Loading...
HomeMy WebLinkAboutSOLR23-0281 APPROVED PLANS (2).pdf(E) S i n g l e F a m i l y H o m e 8 9 ' - 1 0 " 109'-10" 103 ' - 3 " (E ) D r i v e w a y (E) Fence ( E ) S h e d ( E ) G a t e 454 2 0 A b r o n i a T r a i l (E) B l o c k W a l l 1' - 8 " 2 2 ' - 1 1 " 2'-9" .\vicinity map.jpg 1" = 20' N PV-1.0 PV-1.1 PV-2.0 PV-3.0 PV-3.1 PV-4.1 Attached Plot Plan & Photovoltaic Layout Project Notes, Conduit & Grounding Detail Racking Details Fire Labels & Equipment Elevation Fire Placard 3 Line Diagram Manufacture Spec. Sheets OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: TYPE V-B AUTHORITY HAVING JURISDICTION: PALM DESERT CITY ASSESSORS PARCEL NUMBER: #625142001 NUMBER OF STORIES: 1-Story ROOF PITCH: 20° Conduit On Roof Conduit In AtticFence Line Block WallProperty LinesRoof Access Point Conduit In Trench PROPOSED 8.8 KW DC SYSTEM (STC) AT 45420 ABRONIA TRAIL, PALM DESERT, CA 92260 NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 PV-1.05Plot Plan Scale: X SHEET TH I S D R A W I N G T E M P L A T E I S P R O P R I E T A R Y P R O P E R T Y T O C N G S O L A R E N G I N E E R I N G , I N C . A N D I N T H E E V E N T O F U N A U T H O R I Z E D U S E O R C H A N G E S O F T H E S E D R A W I N G B Y A T H I R D P A R T Y , T H E U N A U T H O R I Z E D U S E R S H A L L H O L D H A R M L E S S C N G S O L A R E N G I N E E R I N G , I N C . , I T ' S D I R E C T O R S , O F F I C E R S , A G E N T S , E M P L O Y E E S , A S S I G N S A N D A N Y R E L A T E D P E R S O N S O R E N T I T I E S . (N) Junction Box 4 Vicinity Map Scale: NTS 2 Site Information Scale: N/A SOUTHERN CALIFORNIA EDISON UTILITYSCOPE OF WORK: THE INSTALLATION CONSISTS OF A 8.8 KW DC SYSTEM (STC) ROOFTOP SOLAR ARRAY, A CENTRALIZED INVERTER, AND RELATED ELECTRICAL METERING AND SAFETY EQUIPMENT. ALL EQUIPMENT WILL BE INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY COMPANY. (N) (20) URECO FAM440E8G-BB (N) (20) SolarEdge S440 [HD] Optimizers (E) 225A MSP w/(E) 200A Main Breaker (N) SolarEdge_Technologies SE7600H-US (HD WAVE)(240V) 1 Sheet Index Scale: N/A 3 AHJ Notes Scale: N/A 45420 Abronia Trail, Palm Desert, CA 92260, USA 2022 CA ELECTRICAL CODE . NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 PV-1.1 X SHEET 4 Interconnection Notes Scale: N/A CODE BOOK: BREAKER SIZES: WIRE AMPACITY TABLE: MAX SYSTEM VOLTAGE CORRECTION: NUMBER OF CONDUCTORS CORRECTION: AMBIENT TEMPERATURE CORRECTION: AMBIENT TEMPERATURE ADJUSTMENT: DC GROUNDING ELECTRODE CONDUCTOR: AC GROUNDING ELECTRODE CONDUCTOR: RACK GROUNDING ELECTRODE CONDUCTOR: MAXIMUM OCPD (120% RULE): 2022 CEC CEC 240.6(A) CEC 310.15(B)(16) CEC 690.7(A) CEC 310.15(B)(3)(A) CEC 310.15(B)(2)(A) CEC 310.15(B)(3)(C) UNGROUNDED DC SYSTEM CEC 250.50 CEC 690.47(B) CEC 705.12 2 Electrical Code References Scale: N/A 1 Applicable Codes Scale: N/A 3 Equipment Location Scale: N/A 1.RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 2.JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3.ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4.ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2.DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 3.AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: 3.1.PHASE A OR L1- BLACK 3.2.PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE 3.3.PHASE C OR L3- BLUE, YELLOW, ORANGE*, OR OTHER CONVENTION 3.4.NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE. 1.THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING. 2.WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD. 3.AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. 