Loading...
HomeMy WebLinkAbout_SOLR23-0017_043will revCITY OF PALM DESERT Building Department WILLIS RESIDENCE 47043 ARCADIA LN, PALM DESERT, CA, 92260 The following revisions have been made to the plans: 1. ADJUSTED LAYOUT FOR FITMENT Thank you for your time, Britni Lawson Sunrun COVER SHEET SCOPE OF WORK GENERAL NOTES REV NAME DATE COMMENTS A AC AFCI AZIM COMP DC (E) ESS EXT INT MAG MSP (N) NTS OC PRE-FAB PSF PV RSD TL TYP V W AMPERE ALTERNATING CURRENT ARC FAULT CIRCUIT INTERRUPTER AZIMUTH COMPOSITION DIRECT CURRENT EXISTING ENERGY STORAGE SYSTEM EXTERIOR INTERIOR MAGNETIC MAIN SERVICE PANEL NEW NOT TO SCALE ON CENTER PRE-FABRICATED POUNDS PER SQUARE FOOT PHOTOVOLTAIC RAPID SHUTDOWN DEVICE TRANSFORMERLESS TYPICAL VOLTS WATTS PAGE REV: A1 5/4/2023 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 KELLEY WILLIS 47043 ARCADIA LN, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-043WILL SHEET DESIGNER: NICHOLAS CROW CUSTOMER RESIDENCE: TEL. (310) 704-8061 APN: 630-170-002 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 TABLE OF CONTENTS PAGE # DESCRIPTION PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 LAYOUT PV-4.0 ELECTRICAL PV-5.0 SIGNAGE PV-1.0 LEGEND AND ABBREVIATIONS SCALE: NTS PVC PIPE VENT SATELLITE DISH T-VENT FIRE SETBACKS METAL PIPE VENT HARDSCAPE PROPERTY LINE INTERIOR EQUIPMENT SHOWN AS DASHED PL MAIN PANEL PV LOAD CENTER SUB-PANEL SUNRUN METER DEDICATED PV METER SERVICE ENTRANCE INVERTER(S) AC DISCONNECT(S) DC DISCONNECT(S) CB IQ COMBINER BOX ENERGY STORAGE SYSTEM BP BACKUP LOADS PANEL RAIL STANDOFFS & FOOTINGS SOLAR MODULES ATTIC VENT FLUSH ATTIC VENT CHIMNEY SE MP SP LC SM PM INV AC DC BI BACKUP INTERFACE 1 COMMUNICATION WIRES EXTERNAL RAPID SHUTDOWN SWITCH RSD VICINITY MAP • SYSTEM SIZE: 7110W DC, 6000W AC • MODULES: (18) JA SOLAR: JAM54S31-395/MR • INVERTERS: (1) SOLAREDGE TECHNOLOGIES: SE6000H-USSN • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H PRIME, 9.8KWh, 5KW • MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER WITH 225 AMP BUSBAR. #SSTAMPCS #ESTAMPCS • ALL WORK SHALL COMPLY WITH 2022 CRC/CBC/CEBC, MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2022 CEC. • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2022 CEC. • PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II MODULES, ARE CLASS A FIRE RATED. • RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER 690.12(B). • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 13.7 AMPS MODULE SHORT CIRCUIT CURRENT. • 21.4 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A) & 690.8 (B)]. • CONSTRUCTION WORK HOURS OCTOBER 1ST TO APRIL 30TH MONDAY - FRIDAY 7:00AM TO 5:30PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED CONSTRUCTION WORK HOURS - MAY 1ST THROUGH SEPTEMBER 30TH MONDAY - FRIDAY 6:00AM TO 7:00PM SATURDAY 8:00AM TO 5:00PM SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED • ENERGY STORAGE SYSTEM CONFORMS TO AND IS LISTED UNDER UL 9540. • ENERGY STORAGE SYSTEM LIVE PARTS ARE NOT ACCESSIBLE DURING ROUTINE MAINTENANCE. SYSTEM VOLTAGE IN ACCORDANCE WITH NEC 706.30 AND EXCEPTION 1 NEC 706.30 (A). • ADDITIONAL DISCONNECTING MEANS SHALL BE INSTALLED WHERE ENERGY STORAGE DEVICE INPUT AND OUTPUT TERMINALS ARE MORE THAN 5 FT FROM CONNECTED EQUIPMENT, OR WHERE THE CIRCUITS FROM THESE TERMINALS PASS THROUGH A WALL OR PARTITION PER 706.7(E). • LISTED, COMBINATION TYPE AFCI SHALL BE INSTALLED WHERE BACKED UP CIRCUIT WIRING IS EXTENDED MORE THAN 6FT AND DOES NOT INCLUDE ANY ADDITIONAL OUTLETS OR DEVICES PER NEC 210.12(D). • THE CAPACITY OF THE STANDALONE SYSTEM SUPPLY SHALL BE EQUAL TO OR GREATER THAN THE LOAD POSED BY THE SINGLE LARGEST UTILIZATION EQUIPMENT CONNECTED TO THE SYSTEM PER