Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOLR23-0017 APPROVED PLANS.pdf
SOLR23-0017 MPU 200/A SCOPE OF WORK GENERAL NOTES LEGEND AND ABBREVIATIONS TABLE OF CONTENTS PAGE# DESCRIPTION • SYSTEM SIZE: 711OW DC, 6000W AC •ALL WORK SHALL COMPLY WITH 2O22 CRC/CBC/CEBC, MUNICIPAL CODE, AND SOLAR MODULES • MODULES: (18)JA SOLAR: JAM54S31-395/MR ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. ED SERVICE ENTRANCE RAIL PV-1.0 COVER SHEET • INVERTERS: (1) SOLAREDGE TECHNOLOGIES: • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2O22 CEC. PV-2.0 SITE PLAN SE6000H-USSN • ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2O22 CEC. MP MAIN PANEL • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: • PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE PV-3.0 LAYOUT SNR-DC-00335 SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41. SP SUB-PANEL PV-4.0 ELECTRICAL • ENERGY STORAGE SYSTEM: (1) LG CHEM: RESU 10H • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. STANDOFFS & PRIME, 9.8KWh, 5KW • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. FOOTINGS PV-5.0 SIGNAGE • MAIN PANEL REPLACEMENT: EXISTING 100 AMP MAIN • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. LC PV LOAD CENTER PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II WITH NEW 200 AMP MAIN PANEL WITH 200 AMP MAIN MODULES, ARE CLASS A FIRE RATED. SM SUNRUN METER ® CHIMNEY BREAKER. • RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL °Photovonao CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER 690.12(B). PM DEDICATED PV METER a ATTIC VENT Re°^,m—tme^r 3•.Ata,•°heG antl Untler • CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). t.11— ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. FLUSH ATTIC VENT ° "' - • 13.7 AMPS MODULE SHORT CIRCUIT CURRENT. H INVERTER(S) o PVC PIPE VENT • 21.4 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A)&690.8 (B)]. • CONSTRUCTION WORK HOURS AC AC DISCONNECT(S) ® METAL PIPE VENT OCTOBER 1 ST TO APRIL 30TH .Naaae�Foa,°^1NG85AFETY MONDAY- FRIDAY 7:OOAM TO 5:30PM DC DC DISCONNECT(S) T-VENT SATURDAY 8:OOAM TO 5:OOPM ^E 0 SATELLITE DISH SUNDAY NOT ALLOWED GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED CB IQ COMBINER BOX CONSTRUCTION WORK HOURS - MAY 1 ST THROUGH SEPTEMBER 30TH ENERGY STORAGE FIRE SETBACKS MONDAY- FRIDAY 6:OOAM TO 7:OOPM � SATURDAY 8:OOAM TO 5:OOPM SYSTEM 1 HARDSCAPE SUNDAY NOT ALLOWED BI BACKUP INTERFACE L— GOVERNMENT HOLIDAY CONSTRUCTION WORK NOT ALLOWED —PL PROPERTY LINE • ENERGY STORAGE SYSTEM CONFORMS TO AND IS LISTED UNDER UL 9540. BACKUP LOADS PANEL F_ —1 INTERIOR EQUIPMENT 0• ENERGY STORAGE SYSTEM LIVE PARTS ARE NOT ACCESSIBLE DURING L —1 SHOWN AS DASHED ROUTINE MAINTENANCE. SYSTEM VOLTAGE IN ACCORDANCE WITH NEC 706.30 COMMUNICATION AND EXCEPTION 1 NEC 706.30 (A). O� ® EXTERNAL RAPID •ADDITIONAL DISCONNECTING MEANS SHALL BE INSTALLED WHERE ENERGY WIRES SHUTDOWN SWITCH SCALE: NTS STORAGE DEVICE INPUT AND OUTPUT TERMINALS ARE MORE THAN 5 FT FROM sunrun CONNECTED EQUIPMENT, OR WHERE THE CIRCUITS FROM THESE TERMINALS A AMPERE PASS THROUGH A WALL OR PARTITION PER 706.7(E). AC ALTERNATING CURRENT • LISTED, COMBINATION TYPE AFCI SHALL BE INSTALLED WHERE BACKED UP AFCI ARC FAULT CIRCUIT INTERRUPTER CIRCUIT WIRING IS EXTENDED MORE THAN 6FT AND DOES NOT INCLUDE ANY AZIM AZIMUTH VICINITY MAP COMP COMPOSITION GIL50184RREIA,C10,C46 ADDITIONAL OUTLETS OR DEVICES PER NEC 210.12(D). CA CL#750184 ; Seeing Sun Trail semng suol rat. •THE CAPACITY OF THE STANDALONE SYSTEM SUPPLY SHALL BE EQUAL TO OR DC DIRECT CURRENT GREATER THAN THE LOAD POSED BY THE SINGLE LARGEST UTILIZATION (E) EXISTING 1125 RESEARCH DR.STE B REDLANDS,CA 92374 < ESS ENERGY STORAGE SYSTEM FAX949 . 7 8o5 78sos EQUIPMENT CONNECTED TO THE SYSTEM PER NEC ARTICLE 710.15(A) •ALL PASS-THROUGH CONDUCTORS MUST COMPLY WITH NEC 312.8 EXT EXTERIOR Mockingbird Trail MxkMgb`rd INT INTERIOR CUSTOMER RESIDENCE: MAG MAGNETIC KELLEY WILLIS ° °`eke MSP MAIN SERVICE PANEL 47043 ARCADIA LN, PALM 101 (N) NEW DESERT, CA, 92260 NTS NOT TO SCALE OC ON CENTER TEL. (310)704-8061 PRE-FAB PRE-FABRICATED APN: 630-170-002 47043 Arcadia Ln,Palm. Digitally signed b Anthonette PSF POUNDS PER SQUARE FOOT Desen,CA92260.USA g y g y PV PHOTOVOLTAIC PROJECT NUMBER: DN Castro RSD RAPID SHUTDOWN DEVICE 113R-043WILL ,k=Sor ova LakeSD E=acastro@cityofpalmdesert.org, TL TRANSFORMERLESS DESIGNER: (415)580 6920 ex3 Anthonette Castro C=City of Palm Desert, TYP TYPICAL CN=Anthonette Castro Marrakesh Counlry Club Reason: I am approving this V VOLTS document W WATTS NICHOLAS CROW ® o SHEET 3 d Date:2023.01.1211:31:40-08'00' REV NAME DATE COMMENTS COVER SHEET o V 11 r 9e D,W REV: Al 1/4/2023 PAGE PV-1 .0 a � 0 - SOLR23-0017 MPU 200/A ARRAY TRUE MAG PV AREA SITE PLAN -SCALE = 1/16" = 1'-0" PITCH AZIM AZIM (SQFT) AR-01 1° 187° 175' 231.2 AR-02 1. 188' 176' 147.2 MODULE ELEVATION VIEW-SCALE = NTS - -2'-5" �-2'4" 13'-9" 11'-4" fMm � � 0� NOTES: • RESIDENCE DOES NOT CONTAIN ACTIVE FIRE SPRINKLERS. • MODULES WERE DESIGNED AT LEAST 18" FROM THE ROOF RIDGE. ARRAY DETAILS: • TOTAL ROOF SURFACE AREA: 4480 SQFT. z • TOTAL PV ARRAY AREA: 378.4 SQ FT. J PL Q • PERCENTAGE PV COVERAGE: MP PL Q (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE PL C) AREA) 100 = 8.4% BI BP SE - � PL sunrun od. a (N)ARRAY AR-01 o do G d GILBERT CORREIA,C10,C46 CA CL#750184 d d 1125 RESEARCH DR.STE B REDLANDS,CA 92374 c (E) DRIVEWAY PHONE 805.540.7603 a FAX 949.215.7778 CUSTOMER RESIDENCE: LADDER KELLEY WILLIS a ACCESS POINT 47043 ARCADIA LN, PALM DESERT, CA, 92260 (E) GATE/FENCE (N)ARRAY AR-02 TEL. (310)704-8061 LADDER APN: 630-170-002 J a ACCESS POINT PROJECT NUMBER: 113R-043WILL PL (E) RESIDENCE DESIGNER: (415)580 6920 ex3 PL NICHOLAS CROW PL PL SHEET SITE PLAN REV: Al 1/4/2023 PAGE PV-2.0 SOLR23-0017 MPU 200/A ROOF INFO FRAMING INFO ATTACHMENT INFORMATION DESIGN CRITERIA Name Type Height Type Max OC Detail Max Landscape Max Landscape Max Portrait Max Portrait Configuration MAX DISTRIBUTED LOAD: 3 PSF Span Spacing OC Spacing Overhang OC Spacing Overhang SNOW LOAD: 0 PSF FLAT, FOAM [TILT KIT] - ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: WIND SPEED: AR-01 OMNIBASE 1 LAG - UR 1-Story 2X12 RAFTERS 22'-9" 16" SNR-DC-00335 NA NA 5' -4" 1' - 11" STAGGERED 130 MPH 3-SEC GUST. S.S.LAG SCREWS: AR-02 FLAT, FOAM [TILT KIT] - 1-Story 2X12 RAFTERS 10' - 5" 16" ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: NA NA 5'-4" 1. - 11" STAGGERED 5/16": 2.5" MIN EMBEDMENT OMNIBASE 1 LAG - UR SNR-DC-00335 STRUCTURAL NOTES: • INSTALLERS SHALL NOTIFY D1 -AR-01 -SCALE: 1/8" = V-0" D2 -AR-02 -SCALE: 3/32" = V-0" ENGINEER OF ANY AZIM: 187° AZIM:188° Structural POTENTIAL STRUCTURAL O ly ROOF PITCH: 1° ROOF PITCH: 1° n pIR O WNY Nq� ISSUES OBSERVED PRIOR MODULE PITCH: 10° MODULE PITCH: 10° ��``c��`' * 1 6) `may TO PROCEEDING W/ INSTALLATION. rn c� 41 C BB783 P • IF ARRAY(EXCLUDING o * SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY - 26'-5" - t1 -2 �4 pQ`' ROOF PLANE EDGES 11" lfOF CA (EXCEPT VALLEYS), THEN o ATTACHMENTS NEED TO BE 45'-4"TYP - Signed 01/04/2023 ADDED AND OVERHANG TREDUCED WITHIN THE 12" o BOUNDARY REGION ONLY AS FOLLOWS: 2'-2" 2'-4"13'-8" •• ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS TO BE REDUCED BY 50% ° Ll