HomeMy WebLinkAboutCF-1RCF1R-ALT-02-E
ALTERATIONS TO SPACE CONDITIONING SYSTEMS
(FORMERLY CF-1R-ALT-HVAC)
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE
A. General Information
CF1R-ALT-02 is applicable to multiple space conditioning systems contained within a single dwelling unit.
2023-06-01
Single family
Shapiro - 38154 Azalea Drive
0
VD
00
Date Prepared
Building Type
Dwelling Unit Name
Dwelling Unit Conditioned Floor
Area (ft2)
Number of Space Conditioning
(SC) Systems in this Dwelling
Unit:
O
O
0
0
I -I
Shapiro - 38154 Azalea Drive
38154 Azalea Drive
Palm Desert
92260
Ln
Project Name
Project Location
CA City
Zip Code
Climate Zone
0
O
O
O
O
B. Space Conditioning (SC) System Information
0
Alteration Type
Altered space
conditioning
system
m
Installing entirely
new SC system?
o
o
z
08
Installing entirely
new duct system?
0
z
N
Installing more
than 25 feet of
ducts?
o
o
z
ID
Installing new SC
system
components?
N
O
}
05
Installing a
refrigerant
containing
component?
}
04
Is the SC system a
ducted system?
}
CFA served by this
SC System (ft2)
0
M
O
(0
00
02
SC System
Location or Area
Served
Location 1
I -I
SC System ID or
Name
System 1
0
HERS Provider: CaICERTS
2023-06-01 11:50:36
Registration Date/Time:
Registration Number: 223-A020064351A-000-000-0000000-0000
Report Generated: 2023-06-01 11:50:36
CA Building Energy Efficiency Standards - 2022 Residential Compliance
CF1R-ALT-02-E
CALIFORNIA ENERGY COMMISSION
C. Extension of Existing Duct System, Greater Than 25 Feet (Section150.2(b)1Diib)
This section does not apply to this project.
D. Altered Space Conditioning System (Sections 150.2(b)1E and F)
a
..
U y
3 3
0
ro
c
iditioning Systems
nt for the new portions of supply -air and return -air ducts or plenums: R6 (CZ 3, 5-7) and R8 (CZ 1, 2, 4, 8-16)
Duct Leakage Test required when heating or cooling components are installed in ducted systems, or when more than 25 ft of duct length is replaced
ess than or equal to 10% or less than or equal to 7% leakage to outside, or seal all accessible leaks.
tefrigerant Charge verification required when refrigerant containing components are installed or altered (applicable in CZ 2, 8-15).
flow Rate greater than or equal to 300 CFM per ton required when MCH-25 is required.
ith HERS provider as previously sealed are exempt from MCH-20 Duct Leakage Testing requirements.
Air Handler Furnace changes do not require verification of Air Flow MCH-23, or Refrigerant Charge MCH-25.
:ructed, insulated or sealed with asbestos are exempt from MCH-20 Duct Leakage Testing requirements.
O1 &
Z
s
t
O ,dj C
w a.,
Zr 3
(0
0
..
Setback
13
a)
IN
o C s ~
H
cs
00 E U N
%-I
a -I
coca)
•E w 3 W w
O •C� U ToW
i c
U C W > CC
W
W
N
a -I o
O
W
c EC c asLu
.O w = vs
C Cc U To
trs
U C W > W
N
00
C C y
EERSEER
m
•- w a
o
O - i-
t.) W
08
.+
All new
cooling
components
C
w cc
i N
Q U C
U
0o E
N
Central
packaged
HP
O
•c
U N cu H
c 3 c w
w
'+• E w a
co
= al :LT) U >
W
05
00
C c y
0
'+• w Q.
a
2 = 1—
W
04
.+
All new
heating
components
C
'a GO O1
O) C C
.-'47.N
w as Q
a
o
U
cEy
Central
packaged
HP
N o.
o
ea N T I-
2 N
02
E o ,a
Location 1
N
'I"'Q. iVI
,
> i 4 C
(n U 4,L Gl
Nfit O N
0
0
O1
System 1
-1
E E
O
y to
% Z
T
N
E. Entirely New or Complete Replacement Duct System, with or without Equipment Changeout (Sections 150.2(b)1Diia and 150.2(b)1E, F)
This section does not apply to this project.
F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)1C)
This section does not apply to this project.
HERS Provider: CaICERTS
2023-06-01 11:50:36
Registration Date/Time:
Registration Number: 223-A020064351A-000-000-0000000-0000
Report Generated: 2023-06-01 11:50:36
CA Building Energy Efficiency Standards - 2022 Residential Compliance
CF1R-ALT-02-E
CALIFORNIA ENERGY COMMISSION
HERS Provider: CaICERTS
2023-06-01 11:50:36
Registration Date/Time:
Registration Number: 223-A020064351A-000-000-0000000-0000
Report Generated: 2023-06-01 11:50:36
0
0 0
O 0
N
N
N N
0
N
o O
i
U) >
ra
o a)
O
Q
CA Building Energy Efficiency Standards - 2022 Residential Compliance