Loading...
HomeMy WebLinkAboutAPPROVED SOLR23-0840 PLAN.pdfCOVER SHEET PHOTOVOLTAIC ROOF MOUNT SYSTEM 45585 ABRONIA TRAIL, PALM DESERT, CA 92260 USA REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-0 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com DESIGN CRITERIA: 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA BUILDING CODE (CBC) 2022 CALIFORNIA EXISTING BUILDING CODE (CEBC) 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 2022 CALIFORNIA GREEN CODE (CGC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA PLUMBING CODE (CPC) 2022 CA FIRE CODE TITLE 24 SUPPLEMENT ANY OTHER LOCAL AMENDMENTS 12 MODULES-ROOF MOUNTED - 4.74 kWDC, 4.42 CEC kWAC ROOF TYPE: - COMP SHINGLE NUMBER OF LAYERS: - 01 ROOF FRAME: - 4"X6" RAFTERS @30" O.C. STORY: - ONE STORY SNOW LOAD : - 0 PSF WIND SPEED :- 97 MPH WIND EXPOSURE:- B RISK CATEGORY:- II COORDINATE:- 33.716959, -116.369195 2 VICINITY MAP SCALE: NTSPV-0 1 AERIAL PHOTO SCALE: NTSPV-0 GOVERNING CODES: GENERAL NOTES ·THE CONTRACTOR/INSTALLER OF THE SOLAR PV SYSTEM OVER EXISTING ROOF SHALL CONFORM TO OSHA REQUIREMENTS DURING THE CONSTRUCTION PHASE. JOB SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR/INSTALLER. ·REFER TO ELECTRICAL DRAWING PV-4 FOR PANEL DETAILED INFORMATION. ·IN CASE OF CONFLICT BETWEEN STRUCTURAL DRAWINGS AND ELECTRICAL DRAWINGS, THE MOST RIGID REQUIREMENTS SHALL GOVERN. ·THE CONTRACTOR/INSTALLER SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, ROOF TOP PROJECTIONS, ETC.) AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO INSTALLATIONS OF PV SYSTEM. ·THE CONTRACTOR/INSTALLER SHALL VERIFY AND COORDINATE EXISTING OPENINGS, ROOF TOP UNITS, VENT PIPES, ETC. SHOWN ON DRAWINGS. IF THERE IS A DISCREPANCY BETWEEN DRAWINGS, IT IS THE CONTRACTORS/INSTALLER'S RESPONSIBILITY TO NOTIFY ENGINEER PRIOR TO PERFORMING THE WORK. ·ALL CONSTRUCTION IS TO BE PERFORMED IN STRICT CONFORMANCE WITH ALL APPLICABLE TOWN, COUNTY & STATE REGULATIONS AND/OR ANY OTHER GOVERNING BODIES. · DO NOT SCALE THESE DRAWINGS, USE DIMENSIONS. CONTRACTOR MUST CONDUCT ROOF SURVEY TO VERIFY DIMENSIONS SHOWN ON PLAN PRIOR TO INSTALLATION. IF THERE IS A DISCREPANCY IT IS CONTRACTOR/INSTALLER'S RESPONSIBILITY TO NOTIFY THE ENGINEER IMMEDIATELY. ·LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. ·LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES, OR SIGNS. ·DISCONNECT MEANS MUST HAVE DEDICATED CLEAR UNOBSTRUCTED WORKING SPACE NOT LESS THAN 3' DEEP BY 2.5' WIDE TO NOT LESS THAN 6.5' ABOVE WALKABLE SURFACES IN FRONT OF DISTRIBUTION PANEL. ·ALL SOLAR MODULES, EQUIPMENT, AND METALLIC COMPONENTS TO BE BONDED. ·PV ARRAY NOT TO EXCEED HIGHEST POINT OF THE ROOF. ·RAPID SHUTDOWN IS ACTIVED AT THE INVERTER BY THE DC DISCONNECT. ELECTRICAL NOTES ·ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. ·ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 & 75 DEGREE C WET ENVIRONMENT. ·WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. ·WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH CEC 110.26. ·DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. ·WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. ·ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. ·MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. ·MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER E.G.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. ·THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE SYSTEM SUMMARY: (N) 12 - CANADIAN SOLAR CS6R-395MS-HL (395W) MODULES (N) 01 - SOLAREDGE SE3800H-USRGM INVERTER (N) 12 - SOLAREDGE S440 POWER OPTIMIZERS (N) JUNCTION BOX (E) 100A MAIN SERVICE PANEL WITH (E) 100A MAIN BREAKER (N) 30A NON FUSED AC DISCONNECT (N) 01 - TESLA POWERWALL 2 BATTERY (N) 01 - 200A TESLA BACKUP GATEWAY 2 (N) 01 - 30A IMO DISCONNECT (N) 125A SOLAR SUB PANEL (E) 100A SUB PANEL (BACKED UP LOAD PANEL) EXISTING SYSTEM SUMMARY: (E) 14 - UNKNOWN PV MODULES (E) 01 - SOLAREDGE SE3800H-US INVERTER (E) 30A NON FUSED AC DISCONNECT (SQUARE D DU221RB) SHEET INDEX PV-0 COVER SHEET PV-1 SITE PLAN WITH ROOF PLAN PV-2 ROOF PLAN WITH MODULES PV-3 ATTACHMENT DETAILS PV-3.1 POWER WALL FRAMING DETAILS PV-4 ELECTRICAL LINE DIAGRAM PV-4.1 ELECTRICAL WIRE CALCULATION PV-5 PLACARDS & WARNING LABELS PV-6 OPTIMIZERS CHART PV-7+EQUIPMENT SPEC SHEETS 30 May 2023 EXP : 30 Sep 2023 STRUCTURAL ONLY MSPUM TBG INVACDBAT SUB IMO ACD INV SSP 28'-2" 26 ' - 9 " 31'-9" 7' - 1 0 " ~103.50' ~7 0 . 2 2 ' ~103.74' ~6 8 . 7 3 ' JB SITE PLAN WITH ROOF PLAN REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-1 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SITE PLAN WITH ROOF PLAN 1 SCALE: 3/32" = 1'-0" NOTE: A.ALL ELECTRICAL EQUIPMENT, INVERTERS, DISCONNECTS, MAIN SERVICE PANELS, ETC. SHALL NOT BE INSTALLED WITHIN 3’ OF THE GAS METERS’ SUPPLY OR DEMAND PIPING. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. 67.80" 44 . 6 0 " PHOTOVOLTAIC MODULES CANADIAN SOLAR CS6R-395MS-HL (395W) NOTE: * 3/4" OR GREATER IMC, RMC, FMC, LFMC, PVC, HDPE, NUCC, RTRC, LFNC, FMT, ENT OR EMT CONDUIT RUN EXPOSED CONDUIT RUN SHALL BE MIN. 7/8" ABOVE ROOF. * ROMEX RUN INSIDE ATTIC ROOF DESCRIPTION ROOF TYPE COMP SHINGLE ROOF ROOF ROOF TILT AZIMUTH PV AREA (SQ.FT.) NO. OF MODULE #1 12°270°251.99 12 LEGEND UTILITY METER AC DISCONNECT JUNCTION BOX UM ACD JB INVERTERINV FENCE CONDUIT PROPERTY TREES VENT, ATTIC FAN (ROOFOBSTRUCTION) CHIMNEY BAT BATTERY TBG TESLA BACKUP GATEWAY IMO IMO DISCONNECT MAIN SERVICE PANELMSP SUB SUB PANEL AC DISCONNECTACD INVERTERINV EXISTING MODULE SSP SOLAR SUB PANEL AB R O N I A T R A I L PROPERTY LINE PR O P E R T Y L I N E PROPERTY LINE PR O P E R T Y L I N E EXISTING DRIVEWAY ONE- STORY HOUSE (E) STRUCTURE ROOF #1 (E) 14 - UNKNOWN PV MODULES ROOF ACCESS POINT (N) 3/4" OR GREATER EMT CONDUIT RUN (7/8 INCHES ABOVE ROOF) GATE 30 May 2023 EXP : 30 Sep 2023 STRUCTURAL ONLY MSPUM TBG INVACDBAT SUB IMO ACD INV SSP 6" 47 ' - 1 " 3' - 0 " 9'-5" 1'-6"3" JB REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-2 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com ROOF PLAN WITH MODULES ROOF PLAN WITH MODULES SCALE: 3/16" = 1'-0"1 MODULE TYPE, DIMENSIONS & WEIGHT NUMBER OF MODULES = 12 MODULES MODULE TYPE = CANADIAN SOLAR CS6R-395MS-HL (395W) MODULES MODULE WEIGHT = 49.40 LBS / 22.5 KG. MODULE DIMENSIONS = 67.80"X 44.60" = 21.00 SF UNIT WEIGHT OF ARRAY = 2.35 PSF · PLUMBING VENTS, SKYLIGHTS AND MECHANICAL VENTS SHALL NOT BE COVERED, MOVED, RE-ROUTED OR RE-LOCATED. NOTE: ACTUAL ROOF CONDITIONS AND RAFTERS (OR SEAM) LOCATIONS MAY VARY. INSTALL PER MANUFACTURER(S) INSTALLATION GUIDELINES AND ENGINEERED SPANS FOR ATTACHMENTS ARRAY AREA & ROOF AREA CALC'S AREA OF NEW ARRAY (Sq. Ft.) AREA OF EXISTING ARRAY (Sq. Ft.) AREA OF NEW & EXISTING ARRAY (Sq. Ft.) AREA OF ROOF(PLAN VIEW) (Sq. Ft.) TOTAL