NEC ARTICLE 710.15(A) • ALL PASS-THROUGH CONDUCTORS MUST COMPLY WITH NEC 312.8 PL PL PL PL PL PL PL PL PL PL PL PL PAGE REV: A1 5/4/2023 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 KELLEY WILLIS 47043 ARCADIA LN, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-043WILL SHEET DESIGNER: NICHOLAS CROW CUSTOMER RESIDENCE: TEL. (310) 704-8061 APN: 630-170-002 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SITE PLAN ARRAY PITCH PV AREA (SQFT) AR-01 1° 231.2 TRUE AZIM MAG AZIM 175°187° PV-2.0 #SSTAMPSP #ESTAMPSP SITE PLAN - SCALE = 1/16" = 1'-0" NOTES: x RESIDENCE DOES NOT CONTAIN ACTIVE FIRE SPRINKLERS. x MODULES WERE DESIGNED AT LEAST 18'' FROM THE ROOF RIDGE. ARRAY DETAILS: x TOTAL ROOF SURFACE AREA: 4480 SQFT. x TOTAL PV ARRAY AREA: 378.4 SQ FT. x PERCENTAGE PV COVERAGE: (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE AREA) * 100 = 8.4% (E) RESIDENCE (N) ARRAY AR-01 AR C A D I A L N (E) GATE/FENCE (E) DRIVEWAY BP MP SEINVBI 13'-9"11'-4" 2'-5" MODULE ELEVATION VIEW - SCALE = NTS LADDER ACCESS POINT LADDER ACCESS POINT PAGE REV: A1 5/4/2023 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 KELLEY WILLIS 47043 ARCADIA LN, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-043WILL SHEET DESIGNER: NICHOLAS CROW CUSTOMER RESIDENCE: TEL. (310) 704-8061 APN: 630-170-002 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-3.0 LAYOUT #SSTAMP DESIGN CRITERIA MAX DISTRIBUTED LOAD: 3 PSF SNOW LOAD: 0 PSF WIND SPEED: 130 MPH 3-SEC GUST. S.S.LAG SCREWS: 5/16": 2.5" MIN EMBEDMENT STRUCTURAL NOTES: x INSTALLERS SHALL NOTIFY ENGINEER OF ANY POTENTIAL STRUCTURAL ISSUES OBSERVED PRIOR TO PROCEEDING W/ INSTALLATION. x IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS), THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS FOLLOWS: xx ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS TO BE REDUCED BY 50% xx ALLOWABLE OVERHANG INDICATED ON PLANS TO BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS NOTES TO INSTALLER: • MODULES TILTED 10° TO ROOF SURFACE. • MINIMUM 2'-5" SPACING BETWEEN ROWS. • INSTALLERS MUST DETERMINE ACTUAL LOCATION OF RAFTERS AND PENETRATIONS • LEVEL RAILS D1 - AR-01 - SCALE: 1/8" = 1'-0" AZIM: 187° ROOF PITCH: 1° MODULE PITCH: 10° ROOF INFO FRAMING INFO ATTACHMENT INFORMATION Name Type Height Type Max Span OC Spacing Detail Max Landscape OC Spacing Max Landscape Overhang Max Portrait OC Spacing Max Portrait Overhang Configuration AR-01 FLAT, FOAM [TILT KIT] - OMNIBASE 1 LAG - UR 1-Story 2X12 RAFTERS 22' - 9" 16" ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 NA NA 5' - 4"1' - 11" STAGGERED MODULE ELEVATION DETAIL - SCALE: NTS 2'-5" 1'-2"10°10° ROOF PITCH, SEE NOTES MODULE PITCH, SEE NOTES 5'-4" TYP 1'-8"28'-6" 6'-5" 5'-8" 2'-5" 5'-8" 9'-2" 5'-8" 5'-8" 2'-5" 5'-8" 2'-4" 2'-5" 22'-8" 4USVDUVSBM 0OMZ JUNCTION BOX MIN RATED NEMA3R +- (1) ENERGY STORAGE SYSTEM LG ENERGY SOLUTION: RESU 10H PRIME 3 1 3 2 4 PV MODULES JA SOLAR: JAM54S31-395/MR (18) MODULES OPTIMIZERS WIRED IN: (1) SERIES OF (9) OPTIMIZERS (1) SERIES OF (9) OPTIMIZERS SOLAREDGE POWER OPTIMIZERS S440 LOAD RATED DC DISCONNECT, AFCI, REVENUE GRADE METER, RAPID SHUTDOWN AND ENERGY STORAGE SYSTEM INPUTS SOLAREDGE TECHNOLOGIES: SE6000H-USSN 6000 WATT INVERTER BATTERY SOLAR 2 3 5 (N) 125A BACKUP LOADS PANEL FACILITY LOADS (N) 50A FEEDER BREAKER FACILITY GROUND (N) 50A FEEDER BREAKER AT OPPOSITE END OF BUSBAR NEW 200A MAIN BREAKER (END FED) NEW 225A MAIN PANEL WITH 225A BUSBAR FACILITY LOADS M METER #: SCE 222014-367770 120/240 VAC SINGLE PHASE SERVICE UTILITY GRID NOTE: TOTAL PV BACKFEED = 35A USED FOR INTERCONNECTION CALCULATIONS (N) CURRENT TRANSFORMERS 1 (1) 40A BREAKER (N) SOLAREDGE BACKUP INTERFACE BI-NUSGN-01 M 1 200A MICROGRID INTERCON. DEVICE CTRL 26 CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND 1NONE (4) 10 AWG PV WIRE NONE (1) 6 AWG BARE COPPER 2 3/4" EMT OR EQUIV.