppgt !Qspwjeft!tqbsf!ujmft!up!sfqmbdf!! csplfo!ujmft !2!ubmm!dpof!xjui!Xbufsujhiu!cppu! Vtf!xjui!boz!tuboebse!M.gffu!gps! usbejujpobm!sbjm!npvoujoh!tztufnt/!! Tmfet!boe!mbh!tdsfxt!bsf!tvqqmjfe!jo! qbdlbhft!pg!7/ Qfhbtvt!Tpmbs!Jod/ 211!Xftu!Pijp!Bwf boe!X!tibqft-!boe!bsf!tvqqmjfe!xjui! Sjdinpoe-!DB!!:5915 Qptut!boe!FQEN!Cpput!jo!qbdlbhft!pg!7/ 519/749/:766 xxx/qfhbtvttpmbs/dpn TPMS34.1662!TUSFBNMJOFE!QW UJMF!SFQMBDF!GPS!SBJMFE!SFTJEFOUJBM!GMBU-!T!BOE!X!UJMF!SPPGT 23 Tmfe!jotubmmfeSppg!ujmf!sf.jotubmmfe!pwfs!Tmfe 4 5 Ujmf!Sfqmbdf!Gmbtijoh!jotubmmbujpoNpvoujoh!Qptu!jotubmmbujpo Ujmf!Sfqmbdf!gps!Sbjmt 6 Pof.qjfdf!Gpsnfe!Nfubm!jo!Gmbu-!! Gmbtijoh!Dpotusvdujpo T-!X!Tibqft Gjut!nptu!Gmbu-!T-!boe!X.tibqfe! Ujmf!Dpnqbujcjmjuz Sppg!Ujmft Sbjm!DpnqbujcjmjuzNptu!Tuboebse!M.Gffu Cbuufo!0!Cbuufo.mftt!Gvmmz!Bekvtubcmf!xjuipvu!! BekvtunfouBeejujpobm!Ibsexbsf 2#!Fmfwbufe!Dpof!xjui!FQEN!Cppu Fbtu!0!Xftu!Bekvtunfou!,0.!8#-!25#!Upubm Opsui!0!Tpvui!Bekvtunfou!,0.!203#!Bgufs!Mbht!Jotubmmfe Cfgpsf!ps!Bgufs!Gmbtijoh!Jotubmmbujpo-! Qptu!Jotubmmbujpo Tjnqmf!Uxjtu.Mpdl Bmvnjovn!x0!Qsf.Jotubmmfe!! Qptu!Dpotusvdujpo TT!U.cpmu Gmbtijoh!GjojtiEbsl!Cspo{f Qfhbtvt!Tpmbs!Jod/ M.Gppu!jotubmmfe Tmfe!Jotubmmbujpo!Ibsexbsf)3*!6027#y5.203#!TT!Mbh!Tdsfxt 211!Xftu!Pijp!Bwf VM!TUE!3814-!BTDF!8.16!'!8.21 Sjdinpoe-!DB!!:5915 Xfjhiu7/4mct!0!3:11hs 519/749/:766 Qbufout!Qfoejoh/!Bmm!sjhiut!sftfswfe/ xxx/qfhbtvttpmbs/dpn ª!3127!Qfhbtvt!Tpmbs!Jod/ TPMS34.1662!TUSFBNMJOFE!QW TPMS34.1662!TUSFBNMJOFE!QW ® ®® ® ® ® ® Catalog Item #L x W x HHoleHardwareTorque ® TPMS34.1662!TUSFBNMJOFE!QW Catalog Item #L x W x HHoleHardwareTorque TPMS34.1662!TUSFBNMJOFE!QW Mpbedfoufst!boe!Djsdvju!Csfblfst 2/3 Uzqf!CS!Mpbedfoufst!boe!Djsdvju!Csfblfst Tjohmf.Qibtf Nbjo!Mvh!Mpbedfoufst 2 Tjohmf.Qibtf!Uisff.Xjsf 2310351!Wbd Jotvmbufe0Cpoebcmf!Tqmju!Ofvusbm 2 Nbyjnvn!Ovncfs Xjsf!Tj{f!Sbohf 2.Jodi!)36/5!nn* Nbjo!FodmptvsfCpyDv0Bm!71±D!ps!86±D!Mpbedfoufs 2 Bnqfsf!SbujohTqbdftDjsdvjutUzqfUsjn!UzqfTj{fgps!Nbjo!MvhtDbubmph!Ovncfs 01 8135JoeppsTvsgbdf!)op!epps*6 CS35M81TQ! $9$3 TvsgbdfPvuepps 2 12 35JoeppsTvsgbdf!)op!epps*6 CS35M81THQ! 013 35Pvuepps 6S CS35M81SQ! 2 01 35JoeppsGmvti!)op!epps*6 CS35M81GQ! 14 35JoeppsGmvti!)op!epps*6 CS35M81GHQ! 2 01 23635JoeppsTvsgbdf!)op!epps*7 CS35M236TQ! $25201 013 35Pvuepps 7S CS35M236SQ! GmvtiPvuepps 2 167 35Pvuepps 7S CS35M236STFQ! 156 35Pvuepps 7S CS35M236STF3Q! 2 01 35JoeppsGmvti!)op!epps*7 CS35M236GQ! 08 2 59JoeppsTvsgbdf!)op!epps*8 CS59M236TQ! $25201 28 59JoeppsTvsgbdf!)op!epps*8 CS59M236THQ! 2 038 59Pvuepps 8S CS59M236SQ! Tvsgbdf!)Op!Epps* 08 59JoeppsGmvti!)op!epps*8 CS59M236GQ! 2 08 59JoeppsGmvti!)xjui!epps*8 CS59M236GEQ! 28 59JoeppsGmvti!)op!epps*8 CS59M236GHQ! 2 0 723JoeppsTvsgbdf!)op!epps*8 CS723M236TQ! $25$2 723JoeppsTvsgbdf!)op!epps*8 CS723M236THQ! 2 0 723JoeppsTvsgbdf!)xjui!epps*8 CS723M236TEQ! Gmvti!)Op!Epps* 723JoeppsTvsgbdf!)xjui!epps*8 CS723M236TEHQ! 2 03 723Pvuepps 8S CS723M236SQ! 0 723JoeppsGmvti!)op!epps*8 