ROOF AREA COVERED BY ARRAY % 251.99 270.22 522.21 1791.0 29% 29%ROOF AREA (ARRAY <33% OF ROOF AREA)BILL OF MATERIALS EQUIPMENT QTY DESCRIPTION RAIL 10 UNIRAC NXT UMOUNT RAIL 168" DRK RAIL SPLICE 04 NXT UMOUNT RAIL SPLICE UNIVERSAL CLAMP 34 NXT UMOUNT COMBO CLAMP -DRK ROOF ATTACHMENTS 32 UNIRAC FLASHLOC ACCESSORIES 20 NXT UMOUNT RL & CLMP CAP KIT MLPE & GROUNDING 17 NXT UMOUNT MLPE & LUG CLAMP NOTE: * 3/4" OR GREATER IMC, RMC, FMC, LFMC, PVC, HDPE, NUCC, RTRC, LFNC, FMT, ENT OREMT CONDUIT RUN EXPOSED CONDUIT RUN SHALL BE MIN. 7/8" ABOVE ROOF. * ROMEX RUN INSIDE ATTIC ROOF DESCRIPTION ROOF TYPE COMP SHINGLE ROOF ROOF ROOF TILT AZIMUTH RAFTERS SIZE RAFTERS SPACING #1 12°270°4"X6"30" O.C. ARRAY AREA & ROOF AREA CALC'S ROOF # OF MODULES ARRAY AREA (Sq. Ft.) ROOF AREA (Sq. Ft.) ROOF AREA COVERED BY ARRAY (%) #1 12 251.99 500.0 50.40 LEGEND UTILITY METER AC DISCONNECT JUNCTION BOX UM ACD JB INVERTERINV CONDUIT VENT, ATTIC FAN (ROOFOBSTRUCTION) CHIMNEY BAT BATTERY TBG TESLA BACKUP GATEWAY IMO IMO DISCONNECT MAIN SERVICE PANELMSP SUB SUB PANEL AC DISCONNECTACD INVERTERINV EXISTING MODULE SSP SOLAR SUB PANEL RAFTERS ROOF ATTACHMENT @ 60" O.C. OPTIMIZER AB R O N I A T R A I L FR O N T Y A R D RE A R Y A R D ROOF #1 36" FIRE PATHWAY 18 " F I R E P A T H W A Y 18 " F I R E P A T H W A Y (E) 14 - UNKNOWN PV MODULES (N) 3/4" OR GREATER EMT CONDUIT RUN (7/8 INCHES ABOVE ROOF) 67.80" 44 . 6 0 " PHOTOVOLTAIC MODULES CANADIAN SOLAR CS6R-395MS-HL (395W) 3' - 0 " 36" FIRE PATHWAY 18 " 18" FIRE PATHWAY 30 May 2023 EXP : 30 Sep 2023 STRUCTURAL ONLY NOTE:CONTRACTOR TO VERIFY EXISTING FRAMING AND STRUCTURAL LETTER NOTIFY EOR INCASE OF DISCRIPENCIES REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-3 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com ATTACHMENT DETAIL ATTACHMENT DETAIL SCALE: NTS1 ATTACHMENT DETAIL (ENLARGED VIEW) SCALE: NTS2 NOTE: ACTUAL ROOF CONDITIONS AND RAFTERS (OR SEAM) LOCATIONS MAY VARY. INSTALL PER MANUFACTURER(S) INSTALLATION GUIDELINES AND ENGINEERED SPANS FOR ATTACHMENTS 4"X6" RAFTE R S @ 30" O.CENLARGE VIEW PV MODULES COMP SHINGLE ROOF 2.5" MIN. EMBEDMENT 5/16" x 4" STAINLESS STEEL LAG BOLT W/ SS EPDM BONDED WASHER NXT UMOUNT COMBO CLAMP PV MODULES NXT UMOUNT RAIL NXT UMOUNT RAIL CLAMP FLASHLOC BASE ROOF / DECK MEMBRANE COMP SHINGLE ROOF 5/16"-18 x 2" SERRATED FLANGE HEX SCREW ~4" HEIGHT ADJUSTMENT 1. 3 8 " ~ 4 " 1 . 3 8 " 30 May 2023 EXP : 30 Sep 2023 STRUCTURAL ONLY NOTE TO INSTALLER: VERIFY THE ROOF FRAMING INFO BEFORE INSTALLATION AND NOTIFY EOR IF THERE IS ANY INCONSISTENCY BETWEEN SITE VERIFICATION AND THE FOLLOWING: 4X6 RAFTERS @30" O.C. WITH MAX UNSUPPORTED SPAN EQUAL OR LESS THAN 8.5 FT. REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-3.1 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com POWER WALL FRAMING DETAILS SCALE: NTS1 POWER WALL FRAMING DETAILS 30 May 2023 EXP : 30 Sep 2023 STRUCTURAL ONLY REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-4 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com ELECTRICAL LINE DIAGRAM SUM OF ALL HANDLE RULE NEC-705.12 (B)(2)(3)(C) ELECTRICAL LINE DIAGRAM SCALE: NTS1 SOLAR MODULE SPECIFICATIONS MANUFACTURER / MODEL #VMP IMP VOC ISC TEMPERATURE COEFFICIENT OF Voc MODULE QUANTITY CANADIAN SOLAR CS6R-395MS-HL (395W)30.60 12.91 36.60 13.77 -0.26%/°C 12 MODULE DIMENSION 67.80" L x 44.60" W x 1.38" D AMBIENT TEMPERATURE SPECIFICATIONS RECORD LOW TEMP AMBIENT TEMP (HIGH TEMP 2%) CONDUIT HEIGHT CONDUCTOR TEMPERATURE RATE (ON ROOF) CONDUCTOR TEMPERATURE RATE (OFF ROOF) 2°28°7/8"90°75°NOTE: * 3/4" OR GREATER IMC, RMC, FMC, LFMC, PVC, HDPE, NUCC, RTRC, LFNC, FMT, ENT OR EMT CONDUIT RUN EXPOSED CONDUIT RUN SHALL BE MIN. 7/8" ABOVE ROOF. * ROMEX RUN INSIDE ATTIC G (N) AC DISCONNECT 30A NON FUSED, 240 VAC SOLAREDGE S440 POWER OPTIMIZER RATED DC INPUT POWER - 440 WATTS MAXIMUM INPUT VOLTAGE - 60 VDC MPPT RANGE - 8 TO 60 VDC MAXIMUM SHORT CIRCUIT CURRENT - 14.5 ADC MAXIMUM OUTPUT CURRENT - 15 ADC STRING LIMITATIONS - 8 TO 25 OPTIMIZERS, 5700 WATTS STC PER STRING MAXIMUM SOLAREDGE OPTIMIZERS HAVE INTEGRATED RAPID SHUT DOWN (N) 200A TESLA BACKUP GATEWAY-2 CTRLTESLAC (2) [24-16]AWG THWN-2 COMMUNICATION WITH POWERWALL L EXISTING GROUNDING SYSTEM (E) 100A FEEDER BREAKER FOR GATEWAY BI-DIRECTIONAL UTILITY METER 1-PHASE, 3-W, 120V/240V, 60Hz INVERTER SPECIFICATIONS MANUFACTURER / MODEL #QUANTITY NOMINAL OUTPUT VOLTAGE NOMINAL OUTPUT CURRENT NOMINAL AC POWER SOLAREDGE SE3800H-USRGM 01 240 VAC 16.0A 3.80kW SERVICE FEED: OVERHEAD 30A (N) 5kW AC BATTERY TESLA POWERWALL 2 AC NRTL LISTED, 13.5KWH NEMA 3R CTRL (N) 30A BATTERY BREAKER 40A (N) 40A SOLAR SUB PANEL BREAKER E (N) 30A IMO DISCONNECT G G G (E) 100A SUBPANEL (BACKED UP LOAD PANEL) F (E) LOADS 100A (E) 100A SUB PANEL BREAKER (E) 100A MAIN SERVICE PANEL WITH (E) 100A MAIN BREAKER (BOTTOM FED) EXISTING GROUNDING SYSTEM (N) JUNCTION BOX #2 #1#12 DC AC 12 MODULES CONNECTED IN STRING #1 (N) SOLAREDGE SE3800H-USRGM (240V) OUTPUT: 240 VAC,16.0A 99% CEC WEIGHTED EFFICIENCY NEMA 3R, UL LISTED, INTERNAL GFDI WITH INTEGRATED DC DISCONNECT G A B (E) JUNCTION BOX G G (E) 30A NON FUSED AC DISCONNECT (SQUARE D DU221RB)DC AC (E) SOLAREDGE SE3800H-US G (N) 125A SOLAR SUB PANEL 20A 20A EXISTING WIRES D (E) 20A PV BREAKER(RELOCATE (E) PV BREAKER FROM MAIN PANEL TO SOLAR SUB PANEL) (N) 20A PV BREAKER (E) 14 - UNKNOWN PV MODULES EXISTING WIRES EXISTING WIRES EXISTING WIRES EXISTING WIRES 100A 100A REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-4.1 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com ELECTRICAL WIRE CALCULATION ELECTRICAL WIRE CALCULATION SCALE: NTS1 WIRE TAG CONDUIT WIRE QTY WIRE GAUGE WIRE TYPE TEMP. RATING WIRE AMPACITY (A) TEMP. DERATE CONDUIT FILL DERATE DERATED AMPACITY (A) NOC (A)CEC CORRECTION DESIGN CURRENT (A) GROUND SIZE GROUND WIRE TYPE A OPEN AIR 2 10 AWG PV-WIRE 90°C 40 1.00 1.0 40.00 15 1.25 18.75 10 AWG BARE CU GND B 3/4" EMT 2 10 AWG THWN-2 90°C 40 1.00 1.0 40.00 15 1.25 18.75 10 AWG THWN-2 C 3/4" EMT 3 10 AWG THWN 75°C 35 1.00 1.0 35.00 16.0 1.25 20.00 10 AWG THWN D 3/4" EMT 3 8 AWG THWN 75°C 50 1.00 1.0 50.00 --40.00 10 AWG THWN E 3/4" EMT 2 10 AWG THWN 75°C 35 1.00 1.0 35.00 --30.00 10 AWG THWN F 1 1/4" EMT 3 2 AWG THWN 75°C 115 1.00 1.0 115.00 --100.00 8 AWG THWN REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-5 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com WARNING LABELS & PLACARD POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN CAUTION ! MULTIPLE SOURCES OF POWER WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM LABEL LOCATION: CONDUIT, INVERTER (PER CODE: CEC690.31(D)(2) PHOTOVOLTAIC POWER SOURCE LABEL LOCATION: POINT OF INTERCONNECTION PRODUCTION METER CEC 705.12(B)(3)(3) & CEC 690.59) ELECTRICAL SHOCK HAZARD WARNING TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LABEL LOCATION: MAIN SERVICE PANEL PER CODE(S): CEC 2022: CEC 706.15 (C)(4) & CEC 690.13(B) MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 16.0 AMPS 240 VAC LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2022: 690.54 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): 2022 CEC 690.56(C) & 2022 CFC 1205.4.1 ! 