Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APPROVED SOLR23-1223 PLANS.pdf
NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 6.480 KW DC/5.871 KW CEC AC CONTRACTOR & ENERGY STORAGE SYSTEM - 10.0 KWH SOLR23-1223 47316 ABDEL CIR, PALM DESERT, CA 92260 NEW PV SYSTEM SPECIFICATIONS ) SHEET INDEX GUEST CONSTRUCTION ( SYSTEM SIZE: DC SIZE:6.480 KW DC STC CEC AC SIZE:5.871 KW AC PV-01 COVER PAGE 4717 PARKS AVE, LA MESA, MODULE: (16)HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+405 PV-02 SITE PLAN INVERTER: (16)ENPHASE IQ8PLUS-72-2-US(240V) CA, 75002 PV-03 ATTACHMENT PLAN&DETAILS PV-04 ELECTRICAL DIAGRAM PHONE- (760)712-0382 BATTERY: (2)ENPHASE IQ BATTERY 5P NEIGHBOUR PROPERY PV-04.1 LOAD CALCULATION LIC. NO. - 1085844 CONTROLLER: (01)ENPHASE IQ SYSTEM CONTROLLER 3 PV-05 NOTES PV-06 WARNING LABELS 123'-7" Z�: PV-07 I INSTALLATION RESOURCE APPLICABLE CODES EQUIPMENT DATASHEETS ATTACHED CITY OF PALM DESERT ALL WORK SHALL CONFORM TO THE FOLLOWING CODES: DEPARTMENT OF BUILD NO 3 SAFETY 2022 CALIFORNIA BUILDING CODE APPROVED PHOTOVOLTAIC UNDER 30KW 2022 CALIFORNIA RESIDENTIAL CODE LEGEND 2022 CALIFORNIA ENERGY CODE 2022 CALIFORNIA HISTORICAL BUILDING CODE ---------- PROPERTY LINE 'CHLEN:,ETWIUL—U,PEPEMHR-Ew. E 2022 CALIFORNIA EXISTING BUILDING CODE 41-a" FENCE LINE 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE I I I 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA ELECTRICAL CODE I I AS ADOPTED BY CITY OF PALM DESERT(CA) 1" 7'-10" DESIGN CRITERIA TamecaWilliams „a°sz@o,mdasart PROJECT NAME &ADDRESS ROOF SURFACE TYPE:TPO ROOF FRAMING: 2"X4"RAFTER @ 24"OC JOSEPH LUNA BUILDING STORY: ONE STORY GROUND SNOW LOAD: 0 PSF I p ° I Photovoltaic System-30KW and Under 47316 ABDEL CIR, WIND SPEED: 130 MPH U I p 0 Requirements-Attached PALM DESERT, CA 92260 The attached City of Palm Desert 30kW and Under Photovoltaic WIND EXPOSURE: B I I I Requirementswillbeenforcedduringallfieldinspections It is APN#: 630-360-008 required to be attached to the approved photovoltaic plans at all RISK CATEGORY: 11 times Failure to adhere to these requirements will result in a disaooroved inspection until such time they are provided and demonstrated to be in compliance with the inspector of record AHJ: CITY OF PALM DESERT(CA) 17 '-3" 17 '-3" UTILITY: SCE PROJECT NOTES SYSTEM DETAILS 1.1.1 THIS PHOTOVOLTAIC(PV)&ENERGY STORAGE SYSTEM DC SIZE:6.480 KW DC-(STC) SHALL COMPLY WITH THE RELEVANT YEAR OF THE CALIFORNIA I I I VICINITY MAP CEC AC SIZE:5.871 KW AC ELECTRIC CODE(CEC),ALL MANUFACTURER'S LISTING AND - (16)HANWHA Q CELLS Q.PEAK DUO BLK ML- 05 INSTALLATION INSTRUCTIONS,AND THE RELEVANT CODES AS I I I (16)ENPHASE AS rnalaoata Dr (16)ENPHASE IQ8PLUS-72-2-US(240V) SPECIFIED BY THE AUTHORITY HAVING JURISDICTION'S(AHJ) APPLICABLE CODES. aeotldP'�0 Mlniah WaY 1.1.2 THE UTILITY INTERCONNECTION APPLICATION MUST BE REVISIONS APPROVED AND THE PV&ENERGY STORAGE SYSTEM MUST BE FRONT OF HOUSE INSPECTED PRIOR TO OPERATION st Wei • _ REV DESCRIPTION DATE 1.1.3 ALL PV&ENERGY STORAGE SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, BATTERIES,AND I I I a SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED I ,ad,daAr FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY CEC AND I 49-1" I A Ami,Dr Marrakesh DI OTHER GOVERNING CODES m aystack-Rd-Haystack-Rd 1.1.4 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL v BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV { RESISTANT.ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS SATELLITE MAP SHEET TITLE REQUIRED BY THE CEC AND AHJ. SCOPE OF WORK ABDEL CIR COVER PAGE 1.2.1 CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC&ENERGY 123'-7" STORAGE SYSTEM.THE CONTRACTOR WILL BE RESPONSIBLE DRAWN DATE 12/15/2023 FOR COLLECTION OF EXISTING ONSITE CONDITIONS TO DESIGN, SPECIFY,AND INSTALL THE ROOF-MOUNTED PV SYSTEM AND DRAWN BY SD ENERGY STORAGE SYSTEM DETAILED IN THIS DOCUMENT /. N SHEET NUMBER PROPERTY PLAN PV-01 SCALE:1"-30'-0" PV-01 NOTES: 1. ROOF ACCESS POINT SHALL NOT BE PLAN VIEW TOTAL ROOF AREA: 1808 FTZ LEGEND CONTRACTOR LOCATED IN AREAS THAT REQUIRE THE TOTAL PV ARRAY AREA: 337.93 FT PLACEMENT OF GROUND LADDERS OVER TOTAL %OF ROOF COVERED BY PV: 18.69% ROOF PITCH 9.46 DEGREES(2/12)OR LESS, OPENINGS SUCH AS WINDOWS OR DOORS, FIRE SETBACKS ARE NOT REQUIRED AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD ❑ =MECHANICAL VENT OBSTRUCTIONS SUCH AS TREE LIMBS, GUEST CONSTRUCTION WIRES OR SIGNS. S O L R2 3-122 3 O =FLUE/PLUMBING VENT 2. STRUCTURES,PATIO COVERS,AND/OR O MICROINVERTER(1 PER MODULE) 4717 PARKS AVE, LA MESA, ADDITIONS BUILT WITHOUT PERMITS TO BE 9 10 RESOLVED BY A SEPARATE PERMIT. CA, 75002 6 O (16)HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+405 PHONE- (760)712-0382 5 MODULES WITH ENPHASE LIC. NO. - 1085844 IQ8PLUS-72-2-US(240V) UNDER EACH MODULE 11 O (N)JUNCTION BOX(NEMA 3R) 7 CONDUIT RUN;SURFACE MOUNTED(ACTUAL 8 4 4 CONDUIT RUNS TO BE DETERMINED IN FIELD) OS (E)UTILITY METER(UNDERGROUND SERVICE) 3 O MAIN SERVICE PANEL, SQUARE D ALL IN ONE 2 O7 AC DISCONNECT I� O O8 ENPHASE IQ COMBINER BOX Q J PROJECT NAME &ADDRESS ORAPID SHUTDOWN SWITCH JOSEPH LUNA 1 ENPHASE IQ BATTERY; EXACT LOCATION TED, 47316 ABDEL CIR, 10 WILL NOT BE MOUNTED IN DIRECT SUNLIGHT PALM DESERT, CA 92260 APN#: 630-360-008 11 ENPHASE IQ SYSTEM CONTROLLER AHJ: CITY OF PALM DESERT(CA) o LL UTILITY: SCE 'O SYSTEM DETAILS DC SIZE:6.480 KW DC-(STC) CEC AC SIZE:5.871 KW AC (16)HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+405 SLOPE -3° (16)ENPHASE IQ8PLUS-72-2-US(240V) AZIMUTH -280' ROOF 1 MODULE QTY -16 _ RAFTER -2"X4"@ 24"O.C. REVISIONS SURFACE TYPE -TPO REV DESCRIPTION DATE CITY OF PALM DESER DEPARTMENT OF BUILDING 8 SAFETY APPROVED PHOTOVOLTAIC UNDER- TIF 41 .1 SHEET TITLE SITE PLAN DRAWN DATE 12/15/2023 74" DRAWN BY SD N 1 SITE PLAN FRONT OF HOUSE SHEET NUMBER PV-02 SCALE:3/32" = 11-01, PV-02 DISTRIBUTED LOAD CALCULATIONS NOTE: LEGEND CONTRACTOR MODULE HANWHA Q CELLS Q.PEAK DUO BILK ML-G10+405 1. CONTRACTOR/INSTALLER TO VERIFY COMPATIBILITY OF MODULE WEIGHT 48.5 LBS ANY BRANDS OR PRODUCTS SUBSTITUTED OR USED AS -ATTACHMENT POINTS MODULE DIMENSIONS(L"x W") 74"x 41.1" ALTERNATES WITHIN ANY BRAND-SPECIFIC SYSTEMS. TOTAL CITY.OF MODULES 16 CONTRACTOR SHALL SUPPLY AND PRESENT -RAIL TOTAL WEIGHT OF MODULES 776.00 LBS CERTIFICATES OF COMPATIBILITY TO THE BUILDING TYPE OF RACKING UNIRAC SOLARMOUNT OFFICIAL UPON INSPECTION AS NEEDED. -STRUCTURAL MEMBER TYPE OF ATTACHMENT UNIRAC FLASHLOC RM DISTRIBUTED WEIGHT OF RACKING 0.5 PSF 2. REFER TO PV MODULE MANUFACTURER'S INSTALLATION TOTAL WEIGHT OF ARRAY 944.97 LBS INSTRUCTI S O IL P CIN P CI ICATIONS GUEST CONSTRUCTION AREA OF MODULE 21.12 SOFT. - TOTAL ARRAY AREA 337.93 SOFT. 4717 PARKS AVE, LA MESA, DISTRIBUTED LOAD 12.80 PSF CA, 75002 PHONE- (760)712-0382 LIC. NO. - 1085844 6-0"OC ATTACHMENT SPACING 6'-0"OC ATTACHMENT SPACING • CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY • • • • • APPROVED PHOTOVOLTAIC UNDER 30M mca"c,a,rs rxissarasnaarorto auxs"usr es xsn ox rxsso • • PROJECT NAME &ADDRESS • • JOSEPHLUNA 47316 ABDEL CIR, STRUCTURAL MEMBER @ 24"OC STRUCTURAL MEMBER @ 24"OC PALM DESERT, CA 92260 1 .0 TYPICAL ATTACHMENT PLAN PORTRAIT 1 . 1 TYPICAL ATTACHMENT PLAN LANDSCAPE APN#: 630-360-008 PV-03 SCALE: NTS PV-03 SCALE: NTS AHJ: CITY OF PALM DESERT(CA) UTILITY: SCE SYSTEM DETAILS DC SIZE:6.480 KW DC-(STC) CEC AC SIZE:5.871 KW AC (16)HANWHA Q CELLS Q.PEAK DUO BILK ML-G10+405 (16)ENPHASE IQ8PLUS-72-2-US(240V) PV MODULE L-FOOT UNIRAC SOLARMOUNT FLASHLOC RM ATTACHMENT REVISIONS RAIL ACCOMODATES ROOFING SCREWS SIZES#12-15. REV DESCRIPTION DATE FLASHLOC RM 0_ 3/8"HARWARE (PRE-ASSEMBLED) FLASHLOC RM COVER UNIRAC STANDOFF FLASHLOC RM BASE (E)ROOF SURFACE SHEET TITLE ATTACHMENT PLAN M-1 STRUCTURAL SEALANT,ENTIRE BASE(TYP.) & DETAILS ATTACHMENT METHOD SHALL BE (E)STRUCTURAL MEMBER DRAWN DATE 12/15/2023 PER THE MANUFACTURERS SPECIFICATIONS OR PER THE DRAWN BY SD REQUIREMENTS OF THE ENGINEER OF RECORD SHEET NUMBER 2 ATTACHMENT DETAIL 3 FLASHLOC DETAIL PV-03 PV-03 Scale: NTS PV-03 Scale: NTS MICROINVERTER SPECIFICATIONS SOLAR MODULE SPECIFICATIONS AMBIENT TEMPERATURE SPECIFICATIONS CONTRACTOR MANUFACTURER/MODEL# ENPHASE IQ8PLUS-72-2-US(240V) MANUFACTURER/MODEL# HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+405 RECORD LOW TEMP 3°C INPUT POWER RANGE 235W-440W VMP 37.39V AMBIENT TEMP(HIGH TEMP 2%AVG.) 44°C MIN/MAX START VOLTAGE 22V/58V IMP 10.83A NOMINAL AC VOLTAGE 240V VOC 45.34V MINIMUM CONDUIT HEIGHT ABOVE ROOF SURFACE 7/8" MAX CONT.OUTPUT CURRENT 1.21A ISC 11.17A MAX CONT.OUTPUT POWER 1290W ITEMP.COEFF.VOC -0.27%/°K MAX MODULES PER STRING 113(13 MICROINVERTERS) S O L R2 11 2Z4TEM CONTROLLER 3 IS 200A SERVICE ENTRANCE