HomeMy WebLinkAbout2023-02-08 CAC Regular Meeting Agenda Packet
City of Palm Desert Page 1
CULTURAL ARTS COMMITTEE
CITY OF PALM DESERT, CALIFORNIA
AGENDA
(HYBRID MEETING)
City Hall – Administrative Conference Room
73510 Fred Waring Drive
Palm Desert, CA 92260
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference.
• To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/82341417829
• To participate via phone: Dial (213) 338-8477 enter the Zoom Meeting ID: 823 4141 7829
followed by #. Indicate that you are a participant by pressing # to continue. During the meeting,
press *9 to add yourself to the queue and wait for the Recording Secretary to announce your
name/phone number. Press *6 to unmute your line and limit your comments to three minutes.
• Written public comment may also be submitted to epowell@palmdesert.gov. Emails received
24 hours prior to the meeting will be distributed to the Committee. Any correspondence
received during or after the meeting will be distributed to the Committee as soon as practicable
and retained for the official record. Emails will not be read aloud except as an ADA
accommodation.
1. CALL TO ORDER
2. ROLL CALL
3. NON-AGENDA PUBLIC COMMENT: This time has been set aside for the public to address
the Civic Engagement Committee on issues that are not on the agenda for up to three minutes.
Because the Brown Act does not allow the Committee to act on items not listed on the agenda,
members may briefly respond or refer the matter to staff for a report and recommendation at
a future meeting.
4. CONSENT CALENDAR: All matters listed on the Consent Calendar are considered routine
and may be approved by one motion. The public may comment on any items on the Consent
Agenda within the three-minute time limit. Individual items may be removed by Committee
Members for a separate discussion.
A. APPROVAL OF MINUTES
RECOMMENDATION: Approve the Cultural Arts Committee Regular Meeting
minutes of January 11, 2023.
Wednesday
February 8, 2023
9:00 a.m.
Regular Meeting
Cultural Arts Committee Agenda February 8, 2023
City of Palm Desert Page 2
EXCLUDED CONSENT ITEMS: Items removed from the Consent Calendar for separate
discussion are considered at this time.
5. PRESENTATIONS
A. DISCOVERPD (Lucero Leyva, Project Manager)
6. ACTION CALENDAR
A. REQUEST FOR DIRECTION ON ARTIST REGISTRY REGISTRATION
GUIDELINES
RECOMMENDATION: Provide staff with direction to review and approve guidelines
for accepting artists into the Artist Registry.
B. REQUEST FOR DIRECTION ON 2023/2024 PUBLIC ART COMMUNITY
ENGAGEMENT PROJECT(S)
RECOMMENDATION: Provide staff with direction on public art community
engagement projects for the 2023/2024 fiscal year.
C. REQUEST FOR DIRECTION ON 2023/2024 STUDENT ART WRAP COMPETITION
RECOMMENDATION: Provide staff with direction on a student art competition to vinyl
wrap artworks on select traffic signal cabinets, SCE utility boxes, and/or park water
bottle fillers throughout Palm Desert.
7. INFORMATIONAL REPORTS & COMMENTS
A. PLANNING COMMISSION LIAISON
B. ARCHITECTURAL REVIEW COMMISSION LIAISON
C. CULTURAL ARTS COMMITTEE MEMBERS
D. CITY COUNCIL LIAISON
E. CITY STAFF
1. Project Status Report
F. ATTENDANCE REPORT
8. ADJOURNMENT: The next Regular Meeting will be held on March 8, 2023, at 9:00 a.m.
Cultural Arts Committee Agenda February 8, 2023
City of Palm Desert Page 3
AFFIDAVIT OF POSTING
I hereby certify under penalty of perjury under the laws of the State of California that the
foregoing agenda for the Cultural Arts Committee was posted on the City Hall bulletin board
and City website not less than 72 hours prior to the meeting.
/s/ Monique M. Lomeli, CMC
Recording Secretary
PUBLIC NOTICES
Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the designated
office for inspection of records in connection with this meeting is the City Clerk’s Office,
City Hall, 73-510 Fred Waring Drive, Palm Desert. Staff reports for all agenda items and
documents provided to a majority of the legislative bodies are available for public inspection
at City Hall and on the City’s website at www.cityofpalmdesert.org.
Americans with Disabilities Act: It is the intention of the City of Palm Desert to comply with
the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at
this meeting, or in meetings on a regular basis, you will need special assistance beyond what
is normally provided, the city will attempt to accommodate you in every reasonable manner.
Please contact the Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the
meeting to inform us of your needs and to determine if accommodation is feasible.
City of Palm Desert Page 1
CULTURAL ARTS COMMITTEE
CITY OF PALM DESERT, CALIFORNIA
MINUTES
(HYBRID MEETING)
Pursuant to Assembly Bill 361, this meeting was conducted by teleconference, and
there was in-person public access to the meeting location.