3" PHOTOVOLTAIC AC DISCONNECT WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT LABEL LOCATION: DC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: CEC 690.13(B)) MAIN PHOTOVOLTAIC SYSTEM DISCONNECT LABEL LOCATION: MAIN SERVICE DISCONNECT / UTILITY METER (PER CODE: CEC 690.13(B)) LABEL LOCATION: AC DISCONNECT/BREAKER/ POINT OF CONNECTION (PER CODE: CEC 690.13(B) PHOTOVOLTAIC AC DISCONNECT THIS EQUIPMENT FED BY MULTIPLE SOURCES: TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN POWER SUPPLY SHALL NOT EXCEED AMPACITY OF BUSBAR WARNING LABEL LOCATION: POINTS OF CONNECTION/BREAKER CODE: CEC 705.12(B)(3)(3) LABEL LOCATION: MSP (PER CODE: CEC 705.12(D) & CEC 690.59 CAUTION PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED ! WARNING POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE ! LABEL LOCATION: SERVICE PANEL IF SUM OF BREAKERS EXCEEDS PANEL RATING CEC 705.12 (B)(3)(2) ! ! ! LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2022: 690.56(C)(2) RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING THE DISCONNECTION OF THE GROUNDED CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE ON THE EQUIPMENT ! LABEL LOCATION: INVERTER PER CODE: CEC 690.31(E) RATED MAXIMUM POWER- . POINT CURRENT (Imp) . RATED MAXIMUM POWER- . POINT VOLTAGE (Vmp) . MAXIMUM SYSTEM . VOLTAGE (VOC) . MAXIMUM CIRCUIT . CURRENT (Isc) . A V V A 12.47 380 480 15 LABEL LOCATION: DC DISCONNECT, INVERTER# (PER CODE: CEC 690.53) MAIN SERVICE PANEL WITH MAIN BREAKER UTILITY METER SUB PANEL AC DISCONNECT INVERTER TESLA BACKUP GATEWAY INVERTER AC DISCONNECT SOLAR SUB PANEL BATTERY IMO DISCONNECT PV MODULES PV MODULES 45 5 8 5 AB R O N I A T R A I L REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-6 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com OPTIMIZER CHART 1-10 1 2 3 4 11-20 21-30 31-40 41-50 51-60 5 6 7 8 9 10 POWER OPTIMIZER CHART AB R O N I A T R A I L REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-7 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-8 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-9 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-9 (5) PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-9 (4) PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-9 (3) PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-10 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-11 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-12 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-13 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-16 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS REV SHEET NAME SHEET NUMBER DATEDESCRIPTION VERSION PV-17 PROJECT NAME UR05/27/2023INITIAL RELEASE RI C H A R D K A I N 45 5 8 5 AB R O N I A T R A I L , PA L M D E S E R T , CA 9 2 2 6 0 US A UT I L I T Y : SC E AH J : CI T Y O F P A L M D E S E R T SHEET SIZE ANSI B 11" X 17" AP N : 62 5 1 9 3 0 0 3 SENGA ENERGY 2201 FRANCISCO DRIVE, STE 140-287 EL DORADO HILLS, CA 95762 USA CSLB #: 1033247 PHONE: 9164009920 Email: anthonyc@sengaenergy.com SPEC SHEETS Project : Project Number: By : Date : UNIRAC 1411 Broadway Blvd, NE Albuquerque, NM 87102 RE: Richard Kain To Whom it May Concern, CODE REFERENCES: BUILDING CODE: 2022 CALIFORNIA BUILDING CODE 2021 INTERNATIONAL BUILDING CODE ASCE 7-16 SCOPE OF WORK: DESIGN PARAMETERS RISK/OCCUPANCY CATEGORY : ROOF DEAD LOAD :psf ROOF LIVE LOAD :psf DESIGN WIND SPEED :mph WIND EXPOSURE : GROUND SNOW LOAD :psf SEISMIC DESIGN CATEGORY : EXISTING ROOF STRUCTURE ROOF :4x6 Rafters @ 30" O.C. ROOF MATERIAL :Comp Shingle EXISTING WALL STUDS WALL STUDS :2x4 @ 16" O.C. WALL STUD MATERIAL :Wood Studs Per your request, we have reviewed the existing structure at the above referenced site. The purpose of our review was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof per layout plan. Roof structural framing plan has been reviewed for additional loading due to installation of the roof mounted solar PV addition. The structural review that follows, including plans and calculations, only apply to the section of the roof that is directly supporting the solar PV system and its supporting elements. Richard Kain PE 30-05-2023 Tuesday, May 30, 2023 45585 Abronia Trail, Palm Desert, CA 92260, USA 0 *null II 97 B 8 20 Page 1 CONNECTION TO STRUCTURE OBSERVED CONDITIONS: CONCLUSIONS: LIMITATIONS: Praneet R Erusu, P.E. Principal Engineer Erusu Consultants US Inc. Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry-wide methods and applicable safety standards. Existing Roof and structural members are assumed to be in good and serviceable condition. The contractor must notify Erusu Consultants US Inc. should any damage, deterioration or discrepancies between the as-built condition of the structure and the condition described in this letter be found. The use of solar panel support span tables provided by others are allowed only where the building type, site conditions, site-specific design parameters, and solar panel configuration match the description of the span tables. The design of the solar panel racking (mounts, rails, etc.) and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Erusu Consultants US Inc. assumes no responsibility for improper installation of the solar array. MOUNTING CONNECTION : Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. In the area of the solar array, other live loads will not be present or will be greatly reduced (2022 CBC, Section 1607.14.4). The gravity loads and the stresses of the structural elements, in the area of the solar array are either decreased or increased by no more than 5%. Therefore, the requirements of Section 503.3 of the 2022 CEBC are met and the structure is permitted to remain unaltered. The solar array will be flush-mounted (no more than 6" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case. Regarding seismic loads, we conclude that any additional forces will be small. Conservatively neglecting the weight of existing wall materials, the installation of the solar panels represents an increase in the total weight (and resulting seismic load) of 9.8%. Because the increase in lateral forces is less than 10%, this addition meets the requirements of the exception in Section 503.4 of the 2022 CEBC. Thus the existing lateral force resisting system is permitted to remain unaltered. (1) 5/16" SS LAG BOLT w/ MIN. 2.5" EMBEDMENT INTO (E) 2x FRAMING MEMBER @ MAX. 60" o.c. ALONG RAILS (2) RAILS PER ROW OF PANELS, EVENLY SPACED. PANEL LENGTH PERPENDICULAR TO RAIL NOT TO EXCEED 67.8". (4) 1/4" LAG BOLTS w/ MIN. 2.5" EMBEDMENT (2 TOP & 2 BOTTOM) INTO (E) STUDS, USING 2 STUDS MINIMUM FOR TESLA POWERWALL SINGLE STACK. The observed roof framing is described below. If field conditions differ, the contractor shall notify the engineer prior to starting construction. The roof framing is supported by 4x6 Rafters @ 30" O.C are spanning between load bearing walls. The maximum allowed clear span of rafter is 8.5ft, to be verified in field by the contractor. 