CS723M236GQ! 2 4 723JoeppsGmvti!)op!epps*8 CS723M236GHQ! 2 723JoeppsGmvti!)xjui!epps*8 CS723M236GEQ! Pvuepps 4 723JoeppsGmvti!)xjui!epps*8 CS723M236GEHQ! 2 0 927JoeppsTvsgbdf!)op!epps*8 CS927M236TQ! $25$2 927JoeppsTvsgbdf!)op!epps*8 CS927M236THQ! 2 0 927JoeppsTvsgbdf!)xjui!epps*8 CS927M236TEQ! 927JoeppsTvsgbdf!)xjui!epps*8 CS927M236TEHQ! 2 03 927Pvuepps 8S CS927M236SQ! 0 927JoeppsGmvti!)op!epps*8 CS927M236GQ! 2 4 927JoeppsGmvti!)op!epps*8 CS927M236GHQ! 0 927JoeppsGmvti!)xjui!epps*8 CS927M236GEQ! 2 4 927JoeppsGmvti!)xjui!epps*8 CS927M236GEHQ! 2 Opuft 0 Hspvoe!cbs!ljut!qsjdfe!tfqbsbufmz/!Tff!Qbhf!W2.U2.71/ 2 !Gps!305!djsdvju!mpbedfoufst-!vtf!HCL6!ps!HCL631!hspvoe!cbs/ !Gps!509-!7023!boe!9027!djsdvju!mpbedfoufst-!vtf!HCL21!hspvoe!cbs/ !Hspvoe!cbst!npvou!up!uif!mfgu!tjef!xbmm!pg!uif!fodmptvsf!gps!uif!509-!7023!boe!9027!djsdvju!mpbedfoufst/ 2 1 Tvjubcmf!gps!vtf!bt!tfswjdf!frvjqnfou!xifo!opu!npsf!uibo!uxp!tfswjdf!ejtdpoofdujoh!nbjot!bsf!qspwjefe!ps!xifo!opu!vtfe!bt!b!mjhiujoh!boe!bqqmjbodf!qbofmcpbse! )tff!Bsujdmf!519/45!pg!uif!OFD*/ 2 Hspvoe!cbs!HCL6!jt!jotubmmfe/ 2 3 Sbjoqsppg!qbofmt!bsf!gvsojtife!xjui!ivc!dmptvsf!qmbuft/!Gps!sbjoqsppg!ivct-!sfgfs!up!Qbhf!W2.U2.71/ 4 DTB!boe!VM!bqqspwfe/ 2 5 Ofvusbm0hspvoe!ipmft!)7*!$257!boe!)4*!$25301!BXH!Dv0Bm/ 6 Gps!vtf!bt!tfswjdf!fousbodf!bqqmjdbujpot!pomz/ 7 2 Ofvusbm0hspvoe!ipmft!)7*!$257!boe!)4*!$25201!BXH!Dv0Bm/ 8 Tvjubcmf!gps!vtf!bt!tfswjdf!frvjqnfou!xifo!opu!npsf!uibo!uxp!tfswjdf!ejtdpoofdujoh!nbjot!bsf!qspwjefe!ps!xifo!opu!npsf!uibo!tjy!tfswjdf!ejtdpoofdujoh!nbjot!bsf!qspwjefe!boe! xifo!opu!vtfe!bt!b!mjhiujoh!boe!bqqmjbodf!qbofmcpbse!)tff!Bsujdmf!519/45!pg!uif!OFD*/ 2 Tvjubcmf!gps!vtf!bt!tfswjdf!frvjqnfou!xifo!b!nbjo!csfblfs!jt!vtfe!ps!xifo!opu!npsf!uibo!tjy!tfswjdf!ejtdpoofdujoh!nbjot!bsf!qspwjefe!boe!xifo!opu!vtfe! bt!b!mjhiujoh!boe!bqqmjbodf!qbofmcpbse!)tff!Bsujdmf!519/45!pg!uif!OFD*/ 2 Hspvoe!cbs!HCL21!jt!jotubmmfe/ Hspvoe!cbs!HCL25!jt!jotubmmfe/ Cpy!tj{ft!Qbhft!W2.U2.72!uispvhi!W2.U2.75/ 2 Wpmvnf!2 Sftjefoujbm!boe!Mjhiu!Dpnnfsdjbm DB19211113F Kbovbsz!3124xxx/fbupo/dpn W2.U2.58 TPMS34.1662!TUSFBNMJOFE!QW Mpbedfoufst!boe!Djsdvju!Csfblfst 2/3 Uzqf!CS!Mpbedfoufst!boe!Djsdvju!Csfblfst Ejnfotjpot Bqqspyjnbuf!Ejnfotjpot!jo!Jodift!)nn* Sftjefoujbm0Dpnnfsdjbm0Ofx!Zpsl!Djuz!Mpbedfoufst-!Voju!Fodmptvsft Cpy!Tj{ft Opuf;!Cpy!tj{ft!ep!opu!jodmvef!dpwfst0gspout/ Sftjefoujbm!Mpbedfoufst OFNB!Uzqf!2!JoeppsDpnnfsdjbm!Mpbedfoufst OFNB!Uzqf!2!Joepps Cpy!Tj{fIfjhiuXjeuiEfquiCpy!Tj{fIfjhiuXjeuiEfqui B226/11!)492/1*22/36!)396/9*4/86!):6/4*2:55/11!)2228/7*27/27!)521/5*7/36!)269/9* C227/86!)536/6*25/42!)474/6*4/99!):9/5*3155/11!)2228/7*27/27!)521/5*7/36!)269/9* C329/86!)587/4*25/42!)474/6*4/99!):9/5*3365/11!)2482/7*27/33!)523/1*7/42!)271/4* D232/11!)644/5*25/42!)474/6*4/99!):9/5*3577/61!)279:/2*27/33!)523/1*7/42!)271/4* D334/11!)695/3*25/42!)474/6*4/99!):9/5* D538/11!)796/9*25/42!)474/6*4/99!):9/5* Dpnnfsdjbm!Mpbedfoufst OFNB!Uzqf!4S!Pvuepps