(4) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 3 3/4" EMT OR EQUIV.(2) 8 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 4 3/4" EMT OR EQUIV.(2) 8 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 5 1" EMT OR EQUIV.(2) 4 AWG THHN/THWN-2 (1) 4 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 6 1" EMT OR EQUIV.(2) 4 AWG THHN/THWN-2 (1) 4 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 PAGE REV: A1 5/4/2023 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 KELLEY WILLIS 47043 ARCADIA LN, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-043WILL SHEET DESIGNER: NICHOLAS CROW CUSTOMER RESIDENCE: TEL. (310) 704-8061 APN: 630-170-002 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-4.0 ELECTRICAL #ESTAMP RAIL 6-12 AWG BARE COPPER WIRE 5/16"-18 SS BOLT SS SPLIT LOCK WASHER (TORQUE TO 16 FT-LBS) SNAPNRACK GROUND LUG BONDING CHANNEL NUT SS BONDING PINS NOTE: x ALL HARDWARE IS INCLUDED FROM MANUFACTURER x A MINIMUM OF ONE GROUND LUG IS TO BE INSTALLED ON EVERY CONTINUOUS ROW OF MODULES x GROUNDING LUG MAY BE INSTALLED IN EITHER RAIL CHANNEL x GROUNDING LUG MAY BE INSTALLED SO GROUND WIRE IS PARALLEL OR PERPENDICULAR TO RAIL x ENSURE SPLIT LOCK WASHER IS INSTALLED ON TOP OF COPPER WIRE SNAPNRACK GROUNDING SCALE: NTS MODULE CHARACTERISTICS JA SOLAR: JAM54S31-395/MR: OPEN CIRCUIT VOLTAGE: MAX POWER VOLTAGE: SHORT CIRCUIT CURRENT: 395 W 36.98 V 30.84 V 13.7 A SYSTEM CHARACTERISTICS - INVERTER 1 SYSTEM SIZE: SYSTEM OPEN CIRCUIT VOLTAGE: SYSTEM OPERATING VOLTAGE: MAX ALLOWABLE DC VOLTAGE: SYSTEM OPERATING CURRENT: SYSTEM SHORT CIRCUIT CURRENT: 7110 W 9 V 380 V 480 V 18.71 A 30 A S440 OPTIMIZER CHARACTERISTICS: MIN INPUT VOLTAGE: 8 VDC MAX INPUT VOLTAGE: 60 VDC MAX INPUT ISC: 14.50 ADC MAX OUTPUT CURRENT: 15 ADC PAGE REV: A1 5/4/2023 1125 RESEARCH DR. STE B REDLANDS, CA 92374 PHONE 805.540.7603 FAX 949.215.7778 KELLEY WILLIS 47043 ARCADIA LN, PALM DESERT, CA, 92260 PROJECT NUMBER: 113R-043WILL SHEET DESIGNER: NICHOLAS CROW CUSTOMER RESIDENCE: TEL. (310) 704-8061 APN: 630-170-002 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 SIGNAGE PV-5.0 #ESTAMP NOTES AND SPECIFICATIONS: x SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2019 CEC ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. x SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. x LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. x LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. x SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. x DO NOT COVER EXISTING MANUFACTURER LABELS. POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: 47043 ARCADIA LN, PALM DESERT, CA, 92260 SOLAR PANELS ON ROOF SERVICE ENTRANCE AND PV BREAKER DISCONNECT INVERTER (EXT)ENERGY STORAGE (EXT) PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2022: 690.54 ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(2)(3)(c), LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 1O FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): CEC 2022: 690.31(G)(3), 690.31(G)(4) 690.31(G)(4) IFC 2012: 605.11.1.4 INVERTER 1 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 30 15 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): CEC 2022: 690.53 WARNING! SOURCES: UTILITY GRID, BATTERY AND PV SOLAR ELECTRIC SYSTEM THREE POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): CEC 2022: 706.11 & 705.12(B)(3) WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(2)(3)(b) LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUT DOWN SWITCH PER