RATED GUEST CONSTRUCTION 2. ALL USB COMMS KIT AND CELL MODEM KIT AS NEEDED 4717 PARKS AVE, LA MESA, 3. IQ BATTERY AND PV BREAKER(S) REQUIRE EATON HOLD DOWN KIT (BRHDK125). CA, 75002 4. ATTENTION: TO PREVENT COMPLICATION BE SURE TO POWER DOWN SYSTEM CONTROLLER 3 CONNECTING THE SHUTDOWN SWITCH PHONE- (760)712-0382 LIC. NO. - 1085844 ROMEX CAN BE USED IN LIEU OF CONDUIT FOR INTERIOR BUILDING AND ATTIC RUNS ONLY.DO NOT USE ROMEX IN CONDUIT OR OUTDOOR ENVIRONMENTS. TO UTILITY GRID (N)ENPHASE COMBINER PANEL L1L2 N NEMA 3R,UL LISTED,125A RATED HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+ (ENPHASE X-IQ-AM1-240-5C) LINE TO SYSTEM (N)AC DISCONNECT 30A (E)BI-DIRECTIONAL 405 CONTROLLER 8 MICROINVERTERS IN STRING 1 IQ GATEWAY VISIBLE,LOCKABLE, M 1-PHASE,3-W METERLITY LABELED AND NON-FUSIBLE, (N)ENPHASE SYSTEM CONTROLLER 3 c LL WIRELESS 240V,NEMA 3R,UL LISTED 200A,NEMA 3R,120/240V LOAD 120V/240V ... ENPHASE Q MODEM COMMS L1 L1 CABLE(S) L2 L2 WcoMMss 200A FACTORY WIRING N N 8 MICROINVERTERS IN STRING 2 (N)JUNCTION BOX G G 600 V,NEMA 3R T UL LISTED L1 2o�zP 2 2 40A/2P w.EwA. 3 PROJECT NAME 8c ADDRESS _ ... _ 40/20Ap JOSEPHLUNA 30A/2P 200 ENPHASE IQ8PLUS-72-2-US(240V) I L1 20A/2P A/21O 47316 ABDEL CIR, MICROINVERTERS ONE UNDER I LZ oM°"Ere PALM DESERT, CA 92260 EACH PANEL(240V) N ' n G i, GEC APN#: 630-360-008 �l V c N #6 AWG BARE CU G AHJ: CITY OF PALM DESERT(CA) ESS HOLD DOWN HREDaREozpER ® UTILITY: SCE rvEC os.is (4)#12 AWG THWN-2 (1,3/4'EMT CONDUIT = SYSTEM DETAILS (E)GROUNDING DC SIZE:6.480 KW DC-(STC) ELECTRODE SYSTEM CEC AC SIZE:5.871 KW AC (16)HANWHA Q CELLS Q.PEAK DUO BILK ML-G10+405 r — (N)ENPHASE (16)ENPHASE IQ8PLUS-72-2-US(240V) 4 RAPID Lz /DC LZ /D11 SHUTDOWN CITY OF PALM DESERT O G G SWITCH DEPARTMENT OF BUILDING 8 SAFETY (2)98 AWG THWN-2 REVISIONS APPROVED PHOTOVOLTAIC UNDER 30M (1)#8 AWG THWN-2 GRND o L1 L1314"EMT CONDUIT DLz Lz ° REV DESCRIPTION DATE oGoG (E)200AI2P MAIN BREAKER R R + BATTERY + BATTERY O1 cHlllLQTw 1R—IRSIINReview. _ _ o �,,..o......,,o..eE^:sue^•a���:......,....4.,w.m. (N)ENPHASE ENPHASE (N)ENPHASE ENPHASE o IQ BATTERY 5P IQ BATTERY 5P o BATTERY BATTERY N G (E)225A MAIN SERVICE PANEL,120/240V,1-PHASE (BACKUP PANEL) SHEET TITLE DESCRIPTION FORMULA I RESULT ELECTRICAL PV+ESS OVERCURRENT PROTECTION CEC 690.9(B) TOTAL INVERTER+ESS OUTPUT CURRENT x 1.25=((16 x 1.21)+(2 x 16))A x 1.25 164.2A(SELECTED OCP RATING=70A) IAG RAM EXPECTED TEMP QTY OF CURRENT CONDUIT MINIMUM CONDUCTOR CONDUCTOR REQUIRED CIRCUIT ADJUSTED NEUTRAL WIRE GAUGE& GROUND WIRE DRAWN DATE 12/15/2023 WIRE ID WIRE TEMP DERATE CARRYING CONDUIT SIZE AMPACITY @ AMPACITY @ CONDUCTOR CONDUCTOR CONDUCTOR (OC) (90°C) CONDUCTORS FILL DERATE (TBD ON SITE) TYPE 90°C(A) 75°C(A) AMPACITY(A) AMPACITY @ 90°C(A) SIZE&TYPE SIZE&TYPE DRAWN BY SD 1 44 0.87 4 0.8 3/4"METAL #10 THWN-2 40 35 12.10 27.84 NONE #8 THWN-2 SHEET NUMBER 2 44 0.87 2 1 3/4"METAL #10 THWN-2 40 35 24.20 34.80 #10 THWN-2 #8 THWN-2 3 44 0.87 2 1 2"METAL #3/0 THWN-2 225 200 64.2 195.75 #310 THWN-2 NONE PV-04 4 44 0.87 2 1 2"METAL #3/0 THWN-2 225 200 64.2 195.75 #310 THWN-2 #6 THWN-2 1-1/1-2 2401 V CONTRACTOR NEC 220.83(B) NEC 220.83(B)(1) Floor area 1 18081 sqft x 3VA/sqft I 5424 VA NEC 220.83(B)(2) Small Appl i 2 circuits x 1500VA/circuit = 3000 VA GUEST CONSTRUCTION Laundry Ci 1 circuits x 1500VA/circuit = 1500 VA 4717 PARKS AVE, LA MESA, CA, 75002 240V Load Breaker Rating VA PHONE- (760)712-0382 LIC. NO. - 1085844 NEC 220.83(B)(3) Appliance 60 11520 Appliance 20 3840 Appliance 20 3840 PROJECT NAME &ADDRESS JOSEPHLUNA 47316 ABDEL CIR, PALM DESERT, CA 92260 APN#: 630-360-008 AHJ: CITY OF PALM DESERT (CA) UTILITY: SCE SYSTEM DETAILS DC SIZE:6.480 KW DC-(STC) CEC AC SIZE:5.871 KW AC (16)HANWHA Q CELLS Q.PEAK DUO BLK M L-G 10+405 (16)ENPHASE IQ8PLUS-72-2-US(240V) REVISIONS Total 19200 VA REV DESCRIPTION DATE CITY OF T OF LM BUILDING Total VA of non-AC loads 29124 VA DEPARTMENT OF BUILDINGR SAFETY APPROVED PHOTOVOLTAIC UNDER 30— First 8kVA at 100% 8000 VA .HI111L III III P« .,,..o.1111E ITI ooa.,.E.111I.EE,o Remainder VA at 40% 8449.E VA SHEET TITLE NEC 220.83(B) Total adjusted VA of non-AC loads 16449.6 VA LOAD 100% of AC unit load 9600 VA CALCULATION 100% of electric furnace load 0 VA DRAWN DATE 12/15/2023 DRAWN BY SD Total VA of AC, electirc Furnace and all other loadsl 26049.E VA SHEET NUMBER Total calculated loadl 108.54 A PV-04. 1 GENERAL NOTES CONTRACTOR 1. EXISTING PLUMBING VENTS, SKYLIGHTS,EXHAUST 13. EACH SOURCE INTERCONNECTION OF ONE OR 23. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES OUTLETS, VENTILATION INTAKE AIR OPENINGS SHALL MORE POWER SOURCES INSTALLED IN ONE SYSTEM SMALLER THAN 6 AWG SHALL BE PROTECTED FROM NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SHALL BE MADE AT A DEDICATED CIRCUIT BREAKER OR PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR SYSTEM. FUSIBLE DISCONNECTING MEANS IN ACCORDANCE [CEC 690.46 & 250.120(C)] 2. EQUIPMENT. INVERTERS, MOTOR GENERATORS, WITH CEC 705.12. 24. AN EQUIPMENT GROUNDING CONDUCTOR SHALL NOT BE GUEST CONSTRUCTION PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, 14. THE;o (R -A 422F3RATING OF THE SMALLER THAN 14 AWG [CEC 690.451 AC PHOTOVOLTAIC MODULES, SOURCE-CIRCUIT OVERCURRENT PROTECTION DEVICES IN CIRCUITS 25. FINE STRANDED CABLES USED FOR BATTERY 4717 PARKS AVE, LA MESA, COMBINERS, AND CHARGE CONTROLLERS INTENDED SUPPLYING POWER TO THE BUSBAR OR CONDUCTOR TERMINALS, DEVICES, AND CONNECTIONS REQUIRE LUGS CA, 75002 FOR USE IN PHOTOVOLTAIC POWER SYSTEMS WITH SHALL NOT EXCEED 120% OF THE RATING OF BUSBAR AND TERMINALS IS IN ACCORDANCE WITH CEC 110.14 PHONE- (760)712-0382 BATTERIES SHALL BE IDENTIFIED AND LISTED FOR THE OR CONDUCTOR IN ACCORDANCE WITH CEC 705.12 26. GROUNDING ELECTRODE CONDUCTOR(S) SHALL BE LIC. NO. - 1085844 APPLICATION [CEC 690.4(B)] 15. A CONNECTION AT EITHER END, BUT NOT BOTH INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT A 3. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R ENDS, OF A CENTER-FED PANEL BOARD IN DWELLINGS SPLICE OR JOINT. IF NECESSARY, SPLICES OR RATED, INCLUDING ALL ROOF MOUNTED TRANSITION SHALL BE PERMITTED WHERE THE SUM OF 125 CONNECTIONS SHALL BE MADE AS PERMITTED BOXES AND NON ROOF SWITCHES. ROOF SWITCHES PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT [CEC 250.64(C)] TO BE NEMA 3R RATED. CURRENT AND THE RATING OF THE OVERCURRENT 27. ALL SMOKE ALARMS, CARBON MONOXIDE ALARMS AND 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED DEVICE PROTECTING THE BUSBAR DOES NOT EXCEED AUDIBLE NOTIFICATION DEVICES SHALL BE LISTED AND AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250. 120 PERCENT OF THE CURRENT RATING OF THE LABELED IN ACCORDANCE WITH UL 217 AND UL 2034. THEY 5. PROTECTION DEVICES FOR PV SOURCE CIRCUITS BUSBAR IN ACCORDANCE WITH CEC 705.12. WILL BE INSTALLED IN ACCORDANCE WITH NFPA 72 AND AND PV OUTPUT CIRCUITS ALSO CONNECTED TO 16. EQUIPMENT CONTAINING OVERCURRENT NFPA 720 [IRC 2019 R314 & R3151 SOURCES HAVING SIGNIFICANTLY HIGHER CURRENT PROTECTION DEVICES IN CIRCUITS SUPPLYING POWER 28. SMOKE ALARMS AND CARBON MONOXIDE ALARMS WILL AVAILABILITY (E.G., PARALLEL STRINGS OF TO A BUS BAR OR CONDUCTOR SHALL BE MARKED TO BE RETROFITTED INTO THE EXISTING DWELLING. THESE MODULES, UTILITY POWER), SHALL BE PROTECTED AT INDICATE THE PRESENCE OF ALL SOURCES IN SMOKE ALARMS ARE REQUIRED TO BE IN ALL BEDROOMS, THE SOURCE FROM OVERCURRENT [CEC 690.9(A)] ACCORDANCE WITH CEC 705.12. OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH PROJECT NAME &ADDRESS 6. PV SYSTEM CIRCUITS INSTALLED ON OR IN 17. CIRCUIT BREAKER, IF BACKFED, SHALL BE SUITABLE FLOOR OF THE HOUSE CARBON MONOXIDE ALARMS ARE JOSEPH LUNA BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FOR SUCH OPERATION IN ACCORDANCE WITH CEC REQUIRED TO BE RETROFITTED OUTSIDE EACH BEDROOM FUNCTION [CEC 690.12] 705.12. AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.THESE 47316 ABDEL CIR, 7. THE UTILITY INTERACTIVE INVERTERS SHALL 18. TO MINIMIZE OVERHEATING OF THE BUSBAR IN ALARMS MAY BE SOLELY BATTERY OPERATED IF THE PALM DESERT, CA 92260 AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE ELECTRICAL ENCLOSURE, THE MAIN CIRCUIT BREAKER PHOTOVOLTAIC PROJECT DOES NOT INVOLVE THE REMOVAL APN#: 630-360-008 CONNECTED ELECTRICAL PRODUCTION AND AND THE PV POWER SOURCE CIRCUIT BREAKER SHALL OF INTERIOR WALL AND CEILING FINISHES INSIDE THE HOME, DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN BE PHYSICALLY LOCATED AT THE OPPOSITE END OF OTHERWISE, THE ALARMS MUST BE HARD WIRED AND AHJ: CITY OF PALM DESERT (CA) THE SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE BUSBAR. INTERCONNECTED. UTILITY: SCE THE ELECTRICAL PRODUCTION AND DISTRIBUTION 19. ALL THE CEC REQUIRED WARNING SIGNS, 29. LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED SYSTEM DETAILS NETWORK VOLTAGE HAS BEEN RESTORED. MARKINGS, AND LABELS SHALL BE POSTED ON AND USED IN ACCORDANCE WITH ANY INSTRUCTIONS DC SIZE:6.480 KW DC-(STC) C SIZE:5.871 KW AC [CEC 705.41] EQUIPMENT AND DISCONNECTS PRIOR TO ANY INCLUDED IN THE LISTING OR LABELING PER NEC. c 6)HANWHAQ CELLS QPEAK DUO BLK ML- 405 8. ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE INSPECTIONS. (16)EN+16) PHASE IQ8PLUS-72-2-US(240V) LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT. 20. WHERE PV SYSTEM DC CIRCUIT'S RUN INSIDE A [CEC 310.10(D)(1)] BUILDING, THEY SHALL BE CONTAINED IN METAL 9. THE MODULE CONDUCTORS MUST BE TYPE USE-2 RACEWAYS TYPE MC METAL CLAD CABLE OR METAL REVISIONS OR LISTED FOR PHOTOVOLTAIC (PV) WIRE ENCLOSURES FROM POINIT OF PNETRATION OF THE REV DESCRIPTION DATE [CEC 690.31(C)] SURFACE OF HFIE13=TooPaUaL STQ T E FIRST READILY 10. ALL CONDUCTORS SHALL BE MARKED ON EACH ACCESSIBLE 1SCVROVED PHOTOVOLTAIC UNOEg3v VM ANS [CEC 690.31(G)]. END FOR UNIQUE IDENTIFICATION. 21. FLEXIBLE, ITNL µ°E=oaas . /� BLES SHALL BE 11. AN INSULATED GROUNDED CONDUCTOR OF 6 AWG TERMINATEDr,N.HsasR o oT�ETaMso�1111J ALS, LUGS, DEVICES OR SMALLER SHALL BE IDENTIFIED AS A CONTINUOUS OR CONNECT F :1t"m:R°°:R��:� .1S ED IN ACCORDANCE WHITE FINISH [CEC 200.6] WITH CEC 11 �......aw- ..... 12. THE OUTPUT OF AN INTERCONNECTED ELECTRICAL 22. CONNECTORS SHALL BE OF LATCHING OR LOCKING SHEET TITLE POWER SOURCE SHALL BE PERMITTED TO BE TYPE. CONNECTORS THAT ARE READILY CONNECTED TO THE LOAD SIDE. INTERCONNECTING ACCESSIBLE AND OPERATING AT OVER 30V DC OR 15V NOTES PROVISIONS FOR OTHER POWER SOURCES SHALL AC SHALL REQUIRE TOOL TO OPEN AND MARKED "DO COMPLY WITH CEC 705.12(B)(1) THROUGH 705.12(B)(5) NOT DISCONNECT UNDER LOAD" OR "NOT DRAWN DATE 12/15/2023 FOR CURRENT INTERRUPTING"[CEC 690.33(C) & (E)(2)]. DRAWN BY SD SHEET NUMBER PV-05 AWARNING SOLAR PV SYSTEM EQUIPPED CONTRACTOR ELECTRICAL SHOCK HAZARD WITH RAPID SHUTDOWN TERMINALS ON THE LINE AND TURN RAPID SHUTDOWN LOAD SIDES MAY BE ENERGIZED SWITCH TO THE SOLAR ELECTRIC PV PANELS IN THE OPEN POSITION "OFF"POSITION TO A�O�/S T — GUEST CONSTRUCTION SHUT LABEL LOCATION:COMBINER PANEL,AC SHOCK HAZARD 4717 PARKS AVE, LA MESA, DISCONNECT,POINT OF INTERCONNECTION IN THE ARRAY PER CODE:CEC 706.15(C)(4),CEC 690.13(B) CA, 75002 PHONE- (760)712-0382 WARNING LABEL LOCATION:MAIN SERVICE DISCONNECT LIC. NO. - 1085844 PER CODE:CEC 690.56(C) TURN OFF PHOTOVOLTAIC AC MAIN PHOTOVOLTAIC DISCONNECT PRIOR TO SYSTEM DISCONNECT WORKING INSIDE PANEL LABEL LOCATION: MAIN SERVICE DISCONNECT,UTILITY METER PER CODE:CEC 690.13(B) LABEL LOCATION:COMBINER PANEL(S),MAIN SERVICE DISCONNECT PER CODE:CEC 110.27(C),OSHA 1910.145(q(7) RAPID SHUTD• PHOTOVOLTAIC POWER SOURCE • ■ SOLAR PV SYSTEM LABEL LOCATION:DC CONDUIT/RACEWAYS LABEL LOCATION:RSD INITIATION DEVICE,AC DISCONNECT PER CODE:CEC 690.31(D)(2) PER CODE:CEC 690.56(C)(2) SOLAR LABEL LOCATION:DC CONDUIT/RACEWAYS A CAUTION PER CODE:CEC 690.31(D)(2) PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED PROJECT NAME &ADDRESS LABEL LOCATION:MAIN SERVICE DISCONNECT PHOTOVOLTAIC SYSTEAC DISCONNECTPER CODE:CEC 705.12(D),CEC 690.59 JOSEPH LUNA RATED AC OUTPUT CURRENT: 19.36 A DO NOT DISCONNECT 47316 ABDEL CIR, NOMINALOPERATING AC VOLTAGE: 1 V UNDER LOADPALM DESERT, CA 92260 LABEL LOCATION:AC DISCONNECT/POINT OF INTERCONNECTION LABEL LOCATION:MAIN SERVICE DISCONNECT APN#: 630-360-008 PER CODE:CEC 690.54 PER CODE:CEC 690.15(B)&CEC 690.33(D)(2) CAUTION AHJ: CITY OF PALM DESERT(CA) AWARNING DUAL POWER SOURCE VOLTAGEMULTIPLE SOURCES OF POWER. MAXIMUM DC UTILITY: SCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM POWER TO THIS BUILDING IS ALSO SUPPLIED SYSTEM DETAILS LABEL LOCATION:MAIN SERVICE DISCONNECT,PRODUCTION/NET METER ■ DC SIZE:6.480 KW DC-(STC) CEC AC SIZE:5.871 KW AC PER CODE:CEC 690.59,705.12(C) • FROM �+ THE FOLLOWING SOURCES WITH (16)HANWHAQ CELLS QPEAK DUO BLK 05 EQUIPM LOCATION:DCDISCONNECT/INVERTER/PVDIST. ML-GlODISCONNECTS LOCATED AS SHOWN. (16)EN+ AS ■ EQUIPMENT (16)ENPHASE IQ8PLUS-72-2-US(240V) PER CODE:CEC 690.53 ADDRESS: 47316 ABDEL CIR, PALM DESERT, CA 92260 REVISIONS DISCONNECTAWARNING LABEL LOCATION:AC DISCONNECT ELECTRICAL SHQg KTYOFPAL ARD REV DESCRIPTION DATE EP RTMENT OF BUILDING 8 SAF TY PER CODE:CEC 690.13(B) APPROVED PHOTOVOLTAIC UNDER 3 OV TERMINALS C�t) AWARNING LOAD SIDES AYE IN THE O Ef '9 w`saEo aEPa'° wT THIS EQUIPMENT FED BY MULTIPLE ffc::;,aw, ;. ...•o•.o...o•• SOURCES: DC VOLTAGE IS TOTAL RATING OF ALL OVERCURRENT SOLAR MODULES ARE EXPOSED TO SUNLIGHT DEVICES EXCLUDING MAIN POWER SHEET TITLE SUPPLY SHALL NOT EXCEED AMPACITY OF BUSBAR LABEL LOCATION:DC DISCONNECT WARNING LABELS PER CODE:CEC 690.13(B) LABEL LOCATION:AC DISCONNECT PER CODE:CEC 705.12(B)(3)(3) Z WARNING MAIN SERVICE DRAWN DATE 12/15/2023 POWER SOURCE OUTPUT PANEL DRAWN BY SD CONNECTION. DO NOT RELOCATE UTILITY METER THIS OVERCURRENT DEVICE. ENPHASE IQ SYSTEM AC COMBINER PANEL CONTROLLER 3 SHEET NUMBER LABEL LOCATION:POINT OF INTERCONNECTION AC DISCONNECT PER CODE:CEC 705.12(B)(3)(2) (02) ENPHASE IQ BATTERY RAPID SHUTDOWN SWITCH PV-06 A B C D E F REFERENCE ONL'Y CONTRACTOR 1 N GUEST CONSTRUCTION 4717 PARKS AVE, LA MESA, 2 CA, 75002 PHONE- (760)712-0382 LIC. NO. - 1085844 3 21-5„ 4 O PROJECT NAME &ADDRESS 0 0 JOSEPHLUNA 5 47316 ABDEL CIR, PALM DESERT, CA 92260 APN#: 630-360-008 /0 AHJ: CITY OF PALM DESERT(CA) 6 UTILITY: SCE SYSTEM DETAILS DC SIZE:6.480 KW DC-(STC) CEC AC SIZE:5.871 KW AC (16)HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+405 (16)ENPHASE IQ8PLUS-72-2-US(240V) 7 REVISIONS LITY OF PALM DESERT REV DESCRIPTION DATE MENT OF--.- Al PROVED PHOTOVOLTAIC UNDER-W 8 r PoE .nwaErarnaaaavmauxaNw.ee�nouE[,o Po.o. 1PUSTW"`RE°"REPa1-1— E FRONT OF HOUSE SHEET TITLE INSTALLATION 9 RESOURCE DRAWN DATE 12/15/2023 DRAWN BY SD 10 SHEET NUMBER PV-07 "DIMENSIONS ARE 2D (FLAT) OPEAK DUO ML-G10+ O PEAK DUO ML-G10+ SERIES S O L R23- 1N ■Mechanical Specification SERIES creel l s12 22 0 Format mm x 1045 mm x 32 Tim(including frame) 0�mm mm Weight 22. kg �- Front Cover 3.2mm thermally pre-stressed glass with °m anti-reflection technology 395-415 Wp 1132 Cel is Back Cover Composite film Frame Black anodised aluminium 211% Maximum Module Efficiency Cell 6 x 22 monocrystalline Q.ANTUM solar half cells Junction box 53-101 min x 32-60mm x 15-18mm Protection class IP67,with bypass diodes a. na°° Cable 4MM2 Solar cable;(+)z1250mm,(-)z1250mm } �mloETata Connector St6ubliMC4;IP68 a:mm °ammT��mm MODEL Q.PEAK DUO ML-G10+ Q.PEAK DUO ML-1310.4 ■Electrical Characteristics POWER CLASS 395 400 405 410 415 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power at MPP' PMPP [W] 395 400 405 410 415 Breaking the 21%efficiency barrier Short Circuit Current' Isc [A] 11.13 11.16 11.19 11.22 11.26 In Q.ANTUM DUO Z technology with zero gap cell layout Open Circuit Voltage' Voc M 45.03 45.06 45.09 45.13 45.16 boosts module efficiency Up t0 21.1%. Current at MPP IMpp [A] 10.58 10.64 10.70 10.76 10.82 Voltage at MPP VMpp M 37.32 37.59 37.85 38.11 38.37 Efficiency' 11 1%] z20.1 z20.4 z20.6 >>-20.9 z21.1 Z� A reliable investment Inclusive 25-year product warranty and 25-year linear MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 Warranty performance warranty'. �g m, Power at MPP PMPP IM 296.4 300.1 303.9 307.6 311.4 E Short Circuit Current Isc [A] 8.97 8.99 9.02 9.04 9.07 Open Circuit Voltage Voc M 42.46 42.49 42.52 42.56 42.59 Enduring high performance f Current at MPP IMpp [A] 8.33 8.38 8.43 8.48 8.53 Long-term yield security with Anti LeTID Technology, Voltage at MPP VMPP M 35.59 35.82 36.04 36.27 36.49 Anti PID Technology2 and Hot-Spot Protect. 