E23:/24!)84:/9*25/42!)474/6*4/99!):9/5* Cpy!Tj{fIfjhiuXjeuiEfqui H245/24!)977/9*25/42!)474/6*4/99!):9/5* 5349/11!):76/3*27/42!)525/4*7/49!)272/:* M24:/11!)::1/7*25/42!)474/6*4/99!):9/5* 5455/11!)2228/7*27/42!)525/4*7/49!)272/:* M356/11!)2254/1*25/42!)474/6*4/99!):9/5* 5765/11!)2482/7*27/42!)525/4*7/49!)272/:* M459/49!)2339/4*25/42!)474/6*4/99!):9/5* 5877/67!)27:1/8*27/42!)525/4*7/49!)272/:* 39/74!)32:/2*6/11!)238/1*4/61!)99/:* 4:/55!)34:/8*5/61!)225/4*4/11!)87/3* 524/11!)441/3*22/11!)38:/5*4/67!):1/6* Ofx!Zpsl!Djuz!Mpbedfoufst OFNB!Uzqf!2!Joepps 6:/55!)34:/8*5/61!)225/4*4/11!)87/3* Cpy!Tj{fIfjhiuXjeuiEfqui 723/11!)415/9*7/99!)285/7*5/61!)225/4* B49/11!):76/3*29/24!)571/5*6/11!)238/1* 824/11!)441/3*22/11!)38:/5*4/67!):1/6* C55/11!)2228/7*29/24!)571/5*6/11!)238/1* :25/61!)479/4*7/61!)276/2*4/61!)99/:* D77/61!)279:/2*29/24!)571/5*7/36!)269/9* Sftjefoujbm!Mpbedfoufst OFNB!Uzqf!4S!Pvuepps Uzqft!FDC!boe!FDD!Voju!Fodmptvsft OFNB!Uzqf!2!Joepps Cpy!Tj{fIfjhiuXjeuiEfqui! IfjhiuXjeuiEfqui C2S27/86!)536/6*25/42!)474/6*6/2:!)242/9* 34/36!)6:1/7*!9/99!)336/5*5/61!)225/4* C3S29/86!)587/4*25/42!)474/6*6/2:!)242/9* D4S36/11!)746/1*25/42!)474/6*6/2:!)242/9* Uzqft!FDC!boe!FDD!Voju!Fodmptvsft OFNB!Uzqf!4S! E2S3:/24!)84:/9*25/42!)474/6*6/2:!)242/9* Pvuepps H2S45/24!)977/9*25/42!)474/6*6/2:!)242/9* IfjhiuXjeuiEfqui M2S4:/11!)::1/7*25/42!)474/6*6/2:!)242/9* 34/79!)712/8*:/42!)347/6*6/55!)249/2* M3S56/11!)2254/1*25/42!)474/6*6/2:!)242/9* M4S59/86!)2349/3*25/42!)474/6*6/2:!)242/9* 3S9/74!)32:/2*6/11!)238/1*4/61!)99/:* 4S:/55!)34:/8*5/61!)225/4*4/11!)87/3* 5S24/11!)441/3*22/11!)38:/5*4/67!):1/6* 6S:/55!)34:/8*5/61!)225/4*4/11!)87/3* 7S22/86!)3:9/6*7/61!)276/2*5/61!)225/4* 8S24/11!)441/3*22/11!)38:/5*4/67!):1/6* 9S38/11!)796/9*21/61!)377/8*5/86!)231/8* :S25/36!)473/1*7/61!)276/2*5/11!)212/7* D2S32/11!)644/5*25/42!)474/6*6/2:!)242/9* W2.U2.77Wpmvnf!2 Sftjefoujbm!boe!Mjhiu!Dpnnfsdjbm DB19211113F Efdfncfs!3125xxx/fbupo/dpn TPMS34.1662!TUSFBNMJOFE!QW PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1.Submittal Requirements Completed permit application form. This permit application form can be downloadedat: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits Demonstrate compliance with the eligibility checklist for expedited permitting. Thecriteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits/solar- information Provide a standardizedor simplified photovoltaic plan that demonstrates: Title or Cover Sheet noting the 2019 California Electrical Code. Site and Roof Planshowing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. Asimplified Electrical Plan: 1.Locations of main service or utility disconnect 2.Total number of modules, number of modules per string and the total number of strings 3.Make and model of inverter(s) and/or combiner box if used 4.Single-line diagram ofsystem 5.Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit Provide asimplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1.The type of roof covering and the number of roof coverings installed 2.Type of roof framing, size of members and spacing 3.Weight of panels, support locations and method of attachment 4.Framing plan and details for any work necessary to strengthen the existing roof structure 5.Site-specific structural calculations 6.Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system Updated June 2021 TPMS34.1662!TUSFBNMJOFE!QW Eligibility Checklist Expedited Solar Photovoltaic Permittingfor One-and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application mustgo through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1.General Requirements The photovoltaic system size is 30kW AC CEC rating or less. The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. Thephotovoltaic system is utility interactive. Permit application and declaration is completed and attached. 2.PlanningDepartment Requirements Existing MPU Amps Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. Maximum height of “tilted” panels shall not exceed eighteen (18) inches. All wires shall be strapped to the modules/racking system.No loose or hanging wires are permitted. The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. Modules shall be flush with one another and gaps between panels shall be minimized. Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. 3.Electrical Requirements No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter: 1)No more than two strings per MPPT input where source circuit fusing is not included 2)Fuses (if needed) are rated to the series fuse rating of the PV module 3)No more than one non-inverter-integrated DC combiner is utilized per inverter For central inverter systems: No more than two inverters are utilized. The PV system is connected to the load side of the utility distribution equipment. A Solar PV Standard Plan and supporting documentation is completed and attached. 4.Structural Requirements A completed Structural Criteria and supporting documentation is attached Wind and Seismic (if required). 5.Fire Safety Requirements Clear access pathways provided. Fire classification photovoltaic system is provided. All required marking and labels are provided. A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. 4/19/2023 Applicant Signature: _____________________________________Date:_______________ 40931 Avenue Solana Palm Desert CA 92260 Project Address: ________________________________________________________ Updated June 2021 TPMS34.1662!TUSFBNMJOFE!QW CITYOF PALMDESERT Building & SafetyDepartment 73-510 Fred Waring,PalmDesert, CA (760)776-6420 PHOTOVOLTAIC RESIDENTIAL 0WOR LESS Minimum Submittal Requirements (esidential Rooftop Systems0kw or less) This information is published to guide applicants through astreamlined permitting process for qualifying small rooftopresidentialsolar photovoltaic (PV)systemsof0kilowatts(kW)or less. This bulletinprovides