CODE(S): CEC 2022: 690.56(C)(3), IFC 2012: 605.11.1, IFC 2018: 1204.5.3, CFC 2022: 1204.5.3 ELECTRICAL SHOCK HAZARD WARNING LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2022: 690.13(B) ! SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): CEC 2022: 690.56(C)(1)(a) 4" 3" UR-40 RAIL | UR-60 RAIL FOR USE WITH SNAPNRACK ULTRA SERIES RAILS FIXED TILT, INSTALLEDALLOWABLE ANGLES DETAIL A FRONT LEG, FIXED TILT (RAIL HIDDEN) DETAIL B REAR LEG, FIXED TILT METAL ROOF BASE: BIN 10 DETAIL: SNR-DC-00352 DETAIL: SNR-DC-00353 1-HOLE BASE: BIN 10 DETAIL: SNR-DC-00348 DETAIL: SNR-DC-00349 4-HOLE BASE: BIN 11 DETAIL: SNR-DC-00350 DETAIL: SNR-DC-00357 DETAIL: SNR-DC-00358 DETAIL: SNR-DC-00359 A B DESCRIPTION:DRAWING NUMBER:SCALE:DESIGNER: APPROVED BY: REVISION: Sunrun South LLC 595 MARKET STREET, 29TH FLOOR Ɣ SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 Ɣ FAX (415) 580-6902 THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. ULTRA RAIL, SYSTEM DETAIL, FIXED TILTSNR-DC-00335 1 5/7/2019 NEW DETAIL REV: 1DATE: DNS 5/7/2019 DRAFTER:M.AFFENTRANGER B.PETERSON G.MCHPEETERS Solar Mounting Solutions MJA BIN: *10, *11THE SNAPNRACK FIXED TILT IS A SIMPLE SOLUTION FOR INSTALLATIONS REQUIRING MODULE TILT BEYOND THE EXISTING ROOF SLOPE. IT IS DESIGNED FOR TILT ANGLES FROM 0ƒ-30ƒ ABOVE THE HORIZONTAL UTILIZING FIXED STANDOFF HEIGHTS THE SNAPNRACK FIXED TILT IS COMPATIBLE WITH THE VARIOUS SNAPNRACK ROOF ATTACHMENTS SHOWN. REFER TO SPECIFIC "ATTACHMENT DETAIL" REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH "BIN" NUMBER ON THIS DRAWING REFER TO THE SNAPNRACK INSTALLATION MANUAL FOR 5 16 "‘ HARDWARE TORQUE SPECIFICATIONS FOR ADDITIONAL SYSTEM REQUIREMENTS, INCLUDING MODULE OVERHANG, SEE "SNR-DC-00329 ULTRA RAIL, SYSTEM OVERVIEW, TYPICAL" FOR LEVELING REQUIREMENTS SEE "SNR-DC-00334 ULTRA RAIL, COMPONENT DETAIL, LEVELING SPACER ON STANDOFF" RAILS CAN BE MOUNTED UPSLOPE OR DOWNSLOPE OF THE TILT LEGS TILT ANGLE MUST ALWAYS BE IN SAME DIRECTION AS ROOF PITCH. REVERSE TILT NOT SUPPORTED **SITE-SPECIFIC ANALYSIS IS REQUIRED IF A TALLER STANDOFF IS NECESSARY FOR PROPER INSTALLATION 21 4 " 11 2 " 11 2 " 15 8 " TILT ANGLE, RELATIVE TO HORIZONTAL (30ƒ MAX) *COMPATIBLE ROOF ATTACHMENTS FOR FIXED TILT PV MODULE, TYP. SNAPNRACK ULTRA RAIL ROOF DECKING, (ROOFING MATERIAL NOT SHOWN) STRUCTURAL MEMBER, WOOD RAFTER SHOWN PV MODULE, TYP. SNAPNRACK FIXED TILT, FRONT LEG (51 2 " STANDOFF) SNAPNRACK MODULE CLAMPS SNAPNRACK FIXED TILT, REAR LEG (LENGTH VARIES) SNAPNRACK ROOF ATTACHMENT. FIXED TILT COMPATIBLE WITH ATTACHMENTS ABOVE. REFER TO SPECIFIC SNAPNRACK "ATTACHMENT DETAIL" ROOF PITCH, VARIES (23ƒ MAX) **SNAPNRACK STANDARD STANDOFF, 51 2 " **SNAPNRACK STANDARD STANDOFF, LENGTH VARIES WITH DESIRED TILT (23" MAX) SNAPNRACK FIXED TILT, FRONT LEG (51 2 " STANDOFF) SNAPNRACK FIXED TILT, REAR LEG (LENGTH VARIES) TILT ABOVE ROOF SURFACE (5ƒ-30ƒ) S.S. BOLT WITH SERRATED FLANGE NUT SNAPNRACK STANDOFF CLAMP SNAPNRACK ULTRA RAIL ATTACHMENT HARDWARE SNAPNRACK ALL PURPOSE 90ƒ L FOOT. ALWAYS ORIENT LONG FACE FLUSH TO RAIL, AS SHOWN 342/366 MODULE HEIGHT OFF ROOF: MAX 18" Single Phase Energy Hub InverterwithPrismTechnology ForNorthAmerica SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US(1) 12-25 YEAR WARRANTY Optimizedbattery storagewithHD-Wave technology Record-breaking99% weighted efficiency with 200% DC oversizing Small, lightweight, and easy to install Modular design, future ready with optional upgrades to: DC-coupledstorageforfullorpartialhomebackup Built-in consumption monitoring DirectconnectiontotheSolarEdgesmartEV charger Multi-inverter, scalable storage solution With enhanced battery power up to 10kW Integratedarc fault protection and