4.SUPPLY SIDE TAP INTERCONNECTION WITH SERVICE ENTRANCE CONDUCTORS BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING. 1.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2.PV EQUIPMENT SHALL BE GROUNDED METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES. 3.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO MICRO INVERTER MANUFACTURER'S INSTRUCTIONS. 4.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 5.GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER. 6.IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED. 1.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED, THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2.DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3.RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA. LOCATION OF LABEL ACCORDING TO AHJ. 4.IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION. 1.MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. 2.INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. 3.DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. 4.WORKING CLEARANCES AROUND THE ELECTRICAL EQUIPMENT WILL BE MAINTAINED. 5.ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT. 6.ALL CONDUCTORS SHALL BE 600V, 90°C STANDARD COPPER UNLESS OTHERWISE NOTED. 7.WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 8.THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND/OR THE UTILITY. 9.ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS. 10.PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING 1.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS. 2.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE. 3.ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 4.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL. 5.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE 5 General Notes Scale: N/A 7 Grounding Notes Scale: N/A 11 Disconnection & OCPD Notes Scale: N/A 6 Wiring & Conduit Notes Scale: N/A 10 Structural Notes Scale: N/A Strut Strap Strain Relief Module 2" x 6" Block Junction Box Rain Tight, Steel EMT Connector DC (PV) or AC (MicroInverter) Cable CONDUIT RUN ABOVE ROOF Raceway Above Roof: Minimum Height: 7/8" Roof Framing EMT Conduit FLEX Conduit Through Attic (18" Below Roof Material) EPMD Flashing Strut Strap Strain Relief Module 2" x 6" Block Junction Box Rain Tight, Steel EMT Connector DC (PV) or AC (MicroInverter) Cable Raceway Above Roof: Minimum Height: 7/8" Roof Framing CONDUIT RUN THROUGH ATTIC 8 Conduit Run Details Scale: NTS 9 Grounding Details Scale: NTS UNIVERSAL FASTENING OBJECT (UFO) THE UFO SECURELY BONDS SOLAR MODULES TO XR RAILS. IT COMES ASSEMBLED AND LUBRICATED, AND CAN FIT A WIDE RANGE OF MODULE HEIGHTS. PV MODULE IRONRIDGE RAIL RAIL SPLICE SELF TAPING SCREW Rail to Rail (In The Same Row) Module to Module & Module to Rail Rail to Rail (In The Different Rows) ATTACH ILSCO GBL-4DBT GROUND LUGS W/STAINLESS STEEL MACHINE SCREW (FOR EXTERIOR, WET LOCATIONS) SOLID COPPER GROUND WIRE EQUIPMENT NTS REMOVAL OF ONE PIECE OF EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN ANY OTHER PIECES. NTS REMOVAL OF ONE PIECE OF EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN ANY OTHER