ALLOWABLE° •• NOVRHANG DICA ED ONN PLANS TO BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING 8'-7" 39 INDICATED ON PLANS t_4'-6"j sun ,run w"',"'O< 5k-' - GILBERT CORREIA,C10,C46 CA CL#750184 2'-6" MODULE ELEVATION DETAIL -SCALE: NTS I 1125 RESEARCH DR.STE B REDLANDS,CA 92374 PHONE 805.540.7603 FAX 949.215.7778 CUSTOMER RESIDENCE: —2'-4"— ' 4 KELLEY WILLIS 13'-8" 2'-4" 47043 ARCADIA LN, PALM I I DESERT, CA, 92260 1'-2" 10° 10° 5'-4"TYP I TEL. (310)704-8061 APN:630-170-002 2'-4" ❑ ROOF PITCH, SEE NOTES MODULE PITCH, SEE NOTES -I PROJECT NUMBER: 18'-10" 3951'-4" 113R-043WILL DESIGNER: (415)580-6920 ex3 NICHOLAS CROW NOTES TO INSTALLER: • MODULES TILTED 10°TO ROOF SURFACE. SHEET • MINIMUM 2'-4" SPACING BETWEEN ROWS. LAYOUT • INSTALLERS MUST DETERMINE ACTUAL LOCATION OF RAFTERS AND PENETRATIONS REV: Al 1/4/2023 • LEVEL RAILS PAGE PV-3.0 SOLR23-0017 MPU 200/A 120/240 VAC SINGLE PHASE SERVICE O METER#: PV MODULES M SCE 222014-367770 2 1 JA SOLAR:JAM54S31-395/MR (N)SOLAREDGE / (18)MODULES UTILITY (N)CURRENT BACKUP INTERFACE SOLAREDGE TECHNOLOGIES: _ + �// OPTIMIZERS WIRED IN: GRID TRANSFORMERS BI-NUSGN-01 600 0WATT INVERTER (1)SERIES OF(9)OPTIMIZERS NEW 200A 6000 WATT INVERTER O MAIN IAA CTRL SOLAR JUNCTION BOX (1)SERIES OF(9)OPTIMIZERS BREAKER 6 O IVI (1)40A O4 c�—e% MIN RATED NEMA3R SOLAREDGE POWER OPTIMIZERS 1 (END FED) BREAKER S440 BATTERY NEW 200A fie% 200A MICROGRID FACILITY ON. MAIN DEVICE DEVICE O 3 (1)ENERGY STORAGE SYSTEM LOADS PANEL LOAD RATED DC DISCONNECT, + LG ENERGY SOLUTION: RESU 10H AFCI, REVENUE GRADE METER, PRIME RAPID SHUTDOWN AND ENERGY O 5 STORAGE SYSTEM INPUTS 3 ACiuTv (N)50A —GROUND FEEDER (N)50 FEEDER BREAKER BREAKER AT OPPOSITE END OF BUSBAR (N) 125A NOTE:TOTAL PV BACKFEED=35A BACKUP USED FOR INTERCONNECTION FACILITY LOADS PANEL CALCULATIONS LOADS CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND sunrun 1 NONE (4) 10 AWG PV WIRE NONE (1)6 AWG BARE COPPER 2 3/4"EMT OR EQUIV. (4)10 AWG THHN/THWN-2 NONE (1)10 AWG THHN/THWN-2 3 3/4"EMT OR EQUIV. (2)8 AWG THHN/THWN-2 NONE (1)10 AWG THHN/THWN-2 GILBERT CORREIA,C10,C46 CA CL#750184 4 3/4"EMT OR EQUIV. (2)8 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1)8 AWG THHN/THWN-2 1125 RESEARCH DR.STE B REDLANDS,CA 92374 5 1"EMT OR EQUIV. (2)4 AWG THHN/THWN-2 (1)4 AWG THHN/THWN-2 (1)8 AWG THHN/THWN-2 PHONE 805.540.7603 FAX 949.215.7778 6 1"EMT OR EQUIV. (2)4 AWG THHN/THWN-2 (1)4 AWG THHN/THWN-2 (1)8 AWG THHN/THWN-2 CUSTOMER RESIDENCE: 6-12 AWG BARE 5/16"-18 SS BOLT KELLEY WILLIS COPPER WIRE SS SPLIT LOCK WASHER 47043 ARCADIA LN, PALM (TORQUE TO 16 FT-LBS) DESERT, CA, 92260 \ SNAPNRACK MODULE CHARACTERISTICS / GROUND LUG TEL. (310)704-8061 S440 OPTIMIZER CHARACTERISTICS: JA SOLAR: JAM54S31-395/MR: 395 W MIN INPUT VOLTAGE: 8 VDC / / APN: 630-170-002 OPEN CIRCUIT VOLTAGE: 36.98 V MAX INPUT VOLTAGE: 60 VDC / ( BONDING PROJECT NUMBER: MAX POWER VOLTAGE: 30.84 V MAX INPUT ISC: 14.50 ADC \ CHANNEL NUT 113R-043WILL SHORT CIRCUIT CURRENT: 13.7 A MAX OUTPUT CURRENT: 15 ADC — — — — — SS BONDING RAIL DESIGNER: (415)580 6920 ex3 SYSTEM CHARACTERISTICS - INVERTER 1 NOTE: PINS NICHOLAS CROW • ALL HARDWARE IS INCLUDED FROM MANUFACTURER SYSTEM SIZE: 7110 W • A MINIMUM OF ONE GROUND LUG IS TO BE INSTALLED ON EVERY SHEET SYSTEM OPEN CIRCUIT VOLTAGE: 9 V CONTINUOUS ROW OF MODULES ELECTRICAL SYSTEM OPERATING VOLTAGE: 380 V • GROUNDING LUG MAY BE INSTALLED IN EITHER RAIL CHANNEL • GROUNDING LUG MAY BE INSTALLED SO GROUND WIRE IS MAX ALLOWABLE DC VOLTAGE: 480 V PARALLEL OR PERPENDICULAR TO RAIL REV: Al 1/4/2023 SYSTEM OPERATING CURRENT: 18.71 A ENSURE SPLIT LOCK WASHER IS INSTALLED ON TOP OF COPPER WIRE SYSTEM SHORT CIRCUIT CURRENT: 30 A SNAPNRACK GROUNDING SCALE: NTS PAGE PV-4.0 SOLR23-0017 MPU 200/A INVERTER 1 WARNING WARNINGWMAXIII NOTES AND SPECIFICATIONS: •SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2019 CEC ARTICLE PHOTOVOLTAIC SYSTEM 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690,OR ELECTRICAL SHOCK HAZARD • ' 480 IF REQUESTED BY THE LOCAL AHJ. COMBINER PANEL .SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE ' - 30 ' WORDS,COLORS AND SYMBOLS. TERMINALS ON LINE AND LOAD DO NOT ADD LOADS SIDES MAY BE ENERGIZED IN MAX RATED OUTPUT CURRENTOF - •LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING LABEL LOCATION: METHOD AND SHALL NOT BE HAND WRITTEN. THE OPEN POSITION PHOTOVOLTAIC AC COMBINER(IF CONTROLLER •- • • - ' 15 ADC .LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT APPLICABLE). INVOLVED. LABEL LOCATION: PER CODE(S):CEC 2022:705.12(B)(2)(3)(c), LABEL LOCATION: •SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY INVERTER(S), AC/DC DISCONNECT(S), INVERTER(S), DC DISCONNECT(S). SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. AC COMBINER PANEL(IF APPLICABLE). PER CODE(S):CEC 2022:690.53 •DO NOT COVER EXISTING MANUFACTURER LABELS. PER CODE(S):CEC 2022:690.13(B) WARN I N G OWARNIING THREE POWER SUPPLY SOURCES: UTILITY GRID, POWER SOURCE OUTPUT CONNECTION BATTERY AND PV SOLAR DO NOT RELOCATE THIS ELECTRIC SYSTEM OVERCURRENT DEVICE LABEL LOCATION: LABEL LOCATION: UTILITY SERVICE METER AND MAIN ADJACENT TO PV BREAKER(IF SERVICE PANEL. APPLICABLE). PER CODE(S):CEC 2022:706.11 & PER CODE(S):CEC 2022: 705.12(B)(3) 705.12(B)(2)(3)(b) RAPID SHUTDOWN 10� FOR SOLAR PV SYSTEM CAUTION LABEL LOCATION: POWER TO THIS BUILDING I S INSTALLEDD WITHIN 3'OF RAPID SHUT DOWN SWITCH PER CODE(S): CEC 2022:690.56(C)(3), IFC 2012:605.11.1, IFC 2018: 1204.5.3,CFC 2022: 1204.5.3 ALSO SUPPLIED FROM THE sunrun 4° FOLLOWING SOURCES WITH DISCONNECTS A S SHOWN GILBERT CORREIA,C10,C46 SOLAR PV SYSTEM EQUIPPED CA WITH RAPID SHUTDOWN SOLAR PANELS ON ROOF FPHONE AX 949SEARCH DR STEBREDLANDS,CA 92374 ■ Immmo0billoill ftl;:ak[lq�jll / FAX 949805770.8603 CUSTOMER RESIDENCE: KELLEY WILLIS LABEL LOCATION: 47043 ARCADIA LN, PALM INTERIOR AND EXTERIOR DC CONDUIT EVERY 10 FT, SERVICE ENTRANCE AND PV DESERT, CA, 92260 AT EACH TURN,ABOVE AND BELOW PENETRATIONS, 3 TURN RAPID SHUTDOWN BREAKER DISCONNECT ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. soLARELEcrxic PER CODE(S):CEC 2022:690.31(G)(3),690.31(G)(4) SWITCH TO THE"OFF" pVPANELS ® TEL. (310)704-8061 690.31(G)(4)IFC 2012:605.11.1.4 POSITION TO SHUT DOWN APN: 630-170-002 PV SYSTEM AND REDUCE INVERTER (EXT) SHOCK HAZARD IN THE P PHOTOVOLTAIC AC DISCONNECT ROJECT NUMBER: ARRAY. ENERGY STORAGE (EXT) 113R-043WILL MAXIMUMAC•- 11 AMPS DESIGNER: (415)580-6920 ex3 NOMINALOPERATING AC VOLTAGE: NICHOLAS CROW LABEL LOCATION: LABEL LOCATION: SHEET AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF ON OR NO MORE THAT 1 M(3 FT)FROM THE SERVICE SIGNAGE INTERCONNECTION. DISCONNECTING MEANS TO WHICH THE PV SYSTEMS PER CODE(S):CEC 2022:690.54 ARE CONNECTED.PER CODE(S):CEC 2022:690.56(C)(1)(a) 47043 ARCADIA LN, PALM DESERT, CA, 92260 REV: Al 1/4/2023 PAGE PV-5.0 SOLR23-0017 MPU 200/A THE SNAPNRACK FIXED TILT IS A SIMPLE *COMPATIBLE ROOF ATTACHMENTS FOR FIXED TILT BIN: REVISION: SOLUTION FOR INSTALLATIONS o *10, *1 1 1 5/7/2019 NEW DETAIL MA REQUIRING MODULE TILT BEYOND THE o — EXISTING ROOF SLOPE. IT IS DESIGNED FOR TILT ANGLES FROM 00-300 ABOVE o THE HORIZONTAL UTILIZING FIXED STANDOFF HEIGHTS METAL ROOF BASE: 1-HOLE BASE: 4-HOLE BASE: PV MODULE, TYP. . BIN 10 BIN 10 BIN 11 THE SNAPNRACK FIXED TILT