rapidshutdownfor NEC 2014,NEC 2017 and NEC 2020, per article 690.11 and 690.12 Embedded revenuegrade production data, ANSI C12.20 Class 0.5 solaredge.com HO M E BA C K U P Single Phase Energy Hub Inverter with Prism Technology For North America SE3000H-US/SE3800H-US/SE6000H-US/SE7600H-US/SE10000H-US/ SE11400H-US(1) SE3000H-US SE3800H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US UNITS OUTPUT -AC ON GRID RatedAC Power 3000 3800 @ 240V 3300 @ 208V 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V W MaximumACPowerOutput 3000 3800 @ 240V 3300 @ 208V 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V W AC Frequency Range(min - nom- max)59.3- 60 - 60.5 (2)Hz MaximumContinuous OutputCurrent @ 240V 12.5 16 25 32 42 47.5 A MaximumContinuous OutputCurrent @ 208V -1624- -48.5A GFDI Threshold 1A TotalHarmonicDistortion (THD)<3 % Power Factor 1, adjustable-0.85to0.85 Utility Monitoring,IslandingProtection,Country ConfigurableThresholds Yes ChargeBatteryfromAC (if allowed)Yes TypicalNighttime Power Consumption <2.5 W OUTPUT -AC BACKUP (3) RatedACPower inBackup Operation (4)3000 3800 6000 7600 10000 10300 W 7600*10300* ACL-L OutputVoltage Range in Backup 211 - 264 Vac ACL-N OutputVoltage Range in Backup 105 - 132 Vac AC Frequency Rangein Backup (min - nom- max) 55 - 60 - 65 Hz MaximumContinuousOutputCurrent inBackup Operation 12.5 16 25 32 42 43 A 32* 43* GFDI 1A THD <5 % OUTPUT -SMART EV CHARGER AC RatedAC Power 9600 W ACOutputVoltageRange 211 -264 Vac On-Grid ACFrequency Range(min - nom- max) 59.3 -60 -60.5 Hz MaximumContinuousOutput Current @240V (grid,PV and battery) 40 Aac INPUT -DC (PV AND BATTERY ) Transformer-less, Ungrounded Yes MaxInput Voltage 480 Vdc NomDC Input Voltage 380 Vdc Reverse-Polarity Protection Yes Ground-FaultIsolation Detection NƼ Sensitivity INPUT -DC (PV) MaximumDC Power @ 240V 6000 7600 12000 15200 22000 22800 W 15200*22800* MaximumDC Power @ 208V - 6600 10000 - - 20000 W MaximumInputCurrent(5)@ 240V 8.5 10.5 16.5 20 27 31 Adc20* 31* MaximumInput Current (5) @ 208V -913.5--27Adc Max.Input Short Circuit Current 45 Adc MaximumInverterEfficiency 99 99.2 % CECWeighted Efficiency 99 99 @ 240V 98.5 @ 208V % 2-pole Disconnection Yes *Supported with PN SExxxxH-USMMxxxxxx or SExxxxH-USMNxxxxxx (1) These specifications apply to inverters with part numbers SExxxxH-USSMxxxxx or SExxxxH-USSNxxxxxx and connection unit model number DCD-1PH-US-PxH-F-x (2) For other regional settings please contact SolarEdge support (3) Not designed for standalone applications and requires AC for commissioning. Backup functionality is only supported for 240V grid (4) Rated AC power in Backup Operation are valid for installations with multiple inverters. For a single backup inverter operation, rated AC power in Backup is 90% of the value stated (5) A higher current source may be used; the inverter will limit its input current to the values stated Single Phase Energy Hub Inverter with Prism Technology For North America SE3000H-US/SE3800H-US/SE6000H-US/SE7600H-US/SE10000H-US/ SE11400H-US(1) SE3000H-US SE3800H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US UNITS INPUT -DC (BATTERY) Supported Battery Types SolarEdgeEnergyBank, LG RESU Prime (6) Number of Batteriesper Inverter Up to 3SolarEdgeEnergyBank,up to 2 LG RESU Prime ContinuousPower(7)6000 7600 10000 W PeakPower(7)6000 7600 10000 W MaxInput Current 16 20 26.5 Adc 2-pole Disconnection Yes SMART ENERGY CAPABILITIES ConsumptionMetering Built - in (8) Backup & Battery Storage With Backup Interface(purchased separately) for serviceup to 200A; Up to 3 inverters EV Charging Direct connection toSmartEV charger ADDITIONAL FEATURES SupportedCommunication Interfaces