'Measurement tolerances PMpp±3%;Isc;Voc±5%at STC:1000W/m2,25±2°C,AM 1.5 according to IEC 60904-3•280OW/m2,NMOT,spectrum AM 1.5 Ocells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE ' Extreme weather rating At least 98%of nominal power 10 as High-tech aluminium alloy frame,certified for S during first year.Thereafter max. z sa ------------------ 0.5%degradation per year.At high snow(5400 Pa)and wind loads(4000 Pa). a least 93.5%of nominal power LL too --+-----,------ �? up to 10 years.At least 86%of w .o nominal power up to 25 years. LL° 5 as Innovative all-weather technology All data within measurement 90 w w as >a tolerances.Full warranties in „1 Optimal yields,whatever the weather with excellent low-light g accordance with the warranty w o ao terms of the Qcells sales so and temperature behaviour. o oa to 15 to =5 organisation of your respective all YEARS country. IRRADIANCE IW/m'1 `8 o 'Standard terms of guarantee for the 5 PV companies with the Typical module performance under low Irradlance conditions In The most horQLl MENooF BUOIN TSAFE Y highest production capacity in 2021(February 2021) comparison to STC condhims(25°C,1000W/m). V ch programme inArov-111-°VO-cUNBEIR TEMPERATURE COEFFICIENTS UL A � 1, Temperature Coefficient of Isc a [%/K] +0.04 Temperature Coefficient of Voc (3 [%/K] -0.27 vl Qcells is the firabj a. ass the o most compreh v1sr 't°. in ffiei idustry:The Temperature Coefficient of PMpp y [%/K] -0.34 Nominal Module Operating Temperature NMOT rq 43±3 i? new"Quality ntrr„t1 "Cs w"°sREalIRLHa.o� erden certification o1 institute TUV Pida13d... ,aw..o..o..._ ■Properties for System Design d 'See data sheet on rear for further information. Maximum System Voltage Vsys [VJ 1000 PV module classification Class II 2 APT test conditions according to IEC/TS 62804-1:2015,method A(-1500V,96h) Maximum Reverse Current IP [A] 20 Fire Rating based on ANSI/UL 61730 C/TYPE2 Max.Design Load,Push/Pull [Pa] 3600/2660 Permitted Module Temperature -40°C-+85°C Max.Test Load,Push/Pull [Pa] 5400/4000 on Continuous Duty ■Qualifications and Certificates Quality Controlled PV- TUV Rheinland; IEC 61215:2016; IEC 61730:2016. UK The[deal solution for: v rv ^ This data sheet complies ^ C E 0 0 with DIN EN 50380. A 91 Rooftop arrays on residential buildings Ocells pursues minimizing paper output in consideration of the global environment. w Note-installation imanictlons must be followed.Contact our technical service for further Information on approved Installation of this product. II Hanwha°CELLS GmbH Sonnenallee 17-21,06766 Bltterteld-Wolfen,Germany I TEL+49(0)3494 66 99-23444 1 FAX+49(0)3494 66 99-23000 1 EMAIL sales@q-cells.com I WEB wwa.gcells.com V ENPHASE IQ8 and IQ8+ Microinverters INPUT 1A 1 A' .1 A:' Commonly used module pairings' W 235-350 235-440 Module compatibility 60-cell/120 half-cell 54-cell/108 half-cell,60-cell/120 half-cell,66-cell/132 half- cell and 72-cell/144 half-cell 3—1 1 223 MPPT voltage range V 27-37 27-45 Operating range V 16-48 16-58 Min./Max.start voltage V 22/48 22/58 Max.input DC voltage V 50 60 L ENPHASE Max.continuous input DC current A 10 12 Max.input DC short-circuit current A 25 ENPHASE 0 0 Max.module I, A 20 IQ8 WARNIN� NIRMNI Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1 x 1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT 1 A' .1 A:' Peak output power VA 245 300 Max.continuous output power VA 240 290 Nominal(L-L)voltage/range2 V 240/211-264 1 Q 8 and I Q 8+ Microinverters Max.continuous output current A 1.0 1.21 Nominal frequency Hz 60 Our newest IQ8 Microinverters are the industry's first microg rid-forming,software defined Easy to install Extended frequency range Hz 47-68 microinverters with split-phase power conversion capability to convert DC power to AC Lightweight and compact with plug-n- power efficiently.The brain of the semiconductor-based microinverter is our proprietary play connectors AC short circuit fault current over 2 application specific integrated circuit(ASIC)which enables the microinverter to operate in 3 cycles Arms grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed Power Line Communication(PLC) Max.units per 20 A(L-L)branch circuit' 16 13 digital logic and has superfast response times to changing loads and grid events,alleviating between components constraints on battery sizing for home energy systems. Faster installation with simple two-wire Total harmonic distortion <5% cabling Overvoltage class AC port III AC port backfeed current mA 30 High productivity and reliability • Power factor setting 1.0 Produce power even when the grid is down* Grid-tied power factor(adjustable) 0.85 leading-0.85lagging More than one million cumulative hours Peak efficiency % 97.7 Part of the Enphase Energy System,I08 IQ8 Series Microinverters redefine of testing CEC weighted efficiency % 97 Series Microinverters integrate with the reliability standards with more than one Class II double-insulated enclosure Night-time power consumption mw 60 IQ Battery,IQ Gateway,and the Enphase million cumulative hours of power-on Optimized for the latest high-powered MECHANICAL DATA ADD monitoring and analysis software. testing,enabling an industry-leading PV modules limited warranty of up to 25 years. Ambient temperature range -40°C to+60°C(-40°F to+140°F) CITY OF PALM DESERT Icro EaaPf TMENT OF BUILDING 85AFETV Relative humidity range 4%to 100%(condensing) APPROVED PHOTOVOLTAIC UNDER 30M AW�cacroSPLSXwLNOEeEuEor eEad anced grid DC Connector type MC4 Dimensions(H x W x D) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.21 CERTIFIED derma Ms w«aE aEp�'° plates or the latest griu—vorrients Weight 1.08 kg(2.38 Ibs) on gura e o suppor a wide range Cooling Natural convection-no fans Connect PV modules quickly and easily IQ8 Series Microinverters are UL listed of rid profiles to IQ8 Series Microinverters using the as PV Rapid Shutdown Equipment and g P Approved for wet locations Yes included Q-DCC-2 adapter cable with conform with various regulations,when Meets CA Rule 21(UL 1741-SA)and IEEE Pollution degree PD3 plug-n-play MC4 connectors. installed according to manufacturer's 1547:2018(UL 1741-SB 3rd Ed.) Instructions. Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Note: Environ.category/UV exposure rating NEMA Type 6/outdoor I08 Microinverters cannot be mixed together with 1 previous generations of Enphase microinverters 0Q7 Series,IQ6 Series,etc)in the same system. CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB 31 Ed.),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 'Only when installed with IQ System Controller 2,meets UL 1741. Certifications This product is UL Listed as PV Rapid Shutdown Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 "IQ8 and IQ8PIus support split-phase,240V installations only. Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)Pairing Pv modules with wattage above the limit may result in additional clipping losses.See the compatibility calculator at https://Iink.enphasezom/module-compatibility. ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters, (2)Nominal voltage range can be extended beyond nominal if required by the utility.(3)Limits may vary.Refer to local requirements to define the number of microin-ners per and other names are trademarks of Enphase Energy,Inc.Data subject to change. I08SP-12A-DS-0067-03-EN-US-2022-12-27 branch in your area. IQ8SP-12A-DS-0067-03-EN-US-2022-12-27 ENPHASE. IQ Combiner 5/5C MODEL NUMBER IQ Combiner 5 with IQ Gateway printed circuit board for integrated revenue grade PV production IQ Combiner 5(X-I0-AM1-240-5) metering(ANSIC12.20±0.5%),consumption monitoring(±2.5%)and IQ Battery monitoring(±2.5%). S O L R2 3 12 2 3 Includes a silver solar shield to deflect heat IQ Combiner 5C with IQ Gateway printed circuit board for integrated revenue grade PV production IQ Combiner 5C(X-IQ-AMi-240-5C) metering(ANSI C12.20±0.5%),consumption monitoring(±2.5%)and IQ Battery monitoring(±2.5%). Includes Enphase Mobile Connect cellular modem(CELLMODEM-M1-06-SP-05)'.Includes a silver solar shield to deflect heat WHAT'S IN THE :• c IQ Gateway printed circuit board IQ Gateway is the platform for total energy management for comprehensive,remote maintenance and management of the Enphase IQ System Busbar 125A busbar with support for 1 x IQ Gateway breaker and 4 x 20A breaker for installing IQ Series Microinverters and IQ Battery 5P IQ Gateway breaker Circuit breaker,2-pole,10 A/15 A I X-IQ-AM1-240-5 Production CT Prewired revenue-grade solid core CT,accurate up to 0.5% _ X-IQ-AM1-240-5C Consumption CT Two consumption metering clamp CTs,shipped with the box,accurate up to 2.5% IQ Battery CT One battery metering clamp CT,shipped with the box,accurate up to 2.5% Q Combiner 5/5 C CTRL board Control board for wired communication with IQ System Controller 3/3G and the IQ Battery SP Enphase Mobile Connect(only with IQ Combiner 5C) 4G-based LTE-M1 cellular modem(CELLMODEM-M1-06-SP-05)with a 5-year T-Mobile data plan The IQ Combiner 5/5C consolidates interconnection equipment into a single enclosure and Accessories kit Spare control headers for CTRL board streamlines IQ Series Microinverters and IQ Gateway installation by providing a consistent, Smart ACCESSORIES AND REPLACEMENT PARTS (NOT INCLUDED, ORDER SEPARATELY) pre-wired solution for residential applications.IQ Combiner 5/5C uses wired control Includes IQ Gateway for communication and is compatible with IQ System Controller 3/3G and IQ Battery 5P. communication and control CELLMODEM-Ml-06-SP-05 4G-based LTE-M1 cellular modem with a 5-year T-Mobile data plan Includes Enphase Mobile Connect CELLMODEM-Ml-06-AT-05 4G-based LTE-Mi