IS DETAIL: SNR-DC-00352 DETAIL: SNR-DC-00348 DETAIL: SNR-DC-00350 COMPATIBLE WITH THE VARIOUS DETAIL: SNR-DC-00353 DETAIL: SNR-DC-00349 DETAIL: SNR-DC-00357 SNAPNRACK ROOF ATTACHMENTS DETAIL: SNR-DC-00358 SHOWN. REFER TO SPECIFIC DETAIL: SNR-DC-00359 "ATTACHMENT DETAIL" SNAPNRACK ULTRA RAIL REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH PV MODULE, TYP. SNAPNRACK— "BIN" NUMBER ON THIS DRAWING MODULE CLAMPS SNAPNRACK FIXED REFER TO THE SNAPNRACK INSTALLATION TILT, REAR LEG TILT ANGLE, RELATIVE MANUAL FOR 5/16"0 HARDWARE TORQUE LENGTH VARIES) TO HORIZONTAL SPECIFICATIONS SNAPNRACK FIXED (30° MAX) B TILT, FRONT LEG \ TILT ABOVE FOR ADDITIONAL SYSTEM (5%" STANDOFF) ROOF SURFACE REQUIREMENTS, INCLUDING MODULE (5°-300) ROOF DECKING, SNAPNRACK FIXED OVERHANG, SEE SNR-DC-00329 ULTRA (ROOFING MATERIAL TILT, REAR LEG RAIL, SYSTEM OVERVIEW, TYPICAL NOT SHOWN) A (LENGTH VARIES) FOR LEVELING REQUIREMENTS SEE STRUCTURAL MEMBER,— SNAPNRACK FIXED TILT, FRONT LEG SNR-DC-00334 ULTRA RAIL, COMPONENT WOOD RAFTER SHOWN 1 DETAIL, LEVELING SPACER ON STANDOFF" — (5V„ STANDOFF) RAILS CAN BE MOUNTED UPSLOPE OR ALLOWABLE ANGLES ROOF PITCH, VARIES FIXED TILT, INSTALLED DOWNSLOPE OF THE TILT LEGS (23 MAX) TILT ANGLE MUST ALWAYS BE IN SAME S.S. BOLT WITH DIRECTION AS ROOF PITCH. REVERSE SERRATED FLANGE NUT TILT NOT SUPPORTED / — \ SNAPNRACK ULTRA RAIL ATTACHMENT • **SITE-SPECIFIC ANALYSIS IS REQUIRED SNAPNRACK i �\ HARDWARE 7� \ **SNAPNRACK STANDARD IF A TALLER STANDOFF IS NECESSARY STANDOFF CLAMP / STANDOFF, LENGTH VARIES / � \FOR PROPER INSTALLATION / \ / \ I **SNAPNRACK STANDARD I I WITH DESIRED TILT (23" MAX) STANDOFF, 51/z" L SNAPNRACK ALL PURPOSE I I 11/z I\ / ORIENTOLLONG ACE FLUSH \ / 1%" TO RAIL, AS SHOWN \ 15/" SNAPNRACK ROOF ATTACHMENT. FIXED TILT � U U_� DETAIL A COMPATIBLE WITH ATTACHMENTS ABOVE. REFER UR-40 RAIL I UR-60 RAIL FRONT LEG, FIXED TILT TO SPECIFIC SNAPNRACK "ATTACHMENT DETAIL" DETAIL B FOR USE WITH SNAPNRACK ULTRA SERIES RAILS (RAIL HIDDEN) REAR LEG, FIXED TILT �������\ /I���\ _✓✓✓]]] /7 Sunrun South LLC DESIGNER: G.MCHPEETERS SCALE: DNS DRAWING NUMBER: DESCRIPTION: REV: 595 MARKET STREET,29TH FLOOR•S FAX FRANCISCO,-69 CA 94105 USA ILJI ILJI�JI JILJIC'/. \���V111� IL1I �LJI�IJ\ PHONE(4,5)580-6900.FAx(4,5>586-696z DRAFTER: M.AFFENTRANGER SNR-DC-00335 ULTRA RAIL, SYSTEM DETAIL, FIXED TILT `J THE INFORMATION IN THIS DRAWING IS CONFIDE NTIALAND PROPRIETARY-ANY DATE: 5 7 2019 34166 Solar Mounting Solutions REPRODUCTION,DISCLOSURE,OR USE THEREOFIS PROHIBITED WITHOUT THE APPROVED BY: B.PETERSON WRITTEN CONSENT OF SUNRUN SOUTH LLC. SOLR23-0017 MPU 200/A Harvest the Sunshine JASOLAR JAM54S31 380-405/MROM MECHANICAL DIAGRAMS SPECIFICATIONS `' -- 113412 1088 30,1 Cell Mono a Weight 21.5kg±3% Q- 1U units:mm Dimensions 1722±2mmx1134±2mmx30±1mm Cable Cross Section Size 4mm' (IEC) , 12 AWG(UL) __7 - - - 0 DEEP B LI J E 3.0 L i `ht _- - - e Places 6 No.of cells 108(6x18) Grounding Holes , Junction Box IP68,3 diodes 1S\1 _- w1i\a;�'1rR1�a1\t1a'\a 1������►������y��`t��.�►i���a*,� !\\\!\\\\�''9\i���\\��\U�ti��:, q zoo±� MC4(1000V) Connector MC4-EV02(1500V) M ounting Holes - BDrenPlacengholes m Cable Length Portrait:300mm(+)/400mm(-); 8.1- (Including Connector) Landscape:1200mm(+)/1200mm(-) Half-cell Black Module Packaging Configuration 36pcs/Pallet,864pcs/40ft Container Mono JAM54S31 8 0 40 - Series Remark:customized frame color and cable length available upon request ELECTRICAL PARAMETERS AT STC JAM54S31 JAM54S31 JAM54S31 JAM54S31 JAM54S31 JAM54S31 Introduction TYPE -380/MR -385/MR -390/MR -395/MR -400/MR -405/MR Rated Maximum Power(Pmax)[W] 380 385 390 395 400 405 Assembledconfigurationof the modules Open Circuit Voltage(Voc)[V] 36.58 36.71 36.85 36.98 37.07 37.23 advantages of higher power output,better temperature-dependent performance,reduced shading effect on the energy generation, • of •t spot, as well as enhanced Maximum Power Voltage(Vmp)M 30.28 30.46 30.64 30.84 31.01 31.21 tolerance for loading. Short Circuit Current(Isc)[A] 13.44 13.52 13.61 13.70 13.79 13.87 Maximum Power Current(Imp)[A] 12.55 12.64 12.73 12.81 12.90 12.98 Module Efficiency[%] 19.5 19.7 20.0 20.2 20.5 20.7 Power Tolerance 0-+5W J} Temperature Coefficient of Isc(a_lsc) +0.045%*C Higher output power _Ower LCOE Temperature Coefficient of Voc(p_Voc) -0.275%/oC Temperature Coefficient of Pmax(y_Pmp) -0.350%/*C STC Irradiance 1000W/m2, cell temperature 25°C,AM1.5G Remark:Electrical data in this catalog do not refer to a single module and they are not part of the offer.They only serve for comparison among different module types. Less shading and lower resistive loss "`Nr Better mechanical loading tolerance ELECTRICAL PARAMETERS AT NOCT OPERATING CONDITIONS TYPE JAM54S31 JAM54S31 JAM54S31 JAM54S31 JAM54S31 JAM54S31 Maximum System Voltage 1000V/1500V DC -380/MR -385/MR -390/MR -395/MR -400/MR -405/MR Rated Max Power(Pmax)[W] 286 290 294 298 302 306 Operating Temperature -40 C-+85 C Open Circuit Voltage(Voc)[V] 34.36 34.49 34.62 34.75 34.88 35.12 Maximum Series Fuse Rating 25A Superior Warrant Comprehensive Certificates Max Power Volta a Vmp)M 28.51 28.68 28.87 29.08 29.26 29.47 Maximum Static Load,Front* 5400Pa(1121b/ft2) p y p g ( Maximum Static Load,Back* 2400Pa(50lb/ft2) • 12-year product warranty • • IEC 61215,IEC 61730,UL 61215,UL 61730 Short Circuit Current(Isc)[A] 10.75 10.82 10.89 10.96 11.03 11.10 NOCT 45±2 C • 25-year linear power output warranty I N.I . ISO 9001:2015 Quality management systems Max Power Current(Imp)[A] 10.03 10.11 10.18 10.25 10.32 10.38 Safety Class Class 11 100% • ISO 14001:2015 Environmental management systems NOCT Irradiance 800W/m2,ambient temperature 20oC,wind speed 1m/s,AM1.5G Fire Performance UL Type 1 9II% . ISO 45001:2018 Occupational health and safety management systems CHARACTERISTICS +1 . IEC TS 62941:2016 Terrestrial photovoltaic(PV)modules- Current-Voltage Curve JAM54S31-405/MR Power-Voltage Curve JAM54S31-405/MR Current-Voltage Curve JAM54S31-405/MR Guidelines for increased confidence in PV module design qualification and type approval 14 400 1000w/m' 14 12 350-800w/m' 12 10'C t t 10 800W/m' 300 snow/m, 10 -C ■ New linear power warranty ■ Standard module linear power warranty C E f1V� a 251- a -55C s ��ak y 8 m `m 200 d U e 6 o 150 U CL 4 too 4 2 50 2 ❑■ ■❑■ 0JAS 0 10 20 30 40 00 10 20 30 40 00 10 21 33 M • . - • • Voltage(V) voltage(V) Voltage(V)Specifications subject to technical changes and tests. A Solar reserves the right of final interpretation. ■ Premium Cells, Premium • • 1 SOLR23-0017 MPU 200/A Single Phase Energy Hub Inverter (A with Prism Technology Single Phase Energy Hub for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-UST Inverter with Prism Technology � ... ... for North America OUTPUT-AC ON GRID Rated AC Power 3000 3800 SE3000H-US / SE380OH-US / SE6000H-US / SE760OH-US M 6000 7600 W Maximum AC Power Output 3000 3800 6000 7600 W v AC Output Voltage Range 211-264 Vac AC Frequency Range(min-nom-max) 59.3-60-60.50 Hz Maximum Continuous Output Current 12.5 16 25 32 A GFDI Threshold 1 12-25 Total Harmonic Distortion(THD) <3 %% p YEAR Power Factor 1,adjustable-0.85 to 0.85 Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yes Charge Battery from AC(if Allowed) Yes Typical Nighttime