PIECES. PV MODULE FRAME IRONRIDGE RAIL IronRidge UFO PV Module Min. 3.5" Above Roof End Clamp T-Bolt Pro Solar Fast Jacks Foam Roof (2) 5/16"x3" Lag Bolt (Min. 2.5" Embedded) Iron Ridge Support Rail 4.5" Standoff 4" X 6" Ra f t e r @ 2 4 " . O . C 1/8" = 1'-0" NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 N Array Quantity Mounting Type Array Tilt Azimuth Att. Spacing AR-01 20 Flush Mounted 20°223 72" Roof Type Foam** 1 PV Racking & Roof Framing Plan Scale: X Modules RailsRaftersObstructionsAttachmentsFire Clearance PV-2.0 SHEET AR-01 Roof Material: Foam. Roof Framing: Rafter. Framing Size & Spacing: 4" x 6", 24" O.C. Framing Span & Roof Pitch: 6'-0", 20° Pitch Framing Species & Grade: Douglas Fir Larch #2. Racking / Rail Manufacture: IronRidge 14 Ft. Rails Attachment Manufacture: Pro Solar Fast Jacks. Number of Attachments: 38 Attachments Racking Weight: 3.56 Lbs. / Module Modules: (20) URECO FAM440E8G-BB Module Dimensions: 82.99'' x 41.26'' x 1.38'' Module Weight & Sq.Ft. : 53.79 Lbs. , 23.78 Sq.Ft. Array Sq.Ft. : 475.6 Sq.Ft. Weight w/Racking & Add Ons: 1187 Lbs. Weight (Lbs.) / Attachment: 31.24 Lbs. / Attachment. Distributed Weight on Roof: 2.5 Lbs. / Square Foot. 3 Roof 1 Attachment Detail Scale: NTS 2 Roof 1 Calculations Scale: N/A NOTE: ROOF FRAMING MEMBER'S SIZE, SPAN, AND SPACING TO BE VERIFIED IN FIELD PRIOR TO INSTALL. IF ROOF FRAMING INFORMATION DIFFERS FROM WHAT IS INDICATED ON THE PLANS, CONTACT DESIGN ENGINEER PRIOR TO INSTALL. Ridge Setback Calculations Total Roof Area: 1550 SqFt. Single Module Area: 23.78 SqFt. Total Number of Modules: 20 Total PV Area: 475.6 SqFt. Percentage of Coverage: 31% Fire Sprinklers Installed: NO PER NEC 690.54 PHOTOVOLTAIC AC DISCONNECT RATED AC OPERATING CURRENT: 32A NOMINAL OPERATING AC VOLTAGE: 240V MAXIMUM VOLTAGE: MAXIMUM CIRCUIT CURRENT: 480V 20A WARNING WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION PER NEC 690.13(B) WARNING TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL PER NEC 110.27(C) & OSHA 1910.145(f)(7) WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT PER NEC 690.13(B) PER NEC 690.13(B) PHOTOVOLTAIC AC DISCONNECT MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): 1. 2. 5. 3. PER NEC 690.53 WARNING THE DISCONNECTION OF THE GROUNDED CONDUCTORS(S) MAY RESULT IN OVERVOLTAGE OF THE EQUIPMENT WARNING: PHOTOVOLTAIC POWER SOURCE WARNING PHOTOVOLTAIC POWER SOURCE DO NOT REMOVE UNLESS REPLACED IN EXACT LOCATION - PV POWER CIRCUIT DIRECTLY BELOW DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM PER NEC 690.31(I) PER NEC 690.31(G)(3)(4) PER NEC 690.31(G)(1) PER NEC 690.59 & NEC 705.12(B)(3-4) PER NEC 690.52 WARNING SINGLE 120-VOLT SUPPLY DO NOT CONNECT MULTIWIRE BRANCH CIRCUITS PER NEC 710.15(C) & NEC 692.9(C) PER NEC 690.15(C) & NEC 690.33(E)(2) CAUTION PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED PER NEC 690.13(F) & NEC 705.12(B)(3-4) & NEC 690.59 PER NEC 690.13(B) POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. PER NEC 705.12(B)(2)(c) 6. 7. 8. 9. 11. 12. 13. 14. 15. 16. 17. 18. TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY PER IFC 605.11.3.1(2) & NEC 690.56(C)(1)(a) RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM PER NEC 690.56(C)(3) 10. 