30 May 2023 EXP : 30 Sep 2023 Page 2 Project : Project Number: By : Date : Address :45585 Abronia Trail, Palm Desert, CA 92260, USA Site Plan: Richard Kain PE 30-05-2023 Page 3 Project : Project Number: By : Date : Roof Dead Load Roof Slope = : Angle = Roof Live Load Roof Live Load, Lo = psf (Refer ASCE 7-16, Table 4.3-1) Roof Live Load with PV Array = psf 2022 CBC, Section 1607.14.4 (Ceiling load and MEP is assumed to be not supported by rafters) DL = 8.19 20 0 Framing 1.15 1.02 1.18 PV Array 3 1.02 3.07 Vaulted Ceiling 0 1.02 0.00 MEP & Misc. 0.85 1.02 0.87 Comp Shingle 4 1.02 4.09 1/2" Plywood Deck 2 1.02 2.05 2.6 12 Plan Projected Material Weight (psf) Richard Kain PE 30-05-2023 12 Material Material Weight (psf) Increase due to Roof Slope Page 4 Project : Project Number: By : Date : Richard Kain PE 30-05-2023 Summary of Gravity Loads Dead Load, D = psf Roof Live Load, Lr = psf Gravity Load Comparison (D + Lr)/Cd = psf (Cd = 0.9 for D, 1.15 for S, 1.25 for Lr) Max Loading = psf Proposed to Current Loading Ratio = Gravity Loading with PV Array is not stressing the current framing system by more that 5% of the original configuration. Per Section 503.3 of 2022 California Existing Building Code the structure is allowed to remain unaltered for gravity loading. 25.10 12.51 50%< 105%O.K. Existing With PV Array 25.10 12.51 8.19 11.26 20.00 0.00 Existing With PV Array Page 5 Project : Project Number: By : Date : Wind Load Calculation Wind Loads - ASCE 7-16 Chapter 26 & 29 Risk Category = V = mph Exposure = Average height of building, z = ft - avg (Approximate) ft (Refer ASCE 7-16, Table 26.10-1) α =Zg =ft (Refer ASCE 7-16, Table 26.11-1) Kh & Kz =2.01(z/Zg)^(2/α) = Kzt =(Refer ASCE 7-16, Equation 26.8-1) Kd =(Refer ASCE 7-16, Table 26.6.1) Ke =(Refer ASCE 7-16, Table 26.9-1) qh ='.00256 KzKztKdKeV² =psf (Refer ASCE 7-16, Section 26.10-1) Building Classification = Solar Panel Components and Cladding p C&C = qh(GCp)(ϒe)(ϒa)ASCE 7-16 Chapter 29.4.4 Module Length =in Module Width =in Area of Module =ft2 Roof Pitch =: Slope =degrees Gable Roof = ϒe= ϒa= (Refer ASCE 7-16, Figure 29.4-8) 12 12 21.0 67.80 7° < θ ≤ 20° 1.5 11.77 2.6 44.6 97 B 15 0.57 Enclosed 0.8 1200 zmin = 30 7 1 1 0.85 II Richard Kain PE 30-05-2023 Page 6 Project : Project Number: By : Date : Richard Kain PE 30-05-2023 Zone 1 Uplift External Wind pressure coefficient GCp = External Wind pressure, qGCp = psf Zone 2 Uplift External Wind pressure coefficient GCp = External Wind pressure, qGCp = psf All Zone Downward External Wind pressure coefficient GCp = External Wind pressure, qGCp = psf Maximum Uplift Wind Pressure, p = psf Minimum Downward Wind Pressure ,p =psf Lag Screw / Bolt Connection Check (ASD) for Portrait Tributary Width =in (Max Spacing of fasteners along Rails) Tributary Length =in (Half Panel Length) Tributary Area =ft2 Lag Screw/Bolt Size = Cd =(Refer NDS Table 2.3.2) Embedment = in Grade of Wood = #2 ( or better) G = Capacity = lb/in (Refer NDS Table 12.2A) Number of Screws in Tension = Prying Coefficient = Capacity of Fasteners = lb Demand Zone 1 Zone 2 0.41 Pressure ASD (0.6W)(psf) -16.9 -22.0 14.1 311.1 760 DCR 14.1 239.3 760 0.31 Capacity (lb)Tributary Area (ft2) Uplift (lb)Zone 0.5 266 1 1.4 760 60 0.5 7.1 (Measured from top of the framing member to tapered tip of lag screw, embedment in sheathing and tapered tip of screw is not included) DF -36.71 -2 -28.24 -36.71 16.0 33.90 14.1 5/16 1.6 2.5 -2.6 Page 7 Project : Project Number: By : Date : Richard Kain PE 30-05-2023 Lag Screw / Bolt Connection Check (ASD) for Landscape Tributary Width =in (Max Spacing of fasteners along Rails) Tributary Length =in (Half Panel Length) Tributary Area =ft2 Lag Screw/Bolt Size = Cd =(Refer NDS Table 2.3.2) Embedment = in Grade of Wood = #2 ( or better) G = Capacity = lb/in (Refer NDS Table 12.2A) Number of Screws in Tension = Prying Coefficient = Capacity of Fasteners = lb Demand 60 22.3 9.3 5/16 1.6 2.5 (Measured from top of the framing member to tapered tip of lag screw, embedment in sheathing and tapered tip of screw is not included) DF 0.5 266 1 1.4 760 Zone Pressure ASD (0.6W)(psf) Tributary Area (ft 2) Uplift (lb) Capacity (lb) DCR Zone 1 -16.9 9.3 157.4 760 0.21 0.27Zone 2 -22.0 9.3 204.7 760 Page 8 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Downward) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase Allowable Stress Design Douglas Fir-Larch No.2 900.0 900.0 1,350.0 625.0 1,600.0 580.0 180.0 575.0 31.210 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :ASCE 7-16 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Load for Span Number 1 Uniform Load : D = 0.00810 ksf, Tributary Width = 2.50 ft, (Existing Roof Dead Load) Point Load : D = 0.0420, W = 0.2260 k @ 2.50 ft, (Solar Panel Load) Point Load : D = 0.420, W = 0.2260 k @ 5.80 ft, (Solar Panel Load) Uniform Load : Lr = 0.020, W = 0.0160 ksf, Extent = 0.0 -->> 1.50 ft, Tributary Width = 2.50 ft, (Existing Wind & Roof Live Load) Load for Span Number 2 Uniform Load : D = 0.00810, Lr = 0.020, W = 0.0160 ksf, Tributary Width = 2.50 ft, (Existing Roof Load) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.526: 1 Load Combination +D+H Span # where maximum occurs Span # 1 Location of maximum on span 5.793ft 29.70 psi= = 1,210.95 psi 4x6Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+H = = = 162.00 psi== Section used for this span 4x6 Maximum Shear Stress Ratio 0.183 : 1 8.073 ft= = 637.54 psi Maximum Deflection 708 >=180 519 Ratio =328 >=120 Max Downward Transient Deflection 0.101 in 1013Ratio =>=180 Max Upward Transient Deflection -0.068 in Ratio = Max Downward Total Deflection 0.196 in Ratio =>=120 Max Upward Total Deflection -0.146 in fb: Actual F'b fv: Actual F'v Span: 2 : Lr Only Span: 2 : W Only Span: 1 : +D+0.60W+H Span: 2 : +D+0.60W+H .