Power Consumption <2.5 W o s OUTPUT-AC BACKUPW Rated AC Power in Backup Operation 2400 3050 1 4800 1 6100 W Peak AC Power(<10 sec)in Backup Operation 2700 3400 5400 6900 W AC L-L Output Voltage Range in Backup 211-264 Vac O Solar=-! ..1�_a,» O AC L-N Output Voltage Range in Backup 105-132 Vac AC Frequency Range in Backup(min-nom-max) 55-60-65 Hz O Maximum Continuous Output Current in Backup Operation 10 1 12.7 1 20 1 25.5 A O ® Peak AC Current(<10sec)in Backup Operation 11.25 14.2 22.5 30 A GFDI 1 A THD <5 % o © OUTPUT-SMART EV CHARGER AC Rated AC Power 9,600 W AC Output Voltage Range 211-264 Vac AC Frequency Range(min-nom-max) 59.3-60-60.5 Hz Maximum Continuous Output Current @240V(grid,PV and battery) 40 Aac Optimized battery storage with HD-Wave technology INPUT- DC(PV AND BATTERY) Transformer-less,Ungrounded Yes Record-breaking 99%weighted efficiency with Multi-inverter`), scalable storage solution Max Input Voltage 480 Vdc 200% DC oversizing Nom DC Input Voltage 380 400 Vdc Integrated arc fault protection and rapid shutdown Reverse-Polarity Protection Yes Small, lightweight, and easy to install for NEC 2014, NEC 2017 and NEC 2020, per article Ground-Fault Isolation Detection 600kOSensitivity 690.11 and 690.12 INPUT- DC(PV) Modular design, future ready with optional Maximum DC Power 6000 7600 1 12000 1 15600 W upgrades to: Embedded revenue grade production data, ANSI Maximum Input Current") 8.5 10.5 16.5 20 Adc Max.Input Short Circuit Current 45 Adc / DC-coupled storage for full or partial home backup C12.20 Class 0.5 Maximum Inverter Efficiency 99.2 % / Built-in consumption monitoring CEC Weighted Efficiency 99 % / Direct connection to the SolarEdge smart EV 2-pole Disconnection Yes charger INPUT- DC(BATTERY) Supported Battery Types LG Chem RESU10H Number of Batteries per Inverter 1 or 25� Maximum Battery Capacity per Inverter 19.6 kWh Continuous Power Per Inverter 5000 W s o f a r :To _ Peak Power 6900 W .solaredge.com , , Max Input Current@240V 18 Adc 2-pole Disconnection Yes SOLR23-0017 MPU 200/A Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE380OH-US / SE6000H-US / SE7600H-UST SMART ENERGY CAPABILITIES Consumption Metering Built-in(') Battery Storage With Backup Interface for service up to 200A;Up to 3 inverters',15kW backup power,and 50kWh backup capacity EV Charging Direct connection to Smart EV charger ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,Wi-Fi(optional),Cellular() Revenue Grade Metering,ANSI C12.20 Built-in") Integrated AC,DC and Communication Connection Unit Yes Inverter Commissioning with the SetApp mobile application using built-in Wi-Fi Access Point for local connection DC Voltage Rapid Shutdown(PV and Battery) Yes,according to NEC 2014,NEC 2017 and NEC 2020 690.12 STANDARD COMPLIANCE Safety UL1741,UL1741 SA,UL169913,UL1998,UL9540,CSA 22.2 Grid Connection Standards IEEE1547,Rule 21,Rule 14H Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG Range 3/4"maximum/14-8 AWG 1"maximum/14-6 AWG EV AC Output Conduit Size/AWG Range 3/4"maximum/14-8 AWG 1"maximum/14-6 AWG DC Input(PV)Conduit Size/AWG Range 3/4"maximum/14-8 AWG 1"maximum/14-6 AWG DC Input(Battery)Conduit Size/AWG Range 3/4"maximum/14-8 AWG 1"maximum/14-6 AWG Dimensions with Connection Unit(HxWxD) 17.7 X 14.6 X 6.8/450 X 370 X 174 in/mm Weight with Connection Unit 26/11.8 30.2/13.7 lb/kg Noise <25 dBA Cooling Natural Convection Operating Temperature Range -40 to+140/-40 to+60m -F/-C Protection Rating NEMA 4X *Pending firmware upgrade (1)These specifications apply to inverters with part numbers SExxxxH-USS3xxxxx or SE7600H-USSSHxxxx and connection unit model number DCD-IPH-US-PxH-F-x (2)For other regional settings please contact SolarEdge support (3)Not designed for standalone applications and requires AC for commissioning (4)A higher current source may be used;the inverter will limit its input current to the values stated (5)When connecting two LG Chem RESU batteries,each battery must have a different part number (6)For consumption metering current transformers should be ordered separately:SEACT0750-20ONA-20 or SEACT0750-400NA-20.20 units per box. (7)For both 5-yr and 12-yr data plans: Customer is responsible for verifying that the site location has adequate mobile coverage by the third party service provider prior to any installation by accessing https://www.solaredge.com/- products/communication/cel lu lar-communication-options#/ SolarEdge shall not be responsible or liable for unavailability or discontinuance of network coverage in a specific area or region,any network downtime,or permanent service shutdown. (8)Full power up to at least 50*C/122*F;for power de-rating information refer to:https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf Connecting CTs to the Revenue Grade and Consumption Meter Single Phase Energy Hub Inverter with Prism Technology Service Pdnel Grid O 1T 11 N 17 Shiaklyd CATS.artily ------�1------ I N AC Conduit ®SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S other trademarks mentioned herein are trademarks of their respective owners.Date:11/2020N01/ENG NAM.Subject to change without notice. SOLR23-0017 MPU 200/A Specification Be Prepared with R E S U P R I M _ „ 1 . - - - - - _ - Usable Energy(DoD 100%)[kWh] 16 Usable Energy(DoD 100%)[kWh] 9.6 Power(Rated/Peak)[kW] 7/11 Power(Rated/Peak)[kW] 5/7 Voltage[V] 350-450 Voltage[V] 350-450 Round-trip Efficiency[%] >90 Round-trip Efficiency[%] >90 Storage Power Consumption[W] <0.1 Storage Power Consumption[W] <0.1 Dimension[W x H x D,mm] 504 x 1,086 x 295 Dimension[W x H x D,ri 504 x 817 x 295 Total 159 Total III Weight[kg] Module 130(65 x 2EA) Weight[kg] Module 82(41 x 2EA) r, Control Unit 24 Control Unit 24 Connect Plate 5 Connect Plate 5 Installation Type Floor-standing Installation Type Floor-standing&Wall-mounted Scalability Up to 2 units(32kWh/14kW) Scalability Up to 2 units(19 kWh/10 kW) Operational Temperature[°C] -10-50 Operational Temperature[°C] -10-50 Ingress Rating IP55 Ingress Rating IP55 • • • • • Warranty 70%@10 years(Global) Warranty 70%@10 years(Global) • • Communication CAN&RS485 Communication CAN&R5485 Cell UL 1642 Cell UL 1642 -FA Certification product CE/FCC/RCM/IEC62619/ Certification product CE/FCC/RCM/IEC62619/ I Mp UL1973/IEC62477 UL1973/IEC62477 Compatible Inverters:SMA,Solaredge,SUNGROW,GOODWE,Solis *Values provided for 25"C iM R=SU16H PRIM= R=SWOH PRIM= LG Home Battery R=SU 0''�k www.ighomebatterycom ®LG Energy Solution SOLR23-0017 MPU 200/A Be Prepared with RESU PRIME Battery The ultimate value LG RESU is offering to customers is the maximum security for electricity consumption regardless of Control Unit external uncertainties by realizing energy independence with eco-friendly solar energy. Unique Modular Design ---------------------------------------------------------------------------------------------------------------------------------------------- Battery With its unique modular design, ;. _ Modules R=SU16H PRIME R=SU10H PRIME RESU Prime can be divided into control unit and two battery modules. It enables easier transportation,handling, "The world's largest capacity "The smartest choice of and installation. home battery for first home battery *May vary depending on specific condition whole