Loading...
HomeMy WebLinkAboutSilver Sands Racquet Club (Final)_, ,tea,,.. TREE PLANTING DETAIL NOTE: • STAKE ALL TFUS 24' 5OX AND - 514411 ER W EXGEPTIOK OF 8RA6HYGHIT0N POPIA345S. • IN TURF AREAS LEAVE A BARE AREA APPROX 4' AKAy PROWL TREE BASE IN ALL D7REGTIONS FOR PLANT PIT SUE F0 ER ti TO 5PE-G5. CINCH TIES (2 EAC.H% DO NOT OVER T16HTEX ALLOK TRM TO MOVE WgYi iAT TO BUIi ) CALIPER fi 211s 4) LOD6E POE PIKE '(REM STAKE (2 EA&1) NOTE: SHURR PLANTING DETAIL DEPRE5 M MTMN6 BA -SIN TO REMAIN DURIN6 PLANT MTASLI5+t NT PFRtoo. 13ACKPILL MIX TO BE COMPOSTED GREEN WA5TE FROM A LOCAL CITY LICENSED FACILITY FINISH GRADE ''' INFORMATION Nei _ 1 .- v. .k. - r s� TOPS _,.. a N 1.800-852-TOPS - ' RENTALS ! 1 ! BARRICADES SALES FAX 347-3680 I (760) Cont. Lic. #787664 ; - 44-631 Jackson, Indio, CA 92201 - (760) 347-2111 - - - ! 10968 1 Ave., Ste. E, Hesperia, CA 92345 (760) 949-5991 INFORMATION NOTES. SIVER SANDS RACKET CLIJB LANDSCAPE ENHANCEMENT PROJECT on Portola beginning at th southwest corner of Portola ` "- - and Silver Sands to the Northwest corner of Portola and Country Club, in the City of Palm Desert - CA. Easement area that is between the sidewalk and curb. - - Pre Construction Notes: _ • Manditory bid meeting is required, on site at Siver Sands Racket Club between Silver Sands lane and Country Club on Portola ave. Association manager to set date and time +"� '` "^'---} °--0 '�--t---�-��' � '•._( for pre -bid meeting for selected bidders. • Selected bidders are to familiarize and obtain information needed to successfully bid - r i the renovation plan. Construction Notes: Demolition • Contractor is required to have a validated C-27 license for scope of work. j r z, r-- • Contractor is required to have cut large trees within the last 3 years and is cetified for j - the scope of work. Approximately 67 trees are to be removed. These trees are to be 3_ removed and the stumps are to be be ground down 12" or 1 foot below finished grade. " r_ • Contractor is required to familarize themselves with all existing irrigation valves, isolation valves, landscape lighting at pre -bid meeting. -_ • Contractor is to call dig -alert for all utility marking and other services 1 -�� �3-�3- • Contractor is to use best practice so as not to damage existing sidewalk, curb edge, etc. {, L • Contractor shall use best practice when removing trees in turf area so as to minimize ' turf damage. P Irrigation Construction Notes: • Irrigation system is to be Rain Bird Xerigation Landscape drip control kit between 3-20 GPM pressure regulating basket filter 200 mesh. • XCZ-PRB-100-com with ball valve. _ • ' All irrigation lateral line are to be hard pipe PVC class 200 or 315 pipe solvent weld and fitting. • Polyflex riser PFR-FRA 12" and adapter. • Xeri-bug emitterK1a 1F U5 y a P sq mz • Tree irrigation shall have 2-2 GPH emitter, per tree inside 3" drainage pipe with w perferated round hole. Deep water system. Trees to be on serpate valve, tree only. J • Shrub planting to have one 2 GPH emitter at each plant. ' F • All Agave and Catus type plants to be on seperate valve system. } • Irrigatin emitters are to be placed 4" from golden barrel catus,(water not to drip on �, a catus) • Note: Landscape designer to approve landscape tree and shrub material before planting. 00 `