RS485,Ethernet,Cellular (9),Wi-Fi (optional),SolarEdge Energy Net (optional) RevenueGradeMetering, ANSI C12.20 Built - in (8) IntegratedAC, DC and Communication Connection Unit Yes InverterCommissioning WiththeSetApp mobile applicationusingbuilt-inWi-Fi AccessPoint for local connection DCVoltage Rapid Shutdown (PV and Battery) Yes,according to NEC 2014,NEC 2017and NEC 2020690.12 STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1741 PCS, UL1699B,UL1998, UL9540, CSA 22.2 GridConnection Standards IEEE1547,Rule21,Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS AC Output and EV AC Output Conduit Size / AWG Range 1'' maximum / 14-4 AWG DC Input (PV and Battery) Conduit Size / AWG Range 1'' maximum / 14-6 AWG Dimensionswith Connection Unit (H x W x D)17.7 x 14.6 x 6.8 / 450 x 370 x 174 17.7 x 14.6 x 6.8 / 450 x 370 x 174 17.7 x 14.6 x 6.8 / 450 x 370 x 174 in / mm17.7 x 14.6 x 6.8 / 450 x 370 x 174* WeightwithConnection Unit 26 / 11.8 26/ 11.8 30.2 / 13.7 lb / kg30.2 / 13.7* Noise < 25 <25 < 25 < 50 dBA< 50* Cooling NaturalConvection OperatingTemperature Range -40to +140 / -40 to +60 (10)Ü)/Ü& ProtectionRating NEMA 4  7KHSDUWQXPEHUV6([[[[+86[0[[[[[RQO\VXSSRUWWKH6RODU(GJH(QHUJ\%DQN7KHSDUWQXPEHUV6([[[[+86[1[[[[[VXSSRUWERWK6RODU(GJH(QHUJ\%DQNDQG/*5(683ULPHEDWWHULHV 5HTXLUHVVXSSRUWLQJLQYHUWHUILUPZDUH  Discharge power is limited up to the inverter rated AC power for on-grid and backup applications  For consumption metering current transformers should be ordered separately: SECT-SPL-225A-T-20 or SEACT0750-400NA-20 units per box. Revenue grade metering is only for production metering  Information concerning the Data Plan's terms & conditions is available in the following link: https://www.solaredge.com/sites/default/files/se-communication-plan-terms-and-conditions-eng.pdf  Full power up to at least 50°C / 122°F; for power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. Allothertrademarksmentioned hereinaretrademarksof their respectiveowners. Date: 06/2021 DS-000031-1.5-NAM. Subject to changewithout notice. Power Optimizer For North America S440, S500 25 YEAR WARRANTY PV power optimization at the module level Specifically designed to work with SolarEdge residential inverters Faster installations with simplified cable management and easy assembly using a single bolt Detects abnormal PV connector behavior, preventing potential safety issues* Module-level voltage shutdown for installer and firefighter safety Superior efficiency (99.5%) Flexible system design for maximum space utilization Compatible with bifacial PV modules Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid Shutdown System (PVRSS) Mitigates all types of module mismatch loss, from manufacturing tolerance to partial shading * Expected availability in 2022 solaredge.com PO W E R OP T I M I Z E R Power Optimizer For North America S440, S500 S440 S500 Unit INPUT Rated Input DC Power(1) 440 500 W Absolute Maximum Input Voltage (Voc) 60 Vdc MPPT Operating Range 8 - 60 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 15 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II OUTPUT DURING OPERATION Maximum Output Current 15 Adc Maximum Output Voltage 60 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1+/-0.1 Vdc STANDARD COMPLIANCE Photovoltaic Rapid Shutdown System NEC 2014, 2017 & 2020 EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0, UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 153 x 30 / 5.07 x 6.02 x 1.18 mm / in Weight (including cables) 655 / 1.5 gr / lb Input Connector MC4(2) Input Wire Length 0.1 / 0.32 m / ft Output Connector MC4 Output Wire Length (+) 2.3, (-) 0.10 / (+) 7.54, (-) 0.32 m / ft Operating Temperature