HomeMy WebLinkAboutSilver Sands Racquet Club (Final)_, ,tea,,..
TREE PLANTING DETAIL
NOTE:
• STAKE ALL TFUS 24' 5OX AND -
514411 ER W EXGEPTIOK OF
8RA6HYGHIT0N POPIA345S.
• IN TURF AREAS LEAVE A BARE AREA
APPROX 4' AKAy PROWL TREE BASE
IN ALL D7REGTIONS
FOR PLANT PIT SUE F0 ER
ti TO 5PE-G5.
CINCH TIES (2 EAC.H% DO NOT
OVER T16HTEX ALLOK TRM TO
MOVE WgYi iAT TO BUIi )
CALIPER
fi
211s 4) LOD6E POE PIKE
'(REM STAKE (2 EA&1)
NOTE:
SHURR PLANTING DETAIL
DEPRE5 M MTMN6 BA -SIN
TO REMAIN DURIN6 PLANT
MTASLI5+t NT PFRtoo.
13ACKPILL MIX TO BE COMPOSTED GREEN
WA5TE FROM A LOCAL CITY LICENSED FACILITY
FINISH GRADE
'''
INFORMATION Nei
_ 1
.- v. .k.
-
r s�
TOPS
_,..
a
N
1.800-852-TOPS -
'
RENTALS
! 1
!
BARRICADES
SALES
FAX 347-3680
I
(760)
Cont. Lic. #787664
;
-
44-631 Jackson, Indio, CA 92201 -
(760) 347-2111 - - -
!
10968 1 Ave., Ste. E, Hesperia, CA 92345
(760) 949-5991
INFORMATION NOTES.
SIVER SANDS RACKET CLIJB
LANDSCAPE ENHANCEMENT PROJECT on Portola beginning at th southwest corner of Portola ` "- -
and Silver Sands to the Northwest corner of Portola and Country Club, in the City of Palm Desert -
CA. Easement area that is between the sidewalk and curb. - -
Pre Construction Notes: _
• Manditory bid meeting is required, on site at Siver Sands Racket Club between Silver
Sands lane and Country Club on Portola ave. Association manager to set date and time +"� '` "^'---} °--0 '�--t---�-��' � '•._(
for pre -bid meeting for selected bidders.
• Selected bidders are to familiarize and obtain information needed to successfully bid
- r i
the renovation plan.
Construction Notes: Demolition
• Contractor is required to have a validated C-27 license for scope of work. j r
z,
r--
• Contractor is required to have cut large trees within the last 3 years and is cetified for j -
the scope of work. Approximately 67 trees are to be removed. These trees are to be 3_
removed and the stumps are to be be ground down 12" or 1 foot below finished grade. " r_
• Contractor is required to familarize themselves with all existing irrigation valves,
isolation valves, landscape lighting at pre -bid meeting.
-_
• Contractor is to call dig -alert for all utility marking and other services 1 -��
�3-�3-
• Contractor is to use best practice so as not to damage existing sidewalk, curb edge, etc. {, L
• Contractor shall use best practice when removing trees in turf area so as to minimize '
turf damage. P
Irrigation Construction Notes:
• Irrigation system is to be Rain Bird Xerigation Landscape drip control kit between 3-20
GPM pressure regulating basket filter 200 mesh.
• XCZ-PRB-100-com with ball valve. _
• '
All irrigation lateral line are to be hard pipe PVC class 200 or 315 pipe solvent weld and
fitting.
• Polyflex riser PFR-FRA 12" and adapter.
• Xeri-bug emitterK1a
1F U5 y a P sq mz
• Tree irrigation shall have 2-2 GPH emitter, per tree inside 3" drainage pipe with w
perferated round hole. Deep water system. Trees to be on serpate valve, tree only. J
• Shrub planting to have one 2 GPH emitter at each plant. '
F
• All Agave and Catus type plants to be on seperate valve system. }
• Irrigatin emitters are to be placed 4" from golden barrel catus,(water not to drip on �, a
catus)
• Note: Landscape designer to approve landscape tree and shrub material before
planting. 00
`