19. FOR AC MODULES ONLY FORMAT: (1) WHITE LETTERING ON A RED BACKGROUND (2) MINIMUM 3/8 INCH LETTER HEIGHT (3) ALL LETTERS SHALL BE CAPITALIZED (4) ARIAL OR SIMILAR FONT, NON-BOLD MATERIAL: (1) REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969) AS STANDARD FOR WEATHER RATING. DURABLE ADHESIVE MATERIALS MEET THIS REQUIREMENT. NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAX OVERCURRENT DEVICE RATING FOR AC MODULE PROTECTION DO NOT DISCONNECT UNDER LOAD MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS PER NEC 690.13(B) PHOTOVOLTAIC DC DISCONNECT 4. 15A 240A 60A 8kW 32A 1.25 DC AC OFF ON Inverter w/Integrated DC Disconnect DC Conduit JB M MSP Backyard NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 2 Fire Labels Scale: NTS 1 PV Equipment Location & Fire Label Placement Table Scale: NTS X PV-3.0 SHEET LABELS 1, 2 9, 11 3, 4, 6, 7, 8, 10, 19 1, 2, 7, 12, 14, 15, 16, 17, 18 LABEL PLACEMENT JUNCTION BOX DC CONDUIT INVERTER MAIN SERVICE PANEL NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 SERVICE POINT UTILITY METERING SOLAR PV ARRAY WITH OPTIMIZERS ROOF MOUNTED N NOTE: THE PLAQUE SHALL BE METAL OR PLASTIC, WITH ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE, INCLUDE THE LOCATION OF METER, DISCONNECTS, INVERTER, THE ARRAY AND A FOOTPRINT OF THE ENTIRE BUILDING AND SITE. THE PLAQUE WILL BE ATTACHED BY POP-RIVETS, SCREWS OR OTHER APPROVED FASTENERS. CAUTION POWER TO THE BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AT SHOWN 0" 1 Fire Placard Scale: NTS PV-3.1 SHEET 1"2"3"4"5"6" 0" 1" 2" 3" 4" 5" 6" X PV INVERTER WITH INTEGRATED DC DISCONNECT 454 2 0 A b r o n i a T r a i l . SOUTHERN CALIFORNIA EDISON UTILITY +-+-+-+- G G G G +-+-+-+- G G G G J-BOX L1 L2 N G INVERTER 1 G + - + - G + - MP P T 1 + - MP P T 1 U L Listed G DC Disco. PV R A C K I N G EQ U I P M E N T G G +- GG 1 2 +-+- 9 10 +- G G PV R A C K I N G EQ U I P M E N T G G +- GG 1 2 +-+- 9 10 +- G G 1 Phase / 60 Hz. PV OCPD 40A Main Breaker (E) 200A To Utility Grid Over-Head Service Drop L1 L2 N G N G L1L2 (E) 225A Rated MSP (E) GROUNDING ELECTRODE Ground Rod AC . 1 DC . 1 DC . 2 PV BREAKER SHALL BE LOCATED AT OPPOSITE END OF BUS BAR NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 PV Module 1 (20) URECO FAM440E8G-BB Power at STC: 440W Power at PTC: 410.8W V-oc: 49.6V V-mp: 41V I-sc: 11.34A I-mp:10.74A V-oc Temp Coefficient: -0.27%/°C Output (I-sc x 1.25 x 1.25): 17.7A Inverter 1 SolarEdge_Technologies SE7600H-US (HD WAVE)(240V) Max Output Current: 32A Safety Rating: (32A x 1.25) = 40A Minimum OCPD: 40A Max Number of Strings: 2 Number of MPPT's: 1 Maximum Input Voltage: 480V Transformerless (Y/N): Yes Operating Current:11A Operating Voltage:400V Maximum System Voltage:480V Short Circuit Current:30A PV Optimizer 1 (20)SolarEdge S440 [HD] Max I-sc Input: 14.5A Max V-oc Input: 60V Max Power Per String: 5700W Inverter 1 (4400W/400V) = 11A (4) #10 AWG PV Wire (4) #10 AWG THWN-2 (2) #8 AWG THWN-2 (1) #8 AWG THWN-2 (1) #6 AWG Bare Copper (1) #8 AWG THWN-2 (1) #8 AWG THWN-2 Not Applicable 3/4" EMT Conduit 3/4" EMT Conduit 7/8" - 3 1/2" 7/8" - 3 1/2" "N/A" Under Array Above Roof Exterior Wall 0.65 0.65 0.91 1 0.8 1 15A 15A 32A 26A 20.8A 50.1A 10 Ft. 20 Ft. 5 Ft. 400V 400V 240V 0.09% 0.19% 0.1% 22.8% 27.5% DC.1 DC.2 AC.1 Conductor Qty. Size & Type Wire De-Rate Calculation 18.8A 18.8A 40A 40A 40A 55A 20A 20A 40A X X = X X = X X = Neutral Qty. Size & Type Raceway Size & Type Raceway Height Above Roof Raceway Location Ambient Temp # of Cond. Output Current Final Ampacity