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu +D+H 0.0 0.00 0.00.0 1.00Length = 8.50 ft 1 0.526 0.183 0.90 1.300 1.151.00 1.00 0.94 637.5 1,211.0 0.38 162.01.00 29.71.00 1.00Length = 2.0 ft 2 0.023 0.183 0.90 1.300 1.151.00 1.00 0.04 27.5 1,211.0 0.03 162.01.00 29.71.00 1.00+D+L+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.474 0.165 1.00 1.300 1.151.00 1.00 0.94 637.5 1,345.5 0.38 180.01.00 29.71.00 Page 9 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Downward) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu 1.00Length = 2.0 ft 2 0.020 0.165 1.00 1.300 1.151.00 1.00 0.04 27.5 1,345.5 0.03 180.01.00 29.71.00 1.00+D+Lr+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.359 0.138 1.25 1.300 1.151.00 1.00 0.89 603.4 1,681.9 0.40 225.01.00 31.11.00 1.00Length = 2.0 ft 2 0.057 0.138 1.25 1.300 1.151.00 1.00 0.14 95.5 1,681.9 0.11 225.01.00 31.11.00 1.00+D+S+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.412 0.143 1.15 1.300 1.151.00 1.00 0.94 637.5 1,547.3 0.38 207.01.00 29.71.00 1.00Length = 2.0 ft 2 0.018 0.143 1.15 1.300 1.151.00 1.00 0.04 27.5 1,547.3 0.03 207.01.00 29.71.00 1.00+D+0.750Lr+0.750L+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.364 0.137 1.25 1.300 1.151.00 1.00 0.90 611.9 1,681.9 0.39 225.01.00 30.81.00 1.00Length = 2.0 ft 2 0.047 0.137 1.25 1.300 1.151.00 1.00 0.12 78.5 1,681.9 0.09 225.01.00 30.81.00 1.00+D+0.750L+0.750S+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.412 0.143 1.15 1.300 1.151.00 1.00 0.94 637.5 1,547.3 0.38 207.01.00 29.71.00 1.00Length = 2.0 ft 2 0.018 0.143 1.15 1.300 1.151.00 1.00 0.04 27.5 1,547.3 0.03 207.01.00 29.71.00 1.00+D+0.60W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.401 0.141 1.60 1.300 1.151.00 1.00 1.27 864.2 2,152.8 0.52 288.01.00 40.71.00 1.00Length = 2.0 ft 2 0.028 0.141 1.60 1.300 1.151.00 1.00 0.09 60.2 2,152.8 0.07 288.01.00 40.71.00 1.00+D+0.750Lr+0.750L+0.450W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.363 0.136 1.60 1.300 1.151.00 1.00 1.15 781.9 2,152.8 0.50 288.01.00 39.01.00 1.00Length = 2.0 ft 2 0.048 0.136 1.60 1.300 1.151.00 1.00 0.15 103.0 2,152.8 0.12 288.01.00 39.01.00 1.00+D+0.750L+0.750S+0.450W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.375 0.132 1.60 1.300 1.151.00 1.00 1.19 807.6 2,152.8 0.49 288.01.00 38.01.00 1.00Length = 2.0 ft 2 0.024 0.132 1.60 1.300 1.151.00 1.00 0.08 52.0 2,152.8 0.06 288.01.00 38.01.00 1.00+0.60D+0.60W+0.60H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.283 0.100 1.60 1.300 1.151.00 1.00 0.90 609.2 2,152.8 0.37 288.01.00 28.81.00 1.00Length = 2.0 ft 2 0.023 0.100 1.60 1.300 1.151.00 1.00 0.07 49.2 2,152.8 0.06 288.01.00 28.81.00 1.00+D+0.70E+0.60H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.296 0.103 1.60 1.300 1.151.00 1.00 0.94 637.5 2,152.8 0.38 288.01.00 29.71.00 1.00Length = 2.0 ft 2 0.013 0.103 1.60 1.300 1.151.00 1.00 0.04 27.5 2,152.8 0.03 288.01.00 29.71.00 1.00+D+0.750L+0.750S+0.5250E+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.296 0.103 1.60 1.300 1.151.00 1.00 0.94 637.5 2,152.8 0.38 288.01.00 29.71.00 1.00Length = 2.0 ft 2 0.013 0.103 1.60 1.300 1.151.00 1.00 0.04 27.5 2,152.8 0.03 288.01.00 29.71.00 1.00+0.60D+0.70E+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.178 0.062 1.60 1.300 1.151.00 1.00 0.56 382.5 2,152.8 0.23 288.01.00 17.81.00 1.00Length = 2.0 ft 2 0.008 0.062 1.60 1.300 1.151.00 1.00 0.02 16.5 2,152.8 0.02 288.01.00 17.81.00 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+0.60W+H 1 0.1963 4.416 0.0000 0.000 +D+0.60W+H20.0000 4.416 -0.1458 2.000 . Load Combination Support 1 Support 2 Support 3 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 0.411 0.661 Max Upward from Load Combinations 0.411 0.661 Max Upward from Load Cases 0.277 0.430 +D+H 0.244 0.430 +D+L+H 0.244 0.430 +D+Lr+H 0.301 0.549 +D+S+H 0.244 0.430 +D+0.750Lr+0.750L+H 0.287 0.519 +D+0.750L+0.750S+H 0.244 0.430 Page 10 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Downward) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: Load Combination Support 1 Support 2 Support 3 Vertical Reactions Support notation : Far left is #1 Values in KIPS +D+0.60W+H 0.410 0.620 +D+0.750Lr+0.750L+0.450W+H 0.411 0.661 +D+0.750L+0.750S+0.450W+H 0.369 0.572 +0.60D+0.60W+0.60H 0.313 0.447 +D+0.70E+0.60H 0.244 0.430 +D+0.750L+0.750S+0.5250E+H 0.244 0.430 +0.60D+0.70E+H 0.147 0.258 D Only 0.244 0.430 Lr Only 0.057 0.118 W Only 0.277 0.315 H Only Page 11 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Uplift) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase Allowable Stress Design Douglas Fir-Larch No.2 900.0 900.0 1,350.0 625.0 1,600.0 580.0 180.0 575.0 31.210 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :ASCE 7-16 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Load for Span Number 1 Uniform Load : D = 0.00810 ksf, Tributary Width = 2.50 ft, (Existing Roof Dead Load) Point Load : D = 0.0420, W = -0.5190 k @ 2.50 ft, (Solar Panel Load) Point Load : D = 0.420, W = -0.5190 k @ 5.80 ft, (Solar Panel Load) Uniform Load : Lr = 0.020, W = -0.0370 ksf, Extent = 0.0 -->> 1.50 ft, Tributary Width = 2.50 ft, (Existing Wind & Roof Live Load) Load for Span Number 2 Uniform Load : D = 0.00810, Lr = 0.020, W = -0.0370 ksf, Tributary Width = 2.50 ft, (Existing Roof Load) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.526: 1 Load Combination +D+H Span # where maximum occurs Span # 1 Location of maximum on span 5.793ft 29.70 psi= = 1,210.95 psi 4x6Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+H = = = 162.00 psi== Section used for this span 4x6 Maximum Shear Stress Ratio 0.183 : 1 8.073 ft= = 637.54 psi Maximum Deflection 441 >=180 748 Ratio =456 >=120 Max Downward Transient Deflection 0.155 in 308Ratio =>=180 Max Upward Transient Deflection -0.231 in Ratio = Max Downward Total Deflection 0.136 in Ratio =>=120 Max Upward Total Deflection -0.105 in fb: Actual F'b fv: Actual F'v Span: 2 : W Only Span: 1 : W Only Span: 2 : +0.60D+0.60W+0.60H Span: 2 : +D+H .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu +D+H 0.0 0.00 0.00.0 1.00Length = 8.50 ft 1 0.526 0.183 0.90 1.300 1.151.00 1.00 0.94 637.5 1,211.0 0.38 162.01.00 29.71.00 1.00Length = 2.0 ft 2 0.023 0.183 0.90 1.300 1.151.00 1.00 0.04 27.5 1,211.0 0.03 162.01.00 29.71.00 1.00+D+L+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.474 0.165 1.00 1.300 1.151.00 1.00 0.94 637.5 1,345.5 0.38 180.01.00 29.71.00 Page 12 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Uplift) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu 1.00Length = 2.0 ft 2 0.020 0.165 1.00 1.300 1.151.00 1.00 0.04 27.5 1,345.5 0.03 180.01.00 29.71.00 1.00+D+Lr+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.359 0.138 1.25 1.300 1.151.00 1.00 0.89 603.4 1,681.9 0.40 225.01.00 31.11.00 1.00Length = 2.0 ft 2 0.057 0.138 1.25 1.300 1.151.00 1.00 0.14 95.5 1,681.9 0.11 225.01.00 31.11.00 1.00+D+S+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.412 0.143 1.15 1.300 1.151.00 1.00 0.94 637.5 1,547.3 0.38 207.01.00 29.71.00 1.00Length = 2.0 ft 2 0.018 0.143 1.15 1.300 1.151.00 1.00 0.04 27.5 1,547.3 0.03 207.01.00 29.71.00 