cellular modem with a 5-year AT&T data plan The IQ Combiner 5/5C,along with IQ Series Microinverters,IQ System Controller 3/3G,and (CELLMODEM-M1-06-SP-05),only IQ Battery SIP provides you with a complete grid-agnostic Enphase Energy System. with IQ Combiner 5C Circuit breakers(off-the-shelf) Supports Eaton BR210, ,BR2 BR220,BR230,BR240,B breakers and compatible circuit breakers Supports Eaton BR220B,BR2306,and BR2408 circuit breakers compatible with hold-down kit Supports flexible networking:Wi-Fi, Ethernet,or cellular Circuit breakers(provided by Enphase) BRK-10A-2-240V,BRK-15A-2-240V,BRK-20A-2P-240V,BRK-15A-2P-240V-B,and BRK-20A-2P- 240V-B(More details in"Accessories"section) Provides production metering It 6 (revenue grade)and consumption XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 5/5C monitoring XA-ENV2-PCBA-5 IQ Gateway replacement printed circuit board(PCB)for Combiner 5/5C X-IQ-NA-HD-125A Hold-down kit compatible with Eaton BR-B series circuit breakers(with screws) IQ Series Microinverters IQ System Controller 3/3G Easy to install The high-powered smart grid-ready IQ Series Provides microgrid interconnection Mounts to one stud with centered ELECTRICAL SPECIFICATIONS Microinverters(I06,IQ7,and IQ8 Series) device(MID)functionality by brackets Rating 80 A dramatically simplify the installation process automatically detecting grid failures and seamlessly transitioning the home energy Supports bottom,back,and side System voltage 120/240 VAC,60 Hz system from grid power to backup power conduit entry Supports up to four 2-pole branch Busbar rating 125 A - circuits for 240 VAC plug-in breakers Fault curent rating 10 kAIC (not included) 8 D A total PV branch circuits Maximum continuous current rating(input from PV/storage) 64 A CITY OF PALDEPARTMENT OF BUILD NG 8 SAFETY Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series distributed generation(DG)breakers only(not included) APPROVED PHOTOVOLTAIC UNDER 30M Reliable Maximum total branch circuit breaker rating(input) 80 A of distributed generation/95 A with IQ Gateway breaker included tF .„w ;g e 3R IQ Gateway breaker 10 A or 15 A rating GE/Siemens/Eaton included cS66[a IL G w1T11'Rol Production metering CT 200 A solid core pre-installed and wired to IQ Gateway IQ Battery 5P IQ Load Controller y 'jI-- __T, "E""`"""`"` Fully integrated AC battery system.Includes six Helps prioritize essential appliances T Consumption monitoring CT(CT 200 CLAMP) A pair of 200 A clamp-style current transformers is included with the box field-replaceable IQ8D-BAT Microinverters during a grid outage to optimize program coverage included for both IQ Battery metering CT 200 A clamp-style current transformer for IQ Battery metering,included with the box energy consumption and prolong the IQ Combiner SKUs battery life UL1741 listed UL LISTED 5-year limited A plug-and-play industrial-grade cell modem for systems up to 60 microinverters.(Available in the warranty US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in the installation area.) ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at httos://enphase.com/trademark-usage-guideiines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. IQC-5-5C—DSH-00007-1.0—EN—US-2023-05-22 IQC-5-5C—DSH-00007-1.0—EN—US-2023-05-22 Data Sheet Enphase Q Cable Accessories Enphase Q Cable Accessories REGION:Americas CONDUCTOR SPECIFICATIONS Certification UL3003(raw cable),UL 9703(cable assemblies),DIG cable SOL R23-1223 Flame test rating FT4 Compliance RoHS,OIL RES I,CE,UV Resistant,combined UL for Canada and United States ' Conductor type THHN/TH WN-2 dry/wet Enphase The Enphase Q Cable'" and accessories are part of Disconnecting means The AC and DC bulkhead connectors have been evaluated and approved by UL for use as the load-break the latest generation Enphase IQ System'".These disconnect required by NEC 690. QCable Accessories accessories provide simplicity, reliability, and faster Q CABLE TYPES/ORDERING OPTIONS installation times. Connectorized Models Size/Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG/277 VAC 1.3 m(4.2 ft) Portrait 240 Q-12-17-240 12 AWG/277 VAC 2.0 m(6.5 ft) Landscape(60-cell) 240 Q-12-20-200 12 AWG/277 VAC 2.3 m(7.5 ft) Landscape(72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors Enphase Q Cable Field-wireable connector(male) Q-CONN-10M Make connections from any open connector • Two-wire,double-insulated Enphase Q Cable Field-wireable connector(female ) Q-CONN-10F Make connections from any Q Cable open connector is 50%lighter than the previous generation Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Enphase cable • New cable numbering and plug and play Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors,DC connectors,and AC module mount connectors speed up installation and simplify Q Cable sealing caps(female) Q-SEAL-10 One needed to cover each unused connector on the cabling wire management • Link connectors eliminate cable waste Terminator Q-TERM-10 Terminator cap for unused cable ends Enphase EN4 to MC4 adaptor' ECA-EN4-S22 Connect PV module using MC4 connectors to IQ micros with EN4(TE PV4-S SOLARLOK). 150mm/5.9"to MC4. Enphase EN4 non-terminated adaptor' ECA-EII For field wiring of UL certified DC connectors.EN4(TE PV4-S SOLARLOK)to non-terminated cable.150mm/5.9" Field-Wireable Connectors Enphase EN4 to MC4 adaptor(long)' ECA-EN4-S22-L Longer adapter cable for EN4(TE PV4-S SOLARLOK)to MC4.Use with split cell modules or PV modules with short DC cable.600mm/23.6" • Easily connect Q cables on the roof without Replacement DC Adaptor(MC4) Q-DCC-2 DC adaptor to MC4(max voltage 100 VDC) complex wiring Replacement DC Adaptor(UTX) Q-DCC-5 DC adaptor to UTX(max voltage 100 VDC) • Make connections from any open connector and center feed any section of cable within 1.Qualified per UL subject 9703. branch limits CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY • Available in male and fern le CQP OVED PHOTOVOLTAIC UNDER 3OKW TERMINATOR SEALING CAPS Terminator cap for unused cable Sealing caps for unused aggregator ends,sold in packs often and cable connections 11EIk,ISTW1«RE1UtREPa11E1 (Q-TERM-10) (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL t CABLE CLIP Plan to use at least one per Used to fasten cabling to the racking installation,sold in packs of ten or to secure looped cabling,sold in (Q-DISC-10) �� packs of one hundred(Q-CLIP-100) To learn more about Enphase offerings,visit enphase.com ©2020 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Enphase IQ 7A,Enphase IQ Battery,Enphase Enlighten,Enphase IQ E N P H AS E® Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc.Data subject to change. E N P H AS E• To learn more about Enphase offerings,visit enphase.com u 2020-06-26 �./ Enphase P/N: EP20OG-NA-02-RSD , IMO P/N: S116-PEL64R-2-ENP Type4X. S O L R2 3-12 2 3 Enphase Energy System Key Features Shutdown Switch • Enclosed Solar Isolator NO 600VDC, 16A • IP66/NEMA 4X Protection Rating • 2 Pole, 1 String • Grey/Black Enclosure Cover&Handle 8 C E PL508i C&S M IEC1A5 DC-PV2 SI. NCH Technical Data for DC Main Contacts DC Units SI16 DC-PV1 SI16 (acc.tolEC 60947-3) (acc.to UL5081) Rated Thermal Current h. A 16 Rated Insulation Voltage UI 1) V 1000 Rated Insulation Voltage UI 3) V 1500 Distance of Contacts(per pole) mm 8 Rated Operational Current 1, 300V A 16 16 350V A 16 16 400V A 16 16 500V A 16 16 600V A 16 16 Rated Conditional Short Circuit Current kA� 5 Max.Fuse Size gL(gG) A 40 Mechanical Life Ops 10,000 Rated Short-time Withstand Current(1 s)1. A 800 Short Circuit Making Capacity 1,, A 800 Size of Terminal Screw M4 Pz2 Cable Cross Sections(solid Or stranded) mm/AWG 4-16/12-10 Tightening Torque Nm/lb.in 1.7-1.8/9-16 Maximum Operation Ambient Temperature °C 40 to+45 Maximum Storage Ambient Temperature °C -50 to+90 Power Loss at I., (A)/W (16)/1 Contact Resistance per pole 1.75mD 1)Sub,h:at ovenrohage category I to III,pollution degree 3(standartl-irdm ry):Uimp=8W.. 2)Suitable atovervohage category to III,//pollution tlegme 2(min.IP55):Wimp=3W.. Dimen ion8Ae%ENTO OF BUILDING&TSA- 98 �APPPPROVED PHOTOVOLTAIC UNDER 30M 76 52 e5,2 e4,3 Frew ....s�o.,,00Ao�ooaH.M�..e.m..� O Fe En efcal8r�ySVg[a&,ma^,=ouPuu ae . Sh down Switch ION On O M25/20/16/12 1 8 IEC/Aa e0947.3 DC-PV2 In.Series ---CI-- O O For more information visit we-mropc.com Errors and omissions excepted S*wtto change whMoutnmice.