home backup" for daily use" Connect Plate World's Largest Capacity(16kWh,AW)to back up Enough capacity(9.6kWh,5kW)to back up essential loads in peak time and blackouts critical loads during peak time and emergencies -------------------------------------------------------------------------------------- ---------------------- 7 - •r Carry&Handle ° IIII •'• Lift needed � No lift On-the-Spot Maintenance A Workload IIII The detachable Control Unit . No, I 2-3 lnsrallers 1-2 lnsrallers can be replaced on site, saving maintenance time and cost After sales 4�91 IIII Service(*) Collect& Early diagnosis& Replace On-the-Spot Maintenance *May vary depending on specific conditions RBSUI6H PRIM= R=SU10H PRIM= ------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------- • ®� ��- ;; Maximum energy and high power output RESU Monitoring enable whole home backup both in peak time and blackouts. Real time battery status monitoring ° Fully cover an average daily s R=5U76H x 2ea R=SUIOH x 2ea and early diagnosis with RESU Monitor App/Web-based UI electricity use RESU Monitor remotely monitors battery Fk A . For Installers&End Customers 1 Capacity 32kWh 19.2WVh conditions in real time and proactively diagnoses in case of anomalies, 2af R=SU16H PRIM= Power 14 kw 10 kw ' oars„e, � I enabling installers to take quick *May vary depending on the size of household and energy consumption and accurate remedial actions. SOLR23-0017 MPU 200/A Backup Interface for North America LA BI-EUSGN-01 / BI-NUSGN-01 Backup Interface INPUT FROM GRID for North America O AC Current Input 200 A AC Output Voltage(Nominal) 240 Vac B I-E U SG N-01 / B I-NUSGN-01 AC Output Voltage Range 211 264 Vac AC Frequency(Nominal) 60 Hz AC Frequency Range 59.3-60.5 Hz Microgrid Interconnection Device Rated Current 200 A Service Side AC Main Circuit Breaker Rated Current 200 N/A A Service Side AC Main Circuit Breaker Interrupt Current 10k N/A A Grid Disconnection Switchover Time <100 ms G) OUTPUT TO MAIN DISTRIBUTION PANEL Maximum AC Current Output 200 A AC L-L Output Voltage(Nominal) 240 Vac AC L-L Output Voltage Range 211-264 Vac OAC Frequency(Nominal) 60 Hz AC Frequency Range 59.3-60.5 Hz Maximum Inverters AC Current Output in Backup Operation 78 A Imbalance Compensation in Backup Operation 5000 W AC L-N Output Voltage in Backup(Nominal) 120 V AC L-N Output Voltage Range in Backup 105-132 V AC Frequency Range in Backup 55-65 Hz INPUT FROM INVERTER Number of Inverter Inputs 3 # Rated AC Power 7,600 W Maximum Continuous Input Current @ 240V 32 A Rated AC Power in Continuous Backup Operation 6,100 W Maximum Continuous Input Current in Backup Operation 26 A ® _ Peak AC Power(<10 sec)in Backup Operation 7,000 W Peak AC Current(<10 sec)in Backup Operation 30 A Inverter Input AC Circuit Breaker 40 A Upgradability Up to 3 X 63A CBM GENERATOl Maximum Rated AC Power 15,000 W Maximum Continuous Input Current 63 Adc Backup Interface for Flexible Backup Dry Contact Switch Voltage Rating 250/30 Vac/Vdc Dry Contact Switch Current Rating 5 A Automatically provides backup power to Built-in Auto Transformer and Energy 2-wire start Switch Yes home loads in the event of grid interruption Meter for easier and faster installation ADDITIONAL FEATURES Installation Type Suitable for use as service equipment For main lug only Full flexibility in which loads to backup - / Seamless integration with the Energy Hub Inverter Number of Communication Inputs 2 the entire home or selected loads with Prism Technology to manage and monitor Communication RS485 both PV generation and energy storage Energy Meter(for Import/Export) 1%accuracy Scalable solution to support higher power& Manual Control Over Microgrid Interconnection Device Yes higher capacity(') / Generator connection support() (1)Each 40A CB supports up to one 7.6kW inverter,with each 63A CB supporting one 101<W and one 11.4kW inverter.The CB upgrade kit is available with the following part numbers:for 40A CB,C13-UPG-40-01;for 63A,CB CB-UPG-63-01 (2)Requires supporting inverter firmware (*) Requires supporting inverter firmware solaredge.com solar9=8 W_ SOLR23-0017 MPU 200/A Backup Interface for North America BI-EUSGN-01 / BI-NUSGN-01 STANDARD COMPLIANCE UL1741,CSA 22.2 NO.107 Safety UL869A N/A Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS Supported Inverters StorEdge single phase inverter, Single phase Energy Hub inverter with Prism technology AC From Grid Conduit Size/AWG Range 2"conduits/#0-4/0 AWG AC Inverter Conduit Size/AWG Range 1"conduit/14-4 AWG AC Generator Input Conduit Size/AWG Range 1"conduit/8-3 AWG Communication Conduit Size/AWG Range 3/4"/24-10 AWG Weight 73/33 lb/Kg Cooling Fan(user replaceable) Noise <50 dBA Operating Temeprature Range -40 to+122/-40 to+50 `F/`C Protection Rating NEMA 3R,IP44 Dimensions(HxWxD) 20.59 x 13.88 x 8.62/523.5 x 352.5 x 219 in/mm PV Grid DD Power optimizers Loads 71 DC AC Energy Hub Backup Interface Inverter with Prism _ o Technology •� AC A. Monitoring Platform I I I — Battery AC DC Generator ©SolarEdge Technologies,Ltd.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All C E other trademarks mentioned herein are trademarks of their respective owners.10/2020N01/ENG NA.Subject to change without notice. SOLR23-0017 MPU 200/A Power Optimizer For North America Power Optimizer O S440, S500 rr Unit For North America INPUT Rated Input DC Power" 440 500 W Absolute Maximum Input Voltage(Voc) 60 Vdc S440, 5500 MPPT Operating Range 8-60 Vdc Maximum Short Circuit Current(Isc)of Connected PV Module 14.5 1 15 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II O OUTPUT DURING OPERATION Maximum Output Current 15 Ado Maximum Output Voltage 60 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) rug Safety Output Voltage per Power Optimizer 1+/-0.1 Vdc STANDARD COMPLIANCE _ Photovoltaic Rapid Shutdown System NEC 2014,2017&2020 EMC FCC Part 15 Class B,IEC61000-6-2,IEC61000-6-3 Safety IEC629 (class II safety),UL1741 UL Material UL94 V-0,UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 N INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions(W x L x H) 129 x 153 x 30/5.07 x 6.02 x 1.18 mm/in /M Weight(including cables) 655/1.5 gr/lb — Input Connector MC4a1 Input Wire Length 0.1/0.32 Output Connector MC4 Output Wire Length (+)2.3,(-)0.10/(+)7.54,(-)0.32 m/ft Operating Temperature Range01 -40 to+85 -C Protection Rating IP68/NEMA6P Relative Humidity 0-100 % (1)Rated power of the module at STC will not exceed the power optimizer Rated Input DC Power.Modules with up to+5%power tolerance are allowed (2)For other connector types please contact SolarEdge (3)For ambienttemperature above+70-C/+158-F power de-rating o applied.Refer to Power Optimizers Temper-ne De-Rating Technical Note for more details PV System Design PV power optimization at the module level Inverter HD-Wave 208V Grid 277/480V Grid Minimum String Length S440,S500 PowerO timizers 8 10 18 Maximum String Length(Power Optimizers) 25 5e Specifically designed to work with SolarEdge Faster installations with simplified cable management Maximum Nominal Power per string 5700(6000 with SE76o0-US-SEn400-u) 6000 12750 W Maximum Allowed Connected Power per Strings" I One string 7200 residential inverters and easy assembly using