1.00+D+0.750Lr+0.750L+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.364 0.137 1.25 1.300 1.151.00 1.00 0.90 611.9 1,681.9 0.39 225.01.00 30.81.00 1.00Length = 2.0 ft 2 0.047 0.137 1.25 1.300 1.151.00 1.00 0.12 78.5 1,681.9 0.09 225.01.00 30.81.00 1.00+D+0.750L+0.750S+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.412 0.143 1.15 1.300 1.151.00 1.00 0.94 637.5 1,547.3 0.38 207.01.00 29.71.00 1.00Length = 2.0 ft 2 0.018 0.143 1.15 1.300 1.151.00 1.00 0.04 27.5 1,547.3 0.03 207.01.00 29.71.00 1.00+D+0.60W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.081 0.044 1.60 1.300 1.151.00 1.00 0.26 175.4 2,152.8 0.16 288.01.00 12.81.00 1.00Length = 2.0 ft 2 0.022 0.044 1.60 1.300 1.151.00 1.00 0.07 47.9 2,152.8 0.05 288.01.00 12.81.00 1.00+D+0.750Lr+0.750L+0.450W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.103 0.041 1.60 1.300 1.151.00 1.00 0.33 221.6 2,152.8 0.15 288.01.00 11.81.00 1.00Length = 2.0 ft 2 0.010 0.041 1.60 1.300 1.151.00 1.00 0.03 21.9 2,152.8 0.02 288.01.00 11.81.00 1.00+D+0.750L+0.750S+0.450W+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.115 0.044 1.60 1.300 1.151.00 1.00 0.36 247.3 2,152.8 0.16 288.01.00 12.61.00 1.00Length = 2.0 ft 2 0.014 0.044 1.60 1.300 1.151.00 1.00 0.04 29.1 2,152.8 0.03 288.01.00 12.61.00 1.00+0.60D+0.60W+0.60H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.151 0.059 1.60 1.300 1.151.00 1.00 0.48 325.0 2,152.8 0.22 288.01.00 16.91.00 1.00Length = 2.0 ft 2 0.027 0.059 1.60 1.300 1.151.00 1.00 0.09 59.0 2,152.8 0.07 288.01.00 16.91.00 1.00+D+0.70E+0.60H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.296 0.103 1.60 1.300 1.151.00 1.00 0.94 637.5 2,152.8 0.38 288.01.00 29.71.00 1.00Length = 2.0 ft 2 0.013 0.103 1.60 1.300 1.151.00 1.00 0.04 27.5 2,152.8 0.03 288.01.00 29.71.00 1.00+D+0.750L+0.750S+0.5250E+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.296 0.103 1.60 1.300 1.151.00 1.00 0.94 637.5 2,152.8 0.38 288.01.00 29.71.00 1.00Length = 2.0 ft 2 0.013 0.103 1.60 1.300 1.151.00 1.00 0.04 27.5 2,152.8 0.03 288.01.00 29.71.00 1.00+0.60D+0.70E+H 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 8.50 ft 1 0.178 0.062 1.60 1.300 1.151.00 1.00 0.56 382.5 2,152.8 0.23 288.01.00 17.81.00 1.00Length = 2.0 ft 2 0.008 0.062 1.60 1.300 1.151.00 1.00 0.02 16.5 2,152.8 0.02 288.01.00 17.81.00 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections W Only10.0000 0.000 -0.2311 4.179 W Only 2 0.1552 2.000 0.0000 4.179 . Load Combination Support 1 Support 2 Support 3 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 0.301 0.549 Max Upward from Load Combinations 0.301 0.549 Max Upward from Load Cases 0.244 0.430 Max Downward from all Load Conditio -0.636 -0.726 Max Downward from Load Combinations -0.235 -0.177 Max Downward from Load Cases (Resis -0.636 -0.726 +D+H 0.244 0.430 +D+L+H 0.244 0.430 +D+Lr+H 0.301 0.549 Page 13 Wood Beam LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:4x6 Rafters @ 30" o.c. (Wind Condition_Uplift) (Strength Check) Project File: 4x6 Joist @ 30 o.c_Copy.ec6 Project Title: Engineer: Project ID: Project Descr: Load Combination Support 1 Support 2 Support 3 Vertical Reactions Support notation : Far left is #1 Values in KIPS +D+S+H 0.244 0.430 +D+0.750Lr+0.750L+H 0.287 0.519 +D+0.750L+0.750S+H 0.244 0.430 +D+0.60W+H -0.137 -0.005 +D+0.750Lr+0.750L+0.450W+H 0.001 0.192 +D+0.750L+0.750S+0.450W+H -0.042 0.104 +0.60D+0.60W+0.60H -0.235 -0.177 +D+0.70E+0.60H 0.244 0.430 +D+0.750L+0.750S+0.5250E+H 0.244 0.430 +0.60D+0.70E+H 0.147 0.258 D Only 0.244 0.430 Lr Only 0.057 0.118 W Only -0.636 -0.726 H Only Page 14 Project : Project Number: By : Date : Seismic Ground Motion Values Richard Kain PE 30-05-2023 Page 15 Project : Project Number: By : Date : Seismic Design Force Seismic Loads - ASCE 7-16 Chapter 13 Seismic Force Component Amplification Factor, ap=(Refer ASCE 7-16, Table 13.6 -1) Overstrength Factor, Ωo =(Refer ASCE 7-16, Table 13.6 -1) Component Importance Factor, Ip= SDS = Average roof height of structure,h =ft z/h =z/h should not exceed 1 Frame Weight Wp = psf Seismic Design Force on Solar framing structure Max Fp =1.6 x SDS x Ip X Wp =psf Min Fp =0.3 x SDS x Ip X Wp =psf Seismic Design Load Fp =psf Vertical Seismic Design Load Fp =psf 1.00 Component Response Modification Factor, Rp= 1.50 15 1.11 2.95 0.74 Height in structure at point of attachment, z = ft (Refer ASCE 7-16, Table 13.6 -1) Seismic Coefficients for Mechanical and Electrical components =12 Other mechanical or electrical components. 1 3.07 psf 5.89 15 FP = ((0.4 x ap x SDS x Wp)/ (Rp / Ip)) x ((1+2(z/h)) =2.95 1.00 1.00 1.20 Richard Kain PE 30-05-2023 Page 16 Project : Project Number: By : Date : Richard Kain PE 30-05-2023 Check for Increase in overall seismic loads Array Area =ft2 Number of Arrays = Total Array Area =ft2 Array Load = psf Number of Existing Modules = Existing Area =ft2 Total Array Wt. = lb Total Roof Area =ft2 DL of Roof = psf Total Wt of Roof = lb Increase in Seismic Wt = < Conservatively the Wt. of the Walls tributary to the roof is not included. Seismic weight increase is less than 10% and no seismic retrofit or evaluation of existing lateral system is required per Section 503.4 of 2022 CEBC. 1436.1 1791.0 8.19 3 14 270.22 21.0 12 251.99 14660 9.8% 10% Page 17 Project : Project Number: By : Date : POWER WALL UNIT ATTACHEMENT CALCULATION Richard Kain PE 30-05-2023 Page 18 Project : Project Number: By : Date : 1. Loading Criteria Powerwall Unit Height = ft Powerwall Unit Width = ft Powerwall Unit Depth = ft Powerwall Unit C.G Height, HCG = ft Single Powerwall Weight, W = lbs Number of battery units, n = Max number of stacks per unit, N = Stack operating weight, WPW = lbs Total operating weight, WTPW = lbs Wpw = Unit type = Wall Mounted Number of anchor points at powerwall bracket, n1 = Bolt distance along width, BDX1 = ft Bolt distance along length, BDY1 = ft 2. Check (E) wall capacity to support additional loads imposed by the (N) powerwall units Shear due to dead load at each anchor point, PPW= lbs (E) Wall self weight, Wwall =psf Wall Studs = Wall Stud spacing, s =in Wall self tributary to each stud =plf Wall Height, hwall-1 =ft Richard Kain PE 30-05-2023 10.0 2x4 16 13.3 n x N x W 10 1.33 3.8 2.5 0.5 4.9 251.3 1 1 251.3 251.3 4 lbs/Anchor point 1.5 62.825 Dead T/C Loads from powerwall stack at each anchor point, T/CPW-DL=21 Page 19 Wood Column LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:2x4post Project File: 2x4 studd.ec6 Project Title: Engineer: Project ID: Project Descr: .Code References Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combinations Used : ASCE 7-16 General Information Wood Section Name 2x4Analysis Method : 10Overall Column Height ft Allowable Stress Design ( Used for non-slender calculations )Allow Stress Modification Factors End Fixities Top & Bottom Pinned Wood Species Wood Grade Fb +1,500.0 1,500.0 psi 1,000.0 1,000.0 150.0 1,000.0 33.0 psi Fv psi Fb -Ft psi Fc - Prll psi psi Density pcf Fc - Perp E : Modulus of Elasticity . . . 