information about submittal requirements,plan review, fees,andprovides ageneral summary ofmandatory field inspections. ofthe following: A solar energy system that is no largerthan kilowatts alternating currentnameplateratingor 30kilowatts thermal. A solar energy system that conforms to all applicable state fire, structural,electrical,andother buildingcodesasadoptedor amended by the City andparagraph (iii) ofsubdivision(c) of Section714 of theCivilCode,assuchsectionorsubdivisionmay be amended, renumbered,or re-designatedfrom time to time. ·A solar energy system that is installed onasingleorduplexfamily dwelling. ermitted roof structure) A solar panelor module array that does notexceedthe maximum legalbuildingheightas defined by the City of Palm Desert. Required Approvals The following approvals and permits arerequired to install asmall rooftop residential PV system with amaximum power output of 0kWor less: Planning Departmentapproval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. Fire Marshallapproval is not required for small residential rooftop systems at this time. Building Departmentapproval in the issuance of a Photovoltaic System Permitis required to install or modify a new or existing solar photovoltaic system. 2.Building Permit Application Form A permit application can be obtained in person or downloaded www.cityofpalmdesert.org 3.Eligibility Checklist An eligibility checklistfor expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria, standard plan review timetables apply. Please consult a licensed designed professional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page Њ of Ѝ TPMS34.1662!TUSFBNMJOFE!QW 4.Project Submittal All projects can be submitted in person at:City of Palm Desert,Department ofBuilding and Safety 73-510 Fred Waring Drive,Palm Desert,California 92260 5.Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7) to ten (10) working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6.Plan Review and Permit Fees ·Plan Review Feeis$203. ·Permit Fees are approximately $266 depending on archiving materials. 7.Minimum Plan Set Requirements ·Number of Plans Provide two (2) complete sets of photovoltaic plans separate Site and Roof La ·Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. ·Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicguideline.pdf ·Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. ·Product Specifications and Literature nect boxes and solar panel anchorage system to be used. ·Signage Specifications Provide a legend showing locations andwording of all required signs or placards atvarious photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 0kW in size orsmaller and can -10 (Electrical Contractor) orC-46 (Solar Contractor) or licensed design professional. Electrical Plans shouldinclude the following: Location of main service or utility disconnect. Total number of modules, number of modules per string and the total number of strings. Make and model of inverter(s) and/or combiner box if used. Single line diagram of system. Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page Ћ of Ѝ TPMS34.1662!TUSFBNMJOFE!QW If batteries are to be installed, include them in the diagram and show their locations and venting. Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. Labeling of equipment as required by CEC, Sections 690 and 705. Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation tained inperson. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: The type of roof covering and the number of roof coverings installed. Type of roof framing, size of members and spacing. Weight of panels, support locations and method of attachment. Framing plan and details for any work necessary to strengthen the existing roof structure Site-specific structural calculations. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system. As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar_Structural_Technical_Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four (24) hours in advance at: (760)776- 6420 Monday through Friday (8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 0 kilowatts. If PV system is over 0 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection. The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans.An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. Array conductors and components are installed in a neat and workman-like manner. PV array is properly grounded. Electrical boxes are accessible and connections are suitable for environment. Array is fastened and sealed according to attachment detail. . Appropriate signs are properly constructed, installed and displayed. Smoke detector and carbon monoxide alarms are required at final inspection. Page Ќ of Ѝ TPMS34.1662!TUSFBNMJOFE!QW QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: Permit applicants can savetimeand moneyby following these tips. Take time to review permitrequirementsof the local jurisdiction. Permitting rules and processesdifferamong different cities and counties. Understanding all local requirementswill allow permit applicants to submit a complete and accurate permit applicationpacket the first time. Contact the local electric utility early in the permitting process (solar PVinstallations). Local electric utilities have a completely separate approval process from the local jurisdictionspermitting process. Some electric utilities may require that the solar projectbe reviewedbefore the local jurisdiction issues a building permit.Pursuing utility approval early in the permit process enables the solar PVsystem to become operational as soon as possible. Makesure that the solar installationthat is built matches the submitted plans. The on-site inspector will verify that the installation aligns withproposed plans and any changes may require corrections and additionalinspections. Page Ѝ of Ѝ