Range(3) -40 to +85 ˚C Protection Rating IP68 / NEMA6P Relative Humidity 0 - 100 % (1) Rated power of the module at STC will not exceed the power optimizer Rated Input DC Power. Modules with up to +5% power tolerance are allowed (2) For other connector types please contact SolarEdge (3) For ambient temperature above +70°C / +158°F power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for more details PV System Design Using a SolarEdge Inverter Single Phase HD-Wave Three Phase for 208V Grid Three Phase for 277/480V Grid Minimum String Length (Power Optimizers) S440, S500 8 10 18 Maximum String Length (Power Optimizers) 25 50(4) Maximum Nominal Power per String 5700 (6000 with SE7600-US-SE11400-U) 6000 12750 W Maximum Allowed Connected Power per String(5) (Permitted only when the difference in connected power between strings is 1,000W or less) Refer to Footnote 5 One string 7200 15000 W Two strings or more 7800 Parallel Strings of Different Lengths or Orientations Yes (4) A string with more than 30 optimizers does not meet NEC rapid shutdown requirements; safety voltage will be above the 30V requirement (5) If the inverters rated AC power ≤ maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power. Refer to: https://www.solaredge.com/sites/default/files/se-power-optimizer-single-string-design-application-note.pdf (6) It is not allowed to mix S-series and P-series Power Optimizers in new installations © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: July 12, 2022 DS-000018-NA. Subject to change without notice. 3/14/2023 RE: Structural Certification for Installation of Residential Solar KELLEY WILLIS:47043 ARCADIA LN, PALM DESERT, CA, 92260 Attn: To Whom It May Concern Design Criteria Code 2022 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 10 psf V 130 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Flat, Foam roofing over roof plywood supported by 2X12 Rafters at 16 inches. The slope of the roof was approximated to be 1 degree. After review and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. projects@evengineersnet.com http://www.evengineersnet.com Structural Letter for PV Installation Date: 3/14/2023 Job Address:47043 ARCADIA LN PALM DESERT, CA, 92260 Job Name:KELLEY WILLIS Job Number:031423KW Scope of Work Table of Content Sheet 1 Cover 2 Attachment Uplift checks 3 Roof Framing Check 4 Seismic Check and Scope of work Engineering Calculations Summary Code 2022 California Building Code (ASCE 7-16) Risk category II Roof Dead Load Dr 10 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S 0 psf Wind Load (component and Cladding) V 130 mph Exposure C References NDS for Wood Construction Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. projects@evengineersnet.com http://www.evengineersnet.com Wind Load Cont. 130 mph ASCE 7-16 Figure 26.5-1B C 1.0 ASCE 7-16 Sec 26.8.2 0.85 ASCE 7-16 Table 26.10-1 0.85 ASCE 7-16 Table 26.6-1 0.99 ASCE 7-16 Table 26.9-1 30.90 psf 1.0 Degrees 1.1 0.6 (Wind Tunnel value) Uplift (W)Zone(1) Zone(2r) Zone(2e) Zone(3) Fig. 30-3-2 GCp=-1.3 -1.8 -1.8 -1.95 Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-26.51 -36.71 -36.71 -39.77 GCp=0.7 Figure 30.3-2 P=qh(GCp)(γE)(γa)=14.28 Equation 29.4-7 Rafter Attachments: 0.6D+0.6W (CD=1.6) Connection Check Attachement max. spacing= 6 ft 5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A - NDS 2.5 in DFL Assumed Allowable Capacity= 760 lbs (Lag Bolt) Zone Trib Width Area (ft) Uplift (lbs) Down (lbs) Zone(1)6 16.5 292.2 285.1 Zone(2r)6 16.5 393.2 285.1 Zone(2e)6 16.5 393.2 285.1 Zone(3)6 16.5 423.4 285.1 Conservative Max=423.4 < 760 CONNECTION IS OK 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II V= Exposure = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs γE= γa= KZt = qh= 0.00256KzKztKdKeV2= Pitch = Lag Screw Penetration Risk Category = KZ = Kd = Ke = projects@evengineersnet.com http://www.evengineersnet.com Vertical Load Resisting System Design Roof Framing Rafters Snow Load Fully Exposed pg= 0 psf Ct =1.1 Ce =0.9 Is =1.0 ps = 0 psf pf = 0 psf pfmin. = 0.0 psf 0 plf Max Length, L = 22.75 ft Tributary Width, WT =16in RLL = 20 psf 13.33 plf Dr = 10 psf 13.33 plf PvDL =3 psf 4 plf Load Case: DL w= 17 plf M= 997 lb-ft Mallowable = Sx x Fb'= 2456 lb-ft > 997 lb-ft OK Load Case: DL+RLL DL+Lr= 27 plf Mdown= 1533 lb-ft Mallowable = Sx x Fb'= 3411 lb-ft > 1533 lb-ft OK Load Case: DL+S DL+S= 17 plf Mdown= 997 lb-ft Mallowable = Sx x Fb'= 3275 lb-ft > 997 lb-ft OK Load Case: DL+0.6W w= 28.8 plf Mu= 1654 lb-ft Mallowable = Sx x Fb' (wind)= 4366 lb-ft > 1654 lb-ft OK Load Case: 0.6DL+0.6W w= 22.8 plf Mu= 1309 lb-ft Mallowable = Sx x Fb' (wind)= 4366 lb-ft > 1309 lb-ft OK DL+0.45W+0.75(RLL or S)27 plf Mdown= 1525 lb-ft Mallowable = Sx x Fb'= 4366 lb-ft > 1525 lb-ft OK Member Capacity DF-L No.2 2X12 CL CF Ci Cr Fb = 900 psi 1.0 1.0 1.0 1.15 1035 psi Fv = 180 psi N/A N/A 1.0 N/A 180 psi E = 1600000 psi N/A N/A 1.0 N/A 1600000 psi Emin = 580000 psi N/A N/A 1.0 N/A 580000 psi Depth, d = 11.25 in Width, b = 1.5 in Cross-Sectonal Area, A = 16.875 in2 Moment of Inertia, Ixx = 177.979 in4 Section Modulus, Sxx = 31.6406 in3 Allowable Moment, Mall = Fb'Sxx = 2729.0 lb-ft DCR=Mu/Mall = 0.45 < 1 Satisfactory Allowable Shear, Vall = 2/3Fv'A = 2025.0 lb DCR=Vu/Vall = 0.17 < 1 Satisfactory Design Value Adjusted Value projects@evengineersnet.com http://www.evengineersnet.com Siesmic Loads Check Roof Dead Load 10 psf % or Roof with Pv 8.4% Dpv and Racking 3 psf Average Total Dead Load 10.3 psf Increase in Dead Load 1.2%OK Limits of Scope of Work and Liability The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. We have based our structural capacity determination on information in pictures and a drawing set titled PV plans - KELLEY WILLIS. The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments. The calculations produced for this structure's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures. projects@evengineersnet.com http://www.evengineersnet.com Section 220.83 Existing Dwelling Unit Part #1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Amps Box A (VA) 31.83 7638 Part #2 - Section 220.83 (B)(2),(3)a, b, c, d - Appliances and Dedicated Circuits: Size in VA Size in VA 1500 N/A 3000 N/A 1000 N/A 600 N/A 1000 N/A 1600 N/A 5760 N/A 11520 N/A N/A N/A N/A Amps Box B (VA) N/A 108.25 25980 Total VA from Parts #1 and #2 combined:Box A + Box B =33618 Total VA 33618 First 8,000 VA @ 100%8000 Remaining VA @ 40% Remaining VA =25618 25618 x 40% =10247.2 VA Adding First 8000 VA 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits:18247.2 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits:76.03 Amps Part #3 - Section 220.83 (B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100% of all the Heating or A/C loads in VA:17,280 VA 100% of all the Heating or A/C loads in Amps:72.00 A VA Volts Amps Parts #1 & #2 18247.2 240 76.03 Part #3 17,280 240 72.00 Total VA for all Parts:35,527 Totals Service/Feeder Load 148.03 Laundry Appliance Circuit(s) Dishwasher(s) Disposal(s) Dedicated circuit House Square Footage 2546 Article 220 - Service/Feeder calculation for (address): 47043 Arcadia Ln, Palm Desert, CA, 92260 Building VA (watts) 7638 Amps 31.825 Job Code 113R-043WILL Totals from all Parts Dedicated circuit Total for Part #1: Water Heater Refrigerator(s) Microwave(s) Totals for Part #2:Pool Equipment Dryer Range Oven Cooktop