1,400.0 1,400.0 1,400.0 1,400.0 Cfu : Flat Use Factor 1.0 Cf or Cv for Tension 1.0 Use Cr : Repetitive ? Kf : Built-up columns 1.0 NDS 15.3.2 Exact Width 1.50 in Exact Depth 3.50 in Area 5.250 in^2 Ix 5.359 in^4 Iy 0.9844 in^4 Wood Grading/Manuf.Graded Lumber Wood Member Type Sawn Ct : Temperature Factor 1.0 Cf or Cv for Compression 1.0 1,400.0 Axial Cm : Wet Use Factor 1.0 Cf or Cv for Bending 1.0 x-x Bending y-y Bending ksi No Minimum Basic Y-Y (depth) axis : X-X (width) axis : Fully braced against buckling ABOUT X-X Axis Fully braced against buckling ABOUT Y-Y Axis Brace condition for deflection (buckling) along columns : .Service loads entered. Load Factors will be applied for calculations.Applied Loads Column self weight included : 12.031 lbs * Dead Load Factor AXIAL LOADS . . . Axial Load at 10.0 ft, D = 0.240, Lr = 0.120, W = 0.320 k BENDING LOADS . . . Lat. Point Load at 2.0 ft creating Mx-x, E = 0.0210 k Lat. Point Load at 3.50 ft creating Mx-x, E = 0.0210 k .DESIGN SUMMARY PASS PASS Max. Axial+Bending Stress Ratio =0.08659 Location of max.above base 3.490 ft Applied Axial 0.2520 k Applied Mx 0.05249 k-ft Load Combination +D+0.70E+0.60H Load Combination +D+0.70E+0.60H Bending & Shear Check Results Maximum Shear Stress Ratio = Applied Design Shear 9.135 psi 240.0Allowable Shear psi 0.02538 : 1 Bending Compression Tension Location of max.above base 1.946 ft : 1 At maximum location values are . . . Applied My 0.0 k-ft Maximum SERVICE Lateral Load Reactions . . Top along Y-Y 0.01155 k Bottom along Y-Y 0.03045 k Top along X-X 0.0 k Bottom along X-X 0.0 kGoverning NDS Forumla Comp + Mxx, NDS Eq. 3.9-3 Maximum SERVICE Load Lateral Deflections . . . Along Y-Y 0.1493 in at 4.564 ft above base for load combination :E Only Along X-X 0.0 in at 0.0 ft above base Fc : Allowable 1,600.0 psi Other Factors used to calculate allowable stresses . . . for load combination :n/a . Maximum Axial + Bending Stress Ratios Maximum Shear RatiosCDCLoad Combination Stress Ratio Location Stress Ratio Status LocationPStatus Load Combination Results +D+H 0.900 PASS PASS0.0 0.0 10.0 ft1.000 ft0.05334 +D+L+H 1.000 PASS PASS0.0 0.0 10.0 ft1.000 ft0.04801 +D+Lr+H 1.250 PASS PASS0.0 0.0 10.0 ft1.000 ft0.05669 +D+S+H 1.150 PASS PASS0.0 0.0 10.0 ft1.000 ft0.04174 +D+0.750Lr+0.750L+H 1.250 PASS PASS0.0 0.0 10.0 ft1.000 ft0.05212 +D+0.750L+0.750S+H 1.150 PASS PASS0.0 0.0 10.0 ft1.000 ft0.04174 +D+0.60W+H 1.600 PASS PASS0.0 0.0 10.0 ft1.000 ft0.05286 +D+0.750Lr+0.750L+0.450W+H 1.600 PASS PASS0.0 0.0 10.0 ft1.000 ft0.05786 Page 20 Wood Column LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:2x4post Project File: 2x4 studd.ec6 Project Title: Engineer: Project ID: Project Descr: Maximum Axial + Bending Stress Ratios Maximum Shear RatiosCDCLoad Combination Stress Ratio Location Stress Ratio Status LocationPStatus Load Combination Results +D+0.750L+0.750S+0.450W+H 1.600 PASS PASS0.0 0.0 10.0 ft1.000 ft0.04715 +0.60D+0.60W+0.60H 1.600 PASS PASS0.0 0.0 10.0 ft1.000 ft0.04086 +D+0.70E+0.60H 1.600 PASS PASS3.490 0.02538 1.946 ft1.000 ft0.08659 +D+0.750L+0.750S+0.5250E+H 1.600 PASS PASS3.490 0.01903 1.946 ft1.000 ft0.06517 +0.60D+0.70E+H 1.600 PASS PASS3.490 0.02538 1.946 ft1.000 ft0.08602 . k k-ft Note: Only non-zero reactions are listed. Load Combination X-X Axis Reaction Y-Y Axis Reaction Axial Reaction @ Base @ Top @ Base@ Base @ Top Maximum Reactions @ Base @ Base@ Top @ Top My - End Moments Mx - End Moments +D+H 0.252 +D+L+H 0.252 +D+Lr+H 0.372 +D+S+H 0.252 +D+0.750Lr+0.750L+H 0.342 +D+0.750L+0.750S+H 0.252 +D+0.60W+H 0.444 +D+0.750Lr+0.750L+0.450W+H 0.486 +D+0.750L+0.750S+0.450W+H 0.396 +0.60D+0.60W+0.60H 0.343 +D+0.70E+0.60H 0.008 0.2520.021 +D+0.750L+0.750S+0.5250E+H 0.006 0.2520.016 +0.60D+0.70E+H 0.008 0.1510.021 D Only 0.252 Lr Only 0.120 L Only S Only W Only 0.320 E Only 0.0120.030 H Only .Maximum Deflections for Load Combinations Max. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance +D+H 0.0000 0.000 0.000 ftftinin0.000 +D+L+H 0.0000 0.000 0.000 ftftinin0.000 +D+Lr+H 0.0000 0.000 0.000 ftftinin0.000 +D+S+H 0.0000 0.000 0.000 ftftinin0.000 +D+0.750Lr+0.750L+H 0.0000 0.000 0.000 ftftinin0.000 +D+0.750L+0.750S+H 0.0000 0.000 0.000 ftftinin0.000 +D+0.60W+H 0.0000 0.000 0.000 ftftinin0.000 +D+0.750Lr+0.750L+0.450W+H 0.0000 0.000 0.000 ftftinin0.000 +D+0.750L+0.750S+0.450W+H 0.0000 0.000 0.000 ftftinin0.000 +0.60D+0.60W+0.60H 0.0000 0.000 0.000 ftftinin0.000 +D+0.70E+0.60H 0.0000 0.105 4.564 ftftinin0.000 +D+0.750L+0.750S+0.5250E+H 0.0000 0.078 4.564 ftftinin0.000 +0.60D+0.70E+H 0.0000 0.105 4.564 ftftinin0.000 D Only 0.0000 0.000 0.000 ftftinin0.000 Lr Only 0.0000 0.000 0.000 ftftinin0.000 L Only 0.0000 0.000 0.000 ftftinin0.000 S Only 0.0000 0.000 0.000 ftftinin0.000 W Only 0.0000 0.000 0.000 ftftinin0.000 E Only 0.0000 0.149 4.564 ftftinin0.000 H Only 0.0000 0.000 0.000 ftftinin0.000 . Page 21 Wood Column LIC# : KW-06014559, Build:20.23.05.01 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2023 DESCRIPTION:2x4post Project File: 2x4 studd.ec6 Project Title: Engineer: Project ID: Project Descr: Sketches Page 22 Project : Project Number: By : Date : GLOBAL DESIGN CRITERIA 1. Powerwall unit and Bracket Design Specifications : Unit Height = in Unit Width = in Unit Depth = in Vertical distance between fasteners, Yf = in Unit weight, W = lbs Eccentricity from powerwall, e = in 2. Applicable site loads and coefficients Max Wind Pressure Wind load = mph Risk Category = Exposure Category = Velocity Pressure Coefficient, KZ = Topographic Factor, KZt = Wind Directionality Factor, Kd = Ke = External Pressure Coefficient, GCp = (Ignored for fastener calc) Max Seismic Load SRA at Short Period, SS =ASCE 7-16 Section 11.4.2 Site Class =ASCE 7-16 Section 11.4.3 Short Period Site Coefficient, Fa =ASCE 7-16 Table 11.4-1 ASCE 7-16 Table 11.4-2 Short Period Spectral Acceleration, SDS =ASCE 7-16 Table 11.4-3 Seismic Design Category = ASCE 7-16 Section 11.6 Long Period Site Coefficient, FV = Internal Pressure Coefficient, GCpi = Richard Kain PE 30-05-2023 45.3 29.6 5.75 18 251.3 6.8 97 1 0.85 1 0.85 II B NA 1.20 *null 1.4 0.0 1.5 D 1.2 Page 23 Project : Project Number: By : Date : GRAVITY LOAD CALCULATIONS Snow Load 0.7 * Ce * Ct * Is * Pg,max (Refer ASCE 7-16, Section 7.3-1) = psf Wind Pressure Velocity Pressure, qz = 00256 * Kz * Kzt * Kd* V2 (Refer ASCE 7-16, Section 26.10-1) = psf Design Wind Pressure, p = qz * [GCp + Gcpi](Refer ASCE 7-16, Section 30.3-1 ) =psf Seismic Forces 0.4 * ap * SDS * Wp * [1 + (2 * z / h)] Short