a single bolt (Permitted only when the difference In connected power between Refer to Footnote 5 15000 W strings is 1,000W or less) Two strings or more 7800 Parallel Strings of Different Lengths or Orientations Yes Detects abnormal PV connector behavior, / Flexible system design for maximum space utilization (4)ArthngwlmmDretnan30uption—does-meet NEC rapidsnumuwnreguirements;saeryvolGgewiubeabDveme30Vre9uirement preventing potential safety issues* (5)If the inserters rated Ac power s maximum n—nal power per string,then the maximum power per string will be able to reach up to the invent,maximum input DC power.Refer to. hnps//www.solaredge.conVsftes/defaulWiles/se-power-optimizer-single4ring-design-application-note pdf Compatible with bifaeial PV modules (6)tI,notallowedtomI,5-sedesandP-sedes,PowerOpumeersinnewinstallatons Module-level voltage shutdown for installer and firefighter safety / Meets NEC requirements for arc fault protection(AFCI) # and Photovoltaic Rapid Shutdown System(PVRSS) ° Superior efficiency(99.5%) # " ,35 _ Mitigates all types of module mismatch loss, from manufacturing tolerance to partial shading O G t O 'Expected availability in 2022 solaredge.com solar=@@ ®SolarEdge TxM1nobgies,Inc All rights reu d.$Ov.REDGE Z_Irr SOWREWEare trademaFs or registered trademarks of SolarEdge Technologies, C - Rill Inc All other trademarks mentioned herein are trademarksof-ifir respective owners.ext.,luty 1 ZZ DS-0gg01&NA.Subject to chorge without notice. Inwrtek SOLR23-0017 MPU 200/A �REV ENGINEERING 1/4/2023 RE:Structural Certification for Installation of Residential Solar KELLEY WILLIS:47043 ARCADIA LN, PALM DESERT,CA,92260 Attn:To Whom It May Concern This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report,the roof is made of Flat, Foam roofing over roof plywood supported by 2X12 Rafters at 16 inches.The slope of the roof was approximated to be 1 degree. After review and based on our structural capacity calculation,the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. Design Criteria Code 2022 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 10 psf V 130 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. R oFESS/phi Sincerely, ������ lAUNygNI� z Eugene Munyanziza, P.E. W C 88783 ' n EV Engineering, LLC proiects@evengineersnet.com �9TE OF R� Signed 1/4/2023 http://www.evengineersnet.com Exp:06/30/2024 projects@evengineersnet.com http://www.evengineersnet.com SOLR23-0017 MPU 200/A �REV ENGINEERING Structural Letter for PV Installation Date: 1/4/2023 Job Address: 47043 ARCADIA LN PALM DESERT,CA,92260 Job Name: KELLEY WILLIS Job Number: 010323 KW Scope of Work This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing.All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Table of Content Sheet 1 Cover 2 Attachment Uplift checks 3 Roof Framing Check 4 Seismic Check and Scope of work Engineering Calculations Summary Code 2022 California Building Code(ASCE 7-16) Risk category II Roof Dead Load Dr 10 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S psf Wind Load (component and Cladding) -mph Exposure References NDS for Wood Construction QROf ESS/ON MUNygNl�y Sincerely, W ``� C 88783 y rrrn n� d � Eugene Munyanziza, P.E. \Q EV Engineering, LLC l9lFOF CA Signed 1/4/2023 projects@evengineersnet.com http://www.evengineersnet.com Exp:06/30/2024 projects@evengineersnet.com http://www.evengineersnet.com SOLR23-0017 MPU 200/A �REV ENGINEERING Wind Load Cont. Risk Category= II V= 130 mph ASCE 7-16 Figure 26.5-113 Exposure= C Kzt= 1.0 ASCE 7-16 Sec 26.8.2 KZ= 0.85 ASCE 7-16 Table 26.10-1 Kd= 0.85 ASCE 7-16 Table 26.6-1 Ke= 0.99 ASCE 7-16 Table 26.9-1 qh=0.00256KZKZtKdKeV2= 30.90 psf Pitch = 1.0 Degrees YE= 1.1 Ya= 0.6 (Wind Tunnel value) uplift W Zone(1) Zone(2r) Zone(2e) Zone(3) Fig.30-3-2 GCP= -1.3 -1.8 -1.8 -1.95 Eq.29.4-7 P=gh(GCp)(yE)(YJ= -26.51 -36.71 -36.71 -39.77 GCP= 0.7 Figure 30.3-2 P=gh(GCp)(YE)(YJ= 14.28 Equation 29.4-7 Rafter Attachments:0.6D+0.6W(CD=1.6) Connection Check Attachement max. spacing= 6 ft - 5/16" Lag Screw Withdrawal Value= 266 Ibs/in Table 12.2A- NDS Lag Screw Penetration 2.5 in DFL Assumed Allowable Capacity= 760 Ibs (Lag Bolt) Zone Trib Width Area(ft) Uplift(Ibs) Down(Ibs) Zone(1) 6 16.5 292.2 285.1 Zone(2r) 6 16.5 393.2 285.1 Zone(2e) 6 16.5 393.2 285.1 Zone(3) 6 16.5 423.4 285.1 Conservative Max= 423.4 < 760 CONNECTION IS OK 1. Pv seismic dead weight is negligible to result in significant seismic uplift,therefore the wind uplift governs 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. projects@evengineersnet.com http://www.evengineersnet.com SOLR23-0017 MPU 200/A REV ENGINEERING Vertical Load Resisting System Design Roof Framing Rafters Snow Load Fully Exposed pg= 0 psf Ct= 1.1 Ce= 0.9 IS= 1.0 Ps= 0 psf Pf= 0 psf Pfmin. = 0.0 psf 0 plf Max Length, L= 22.75 ft Tributary Width,WT= 16 in RILL= 20 psf 13.33 plf Dr= 10 psf 13.33 plf PvDL= 3 psf 4 plf Load Case: DL w= 17 plf M= 997lb-ft Mallowable=Sx x Fb'= 2456 lb-ft > 997 lb-ft OK Load Case: DL+RLL DL+Lr= 27 plf Mdown= 1533lb-ft Mallowable=Sx x Fb'= 3411 lb-ft > 1533 lb-ft OK Load Case: DL+S DL+S= 17 plf Mdown= 997lb-ft Mallowable=Sx x Fb'= 3275 lb-ft > 997 lb-ft OK Load Case: DL+0.6W w= 28.8 plf M = 1654 lb-ft Mallowable=Sx x Fb' (wind)= 4366 lb-ft > 1654 lb-ft OK Load Case:0.6DL+0.6W w= 22.8 plf M = 1309 lb-ft Mallowable=Sx x Fb' (wind)= 4366 lb-ft > 1309 lb-ft OK DL+0.45W+0.75(RLL or S) 27 plf Mdown= 1525lb-ft Mallowable=Sx x Fb'= 4366 lb-ft > 1525 lb-ft OK Member Capacity DF-L No.2 2X12 Design Value CL CF Ci C, Adjusted Value Fb= 900 psi 1.0 1.0 1.0 1.15 1035 psi Fv= 180 psi N/A N/A 1.0 N/A 180 psi E= 1600000 psi N/A N/A 1.0 N/A 1600000 psi Emin= 580000 psi N/A N/A 1 1.0 N/A 580000 psi Depth, d = 11.25 in Width, b= 1.5 in Cross-Sectonal Area,A= 16.875 in Moment of Inertia, IXX= 177.979 in Section Modulus,SXX= 31.6406 in' Allowable Moment, Mail= Fb'SXX= 2729.0 lb-ft DCR=M /Mali= 0.45 < 1 Satisfactory Allowable Shear,Vail=2/3F 'A= 2025.0 lb DCR=V /Vail= 0.17 < 1 Satisfactory projects@evengineersnet.com http://www.evengineersnet.com SOLR23-0017 MPU 200/A REV ENGINEERING Siesmic Loads Check Roof Dead Load 10 psf %or Roof with Pv 8.4% Dpv and Racking 3 psf Average Total Dead Load 10.3 psf Increase in Dead Load 1.2% OK The increase in seismic Dead weight as a result of the solar system is less than 10%of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability We have based our structural capacity determination on information in pictures and a drawing set titled PV plans- KELLEY WILLIS.The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments.The calculations produced for this structure's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures. projects@evengineersnet.com http://www.evengineersnet.com SOLR23-0017 MPU 200/A Article 220 - Service/Feeder calculation for (address): Job Code 47043 Arcadia Ln, Palm Desert, CA, 92260 m13R-043WILL Section 220.83 Existing Dwelling Unit Part#1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Building Square Footage VA(watts) Amps House 2546 7638 31.825 Total for Part#1: Amps Box A (VA) 31.83 7638 Part#2 - Section 220.83 (B)(2),(3)a, b, c, d -Appliances and Dedicated Circuits: Dedicated circuit Size in VA Dedicated circuit Size in VA Laundry 1500 Water Heater N/A Appliance Circuit(s) 3000 N/A Dishwasher(s) 1000 N/A Disposal(s) 600 N/A Refrigerator(s) 1000 N/A Microwave(s) 1600 N/A Dryer 5760 N/A Range 11520 N/A Oven N/A N/A Cooktop N/A Totals for Part#2: Amps Box B(VA) Pool Equipment N/A 108.25 25980 Total VA from Parts#1 and #2 combined: Box A+ Box B= 33618 Total VA 33618 First 8,000 VA @ 100% 8000 Remaining VA @ 40% Remaining VA= 25618 25618 x 40% = 10247.2 VA Adding First 8000 VA 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits: 18247.2 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits: 76.03 Amps Part#3 - Section 220.83 (B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100%of all the Heating or A/C loads in VA: 17,280 VA 100%of all the Heating or A/C loads in Amps: 72.00 A Totals from all Parts VA Volts Amps Parts#1  18247.2 240 76.03 Part#3 17,280 240 72.00 Total VA for all Parts: 35,527 Totals Service/Feeder Load 1 148.03 SOLR23-0017 MPU 200/A PALM DESERT PERMIT CENTER Expedited Solar Photovoltaic Permitting for One-and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for roof-top solar photovoltaic (PV) projects 30kW in size or smaller. This bulletin provides information about submittal requirements for plan review, required fees, inspections, and an eligibility checklist. 1. Submittal Requirements - Completed permit application form. This permit application form can be downloaded at: https://www.cityofpaImdesert.org/our-city/departments/palm-desert-permit-center/building-safety-permits - Demonstrate compliance with the eligibility checklist for expedited permitting. The criteria is attached to this informational bulletin or can be downloaded at: https://www.cityofpaI mdesert.org/ou r-city/departments/pal m-desert-permit-center/building-safety-perm its/solar- information - Provide a standardized or simplified photovoltaic plan that demonstrates: ✓ Title or Cover Sheet noting the 2019 California Electrical Code. ✓ Site and Roof Plan showing roof layout, PV panels and the following fire safety items: Approximate location of roof access point, location of code-compliant access pathways, and the locations of all required labels and markings. ✓ A simplified Electrical Plan: 1. Locations of main service or utility disconnect 2. Total number of modules, number of modules per string and the total number of strings 3. Make and model of inverter(s) and/or combiner box if used 4. Single-line diagram of system 5. Specify grounding/bonding, conductor type and size, conduit type and size and number of conductors in each section of conduit - Provide a simplified structural design: Provide structural drawings and calculations stamped and signed by a California-licensed architect, civil or structural engineer, electrical engineer or licensed contractor along with the following information. 1. The type of roof covering and the number of roof coverings installed 2. Type of roof framing, size of members and spacing 3. Weight of panels, support locations and method of attachment 4. Framing plan and details for any work necessary to strengthen the existing roof structure 5. Site-specific structural calculations 6. Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system Updated June 2021 SOLR23-0017 MPU 200/A Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements ud The photovoltaic system size is 30kW AC CEC rating or less. ud The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. The photovoltaic system is utility interactive. Permit application and declaration is completed and attached. 2. Planning Department Requirements C/ Existing MPU Amps Doubling,e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. V Maximum height of"tilted"panels shall not exceed eighteen (18)inches. V All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. N� The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. Modules shall be flush with one another and gaps between panels shall be minimized. d Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements V No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter For central inverter systems: No more than two inverters are utilized. N/ The PV system is connected to the load side of the utility distribution equipment. V A Solar PV Standard Plan and supporting documentation is completed and attached. 4. Structural Requirements A completed Structural Criteria and supporting documentation is attached Wind and Seismic(if required). 5. Fire Safety Requirements Clear access pathways provided. ISK Fire classification photovoltaic system is provided. All required marking and labels are provided. S/ A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature Date 1/6/22 Project Address 47043 ARCADIA LN Updated June 2021 SOLR23-0017 MPU 200/A —T CITY OF PALM DESERT Building & Safety Department 73-510 Fred Waring, Palm Desert, CA (760) 776-6420 PHOTOVOLTAIC RESIDENTIAL 30KW OR LESS Minimum Submittal Requirements (Residential Rooftop Systems-30kw or less) This information is published to guide applicants through a streamlined permitting process for qualifying small rooftop residential solar photovoltaic (PV) systems of 30 kilowatts (kW) or less. This bulletin provides information about submittal requirements, plan review, fees, and provides a general summary of mandatory field inspections. The definition of"qualifying residential rooftop solar systems" is all of the following: ■ A solar energy system that is no larger than 30 kilowatts alternating current nameplate rating or 30 kilowatts thermal. ■ A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the City and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time. ■ -A solar energy system that is installed on a single or duplex family dwelling. (Permitted roof or accessory structure acceptable) ■ A solar panel or module array that does not exceed the maximum legal building height as defined by the City of Palm Desert. ■ Electrical main panel upgrade included with solar plan (Review required if doubling in size) 1. Required Approvals The following approvals and permits are required to install a small rooftop residential PV system with a maximum power output of 30 kW or less: • Planning Department approval is required at the time of plan review submittal. Please coordinate directly at (760) 776-6483. • Fire Marshall approval is not required for small residential rooftop systems at this time. • Building Department approval in the issuance of a Photovoltaic System Permit is required to install or modify a new or existing solar photovoltaic system. 2. Building Permit Application Form A permit application can be obtained in person or downloaded from the Department's website at: www.cityofpalmdesert.org 3. Eligibility Checklist An eligibility checklist for expedited and standardized permitting is provided and can be downloaded at the Department's website or obtained in person. If your project does not meet these criteria's, standard plan review timetables apply. Please consult a licensed designed professional or licensed contractor for further details for submitting a comprehensive photovoltaic plan. Page 1 of 4 SOLR23-0017 MPU 200/A 4. Project Submittal All projects can be submitted in person at: City of Palm Desert, Department of Building and Safety 73-510 Fred Waring Drive, Palm Desert,California 92260 5. Plan Review Timeframes: All qualifying small residential photovoltaic plan reviews are expedited to seven (7)to ten (10)working days from the date of project submittal. All necessary follow up reviews occur within seven (7) working days. 6. Plan Review and Permit Fees Plan Review Fee is $203. Permit Fees are approximately$266 depending on archiving materials. 7. Minimum Plan Set Requirements • Number of Plans Provide two (2) complete sets of photovoltaic plans (Minimum 11"X17" to Maximum of 24"X36"). Include a separate Site and Roof Layout Plan for the Riverside County Assessor's Office. • Site Plan Provide a fully dimensional site plan showing property lines, all structures, and the location of the main electrical service, all photovoltaic inverters and disconnects, etc. • Roof Plan Provide a roof plan showing the location of the photovoltaic panels and the required setbacks. Include all walkways to roof mounted equipment (including any roof mounted heating and air conditioning equipment, etc.). Roof plans should also identify the size and spacing of the existing roof framing members and the slope of the roof plus any required roof framing alterations needed. In addition, demonstrate the required clear path access pathways as required by the State Fire Marshal's Office. You can find these clearances at: http://osfm.fire.ca.gov/training/pdf/photovoltaics/solarphotovoltaicquideline.pdf Attachment Details Provide an attachment detail demonstrating how the photovoltaic panels and array will be secured to the racking system and roof structure. • Product Specifications and Literature Provide all manufacturers' specifications on all inverters, solar panels, combiner and disconnect boxes and solar panel anchorage system to be used. • Signage Specifications Provide a legend showing locations and wording of all required signs or placards at various photovoltaic system components. Standard Electrical Plan A standard generic electrical plan may be used for proposed solar installations of 30kW in size or smaller and can be downloaded within the City's website. All submittals must be signed by a C-10 (Electrical Contractor) or C-46 (Solar Contractor)or licensed design professional. Electrical Plans should include the following: • Location of main service or utility disconnect. • Total number of modules, number of modules per string and the total number of strings. • Make and model of inverter(s)and/or combiner box if used. • Single line diagram of system. • Specify grounding/bonding, conductor type and size, conduit type, size and number of conductors in each section of conduit. Page 2 of 4 SOLR23-0017 MPU 200/A • If batteries are to be installed, include them in the diagram and show their locations and venting. • Equipment cut sheets including inverters, modules, AC and DC disconnects, combiners and wind generators. • Labeling of equipment as required by CEC, Sections 690 and 705. • Site diagram showing the arrangement of panels on the roof or ground, north arrow, lot dimensions and the distance from property lines to adjacent buildings/structures (existing and proposed). Expedited Structural Criteria with Supporting Documentation A Structural Criteria Checklist can be downloaded at Department's website or obtained in person. Projects not within the scope of this structural criteria may require a licensed design professional justification. For non-qualifying systems, provide structural drawings and calculations stamped and signed by a licensed designed professional along with the following information: • The type of roof covering and the number of roof coverings installed. • Type of roof framing, size of members and spacing. • Weight of panels, support locations and method of attachment. • Framing plan and details for any work necessary to strengthen the existing roof structure • Site-specific structural calculations. • Where an approved racking system is used, provide documentation showing manufacturer of the rack system, maximum allowable weight the system can support, attachment method to the roof or ground and product evaluation information or structural design for the rack system. • As a references, the Solar Structural Technical Appendix hyperlink is provided: http://www.opr.ca.gov/docs/Solar Structural Technical Appendix.pdf Inspection Information Once a photovoltaic system permit has been issued and the system has been installed, it must be inspected before final approval is granted. Inspections are required to be scheduled twenty-four(24)hours in advance at: (760)776-6420 Monday through Friday(8AM to 4PM) Same day inspection will not be provided. Qualifying small rooftop PV systems will be inspected in one (1) site visit, if under 30 kilowatts. If PV system is over 30 kilowatts it will require a rough inspection after mounting system is installed. If the inspection does not pass, subsequent inspections will not conform to the one inspection policy per the California Solar Initiative AB2188. Permit holders must be prepared to show conformance with all technical requirements in the field at the time of inspection.The inspector will verify that the installation is in conformance with applicable code requirements and with the approved plans. An OSHA approved ladder must be provided by the contractor of record or property owner at the time of inspection. Here are some common points of inspection you should be prepared to show: • Number of PV modules and model number match plans and specification sheets number match plans and specification sheets. • Array conductors and components are installed in a neat and workman-like manner. • PV array is properly grounded. • Electrical boxes are accessible and connections are suitable for environment. • Array is fastened and sealed according to attachment detail. • Conductor's ratings and sizes match plans. • Appropriate signs are properly constructed,installed and displayed. • Smoke detector and carbon monoxide alarms are required at final inspection. Page 3 of 4 SOLR23-0017 MPU 200/A QUICK TIPS FOR CONTRACTORS & PROPERTY OWNERS WHEN APPLYING FOR A SOLAR PERMIT: • Permit applicants can save time and money by following these tips. • Take time to review permit requirements of the local jurisdiction. • Permitting rules and processes differ among different cities and counties. Understanding all local requirements will allow permit applicants to submit a complete and accurate permit application packet the first time. • Contact the local electric utility early in the permitting process(solar PV installations). • Local electric utilities have a completely separate approval process from the local jurisdiction's permitting process.Some electric utilities may require that the solar project be reviewed before the local jurisdiction issues a building permit. Pursuing utility approval early in the permit process enables the solar PV system to become operational as soon as possible. • Make sure that the solar installation that is built matches the submitted plans. • The on-site inspector will verify that the installation aligns with proposed plans and any changes may require corrections and additional inspections. Page 4 of 4