©2021 IMO Precisim Connols Ltd REF S116-PEL64R-2-ENP Datasheer 0821 ' SOLARMOUNT ■ii U N I R OPTIMIZED COMPONENTS • 1 • I I • : 11 1 • I I , I11 ' , 1 • I I • , 1 1 '1 I INTEGRATED BONDING&PRE-ASSEMBLED PARTS • , 1 • 1 • •1 , 1, 1 1 • , 1 • • 1 1• • •I , 1 Components are pre-assembled and optimized to reduce installation steps and save labortime.Our now grounding&bonding process eliminates copper wire and grounding INTEGRATED BONDING 1 1 1 1• I , ' 1 , ,• • 1 1 1 • , ', •1 •, •1 •• 1 , •1 1 , 1 1 •, straps or bonding jumpers to reduce costs.Utilize the microinverter mount with a wire MIDCLAMP management clip for an easier installation. END VERSATILITY ;E CAPS ONE PRODUCT-MANY APPLICATIONS Quickly set modules flush to the roof or at a desired tilt angle. Change module INTEGRATED BONDING orientationto portrait orlandscapewhilesecuringalargevarietyofframed modules on SPLICE BAR flat,low slope or steep pitched roofs.Available in mill,clear and dark anodized finishes to outperform your projects financial and aesthetic aspirations. AUTOMATED DESIGN TOOL DESIGN PLATFORM AT YOUR SERVICE lt4 Creating a bill of materials is just a few clicks away with U-Builder,a powerful online ® INTEGRATED BONDING tool that stream I ines the processof designinga code compliant solar mounting system. ® L-FOOT w/T-BOLT Save time by creating a user profile,and recall preferences and projects automatically when you log in.You will enjoy the ability to share projects with customers;there's no need to print results and send to a distributor,just click and share. FRONT INTEGRATED BONDING TRIM MICROINVERTER MOUNT w/ • 1 ', ,• ' WIRE MANAGEMENT o BONDING&GROUNDING E N MECHANICAL LOADING SYSTEM FIRE CLASSIFICATION - UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT 6.111 l]2 1 11 111019 9 1 ILL. I UNMATCHED CERTIFIED ENGINEERING BANKABLE DESIGN rLkMIT 11, i i i. EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION TECHNICAL SUPPORT CERTIFIED QUALITY PROVIDER BANKABLE WARRANTY Unirac's technical support team is dedicated to answering Unirac is the only PV mounting vendor with ISO certifications Dont leave your project to chance, Unirac has the financial questions & addressing issues in real time. An online for 9001:2008, 14001:2004 and OHSAS 18001:2007, strength to back our products and reduce your risk. Have library of documents including engineering reports, which means we deliver the highest standards for fit, peace of mind knowing you are receiving products of FAST INSTALLATION. SUPERIOR AESTHETICS stamped letters and technical data sheets greatly form, and function. These certifications demonstrate our exceptional quality.SOLARMOUNT is covered by a 10 year simplifies your permitting and project planning process. excellence and commitment to first class business practices. limited product warranty and a 5 year limited finish warranty. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I OPTIMIZED COMPONENTS • VERSATILITY • DESIGN TOOLS • QUALITY PROVIDER PROTECT YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN PUB2016MAYIG PRINTEDUPDATE FLASHLOC TM RM ::� N I RA NOTES: 1. ATTACHMENT CAN ACCOMMODATE ROOFING SCREW SIZES #12 - #15. FASTENER SIZE, LENGTH, AND THE STRONGEST ATTACHMENT FOR EVERY FLAT ROOF QUANTITY TO BE SELECTED BY STRUCTURAL ENGINEER OF RECORD WHEN DESIGNING FOR THE SPECIFIC BETTER SOLAR STARTS HERE PROJECT CONSTRUCTION AND CAPACITY. 2. REFER TO THE UNIRAC INSTALLATION GUIDE FOR PROPER USE OF CHEM LINK M1 AND ONE-PART SEALANTS FOR WATER TIGHT INSTALLATION. Unirac's FLASHLOC'm RM is a lightweight, durable, powder-coated cast aluminum roof attachment solution that provides fast,easy installation and helps save labor cost.FLASHLOCT"'Rll$QhIR2 tl1 Z?3ofing materials and is applicable for almost all solar racking form factors. Rigorous mechanical, sealing, and ease-of-install testing djLu has been successfully completed for assurance of long-term reliability. O 3/8" HARDWARE FEATURES (PRE-ASSEMBLED) FLASHLOCTm Technology— no more membrane SKUs or heat welding - - s/ 71/n • Works for all roof types —see Chemlink M-1's compatibility for details COVER • Labor and attachment savings I • Industry-leading install time • 6,600-lb. uplift offset (ultimate) • Includes 8 fastener holes ���•�--�T • � p D � • Attachment can accommodate roofing screw sizes#12 -#15 �`� • 25-year warranty `r J o 0 - / PRODUCT SPECIFICATIONS TOP VIEW�" • 1.511 diameter X 0.94"height • Included hardware: 1 preassembled bolt and washer • Chemlink M-1 and 1-Part included in kit 6%611 13� BASE PART NUMBER DESCRIPTION 310999 FLASHLOC RM KIT 10 *Check with your local distributor for finalized pricing. 15/161 CITY OF DESERT ULTIMATE TEST LOAD (WITH 8 ROOF FASTENERS) DEPARTMENTT OF OF BUILDING PART#TABLE APPROVED PHOTOVOLTAIC UNDER 3OKW • P/N DESCRIPTION UPLIFT ULTIMATE CAPACITY 6,670 Ibs. IALLRED IREP�NR ^EwpoNEE o 310999 FLASHLOC RM KIT SHEAR ULTIMATE CAPACITY 5,760 Ibs. _F — - -- �� PRODUCT LINE: RM DRAWING NOT TO SCALE ii� U N I RAC ALL DIMENSIONS ARE o DRAWING TYPE: ASSEMBLY DETAIL NOMINAL Q 1411 BROADWAY BLVD. NE U_ ALBUQUERQUE,NM 87102 USA DESCRIPTION: FLASHLOC RM KIT PRODUCT PROTECTED BY PHONE: 505.242.6411 ONE OR MORE US PATENTS WWW.UNIRAC.COM REVISION DATE: 6/26/2020 LEGAL NOTICE SHEET ':I ENPHASE. m IQ Battery 5P MODEL NUMBER IQBATTERY-5P-IP-NA The IQ Battery 5P system with integrated IQ Microinverters and battery management system(BMS)with S O L R2 3—12 2 3 battery controller. WHAT'S IN THE :r IQ Battery 5P unit IQ Battery 5P unit(605 T02-US00-1-3) ID cover and conduit cover IQ Battery 5P cover with two conduit covers for left-side and right-side of the unit Bottom mounting bracket and top shield Bottom mounting bracket for mounting bracket on the wall.One top shield required for UL9540A M5 seismic screws Two M5 seismic screws for securing battery unit on bottom bracket M4 grounding screws Two M4 grounding screws to secure top shield on bottom wall-mount bracket M5ID cover grounding screws Two M5ID Cover grounding screws for EMI/EMC requirement Cable ties Six cable ties for securing field cables to the unit CTRL connector Spare CTRL connector without resistor for CTRL wiring CTRL connector with resistor Spare CTRL connector with resistor for CTRL wiring Quick Install Guide(QIG) QIG for instructions on IQ Battery unit installation OPTIONAL r• AND REPLACEMENT PARTS IQ8D-BAT-RMA IQ8D-BAT Microinverter for field replacement IQBattery 5P Powerful 605402-US00-1-3-RMA IQ Battery 5P Battery unit for field replacement Provides 3.84 kVA continuous and B05-CX-0550-0 IQ Battery 5P cover for field replacement The IQ Battery 5P all-in-one AC-coupled system is powerful,reliable,simple,and safe.It 7.68 kVA peak power has a total usable energy capacity of 5.0 kWh and includes six embedded grid-forming Doubles the available power per kWh B05-PI-0550-0 IQ Battery 5P pedestal mount • microinverters with a 3.84 kVA continuous power rating.It provides backup capability and of prior generations of IQ Battery 5P B05-CP-096-0 IQ Battery 5P conduit plates for field replacement.Includes one left-side and one right-side conduit plate installers can quickly design the right system size to meet the customer needs. Includes six embedded IQ8D-BAT B05-WB-0543-0 IQ Battery 513 wall bracket for field replacement.Includes one wall-mount bracket and one top shield Microinverters IQBATTERY-HNDL-5 IQ Battery 5P lifting handles.Includes one left-side and one right-side lifting handle Dimensions Reliable B05-ACFB-080-0 IQ Battery 513 AC filter board for field replacement 15-year limited warranty B05-BMSNA-0490-0 IQ Battery 513 EMS board for field replacement Cools passively with no moving parts B05-CANB-063-0 IQ Battery 513 control communication board for field replacement or fans B05-NICS-0524-0,B05-NUCS-0524-0 IQ Battery 5P control switch preinstalled on the wiring cover for field replacement Uses wired communication for fast r r , and consistent connection ENPHASE 980 mm Updates software and firmware Rated(continuous)output power 3.84 kVA remotely Peak output power 7.68 kVA(3 seconds),6.14 kVA(10 seconds) Nominal voltage/Range 240/211-264 VAC Simple Fully integrated AC battery system Nominal frequency/Range 60/57-63 Hz Installs and commissions easily Rated output current(Q240 VAC) 16 A uppor s Backup, e - onsum tion, Peak output current(@240 VAC) 32 A(3 seconds),25.6 A(10 seconds) ITV OF PALM DE T <550mm 188mm dtinaeA MENToFBUILOIN s Power factor(adjustable) 0.85 leading...0.85lagging ffersAPPROVED PHOTOVOLTAIC IlNDE1t,K r1 L o.. iitltt7 mA1tff1e Maximum output overcurrent protection 20 A per unit O•9 O •o µW "..., o..00Ao ooaH.. E.Em E'o Interconnection Single-phase O O O AC round-trip efficiency 90% Sae Chemistry Lithium iron phosphate(LFP) ,o Top shield Tested to meet UL 9540A,the highest Altitude Up to 2,500 meters(8,202 feet) industry standard for battery safety Mounting Wall-mount or pedestal-mount(sold separately) Enphase o00 0 Q 15 UL UL Uses lithium iron phosphate(LFP) chemistry