Period Spectral Acceleration, SDS = Component Amplification Factor, ap =(Batteries - Refer ASCE 7-16, Table 13.6-1) (need not exceed 1.0) (Hazardous material - Refer ASCE 7-16, Table 13.1.3) * Wp 0.3 * SDS * Ip * Wp (Refer ASCE 7-16, Section 13.3-3 ) * Wp 1.6 * SDS * Ip * Wp (Refer ASCE 7-16, Section 13.3-2 ) = * Wp lbs * Wp =lbs = * Wp = lbs 271.4 251.3 Vertical Seismic Force, Fp,vert = 60.3 1 1 2.5 0.24 0.54 1.08 1.08 Weight of 1 Powerwall + Bracket, Wp = Fp,final = 0.2 * SDS * Wp Richard Kain PE 30-05-2023 0 (Rp / Ip) 1.2 1.92 Pf,max = Fp,max = Fp,min = Horizontal Seismic Force, Fp = (z/h)wall = Component Importance Factor, Ip = Response Modification Factor, Rp = Fp,wall = 24.4 17.4 0.9 Page 24 Project : Project Number: By : Date : LOAD APPLICATIONS Dead Load Shear Load Unit Load = lbs (distributed over # fasteners) Withdrawal load Withdrawal Force = Ecc moment / Yf Ecc Moment = in-lbs Withdrawal Force = lbs (distributed @ Top Bracket) Snow Load Shear Load Shear Force, Sparallel = =lbs (distributed over # fasteners) Withdrawal load Withdrawal Force = Ecc Moment = in-lbs Withdrawal Force = lbs (distributed @ Top Bracket) Wind Load Shear Load Wind Load, Wparallel = p * Side Surface Area of Unit =lbs (distributed over # fasteners) Withdrawal load (Suction) Withdrawal Load on Fastener = from Wind Load, Wperp = p * Front Surface Area of Unit = lbs (distributed over # fasteners) Ecc moment / Yf 0 0.0 44.1 226.9 Richard Kain PE 30-05-2023 Pf * Top Surface Area of Unit 251.3 1708.8 94.9 0 Page 25 Project : Project Number: By : Date : Richard Kain PE 30-05-2023 Seismic Load Shear Load lbs lbs (Refer ASCE 7-16, Section 12.4-4) Withdrawal load (accounts for horizontal components of Fp,vert and Fp) lbs lbs (Refer ASCE 7-16, Section 12.4-3) + Note: All withdrawal loads account for eccentricity, e, of the unit/bracket/wall system Greatest Withdrawal Load from Load Combination [D+.75*L+.75*(.6W)+.75*S] =lbs ((1+.14Sds)D+0.7Ev = lbs ((1+0.105Sds)D+0.525Ex+0.75S) = lbs Max Withdrawal load = Greatest Shear Load from [D+.75*L+.75*(.6W)+.75*S] Load Combination [D+.75*L+.75*(.6W)+.75*S] =lbs ((1+.14Sds)D+0.7Ev = lbs ((1+0.105Sds)D+0.525Ex+0.75S) = lbs Max Shear load = 60.3 # Top Fasteners Horizontal 271.4 # Total Fasteners Vertical Horizontal Seismic Force, Fp =271.4 Horizontal Effect, Eh = 271.4 Vertical Seismic Force, Fp,vert =60.3 Vertical Effect, Ev = 60.3 483.5 425.5 197.0 483.5 197.0 153.1 138.6 271.1 Seismic Load, E = Page 26 Project : Project Number: By : Date : ATTACHMENTS USING WOOD STUDS Wood Stud (With & Without Blocking) Lag Screw/Bolt Size = Number of Screws in Tension = Thread Length, p = in Eccentricity, e = in Withdrawal per Fastener, T = lbs SPF Lumber Specific Gravity, G = Withdrawal Design, W = lbs/in [NDS Table 12.2A] Load Duration Factor, CD = Capacity of Fasteners'' = lbs > O.K. lbs Shear Design, Z = lbs/in [NDS Table 12J (SPF)] Load Duration Factor, CD = Z' = lbs > O.K. Combined Shear and Withdrawal Analysed per NDS 2012 Sec. 11.4 and Eq. 11.4-2 α = deg R= lbs Z' α = lbs DCR = =<O.K. 130.53 415 494 494 Shear Load per Fastener, V = 121 110 440.0 120.88 1.6 440.0 R/Z' α Richard Kain PE 30-05-2023 0.31 22.2 1.05 2.5 6.8 173.0 1.6 49.26 4 49.26 0.42 1/4 Page 27 Updated June 2021    This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist.   1. Submittal Requirements  Completed permit application form. This permit application form can be downloaded at: https://www.cityofpalmdesert.org/our‐city/departments/palm‐desert‐permit‐center/building‐safety‐permits   Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpalmdesert.org/our‐city/departments/palm‐desert‐permit‐center/building‐safety‐permits/solar‐ information     Provide a standardized or simplified photovoltaic plan that demonstrates:  Title or Cover Sheet noting the 2019 California Electrical Code.  Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings.  A simplified Electrical Plan: 1. Locations of main service or utility disconnect 2. Total number of modules, number of modules per string and the total number of strings 3. Make and model of inverter(s) and/or combiner box if used 4. Single-line diagram of system 5. Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit  Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1. The type of roof covering and the number of roof coverings installed 2. Type of roof framing, size of members and spacing 3. Weight of panels, support locations and method of attachment 4. Framing plan and details for any work necessary to strengthen the existing roof structure 5. Site-specific structural calculations 6. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One‐and Two‐Family Dwellings  Updated June 2021              These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review)    1. General Requirements ☐ The photovoltaic system size is 30kW AC CEC rating or less. ☐ The solar array is roof-mounted on a one- or two-family dwelling unit or permitted accessory structure. ☐ The photovoltaic system is utility interactive. ☐ Permit application and declaration is completed and attached. 2. Planning Department Requirements ☐ Existing MPU Amps Doubling, e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. ☐ Maximum height of “tilted” panels shall not exceed eighteen (18) inches. ☐ All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. ☐ The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. ☐ Modules shall be flush with one another and gaps between panels shall be minimized. ☐ Screening of panels is not required. Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements   ☐ No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT) input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses (if needed) are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter ☐ For central inverter systems: No more than two inverters are utilized. ☐ The PV system is connected to the load side of the utility distribution equipment. ☐ A Solar PV Standard Plan and supporting documentation is completed and attached.   4. Structural Requirements   ☐ A completed Structural Criteria and supporting documentation is attached Wind and Seismic (if required). 5. Fire Safety Requirements ☐ Clear access pathways provided. ☐ Fire classification photovoltaic system is provided. ☐ All required marking and labels are provided. ☐ A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews, a plan review fee of $168.00 per hour (with one-half hour minimum) will be collected from the applicant. Applicant Signature: _____________________________________Date:_______________ Project Address: ___________________________________________________________ Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings 45585 Abronia Trail Palm Desert, CA 92260 7/19/2023