1. CALL TO ORDER
A Regular Meeting of the Cultural Arts Committee was called to order by Chair Boren on
Wednesday, January 11, 2023, at 9:04 a.m.
2. ROLL CALL
Present: Committee Members Lori Flint, Tom Mitze, Ann Simley, Vice Chair Liz Hauer, and
Chair Maureen Boren
Absent: Committee Member Carol Adney
Liaison(s)
Present: Wallace Colvard, Architectural Review Commission Liaison
Lindsay Holt, Planning Commission Liaison
City Staff
Present: Amy Lawrence, Deputy Director of Economic Development; Erica Powell,
Management Analyst; and Debbie Thompson, Recording Secretary, were present
at Roll Call. Other staff members presented reports or responded to questions as
indicated in the minutes.
3. NON-AGENDA PUBLIC COMMENT:
None
4. CONSENT CALENDAR:
MOTION BY COMMITTEE MEMBER FLINT, SECOND BY COMMITTEE MEMBER HAUER,
CARRIED 5-0, to approve the consent calendar.
A. Approval of Cultural Arts Committee Meeting Minutes
Wednesday,
January 11, 2023
9:00 a.m.
Regular Meeting
Cultural Arts Committee Minutes January 11, 2023
City of Palm Desert Page 2
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
MOTION BY COMMITTEE MEMBER FLINT, SECOND BY COMMITTEE MEMBER
HAUER, CARRIED 5-0, to approve the December 14, 2022, Minutes.
CONSENT ITEMS HELD OVER:
None
5. PRESENTATIONS
A. Public Works Project Manager, Audrey Nickerson gave a presentation regarding the
Haystack Road Active Transportation Program (ATP).
6. ACTION CALENDAR
None
7. INFORMATIONAL REPORTS & COMMENTS
A. PLANNING COMMISSION:
No report.
B. ARCHITECTURAL REVIEW COMMISSION:
Architectural Review Commission Liaison, Wallace Colvard provided an update on the
recent activities of the Architectural Review Commission.
C. CULTURAL ARTS COMMITTEE MEMBERS
No report.
D. CITY COUNCIL LIAISON
Mayor Pro Tem Quintanilla provided an update on the recent activities of the City Council.
E. CITY STAFF
1. Project Status Report
Management Analyst, Erica Powell provided an oral report on the items listed on the
Project Status Report that was included in the agenda packet.
F. ATTENDANCE REPORT
The attendance report was provided with the agenda materials. The Committee took no
action on this matter.
A. ADJOURNMENT
The Cultural Arts Committee adjourned at 10:36 a.m.
Cultural Arts Committee Minutes January 11, 2023
City of Palm Desert Page 3
ALL ACTIONS ARE DRAFT, PENDING APPROVAL OF THE MINUTES
Respectfully submitted,
Debbie L. Thompson
Debbie L. Thompson
Recording Secretary
ATTEST:
Erica Powell
Erica Powell, Deputy Director of Economic Development
Secretary
APPROVED BY CAC: __/__/2023
PREST | VUKSIC | GREENWOOD
A R C H I T E C T S I N T E R I O R S
D I S C O V E R P A L M D E S E R T
V I S I T O R C E N T E R
PALM DESERT, CA
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A001
PROJECT
INFORMATION / SHEET
INDEX
JANUARY 9, 2022Proj. No. 221094PROJECT INFORMATION
OWNER
CITY OF PALM DESERT
73-510 FRED WARING DR.
PALM DESERT, CA 92260
APPLICANT
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
LEGAL DESCRIPTION
APN 622-250-014-2
PROJECT DESCRIPTION / LOCATION
BEING A DIVISION OF A PORTION OF THE WEST HALF
OF THE SOUTHWEST QUADRANT OF SECTION 17,
T5S, R6E, S.B.B.M.
ZONING
PUBLIC
NO YARDS/SETBACKS REQUIRED.
HEIGHT LIMIT = 35'
PARKING DATA
REQUIRED PARKING
ALL PARKING IS EXISTING AND TO BE PART OF
SHARED PARKING AGREEMENT
BUILDING DATA
OCCUPANCY:
TYPE OF CONSTRUCTION:
SPRINKLED
NO. OF STORIES
GREATEST HEIGHT
B
TYPE VB
YES
1
28'-0"
CONSULTANTS
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
760.779.5393
JOHN VUKSIC
ARCHITECT
CIVIL ENGINEER
LANDSCAPE ARCHITECT
SHEET
NO.SHEET NAME
ARCHITECTURE
A000 COVER SHEET
A001 PROJECT INFORMATION / SHEET INDEX
A002 VINICITY / ADA ACCESS
CIVIL
1 PRELIMINARY GRADING PLAN
LANDSCAPE
L5.00 CONCEPTUAL LANDSCAPE PLAN
ARCHITECTURE
A100 OVERALL SITE PLAN
A101 ART IN PUBLIC PLACES EXHIBIT
A102 ENLARGED SITE PLAN
A110 SITE CROSS SECTIONS
A200 FLOOR PLAN
A300 EXTERIOR ELEVATIONS
A301 EXTERIOR ELEVATIONS
A302 EXTERIOR ELEVATIONS
A310 COLORED ELEVATIONS
A311 COLORED ELEVATIONS
A320 3D VIEWS
A321 3D VIEWS
A400 ROOF PLAN
A600 MATERIAL BOARD
SITE
VICINITY MAP
FRED WARING DRIVESAN PABLO AVEMAGNESIA FALLS DRIVE
PORTOLA AVESQUARE FOOTAGE
NAME S.F.
STORAGE / SUPPORT 647.3 SF
VISITOR CENTER 504.1 SF
ELECTRICAL / MECH. 231.9 SF
RESTROOMS 446.5 SF
VISITOR CENTER SUPPORT 512.3 SF
GALLERY 1,197.3 SF
Grand total 3,539.5 SF
THE ALTUM GROUP
44-600 VILLAGE COURT, STE 100
PALM DESERT, CA 92260
760.346.4750
DOUG FRANKLIN
MSA CONSULTING, INC.
34200 BOB HOPE DRIVE
RANCHO MIRAGE, CA 92270
760.320.9811
RON GREGORY
SAN PABLO AVENUE FRED WARING DRIVECIVIC CENTER PARK
SKATE PARK CIVIC
CENTER
(E) ACCESSIBLE PATH
TO PUBLIC ROW
A100
1
PROPOSED
NEW BUILDING
NEW ADA
PARKING
PROPOSED NEW CARPORT W/
SOLAR AS REQ'D BY CBC, MUST BE
LOCATED WITHIN 250' OF BLDG.
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1" = 50'-0"
A002
VINICITY / ADA
ACCESS
JANUARY 9, 2022Proj. No. 2210940'20'40'80'160'
EEEEEEVVEEEEWMBFPPARKINGNOSAN PABLO AVENUE
(E) SKATE PARK
PROPERTY LINEPROPERTY LINEPROPERTY LINE
(E) PARKING
(E) PARKING
PD LINK BIKE PATH
PD LINK PED PATH
(E) SIDEWALK
(E) RESTROOMS
PUBLIC ART SCUPLTURE LOCATION.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE.
PUBIC ART IMAGE WALL. ARTWORK TO
BE COMMISSIONED BY THE PALM
DESERT CULTURAL ARTS COMMITTEE.
PUBLIC ART HANGING SCUPLTURE
LOCATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT
CULTURAL ARTS COMMITTEE.
PUBLIC ART SHADE STRUCTURE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE.
DISCOVER PUBLIC ART SIGNAGE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE.
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/16" = 1'-0"
A101
ART IN PUBLIC
PLACES EXHIBIT
JANUARY 9, 2022Proj. No. 2210941/16" = 1'-0"1 ART IN PUBLIC PLACES LOCATIONS
EEEEVVEPROPERTY LINEPROPERTY LINE
OUTDOOR
FLEX GALLERY
OUTDOOR FLEX
SPACE
S A N P A B L O /
C V L I N K
SKATE PARK
OUTDOOR
COMMUNITY SPACE
VISITOR
CENTER
GALLERY
P D C I V I C C E N T E R
P A R K & P A R K I NG
OPTIONAL FUTURE
COFFEE KIOSK OR
'POP-UP' SEASONAL
VENDOR
ELEC.
/ FR.
PUBLIC
ART
MECH/MAINT.
YARD
OPTIONAL FUTURE
COFFEE KIOSK OR
CV LINK AMENITY,
CYCLE REPAIR
PA
PA
PD LINK PED PATH
(E) SIDEWALK
PA
PA
PLANTER
PA
PUBLIC
ART
PUBLIC
ART
(E) PARKING
1
A110
1
A110
2
A110
2
A110
OPTIONAL
RAIN HARVESTING
RESERVOIR
RAMP RAMP
RAMPPA
PA
PA
PA
TYP.105
107
107
107
107
108
106
108
107
102
110
TYP.105
TYP.105
107 107
104
104
104
TYP.102
TYP.102
TYP.102
TYP.102
TYP.101
TYP.101
109
109
103STEPS DOWN6" RI
SERS4'-0"4'-0"4'-0"4'-0"EXISTING RAMP TO BE
RECONSTRUCTED AS
REQUIRED TO MEET
ADA REQUIREMENTS
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A102
ENLARGED SITE PLAN
JANUARY 9, 2022Proj. No. 2210940'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
101 EXISTING CURB
102 NEW HARDSCAPE
103 NATURAL ROCK BENCH
104 PUBLIC ART LOCATION. ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS COMMITTEE.
105 PUBLIC ART SHADE STRUCTURE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
106 SWINGS
107 EXISTING TREE TO REMAIN
108 EXISTING TREE TO BE REMOVED
109 EXISTING SKATE PARK FENCE WITH LASER CUT PRIVACY
SCREEN TO MATCH NEW
110 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
PLPD LINK
(BIKE)
PD LINK
(PED)
SAN PABLO
PARKING
CIVIC CENTER PARK
PARKING
FIRST FLOOR
0"PLPARKINGSKATE PARK
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A110
SITE CROSS
SECTIONS
JANUARY 9, 2022Proj. No. 2210941/8" = 1'-0"1 SITE CROSS SECTION A
0'4'8'16'32'
1/8" = 1'-0"2 SITE CROSS SECTION B
11
A
A
66
106
STORAGE 1
105
COPY /
SUPPORT RM.27'-0"37'-0"12'-0"200
GALLERY
114
BREEZEWAY /
OUTDOOR
FLEX GALLERY76'-0"OPEN TO ABOVE
55
22
B
B
418'-0"8'-0"11'-0"H
H
OPEN TO ABOVE
121
VISITOR
CENTER
120
RECEPTION
117
OFFICE118
KITCHEN /
BREAK /
GREEN ROOM
12'-0"E
E
D
D
7'-0"20'-0"18'-0"30'-6"22'-6"23'-0"
C
C
20'-0"
27'-0"18'-0"30'-6"22'-6"23'-0"
14'-0"13'-0"3'-0"
121'-0"
48'-0"
G
G
8
5'-0"4'-0"2'-0"4'-0"2'-0"6'-0"2'-0"8'-0"2'-0"10'-0"1'-6"6"2'-0"26'-0"2'-0"49'-0"45'-6"8'-0"20'-0"8'-0"2'-0"9'-0"24'-0"11'-6"11'-0"3'-0"
10'-0"18'-0"
125
MEN'S
124
DF
123
WOMEN'S
127
MECH/STOR.
122
ELECT.
LINE OF ROOF ABOVE,
TYP.
FUTURE CONTAINER
FOR VENDOR
PUBLIC ART SHADE STRUCTURE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE, TYP.
FUTURE CONTAINER
FOR VENDOR
JAN.
LINE OF ROOF
ABOVE, TYP.
IT
A300
1
F
F
7
A301 2
A301
1
A3022
A3002
1
SWINGS
6'-3"
7 4 °4'-0"4'-0"ACCESS TO
MECH.
3
PUBLIC ART SHADE STRUCTURE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE, TYP.
PUBLIC ART SHADE STRUCTURE.
ARTWORK TO BE COMMISSIONED BY
THE PALM DESERT CULTURAL ARTS
COMMITTEE, TYP.
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A200
FLOOR PLAN
JANUARY 9, 2022Proj. No. 2210940'4'8'16'32'
SQUARE FOOTAGE
NAME S.F.
STORAGE / SUPPORT 647.3 SF
VISITOR CENTER 504.1 SF
ELECTRICAL / MECH. 231.9 SF
RESTROOMS 446.5 SF
VISITOR CENTER SUPPORT 512.3 SF
GALLERY 1,197.3 SF
Grand total 3,539.5 SF
FIRST FLOOR
0"
301 300 300
28'-0"3'-6"2'-2"8"9'-2"27'-6"
16'-6"15'-6"
303B304303B 303A
310
TYP.
320
TYP.
313
TYP.317
318
TYP.
313
TYP.
317305
314
OPEN
BREEZEWAY
305
313
309315
319 303B322305
TYP.
317 323324
325
302B
316
300
FIRST FLOOR
0"
303B 304 303A
300
TYP.
320 318
TYP.
313
TYP.
306
314 305319TYP.317
TYP.
3175'-2"8"9'-2"27'-6"9'-10"309
315 326
TYP.
320300
16'-6"
302B
316
301
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A300
EXTERIOR
ELEVATIONS
JANUARY 9, 2022Proj. No. 2210941/8" = 1'-0"1 WEST ELEVATION (SAN PABLO)
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
304 WOOD VENEER. MFR:TBD COLOR: RUSTIC OAK
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
306 GLASS PIVOT DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
310 SIGNAGE. SEPARATE PERMIT.
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
314 STEEL TUBE TRANSOM BEAM, SEE STRUCTURAL. CLAD TO
MATCH WINDOW FRAMES, PRIMED AND PAINTED ON
EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
316 FUTURE ART INSTALLATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
317 FUTURE ART SHADE STRUCTURE INSTALLATION. ARTWORK
TO BE COMMISSIONED BY PTHE PALM DESERT CULTURAL
ARTS COMMITTEE.
318 RAISED PLANTER
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
322 METAL FASCIA. COLOR: ACCENT PINK
323 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
324 NATURAL ROCK BENCH
325 RAIN CHAIN
326 SWINGS
1/8" = 1'-0"2 SOUTH ELEVATION
0'4'8'16'32'
FIRST FLOOR
0"
303B TYP.300 TYP.302B
TYP.
300
TYP.300
303A 312 311307 315
TYP.
320
OPEN
BREEZEWAY
18'-6"
28'-0"27'-6"
TYP.
305
TYP.
317
TYP.317
TYP.
320
305
326313 303B
328 319
330
316 302A
302B
FIRST FLOOR
0"
303B301
303A
303B
321 301
303B303A
315 312
TYP.317 319
305 315
TYP.313
317 300 325
TYP.
320
27'-6"
18'-6"
28'-0"
16'-6"9'-10"12'-0"309302B 321
316
EXISTING SKATE PARK FENCE WITH LASER CUT PRIVACY SCREEN TO MATCH NEW
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A301
EXTERIOR
ELEVATIONS
JANUARY 9, 2022Proj. No. 2210941/8" = 1'-0"1 EAST ELEVATION
0'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302A BACKLIT LASER CUT METAL PANEL. MFR: MOZ DESIGNS,
COLOR: RUST POWDER, PATTERN: VINES
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
307 OVERHEAD SECTIONAL GARAGE DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
311 HOLLOW METAL DOOR, PAINTED TO MATCH ADJACENT
PLASTER
312 HOLLOW METAL LOUVERED MECHANICAL DOOR, PAINTED
TO MATCH ADJACENT PLASTER
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
316 FUTURE ART INSTALLATION. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
317 FUTURE ART SHADE STRUCTURE INSTALLATION. ARTWORK
TO BE COMMISSIONED BY PTHE PALM DESERT CULTURAL
ARTS COMMITTEE.
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
321 OVERFLOW DRAIN
325 RAIN CHAIN
326 SWINGS
328 STEEL TUBE COLUMN, SEE STRUCTURAL. CLAD TO MATCH
WINDOW FRAMES, PRIMED AND PAINTED ON EXTERIOR TO
MATCH WINDOW FRAMES.
330 6' FENCE
1/8" = 1'-0"2 NORTH ELEVATION
FIRST FLOOR
0"
303B 300 300 304 303B
306 314
305322
322
TYP.317
TYP.317 TYP.320TYP.313 300 3181'-4"2'-2"8"9'-2"12'-0"27'-6"
319
16'-6"
325
FIRST FLOOR
0"
302B303B
301 309 310
319 322 303A
15'-6"3'-6"2'-2"8"9'-2"313 329 305 306 320 315 326310
305 304
309 302B
BY OTHERS
FUTURE ART
300
303B
1'-4"2'-2"8"9'-2"313
314
OPEN
BREEZEWAY
TYP.
320 323
305
305
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A302
EXTERIOR
ELEVATIONS
JANUARY 9, 2022Proj. No. 2210940'4'8'16'32'
KEYNOTES
NO. DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX, VENETIAN FAUX CONCRETE
ACRYLIC FINISH, COLOR: CONCRETE WARM GREY.
CONTRACTOR TO PROVIDE MOCK UP FOR ARCHITECT'S
APPROVAL.
301 IMAGE OVER 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC
FINISH. ARTWORK TO BE COMMISSIONED BY PALM DESERT
ARTS COMMISSION THROUGH THE ART IN PUBLIC PLACES
PROGRAM.
302B PERFORATED CORRUGATED METAL FENCE. MFR: MOZ
DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN:
CUSTOM PERFORATION
303A METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212
STYLE: FOG FLAT
303B METAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132
STYLE: FLAT
304 WOOD VENEER. MFR:TBD COLOR: RUSTIC OAK
305 FIXED STOREFRONT GLASS, FRAME: BLACK ANODIZED
ALUMINUM
306 GLASS PIVOT DOOR
309 METAL EYEBROW. COLOR TO MATCH WINDOW FRAMES.
310 SIGNAGE. SEPARATE PERMIT.
313 STEEL PIPE COLUMN, DIAMETER SEE STRUCTURAL. PRIMED
AND PAINTED ON EXTERIOR TO MATCH WINDOW FRAMES.
314 STEEL TUBE TRANSOM BEAM, SEE STRUCTURAL. CLAD TO
MATCH WINDOW FRAMES, PRIMED AND PAINTED ON
EXTERIOR TO MATCH WINDOW FRAMES.
315 FUTURE SHIPPING CONTAINER FOR VENDOR BY OTHERS
317 FUTURE ART SHADE STRUCTURE INSTALLATION. ARTWORK
TO BE COMMISSIONED BY PTHE PALM DESERT CULTURAL
ARTS COMMITTEE.
318 RAISED PLANTER
319 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
320 BOULDER PER LANDSCAPE
322 METAL FASCIA. COLOR: ACCENT PINK
323 DISCOVER PUBLIC ART SIGNAGE. ARTWORK TO BE
COMMISSIONED BY THE PALM DESERT CULTURAL ARTS
COMMITTEE.
325 RAIN CHAIN
326 SWINGS
329 SHIPPING CONTAINER WALL. COLOR:
1/8" = 1'-0"1 NORTH BREEZEWAY ELEVATION
1/8" = 1'-0"2 SOUTH BREEZEWAY ELEVATION
1/8" = 1'-0"3 WEST BREEZEWAY ELEVATION
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A310
COLORED
ELEVATIONS
JANUARY 9, 2022Proj. No. 2210940'4'8'16'32'
WEST ELEVATION (SAN PABLO)
SOUTH ELEVATION
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A311
COLORED
ELEVATIONS
JANUARY 9, 2022Proj. No. 2210940'4'8'16'32'
NORTH ELEVATION
EAST ELEVATION
11
A
A
66
55
22
B
B
44
H
H
E
E
D
D
C
C
G
G
88
A300
1
F
F
7
7
A301 2
A301
1
A3022
A3002
1
OPEN TO BELOW
OPEN TO BELOW
T.O. EAVE 18'-6"
T.O. EAVE 28'-0"
T.O. EAVE 16'-6"
T.O. EAVE 27'-6"
T.O.P. 15'-6"
9'-10"SLOPE 1/4" / 1'-0"3
600
603
601
604
605
TYP.
602
600
V
A
LL
E
Y
V
A
LL
E
Y
600
317
317
317
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER
1/8" = 1'-0"
A400
ROOF PLAN
JANUARY 9, 2022Proj. No. 221094KEYNOTES
NO. DESCRIPTION
602 STANDING SEAM ROOFING, MFR: ATAS, PRODUCT:DUTCH
SEAM MRD194 19 1/4" 22 GA COLOR: DARK BRONZE
ANODIZED, UL 790/ASTME 108
604 DRAIN TO THRU PIPE DRAIN TO RAIN CHAIN. RAIN CHAIN TO
TERMINATE AT PLANTER BMP.
605 DRAIN TO ROOF DRAIN AND OVERFLOW. CONNECT ROOF
DRAIN TO UNDERGROUND DRAINAGE SYSTEM AND
DAYLIGHT OVERFLOW TO GRADE
0'4'8'16'32'
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A600
MATERIAL BOARD
JANUARY 9, 2022Proj. No. 221094P1 M3M5
M1
M4M2 M3
ARTWORK, TYP.
W1
M1
W1
WOOD VENEER. MFR:TBD COLOR: RUSTIC OAKPLASTER - VENETIAN COLOR: CONCRETE WARM GRAYMETAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 132 STYLE: FLATP1 M1
STEEL, DOOR & WINDOW FRAMESCOLOR: BLACK ANODIZEDMETAL VENEER. MFR: MOZ DESIGNS, COLOR: PATINA 212 STYLE: FOG FLATBACKLIT LASER CUT METAL PANEL. MFR: MOZ DESIGNS, COLOR: RUST POWDER, PATTERN: VINESPERFORATED CORRUGATED METAL FENCE. MFR: MOZ DESIGNS, COLOR: POWDER RUSTED COPPER, PATTERN: CUSTOM PERFORATIONM2 M3 M4 M5 M6
M6
STANDING SEAM ROOFING MFR: ATASCOLOR: DARK BRONZE ANODIZED
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
DISCOVER PALM DESERT VISITOR CENTER A601
MATERIALS
JANUARY 9, 2022Proj. No. 221094faux concreteweathered zinccopperdark bronzereclaimed wood pallets
STAFF REPORT
CITY OF PALM DESERT
CULTURAL ARTS COMMITTEE
MEETING DATE: February 8, 2023
SUBMITTED BY: Erica Powell, Management Analyst
REQUEST: REQUEST FOR DIRECTION ON ARTIST REGISTRY
REGISTRATION GUIDELINES
____________________________________________________________________
Recommendation
Provide staff with direction to review and approve guidelines for accepting artists into
the Artist Registry.
Discussion
The Palm Desert Artist Registry was created for artists to share their work, act as a
preferred artist list for the City to send out Request for Qualifications (RFQ), Request for
Proposals (RFP), Call for Entries, and assist developers in connecting with the creative
community.
The current Artist Registry states that applications are “juried” and accepted by a process of
approval through the Cultural Arts Committee. The artist registry developer, Artsopolis
made staff aware that there may be an overwhelming number of submissions once the artist
registry goes ‘live’ online. A recommendation was made to create limiting criteria to the
application. The parameters should be defined before an artist decides to apply.
Examples:
• Artists willing to work in Palm Desert.
• Artists who have previously displayed artwork in Palm Desert.
• Artists who live in Palm Desert.
In addition, staff is also seeking guidance for the following:
• If properly defined, does the Cultural Arts Committee need to approve each applicant
or can staff make the final decision?
• For example, if an artist submits a complete application and fits the professional
qualifications, what reviewing parameters would the Cultural Arts Committee
require?
After reviewing other municipalities, the majority accept new registrants without review. A
response from City of Atlanta, Mayor’s Office of Cultural Affairs, said, “I do not think a
registry with a formal process is the best and most equitable route.” An example of when a
review could be deemed necessary would be when the artist clearly was not qualified.
Fiscal Analysis
There is no financial impact to the Public Art Fund.
Enclosure: Artist Registration Form
Artist Registry Application (recreated from online test version)
1. Contact Information
a. Name, Address, Email, Phone, Mobile, Website, Social Media (Instagram,
Facebook, YouTube, Other)
2. Gender
a. Male, Female, Other
3. Race/Ethnicity (for future grant reporting purposes)
a. List all and ‘prefer not to answer’.
4. Do you have teaching experience? Yes/No
5. Short Biography (max 200 words)
6. Statement of Work
a. Information on work, mediums, and approach
7. CV/Resume: upload option
8. Gallery Representation (max 500 words)
9. Featured Display Image (At least 72 dpi, file sizes less than 6MB)
a. Title, Year, Dimensions, Mediums, Description
10. Upload three (3) Additional Samples of Work
a. Title, Year, Dimensions, Mediums, Description
11. Selected Mediums (Check all that apply)
a. Acrylic, Aluminum, Bronze, Ceramics, Collage, Concrete, Digital, Drawing
Media, Fiberglass, Glass, Light/Neon/LED, Metal, Mixed Media, Oil, Paint,
Photography, Powder Coat, Recycled, Sound/Audio, Stainless Steel,
Steel, Stone, Terrazzo, Video, Wood
STAFF REPORT
CITY OF PALM DESERT
CULTURAL ARTS COMMITTEE
MEETING DATE: February 8, 2023
SUBMITTED BY: Erica Powell, Management Analyst
REQUEST: REQUEST FOR DIRECTION ON 2023/2024 PUBLIC ART
COMMUNITY ENGAGEMENT PROJECT(S)
____________________________________________________________________
Recommendation
Provide staff with direction on public art community engagement projects for the
2023/2024 fiscal year.
Discussion
The following are proposed community engagement projects for the 2023/2024 fiscal
year. These opportunities are for community driven artwork, led by a professional artist
with teaching capabilities under the direction of Pete Salcido of Flat Black Art Supply.
Mural Workshop
A one-day event for children ages 10 – 16 would be held on a Saturday at Flat Black Art
Supply. The selected artist would prepare a temporary mural wall by outlining the
design prior to the day of the event. The day would consist of educating the participants
on how to handle the paint, techniques for application, and what they will be working on
for the second half of the day. As the artist is teaching and applying the paint, one side
of the wall will be completed as an example. For the hands-on experience, the wall that
includes the design will be revealed and participants are encouraged to participate in
recreating the same design on the opposing side. The temporary wall would be for
display in a location to be determined.
Multi-day Mural Project
A multi-day mural project would be a four (4) day event held on four (4) consecutive
Saturdays for adults 18 and older at Flat Black Art Supply. This event would be free to
the public. The first three (3) Saturdays would be educational with practical application
for practice. The final Saturday would be completing a mural at a location to be
determined.
If the Cultural Arts Committee recommends one or both projects, staff will bring forward
a detailed request for direction in FY 2023/2024.
Fiscal Analysis
Estimated costs for both proposed projects is $10,000. If the Cultural Arts Committee
recommends this project, staff will include funding in the FY 2023/2024 Public Art
budget.
Feb 8, 2023 – Cultural Arts Committee Staff Report
Request for Direction on Community Engagement Projects
Page 2 of 2
Attachments: Images of One-day Workshop at Flat Black Art Supply
STAFF REPORT
CITY OF PALM DESERT
CULTURAL ARTS COMMITTEE
MEETING DATE: February 8, 2023
SUBMITTED BY: Erica Powell, Management Analyst
REQUEST: REQUEST FOR DIRECTION ON 2023/2024 STUDENT ART
WRAP COMPETITION
____________________________________________________________________
Recommendation
Provide staff with direction on a student art competition to vinyl wrap artworks on select
traffic signal cabinets, SCE utility boxes, and/or park water bottle fillers throughout Palm
Desert.
Discussion
Staff is proposing an artwork competition within Palm Desert schools, grades K through
12, wherein students would submit artwork for vinyl wrap on select traffic signal
cabinets, SCE utility boxes, and/or park water bottle fillers at locations to be determined
throughout the city. The competition would be broken down in three (3) categories:
Elementary, middle school and high school. The competition could be theme based and
held annually or biannually.
Staff would present locations to the Cultural Arts Committee and submissions would be
reviewed to select winners, whose artworks would be vinyl wrapped for up to two (2) to
three (3) years or more. If the Cultural Arts Committee recommends this project, staff
will bring forward a detailed request for direction in FY 2023/2024.
Fiscal Analysis
Estimated costs for three utility art wraps is $6,000. If the Cultural Arts Committee
recommends this project, staff will include funding in the FY 2023/2024 Public Art
budget.
CITY OF PALM DESERT
CULTURAL ARTS COMMITTEE
MEMORANDUM
To: Cultural Arts Committee (CAC) Members
From: Erica Powell, Management Analyst
Date: February 8, 2023
Subject: Project Status Report for the February 8, 2023, Cultural Arts Committee
Meeting
1. Public Art Documentary Film Series – The second film scheduled for February
22, 2023, is Ursula von Rydingsvard: Into Her Own, with guest speaker Director,
Daniel Traub and moderator Deborah Glickman. All films will screen at UCR
Palm Desert Center beginning at 6 p.m. Below is the schedule for the remainder
of the series:
− March 22 – Tyrus
− April 26 – Carved in Stone: SANANNGUAQTIT
2. Desert X 2023 Exhibition – The City Council approved the Desert X
sponsorship on January 26, 2023. Staff is currently working with Desert X on
permitting for the Portola/Frank Sinatra and Cap Homme Adams sites.
3. Student Art and Essay Contest – Submissions from participating schools are
now displayed in the Palm Desert Community Gallery through March 16, 2023.
The contest will be judged on Wednesday, February 1 and winners will be
announced to the schools by February 9. The Awards Ceremony will be held on
March at 6 p.m. in the Council Chamber.
4. Palm Springs Life 8-month feature content – Beginning in February 2023, the
City contracted with Palm Springs Life to promote Palm Desert’s Public Art
program. The February issue was released online January 26, and highlights the
El Paseo Sculpture Exhibition. The March issue will highlight the two recent
murals in Palm Desert, Desert Wonderland by Kathleen Goff and Monarch Sky
by John Cuevas, an interview with John Cuevas, and information about the San
Pablo Public Art Development Plan. Content is as follows for the remaining six
(6) months:
a. April: Civic Center Park/E. Tyler Burton
b. May: El Paseo Sculpture Exhibition/Artist profiles: Delos Van Earl and
Lynn Jaye
c. September: Citywide Virtual Art Tour
Status Report for the February 8, 2023, CAC Meeting
Page 2
d. October: El Paseo Sculpture Exhibition/Artist profiles: Karen and Tony
Barone and T. Barny
e. November: Community Projects
f. December: San Pablo Phase I roundabout sculpture installation and artist
profile: Sunburst by Donald Gialanella.
5. FY 2022/2023 Project List – Listed is an update of the projects that staff is
currently working on or will soon be working on:
− 2023/24 El Paseo Sculpture Exhibition – completed installations, new sign
posts and virtual tour, which now includes audio
− Anza-Borrego: lighting plan approved; ordered lighting and will install on
delivery
− Desert X land art permitting and sponsorship agreement
− San Pablo Phase I roundabout sculpture installation: bidding for a general
contractor to install the engineered pads, hiring a professional installer, and
working out logistics for installation. Projected installation in October 2023
− San Pablo Phase II roundabout contracting and installation
− Replacement of stolen artwork at Freedom Park
− Replacement of artwork on the traffic signal cabinet on Fred Waring x Cook
(Sun Crawlers by artist John Cuevas)
− Work w/DSRT Surf on implementation of public art into its project
− Artwork implementation for Lupine Plaza, Discover Palm Desert Visitor
Center, and other City projects
− Possibly re-open Palm Desert Community Gallery (five exhibits pending)
− City wide virtual public art tour: ongoing photography and copy is being
worked on to complete each mapped artwork
− Design and print updated public art rack card/brochure
− City wide review of public art signage
− Assessment of City welcome signage/monuments for possible artwork
implementation
− Implementation of bottle filler and SCE utility box art wraps
− Waring Plaza developer artwork maintenance
− Partner with CREATE Center for the Arts on an augmented reality art project
− Develop the Public Art website for strategic, program content
− Possible deaccession of artwork at the Palm Desert Community Center:
construction estimated to begin in December 2023
− Update Public Art Municipal Code and Cultural Arts Committee bylaws to
approve funding cap for City Council approval
− Other proposed projects coming soon!!
CITY OF PALM DESERT
ATTENDANCE REPORT
Advisory Body: Cultural Arts Committee
Prepared By: Debbie Thompson
Year 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2023 Total
Unexcused
Absences
Month Feb March Apr May June July Aug Sept Oct Nov Dec Jan Total
Absences Date 2/9 3/9 4/13 5/11 6/8 7/13 8/10 9/14 10/11 11/9 12/14 1/11
Adney, Carol P P P P P P _ P P _ E A 2 1
Boren, Maureen P P P P P P _ P P _ P P 0 0
Flint, Lori P P P P P P _ P P _ P P 0 0
Harding, Louise* P P P A P A _ _ _ 2 2
Hauer, Liz P P P P P P _ P P _ P P 0 0
Higgins, Louisa* P P A P P P _ A P _ P 2 2
Mitze, Tom _ P P _ P P 0 0
Simley, Ann (Alt) _ P P 0 0
Wallach, Jeff* P _ P A _ P 1 1
Palm Desert Municipal Code 2.34.010:
Monthly: Three unexcused absences from regular meetings in any twelve-month period shall constitute an automatic resignation of members holding office on
boards that meet monthly.
P Present
A Absent
E Excused
- No meeting