for maximum safety and 000 0 000 ' longevity 0 00 0o Q 15-year LISTED UL9540A limited Certified o � o warranty Bottom mounting bracket ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at httos://eni)hase.com/trademark-usaoe-guidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. IQB-5P-DSH-00010-1.0-EN-US-2023-05-22 'Supported to both grid-connected and backup/off-grid operation 2 AC to the battery to AC at 50%power rating IQB-5P-DSH-00010-1.0-EN-US-2023-05-22 ENPHASE. IQ System Controller 3/3G MODEL , IQ System Controller 3 streamlines grid-independent capabilities of PV and storage installations. F0D111C240lJS01 Integrates hold-down capability.Supports up to 40 kWH(without PCS*)and 80 kWh(with PCS*) E)ENPHASE S O L R2 3—1 2 2 3 IQ Battery 5P. Does not support generator integration IQ System Controller 3G streamlines grid-independent capabilities of PV and storage installations. SC200G111C240US01 Integrates hold-down capability.Supports up to 20 kWH(without PCS*)and 40 kWh(with PCS*) IQ Battery 5R Supports generator integration WHAT'S IN THE :r IQ System Controller 3/3G Includes neutral-forming transformer(NFT)and microgrid interconnect device(MID) System Shutdown Switch Includes pre-wired red,black,orange and purple 12 AWG wire(EP200G-NA-02-RSD) Wall-mounting bracket Screws provided in the accessories kit for mounting 4-pole circuit breaker Pre installed Quad breaker(BRK-20A40A-4P-24OV),20 A-40 A,10 kAIC,Eaton BQC2202402 Accessories Kit IQ System Controller 3/3G literature kit,including labels,CTRL headers,screws,filler plates,and QIG(EP200G-LITKIT) OPTIONAL O• CT-200-SPLIT 200 A split core current transformers for metering(accuracy:±2.5%)' QSyst e m Controller 3/3G Easy to Install CT-200-CLAMP 200 A clamp-type current transformers for metering(accuracy:±2.5%)' • Connects to service entrance'or main Circuit breakers(order separately,as needed)4: Circuit breakers(order separately,as needed)5: The Enphase IQ System Controller 3/3G connects the home to grid power,the IQ Battery load center BRK-10oA-2P-240V:Main breaker,2-pole,100A,25kAIC,CSR210ON BRK-20A-2P-24oV-B:Circuit breaker,2-pole,20 A,10 kAIC,BR220B/BR220 system,and solar PV.It provides microgrid interconnect device(MID)functionality by Includes neutral-forming transformer or CSR2100 BRK-30A-2P-240V-B:Circuit breaker,2-pole,30 A,10 kAIC,BR230 • automatically detecting and seamlessly transitioning the home energy system from grid power BRK-125A-2P-24oV:Main breaker,2-pole,125A,25kAIC,CSR2125N BRK-40A-2P-240V-B:Circuit breaker,2-pole,40 A,10 kAIC,BR240B/BR240 to backup power in the event of a grid failure.It consolidates interconnection equipment into a Mounts on single stud with centered BRK-150A-2P-24OV:Main breaker,2-pole,150A,25kAIC,CSR215ON BRK-60A-2P-240V:Circuit breaker,2-pole,60 A,10 kAIC,BR260 single enclosure and streamlines grid-independent capabilities of PV and storage installations by brackets BRK-175A-2P-240V:Main breaker,2-pole,175A,25kAIC,CSR2175N BRK-80A-2P-24oV:Circuit breaker,2-pole,80 A,10 kAIC,BR280 providing a consistent,pre-wired solution for residential applications. Provides conduit entry from bottom, BRK-200A-2P-24oV:Main breaker,2-pole,200A,25kAIC,CSR220ON f left,or right EP20OG-HNDL-R1 IQ System Controller 3/3G installation handle kit(order separately) Includes color-coded wires for ease of CTRL-SC3-NA-01 Control cable,500 ft.spool(order separately) wiring System Shutdown Switch ELECTRICAL SPECIFICATIONS Integrates hold-down functionality to eliminate the need for hold-down kits Nominal voltage/Range(L-L) 240 V-e/±20% and special breakers Voltage measurement accuracy ±1%V nominal(±1.2V L-N and±2.4V L-L) Auxiliary(dry)contact for load control,excess PV control,and generator 24 V,1 A IQ Series Microinverters IQ Battery 5P Flexible two-wire control The high-powered smart grid-ready IQ Series Fully integrated AC battery system.Includes six Can be used for Sunlight Backup, Nominal frequency/Range 60 Hz/56-63 Hz Microinverters(M Series,IQ6,IQ7,and IQ8 field-replaceable IQ8D-BAT microinverters Home Essentials Backup,or Full Energy Series)dramatically simplify the installation Independence Frequency measurement accuracy ±0.1 Hz process IQ System Controller 3 integrates with Maximum continuous current rating 160 A IQ Battery 513 Maximum input overcurrent protection device 200 A IQ System Controller 3G integrates Maximum output overcurrent protection device 200 A with select AC standby ge erators.See CITY OF PALM DESERT Gerl my—T OF BUILD-toffFtch Brief for a Maximum overcurrent protection device rating for generator circuit 80 A(IQ System Controller 3G only-SC200G111C240US01) IIS}AQ'ROVED PHOTOVOLTAIC UNDER]OKW Lo lJJ o ° o o Maximum overcurrent protection device rating for storage circuit 2x 80 A(IQ System Controller 3-SC200D111C240US01),1x 80 A(IQ System Controller 3G- .o` SC200G111C240US01) M K s;FgN o�a.oNNPa.. E Maximum overcurrent protection device rating for PV combiner unit 80 A REIUIRE IQ Combiner 5/5C IQ Load Controller ........ Consolidates PV interconnection equipment afe and Reliable Internal busbar rating 200 A Helps prioritize essential appliances into a single enclosure and streamlines IQ Series during a grid outage to optimize System Shutdown Switch can be Neutral-forming transformer(NFT) Microinverters and IQ Gateway installation by energy consumption and prolong used to disconnect PV,battery,and Maximum continuous unbalance current: s A @ 12o v providing a Consistent,pre-wired solution for batter life Breaker rating(pre-installed):40A between L7 and Neutral;40A Peak rated power:8,800 VA for 30 seconds Y generator systems between L2 and Neutral Peak unbalanced current:80 A @ 120 V for 2 seconds residential applications It acts as a rapid shutdown initiator of Continuous rated power:3,600 VA Enphase grid-forming IQ8 PV Microinverters for safety of maintenance technicians/first ' ® responders 10-year limited LISTED 10-year limited warranty warranty (2)Factory installed quad breaker(Siemens or Eaton).NFT pre-wired to 40 A terminal of the quad breaker. ©2023 Enphase Energy.All rights reserved.En phase,the a and CC logos,IQ,and certain other marks listed at (3)Two unit of CT-200-SPLIT or CT-200-CLAMP to be bought separately for generator integration https://en phase.com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the US and other countries.to change. (4)The IQ System Controller 3 is rated at 22 kAIC. Data subject (1)IQ System Controller 3 is not suitable for use as service equipment in Canada. 1 9 (5)Integrated hold down kit also support breakers(BR220/BR230/BR240)without predrilled hole. IQSC-3-DSH-00021-1.0-EN-US-2023-05-22 (6)"-"indicates alternating current(AC)supply. IQSC-3-DSH-00021-1.0-EN-US-2023-05-22 (*)Power Control System SOLR23-1223 I WIN MCPHERSON MOPE ENGINEERING Structural Analysis Report For Photovoltaic System Addition to Existing Structure PROFESS/N cp At 8208s Z [^o x _3/31/24 The LUNA Residence ��9 / \` 47316 ABDEL CIR rF OF CAOF�� PAL DESERT, CA 92260 Digitally sealed by RJM on 12/27/23 Designed in Accordance with CBC 2022, ASCE 7-16 Date. 12/2 7/2 3 CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY Job#: 23-17065 APPROVED PHOTOVOLTAIC UNDER 30M E.O.R.: Ryan McPherson, P.E. 9240 Limonite Ave 1"I11� ..11......Eo.T"T' 11 "„sTw q aEIL RE P� FROM,E Jurupa Valley, CA 92509 Po E . Mobile: (909) 566-0066 Email: SE@mcpe.group 1 of 7 12/27/2023 3:13 PM ©McPherson Engineering �MCPHERSON By: A.C. ENGINEERING Date: 12/27/23 Table Of Contents SOLR23-1223 Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 *Note: This engineering report is limited to the information presented to Engineer via plans, site information, photos, and written correspondence as provided by Client. On-site structural observations and verification of site conditions are not included herein. Engineering for manufactured products such as photovoltaic modules or racking systems is excluded from this report. Please refer to the manufacturer's specifications, certifications, and re-engineCITY ereDESERT for product engineering. Installations of solar modules and related a Ug�n OVEUENOTOVOLT OF A,CUNDING DS{I�FEpTY packages p g� g• q df}ROVED PHOTOVOLTAID UNDERSdkVJ performed in accordance with manufacturer recommendations, local codes, industry best practices, and applicable safety standards. Owner and/or Cont � Ea""'"°�°`"°°°°�°""`""'°`�"°"'""° Engineer should any damage, deterioration, or descrepancies between curre ''EwKLSaEp°'RuT"" ..E� structure or otherwise as this letter describes before proceding with constru applies only to regions of the structure where solar modules will be supported and the supporting elements. 2of7 12/27/2023 3:13 PM ©McPherson Engineering McPHERSON By: A.C. 10s I ENGINEERING Date: 12/27/23 Project Info SOLR23-1223 Location: 47316 ABDEL CIR PAL DESERT, CA 92260 Existing Structure Info: Number of Stories= 1 Aroof= 1800 sq.ft. Roof Square Footage A3ra fir = 0 sq.ft. Third Floor Square Footage(if applicable) A2na fir = 0 sq.ft. Second Floor Square Footage(if applicable) Site Properties: Lattitude = 33.705311 Longitude= -116.378696 SS = 1.500 S, = 0.600 Exposure Category= B Ult. Wind Speed = 130 m.p.h. P.V.Array Info: Model = HANWHA Q.PEAK DUO BILK ML-G10+405 Height of Panel = 74.00 in. Width of Panel = 41.10 in. Area of Panel = 21.1 ft.2 Number of New Panels= 16 Number of Exis. Panels = 0 Total Area of Array= 337.9 ft.2 Spacing of Anchors= 6.0 ft. max. on center rows of racks per panel = 2 CITY PAL Panel Tilt= 7-27 deg DEPARTM NTT OF BUILDING BTSAFETY APPROVED PHOTOVOLTAIC UNDER 30M 3of7 12/27/2023 3:13 PM ©McPherson Engineering McPHERSON By: A.C. 10s I ENGINEERING Date: 12/27/23 Gravity Loads SOLR23-1223 Existing Loads: Roof Design Loads: Roofing= 4.0 p.s.f. Composition roofing Sheathing= 1.5 p.s.f. 1/2" Plywood Framing= 1.5 p.s.f. 2x4 Rafters Misc= 1.0 p.s.f. DLri = 8.0 p.s.f. Roofing Dead Load (applied to top of rafters/trusses only) Ceiling= 2.0 p.s.f. Drywall and framing DLr2 = 10.0 p.s.f. Total Existing Roof Dead Load LLr = 20.0 p.s.f. Roof Live Load (Per C.B.C,Table 1607.1) SL = 0.0 p.s.f. Snow Load Floor Design Loads: (if applicable) Flooring= 10.0 p.s.f. Weight of floor finish Sheathing= 2.2 p.s.f. 3/4" plywood Framing= 2.0 p.s.f. 2x framing or manufactured floor truss Interior Partitions= 15.0 p.s.f. 2x framed walls with drywall finish each side Ceiling= 5.0 p.s.f. Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f. Total Existing Floor Dead Load Proposed Loads: Panels= 2.8 p.s.f. weight of panels including rack system DLrl_proposed = 10.8 p.s.f. Proposed Roof Dead Load (applied to top only) DLr2_proposed = 12.8 p.s.f. Total Proposed Roof Dead Load LLr proposed — 0.0 p.s.f. Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less,1607.13.5.1 item 1 Exception Check Proposed Gravity Loads: CITYT OF BUILDING DESERT DEPARTMENT OF BUILDING 8 SAFETY APPROVED PHOTOVOLTAIC UNDER 30M Total Existing Roof LoadP, Wex = (DLrf + LLr) (Aroof) = 50.4 ips E kDSTw,«REo IREPaRR Ew. ` Total Proposed Roof Load Wprop — (DLr1 + LLr) (Aroof-Aarray) + (DL0_proposed+ LLr proposed) (Aarray) — 44.6 kips Proposed Load Demand W prop- Wex = -11.54% TOTAL DECREASE IN GRAVITY LOADS, PANELS OKI Wex 4of7 12/27/2023 3:13 PM ©McPherson Engineering �MCPHERSON By: A.C. MOPE I ENGINEERING Date: 12/27/23 Lateral Loads SOLR23-1223 Seismic Design Parameters Risk Category= 2 Per Table 1-5-1 R= 6.5 Response Modification Factor(Table 12-2.1) Site Class = D Per 11.4.2 le = 1 Seismic Importance Factor(Table 1.5-2) Ss= 1.50 Short Period P.G.A. Si = 0.60 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa= 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement#1 Tables used for Fa and Fv Fv = 1.70 Site Coefficient per Table 11.4-2 (note:section 11.4.8 Exception#2 calc used) SMS = SDS Fa = 1.80 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD, Fv = 1.02 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMs) = 1.20 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) = 0.68 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) T= Ct(hn)x per Eq. 12.8-7 hn = 15 ft Ct = 0.02 (per table 12.8-2) x= 0.75 (per table 12.8-2) T= 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient(Per 12.8.1.1) CS = (SDS le)/R = 0.18 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = 1.5*(SD1 le)/R T = 1.03 Max.Seismic Response Coefficient Per Eq. 12.8-3 if T <_ TL Cs2 = 0.01 Min.Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS le = 0.05 Min.Seismic Response Coefficient Per Eq. 12.8-E CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY Cs3 = 0.5 S1 le/R = 0.05 Min.Seismic Response Coefficient Per Eq. 12.8-E if S RPRROVED PHOTOVOLTAIC UNDER 30M Cs = 0.18 Design Seismic CoefficientP, Check Additional Base Shear Wexisting = 18.0 kips Weight of Existing Structure Wpaneis = 0.9 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 3.3 kips Roof Level Shear of Existing Structure Vpaneis = Cs Wpaneis= 0.2 kips Additional Roof Level Shear of Proposed Panels Vpaneis = 5.25% < 10% PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT Vexisting REQUIRE SEISMIC RETROFIT, PANELS OKI 5of7 12/27/2023 3:13 PM ©McPherson Engineering McPHERSON By: A.C. 10s I ENGINEERING Date: 12/27/23 Wind Uplift Anchorage Rooftop Solar Panels Wind Pressures(Section 29.4,ASCE 7-16) SOLR23-1223 Vuit = 130 mph K,= 1.00 (sec 26.8.2) h = 15 ft Exposure Category= B KZ= 0.57 (sec 26.10.1) Roof Zone = 2 Kd= 0.85 (sec 26.6) Roof 6= 7-27 deg Ke= 1.00 (sec 26.9) qh=0.00256 KZ K, Kd Ke Vz qh= 20.96 (eq.26.10-1) GPp= -2 uplift yE= 1.5 (sec 29.4.4) ya= 0.69 (fig 29.4-8) Flush Mounted Panels-ASCE Section Flat Roof Panels-ASCE Section 29.4.3 29.4.4(where applicable) (where applicable) yE= 1.5 FIG 29.4-7) yc= 0.97 (fig 29.4-7) hpt= 0 ya= 0.69 (fig 29.4-8) Yp= 0.9 (fig 29.4-7) w= 0.00 deg(panel tilt) GPp= -2 uplift GCrn,= 1.4 uplift p = qh(GPp) YE Ya (eq 29.4-7) p = qh(GC,.) YE Yc Yp (eq 29.4-6) p = -43.6 p.s.f. p = 38.4 p.s.f. Check Anchorage to Existing Structure 0.6DL-0.6W controlling load combination(eq. 16-15 for ASD) DL= 2.8 p.s.f. dead load of panel (inlcuding rack system) W= 43.6 p.s.f. wind load normal to face of panel Arealag = 18.5 sq.ft. area tributary to each anchor SPanc = 6.0 ft. spacing of anchors P,plift=Arealag (0.6DL-0.6W) = 452.8 Ibs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag= 2.5 in. min. penetration to existing framing CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY ^ Wiag = 266 lb/in. withdrawal load per in.of penetration p er ROVED PHOTOVOLTAIC UNDLVU CD = 1.6 load duration factor for wind per N GoraMcEo°a:.E Ct= 0.8 temperature factor per NDS Table 2. .3Ea�I HR AGa�TOT„ETERNSOFTHEP NOscrews= 2 number of screws in withdrawal ...m.�°° as.w Noo�uPaN�I III ^Ew° E Fallow=Penlag(Wlag CD Ct) * Noscrews= 1702.4 Ibs total allowable withrawal on anchor Puplift = 0.27 < 1.00 Anchor is OKI Pallow Anchorage = USE (2) 5/161N. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/2.51N. MIN. PENETRATION 6of7 12/27/2023 3:13 PM ©McPherson Engineering OsMCPHERSON By: A.C. ENGINEERING Date: 12/27/23 Summary SOLR23-1223 Gravity Loads: DEMAND DECREASED BY 11.54% = OK! Lateral Loads: DEMAND INCREASED BY 5.25%< 10% = OK! Anchorage: DEMAND OF 452.81-13. < CAPACITY OF 1702.41-13. = OK! USE (2) 5/161N. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/2.51N. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OK! CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY APPROVED PHOTOVOLTAIC UNDER 30M 7of7 12/27/2023 3:13 PM ©McPherson Engineering Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If an)SQLrR2 @2e43se design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements Zd The photovoltaic system size is 30kW AC CEC rating or less. L�1 , The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. B/ The photovoltaic system is utility interactive. Permit application and declaration is completed and attached. 2. Planning Department Requirements ❑ Existing MPU Amps Doubling,e.g., 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. E( Maximum height of"tilted"panels shall not exceed eighteen (18)inches. FY j All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. L�( Modules shall be flush with one another and gaps between panels shall be minimized. Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. /3. Electrical Requirements Lam' No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter Ly For central inverter systems: No more than two inverters are utilized. dj The PV system is connected to the load side of the utility distribution equipment. d A Solar PV Standard Plan and supporting documentation is completed and attached. / 4. Structural Requirements P' A completed Structural Criteria and supporting documentation is attached Wind and Seismic if required . CITY OF PALM DESERT DEPARTMENT OF BUILDING 8 SAFETY 5. Fire Safety Requirements APPROVED PHOTOVOLTAIC UNDER 30M Clear access pathways provided. EAIPLIAIIIAGIIII PE� E11 E° Fire classification photovoltaic system is provided 111—ISTw,«REIURE-1 1— A diagram of the roof layout of electrical panels, modules, clear access pathways an1eILTYc„Ep xim..° oNFPOMT„ All required marking and labels are provided. � g y p p y approxlma e oca Ions of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature: 'A�ur�d Date: 12/11/2023 Project Address: 47316 ABDEL CIR,PALM DESERT,CA92260 Updated February 2023