Dist. (Ft) Voltage Voltage Drop % Conduit Fill % Ground Qty., Size & Type 125% of Output Current Wire Rating Min. OCPD Wire Tag 1 Scale: NTS X SHEET Ambient Temperature Information Extreme Min Temp:-7°C Ambient Temp:39°C Ambient Temp. Adjustments 0" to 7/8" Above Roof:72°C Voltage Drop Information DC Voltage Drop:0.28% AC Voltage Drop:0.1% Total System Voltage Drop:0.38% Main Service Panel 1 Existing 225A MSP, Top-Fed 1Ø, 3W, 120/240V Utility: Southern California Edison Interconnection: PV Breaker Main Breaker De-Rated:No PER NEC 705.12 Main Panel Interconnection Information Bus Bar 1 Rating: Main Breaker 1 Rating: PV Back Feed (Actual Load): PV OCPD: Interconnection Calculation: 120% Rule 225A 200A 40A 40A (40A + 200A) = 240A (<=) 270A PV-4.1Three Line Diagram NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Module Data Sheets Scale: NTS X DATA SHEET NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Inverter Data Sheets Scale: NTS X DATA SHEET NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Inverter Data Sheets Scale: NTS X DATA SHEET NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Optimizer Data Sheets Scale: NTS X DATA SHEET NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Rail Data Sheets Scale: NTS X DATA SHEET NABCEP CERTIFIED CNG SOLAR ENGINEERING, INC. DESCRIPTION DATE Initial Draft of Plans Revisions Per Contractor 2/17/23 3/6/23 PR O J E C T I N F O . REVISION BLOCK CO N T R A C T O R I N F O R M A T I O N SY S T E M I N F O R M A T I O N ID# PV INSTALLATION PROFESSIONAL Design By: 8. 8 k W D C S y s t e m ( S T C ) (2 0 ) U R E C O F A M 4 4 0 E 8 G - B B (2 0 ) S o l a r E d g e S 4 4 0 [ H D ] O p t i m i z e r s So l a r E d g e _ T e c h n o l o g i e s S E 7 6 0 0 H - U S ( H D WA V E ) ( 2 4 0 V ) 8. 1 3 k W C E C A C S y s t e m S i z e So l P o w e r 49 9 3 7 R e d o n d o P o n i e n t e Co a c h e l l a , C A 9 2 2 3 6 (7 6 0 ) 2 9 6 - 0 0 1 2 C- 1 0 # 1 0 8 2 0 5 0 St a c e y H a r d i n g 45 4 2 0 A b r o n i a T r a i l Pa l m D e s e r t , C A 9 2 2 6 0 AP N # 6 2 5 1 4 2 0 0 1 1 Attachment Data Sheets Scale: NTS X DATA SHEET Updated June 2021 This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1. Submittal Requirements − Completed permit application form. This permit application form can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits − Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits/solar- information − Provide a standardized or simplified photovoltaic plan that demonstrates:  Title or Cover Sheet noting the 2019 California Electrical Code.  Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings.  A simplified Electrical Plan: 1. Locations of main service or utility disconnect 2. Total number of modules, number of modules per string and the total number of strings 3. Make and model of inverter(s) and/or combiner box if used 4. Single-line diagram of system 5. Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit − Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1. The type of roof covering and the number of roof coverings installed 2. Type of roof framing, size of members and spacing 3. Weight of panels, support locations and method of attachment 4. Framing plan and details for any work necessary to strengthen the existing roof structure 5. Site-specific structural calculations 6. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings